adam k cramm portfolio
DESCRIPTION
A collection of work at OPN Architects and as a graduate student at the University of Nebraska-Lincoln ranging in size, scale and complexity.TRANSCRIPT
ADAM K CRAMM AIA, [email protected]
402.679.2151
12345PERFORMING ARTS CONVENTION CENTER PARKING STRUCTUREOFFICE GRADUATE WORKHANCHER AUDITORIUMPELLI/CLARKE/PELLI + OPNIOWA CITY, IAUNIVERSITY OF IOWA$131,000,000UNDER CONSTRUCTION180,000 SF
6GRADUATE WORK
CR CONVENTION COMPLEXOPNCEDAR RAPIDS, IACITY OF CEDAR RAPIDS$106,000,000COMPLETED 2013471,000 SF
INTERMECOPNCEDAR RAPIDS, IAHONEYWELL$9,000,000COMPLETED 201381,000 SF
CEDAR RAPIDS PARKOPNCEDAR RAPIDS, IACITY OF CEDAR RAPIDS$9,000,000UNDER CONSTRUCTION206,000 SF
RED BARN VIDEO LOUNGEMIN/DAY + F.A.C.T.LINCOLN, NESHELDON ART GALLERYN/ACOMPLETED 2008N/A
URBAN AGRICULTURESTUDENT WORKLINCOLN, NEN/AN/ASPECULATIVEN/A
1HANCHER AUDITORIUMFor more than 30 years, Hancher Auditorium has presented the finest in world culture to students and the public alike. In 1999, The New York Times called Hancher a “forward-looking arts sponsor.” In June 2008, the University of Iowa incurred significant damage to campus buildings due to the flooding of the Iowa River. Of those buildings flooded, the Voxman Music Building, Hancher and Clapp Recital Hall were all damaged and determined by FEMA eligible for replacement.
The original building was designed by Max Abramovitz (1972), and stood as an icon, symbolizing the arts for the University, the community and the State of Iowa. It is the desire of the University for the replacement facility to carry that same distinction.
The replacement of the existing Hancher facility will have a large multi-purpose proscenium theater, as well as a smaller performance space for rehearsals, performance and teaching. The building program requires front-of-house and back-of-house support spaces and administrative offices. The larger theater space will accommodate commercial productions including music, dance, opera and theatrical works.
Renderings courtesy of Pelli/Clarke Pelli
VIEW FROM CAMPUS
VIEW FROM RIVER
HOUSE
SECOND FLOOR LOBBY
DN
UP
DN
DN
DN
DN
DN
DN
DN
DN
DN DN
UPUP
UP
UP
UP
UP
UP
UP
DNUPUP
DN
DN
D WD W
DNDN
DN DN
UP
UP
UP
DN
FLOOR 01
1. LOBBY2. AUDITORIUM3. ADMINISTRATION4. SCENE SHOP5. REHEARSAL
1
52
4
3
1
2 3
4
FLOOR 02
1. LOBBY2. AUDITORIUM3. ADMINISTRATION4. SCENE SHOP5. COSTUME SHOP
FLOOR 03
1. LOBBY2. AUDITORIUM
5
1
2
SITE PLAN
LEVEL 1665' - 0"
LEVEL 3713' - 6"
LEVEL 4732' - 6"
LEVEL 2690' - 6"
A2542
2" BELOW GRADE XEPSINSULATION
CONCRETE SITE PAVING,REFER TO LANDSCAPE
DRAWINGS
CONCRETE FOUNDATION WALL- REFER TO STRUCTURAL
DRAWINGS
EXT:I-M6-B0
EXT-S-M6-B0
INTERIOR LINEAR WOODPLANK CEILING SYSTEM
A3504
SIM
A24912
SIM
A3607
A3602
A2547
A3501
SIM
A3605
SIM
A2546
A2545
A3504
SIM
A2541
A2543
A2547
SIM
A2547
SIM
A2541
SIM
ENTRANCEVESTIBULE/
FOYERX1001
A2413
A2413
UNDER-SLAB VAPOR BARRIERCONCRETE SLAB ON GRADE -REFER TO STRUCTURALDRAWINGS
CURTAINWALL - REFER TOTYPICAL ASSEMBLY DETAILS
C-WD-S
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
R1R2
WRAP STRUCTURAL STEELMEMBER W/ INSULATION 3'-0"MIN. FROM PENETRATION OF
AIR BARRIER - TYP.
STRUCTURAL STEEL MEMBERBEYOND W/ SPRAY APPLIED
FIREPROOFING
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIEDFIREPROOFING
CONCRETE TOPPING SLAB
CONCRETE SLAB ON METALDECK
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIEDFIREPROOFING
C-WD-S
EXT-S-M6-S0
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
R1
EXT-M-M6-S0
EXT-M-M6-B0
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
R1
CURTAINWALL - REFER TOTYPICAL ASSEMBLY DETAILS
SKYLIGHT SKYLIGHT
C-WD-B
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
R1
6" COLD FORMED METALFRAMING
STRUCTURAL STEEL MEMBERBEYOND W/ SPRAY APPLIEDFIREPROOFING
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIEDFIREPROOFING
691' - 6"
T.O. PARAPET
714' - 0"
T.O. PARAPET
733' - 0"
T.O. PARAPET
A2418
Sim
3A247
GROUT
CURTAINWALL - REFER TOTYPICAL ASSEMBLY DETAILS
A2412
Sim
CAFE2001
VARIES
VARIES
VARIES
C
Drawing
CONSTRUCTIONDOCUMENTS
Project
Owner
CEDAR RAPIDS - DES MOINES
OPN ARCHITECTS
UNIVERSITY OF IOWAFACILITIES MANAGEMENT
PELLI CLARKE PELLI ARCHITECTS1056 CHAPEL STREETNEW HAVEN, CT 06510T. 203.777.2515
Project No.
A
A R C H I T E C T S
200 5TH AVENUE SE SUITE 201CEDAR RAPIDS, IA 52401319-363-6018 PHONE319-363-7349 [email protected]
24 252322212019181716151413121110987654321
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
T
U
P RIN
TED
:
Sheet Issue Date
141 EAST PARK ROAD, IOWACITY, IA 52242
200 UNIVERSITY SERVICESBUILDINGIOWA CITY, IA 52242
M.A. MORTENSON COMPANY700 MEADOW LANE NORTHMINNEAPOLIS, MN 55422P: 763-522-2100
Owner's Representative
Key Plan
26 27 28 29
V
W
X
Y
Consultants
CIVIL ENGINEERSHIVE HATTERY, INC.2834 NORTHGATE DRIVEIOWA CITY. IA 52245P: 319-354-3040
LANDSCAPE ARCHITECTUREBALMORI ASSOCIATES833 WASHINGTON STREET, 2ND FLOORNEW YORK, NY 10014P:212-431-8616
ELECTRICAL ENGINEERALVINE AND ASSOCIATES1102 DOUGLAS STREETOMAHA, NE 68102-1814P: 402-346-7007
ACOUSTIC CONSULTANTKIRKEGAARD ASSOCIATES801 WEST ADAMS STREET, 8TH FLOORCHICAGO, IL 60607P: 312-441-1980
MECHANICAL ENGINEERALVINE AND ASSOCIATES1102 DOUGLAS STREETOMAHA, NE 68102-1814P: 402-346-7007
AUDIO VISUAL CONSULTANTTHRESHOLD ACOUSTICS53 WEST JACKSON BOULEVARD,SUITE 815CHICAGO, IL 60604P:312-386-1400
CONFLUENCE1300 WALNUT STREET, SUITE 200DES MOINES, IA 50309P:515-288-4875
THEATRE CONSULTANTTHEATRE PROJECTS CONSULTANTS47 WATER STREETSOUTH NORWALK, CT 06854P: 203-299-0830
STRUCTURAL ENGINEERTHORNTON-TOMASETTI, INC.330 N. WABASH AVENUE, SUITE 1500CHICAGO, IL 60611P: 312-596-2000
FOOD SERVICEMICHAEL L. BRADNAN & ASSOCIATES5750 COUNTRY LANE NECEDAR RAPIDS, IA 52411P:319-395-0395
TECHNOLOGY ENGINEERALVINE AND ASSOCIATES1102 DOUGLAS STREETOMAHA, NE 68102-1814P: 402-346-7007
ARCHITECTURAL LIGHTINGCLINE BETTRIDGE BERNSTEINLIGHTING DESIGN INC.116 EAST 27TH STREET, 4TH FLOORNEW YORK, NY 10016P:212-741-3280
SIGNAGE/ GRAPHICSPENTAGRAM204 FIFTH AVENUENEW YORK, NY 10010P:212-683-7000
VERTICALTRANSPORTATION
LERCH BATES, INC.706 SECOND AVENUE S, SUITE 660MINNEAPOLIS, MN 55402P:612-332-5471
OPN #10234005
DESIGN ARCHITECT
BID SET - BE3/4 08/16/13
Revision Dates
8/19
/ 201
39 :
18:4
1AM
A331
WALL SECTIONS - AREA C
HANCHER AUDITORIUM -REPLACEMENT FACILITY
1/2" = 1'-0"1 WALL SECTION
LOBBY LOBBY
LEVEL 1665' - 0"
LEVEL 3713' - 6"
LEVEL 2690' - 6"
B10
ARTDESIGN
2410
VESTIBULEX1025
691' - 6"
EXT-S-M6-B0
EXT-S-M6-S0
EXT:I-M6-B0
2" BELOW GRADE XEPSINSULATION
A2453
A3504
SIM A3503
A2521
R1
A3504
SIM
A3527
A2413
UNDER-SLAB VAPOR BARRIER
CONCRETE FOUNDATION WALL- REFER TO STRUCTURALDRAWINGS
CONCRETE SLAB ON GRADE -REFER TO STRUCTURALDRAWINGS
CONCRETE FROST STOOP,REFER TO CIVIL DRAWINGS
CONCRETE FROST WALL,REFER TO CIVIL DRAWINGS
CURTAINWALL - REFER TOTYPICAL ASSEMBLY DETAILS
A3502
C-WD-B
STRUCTURAL STEEL MEMBERBEYOND W/ SPRAY APPLIED
FIREPROOFING
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
R1
