6965 El Camino Real, Suite 105-278, Carlsbad, CA 92009 www.mgpaia.com T: 760.929.1500 F: 760.929.1506 ADDENDUM NUMBER FIVE DISTRICT BID NO. 07-19/20 (Phase 2) ALBERHILL ELEMENTARY SCHOOL LAKE ELSINORE UNIFIED SCHOOL DISTRICT LAKE ELSINORE, CALIFORNIA July 11, 2019 Architect's Project Number: LEAHE02 DSA Application Number: 04-117782 General: All project documents including contract documents, drawings and specifications shall remain unchanged, except for those elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and this Addendum, this Addendum shall govern. Acknowledge receipt of Addenda Number Two, Three, Four and Five in the appropriate spot on the Bid Form. GENERAL BIDDING REQUIREMENTS 1. Add Bid Alternate Form to Bid Documents. This applies to Alternate Bid Item # 01 (Glazing Security Film) for Bid Package No. 12 as indicated herein. Replace Bid Form Pages 20 thru 23 (attached) and submit these replacement sheets with their bid. 2. Phase 1 Sub-grade elevations will be documented in ‘Record Drawings’ upon completion of the work. The sub-grade elevations will be established based on Finish Surface (FS) Finish Floor (FF) and Top of Curb (TC) & Flow Line (FL) on Civil Drawings to +/- 0.10 FT. Except at building pads; the Building Pads’ (Sub-grade) will be certified to within 1/2 INCH of required elevation (11 INCHES below Bldg. finish floor elevations) Per structural foundation plans. 3. As it affects Addendum Two: Change District Bid Number to 07-19/20 (Phase 2). 4. Bid Package Scope Assignment Clarification: - Any backing called out to be “wood” shall be supplied and installed by Bid Package No. 7 Trade Contractor. - Any backing called out to be “light gauge metal” shall be supplied and installed by Bid Package No. 14. Trade Contractor. SPECIFICATIONS ITEM NO. 1 SPECIFICATION – TABLE OF CONTENTS 1. Division 7: Revise 07 1310 title to, (Sheet Membrane Waterproofing and Drainage Composite). 2. Division 8: Remove Section 08 1116 (Aluminum Doors and Frames). 3. Division 8: Correct the Section Number from 08 8313, to read, 08 3313 (Overhead Coiling Doors). ITEM NO. 2 SPECIFICATION 01 1050: FIELD ENGINEERING 1. Section 1.06.A.: Delete the text, “On the request of the Architect,” replace with, “Complete field engineering and record documentation is required per this Specification.” 2. Section 1.06.B.: Add Item 8. to read, “After required fine-grading, paving and aggregate base installation, Prime Trade Contractor shall provide on survey record document (15) Fifteen additional as-graded / as-paved spot elevations per site acre” Page 1 of 28

Upload: others

Post on 15-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

6965 El Camino Real, Suite 105-278, Carlsbad, CA 92009 www.mgpaia.com

T: 760.929.1500 F: 760.929.1506

ADDENDUM NUMBER FIVE DISTRICT BID NO. 07-19/20 (Phase 2) ALBERHILL ELEMENTARY SCHOOL LAKE ELSINORE UNIFIED SCHOOL DISTRICT LAKE ELSINORE, CALIFORNIA July 11, 2019 Architect's Project Number: LEAHE02 DSA Application Number: 04-117782 General: All project documents including contract documents, drawings and specifications shall remain unchanged, except for those elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and this Addendum, this Addendum shall govern. Acknowledge receipt of Addenda Number Two, Three, Four and Five in the appropriate spot on the Bid Form.

GENERAL BIDDING REQUIREMENTS

1. Add Bid Alternate Form to Bid Documents. This applies to Alternate Bid Item # 01 (Glazing Security Film) for Bid Package No. 12 as indicated herein. Replace Bid Form Pages 20 thru 23 (attached) and submit these replacement sheets with their bid.

2. Phase 1 Sub-grade elevations will be documented in ‘Record Drawings’ upon completion of the work. The sub-grade elevations will be established based on Finish Surface (FS) Finish Floor (FF) and Top of Curb (TC) & Flow Line (FL) on Civil Drawings to +/- 0.10 FT. Except at building pads; the Building Pads’ (Sub-grade) will be certified to within 1/2 INCH of required elevation (11 INCHES below Bldg. finish floor elevations) Per structural foundation plans.

3. As it affects Addendum Two: Change District Bid Number to 07-19/20 (Phase 2). 4. Bid Package Scope Assignment Clarification: - Any backing called out to be “wood” shall

be supplied and installed by Bid Package No. 7 Trade Contractor. - Any backing called out to be “light gauge metal” shall be supplied and installed by Bid Package No. 14. Trade Contractor.

SPECIFICATIONS

ITEM NO. 1 SPECIFICATION – TABLE OF CONTENTS

1. Division 7: Revise 07 1310 title to, (Sheet Membrane Waterproofing and Drainage Composite). 2. Division 8: Remove Section 08 1116 (Aluminum Doors and Frames). 3. Division 8: Correct the Section Number from 08 8313, to read, 08 3313 (Overhead Coiling

Doors).

ITEM NO. 2 SPECIFICATION 01 1050: FIELD ENGINEERING

1. Section 1.06.A.: Delete the text, “On the request of the Architect,” replace with, “Complete field engineering and record documentation is required per this Specification.”

2. Section 1.06.B.: Add Item 8. to read, “After required fine-grading, paving and aggregate base installation, Prime Trade Contractor shall provide on survey record document (15) Fifteen additional as-graded / as-paved spot elevations per site acre”

Page 1 of 28

Page 2: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

ADDENDUM NUMBER FIVE BID NO. 07-19/20 (Phase 2) ALBERHILL ELEMENTARY SCHOOL LAKE ELSINORE UNIFIED SCHOOL DISTRICT

July 11, 2019 Page 2 of 7

6965 El Camino Real, Suite 105-278, Carlsbad, CA 92009 www.mgpaia.com

T: 760.929.1500 F: 760.929.1506

ITEM NO. 3 SPECIFICATION 06 8316: FIBERGLASS REINFORCED PANELING

1. Section 2.01. A. Change Sequentia, Inc, to Crane Composites – Sequentia. 2. Add Nudo – Fiberlite FRP to Manufacturers List. 3. Section 2.02. Add 4.: “Panels shall meet Class A rating for Flame-Spread and Smoke-

Developed when tested per ASTM E-84 and shall comply with CDPH low VOC emitting material compliance (Section 01350)”.

ITEM NO. 4 SPECIFICATION 05 5000: METAL FABRICATIONS

1. Section 2.03. E.: Ladders, change from, “not used” to read, “provide custom fabricated or pre-manufactured roof access ladders, hot dip galvanized after fabrication” see plans for locations and details. Provide “Ladder-up” safety extension pole at each roof access hatch.

ITEM NO. 5 SPECIFICATION 07 1116: INSULATION AND ISOLATION

1. Section 2.01. A. 1.: Change thermal insulation from’ “R-30” to read, “R-38” 2. Section 2.01. B. 1.: Change thermal insulation from “R-11” to read, “R-21”

ITEM NO. 6 SPECIFICATION 08 1116: ALUMINUM DOORS AND FRAMES

1. Delete this specification section in its entirety. Aluminum Entrances and Storefront are required and indicated in Specification 08 4100.

ITEM NO. 7 SPECIFICATION 08 3313: OVERHEAD COILING DOORS

1. Section 2.01. A.: Change from, “motor operated” to “manual push-up” counter door.

ITEM NO. 8 SPECIFICATION 08 8800: GLASS AND GLAZING

1. Revise Section 2.01, E.: Remove “Solargray” by PPG Industries, Replace with Basis-of -Design, = Guardian Glass, SNX 62/27 on “CrystalGray”. Thickness remains the same. Fully Tempered all panes, all units.

2. Revise Section 2.01,G. 3. e.: Revise spacer from “metal”, to “Black”, thermally broken, per manufacturers requirements, fully compatible with Argon Gas filled IGU.

3. Add Section 2.01. G. 3. h.: Fill: Argon gas filled IGUs all exterior facing units. 4. Revise Section 2.01. G. 4.: Change from, “Un-coated Insulating Glass Units” (IGU) to comply

with the following: a. Change from Exterior Pane: “tinted “Solargray” by (PPG Industries)” to read: “Basis of

Design is Guardian Glass, SunGuard, Fully-Coated 1” IGU with Guardian Glass Exterior SNX 62/27 on “CrystalGray” glass with the following min. design performance requirements: Light Transmittance = 44%, Reflect Out = 8%, Reflect In = 11%, U-value = 0.24 (Argon gas fill) SHGC 0.22, LSG 1.98. All panes, all units fully tempered”.

b. The IGU thermally broken spacer shall be suitable for manufacturers Argon gas installation.

ITEM NO. 9 SPECIFICATION 09 9200: LATH AND PLASTER

1. Revise Section 2.01. F.: Change from, “color as selected by Architect,” to read, “Custom stucco color to match Dunn-Edwards Paint DE6214 “Pigeon Gray.”

Page 2 of 28

Page 3: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

ADDENDUM NUMBER FIVE BID NO. 07-19/20 (Phase 2) ALBERHILL ELEMENTARY SCHOOL LAKE ELSINORE UNIFIED SCHOOL DISTRICT

July 11, 2019 Page 3 of 7

6965 El Camino Real, Suite 105-278, Carlsbad, CA 92009 www.mgpaia.com

T: 760.929.1500 F: 760.929.1506

ITEM NO. 10 SPECIFICATION 23 0900: INSTRUMENTATION AND CONTROLS

1. Instrumentation and Controls: Delete paragraph 2.02-A, there is no existing BAS protocol.

ITEM NO. 11 SPECIFICATION DIVISION 26: NETWORK EQUIPMENT AND CEILING MOUNTED PROJECTOR. (Bid Package No. 11)

1. Add Section 26 2413. 2.09: for rack mounted switchgear, Digital network equipment and Projectors to the Project. This equipment shall be Contractor Furnished and Contractor Installed, in addition to the other Digital Network Equipment/Racks/UPS as indicated in the Plans and Specifications:

2. Network Equipment: SWITCHES

Provide and Install: HPE ARUBA 2930M 48G POE+ Part No. Jl322a - 2930m; plus, associated power supply’s ji087a x372 PS 1050 watt Bldg. Rack Layout Bldg. 100 70 ports 2 switches 48 port patch panel (1u switch) Bldg. 200 15 ports 1 switch 24 port patch panel (1u switch) Bldg. 300 145 ports 4 switches 48 port patch panel (1u switch) Bldg. 400 185 ports 4 switches 48 port patch panel (1u switch) Bldg. 500 185 ports 4 switches 48 port patch panel (1u switch) -TOTAL 15 Switches per model number above with associated patch panels & cables. Provide and Install Wireless Access Points (WAP): HPE ARUBA 335, Part No. jw825a (335 AP) with mounting bracket and jacks. -One per Classroom & Collaboration Rooms and where indicated on the drawings.

