a3d a creative legacy: balfour beatty handout

15
Building the A3 Hindhead Tunnel by Balfour Beatty

Upload: karen-cropper

Post on 16-Apr-2015

25 views

Category:

Documents


5 download

DESCRIPTION

This document was produced by Balfour Beatty in relation to the building of the A3 Hindhead Tunnel for the school group focusing on the theme of the engineering works. For more information about the A3D A Creative Legacy project see http://a3dhindhead.tumblr.com/

TRANSCRIPT

Page 1: A3D A Creative Legacy: Balfour Beatty handout

Building the A3 Hindhead Tunnel

by Balfour Beatty

Page 2: A3D A Creative Legacy: Balfour Beatty handout

Why was the tunnel built?

Reduce traffic jams

Minimise accidents

Make Hindhead village quieter

and safer

A3 Hindhead Presentation 2012

Page 3: A3D A Creative Legacy: Balfour Beatty handout

Then and now

A3 Hindhead Presentation 2012

April 2007

July 2010

Page 4: A3D A Creative Legacy: Balfour Beatty handout

Then and now

A3 Hindhead Presentation 2012

Before

During

Page 5: A3D A Creative Legacy: Balfour Beatty handout

Then and now

A3 Hindhead Presentation 2012

After

Page 6: A3D A Creative Legacy: Balfour Beatty handout

Giving the A3 back to nature

A3 Hindhead Presentation 2012

No more tarmac

Removing the tarmac

Page 7: A3D A Creative Legacy: Balfour Beatty handout

What did Balfour Beatty think about before building the tunnel?

A3 Hindhead Presentation 2012

Wildlife!

What sort of wildlife do you think we found?

Page 8: A3D A Creative Legacy: Balfour Beatty handout

Designing the tunnel

A3 Hindhead Presentation 2012

Started in 2002

Page 9: A3D A Creative Legacy: Balfour Beatty handout

Designing the tunnel

A3 Hindhead Presentation 2012

Page 10: A3D A Creative Legacy: Balfour Beatty handout

Clearing the land

A3 Hindhead Presentation 2012

Started in 2007

Page 11: A3D A Creative Legacy: Balfour Beatty handout

Digging the tunnel and building underpasses

A3 Hindhead Presentation 2012

Started in 2008

Page 12: A3D A Creative Legacy: Balfour Beatty handout

The tunnel breakthrough

A3 Hindhead Presentation 2012

February 2009

Page 13: A3D A Creative Legacy: Balfour Beatty handout

Building junctions and bridges

A3 Hindhead Presentation 2012

Started in 2009

Soil nails to hold back the earth

Page 14: A3D A Creative Legacy: Balfour Beatty handout

The finishing touches

A3 Hindhead Presentation 2012

Started in 2010

Page 15: A3D A Creative Legacy: Balfour Beatty handout

The tunnel opened in July 2011

A3 Hindhead Presentation 2012

• Thetunnelcost£371milliontobuild

• Thetunnelis1.8kmlong,that’sthesameas15footballpitches

• 856newroadsignshavebeeninstalled

• 1243potsofpaintwereusedtopaintthetunnel

• 4,752peoplehaveworkedonthescheme

• 179reptilesweremovedtoaplaceofsafety,awayfromthebuildingworks

• 7dormousebridgeswerebuilt

• Someofthetreesremovedduringsiteclearancewereusedtomakemastsforsailingboats

• 200,000newtreesandshrubshavebeenplanted