6" COLD FORMED METALFRAMING
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIEDFIREPROOFING
CONCRETE SLAB ON METALDECK
CONCRETE TOPPING SLAB
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIEDFIREPROOFING
CURTAINWALL - REFER TOTYPICAL ASSEMBLY DETAILS
T.O. PARAPET
STRUCTURAL STEEL MEMBERBEYOND W/ SPRAY APPLIED
FIREPROOFING
C-WD-S
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
CONCRETE SITE PAVING,REFER TO LANDSCAPE
DRAWINGS
A2412
Sim
714' - 0"T.O. PARAPET
VARIESB.O. SOFFIT
VARIESB.O. SOFFIT
LEVEL 1665' - 0"
LEVEL 3713' - 6"
LEVEL 2690' - 6"
LEVEL 0648' - 0"
B10
A3504
A3505
A3509
691' - 6"
714' - 0"
STAIRXSTL05
EXT-S-M6-B0
EXT-S-M6-S0
CONCRETE FOUNDATION WALL- REFER TO STRUCTURALDRAWINGS
CONCRETE FOOTING / GRADEBEAM - REFER TOSTRUCTURAL DRAWINGS
R1
EXT-S-M6-B0
EXT-S-M6-B0
A2413
A24111
Sim
1' - 5 1/4"1' - 7"8"
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIEDFIREPROOFING
A3425
SIM
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIEDFIREPROOFING
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
R1
1' - 5 1/4"1' - 7"8"
T.O. PARAPET
C-WD-S
EXT:I-M6-B0
STRUCTURAL STEEL MEMBERBEYOND W/ SPRAY APPLIED
FIREPROOFING
STRUCTURAL STEEL MEMBERBEYOND W/ SPRAY APPLIED
FIREPROOFING
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIEDFIREPROOFING
T.O. PARAPET
CONCRETE SITE PAVING,REFER TO LANDSCAPE
DRAWINGS
A2412
Sim
VARIES
B.O. SOFFIT
VARIES
B.O. SOFFIT
LEVEL 1665' - 0"
LEVEL 3713' - 6"
LEVEL 2690' - 6"
LEVEL 0648' - 0"
B10
VESTIBULEX1331
CUST.CONTROL
L343
EXT-S-M6-B0
EXT-S-M6-B0
EXT-S-M6-S0
691' - 6"
714' - 0"
CONCRETE FOOTING / GRADEBEAM - REFER TOSTRUCTURAL DRAWINGS
CONCRETE FOUNDATION WALL- REFER TO STRUCTURALDRAWINGS
CONCRETE SLAB ON METALDECK
A3504
SIM
A3505
SIM
A3502
A3506
R1
A2413
A24111
Sim
STRUCTURAL STEEL MEMBERBEYOND W/ SPRAY APPLIEDFIREPROOFING
CONCRETE FROST STOOP,REFER TO CIVIL DRAWINGS
CONCRETE FROST WALL,REFER TO CIVIL DRAWINGS
CURTAINWALL ENTRANCESYSTEM - REFER TO TYPICAL
ASSEMBLY DETAILS
CURTAINWALL - REFER TOTYPICAL ASSEMBLY DETAILS
STRUCTURAL STEEL MEMBERBEYOND W/ SPRAY APPLIED
FIREPROOFING
6" COLD FORMED METALFRAMING
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIEDFIREPROOFING
CONCRETE SLAB ON METALDECK
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIEDFIREPROOFING
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIEDFIREPROOFING
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
R1
T.O. PARAPET
C-WD-S
1' - 5"1' - 7"8"
STRUCTURAL STEEL MEMBERBEYOND W/ SPRAY APPLIED
FIREPROOFING
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
EXT-S-M6-B0
T.O. PARAPET
CONCRETE SITE PAVING,REFER TO LANDSCAPE
DRAWINGS
A2412
Sim
VARIESB.O. SOFFIT
VARIESB.O. SOFFIT
B
Drawing
CONSTRUCTIONDOCUMENTS
Project
Owner
CEDAR RAPIDS - DES MOINES
OPN ARCHITECTS
UNIVERSITY OF IOWAFACILITIES MANAGEMENT
PELLI CLARKE PELLI ARCHITECTS1056 CHAPEL STREETNEW HAVEN, CT 06510T. 203.777.2515
Project No.
A
A R C H I T E C T S
200 5TH AVENUE SE SUITE 201CEDAR RAPIDS, IA 52401319-363-6018 PHONE319-363-7349 [email protected]
24 252322212019181716151413121110987654321
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
T
U
P RIN
TED
:
Sheet Issue Date
141 EAST PARK ROAD, IOWACITY, IA 52242
200 UNIVERSITY SERVICESBUILDINGIOWA CITY, IA 52242
M.A. MORTENSON COMPANY700 MEADOW LANE NORTHMINNEAPOLIS, MN 55422P: 763-522-2100
Owner's Representative
Key Plan
26 27 28 29
V
W
X
Y
Consultants
CIVIL ENGINEERSHIVE HATTERY, INC.2834 NORTHGATE DRIVEIOWA CITY. IA 52245P: 319-354-3040
LANDSCAPE ARCHITECTUREBALMORI ASSOCIATES833 WASHINGTON STREET, 2ND FLOORNEW YORK, NY 10014P:212-431-8616
ELECTRICAL ENGINEERALVINE AND ASSOCIATES1102 DOUGLAS STREETOMAHA, NE 68102-1814P: 402-346-7007
ACOUSTIC CONSULTANTKIRKEGAARD ASSOCIATES801 WEST ADAMS STREET, 8TH FLOORCHICAGO, IL 60607P: 312-441-1980
MECHANICAL ENGINEERALVINE AND ASSOCIATES1102 DOUGLAS STREETOMAHA, NE 68102-1814P: 402-346-7007
AUDIO VISUAL CONSULTANTTHRESHOLD ACOUSTICS53 WEST JACKSON BOULEVARD,SUITE 815CHICAGO, IL 60604P:312-386-1400
CONFLUENCE1300 WALNUT STREET, SUITE 200DES MOINES, IA 50309P:515-288-4875
THEATRE CONSULTANTTHEATRE PROJECTS CONSULTANTS47 WATER STREETSOUTH NORWALK, CT 06854P: 203-299-0830
STRUCTURAL ENGINEERTHORNTON-TOMASETTI, INC.330 N. WABASH AVENUE, SUITE 1500CHICAGO, IL 60611P: 312-596-2000
FOOD SERVICEMICHAEL L. BRADNAN & ASSOCIATES5750 COUNTRY LANE NECEDAR RAPIDS, IA 52411P:319-395-0395
TECHNOLOGY ENGINEERALVINE AND ASSOCIATES1102 DOUGLAS STREETOMAHA, NE 68102-1814P: 402-346-7007
ARCHITECTURAL LIGHTINGCLINE BETTRIDGE BERNSTEINLIGHTING DESIGN INC.116 EAST 27TH STREET, 4TH FLOORNEW YORK, NY 10016P:212-741-3280
SIGNAGE/ GRAPHICSPENTAGRAM204 FIFTH AVENUENEW YORK, NY 10010P:212-683-7000
VERTICALTRANSPORTATION
LERCH BATES, INC.706 SECOND AVENUE S, SUITE 660MINNEAPOLIS, MN 55402P:612-332-5471
OPN #10234005
DESIGN ARCHITECT
BID SET - BE3/4 08/16/13
Revision Dates
8/19
/ 201
39 :
15:4
6AM
A320
WALL SECTIONS - AREA B
HANCHER AUDITORIUM -REPLACEMENT FACILITY
1/2" = 1'-0"3 WALL SECTION 1/2" = 1'-0"1 WALL SECTION
1/2" = 1'-0"2 WALL SECTION
LEVEL 3713' - 6"
UB TF
733' - 0"
EXT-S-M6-B0
EXT-S-M6-B0
EXT-S-M6-B0
BUILDING EXPANSION JOINT
A3512
A3516
A3517
A35111
A3518
A35112
R3
763' - 6"
R18" 2' - 4"
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
8"5' - 5 1/2"
T.O. PARAPET
C-WD-B
8" 3' - 0" 7' - 2 1/2"
8" 3' - 3 1/8"
CONCRETE THEATER WALL- REFER TO STRUCTURAL
STRUCTURAL STEEL MEMBERBEYOND W/ SPRAY APPLIED
FIREPROOFING
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
T.O. PARAPET
1' - 1"
EXT-S-M6-B0
VARIES
B.O. SOFFIT
736' - 0"
B.O. SOFFIT
775' - 0"
LEVEL 3713' - 6"
LEVEL 4732' - 6"
B9 T12
STAIRXST306
STAIRXST406
EXT-S-M6-B0
EXT-S-M6-B0
EXT-S-M6-B0
BUILDING EXPANSION JOINT
A3513
A3516
SIM
A3521
A35112
SIM
736' - 0"
A3517
SIM
A2413
A3518
SIM
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIEDFIREPROOFING
CONCRETE SLAB ON METALDECK
CONCRETE TOPPING SLAB
R1
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
CONCRETE THEATER WALL- REFER TO STRUCTURAL
EXT-S-M6-B0
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
R1
C-WD-B
B.O. SOFFIT
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
R3
VARIES
B.O. SOFFIT
733' - 0"T.O. PARAPET
VARIES
T.O. PARAPET
LEVEL 3713' - 6"
LEVEL 4732' - 6"
733' - 0"
EXT-S-M6-B0
EXT-S-M6-B0
CONCRETE SLAB ON METALDECK
EXT-S-M6-B0
BUILDING EXPANSION JOINT
A3513
SIM
A3521
SIM
A3522
A3517
SIM
A2413
A35011R1
CONCRETE SLAB ON METALDECK
CONCRETE TOPPING SLAB
CURTAINWALL - REFER TOTYPICAL ASSEMBLY DETAILS
CONCRETE THEATER WALL- REFER TO STRUCTURAL
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
T.O. PARAPET
R1
CONCRETE CAP BEAM- REFER TO STRUCTURAL
C-WD-B
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
R3
A3516
SIM
VARIES
B.O. SOFFIT
736' - 0"
B.O. SOFFIT
VARIES
T.O. PARAPET
B
Drawing
CONSTRUCTIONDOCUMENTS
Project
Owner
CEDAR RAPIDS - DES MOINES
OPN ARCHITECTS
UNIVERSITY OF IOWAFACILITIES MANAGEMENT
PELLI CLARKE PELLI ARCHITECTS1056 CHAPEL STREETNEW HAVEN, CT 06510T. 203.777.2515
Project No.