3. Bldg. 200 (Multi-purpose Room) Provide and Install Projector and Mounting Kit: a. Epson Pro L1300 4K “Large Venue Projector” Ceiling mounted projector. b. Chief KTTPS003 Mounting Kit. c. Epson Middle Throw powered lens. d. DYNAVISTA Full motion universal telescoping projector mounting brackets.

ITEM NO. 12 SPECIFICATION 26 6060: PORTABLE ASSISTIVE LISTENING SYSTEMS

1. Provide Assistive Listening Devices in accordance with the Table on Sheet A-9.7. Provide a min. number of complete receiver systems to accommodate the portable listening devices indicated for each Building.

Page 3 of 28

Page 4: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

ADDENDUM NUMBER FIVE BID NO. 07-19/20 (Phase 2) ALBERHILL ELEMENTARY SCHOOL LAKE ELSINORE UNIFIED SCHOOL DISTRICT

July 11, 2019 Page 4 of 7

6965 El Camino Real, Suite 105-278, Carlsbad, CA 92009 www.mgpaia.com

T: 760.929.1500 F: 760.929.1506

DRAWINGS

ITEM NO. 13 DRAWING A-1.2, A-1.3 & Ad1.1: ENLARGED SITE PLAN & DETAILS

1. Provide fine grading and Add aggregate base course for parking lot paving adjacent to Bldg. 500 in accordance with attached Sketch SK 5.01.

2. Detail 1/Ad1.1: Revise pavement legend in accordance with attached Sketch SK 5.02. Add notes regarding saw cut joint dimensions and patterns as indicated on attached Sketch.

ITEM NO. 14 DRAWING A-2.1: FLOOR PLAN – BLDG 100

1. Revise Room ‘108’ from STOR.. To read, “ROOF ACCESS/ELECT. CLOS.” In accordance with attached Sketch SK 5.03.

2. Revise dimensions ot ELECTRICAL RM. ‘125’ in accordance with attached Sketch SK 5.04.

ITEM NO. 15 DRAWING A-2.3: FLOOR PLAN – BLDG 300

1. Revise door swings at Doors 302C and 304C to out-swinging In accordance with attached Sketch SK 5.05.

ITEM NO. 16 DRAWING A-2.5: FLOOR PLAN – BLDG 500

1. Revise door location in Electrical Room ‘524’ in accordance with attached Sketch SK 5.06.

ITEM NO. 17 DRAWING A-8.1& A-8.2: DOOR SCHEDULES

1. BLDG. 100: Doors 120A and 120B: Change Door Type from Half Glass (HG) to full-glass (HM/FG) per Addendum 3, Sketch SK-3.04. Change Glass Type to GT3.

2. BLDG. 100: Add Door Glass Type GT3 to the Following Doors, 102A, 105A, 119C. 3. BLDG. 100: Change Door 104B from Glass Type GT1 to GT3. 4. BLDG. 100: Change Door 119C from ALUM to Hollow Metal (HM). 5. BLDG. 200: Change Doors 201C, 201D and 202B: Change door type 4284 HG,

elevation as indicated in Addendum Three, Sketch SK-3.05. 6. BLDG. 200: Change Doors 201A and 201B from Glass Type GT6 to GT4. 7. BLDG. 200: Change Doors 201C and 201D from Glass Type GT3 to GT4. 8. BLDG. 200: Add Door Glass Type GT1 to Door 202B. 9. BLDG. 300: Change Exterior Doors: 301A, 301B, 302A, 303A, 303B, 304A, 305A, 305B,

306A, 306B, 307A, 307B, & 308A from Glass Type GT3 to GT4. 10. BLDG. 300: Change Interior Doors: 301C, 302B, 303C, 304B, 305C, 306C, 307C, &

308C from Glass Type GT3 to GT1. 11. BLDG. 400: Change Exterior Doors: 401A, 402A, 403A, 404A, 405A, 406A, 407A, 408A,

409A, 410A, 411A, & 412A Change Glass Type GT3 to GT4. 12. BLDG 400: Add Door Glass Type GT1 to Doors: 401B, 402B, 403B, 404B, 405B, 406B,

407B, 408B, 409B, 410B, 411B, & 412B

Page 4 of 28

Page 5: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

ADDENDUM NUMBER FIVE BID NO. 07-19/20 (Phase 2) ALBERHILL ELEMENTARY SCHOOL LAKE ELSINORE UNIFIED SCHOOL DISTRICT

July 11, 2019 Page 5 of 7

6965 El Camino Real, Suite 105-278, Carlsbad, CA 92009 www.mgpaia.com

T: 760.929.1500 F: 760.929.1506

13. BLDG. 500: Change Exterior Doors: 501A, 502A, 503A, 504A, 505A, 506A, 507A, 508A, 509A, 510A, 511A, & 512A Change Glass Type GT3 to GT4.

14. BLDG. 500: Change Interior Doors 501B, 502B, 503B, 504B, 505B, 506B, 507B, 508B, 509B, 510B, 511B, & 512B, Change Glass Type GT3 to GT1.

ITEM NO. 18 DRAWING A-8.3: WINDOW SCHEDULE & ELEVATIONS

1. Clarify Window Schedule and glazing Types: All exterior 1” Insulating Glass Unites (IGU)

shall be assembled with glass type as specified in this Addendum (Addendum Five) -ITEM 8. The typical IGU for exterior glazed doors and windows shall be a 1” IGU Coated, 1 / 4” Guardian Glass “SNX 62/27” on Guardian “CrystalGray”, Tempered, 1 /2” Argon fill gas space, 1 /4” Clear, Tempered. All units, all panes are fully tempered. Coating on Surface #2.

2. Clarify Glass Type Schedule in accordance with attached Sketch SK 5.07 & 5.08 and

specifications revisions herein.

3. Clarify location of sliding ADA Service Window Units (08 5659): Window Type 4254VS in accordance with attached Sketch SK 5.09. The remainder of the opening and glazed aluminum storefront and entrance doors (08 4100) as indicated. Change Storefront to 2” sightline x 4” deep to match spec. Add steel reinforced jambs at each door frame.

4. Clarify Alternate Bid Item No. 1 per attached Sketch SK 5.08.

5. Clarify Window Schedule: Where “ALUM” is indicated this is a glazed Aluminum Window Unit with full Divided-Lites (as elevated) per Specification Section 08 5113. The only Storefront with entrance doors is indicated in Detail 19/A-8.3, Provide and install complete per Specifications Section 08 4100 and elevation details.

6. Clarify Window Elevations: the horizontal and vertical intermediate mullions indicate are solid Hollow Metal (Closed Section) or Aluminum mullion elements for a true divided-lite assembly for both Hollow Metal and Aluminum Window Units. Depth of mullion to equal frame depth and have equal sight-line widths.

ITEM NO. 19 DRAWING A-9.6: FLOOR FINISH DRAWING

1. Revise Legend in accordance with attached Sketch SK 5.10.

ITEM NO. 20 DRAWING A-9.7: ROOM FINISH SCHEDULE & ABBREVIATIONS

1. Revise Abbreviation Type “SC” from “STAINED AND SEALED CONC. WITH DECORATIVE PATTERN, SEE DWG. A-9.6,” to read, “SEALED CONCRETE FLOOR: TWO COATS OF CONCRETE FLOOR SEALER OVER SMOOTH HARD-TROWELED CONCRETE SLAB.”

Page 5 of 28

Page 6: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

ADDENDUM NUMBER FIVE BID NO. 07-19/20 (Phase 2) ALBERHILL ELEMENTARY SCHOOL LAKE ELSINORE UNIFIED SCHOOL DISTRICT

July 11, 2019 Page 6 of 7

6965 El Camino Real, Suite 105-278, Carlsbad, CA 92009 www.mgpaia.com

T: 760.929.1500 F: 760.929.1506

2. Add Abbreviation “SPC” for Stained and Polished Concrete floor to read, “STAINED AND POLISHED CONC. WITH DECORATIVE PATTERN, SEE DWG. A-9.6, INSTALL PER SPECIFICATION 03 3360.” Note: Spec. Revised in Addendum Three.

3. FINISH SCHEDULE: Change the following Rooms’ floor finish to Type: “SPC”: a. Lobby ‘101A’, Front Office ‘101B’, Halls ‘101C’ and ‘101D’ Maker Space ‘119’,

Collaboration ‘310’, Collaboration ‘420’, & Collaboration ‘520’. See floor Patterns on Sheet A-9.6 as occurs.

ITEM NO. 21 DRAWING Ad9.4: CASEWORK AND CABINET DETAILS

1. Add Detail 2: Lobby counter steel support Detail in accordance with attached Sketch 5.11.

ITEM NO. 22 DRAWING S-1.5: TYPICAL WOOD DETAILS

1. Detail 1: SHEAR WALL SCHEDULE: Change all the Sheathing from Oriented Strand Board “OSB” to APA rated structural plywood, Exposure 1. Thickness remains the same. OSB shall not be used on the job.

ITEM NO. 23 DRAWING S-4, S-5 & S-6: FOUNDATION PLANS

1. Buildings 300, 400 and 500: remove requirements for recessed floor slabs in all Restrooms as indicated. The restroom floors in these buildings shall be smooth hard-troweled slabs (aligned with Finish Floor) and sealed with two coats of concrete floor sealer.

ITEM NO. 24 DRAWING E1.2: ENLARGED ELECTRICAL SITE PLAN

1. Provide and install Distribution Power Cable Trench with cover plate in accordance with Southern California Edison (SCE) Figure MC 805-3-Distribution Power Cable Trench, “Poured” (non-traffic) Pages one thru four, issue date 4-26-2019. Design shall be suitable for under CMU enclosure wall construction. See also details associated with Detail 11/E0.6. for final coordination of the installation of secondary electrical gear and wiring.

