actual situation, potential, development on the corridor ......• project/product trains (e.g....
TRANSCRIPT
![Page 1: Actual situation, Potential, Development on the corridor ......• Project/product trains (e.g. Suzhou-Warszawa) • Network trains (consolidation on the border) European main clients](https://reader034.vdocument.in/reader034/viewer/2022050323/5f7d734a9b53a16fd444b57e/html5/thumbnails/1.jpg)
Actual situation, Potential, Development on the corridor Asia – Europe April 2015
![Page 2: Actual situation, Potential, Development on the corridor ......• Project/product trains (e.g. Suzhou-Warszawa) • Network trains (consolidation on the border) European main clients](https://reader034.vdocument.in/reader034/viewer/2022050323/5f7d734a9b53a16fd444b57e/html5/thumbnails/2.jpg)
MAIN ROUTES
UTLC opens a chance to
combine all routes between Asia and Europe to an efficient railway system.
![Page 3: Actual situation, Potential, Development on the corridor ......• Project/product trains (e.g. Suzhou-Warszawa) • Network trains (consolidation on the border) European main clients](https://reader034.vdocument.in/reader034/viewer/2022050323/5f7d734a9b53a16fd444b57e/html5/thumbnails/3.jpg)
Belgium, Denmark, Netherlands, Romania -Core areas: Poland, Slovakia, Germany -Areas in development: Czech republic, Sweden, Austria, Italy, Switzerland, -Emerging areas: France, Finland, United Kingdom, Spain
-Stagnating areas: Hungary, Slovenia, Croatia, Serbia, Bosnia & Herzegovina, Bulgaria
-Potential new areas: Turkey & other south-east European countries
OVERVIEW OF TRANSIT SERVICE AREAS
![Page 4: Actual situation, Potential, Development on the corridor ......• Project/product trains (e.g. Suzhou-Warszawa) • Network trains (consolidation on the border) European main clients](https://reader034.vdocument.in/reader034/viewer/2022050323/5f7d734a9b53a16fd444b57e/html5/thumbnails/4.jpg)
FUTURE DEVELOPMENT OF DIFFERENT AREAS, DEPENDS ON:
SERVICE - stable frequency - transit time in competitive range of 13 days (e.g.Suzhou - Warszawa) - reasonable total rate compared to the sea freight and air freight
PRECONDITIONS - European railway infrastructure must improve west-east connection - Improve transit time for railing in Europe - Main terminals in Europe in strategic locations, to reduce the
pre- & on-carriage distance to <300 Km
![Page 5: Actual situation, Potential, Development on the corridor ......• Project/product trains (e.g. Suzhou-Warszawa) • Network trains (consolidation on the border) European main clients](https://reader034.vdocument.in/reader034/viewer/2022050323/5f7d734a9b53a16fd444b57e/html5/thumbnails/5.jpg)
VOLUME
15000
29000
70000
100000
0
20000
40000
60000
80000
100000
120000
2013 2014 2015 2016
VOLUME Development
TEU
250.000 TEU in 2018
Different types of trains in one system • Dedicated block trains • Project/product trains (e.g. Suzhou-Warszawa) • Network trains (consolidation on the border)
![Page 6: Actual situation, Potential, Development on the corridor ......• Project/product trains (e.g. Suzhou-Warszawa) • Network trains (consolidation on the border) European main clients](https://reader034.vdocument.in/reader034/viewer/2022050323/5f7d734a9b53a16fd444b57e/html5/thumbnails/6.jpg)
European main clients
Asian main clients
Main LCL clients
![Page 7: Actual situation, Potential, Development on the corridor ......• Project/product trains (e.g. Suzhou-Warszawa) • Network trains (consolidation on the border) European main clients](https://reader034.vdocument.in/reader034/viewer/2022050323/5f7d734a9b53a16fd444b57e/html5/thumbnails/7.jpg)
European cargo
Automotive, machinery, tires, paper, electro parts, LCL
Asian cargo
Electronics & high tech, displays, fashion, machinery, refractory material,
e-com, LCL
Cargo
![Page 8: Actual situation, Potential, Development on the corridor ......• Project/product trains (e.g. Suzhou-Warszawa) • Network trains (consolidation on the border) European main clients](https://reader034.vdocument.in/reader034/viewer/2022050323/5f7d734a9b53a16fd444b57e/html5/thumbnails/8.jpg)
2015 Reduction of the transit-time to 11 days from Suzhou – Warszawa - Implement CIM/SMGS railway bill - Reduction of time for border crossing between wide and normal
gouge
2016 / 17 Reduction of the transit-time to 10 days and less
SHORT TERM TARGETS
![Page 9: Actual situation, Potential, Development on the corridor ......• Project/product trains (e.g. Suzhou-Warszawa) • Network trains (consolidation on the border) European main clients](https://reader034.vdocument.in/reader034/viewer/2022050323/5f7d734a9b53a16fd444b57e/html5/thumbnails/9.jpg)
SERVICE - Turkey-Asia railway system via Kazakhstan - Transit time 14-15 days - Weekly departure in both direction - Further connection to neighbour countries
DEVELOPMENT OF NEW POTENTIAL AREAS, DEPENDS ON:
![Page 10: Actual situation, Potential, Development on the corridor ......• Project/product trains (e.g. Suzhou-Warszawa) • Network trains (consolidation on the border) European main clients](https://reader034.vdocument.in/reader034/viewer/2022050323/5f7d734a9b53a16fd444b57e/html5/thumbnails/10.jpg)
Nord-East China
Central-East China & Japan/S.Korea
South-East China
Nord-West China
MAIN SERVED AREAS IN ASIA, LONG TERM VIEW
![Page 11: Actual situation, Potential, Development on the corridor ......• Project/product trains (e.g. Suzhou-Warszawa) • Network trains (consolidation on the border) European main clients](https://reader034.vdocument.in/reader034/viewer/2022050323/5f7d734a9b53a16fd444b57e/html5/thumbnails/11.jpg)
- Enter in most important/strategic departure cities
- Build up a direct railway connection to/from main industry areas in China
- Use all main gates from/to China in order to generate a flexible service & an efficient repositioning system
- Clearly defined sales activities such as clients work shops, networking……
FUTURE STRATEGY
![Page 12: Actual situation, Potential, Development on the corridor ......• Project/product trains (e.g. Suzhou-Warszawa) • Network trains (consolidation on the border) European main clients](https://reader034.vdocument.in/reader034/viewer/2022050323/5f7d734a9b53a16fd444b57e/html5/thumbnails/12.jpg)
THANK YOU FOR YOUR ATTENTION
...join with us the future...