A
A R C H I T E C T S
200 5TH AVENUE SE SUITE 201CEDAR RAPIDS, IA 52401319-363-6018 PHONE319-363-7349 [email protected]
24 252322212019181716151413121110987654321
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
T
U
P RIN
TED
:
Sheet Issue Date
141 EAST PARK ROAD, IOWACITY, IA 52242
200 UNIVERSITY SERVICESBUILDINGIOWA CITY, IA 52242
M.A. MORTENSON COMPANY700 MEADOW LANE NORTHMINNEAPOLIS, MN 55422P: 763-522-2100
Owner's Representative
Key Plan
26 27 28 29
V
W
X
Y
Consultants
CIVIL ENGINEERSHIVE HATTERY, INC.2834 NORTHGATE DRIVEIOWA CITY. IA 52245P: 319-354-3040
LANDSCAPE ARCHITECTUREBALMORI ASSOCIATES833 WASHINGTON STREET, 2ND FLOORNEW YORK, NY 10014P:212-431-8616
ELECTRICAL ENGINEERALVINE AND ASSOCIATES1102 DOUGLAS STREETOMAHA, NE 68102-1814P: 402-346-7007
ACOUSTIC CONSULTANTKIRKEGAARD ASSOCIATES801 WEST ADAMS STREET, 8TH FLOORCHICAGO, IL 60607P: 312-441-1980
MECHANICAL ENGINEERALVINE AND ASSOCIATES1102 DOUGLAS STREETOMAHA, NE 68102-1814P: 402-346-7007
AUDIO VISUAL CONSULTANTTHRESHOLD ACOUSTICS53 WEST JACKSON BOULEVARD,SUITE 815CHICAGO, IL 60604P:312-386-1400
CONFLUENCE1300 WALNUT STREET, SUITE 200DES MOINES, IA 50309P:515-288-4875
THEATRE CONSULTANTTHEATRE PROJECTS CONSULTANTS47 WATER STREETSOUTH NORWALK, CT 06854P: 203-299-0830
STRUCTURAL ENGINEERTHORNTON-TOMASETTI, INC.330 N. WABASH AVENUE, SUITE 1500CHICAGO, IL 60611P: 312-596-2000
FOOD SERVICEMICHAEL L. BRADNAN & ASSOCIATES5750 COUNTRY LANE NECEDAR RAPIDS, IA 52411P:319-395-0395
TECHNOLOGY ENGINEERALVINE AND ASSOCIATES1102 DOUGLAS STREETOMAHA, NE 68102-1814P: 402-346-7007
ARCHITECTURAL LIGHTINGCLINE BETTRIDGE BERNSTEINLIGHTING DESIGN INC.116 EAST 27TH STREET, 4TH FLOORNEW YORK, NY 10016P:212-741-3280
SIGNAGE/ GRAPHICSPENTAGRAM204 FIFTH AVENUENEW YORK, NY 10010P:212-683-7000
VERTICALTRANSPORTATION
LERCH BATES, INC.706 SECOND AVENUE S, SUITE 660MINNEAPOLIS, MN 55402P:612-332-5471
OPN #10234005
DESIGN ARCHITECT
BID SET - BE3/4 08/16/13
Revision Dates
8/19
/ 201
39 :
16:2
2AM
A322
WALL SECTIONS - AREA B
HANCHER AUDITORIUM -REPLACEMENT FACILITY
1/2" = 1'-0"1 WALL SECTION 1/2" = 1'-0"2 WALL SECTION
1/2" = 1'-0"3 WALL SECTION
LEVEL 1665' - 0"
LEVEL 2690' - 6"
RB
WESTLOBBYX1200
REHEARSALROOM1200
BUILDING EXPANSIONJOINT
677' - 0"
EXT-S-M6-B0
2" BELOW GRADE XEPSINSULATION
CONCRETE FOUNDATION WALL- REFER TO STRUCTURAL
DRAWINGS
A3524
A3523
RA.4RA
A7914
A7917
A7918
A7912
706' - 6"T.O. PARAPET
2'-0
"9'
-4"
+/-1
4'-0
"
10" GROUND FACE CMU
8" OFF-SET SPLIT FACE CMU,PAINT
BOND BEAM
BOND BEAM
10" CMU
BOND BEAM
10" GROUND FACE CMU
BOND BEAM
8" CMU
1" FABRIC WRAPPEDACOUSTICAL WALL PANELTYPE A
BOND BEAM
BOND BEAM
2'-0
"8'
-0"
2'-0
"
8'-0
"
A35010
SIM
EXT-S-M6-B0
A2411
SIM
CONCRETE FOOTING / GRADEBEAM - REFER TO
STRUCTURAL DRAWINGS
UNDER-SLAB VAPOR BARRIER
CONCRETE SLAB ON GRADE -REFER TO STRUCTURAL
DRAWINGS
R1
3' - 1"8"1"
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
R3
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
SEAL ALLPENETRATIONSAIR TIGHT
A2412
Sim
CURTAINWALL - REFER TOTYPICAL ASSEMBLY DETAILS
ACOUSTICAL FINISH, AF-1CONTINUOUS INSIDE PLENUM
10" GROUND FACE CMU
FILL STUD CAVITY WITH SOUNDBATT INSULATION
2 LAYERS 5/8" TYPE "X" GWB
VARIES
B.O. SOFFIT
691' - 6"
T.O. PARAPET
LEVEL 1665' - 0"
RE
REHEARSALROOM1200
706' - 6"
EXT-S-M6-B0
A3537
A35310
A3536
RF
T.O.PARAPET
A2411
SIM
CONCRETE FOOTING / GRADEBEAM - REFER TO
STRUCTURAL DRAWINGS
CONCRETE STEM WALL, REFERTO STRUCTURAL DRAWINGS
CONCRETE APRON - REFER TOSTRUCTURAL DRAWNGS
CURTAINWALL - REFER TOTYPICAL ASSEMBLY DETAILS
CURTAINWALL - REFER TOTYPICAL ASSEMBLY DETAILS
C-WD-B
B.O. SOFFIT
STRUCTURAL STEEL MEMBERBEYOND W/ SPRAY APPLIED
FIREPROOFING
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
6" COLD FORMED METALFRAMING
R3
8" 1' - 7"
STRONG POINT - REFER TOASSEMBLY DETAILS
FALL PROTECTION - REFERTO ASSEMBLY DETAILS
CURTAINWALL MULLIONCROSS BRACE
8'-0
"
679' - 6"
LEVEL 1665' - 0"
R1.1
REHEARSALROOM1200
EXT-S-M6-B0
A24110
A7911
CONCRETE THICKENED SLAB
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
STRUCTURAL STEEL MEMBERW/ SPRAY APPLIED
FIREPROOFING
706' - 6"
T.O. PARAPET
R3
CONCRETE FOOTING / GRADEBEAM - REFER TO
STRUCTURAL DRAWINGS
A2416
SIM
B
Drawing
CONSTRUCTIONDOCUMENTS
Project
Owner
CEDAR RAPIDS - DES MOINES
OPN ARCHITECTS
UNIVERSITY OF IOWAFACILITIES MANAGEMENT
PELLI CLARKE PELLI ARCHITECTS1056 CHAPEL STREETNEW HAVEN, CT 06510T. 203.777.2515
Project No.
A
A R C H I T E C T S
200 5TH AVENUE SE SUITE 201CEDAR RAPIDS, IA 52401319-363-6018 PHONE319-363-7349 [email protected]
24 252322212019181716151413121110987654321
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
T
U
P RIN
TED
:
Sheet Issue Date
141 EAST PARK ROAD, IOWACITY, IA 52242
200 UNIVERSITY SERVICESBUILDINGIOWA CITY, IA 52242
M.A. MORTENSON COMPANY700 MEADOW LANE NORTHMINNEAPOLIS, MN 55422P: 763-522-2100
Owner's Representative
Key Plan
26 27 28 29
V
W
X
Y
Consultants
CIVIL ENGINEERSHIVE HATTERY, INC.2834 NORTHGATE DRIVEIOWA CITY. IA 52245P: 319-354-3040
LANDSCAPE ARCHITECTUREBALMORI ASSOCIATES833 WASHINGTON STREET, 2ND FLOORNEW YORK, NY 10014P:212-431-8616
ELECTRICAL ENGINEERALVINE AND ASSOCIATES1102 DOUGLAS STREETOMAHA, NE 68102-1814P: 402-346-7007
ACOUSTIC CONSULTANTKIRKEGAARD ASSOCIATES801 WEST ADAMS STREET, 8TH FLOORCHICAGO, IL 60607P: 312-441-1980
MECHANICAL ENGINEERALVINE AND ASSOCIATES1102 DOUGLAS STREETOMAHA, NE 68102-1814P: 402-346-7007
AUDIO VISUAL CONSULTANTTHRESHOLD ACOUSTICS53 WEST JACKSON BOULEVARD,SUITE 815CHICAGO, IL 60604P:312-386-1400
CONFLUENCE1300 WALNUT STREET, SUITE 200DES MOINES, IA 50309P:515-288-4875
THEATRE CONSULTANTTHEATRE PROJECTS CONSULTANTS47 WATER STREETSOUTH NORWALK, CT 06854P: 203-299-0830
STRUCTURAL ENGINEERTHORNTON-TOMASETTI, INC.330 N. WABASH AVENUE, SUITE 1500CHICAGO, IL 60611P: 312-596-2000
FOOD SERVICEMICHAEL L. BRADNAN & ASSOCIATES5750 COUNTRY LANE NECEDAR RAPIDS, IA 52411P:319-395-0395
TECHNOLOGY ENGINEERALVINE AND ASSOCIATES1102 DOUGLAS STREETOMAHA, NE 68102-1814P: 402-346-7007
ARCHITECTURAL LIGHTINGCLINE BETTRIDGE BERNSTEINLIGHTING DESIGN INC.116 EAST 27TH STREET, 4TH FLOORNEW YORK, NY 10016P:212-741-3280
SIGNAGE/ GRAPHICSPENTAGRAM204 FIFTH AVENUENEW YORK, NY 10010P:212-683-7000
VERTICALTRANSPORTATION
LERCH BATES, INC.706 SECOND AVENUE S, SUITE 660MINNEAPOLIS, MN 55402P:612-332-5471
OPN #10234005
DESIGN ARCHITECT
BID SET - BE3/4 08/16/13
Revision Dates
8/19
/ 201
39 :
16:4
2AM
A323
WALL SECTIONS - AREA B
HANCHER AUDITORIUM -REPLACEMENT FACILITY
1/2" = 1'-0"1 WALL SECTION 1/2" = 1'-0"3 WALL SECTION
1/2" = 1'-0"2 WALL SECTION
2CR CONVENTION COMPLEXThe new Cedar Rapids Convention Complex is at the very heart of a collective vision to transform Cedar Rapids. Community leaders and urban planners view the convention complex as the anchor and catalyst for total urban renewal. Located in the heart of downtown, the new Cedar Rapids Convention Complex consists of three interrelated facilities:
New convention centerRenovation of the U.S. Cellular Center ArenaRenovation of the Convention Complex Hotel (DoubleTree by Hilton Cedar Rapids)
The complex opened its doors on May 31, 2013 and is one of the largest convention and events complex in the state of Iowa — second only to Veterans Memorial Auditorium in Des Moines. The Cedar Rapids Convention Complex includes a new exhibit hall, ballrooms, meeting rooms and pre-function space, plus a renovated events arena and renovated hotel with an additional ballroom and meeting room space. The 471,227 square foot complex offers 81,779 square feet of exhibit space, 12,359 square feet of ballroom space and 19,383 square feet of meeting room space.
Convention Center and Arena | 295,000 SFDoubleTree by Hilton Hotel | 176,000 SF
Photos courtesy of Main Street Studio
VIEW FROM FIRST AVE.