2. Provide underground electrical power and signal conduit and associated wiring in accordance with Phase 2 “P2” underground electrical requirements. Locate and coordinate with existing Phase 1 “P1” underground utilities. In accordance with attached Drawing E-1.2. Phase 1 includes conduit only. All final wiring/conduit “P2” and final connections/terminations “P1” & “P2” are in this contract. This supersedes Addendum Three Drawing E1.2.

3. Add General Construction Note to E1.2: “for trenching under building footings (including covered walkways) the depth of the trenching shall include an additional 18” min. depth from the bottom of footings to the top of conduit. The conduit shall have 3” max. of 2000 psi concrete slurry encasement at these locations. Or as required by Detail 2/S-1.3. Backfill and Compaction shall comply with project Geotechnical Report. Depth for Trenching Backfill and Compaction under paved areas shall be in accordance with Codes, Project Specifications and Plans & project Geotechnical Report.

Page 6 of 28

Page 7: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

ADDENDUM NUMBER FIVE BID NO. 07-19/20 (Phase 2) ALBERHILL ELEMENTARY SCHOOL LAKE ELSINORE UNIFIED SCHOOL DISTRICT

July 11, 2019 Page 7 of 7

6965 El Camino Real, Suite 105-278, Carlsbad, CA 92009 www.mgpaia.com

T: 760.929.1500 F: 760.929.1506

ITEM NO. 25 DRAWING E4.1: BUILDING 300 LIGHTING PLAN

1. Revise Lighting control callout: callout shall be Type “B” for kindergarten classroom lighting control. Coordinate also with Sheet E-LC1.

ITEM NO. 26 DRAWINGS SC-102, SC-301, SC-302, SC-501 and SC-601: SECURITY PLANS

1. Replace indicated drawings in their entirety with attached Drawings SC-102, SC-301, SC-302, SC-501 and SC-601.

Addendum Five Attachments: 1. Bid Package No. 12, Bid Forms for Alternate Bid #01 …………………………….. (4) 8.5” x 11” Sheets 2. Sketches, Architectural SK-5.01 thru 5.11…………………………………………... (11) 8.5” x 11” Sheets 3. Electrical Drawing E1.2 …………………………………………………………………. (1) 24” x 36” Sheet

4. Security Drawings: SC-102, SC-301, SC-302, SC-501 and SC-601 ………… (5) 24” x 36” Sheets.

END OF ADDENDUM

Fred Gualda AIA, C20789 Principal

MGPA Architecture C:\Users\Rob.Smith\ShareFile\Shared Folders\LEAHE02 Alberhill ES - Redo Two\04Bidding\02_ADDENDUM\ADDENDUM 05 (PHASE 2)\Addendum 05_TEXT DRAFT.docx

Page 7 of 28

Page 8: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

Project Name: Alberhill E.S. Bid FormLake Elsinore Unified School District

TO: Lake Elsinore Unified School District, acting by and through its Governing Board, herein called “District”.

1. Pursuant to and in compliance with your Notice Inviting Bids and other Contract Documents relating thereto, the undersigned bidder, having familiarized himself with the terms of the Contract, the Trade Contractor Category of Work, the local conditions affecting the performance of the Contract, the cost of the work at the place where the work is to be done, with the Drawings and Specifications, and other Addenda, hereby proposes and agrees to perform within the time stipulated, the Trade Contract, including all of its component parts, and everything required to be performed, including its acceptance by the District, and to provide and furnish any and all labor, materials, tools, expendable equipment, and utility and transportation services necessary to perform the Trade Contract and complete all of the Work in a workmanlike manner required in connection with the construction of:

ALBERHILL ELEMENTARY SCHOOL

in the District described above, all in strict conformance with the drawings and other Contract Documents on file at the Purchasing Services of said District for amounts set forth herein.

2. BIDDER ACKNOWLEDGES THE FOLLOWING ADDENDUM:

Number Number Number Number Number Number Number Number

Acknowledge the inclusion of all Addenda issued prior to bid in the blanks provided above. Your failure to do so may render your bid non-responsive.

3. TOTAL CASH PURCHASE PRICE IN WORDS & NUMBERS:

____________________________________________________________________ DOLLARS

($ ____________________________)

ALLOWANCES(S): Allowances for work not included in the plans and specifications: (to be used at the direction of LEUSD or its representative(s):

BID PACKAGE #12 ALLOWANCE: Thirty-Two Thousand Dollars ($32,000.00)

TOTAL EXTENDED BID PRICE (BASE + ALLOWANCES(S):

______________________________________________________ Dollars ($_______________)

The following amount shall be “ADDED” to the Total Extended Bid Price above at the District’s option.

ADD SECURITY FILM TO ALL BLDG. 100 EXTERIOR WINDOWS, SIDELITES AND TRANSOM GLAZING, THAT FACE THE FRONT PARKING LOT, AS PER ADDENDUM NO. 5 _____

_______________________________________________________Dollars ($______________)

Page 20

Page 8 of 28

Page 9: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

Project Name: Alberhill E.S. Bid FormLake Elsinore Unified School District

Total extended price is inclusive of all applicable sales taxes and costs, and is the basis for award.Total “ADD” price is inclusive of all applicable sales taxes and costs.

4. TIME FOR COMPLETION: The District may give a Notice to Proceed within ninety (90) days of the award of the bid by the District. Once the Trade Contractor has received the Notice to Proceed, the Trade Contractor shall diligently study and work with Construction Manager and other Trade Contractors to build a realistic Trade Contractor Baseline Schedule for the purpose of outlining the entire scope of Work and to complete the Work in the time specified in the Agreement. By submitting this bid, Trade Contractor has thoroughly studied this Project and agrees that the Contract Time for this Project is adequate for the timely and proper completion of the Project. Further, Trade Contractor has included in the analysis of the time required for this Project, Rain Days, Governmental Delays, and the requisite time to complete Punch List.

5. It is understood that the District reserves the right to reject any or all bids and/or waive any irregularities or informalities in this bid or in the bid process. The Trade Contractor understands that it may not withdraw this bid for a period of ninety (90) days after the date set for the opening of bids.

6. Attached is bid security in the amount of not less than ten percent (10%) of the bid:

Bid bond (10% of the Bid), certified check, or cashier’s check (circle one)

7. The required List of Designated Subcontractors is attached hereto.

8. The required Non-Collusion Declaration is attached hereto.

9. The Substitution Request Form, if applicable, is attached hereto.

10. It is understood and agreed that if written notice of the acceptance of this bid is mailed, telegraphed, or delivered to the undersigned after the opening of the bid, and within the time this bid is required to remain open, or at any time thereafter before this bid is withdrawn, the undersigned will execute and deliver to the District a Contract in the form attached hereto in accordance with the bid as accepted, and that he or she will also furnish and deliver to the District the Performance Bond and Payment Bond, all within five (5) calendar days after award of Contract, and that the work under the Contract shall be commenced by the undersigned bidder, if awarded the Contract, by the start date provided in the District’s Notice to Proceed, and shall be completed by the Trade Contractor in the time specified in the Contract Documents.

11. The names of all persons interested in the foregoing proposal as principals are as follows:

Page 21

Page 9 of 28

Page 10: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

Project Name: Alberhill E.S. Bid FormLake Elsinore Unified School District

(IMPORTANT NOTICE: If bidder or other interested person is a corporation, state the legal name of such corporation, as well as the names of the president, secretary, treasurer, and manager thereof; if a co-partnership, state the true names of the firm, as well as the names of all individual co-partners comprising the firm; if bidder or other interested person is an individual, state the first and last names in full.)

12. PROTEST PROCEDURES. If there is a bid protest, the grounds shall be submitted as set forth in the Instructions to Bidders.

13. The undersigned bidder shall be licensed and shall provide the following California Contractor’s license information:

License Number:

License Expiration Date:

Name on License:

Class of License:

DIR Registration Number:

If the bidder is a joint venture, each member of the joint venture must include the above information.

14. Time is of the essence regarding the completion of the Project in the Contract Time and within the Milestones set forth in the Outline Schedule, therefore, in the event the bidder to whom the Contract is awarded fails or refuses to post the required bonds and return executed copies of the Agreement form within five (5) calendar days from the date of receiving the Notice of Award, the District may declare the bidder’s bid deposit or bond forfeited as damages.

15. The bidder declares that he/she has carefully examined the location of the proposed Project, that he/she has examined the Contract Documents, including the Plans, General Conditions, Supplemental Conditions, Addenda, and Specifications, and read the accompanying instructions to bidders, and hereby proposes and agrees, if this proposal is accepted, to furnish all materials and do all work required to complete the said work in accordance with the Contract Documents, in the time and manner therein prescribed for the unit cost and lump sum amounts set forth in this Bid Form.

16. DEBARMENT. In addition to seeking remedies for False Claims under Government Code Section 12650 et seq. and Penal Code Section 72, the District may debar a Trade Contractor pursuant to Article 15 of the General Conditions if the Board, or the Board may designate a hearing officer who, in his or her discretion, finds the Trade Contractor has done any of the following:

a. Intentionally or with reckless disregard, violated any term of a contract with the District;

b. Committed an act or omission which reflects on the Trade Contractor’s quality, fitness or capacity to perform work for the District;

c. Committed an act or offense which indicates a lack of business integrity or business honesty; or

Page 22

Page 10 of 28

Page 11: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

Project Name: Alberhill E.S. Bid FormLake Elsinore Unified School District

d. Made or submitted a false claim against the District or any other public entity. (See Government Code Sections 12650, et seq., and Penal Code Section 72)

17. DESIGNATION OF SUBCONTRACTORS. In compliance with the Subletting and Subcontracting Fair Practices Act (California Public Contract Code Sections 4100 et seq.) and any amendments thereof, each bidder shall list subcontractors on the District’s form Subcontractor list. This subcontractor list shall be submitted with the bid and is a required form

I agree to receive service of notices at the e-mail address listed below.

I the below-indicated bidder, declare under penalty of perjury that the information provided and representations made in this bid are true and correct.

Proper Name of Company

Name of Bidder Representative

Street Address

City, State, and Zip

( )Phone Number

( )Fax Number

E-Mail

By:Signature of Bidder Representative

Date:

NOTE: If bidder is a corporation, the legal name of the corporation shall be set forth above together with the signature of authorized officers or agents and the document shall bear the corporate seal; if bidder is a partnership, the true name of the firm shall be set forth above, together with the signature of the partner or partners authorized to sign contracts on behalf of the partnership; and if bidder is an individual, his signature shall be placed above.

All signatures must be made in permanent blue ink.

