a1... · f1 as mh e10 mh d2 as e12 d1 f11 f9 f10 p1 as p2 e11 p3 p4 as ph11 p5 e9 p6 as as as as as...
TRANSCRIPT
S43
500m250m100m0
Q8
AS
Q4 Flammability Meter
AS
Q6
Q7
Q5
AS
H6 NY303
NY304
AS
Q2 Flammability Meter
AS
TR15 Flammability Meter AS
NY7
AS
AS
AS HS2
H3
H4
H5
AS
AS
F8
F7
F6
F5
F4
F3
F2
F7 Flammability Meter
F1
AS
MHE10
MH
D2
AS
E12D1
F11
F9
F10
P1
AS
E11P2
P3
P4
AS PH11
P5E9
P6
AS
AS
AS
AS
AS
E4
E5Q1
P8
P9
P7
P10 E6
G1
G2E7
E8 G5
G4
E2
E3
C6B1B2B3B4
A1
A3A4
A5
A6
SAMPLEROOM
Tilt Plate Seperator
C5 Flammability Meter
C Flammability Meter
Butakon Pumping Station
D4
C1
C Drain Flammability Meter
AS
Corridor Pumping Station
AS
AS
A7
Site Penstock Outfall
Website: www.sembcorp.co.ukTel: +44 (0) 1642 212000For illustration and publicity purposes only. This Map should not be used or relied upon for commercial use and must not be loaned or copied without the consent ofSembCorp Utilities UK Limited. Contains information reproduced with permission/provided under license from third parties. All relevant rights reserved and respected. E-Mail: [email protected]
Reference
Title
DateScale
DATEAPP.CHK'DDRAWNALTERATIONREV
Size
A1Revision
GIS-00-L-02663
APPLICATION DOCUMENT REFERENCE No. 4.10INDICATIVE DRAINAGE PLAN SHEET 2 of 3
09/11/17 11:55001 FIRST ISSUE PS
521,00.00N
458,
000.
00E
Reproduced by permission of Ordnance Survey on behalf of HMSO Crown Copyright and Database right 2005. All rights reserved. Ordnance Survey License No. 100050351.
N
E
S
W
Tees Combined-Cycle Power Plant (CCPP) Order
Infrastructure Planning(Applications: Prescribed Forms and Procedures)
Regulations 2009 - Regulation 5(2)(o)
KEY
THE ORDER LIMITS
EXISTING DRAINAGE CONNECTION