ARENA
HOTEL
LANTERN
CONVENTIONUP
UP
UP UP
UP
DNUP
STAGE
ADMINISTRATIONFIRST AVENUE BACK OF HOUSE (BOH)
BOH CORRIDORBOH STAIR/ELEVATORHOTEL SERVICESMEETING ROOM/FLEX HALLPUBLIC CIRCULATIONRESTROOMSRETAIL/CONCESSIONSTRUCK APRONVERTICAL CIRCULATION
FLOOR 01
ARENA
HOTEL
LANTERN
CONVENTION
FIRST AVENUE BACK OF HOUSE (BOH)BOH CORRIDORBOH STAIR/ELEVATORHOTEL SERVICESMEETING ROOM/FLEX HALLPUBLIC CIRCULATIONRESTROOMSRETAIL/CONCESSIONSTRUCK APRON
FLOOR 02
UPDN
FLEX HALL BELOW
LOBBY BELOW
VERTICAL CIRCULATION
LANTERN CONVENTION CENTER LOBBY
HOTEL LOBBY
RESTAURANT
GUEST ROOM
LOUNGE
ARENA
3INTERMECIntermec is a supply chain management company with more than 2,300 employees worldwide in more than 65 countries. For decades, their Cedar Rapids office was housed in a dark, largely windowless building on a nondescript corner in downtown Cedar Rapids. After a devastating flood swept through the building in 2008, executives questioned whether to move their operations out of the downtown core, renovate their existing space or build new. They decided to remain in the downtown but to build a new, modern facility.
OPN Architects worked with the company to design a new, state-of-the-art facility to house the firm’s research, engineering and administrative functions. The Cedar Rapids Technology Center provides space for more than 230 employees to collaborate on the design, development and testing of next-generation designs for mobile and data collection solutions.
The two-story, 81,000-square-foot structure hosts 31,000-square-feet of open office space; 12,000-square-feet of lab space; a 3,700-square-foot multi-purpose/cafe space; and a 2,300-square-foot loading dock and storage facility. The upper level houses workspaces, teaming rooms, an executive conference room and a customer demonstration area.
Photos courtesy of Main Street Studio
VIEW FROM THIRD STREET
MAIN ENTRANCE
LOBBYLOBBY
1st FLOOR0"
2nd FLOOR15' - 6"
5
T.O. PARAPET32' - 6"
BRICK VENEER ON FOUNDATIONFACE BRICK - MODULAR
AIR SPACE3" RIGID INSULATION
AIR AND WATER BARRIER MEMBRANECAST IN PLACE CONCRETE FOUNDATION
2" RIGID INSULATION
TERRACOTTA ON 6" FRAMINGTERRACOTTA PANEL ASSEMBLY
AIR SPACE3" RIGID INSULATION & THERMALLY
BROKEN BRACKET & FRAMING SYSTEMAIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING W/ BATT INSULATION5/8" TYPE "X" GWB
TERRACOTTA ON 6" FRAMINGTERRACOTTA PANEL ASSEMBLY
AIR SPACE3" RIGID INSULATION & THERMALLY
BROKEN BRACKET & FRAMING SYSTEMAIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING5/8" TYPE "X" GWB
27' - 6"
EIFS SOFFIT4" EIFS
EIFS AIR / MOISTURE BARRIER5/8" GLASS MAT GYPSUM SHEATHING
A3425
ROOF ASSEMBLYFULLY ADHERED ROOFING MEMBRANE
4" POLY ISO INSULATIONMETAL ROOF DECK
SLOPED STEEL STRUCTURE
INSULATED PRECAST AT PARAPET12" INSULATED PRECAST PANEL
2" RIGID INSULATION1/2" FIRE TREATED PLYWOOD
FULLY ADHERED ROOFING MEMBRANE
12" INSULATEDARCHITECTURAL PRECAST
PANEL - PAINT
A3426
SEE STRUCTURAL
-4' - 0" BRICK LEDGE
SLAB ON GRADE ASSEMBLYREINFORCED CONCRETE SLAB
VAPOR RETARDER2" RIGID INSULATION (MIN. 24" HORIZ.)
COMPACTED FILL
A3415
Sim
1"
1'-10"
STEEL BEAM - REFER TOSTRUCTURAL
STEEL BEAM - REFER TOSTRUCTURAL
2'-3
3/4
"
A3437
Sim
CEILING ASSEMBLY - REFER TOCEILING PLANS
SLAB ASSEMBLYCONCRETE SLAB
METAL DECK
REINFORCED CONCRETEFOUNDATION - REFER TO
STRUCTURAL
ALUMINUM CURTAIN WALLSYSTEM MULLION
A3113
Sim
9'-8
1/4
"
2'-9 1/8"
DASHED LINE INDICATES WEEPOPENING TO DRAIN CAVITY ATVERTICAL PANEL JOINTS, TYP.
ALUMINUM CURTAIN WALLSYSTEM MULLION
ALUMINUM CURTAIN WALLSYSTEM MULLION
ALUMINUM STOREFRONT SILL
ROLLER WINDOW SHADES W/FINISHED ENCLOSURE FASCIA
ALUMINUM CURTAIN WALLSYSTEM HEAD
25' - 6" B.O. PRECAST
6"
25' - 2 1/4" T.O. WINDOW
ALUMINUM STOREFRONTWINDOW ASSEMBLY
3 PA
NEL
S3
PAN
ELS
1' - 1 1/4" T.O. SILL
-1' - 0 3/4" B.O. EIFS
A3453
Sim
ALUMINUM COMPOSITEBACKPAN ATTACHED TOWINDOW FRAME - FINISH
SYSTEM TO MATCH WINDOWSYSTEM
CURTAIN WALL INSULATION
ROLLER WINDOW SHADES W/FINISHED ENCLOSURE FASCIA
SPANDREL GLASS PANEL
1st FLOOR0"
2nd FLOOR15' - 6"
5
T.O. PARAPET32' - 6"
BRICK VENEER ON 6" FRAMINGFACE BRICK - MODULAR
AIR SPACE3" RIGID INSULATION
AIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING5/8" TYPE "X" GWB
BRICK VENEER ON FOUNDATIONFACE BRICK - MODULAR
AIR SPACE3" RIGID INSULATION
AIR AND WATER BARRIER MEMBRANECAST IN PLACE CONCRETE FOUNDATION
2" RIGID INSULATION
BRICK VENEER ON 6" FRAMINGFACE BRICK - MODULAR
AIR SPACE3" RIGID INSULATION
AIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING5/8" TYPE "X" GWB
SLAB ON GRADE ASSEMBLYREINFORCED CONCRETE SLAB
VAPOR RETARDER2" RIGID INSULATION (MIN. 24" HORIZ.)
COMPACTED FILL
ROOF ASSEMBLYFULLY ADHERED ROOFING MEMBRANE
4" POLY ISO INSULATIONMETAL ROOF DECK
SLOPED STEEL STRUCTURE
-4' - 0" BRICK LEDGE
12" INSULATEDARCHITECTURAL PRECAST
PANEL - PAINT
INSULATED PRECAST WITH 3 5/8" FRAMING12" INSULATED PRECAST PANEL
3 5/8" METAL FRAMING5/8" TYPE "X" GWB
INSULATED PRECAST AT PARAPET12" INSULATED PRECAST PANEL
2" RIGID INSULATION1/2" FIRE TREATED PLYWOOD
FULLY ADHERED ROOFING MEMBRANE
12" INSULATEDARCHITECTURAL PRECAST
PANEL - PAINT
A3415
Sim
A3416
Sim
A3417
Sim
A3422
A3421
SEE STRUCTURAL
A3437
Sim
7'-1
0"2'
-0"
STEEL BEAM - REFER TOSTRUCTURAL
STEEL BEAM - REFER TOSTRUCTURAL
STEEL BEAM - REFER TOSTRUCTURAL
30' - 2 3/4" T.O.S.
1'-10"
SLAB ASSEMBLYCONCRETE SLAB
METAL DECK
1"
10' - 0" T.O. BRICK
REINFORCED CONCRETEFOUNDATION - REFER TO
STRUCTURAL
1"
2'-0
"2'
-0"
6'-0
"
1'-2"7"
6' - 0" T.O. SILL
8' - 0" T.O. WINDOW
A3113
Sim
ALUMINUM-FRAMEDSTOREFRONT
ROLLER WINDOW SHADES W/FINISHED ENCLOSURE FASCIA
REFER TO STRUCTURALREFER TO STRUCTURAL
A3412
Sim
A3413
Sim
17' - 6" T.O. SILL
5' - 10" T.O. BRICK
PRECAST REVEAL JOINT
1'-7 3/4"
DASHED LINE INDICATES WEEPOPENING TO DRAIN CAVITY ATVERTICAL PANEL JOINTS, TYP.
DASHED LINE INDICATES WEEPOPENING TO DRAIN CAVITY ATVERTICAL PANEL JOINTS, TYP.
CEILING ASSEMBLY - REFER TOCEILING PLANS
6"
REFER TO STRUCTURAL
ALUMINUM STOREFRONTMULLION
25' - 4" T.O. WINDOW
ALUMINUM STOREFRONTRECEIVER - ALLOW FOR
DEFLECTION
ALUMINUM STOREFRONTRECEIVER - ALLOW FOR
DEFLECTION
ALUMINUM STOREFRONT SILL
ROLLER WINDOW SHADES W/FINISHED ENCLOSURE FASCIA
AB
Dra
win
g
CO
NS
TR
UC
TIO
ND
OC
UM
EN
TS
Co
nsu
ltan
ts
Pro
ject
Ow
ner
All re
po
rts, pla
ns, sp
ecifica
tion
s, com
pu
ter file
s,fie
ld d
ata
, no
tes a
nd o
ther d
ocu
me
nts a
nd
instru
men
ts pre
pa
red
by O
PN
Arch
itects, In
c.a
s instru
me
nts o
f service
shall re
main
the
pro
pe
rty of O
PN
Arch
itects, In
c. OP
NA
rchite
cts, Inc. sh
all re
tain
all co
mm
on la
w,
statu
tory a
nd
oth
er re
serve
d rig
hts, in
clud
ing
the
cop
yrigh
t the
reto
.
© 2
01
1 O
PN
Arch
itects, In
c.
CE
DA
R R
AP
IDS
- DE
S M
OIN
ES
OP
N A
RC
HIT
EC
TS
, INC
.