Page 23

Page 11 of 28

Page 12: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

SCHOOL

LAKE ELSINORE UNIFIED

SCHOOL DISTRICT

ALBERHILL ELEMENTARY

LEAHE02

SK-

ADDENDUM TWO

04-117782

6965 EL CAMINO REAL, STE 105

CARLSBAD, CA 92009

ADDENDUM THREE

24'-0

"

18'-0

"

18'-0

"

50'-0

"

20'-0

"

20'-0

"

20'-0

"108'-0"

3" ACOVER

7" BASE

38'-0"MOVE LOCATIONOF LIGHT POLE

30'-6"

98'-0

"

2% M

AX.

A-1.2, A-1.3, & C-2.3

see civildrawings foralignment withproposed spotelevations

see civildrawings foralignment withproposed spotelevations

PARTIAL SITE PLANN.T.S.

PARKING AREA

7/11/2019

ADDENDUM FIVE

BLDG. 500

5

5.01

Page 12 of 28

Page 13: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

SCHOOL

LAKE ELSINORE UNIFIED

SCHOOL DISTRICT

ALBERHILL ELEMENTARY

LEAHE02

SK-

ADDENDUM TWO

04-117782

6965 EL CAMINO REAL, STE 105

CARLSBAD, CA 92009

ADDENDUM THREE

10"

7"

SAW CUT CONC. PAVEMENT IN PATTERNINDICATED ON SITE PLANS5'-0" X 5'-0" GRID.-MACHINE CHAMFER ALL SAWCUT EDGES 5

16A-1.2 & Ad1.1

ENLARGED SITE PLANNONE

ALSO-SAW CUT CONC. PAVEMENT INPATTERN INDICATED ON SITE PLANS5'-0" X 5'-0" GRID.-MACHINECHAMFER ALL SAW CUT EDGES

SHEET Ad1.1 5

ADDENDUM FIVE

5

5

EA. WAY

EA. WAY

5

7/11/2019

5.02

Page 13 of 28

Page 14: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

SCHOOL

LAKE ELSINORE UNIFIED

SCHOOL DISTRICT

ALBERHILL ELEMENTARY

LEAHE02

SK-

ADDENDUM TWO

04-117782

6965 EL CAMINO REAL, STE 105

CARLSBAD, CA 92009

ADDENDUM THREE

1FLOOR PLAN - BLDG 100 (PARTIAL)

A-2.1

5

55

ADDENDUM FIVE

1/4" = 1'-0"

5.037/11/2019

Page 14 of 28

Page 15: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

SCHOOL

LAKE ELSINORE UNIFIED

SCHOOL DISTRICT

ALBERHILL ELEMENTARY

LEAHE02

SK-

ADDENDUM TWO

04-117782

6965 EL CAMINO REAL, STE 105

CARLSBAD, CA 92009

ADDENDUM THREE

1 FLOOR PLAN - BLDG 100 (PARTIAL)

A-2.1

ADDENDUM FIVE

5

5

3/8" = 1'-0"

5.047/11/2019

Page 15 of 28

Page 16: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

SCHOOL

LAKE ELSINORE UNIFIED

SCHOOL DISTRICT

ALBERHILL ELEMENTARY

LEAHE02

SK-

ADDENDUM TWO

04-117782

6965 EL CAMINO REAL, STE 105

CARLSBAD, CA 92009

ADDENDUM THREE

1 FLOOR PLAN - BLDG 300 (PARTIAL)

A-2.3

ADDENDUM FIVE

1/4" = 1'-0"

5 5

5.057/11/2019

Page 16 of 28

Page 17: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

SCHOOL

LAKE ELSINORE UNIFIED

SCHOOL DISTRICT

ALBERHILL ELEMENTARY

LEAHE02

SK-

ADDENDUM TWO

04-117782

6965 EL CAMINO REAL, STE 105

CARLSBAD, CA 92009

ADDENDUM THREE

1 FLOOR PLAN - BLDG 500 (PARTIAL)

A-2.5

ADDENDUM FIVE

N.T.S.

5

5

5.067/11/2019

Page 17 of 28

Page 18: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

SCHOOL

LAKE ELSINORE UNIFIED

SCHOOL DISTRICT

ALBERHILL ELEMENTARY

LEAHE02

SK-

ADDENDUM TWO

04-117782

6965 EL CAMINO REAL, STE 105

CARLSBAD, CA 92009

ADDENDUM THREE

SET IN STOREFRONT51.75"59" 3

GUARDIAN GLASS SNX 62/27 ON "CHRYSTALGRAY"

CLEAR

A-8.3

WINDOW SCHEDULEN.T.S.

CLEAR

GT6 = 1" IGU-GUARDIAN GLASS SNX 62/27 ON "CHRYSTALGRAY", TEMPERED, 1/2" ARGON GAS SPACE, 1/4" CLEAR, TEMPERED

DELETE SECURITY FILM OPTION

GT4 = 1" IGU-GUARDIAN GLASS SNX 62/27 ON "CHRYSTALGRAY", TEMPERED, 1/2" ARGON GAS SPACE, 1/4" CLEAR, TEMPERED

PASS-THRU

PART OF FUTURE BID PACKAGE, PHASE 3

MIN. STC RATING OF 35

4

3

SEE REV. BELOW

ADDENDUM FIVE

SHEETS: A8.1, A8.2 & A8.3

5

5

5

1

5.077/11/2019

Page 18 of 28

Page 19: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

SCHOOL

LAKE ELSINORE UNIFIED

SCHOOL DISTRICT

ALBERHILL ELEMENTARY

LEAHE02

SK-

ADDENDUM TWO

04-117782

6965 EL CAMINO REAL, STE 105

CARLSBAD, CA 92009

ADDENDUM THREE

A-8.3

01

WINDOW SCHEDULE (ALTERNATE BID #01)

DELETE

55

ADDENDUM FIVE

ADD NOTE:1) DELETE THE SECURITY FILM IDENTIFIED AS A PART OF GLASS TYPES GT6 & GT7 ONDOOR & WINDOW SCHEDULES. GLASS TYPE REMAINS THE SAME.

5

5

5

7/11/2019

5.08

Page 19 of 28

Page 20: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

SCHOOL

LAKE ELSINORE UNIFIED

SCHOOL DISTRICT

ALBERHILL ELEMENTARY

LEAHE02

SK-

ADDENDUM TWO

04-117782

6965 EL CAMINO REAL, STE 105

CARLSBAD, CA 92009

ADDENDUM THREEADDENDUM FIVE

WINDOW SCHEDULES & ELEVATIONS (PARITAL)

A-8.3

19N.T.S.

FIXED

(SLIDING SERVICE WINDOW UNITS)

FIXED

5

5

2" 4"

DOOR JAMBMULLIONS TO BESTEEL REINFORCEDEA. SIDE, TYP.

5

X

2

Ad9.45

5.097/11/2019

Page 20 of 28

Page 21: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

SCHOOL

LAKE ELSINORE UNIFIED

SCHOOL DISTRICT

ALBERHILL ELEMENTARY

LEAHE02

SK-

ADDENDUM TWO

04-117782

6965 EL CAMINO REAL, STE 105

CARLSBAD, CA 92009

ADDENDUM THREE

FINISH PLANS (LEGEND)

A-9.6

ADDENDUM FIVE

N.T.S.

STAINED, POLISHED & SEALEDCOLOR 1

STAINED, POLISHED & SEALED

COLOR 2

5

5.107/11/2019

Page 21 of 28

Page 22: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

SCHOOL

LAKE ELSINORE UNIFIED

SCHOOL DISTRICT

ALBERHILL ELEMENTARY

LEAHE02

SK-

ADDENDUM TWO

04-117782

6965 EL CAMINO REAL, STE 105

CARLSBAD, CA 92009

ADDENDUM THREE

2BUILDING 100 - LOBBY COUNTER DETAIL

Ad9.4

ADDENDUM FIVE

N.T.S.

5

5.117/11/2019

Page 22 of 28

Page 23: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

2

1

1

11

E0.6

7

E0.6

3

E0.6

6

E0.6

2

E0.6

1

E0.6

8

E0.6

9

E0.6

5

E0.6

3

3DP1-3

5DP1-4

MSB-2

MSB-3

MSB-4

1

FA5

-

FA4

-

FA2

-

FACP

-

FA3

-

STOP S

TOP S

TOP

THRU

ONLY

PASS

OFFONLY

DROP

THRU

ONLY

PASS

THRU

ONLY

PASS

OFFONLY

DROP

THRU

ONLY

PASS

STOP

THRU

ONLY

PASSOFF

ONLY

DROP

THRU

ONLY PAS

S

STOP

TURNONLY

LEFT

TURN ONLY

LEFT

DO NOTENTER

DO NOTENTER

STOP

BUSES ONLY

STOP

STOP

TURNONLY

LEFT

DO NOTENTER

RIGHT

ONLYTURN

4

0

0

B

L

D

G

.

2

0

0

B

L

D

G

.

3

0

0

B

L

D

G

.

1

0

0

B

L

D

G

.

5

0

0

B

L

D

G

.

MSB-1

MSB-5

2

5

MSB-2

4

E0.6

4

4

MSB-1

2

MSB-3

P1

P2

3DP1-3

P2

MSB-3

P1

P2

1

P1

P2

1

P1

P2

P2

P2

P2

P1

1

P1

2

P2

1

P2

P1P1

P1

P2

P1

MSB-4

P1

5

P1

P1

P21

P1

1

P2

P1

P2

10

E0.6

MSB-5

(TYP.)

3DP1-3

2

P2

2

MSB-1

P2

FB

A E

ngineering / P

lot D

ate: 7/2/2019 3:52 P

M / P

lotted by: M

ark M

ahdavian

/ D

raw

ing Location: I:\229\139\E

1.2_229139.dw

g

Issue Date:

Revisions:1

2

3

Consultant Stamp:

Project Title

Sheet Title:

Sheet Number:

for

ALBE

RHILL

ELE

MENT

ARY

SCHO

OL

LAKE

ELS

INOR

E UN

IFIE

D SC

HOOL

DIS

TRIC

TLA

KE E

LSIN

ORE

CALIF

ORNI

A

DSA Stamp

MGPA

A

RC

HI

TE

CT

UR

EA

n

Ar

ch

it

ec

tu

ra

l

Co

rp

or

at

io

nM

ail

ing

: 6

96

5 E

l C

am

ino

Re

al,

Su

ite

s 1

05

-27

8

Ca

rl

sb

ad

,

CA

92

00

9T

ele

: (7

60

) 9

29

-15

00

Fa

x: (

76

0)

92

9-1

50

6

Consultant:

Job Nº.:

150 Paularino Avenue Suite A120

Costa Mesa, CA 92626

949.852.9995 949.852.1657 (fax)

FBAEngineering

Consulting Electrical Engineers

fbaengr.com

FBA Job Number: 229.139

E1.2ENLARGED SITE ELECTRICAL PLAN

SCALE

A

1"= 30'-0"

SCALE: 1" = 30'-0"

15' 30'0 60'

PROVIDE THE FOLLOWING UNDERGROUND SIGNAL SYSTEM CONDUITS WITH 1

SPECIFIED CONDUCTORS:

- 3"C. DATA SYSTEM WITH 24MM/12SM FIBER OPTIC CABLES.

