Page 1: A3D A Creative Legacy: Balfour Beatty handout

Building the A3 Hindhead Tunnel

by Balfour Beatty

Page 2: A3D A Creative Legacy: Balfour Beatty handout

Why was the tunnel built?

Reduce traffic jams

Minimise accidents

Make Hindhead village quieter

and safer

A3 Hindhead Presentation 2012

Page 3: A3D A Creative Legacy: Balfour Beatty handout

Then and now

A3 Hindhead Presentation 2012

April 2007

July 2010

Page 4: A3D A Creative Legacy: Balfour Beatty handout

Then and now

A3 Hindhead Presentation 2012

Before

During

Page 5: A3D A Creative Legacy: Balfour Beatty handout

Then and now

A3 Hindhead Presentation 2012

After

Page 6: A3D A Creative Legacy: Balfour Beatty handout

Giving the A3 back to nature

A3 Hindhead Presentation 2012

No more tarmac

Removing the tarmac

Page 7: A3D A Creative Legacy: Balfour Beatty handout

What did Balfour Beatty think about before building the tunnel?

A3 Hindhead Presentation 2012

Wildlife!

What sort of wildlife do you think we found?

Page 8: A3D A Creative Legacy: Balfour Beatty handout

Designing the tunnel

A3 Hindhead Presentation 2012

Started in 2002

Page 9: A3D A Creative Legacy: Balfour Beatty handout

Designing the tunnel

A3 Hindhead Presentation 2012

Page 10: A3D A Creative Legacy: Balfour Beatty handout

Clearing the land

A3 Hindhead Presentation 2012

Started in 2007

Page 11: A3D A Creative Legacy: Balfour Beatty handout

Digging the tunnel and building underpasses

A3 Hindhead Presentation 2012

Started in 2008

Page 12: A3D A Creative Legacy: Balfour Beatty handout

The tunnel breakthrough

A3 Hindhead Presentation 2012

February 2009

Page 13: A3D A Creative Legacy: Balfour Beatty handout

Building junctions and bridges

A3 Hindhead Presentation 2012

Started in 2009

Soil nails to hold back the earth

Page 14: A3D A Creative Legacy: Balfour Beatty handout

The finishing touches

A3 Hindhead Presentation 2012

Started in 2010

Page 15: A3D A Creative Legacy: Balfour Beatty handout

The tunnel opened in July 2011

A3 Hindhead Presentation 2012

• Thetunnelcost£371milliontobuild

• Thetunnelis1.8kmlong,that’sthesameas15footballpitches

• 856newroadsignshavebeeninstalled

• 1243potsofpaintwereusedtopaintthetunnel

• 4,752peoplehaveworkedonthescheme

• 179reptilesweremovedtoaplaceofsafety,awayfromthebuildingworks

• 7dormousebridgeswerebuilt

• Someofthetreesremovedduringsiteclearancewereusedtomakemastsforsailingboats

• 200,000newtreesandshrubshavebeenplanted