INT
ER
ME
C550 SECOND STREET SECEDAR RAPIDS, IOW
A 52401
CIV
IL E
NG
INE
ER
SCHNOOR - BONIFAZIENGINEERING & SURVEYING, LC2750 1ST AVE NE, SUITE 110CEDAR RAPIDS, IOW
A 52402P. 319-298-8888
ST
RU
CT
UR
AL E
NG
INE
ER
M2B STRUCTURAL ENGINEERS, LLP422 2ND AVE SE, SUITE BCEDAR RAPIDS, IOW
A 52401P. 319-364-0666
ME
CH
AN
ICA
L E
NG
INE
ER
KJWW
ENGINEERING CONSULTANTS623 26TH AVEROCK ISLAND, ILLINOIS 61201P. 309-788-0673
ELE
CT
RIC
AL E
NG
INE
ER
KJWW
ENGINEERING CONSULTANTS623 26TH AVEROCK ISLAND, ILLINOIS 61201P. 309-788-0673
Ke
y Pla
n
OP
N P
roje
ct No. 1
12
030
00
2021
A
AR
CH
ITE
CT
S
200 5
TH
AV
EN
UE
SE
SU
ITE
201
CE
DA
R R
AP
IDS
, IA 5
2401
319-3
63-6
018 P
HO
NE
319-3
63-7
349 F
AX
ww
w.o
pnarch
itects.co
mopn@
opnarch
itects.co
m
1918
1716
1514
1312
1110
98
76
54
32
1
B C D E F G H J K L M N P Q
SD PRICING08-12-2011
Pre
vious Issu
e D
ate
s
Re
vision D
ate
s
Sh
ee
t Issue D
ate
INT
ER
ME
C601 3RD ST SE
100% CD'S
01-23-2012
DD PRICING10-14-2011
75% CD'S
12-02-201195%
CD'S12-23-2011
A314
WA
LL S
EC
TIO
NS
3/4" = 1'-0"2 WEST TERRACOTTA 3/4" = 1'-0"1 WEST FACADE
2nd FLOOR15' - 6"
A
BRICK VENEER ON 6" FRAMINGFACE BRICK - MODULAR
AIR SPACE3" RIGID INSULATION
AIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING5/8" TYPE "X" GWB
BRICK VENEER ON 6" FRAMINGFACE BRICK - MODULAR
AIR SPACE3" RIGID INSULATION
AIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING5/8" TYPE "X" GWB
7'-1
0"2'
-0"
A3411
A3412
A3413
A3414
BRICK VENEER AT PARAPETFACE BRICK - MODULAR
AIR SPACE3" RIGID INSULATION
AIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING5/8" GLASS MAT GYPSUM SHEATHING
2" RIGID INSULATION1/2" FIRE TREATED PLYWOOD
FULLY ADHERED ROOFING MEMBRANE
ROOF ASSEMBLYFULLY ADHERED ROOFING MEMBRANE
4" POLY ISO INSULATIONMETAL ROOF DECK
SLOPED STEEL STRUCTURE
SLAB ON GRADE ASSEMBLYREINFORCED CONCRETE SLAB
VAPOR RETARDER2" RIGID INSULATION (MIN. 24" HORIZ.)
COMPACTED FILL
-4' - 0" BRICK LEDGE
BRICK VENEER ON FOUNDATIONFACE BRICK - MODULAR
AIR SPACE3" RIGID INSULATION
AIR AND WATER BARRIER MEMBRANECAST IN PLACE CONCRETE FOUNDATION
2" RIGID INSULATION
SEE STRUCTURAL
A3412
Sim
30' - 4 1/2" T.O.S.
1'-9"
CEILING ASSEMBLY - REFER TOCEILING PLANS
STEEL BEAM WITH SPRAYAPPLIED FIREPROOFING -
REFER TO STRUCTURAL
REINFORCED CONCRETEFOUNDATION - REFER TO
STRUCTURAL
SLAB ASSEMBLYCONCRETE SLAB
METAL DECK
ROLLER WINDOW SHADES W/FINISHED ENCLOSURE FASCIA
A3437
25' - 4" T.O. WINDOW
6"
17' - 4" T.O. BRICK
10' - 0" T.O. WINDOW
6"
32' - 2 7/8" T.O. BRICK
ALUMINUM STOREFRONTWINDOW ASSEMBLY
ALUMINUM STOREFRONTWINDOW ASSEMBLY
SLIP CONNECTOR - REFER TOSTRUCTURAL
SLIP CONNECTOR - REFER TOSTRUCTURAL
ROLLER WINDOW SHADES W/FINISHED ENCLOSURE FASCIA
APPLY SPRAY APPLIEDFIREPROOFING TO UNDERSIDE
OF COMPOSITE DECK
0" FIRST FLOOR
STEEL BEAM - REFER TOSTRUCTURAL
FIRESTOPPING
1"
32' - 6" T.O. PARAPET
1'-2"
17 COURSES
33 COURSES
31 COURSES
ALUMINUM STOREFRONT SILL
ALUMINUM STOREFRONTRECEIVER - ALLOW FOR
DEFLECTION
1'-2"
ALUMINUM STOREFRONT SILL
ALUMINUM STOREFRONTRECEIVER - ALLOW FOR
DEFLECTION
ALUMINUM STOREFRONTMULLION
17' - 6" T.O. SILL
CEILING ASSEMBLY - REFER TOCEILING PLANS
2nd FLOOR15' - 6"
1
A3415
A3416
A3417
A3416
Sim
A3418
2'-0
"7'
-10"
ROOF ASSEMBLYFULLY ADHERED ROOFING MEMBRANE
4" POLY ISO INSULATIONMETAL ROOF DECK
SLOPED STEEL STRUCTURE
STEEL BEAM WITH SPRAYAPPLIED FIREPROOFING -
REFER TO STRUCTURAL
INSULATED PRECAST AT PARAPET12" INSULATED PRECAST PANEL
2" RIGID INSULATION1/2" FIRE TREATED PLYWOOD
FULLY ADHERED ROOFING MEMBRANE
-4' - 0" BRICK LEDGE
SLAB ON GRADE ASSEMBLYREINFORCED CONCRETE SLAB
VAPOR RETARDER2" RIGID INSULATION (MIN. 24" HORIZ.)
COMPACTED FILL
SEE STRUCTURAL
12" INSULATEDARCHITECTURAL PRECAST
PANEL - PAINT
12" INSULATEDARCHITECTURAL PRECAST
PANEL - PAINT
INSULATED PRECAST12" INSULATED PRECAST PANEL
3 5/8" METAL FRAMING5/8" TYPE "X" GWB
SLAB ASSEMBLYCONCRETE SLAB
METAL DECK
ROLLER WINDOW SHADES W/FINISHED ENCLOSURE FASCIA
ROLLER WINDOW SHADES W/FINISHED ENCLOSURE FASCIA
30' - 6 1/2" T.O.S.
25' - 4" T.O. WINDOW
1'-10"
A3438
FACE BRICK
32' - 4" T.O. PRECAST
12" INSULATEDARCHITECTURAL PRECAST
PANEL - PAINT
ALUMINUM STOREFRONTWINDOW ASSEMBLY
ALUMINUM STOREFRONTWINDOW ASSEMBLY
A3113
TYP.
REFER TO STRUCTURAL
REFER TO STRUCTURAL
REFER TO STRUCTURAL
STEEL BEAM WITH SPRAYAPPLIED FIREPROOFING -
REFER TO STRUCTURAL
10' - 0" T.O. WINDOW
APPLY SPRAY APPLIEDFIREPROOFING TO UNDERSIDE
OF COMPOSITE DECK
0" FIRST FLOOR
32' - 6" T.O. PARAPET
STEEL BEAM - REFER TOSTRUCTURAL
FIRESTOPPING
-1' - 11 1/2" B.O. PRECAST
REINFORCED CONCRETEFOUNDATION - REFER TO
STRUCTURAL
DASHED LINE INDICATES WEEPOPENING TO DRAIN CAVITY ATVERTICAL PANEL JOINTS, TYP.
DASHED LINE INDICATES WEEPOPENING TO DRAIN CAVITY ATVERTICAL PANEL JOINTS, TYP.
DASHED LINE INDICATES WEEPOPENING TO DRAIN CAVITY ATVERTICAL PANEL JOINTS, TYP.
1'-7 3/4"
1'-7 3/4"
PRECAST REVEAL JOINT
CEILING ASSEMBLY - REFER TOCEILING PLANS
6"
ALUMINUM STOREFRONTMULLION
ALUMINUM STOREFRONT SILL
17' - 6" T.O. SILL
ALUMINUM STOREFRONTRECEIVER - ALLOW FOR
DEFLECTION
ALUMINUM STOREFRONT SILL
ALUMINUM STOREFRONTRECEIVER - ALLOW FOR
DEFLECTION
CEILING ASSEMBLY - REFER TOCEILING PLANS
3/4"
1/2"
1/8"
AB
Dra
win
g
CO
NS
TR
UC
TIO
ND
OC
UM
EN
TS
Con
s ulta
nts
Pro
ject
Ow
ner
Allre
ports,
pla
ns,
spe
cific atio
ns,
com
pute
rfile
s,fie
ldd
ata
,n
ote
sa
nd
oth
er
do
cum
ents
and
instru
ments
pre
pa
red
by
OP
NA
rchi te
cts,In
c.a
sin
s trum
ents
ofse
rvicesh
allre
main
the
pro
pe
rtyof
OP
NA
rchite
ct s,In
c.O
PN
Arch
i tects,
Inc.
shallre
tain
allco
mm
on
law
,sta
tuto
ryan
dot h
er
rese
rv ed
rights,
inclu
din
gth
ec o
pyrig
ht
there
to.
©20
11
OP
NA
r chite
cts,I n
c.
CE
DA
RR
AP
IDS
-D
ES
MO
INE
S
OP
NA
RC
HIT
EC
TS
,IN
C.
INT
ER
ME
C550S ECOND
S TREETS E
CEDA RRAPID S,IOW
A5 2401
CIV
ILE
NG
INE
ER
SCHN OOR-B ONIFAZI
ENG INEERING&
SURVE YING,LC2750 1ST
AVENE,SUITE
110CEDA R
RAPID S,IOWA
5 2402P.31 9-298-888 8
ST
RU
CT
UR
AL
EN
GIN
EE
RM2B
STRUCTU RALENG INEERS, LLP4222 ND
AVES E,SUITE
BCEDA R
RAPID S,IOWA
5 2401P.31 9-364-066 6
ME
CH
AN
I CA
LE
NG
INE
ER
KJWW
ENGINE ERINGC ONSULTA NTS
6232 6THAVE
ROC KISLAND ,ILLINOIS
61201P.30 9-788-067 3
ELE
CT
RIC
AL
EN
GIN
EE
RKJW
WENGINE ERING
C ONSULTA NTS6232 6TH
AVEROC K
ISLAND ,ILLINOIS61201
P.30 9-788-067 3
Key
Pla
n
OP
NP
roje
ctN
o.112
03
00
0
2021
A
AR
CH
ITE
CT
S
200
5T
HA
VE
NU
ES
ES
UIT
E201
CE
DA
RR
AP
IDS
,IA
52401
319- 3
63-6
018
PH
ON
E319- 3
63-7
349
FA
Xw
ww
.opnarc h
itects.c o
mopn@
opnarc h
itects.c o
m
1918
1716
1514
1312
1110
98
76
54
32
1
B C D E F G H J K L M N P Q
SDP RICING
08-12 -2011
Pre
vi ous
Issue
Da
tes
Revis io
nD
ate
s
She
et
Issue
Da
te
INT
ER
ME
C6013 RD
STSE
100%CD'S
01-23 -2012
DDP RICING
10-14 -201175%
CD'S12-02 -2011
95%CD'S
12-23 -2011
A311
WA
LL
SE
CT
ION
S
3/4" = 1'-0"1 NORTH BRICK 3/4" = 1'-0"2 EAST PRECAST PANEL
6" = 1'-0"3 TYPICAL PRECAST REVEAL DETAIL
NOTE: REFER TO EXTERIOR ELEVATIONS FORLOCATIONS OF REVEAL JOINTS
1st FLOOR0"
2nd FLOOR15' - 6"
5
T.O. PARAPET32' - 6"
BRICK VENEER ON FOUNDATIONFACE BRICK - MODULAR
AIR SPACE3" RIGID INSULATION
AIR AND WATER BARRIER MEMBRANECAST IN PLACE CONCRETE FOUNDATION
2" RIGID INSULATION
TERRACOTTA ON 6" FRAMINGTERRACOTTA PANEL ASSEMBLY
AIR SPACE3" RIGID INSULATION & THERMALLY
BROKEN BRACKET & FRAMING SYSTEMAIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING W/ BATT INSULATION5/8" TYPE "X" GWB
TERRACOTTA ON 6" FRAMINGTERRACOTTA PANEL ASSEMBLY
AIR SPACE3" RIGID INSULATION & THERMALLY
BROKEN BRACKET & FRAMING SYSTEMAIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING5/8" TYPE "X" GWB
27' - 6"
EIFS SOFFIT4" EIFS
EIFS AIR / MOISTURE BARRIER5/8" GLASS MAT GYPSUM SHEATHING
A3425
ROOF ASSEMBLYFULLY ADHERED ROOFING MEMBRANE
4" POLY ISO INSULATIONMETAL ROOF DECK
SLOPED STEEL STRUCTURE
INSULATED PRECAST AT PARAPET12" INSULATED PRECAST PANEL
2" RIGID INSULATION1/2" FIRE TREATED PLYWOOD
FULLY ADHERED ROOFING MEMBRANE
12" INSULATEDARCHITECTURAL PRECAST
PANEL - PAINT
A3426
SEE STRUCTURAL
-4' - 0" BRICK LEDGE
SLAB ON GRADE ASSEMBLYREINFORCED CONCRETE SLAB
VAPOR RETARDER2" RIGID INSULATION (MIN. 24" HORIZ.)