- 3"C. PUBLIC ADDRESS SYSTEM

- 2"C.O. INTRUSION DETECTION SYSTEM

- 2"C. FIRE ALARM SYSTEM

- 2"C. LIGHTING CONTROL

- 2"C.O. EMS SYSTEM

- 2"C. TELEPHONE SYSTEM WITH ONE SET OF 25 PAIRS TELEPHONE CABLES

- 2"C.O. SPARE

STUB-OUT THE FOLLOWING SIGNAL SYSTEM CONDUITS FOR FUTURE:2

- 2"C.O. DATA SYSTEM

- 2"C.O. PUBLIC ADDRESS SYSTEM

- 2"C.O. INTRUSION DETECTION SYSTEM

- 2"C.O. FIRE ALARM SYSTEM

- 2"C.O. LIGHTING CONTROL

- 2"C.O. EMS SYSTEM

- 2"C.O. TELEPHONE

- 2"C.O. SPARE

STUB-OUT CONDUITS MINIMUM 24" BELOW GRADE. PROVIDE MARKER.3

PROVIDE 3'X4'X3'D UNDERGROUND CONCRETE PULL BOX WITH BOLT-DOWN4

TRAFFIC COVER FOR ROUTING POWER FEEDERS. ENGRAVE "POWER".

PROVIDE 3'X4'X3'D UNDERGROUND CONCRETE PULL BOX WITH BOLT-DOWN5

TRAFFIC COVER FOR ROUTING SIGNAL SYSTEM CONDUITS. ENGRAVE "SIGNAL".

06/17/19

ADDENDUM #3

UNDER GROUND CONDUIT SYMBOL

P1

P2

PHASE 1 UNDERGROUND POWER/SINGAL

PHASE 2 UNDERGROUND POWER/SINGAL

P1P1

P2

P1

P1

P1

5

P1route toavoid treeplacement

P1

ADDENDUM #5

P1

P1

P1

5

5

5

5

P1

7/11/2019

SUPERCEDESADD_03

Page 23 of 28

Page 24: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

SECURITY COMPONENT PRICING MATRIX

SECURITY MANAGEMENT SYSTEM

COMPONENT DESCRIPTION MANUFACTURER PART NO.MATERIALUNIT COST UNIT QTY

EXTENDEDTOTAL

ACCESS CONTROL SYSTEM (ACS)

ACS SERVER EA $0.00ACS SOFTWARE EA $0.00ACS DATABASE SOFTWARE EA $0.00ACS INTEGRATION TO MILESTONE X-PROTECT EA $0.00

ACS INTEGRATION TO IDS SYSTEM EA $0.00

ACS PANEL/CONTROLLER EA $0.00

ACS READER BOARD EA $0.00

ACS RS-485 INTERFACE BOARD EA $0.00

ACS INPUT BOARD EA $0.00

ACS OUTPUT BOARD EA $0.00CARD READER 1-GANG MOUNT ALLEGION MT15 EA $0.00CARD READER MULLION MOUNT ALLEGION MT11 EA $0.00RECESSED DOOR CONTACT UTC SECURITY 1078CW EA $0.00

MIFARE CLASSIC KEYFOB ALLEGION 9651T EA $0.00

MIFARE CLASSIC CARD ALLEGION 9551 EA $0.00

ELECTRIC LOCK WITH INTEGRAL READER ALLEGION AD-300 SERIES EA $0.00

ELECTRIC LOCK READER MODULE ALLEGION SMART - SI EA $0.00

LOCK POWER SUPPLY ALTRONIX AL600ULACM EA $0.00

DOOR MONITORING STATION SCHLAGE 800L2 EA $0.00ACCESS CONTROL COMPOSITE CABLE BELDEN 658AFS FT $0.00RS-485 COMMUNICATION CABLE BELDEN 9842 FT $0.0018AWG/4-CONDUCTOR CABLE BELDEN 6302FE FT $0.00[ LIST ADDITIONAL ITEMS AS NEEDED ] $0.00

ACCESS CONTROL SUBTOTAL: $0.00VIDEO SURVEILLANCE SYSTEM (VSS)

VIDEO SURVEILLANCE SERVER HARDWARE MILESTONE HUSKY M550A EA $0.00

VIDEO SURVEILLANCE SOFTWARE MILESTONE X-PROTECT EXPERT EA $0.00

CAMERA LICENSE MILESTONE X-PROTECT EXPERT EA $0.00CAMERA 1 - INTERIOR FIXED DOME AXIS COMMUNICATIONS M3046-V EA $0.00CAMERA 2 - INTERIOR FISHEYE PANORAMIC HIKVISION DS-2CD6362F-IV EA $0.00CAMERA 3 - EXTERIOR COMPACT DOME, 2.8MM HIKVISION DS-2CD2542FWD-IS EA $0.00

CAMERA 4 - EXTERIOR 4-LENS HIKVISION DS-2CD6D54FWD-Z EA $0.00

ROOF PARAPET MOUNT FOR CAMERA 4 HIKVISION RPM EA $0.00

CAMERA 5 - EXTERIOR 4-LENS HIKVISION DS-2CD6D54FWD-Z EA $0.00

CORNER MOUNT BRACKET FOR CAMERA 5 HIKVISION CMP EA $0.00

WALL ARM MOUNT BRACKET FOR CAMERA 5 HIKVISION WMP-L EA $0.00

CAMERA 6 - EXTERIOR FIXED DOME HIKVISION DS-2CD2742FWD-IZS EA $0.00PENDANT CAP FOR CAMERA 6 HIKVISION PC135 EA $0.00WALL ARM MOUNT BRACKET FOR CAMERA 6 HIKVISION WMS EA $0.00[ LIST ADDITIONAL ITEMS AS NEEDED ] $0.00

VIDEO SURVEILLANCE SUBTOTAL: $0.00INTRUSION DETECTION SYSTEM (IDS)

IDS CONTROL PANEL & POWER SUPPLY DMP XR550N EA $0.00

IDS CELLULAR COMMUNICATOR DMP 263LTE-V/381-2 EA $0.00

IDS ZONE EXPANSION MODULE DMP 711 EA $0.00

IDS KEYPAD CONTROLLER WITH INTEGRAL READER DMP 7060 EA $0.00PIR MOTION DETECTOR OPTEX FX-360 EA $0.0018AWG/4-CONDUCTOR CABLE BELDEN FT $0.00[ LIST ADDITIONAL ITEMS AS NEEDED ] $0.00

INTRUSION DETECTION SUBTOTAL: $0.00ENTRY COMMUNICATIONS SYSTEM (ECS)

VIDEO INTERCOM IP DOOR STATION AIPHONE IX-DA $0.00

VIDEO INTERCOM IP MASTER STATION AIPHONE IX-MV $0.00[ LIST ADDITIONAL ITEMS AS NEEDED ] $0.00

ENTRY COMMUNICATIONS SUBTOTAL: $0.00MISCELLANEOUSSHIPPING & HANDLING $0.00FIRE STOP MATERIALS $0.00

J-HOOKS/CABLE SUPPORT $0.00

MISCELLANEOUS CONNECTORS & FITTINGS $0.00[ LIST ADDITIONAL ITEMS AS NEEDED ] $0.00

MISCELLANEOUS SUBTOTAL: $0.00

LABOR / INSTALLATIONPROJECT MANAGEMENT $0.00 HR $0.00ENGINEERING $0.00 HR $0.00SUBMITTALS/AS-BUILT DOCUMENTS $0.00 HR $0.00SYSTEM PROGRAMMING $0.00 HR $0.00

WIRING & DEVICE INSTALLATION $0.00 HR $0.00

TESTING/COMMISSIONING $0.00 HR $0.00

TRAINING $0.00 HR $0.00

LABOR / INSTALLATION SUBTOTAL: $0.00

PROJECT COST SUMMARYACCESS CONTROL SUBTOTAL: $0.00

VIDEO SURVEILLANCE SUBTOTAL: $0.00INTRUSION DETECTION SUBTOTAL: $0.00

ENTRY COMMUNICATIONS SUBTOTAL: $0.00

MISCELLANEOUS SUBTOTAL: $0.00

LABOR / INSTALLATION SUBTOTAL: $0.00

PROJECT SUB-TOTAL: $0.00

SALES TAX:WARRANTY & MAINTENANCE YEAR 1:

OTHER ADJUSTMENTS:TOTAL PROJECT COST: $0.00

WARRANTY & MAINTENANCE COSTS YEARS 2 THROUGH 5WARRANTY & MAINTENANCE YEAR 2:WARRANTY & MAINTENANCE YEAR 3:WARRANTY & MAINTENANCE YEAR 4:WARRANTY & MAINTENANCE YEAR 5:

TOTAL WARRANTY & MAINTENANCE YEARS 2 THRU 5:

5

Copyright 2001 TM TECHNOLOGY PARTNERS, INC.

TEL: 212.398.2424

CONSULTING, DESIGN & PROJECT MANAGEMENTWORLDWIDE PLAZA, 825 EIGHTH AVENUE

NEW YORK, NY 10019

Issue Date:

Revisions:

Consultant Stamp:

Project Title

Sheet Title:

Sheet Number:

for

DSA 10/17/2018

ALBE

RHILL

ELE

MENT

ARY

SCHO

OL

LAKE

ELS

INOR

E UN

IFIE

D SC

HOOL

DIS

TRIC

TLA

KE E

LSIN

ORE

CALIF

ORNI

A

DSA Stamp

MG

PA

AR

CH

IT

EC

TU

RE

An

A

rc

hi

te

ct

ur

al

C

or

po

ra

ti

on

Mai

lin

g: 6

96

5 E

l C

am

ino

Re

al,

Su

ite

s 1

05

-27

8

Ca

rl

sb

ad

,

CA

92

00

9T

ele

: (7

60

) 9

29

-15

00

Fax:

(7

60

) 9

29

-15

06

Consultant:

Job Nº.: 8L5780002

SECURITYCOMPONENT LIST

SC-102

ADDENDUM 5 07/11/2019

Page 24 of 28

Page 25: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

1.7X

1.7X

195s.f.

PTA/PARENT

CENTER

102

250s.f.

ADMIN. OFFICE

104

107s.f.

OPEN CONF.

107

119s.f.

NURSE

109

595s.f.

MAKER SPACE

119

1896s.f.

MEDIA CENTER

120

249s.f.

WORKROOM

115

179s.f.

M

112

300s.f.

CONFERENCE

105

77s.f.

ALL GENDER

123

77s.f.

ALL GENDER

124

59s.f.

CUSTODIAL

126138s.f.

SIGNAL ROOM

117

730s.f.

FRONT OFFICE

101B

145s.f.

SOP/

CONF/TESTING

122

367s.f.

HALL

101D

148s.f.

SOP OFFICE

121

153s.f.

ADMIN OFFICE

103

40s.f.

STOR.

108

164s.f.

PSYCH

106

183s.f.

W

113

185s.f.

HEALTH OFFICE

110

416s.f.

LOBBY

101A

327s.f.

TEACHER'S

LOUNGE

114

41s.f.

STOR.

116

384s.f.

HALL

101C

19s.f.

RISER

118

147s.f.

MEDIA CENTER

CONF.

120A

41s.f.

ELECTRICAL

125

65s.f.

ACC. RR

111

1.N

1.N

1.A

1.K

1.K

1.J

1.J

1.1

1.1

1.L

1.3

1.H

1.H

1.M

1.EX

1.B

1.B

1.6X

1.6X1.D

1.D

1.13

1.13

1.9

1.9

1.10

1.10

1.7

1.7

1.8

1.8

1.4

1.11

1.11

1.C

1.C

1.6

1.FX1.CX 1.GX1.DX

1.E

1.5

1.HX1.AX

1.3X

1.3X

1.4X

1.5X

1.2X1.2X

1.BX

1.F

1.G

1.12

1.12

1.2

1.2

101AA

CRDC

EPETDC

EP ET

EH EHELCR101B1

B

ELCR

101B2B

101CC

DC

EP ET

ETEPCR

101DC

DCEP ET

ET

EPCR

EH

ELCR 102A

B

EH

ELCR

104CB

EHELCR

105AB

106BB

EHELC

R

EHELCR 110AB

103AB

EHELCR

EH

ELCR

104AB

EH

ELCR114AB

EH

ELCR

115AB

EHELC

R115B

B

EPCR

EH

119AD

ELCR

EH119B

B

EHELCR

119CB

EHELCR

EHELCR

DCDC

120BE120A

E

CR

DCEP

ETDC

EP ET120DA

CR

DC EP ETDC

EPET 120C

A

EH

ELCR

120EB

IM PBPBKP

DR

ACPLPS NS

VI

IDP 1

2

1

CR5

CR5CR 5

MS

MS MS

Copyright 2001 TM TECHNOLOGY PARTNERS, INC.

TEL: 212.398.2424

CONSULTING, DESIGN & PROJECT MANAGEMENTWORLDWIDE PLAZA, 825 EIGHTH AVENUE

NEW YORK, NY 10019

Issue Date:

Revisions:

Consultant Stamp:

Project Title

Sheet Title:

Sheet Number:

for

DSA 10/17/2018

ALBE

RHILL

ELE

MENT

ARY

SCHO

OL

LAKE

ELS

INOR

E UN

IFIE

D SC

HOOL

DIS

TRIC

TLA

KE E

LSIN

ORE

CALIF

ORNI

A

DSA Stamp

MG

PA

AR

CH

IT

EC

TU

RE

An

A

rc

hi

te

ct

ur

al

C

or

po

ra

ti

on

Mai

lin

g: 6

96

5 E

l C

am

ino

Re

al,

Su

ite

s 1

05

-27

8

Ca

rl

sb

ad

,

CA

92

00

9T

ele

: (7

60

) 9

29

-15

00

Fax:

(7

60

) 9

29

-15

06

Consultant:

Job Nº.: 8L5780002

SECURITY SYMBOL LEGENDDOOR HARDWARE

CONCEALED 8 WIRE ELECTRIC HINGE

ELECTRIFIED LOCKSET W/ REQUEST TO EXITEL

EH

ACCESS CONTROL SYSTEM

CARD READER - SINGLE GANG WALL MOUNTED

DOOR CONTACT - RECESS MOUNTED

CR

DC

DOOR RELEASE BUTTON - DESK MOUNTEDDR

PUSH BUTTON REQUEST TO EXIT - WALL MOUNTED

MOTION SENSOR REQUEST TO EXIT - WALL OR CEILING MOUNTEDMX

PX

IP VIDEO SURVEILLANCE SYSTEM

IP VIDEO SURVEILLANCE CAMERA CAMERA

LOCK POWER SUPPLYLPS

NETWORK VIDEO SERVER/RECORDERNVR

VIDEO SURVEILLANCE WORKSTATIONVSW

ACCESS CONTROL PANELACP

ACCESS CONTROL SERVERACS

KVM SWITCH WITH MONITOR KVM

ELECTRIFIED PANIC HARDWARE W/ REQUEST TO EXIT

EP

PANIC BUTTON - DESK MOUNTEDPB

XX - DENOTES CAMERA TYPE1 - INTERIOR IP MINIDOME CAMERA - CEILING MOUNT2 - INTERIOR IP FISHEYE CAMERA - CEILING MOUNT3 -EXTERIOR IP DOME CAMERA - SURFACE MOUNT4 - EXTERIOR MULTI-LENS IP DOME CAMERA - PARAPET MOUNT5 - EXTERIOR MULTI-LENS IP DOME CAMERA - CORNER MOUNT6 - EXTERIOR IP DOME CAMERA - WALL MOUNT

ET

ELECTRIC POWER TRANSFER

ACCESS CONTROL DEVICE POWER SUPPLYAPS

X

NETWORK SWITCHNS

ELECTRIFIED LOCKSET WITH INTEGRATED CARD READER

ELECTRIFIED PANIC HARDWARE WITH INTEGRATED CARD READEREPCR

ELCR

ENTRY COMMUNICATION SYSTEM

VIDEO INTERCOM DOOR STATION - WALL MOUNTED

VIDEO INTERCOM MASTER STATIONIM

VI

INTRUSTION DETECTION SYSTEM

KEYPAD CONTROLLER - WALL MOUNTEDKP

IDP INTRUSION DETECTION PANEL

MOTION DETECTOR CEILING MOUNTEDMD

BUILDING 100 SECURITY PLAN

1SCALE: 1/8" = 1'-0"

DRAWING NOTESMAIN IT ROOM FOR THE SCHOOL. ALL SECURITY SYSTEMS HEAD END EQUIPMENTSHALL BE LOCATED IN THIS ROOM. ALL SECURITY DEVICES FOR THIS BUILDING TOBE WIRED BACK TO THIS ROOM. ACCESS CONTROL AND INTRUSION DETECTIONDEVICES TO BE WIRED TO NEW WALL-MOUNTED ENCLOSURES IN THIS ROOM. ALLNETWORK CONNECTED DEVICES SUCH AS INTERCOMS AND CAMERAS SHALL BECONNECTED TO NETWORK SWITCHES IN THIS ROOM. REFER TO PART PLANS ANDELEVATIONS ON DRAWING SC-701.

ELECTRICAL CONTRACTOR TO PROVIDE A 1-INCH CONDUIT WITH DRAG LINEFROM THE DESK TO THE NEAREST ACCESSIBLE CEILING FOR LOW-VOLTAGESECURITY WIRING.

1

2

SECURITY PLANBUILDING 100

SC-301

1

ADDENDUM 5 07/11/2019

**

**

(2) TWO

Page 25 of 28

Page 26: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

DN

DN

MULTI-PURPOSE

ROOM

201

FOOD SERVICE

202

GIRLS R.R.

205

BOY'S R.R.

206

STORAGE

212

SIGNAL RM

210

CUSTODIAL

209

STORAGE RM

208

ALL GENDER

207

ELECTRICAL

204

DRY STORAGE

203

STOR.

211

COOLER

202A

2.2

2.2

2.3

2.3

2.D 2.D

2.A2.A

2.1

2.1

2.4

2.4

2.B 2.B

2.C2.C

2.E 2.E

2.F 2.F

2.5

2.5

2.G 2.G

2.6

2.6

PLATFORM

SEE FOOD SERVICE DWGS.

3.0

1:12

1:12

201AA CR

DC

EPET

DCEP ET

201BA

CR DC

EP

ET

DCEP ET

DC

EPET CR

201CF

DC

EPET CR

201DF

ETEPCR

202AG

ET ELCR

202BH

ACPLPS NS

KP

IDP

1

CR5

CR

5

CR

5

CR5

MSMS

MS

MS

Copyright 2001 TM TECHNOLOGY PARTNERS, INC.