COMPACTED FILL
A3415
Sim
1"
1'-10"
STEEL BEAM - REFER TOSTRUCTURAL
STEEL BEAM - REFER TOSTRUCTURAL
2'-3
3/4
"
A3437
Sim
CEILING ASSEMBLY - REFER TOCEILING PLANS
SLAB ASSEMBLYCONCRETE SLAB
METAL DECK
REINFORCED CONCRETEFOUNDATION - REFER TO
STRUCTURAL
ALUMINUM CURTAIN WALLSYSTEM MULLION
A3113
Sim
9'-8
1/4
"
2'-9 1/8"
DASHED LINE INDICATES WEEPOPENING TO DRAIN CAVITY ATVERTICAL PANEL JOINTS, TYP.
ALUMINUM CURTAIN WALLSYSTEM MULLION
ALUMINUM CURTAIN WALLSYSTEM MULLION
ALUMINUM STOREFRONT SILL
ROLLER WINDOW SHADES W/FINISHED ENCLOSURE FASCIA
ALUMINUM CURTAIN WALLSYSTEM HEAD
25' - 6" B.O. PRECAST
6"
25' - 2 1/4" T.O. WINDOW
ALUMINUM STOREFRONTWINDOW ASSEMBLY
3 PA
NEL
S3
PAN
ELS
1' - 1 1/4" T.O. SILL
-1' - 0 3/4" B.O. EIFS
A3453
Sim
ALUMINUM COMPOSITEBACKPAN ATTACHED TOWINDOW FRAME - FINISH
SYSTEM TO MATCH WINDOWSYSTEM
CURTAIN WALL INSULATION
ROLLER WINDOW SHADES W/FINISHED ENCLOSURE FASCIA
SPANDREL GLASS PANEL
1st FLOOR0"
2nd FLOOR15' - 6"
5
T.O. PARAPET32' - 6"
BRICK VENEER ON 6" FRAMINGFACE BRICK - MODULAR
AIR SPACE3" RIGID INSULATION
AIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING5/8" TYPE "X" GWB
BRICK VENEER ON FOUNDATIONFACE BRICK - MODULAR
AIR SPACE3" RIGID INSULATION
AIR AND WATER BARRIER MEMBRANECAST IN PLACE CONCRETE FOUNDATION
2" RIGID INSULATION
BRICK VENEER ON 6" FRAMINGFACE BRICK - MODULAR
AIR SPACE3" RIGID INSULATION
AIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING5/8" TYPE "X" GWB
SLAB ON GRADE ASSEMBLYREINFORCED CONCRETE SLAB
VAPOR RETARDER2" RIGID INSULATION (MIN. 24" HORIZ.)
COMPACTED FILL
ROOF ASSEMBLYFULLY ADHERED ROOFING MEMBRANE
4" POLY ISO INSULATIONMETAL ROOF DECK
SLOPED STEEL STRUCTURE
-4' - 0" BRICK LEDGE
12" INSULATEDARCHITECTURAL PRECAST
PANEL - PAINT
INSULATED PRECAST WITH 3 5/8" FRAMING12" INSULATED PRECAST PANEL
3 5/8" METAL FRAMING5/8" TYPE "X" GWB
INSULATED PRECAST AT PARAPET12" INSULATED PRECAST PANEL
2" RIGID INSULATION1/2" FIRE TREATED PLYWOOD
FULLY ADHERED ROOFING MEMBRANE
12" INSULATEDARCHITECTURAL PRECAST
PANEL - PAINT
A3415
Sim
A3416
Sim
A3417
Sim
A3422
A3421
SEE STRUCTURAL
A3437
Sim
7'-1
0"2'
-0"
STEEL BEAM - REFER TOSTRUCTURAL
STEEL BEAM - REFER TOSTRUCTURAL
STEEL BEAM - REFER TOSTRUCTURAL
30' - 2 3/4" T.O.S.
1'-10"
SLAB ASSEMBLYCONCRETE SLAB
METAL DECK
1"
10' - 0" T.O. BRICK
REINFORCED CONCRETEFOUNDATION - REFER TO
STRUCTURAL
1"
2'-0
"2'
-0"
6'-0
"
1'-2"7"
6' - 0" T.O. SILL
8' - 0" T.O. WINDOW
A3113
Sim
ALUMINUM-FRAMEDSTOREFRONT
ROLLER WINDOW SHADES W/FINISHED ENCLOSURE FASCIA
REFER TO STRUCTURALREFER TO STRUCTURAL
A3412
Sim
A3413
Sim
17' - 6" T.O. SILL
5' - 10" T.O. BRICK
PRECAST REVEAL JOINT
1'-7 3/4"
DASHED LINE INDICATES WEEPOPENING TO DRAIN CAVITY ATVERTICAL PANEL JOINTS, TYP.
DASHED LINE INDICATES WEEPOPENING TO DRAIN CAVITY ATVERTICAL PANEL JOINTS, TYP.
CEILING ASSEMBLY - REFER TOCEILING PLANS
6"
REFER TO STRUCTURAL
ALUMINUM STOREFRONTMULLION
25' - 4" T.O. WINDOW
ALUMINUM STOREFRONTRECEIVER - ALLOW FOR
DEFLECTION
ALUMINUM STOREFRONTRECEIVER - ALLOW FOR
DEFLECTION
ALUMINUM STOREFRONT SILL
ROLLER WINDOW SHADES W/FINISHED ENCLOSURE FASCIA
AB
Dra
win
g
CO
NS
TR
UC
TIO
ND
OC
UM
EN
TS
Co
nsu
ltan
ts
Pro
ject
Ow
ner
All re
po
rts, pla
ns, sp
ecifica
tion
s, com
pu
ter file
s,fie
ld d
ata
, no
tes a
nd o
ther d
ocu
me
nts a
nd
instru
men
ts pre
pa
red
by O
PN
Arch
itects, In
c.a
s instru
me
nts o
f service
shall re
main
the
pro
pe
rty of O
PN
Arch
itects, In
c. OP
NA
rchite
cts, Inc. sh
all re
tain
all co
mm
on la
w,
statu
tory a
nd
oth
er re
serve
d rig
hts, in
clud
ing
the
cop
yrigh
t the
reto
.
© 2
01
1 O
PN
Arch
itects, In
c.
CE
DA
R R
AP
IDS
- DE
S M
OIN
ES
OP
N A
RC
HIT
EC
TS
, INC
.
INT
ER
ME
C550 SECOND STREET SECEDAR RAPIDS, IOW
A 52401
CIV
IL E
NG
INE
ER
SCHNOOR - BONIFAZIENGINEERING & SURVEYING, LC2750 1ST AVE NE, SUITE 110CEDAR RAPIDS, IOW
A 52402P. 319-298-8888
ST
RU
CT
UR
AL E
NG
INE
ER
M2B STRUCTURAL ENGINEERS, LLP422 2ND AVE SE, SUITE BCEDAR RAPIDS, IOW
A 52401P. 319-364-0666
ME
CH
AN
ICA
L E
NG
INE
ER
KJWW
ENGINEERING CONSULTANTS623 26TH AVEROCK ISLAND, ILLINOIS 61201P. 309-788-0673
ELE
CT
RIC
AL E
NG
INE
ER
KJWW
ENGINEERING CONSULTANTS623 26TH AVEROCK ISLAND, ILLINOIS 61201P. 309-788-0673
Ke
y Pla
n
OP
N P
roje
ct No. 1
12
030
00
2021
A
AR
CH
ITE
CT
S
200 5
TH
AV
EN
UE
SE
SU
ITE
201
CE
DA
R R
AP
IDS
, IA 5
2401
319-3
63-6
018 P
HO
NE
319-3
63-7
349 F
AX
ww
w.o
pnarch
itects.co
mopn@
opnarch
itects.co
m
1918
1716
1514
1312
1110
98
76
54
32
1
B C D E F G H J K L M N P Q
SD PRICING08-12-2011
Pre
vious Issu
e D
ate
s
Re
vision D
ate
s
Sh
ee
t Issue D
ate
INT
ER
ME
C601 3RD ST SE
100% CD'S
01-23-2012
DD PRICING10-14-2011
75% CD'S
12-02-201195%
CD'S12-23-2011
A314
WA
LL S
EC
TIO
NS
3/4" = 1'-0"2 WEST TERRACOTTA 3/4" = 1'-0"1 WEST FACADE
1st FLOOR0"
2nd FLOOR15' - 6"
1
5 5/8" 1'-2"
34' - 0" T.O. PARAPET
TERRACOTTA ON 6" FRAMINGTERRACOTTA PANEL ASSEMBLY
AIR SPACE3" RIGID INSULATION & THERMALLY
BROKEN BRACKET & FRAMING SYSTEMAIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING5/8" TYPE "X" GWB
BRICK VENEER ON FOUNDATIONFACE BRICK - MODULAR
AIR SPACE3" RIGID INSULATION
AIR AND WATER BARRIER MEMBRANECAST IN PLACE CONCRETE FOUNDATION
2" RIGID INSULATION
A3419
A34110
A34111
A3414
Sim
-4' - 8" BRICK LEDGE
SLAB ON GRADE ASSEMBLYREINFORCED CONCRETE SLAB
VAPOR RETARDER2" RIGID INSULATION (MIN. 24" HORIZ.)
COMPACTED FILL
TERRACOTTA AT PARAPETTERRACOTTA PANEL ASSEMBLY
AIR SPACE3" RIGID INSULATION & THERMALLY
BROKEN BRACKET & FRAMING SYSTEMAIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING5/8" GLASS MAT GYPSUM SHEATHING
2" RIGID INSULATION1/2" FIRE TREATED PLYWOOD
FULLY ADHERED ROOFING MEMBRANE
ROOF ASSEMBLYFULLY ADHERED ROOFING MEMBRANE
4" POLY ISO INSULATIONMETAL ROOF DECK
SLOPED STEEL STRUCTURE
A34110
Sim
SEE STRUCTURAL
CEILING ASSEMBLY - REFER TOCEILING PLANS
STEEL BEAM - REFER TOSTRUCTURAL
STEEL BEAM - REFER TOSTRUCTURAL
STEEL BEAM - REFER TOSTRUCTURAL
1'-7 5/8"
A3437
Sim
SLAB ASSEMBLYCONCRETE SLAB
METAL DECK
30' - 6 1/2" T.O.S.
25' - 2" T.O. WINDOW
CEILING ASSEMBLY - REFER TOCEILING PLANS
TERRACOTTA ON 6" FRAMINGTERRACOTTA PANEL ASSEMBLY
AIR SPACE3" RIGID INSULATION & THERMALLY
BROKEN BRACKET & FRAMING SYSTEMAIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING5/8" TYPE "X" GWB
ALUMINUM STOREFRONTWINDOW ASSEMBLY
SLIP CONNECTOR - REFER TOSTRUCTURAL
ALUMINUM STOREFRONTWINDOW ASSEMBLY
ROLLER WINDOW SHADES W/FINISHED ENCLOSURE FASCIA
ROLLER WINDOW SHADES W/FINISHED ENCLOSURE FASCIA
17' - 6" T.O. SILL
SLIP CONNECTOR - REFER TOSTRUCTURAL
10' - 0" T.O. WINDOW
1"
A3192
Sim
13 P
ANEL
S
11 P
ANEL
S
REINFORCED CONCRETEFOUNDATION - REFER TO
STRUCTURAL
1'-3 3/8"
ALUMINUM STOREFRONTRECEIVER - ALLOW FOR
DEFLECTION
ALUMINUM STOREFRONT SILL
ALUMINUM STOREFRONT SILL
ALUMINUM STOREFRONTRECEIVER - ALLOW FOR
DEFLECTION
2nd FLOOR15' - 6"
1
A3434
A3435
A3436
A3192
34' - 0" T.O. PARAPET
TERRACOTTA AT PARAPETTERRACOTTA PANEL ASSEMBLY
AIR SPACE3" RIGID INSULATION & THERMALLY
BROKEN BRACKET & FRAMING SYSTEMAIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING5/8" GLASS MAT GYPSUM SHEATHING
2" RIGID INSULATION1/2" FIRE TREATED PLYWOOD
FULLY ADHERED ROOFING MEMBRANE
ROOF ASSEMBLYFULLY ADHERED ROOFING MEMBRANE
4" POLY ISO INSULATIONMETAL ROOF DECK
SLOPED STEEL STRUCTURE
STEEL BEAM - REFER TOSTRUCTURAL
CEILING ASSEMBLY - REFER TOCEILING PLANS
ALUMINUM CURTAIN WALLSYSTEM MULLION
TERRACOTTA ON 6" FRAMINGTERRACOTTA PANEL ASSEMBLY
AIR SPACE3" RIGID INSULATION & THERMALLY
BROKEN BRACKET & FRAMING SYSTEMAIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING5/8" TYPE "X" GWB
1'-7 5/8"
STEEL BEAM - REFER TOSTRUCTURAL
EIFS SOFFIT4" EIFS
EIFS AIR / MOISTURE BARRIER5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING
A3444
Sim
A3419
Sim
30' - 9" T.O.S.
10' - 0" B.O. EIFS
28' - 5" T.O. WINDOW
5"5"
5"5"
5"5"
5"
TERRA COTTA SUNSCREEN
13 P
ANEL
S
1'-4 1/4"
8 PA
NEL
S
ALUMINUM CURTAIN WALLSYSTEM SILL
ALUMINUM CURTAIN WALLSYSTEM
ALUMINUM CURTAIN WALLSYSTEM HEAD
COLUMN BEYOND
TERRACOTTA ON 6" FRAMINGTERRACOTTA PANEL ASSEMBLY
AIR SPACE3" RIGID INSULATION & THERMALLY
BROKEN BRACKET & FRAMING SYSTEMAIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING
ALUMINUM COMPOSITEBACKPAN ATTACHED TOWINDOW FRAME - FINISH
SYSTEM TO MATCH WINDOWSYSTEM
CURTAIN WALL INSULATION
ROLLER WINDOW SHADES W/FINISHED ENCLOSURE FASCIA
FT WOOD BLOCKING
3 5/8" METAL FRAMINGSPANDREL GLASS PANEL
FT WOOD BLOCKING
AB
Dra
win
g
CO
NS
TR
UC
TIO
ND
OC
UM
EN
TS
Co
nsu
ltan
ts
Pro
ject
Ow
ner
All re
po
rts, pla
ns, sp
ecifica
tion
s, com
pu
ter file
s,fie
ld d
ata
, no
tes a
nd o
ther d
ocu
me
nts a
nd
instru
men
ts pre
pa
red
by O
PN
Arch
itects, In
c.a
s instru
me
nts o
f service
shall re
main
the
pro
pe
rty of O
PN
Arch
itects, In
c. OP
NA
rchite
cts, Inc. sh
all re
tain
all co
mm
on la
w,
statu
tory a
nd
oth
er re
serve
d rig
hts, in
clud
ing
the
cop
yrigh
t the
reto
.
© 2
01
1 O
PN
Arch
itects, In
c.
CE
DA
R R
AP
IDS
- DE
S M
OIN
ES
OP
N A
RC
HIT
EC
TS
, INC
.
INT
ER
ME
C550 SECOND STREET SECEDAR RAPIDS, IOW
A 52401
CIV
IL E
NG
INE
ER
SCHNOOR - BONIFAZIENGINEERING & SURVEYING, LC2750 1ST AVE NE, SUITE 110CEDAR RAPIDS, IOW
A 52402P. 319-298-8888
ST
RU
CT
UR
AL E
NG
INE
ER
M2B STRUCTURAL ENGINEERS, LLP422 2ND AVE SE, SUITE BCEDAR RAPIDS, IOW
A 52401P. 319-364-0666
ME
CH
AN
ICA
L E
NG
INE
ER
KJWW
ENGINEERING CONSULTANTS623 26TH AVEROCK ISLAND, ILLINOIS 61201P. 309-788-0673
ELE
CT
RIC
AL E
NG
INE
ER
KJWW
ENGINEERING CONSULTANTS623 26TH AVEROCK ISLAND, ILLINOIS 61201P. 309-788-0673
Ke
y Pla
n
OP
N P
roje
ct No. 1
12
030
00
2021
A
AR
CH
ITE
CT
S
200 5
TH
AV
EN
UE
SE
SU
ITE
201
CE
DA
R R
AP
IDS
, IA 5
2401
319-3
63-6
018 P
HO
NE
319-3
63-7
349 F
AX
ww
w.o
pnarch
itects.co
mopn@
opnarch
itects.co
m
1918
1716
1514
1312
1110
98
76
54
32
1
B C D E F G H J K L M N P Q
SD PRICING08-12-2011
Pre
vious Issu
e D
ate
s
Re
vision D
ate
s
Sh
ee
t Issue D
ate
INT
ER
ME
C601 3RD ST SE
100% CD'S
01-23-2012
DD PRICING10-14-2011
75% CD'S
12-02-201195%
CD'S12-23-2011
A312
WA
LL S
EC
TIO
NS
3/4" = 1'-0"1 EAST TERRACOTTA
3/4" = 1'-0"2 EAST TERRACOTTA AT SOUTH END
1st FLOOR0"
2nd FLOOR15' - 6"
1
5 5/8" 1'-2"
34' - 0" T.O. PARAPET
TERRACOTTA ON 6" FRAMINGTERRACOTTA PANEL ASSEMBLY
AIR SPACE3" RIGID INSULATION & THERMALLY
BROKEN BRACKET & FRAMING SYSTEMAIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING5/8" TYPE "X" GWB
BRICK VENEER ON FOUNDATIONFACE BRICK - MODULAR
AIR SPACE3" RIGID INSULATION
AIR AND WATER BARRIER MEMBRANECAST IN PLACE CONCRETE FOUNDATION
2" RIGID INSULATION
A3419
A34110
A34111
A3414
Sim
-4' - 8" BRICK LEDGE
SLAB ON GRADE ASSEMBLYREINFORCED CONCRETE SLAB
VAPOR RETARDER2" RIGID INSULATION (MIN. 24" HORIZ.)
COMPACTED FILL
TERRACOTTA AT PARAPETTERRACOTTA PANEL ASSEMBLY
AIR SPACE3" RIGID INSULATION & THERMALLY
BROKEN BRACKET & FRAMING SYSTEMAIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING5/8" GLASS MAT GYPSUM SHEATHING
2" RIGID INSULATION1/2" FIRE TREATED PLYWOOD
FULLY ADHERED ROOFING MEMBRANE
ROOF ASSEMBLYFULLY ADHERED ROOFING MEMBRANE
4" POLY ISO INSULATIONMETAL ROOF DECK
SLOPED STEEL STRUCTURE
A34110
Sim
SEE STRUCTURAL
CEILING ASSEMBLY - REFER TOCEILING PLANS
STEEL BEAM - REFER TOSTRUCTURAL
STEEL BEAM - REFER TOSTRUCTURAL
STEEL BEAM - REFER TOSTRUCTURAL
1'-7 5/8"
A3437
Sim
SLAB ASSEMBLYCONCRETE SLAB
METAL DECK
30' - 6 1/2" T.O.S.