TEL: 212.398.2424

CONSULTING, DESIGN & PROJECT MANAGEMENTWORLDWIDE PLAZA, 825 EIGHTH AVENUE

NEW YORK, NY 10019

Issue Date:

Revisions:

Consultant Stamp:

Project Title

Sheet Title:

Sheet Number:

for

DSA 10/17/2018

ALBE

RHILL

ELE

MENT

ARY

SCHO

OL

LAKE

ELS

INOR

E UN

IFIE

D SC

HOOL

DIS

TRIC

TLA

KE E

LSIN

ORE

CALIF

ORNI

A

DSA Stamp

MG

PA

AR

CH

IT

EC

TU

RE

An

A

rc

hi

te

ct

ur

al

C

or

po

ra

ti

on

Mai

lin

g: 6

96

5 E

l C

am

ino

Re

al,

Su

ite

s 1

05

-27

8

Ca

rl

sb

ad

,

CA

92

00

9T

ele

: (7

60

) 9

29

-15

00

Fax:

(7

60

) 9

29

-15

06

Consultant:

Job Nº.: 8L5780002

SECURITY SYMBOL LEGENDDOOR HARDWARE

CONCEALED 8 WIRE ELECTRIC HINGE

ELECTRIFIED LOCKSET W/ REQUEST TO EXITEL

EH

ACCESS CONTROL SYSTEM

CARD READER - SINGLE GANG WALL MOUNTED

DOOR CONTACT - RECESS MOUNTED

CR

DC

DOOR RELEASE BUTTON - DESK MOUNTEDDR

PUSH BUTTON REQUEST TO EXIT - WALL MOUNTED

MOTION SENSOR REQUEST TO EXIT - WALL OR CEILING MOUNTEDMX

PX

IP VIDEO SURVEILLANCE SYSTEM

IP VIDEO SURVEILLANCE CAMERA CAMERA

LOCK POWER SUPPLYLPS

NETWORK VIDEO SERVER/RECORDERNVR

VIDEO SURVEILLANCE WORKSTATIONVSW

ACCESS CONTROL PANELACP

ACCESS CONTROL SERVERACS

KVM SWITCH WITH MONITOR KVM

ELECTRIFIED PANIC HARDWARE W/ REQUEST TO EXIT

EP

PANIC BUTTON - DESK MOUNTEDPB

XX - DENOTES CAMERA TYPE1 - INTERIOR IP MINIDOME CAMERA - CEILING MOUNT2 - INTERIOR IP FISHEYE CAMERA - CEILING MOUNT3 -EXTERIOR IP DOME CAMERA - SURFACE MOUNT4 - EXTERIOR MULTI-LENS IP DOME CAMERA - PARAPET MOUNT5 - EXTERIOR MULTI-LENS IP DOME CAMERA - CORNER MOUNT6 - EXTERIOR IP DOME CAMERA - WALL MOUNT

ET

ELECTRIC POWER TRANSFER

ACCESS CONTROL DEVICE POWER SUPPLYAPS

X

NETWORK SWITCHNS

ELECTRIFIED LOCKSET WITH INTEGRATED CARD READER

ELECTRIFIED PANIC HARDWARE WITH INTEGRATED CARD READEREPCR

ELCR

ENTRY COMMUNICATION SYSTEM

VIDEO INTERCOM DOOR STATION - WALL MOUNTED

VIDEO INTERCOM MASTER STATIONIM

VI

INTRUSTION DETECTION SYSTEM

KEYPAD CONTROLLER - WALL MOUNTEDKP

IDP INTRUSION DETECTION PANEL

MOTION DETECTOR CEILING MOUNTEDMD

BUILDING 200 SECURITY PLAN

1SCALE: 1/8" = 1'-0"

DRAWING NOTESBUILDING IT ROOM. ALL SECURITY DEVICES FOR THIS BUILDING TO BE WIRED BACKTO THIS ROOM. ACCESS CONTROL AND INTRUSION DETECTION DEVICES TO BEWIRED TO NEW WALL-MOUNTED ENCLOSURES IN THIS ROOM. ALL NETWORKCONNECTED DEVICES SUCH AS INTERCOMS AND CAMERAS SHALL BE CONNECTEDTO NETWORK SWITCHES IN THIS ROOM. REFER TO PART PLANS AND ELEVATIONSON DRAWING SC-701.

1

SECURITY PLANBUILDING 200

SC-302

ADDENDUM 5 07/11/2019

Page 26 of 28

Page 27: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

CR

DC

DCEPETEH

ELCR

DC

EPET

ET

EPCR

DC

A 101AB 101B1ACP

LPS

FAR

117

EPET

EHELCR

B 101B2B 101C

DC

EPET

ET

EPCR

B 101D

EHELCR

B 102A

EHELCR

B 103A

EHELCR

B 104A

EHELCR

B 104C

EHELCR

B 105A

EHELCR

B 106B

EHELCR

B 110A

EHELCR

B 114A

EHELCR

B 115A

EHELCR

B 115B

EHELCR

B 119A

EHELCR

B 119B

EHELCR

B 119C

EHELCR

E 120A

DCEH

ELCR

E 120B

CR

DC

DCEPET

A 120C

EPET

CR

DC

DCEPET

A 120D

EPET

EHELCR

B 120E

EPCRET

CR

DC

DCEPET

A 201AACP

LPS

FAR

210

EPET

CR

DC

DCEPET

A 201B

EPET

CR

DCEPET

F 201C

CR

DCEPET

F 201DG 202A

ETELCR

H 202B

EHEPCREH

DCEP

ELCR

DC

EPET

ETEPCR

ACP

LPS

FAR

313D 301AI 301B

EH

B 301C

EHEPCR

D 302A

ELCREH

B 302B

EHEPCREH

DCEP

ELCR

D 303AI 303B

EH

B 303C

EHEPCR

D 304A

ELCREH

B 304B

EHEPCREH

DCEP

ELCR

D 305AI 305B

EH

B 305C

EHEPCREH

DCEP

ELCR

D 306AI 306B

EH

B 306C

EHEPCREH

DCEP

ELCR

D 307AI 307B

EH

B 307C

EHEPCREH

DCEP

ELCR

D 308AI 308B

EH

B 308C

C 310A

DC

EPET

ETEPCR

C 310B

ELCREH

B 311A

ELCREH

B 312B

BUILDING 100 ACCESS CONTROL RISER DIAGRAM

1NOT TO SCALE

BUILDING 200 ACCESS CONTROL RISER DIAGRAM

2NOT TO SCALE

BUILDING 300 ACCESS CONTROL RISER DIAGRAM

3NOT TO SCALE

DESK

PBPBDR

MS 5

CR

MS 5

CRMS 5

CR

MS 5

CRMS 5

CR

MS 5

CRMS 5

CR

Copyright 2001 TM TECHNOLOGY PARTNERS, INC.

TEL: 212.398.2424

CONSULTING, DESIGN & PROJECT MANAGEMENTWORLDWIDE PLAZA, 825 EIGHTH AVENUE

NEW YORK, NY 10019

Issue Date:

Revisions:

Consultant Stamp:

Project Title

Sheet Title:

Sheet Number:

for

DSA 10/17/2018

ALBE

RHILL

ELE

MENT

ARY

SCHO

OL

LAKE

ELS

INOR

E UN

IFIE

D SC

HOOL

DIS

TRIC

TLA

KE E

LSIN

ORE

CALIF

ORNI

A

DSA Stamp

MG

PA

AR

CH

IT

EC

TU

RE

An

A

rc

hi

te

ct

ur

al

C

or

po

ra

ti

on

Mai

lin

g: 6

96

5 E

l C

am

ino

Re

al,

Su

ite

s 1

05

-27

8

Ca

rl

sb

ad

,

CA

92

00

9T

ele

: (7

60

) 9

29

-15

00

Fax:

(7

60

) 9

29

-15

06

Consultant:

Job Nº.: 8L5780002

SECURITYACCESS CONTROLRISER DIAGRAMS

1. THIS RISER DIAGRAM IS CONCEPTUAL AND SHOULD BE USED AS AGUIDELINE IN ENGINEERING THE FINAL ACCESS CONTROL SYSTEM.

2. SECURITY INTEGRATOR SHALL FURNISH AND INSTALL WALL MOUNTEDENCLOSURE TO HOUSE THE EQUIPMENT BOARDS AND DEVICEPOWER SUPPLIES. THE WALL MOUNTED ENCLOSURE SHALL BEINSTALLED ON PLYWOOD PROVIDED BY THE ELECTRICALCONTRACTOR.

3. ALL ACCESS CONTROL SYSTEM CABLING SHALL BE HOMERUN FROMEACH DEVICE LOCATION TO THE SECURITY OFFICE AS INDICATED INRISER. NO SPLICES WILL BE ACCEPTABLE.

4. SECURITY INTEGRATOR SHALL UTILIZE THE CONDUITS AND CONDUITSLEEVES PROVIDED BY THE PROJECT ELECTRICIAN. COORDINATE ALLCONDUIT REQUIREMENTS WITH THE GENERAL AND ELECTRICALCONTRACTOR.

5. QUANTITY AND TYPE OF CABLING ARE NOT SHOWN. CONTRACTOR TOTABULATE QUANTITY BASED ON DEVICES SHOWN AND RISER ROUTESIDENTIFIED. REFER TO SECURITY PLANS AND DETAILS FORADDITIONAL INFORMATION.

6. THE PROJECT FIRE ALARM CONTRACTOR SHALL BE RESPONSIBLE TOPROVIDE A RELAY CONTACT FROM THE BUILDING LIFE SAFETYSYSTEM FOR CONNECTION TO LOCK POWER SUPPLIES FOR ALLFAIL-SAFE LOCKS. COORDINATE THIS REQUIREMENT IN THE FIELDWITH THE GENERAL CONTRACTOR.

7. ALL ETHERNET CONNECTIONS WILL BE PROVIDED BY THE CLIENT.CONTRACTOR SHALL REVIEW THE QUANTITY AND LOCATION OF ALLNETWORK CONNECTIONS WITH THE CLIENT PRIOR TO SYSTEMTESTING.

8. SECURITY CONTRACTOR SHALL COORDINATE EXACT BACKBOXLOCATIONS FOR ELECTRICAL AND VOICE/DATA OUTLETS WITH THEELECTRICAL AND CABLING CONTRACTORS, RESPECTIVELY. ALL 120VCIRCUITS AND NETWORK CABLING SHALL BE PROVIDED BY OTHERS.

9. SECURITY CONTRACTOR SHALL FIRESTOP ALL CONDUIT SLEEVESAND PENETRATIONS THROUGH FIRE RATED WALLS, INCLUSIVE OF ALLFIRE STAIRS.

10. ALL ACCESS CONTROL SYSTEM WIRING SHALL BE PLENUM RATEDAND RUN ABOVE ACCESSIBLE CEILING TILES WITH J-HOOKSINSTALLED EVERY 5'.

11. SECURITY INTEGRATOR SHALL COORDINATE IP ADDRESSREQUIREMENTS FOR ACCESS CONTROL PANEL AND SERVER WITHOWNER'S IT DEPARTMENT.

ACCESS CONTROL RISER DIAGRAM NOTES:

SECURITYACCESS CONTROLRISER DIAGRAMS

SC-501

ADDENDUM 5 07/11/2019

Page 27 of 28

Page 28: ADDENDUM NUMBER FIVE - 4.files.edl.io · 7/11/2019  · elements added, revised, deleted, or clarified by this Addendum. In case of conflict between Drawings, Project Manual, and

DOOR TYPE A - DOUBLE DOOR WITH ELECTRIC PANIC HARDWARE

FINISHED FLOOR

ELECTRONIC POWERTRANSFER PROVIDEDBY DOOR HARDWARECONTRACTOR

ELECTRIFIED PANIC HARDWAREWITH ELECTRIC LATCH RETRACTIONAND INTEGRAL REQUEST TO EXITBY DOOR HARDWARE CONTRACTOR.

ELECTRIFIED PANIC HARDWAREWITH ELECTRIC LATCH RETRACTIONAND INTEGRAL REQUEST TO EXITBY DOOR HARDWARE CONTRACTOR.

FLUSH MOUNTED RECESSEDMAGNETIC DOOR POSITIONSWITCH MOUNTED IN DOORAND DOOR JAMB (TYPICAL)

WALL MOUNTED CARDREADER MOUNTED ONSINGLE-GANG BOX ONUNSECURE SIDE BYSECURITY CONTRACTOR

PLENUM-RATED LOW-VOLTAGE ACCESSCONTROL WIRING RUN TO THE RESPECTIVETELECOM CLOSET BY SECURITY CONTRACTOR.

4" SQUARE SPLICE BOX BYELECTRICAL CONTRACTOR.

ACCESSIBLE CEILING

3/4" CONDUIT W/ DRAG LINESTUBBED UP TO ACCESSIBLECEILING ON SECURE SIDEOF DOOR PROVIDED BY THEELECTRICAL CONTRACTOR

ELECTRONIC POWERTRANSFER PROVIDEDBY DOOR HARDWARECONTRACTOR

PLAN

VIE

W

SECURED SIDE

UNSECURED SIDE DCDC CR

ET ET

PS

FIRE ALARM INTERFACE BYFIRE ALARM CONTRACTOR

POWER SUPPLY BYHARDWARE VENDORAND WIRED BY SECURITYCONTRACTOR

ELECTRICAL CONTRACTOR SHALL FURNISHAND INSTALL DEDICATED 120V, 20A CIRCUITFOR CONNECTION TO POWER SUPPLY

SECURED SIDE

UNSECURED SIDEEH

ACCESSIBLE CEILING

PLAN

VIE

WEL

EVAT

ION

VIEW

DOOR TYPE B - SINGLE DOOR WITH INTEGRATED ELECTRIC LOCKSET

FINISHED FLOOR

STANDARD STRIKE PROVIDEDBY DOOR HARDWARE CONTRACTOR.

ELECTRIC MORTISE LOCKSETWITH INTEGRAL CARD READER,DOOR POSITION AND REX DEVICEPROVIDED BY SECURITYCONTRACTOR

3/4" CONDUIT W/ DRAG LINES STUBBEDUP TO ACCESSIBLE CEILING ON SECURESIDE OF DOOR PROVIDED BY THEELECTRICAL CONTRACTOR.

PLENUM-RATED LOW-VOLTAGE ACCESSCONTROL WIRING RUN TO THE RESPECTIVETELECOM CLOSET BY SECURITY CONTRACTOR.

DOOR TYPE C - DOUBLE DOOR WITH INTEGRATED ELECTRIC PANIC HARDWARE

FINISHED FLOOR

ELECTRONIC POWERTRANSFER PROVIDEDBY DOOR HARDWARECONTRACTOR

ELECTRIFIED PANIC HARDWAREWITH INTEGRAL REQUEST TO EXITBY DOOR HARDWARE CONTRACTOR.

ELECTRIFIED PANIC HARDWAREWITH INTEGRAL REQUEST TO EXITBY DOOR HARDWARE CONTRACTOR.

FLUSH MOUNTED RECESSEDMAGNETIC DOOR POSITIONSWITCH MOUNTED IN DOORAND DOOR JAMB (TYPICAL)

PLENUM-RATED LOW-VOLTAGE ACCESSCONTROL WIRING RUN TO THE RESPECTIVETELECOM CLOSET BY SECURITY CONTRACTOR.

4" SQUARE SPLICE BOX BYELECTRICAL CONTRACTOR.

ACCESSIBLE CEILING

3/4" CONDUIT W/ DRAG LINESTUBBED UP TO ACCESSIBLECEILING ON SECURE SIDEOF DOOR PROVIDED BY THEELECTRICAL CONTRACTOR

ELECTRONIC POWERTRANSFER PROVIDEDBY DOOR HARDWARECONTRACTOR

PLAN

VIE

W

SECURED SIDE

UNSECURED SIDE DCET ET

ELECTRIC TRIM WITHINTEGRAL CARD READER,DOOR POSITION ANDREQUEST TO EXITPROVIDED BY SECURITYCONTRACTOR

SECURED SIDE

UNSECURED SIDEEH

ACCESSIBLE CEILING

PLAN

VIE

WEL

EVAT

ION

VIEW

DOOR TYPE D - SINGLE DOOR WITH INTEGRATED PANIC HARDWARE

FINISHED FLOOR

STANDARD STRIKE PROVIDEDBY DOOR HARDWARE CONTRACTOR.

3/4" CONDUIT W/ DRAG LINES STUBBEDUP TO ACCESSIBLE CEILING ON SECURESIDE OF DOOR PROVIDED BY THEELECTRICAL CONTRACTOR.

PLENUM-RATED LOW-VOLTAGE ACCESSCONTROL WIRING RUN TO THE RESPECTIVETELECOM CLOSET BY SECURITY CONTRACTOR.

ELECTRIFIED PANIC HARDWAREWITH INTEGRAL REQUEST TO EXITBY DOOR HARDWARE CONTRACTOR.

ELECTRIC TRIM WITHINTEGRAL CARD READER,DOOR POSITION ANDREQUEST TO EXITPROVIDED BY SECURITYCONTRACTOR

DOOR TYPE E - DOUBLE DOOR WITH INTEGRATED ELECTRIC LOCKSET

FINISHED FLOOR

FLUSH MOUNTED RECESSEDMAGNETIC DOOR POSITIONSWITCH MOUNTED IN DOORAND DOOR JAMB (TYPICAL)

PLENUM-RATED LOW-VOLTAGE ACCESSCONTROL WIRING RUN TO THE RESPECTIVETELECOM CLOSET BY SECURITY CONTRACTOR.

4" SQUARE SPLICE BOX BYELECTRICAL CONTRACTOR.

ACCESSIBLE CEILING

3/4" CONDUIT W/ DRAG LINESTUBBED UP TO ACCESSIBLECEILING ON SECURE SIDEOF DOOR PROVIDED BY THEELECTRICAL CONTRACTOR

PLAN

VIE

WSECURED SIDE

UNSECURED SIDE DCEH

ELECTRIC MORTISE LOCKSETWITH INTEGRAL CARD READER,DOOR POSITION AND REX DEVICEPROVIDED BY SECURITYCONTRACTOR

AUTO FLUSH BOLT

SECURED SIDE

UNSECURED SIDE DCET

CR

ACCESSIBLE CEILING

PLAN

VIE

WEL

EVAT

ION

VIEW

DOOR TYPE F - SINGLE DOOR WITH ELECTRIC PANIC HARDWARE

FINISHED FLOOR

STANDARD STRIKE PROVIDEDBY DOOR HARDWARE CONTRACTOR.

WALL MOUNTED CARD READERMOUNTED ON SINGLE-GANG BOXON UNSECURE SIDE BYSECURITY CONTRACTOR

FLUSH MOUNTED RECESSEDMAGNETIC DOOR POSITIONSWITCH MOUNTED IN DOORAND DOOR JAMB (TYPICAL)

3/4" CONDUIT W/ DRAG LINES STUBBEDUP TO ACCESSIBLE CEILING ON SECURESIDE OF DOOR PROVIDED BY THEELECTRICAL CONTRACTOR.

ELECTRONIC POWERTRANSFER PROVIDEDBY DOOR HARDWARECONTRACTOR

PLENUM-RATED LOW-VOLTAGE ACCESSCONTROL WIRING RUN TO THE RESPECTIVETELECOM CLOSET BY SECURITY CONTRACTOR.

PSFIRE ALARM INTERFACE BYFIRE ALARM CONTRACTOR

POWER SUPPLY BYHARDWARE VENDORAND WIRED BY SECURITYCONTRACTOR

ELECTRICAL CONTRACTOR SHALL FURNISHAND INSTALL DEDICATED 120V, 20A CIRCUITFOR CONNECTION TO POWER SUPPLY

ELECTRIFIED PANIC HARDWAREWITH ELECTRIC LATCH RETRACTIONAND INTEGRAL REQUEST TO EXITBY DOOR HARDWARE CONTRACTOR.

ELECTRONIC TRANSFERHINGE PROVIDED BY DOORHARDWARE CONTRACTOR

ELECTRONIC TRANSFERHINGE PROVIDED BY DOORHARDWARE CONTRACTOR

ELECTRONIC TRANSFERHINGE PROVIDED BY DOORHARDWARE CONTRACTOR

ELEV

ATIO

N VI

EW

ELEV

ATIO

N VI

EW

ELEV

ATIO

N VI

EW

1

WALL MOUNTED CARDREADER MOUNTED ONSINGLE-GANG BOX ONSECURE SIDE BYSECURITY CONTRACTOR

WALL MOUNTED MONITORINGSTATION MOUNTED ONSINGLE-GANG BOX ONSECURE SIDE BYSECURITY CONTRACTOR

5

5

WALL MOUNTED CARDREADER MOUNTED ONSINGLE-GANG BOX ONSECURE SIDE BYSECURITY CONTRACTOR

WALL MOUNTED MONITORINGSTATION MOUNTED ONSINGLE-GANG BOX ONSECURE SIDE BYSECURITY CONTRACTOR

5

5

Copyright 2001 TM TECHNOLOGY PARTNERS, INC.

TEL: 212.398.2424

CONSULTING, DESIGN & PROJECT MANAGEMENTWORLDWIDE PLAZA, 825 EIGHTH AVENUE

NEW YORK, NY 10019

Issue Date:

Revisions:

Consultant Stamp:

Project Title

Sheet Title:

Sheet Number:

for

DSA 10/17/2018

ALBE

RHILL

ELE

MENT

ARY

SCHO

OL

LAKE

ELS

INOR

E UN

IFIE

D SC

HOOL

DIS

TRIC

TLA

KE E

LSIN

ORE

CALIF

ORNI

A

DSA Stamp

MG

PA

AR

CH

IT

EC

TU

RE

An

A

rc

hi

te

ct

ur

al

C

or

po

ra

ti

on

Mai

lin

g: 6

96

5 E

l C

am

ino

Re

al,

Su

ite

s 1

05

-27

8

Ca

rl

sb

ad

,

CA

92

00

9T

ele

: (7

60

) 9

29

-15

00

Fax:

(7

60

) 9

29

-15

06

Consultant:

Job Nº.: 8L5780002

SECURITY DETAILSACCESS CONTROLDOORS

SC-601

ADDENDUM 5 07/11/2019

Page 28 of 28