25' - 2" T.O. WINDOW
CEILING ASSEMBLY - REFER TOCEILING PLANS
TERRACOTTA ON 6" FRAMINGTERRACOTTA PANEL ASSEMBLY
AIR SPACE3" RIGID INSULATION & THERMALLY
BROKEN BRACKET & FRAMING SYSTEMAIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING5/8" TYPE "X" GWB
ALUMINUM STOREFRONTWINDOW ASSEMBLY
SLIP CONNECTOR - REFER TOSTRUCTURAL
ALUMINUM STOREFRONTWINDOW ASSEMBLY
ROLLER WINDOW SHADES W/FINISHED ENCLOSURE FASCIA
ROLLER WINDOW SHADES W/FINISHED ENCLOSURE FASCIA
17' - 6" T.O. SILL
SLIP CONNECTOR - REFER TOSTRUCTURAL
10' - 0" T.O. WINDOW
1"
A3192
Sim
13 P
ANEL
S
11 P
ANEL
S
REINFORCED CONCRETEFOUNDATION - REFER TO
STRUCTURAL
1'-3 3/8"
ALUMINUM STOREFRONTRECEIVER - ALLOW FOR
DEFLECTION
ALUMINUM STOREFRONT SILL
ALUMINUM STOREFRONT SILL
ALUMINUM STOREFRONTRECEIVER - ALLOW FOR
DEFLECTION
2nd FLOOR15' - 6"
1
A3434
A3435
A3436
A3192
34' - 0" T.O. PARAPET
TERRACOTTA AT PARAPETTERRACOTTA PANEL ASSEMBLY
AIR SPACE3" RIGID INSULATION & THERMALLY
BROKEN BRACKET & FRAMING SYSTEMAIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING5/8" GLASS MAT GYPSUM SHEATHING
2" RIGID INSULATION1/2" FIRE TREATED PLYWOOD
FULLY ADHERED ROOFING MEMBRANE
ROOF ASSEMBLYFULLY ADHERED ROOFING MEMBRANE
4" POLY ISO INSULATIONMETAL ROOF DECK
SLOPED STEEL STRUCTURE
STEEL BEAM - REFER TOSTRUCTURAL
CEILING ASSEMBLY - REFER TOCEILING PLANS
ALUMINUM CURTAIN WALLSYSTEM MULLION
TERRACOTTA ON 6" FRAMINGTERRACOTTA PANEL ASSEMBLY
AIR SPACE3" RIGID INSULATION & THERMALLY
BROKEN BRACKET & FRAMING SYSTEMAIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING5/8" TYPE "X" GWB
1'-7 5/8"
STEEL BEAM - REFER TOSTRUCTURAL
EIFS SOFFIT4" EIFS
EIFS AIR / MOISTURE BARRIER5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING
A3444
Sim
A3419
Sim
30' - 9" T.O.S.
10' - 0" B.O. EIFS
28' - 5" T.O. WINDOW
5"5"
5"5"
5"5"
5"
TERRA COTTA SUNSCREEN
13 P
ANEL
S
1'-4 1/4"
8 PA
NEL
S
ALUMINUM CURTAIN WALLSYSTEM SILL
ALUMINUM CURTAIN WALLSYSTEM
ALUMINUM CURTAIN WALLSYSTEM HEAD
COLUMN BEYOND
TERRACOTTA ON 6" FRAMINGTERRACOTTA PANEL ASSEMBLY
AIR SPACE3" RIGID INSULATION & THERMALLY
BROKEN BRACKET & FRAMING SYSTEMAIR AND WATER BARRIER MEMBRANE5/8" GLASS MAT GYPSUM SHEATHING
6" METAL FRAMING
ALUMINUM COMPOSITEBACKPAN ATTACHED TOWINDOW FRAME - FINISH
SYSTEM TO MATCH WINDOWSYSTEM
CURTAIN WALL INSULATION
ROLLER WINDOW SHADES W/FINISHED ENCLOSURE FASCIA
FT WOOD BLOCKING
3 5/8" METAL FRAMINGSPANDREL GLASS PANEL
FT WOOD BLOCKING
AB
Dra
win
g
CO
NS
TR
UC
TIO
ND
OC
UM
EN
TS
Co
nsu
ltan
ts
Pro
ject
Ow
ner
All re
po
rts, pla
ns, sp
ecifica
tion
s, com
pu
ter file
s,fie
ld d
ata
, no
tes a
nd o
ther d
ocu
me
nts a
nd
instru
men
ts pre
pa
red
by O
PN
Arch
itects, In
c.a
s instru
me
nts o
f service
shall re
main
the
pro
pe
rty of O
PN
Arch
itects, In
c. OP
NA
rchite
cts, Inc. sh
all re
tain
all co
mm
on la
w,
statu
tory a
nd
oth
er re
serve
d rig
hts, in
clud
ing
the
cop
yrigh
t the
reto
.
© 2
01
1 O
PN
Arch
itects, In
c.
CE
DA
R R
AP
IDS
- DE
S M
OIN
ES
OP
N A
RC
HIT
EC
TS
, INC
.
INT
ER
ME
C550 SECOND STREET SECEDAR RAPIDS, IOW
A 52401
CIV
IL E
NG
INE
ER
SCHNOOR - BONIFAZIENGINEERING & SURVEYING, LC2750 1ST AVE NE, SUITE 110CEDAR RAPIDS, IOW
A 52402P. 319-298-8888
ST
RU
CT
UR
AL E
NG
INE
ER
M2B STRUCTURAL ENGINEERS, LLP422 2ND AVE SE, SUITE BCEDAR RAPIDS, IOW
A 52401P. 319-364-0666
ME
CH
AN
ICA
L E
NG
INE
ER
KJWW
ENGINEERING CONSULTANTS623 26TH AVEROCK ISLAND, ILLINOIS 61201P. 309-788-0673
ELE
CT
RIC
AL E
NG
INE
ER
KJWW
ENGINEERING CONSULTANTS623 26TH AVEROCK ISLAND, ILLINOIS 61201P. 309-788-0673
Ke
y Pla
n
OP
N P
roje
ct No. 1
12
030
00
2021
A
AR
CH
ITE
CT
S
200 5
TH
AV
EN
UE
SE
SU
ITE
201
CE
DA
R R
AP
IDS
, IA 5
2401
319-3
63-6
018 P
HO
NE
319-3
63-7
349 F
AX
ww
w.o
pnarch
itects.co
mopn@
opnarch
itects.co
m
1918
1716
1514
1312
1110
98
76
54
32
1
B C D E F G H J K L M N P Q
SD PRICING08-12-2011
Pre
vious Issu
e D
ate
s
Re
vision D
ate
s
Sh
ee
t Issue D
ate
INT
ER
ME
C601 3RD ST SE
100% CD'S
01-23-2012
DD PRICING10-14-2011
75% CD'S
12-02-201195%
CD'S12-23-2011
A312
WA
LL S
EC
TIO
NS
3/4" = 1'-0"1 EAST TERRACOTTA
3/4" = 1'-0"2 EAST TERRACOTTA AT SOUTH END
4CR PARKConstructed in the 600 block of Second Street SE on an existing city-owned surface lot, this 6-story, cast-in-place, post-tensioned structure will provide 620 additional parking spaces to the downtown district for several local area businesses. Nearly all parking will be monthly, contract parking for employees and visitors of nearby business offices. Approximately 75 spaces will remain as transient, hourly parking.
Vehicular access to the parking ramp will be two open entry/exits from 2nd Street and 6th Avenue. Pedestrian egress has been provided on both the northeast and southwest corners of the parking structure.
The addition of this ramp to the downtown cityscape is intended to replace the city’s First Street Parkade, which had been slated for demolition before it received flood damage in 2008.
SE VIEW
8'-4
"1'
-1 1
/2"
2'-6
1/2
"3'
-8"
43'-0
"2'
-8"
2'-1"
3'-6
"3'
-6"
3'-6
"3'
-6"
3'-6
"
61'-4
"
2"
2"
2"
2"
2"
2'-2
"
2'-4
"
2'-2
"
2'-4
"
8'-4
"1'
-1 1
/2"
2'-6
1/2
"3'
-8"
43'-0
"2'
-8"
2'-1"
3'-6
"3'
-6"
3'-6
"3'
-6"
3'-6
"
61'-4
"
2"
2"
2"
2"
2"
A311
1 WALL SECTION1/2" - 1'-0" 2 WALL SECTION
1/2" - 1'-0"
8'-4
"1'
-1 1
/2"
2'-6
1/2
"3'
-8"
43'-0
"2'
-8"
2'-1"
3'-6
"3'
-6"
3'-6
"3'
-6"
3'-6
"
61'-4
"
2'-2
"
2'-4
"
2'-2
"
2'-4
"
VA
RIE
S6"
3'-2
"3'
-8"
43'-0
"2'
-8"
2'-1"
3'-6
"3'
-6"
3'-6
"3'
-6"
3'-6
"
61'-4
"
8'-3
1/2
"9
1/4"
1'-1
1/4
"
2'-2
"
2'-4
"
2'-2
"
2'-4
"
A312
1 WALL SECTION1/2" - 1'-0" 2 WALL SECTION
1/2" - 1'-0"
NE VIEW
SW VIEW
NW VIEW
STRUCTURAL BAY ELEVATION
5RED BARN VIDEO LOUNGEThis exhibition concerns the complex interrelationship of art, landscape and architecture in a rural context. Led by Jeffery L. Day, a professor in the College of Architecture at the University of Nebraska-Lincoln, the show focuses on design proposals for the development of Art Farm, a non-profit art residency program situated on a forty-acre working farm in Marquette, Nebraska. The design work and exhibition are collaborations between the architecture firm Min l Day and FACT, a student-staffed design lab.
The Art Farm exhibition features the installation in the Sheldon Great Hall of an old farm building from Art Farm that has been re-purposed as a video lounge with a modern interior.
The combined focus areas of architectural and landscape design, art practice, and the rural Nebraska environment suggest that the exhibition would appeal to a wide variety of people.
The exhibition demonstrates alternatives to the predominant land uses found in the Great Plains and it asks the question, “Can art form the basis of a post-agricultural landscape?”
*2008 AIA Central States Citation Award Photos courtesy of Min l Day
ORIGINAL ROOF FRAMING & SHEATHING
SHAPED MDF RIBS
MASONITE CEILING SUBSTRATE
1/2” VOLARA FOAM LINER
SHAPED EPS FOAM
SANDED OSB INTERIOR CLADDING
ORIGINAL 2X WOOD FRAMING
ORIGINAL DROP SIDING
6URBAN AGRICULTUREStrategic Objectives: Create an environmentally responsive, holistic design solution for the West Haymarket District that considers the facility in terms of flow of people, water, vegetation, and energy harnessing through the use of wind technology. This site will serve as a diversified energy collection network.
Land Use: Implement a progressive land use strategy that greatly increases the impact of railway transportation. Commercial and residential development hubs will promote local and regional retail operations, extensive open green space for continuous public use and reserves for circulation and easy access. The majority of the site will be an urban garden, allowing for production of agriculture in the middle of downtown Lincoln.
Transportation: Transportation will be a strong visual and physical connection that will link the south end of the West Haymarket with the land mark tower which will be located on the north end of this land. A train station will be located on the southern portion of the Haymarket to activate this current industrialized area of Lincoln.
*Published on the Council for Tall Buildings and Urban Habitat (CTBUH) website
*Published in the University of Nebraska-Lincoln book of work
SECTION DIAGRAM SKIN DIAGRAM
LOBBY
RESIDENCE
ADAM K CRAMM AIA, [email protected]
402.679.2151