adeptus hospital mesa arizona usa march 2016...title: adeptus...

1
5.5 Copyright © 2017 Pinnacle Infotech, Inc. Global Leader in BIM Services www.pinnaclecad.com Mechanical Ductwork Isometric Shop Drawing BIM Start Date March, 2016 Project Area 86,000 Sq ft Architect 5 BIM Engineers Ascension Group Architects Team Size BIM End Date July, 2016 innacle is responsible for creating the 3D Model at P LOD 400 and Shop Drawings of Arizona General Hospital consisting of inpatient rooms, two advanced operating suites, an emergency room, a laboratory and a full radiology suite. The hospital is capable of inpatient and outpatient surgical procedures, providing 24/7 access to emergency medical care. Scope of Work Our scope of work included 3D Modeling, Coordination and Shop Drawing Preparation. Trades Covered: HVAC, MP & PL Software Used: AutoCAD FAB-MEP-2014 LOD: 400 MEP Engineer SW Associates Consulting Engineers Developer/Owner PM Realty Group Challenges & Solutions Pinnacle Value Addition Created duct riser drawing, wall sleeve and opening drawing for the fire rated wall according to the fire damper; Raised 25 RFIs pertaining to design & coordination issues (such as missing continuation and required storm connection in 2nd floor, missing VTR Information) and adjusted window position and routing. Mesa, Arizona, USA Sub Contractor* TD Industry Project Speciality Creation of the duct riser drawing and damper sleeve drawing for fire rated wall. 1. Coordination Challenge: We have faced coordination challenge in Level 2 (Floor) of the Building as every element is not possible to accommodate within the available space. Solution: Our lead coordinator raised RFIs to the client for changing a few designs owing to the coordination problem. Consequently, the design has been updated by the architect from the client's side. 2. Input Challenge/Missing Information: Lack of equipment submittal during the initial phase of the model creation. Solution: We have raised RFIs and conducted Webex meeting every week to get the missing information from the client.

Upload: others

Post on 08-Mar-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Adeptus Hospital Mesa Arizona USA March 2016...Title: Adeptus Hospital_Mesa_Arizona_USA_March_2016.cdr Author: Bikram Chakraborty Created Date: 2/6/2017 11:16:20 AM

5.5

Copyright © 2017 Pinnacle Infotech, Inc.

Global Leader in BIM Serviceswww.pinnaclecad.com

Mechanical Ductwork Isometric

Shop Drawing

BIM Start Date March, 2016

Project Area 86,000 Sq ft

Architect

5 BIM Engineers

Ascension Group Architects

Team Size

BIM End Date July, 2016

innacle is responsible for creating the 3D Model at PLOD 400 and Shop Drawings of Arizona General Hospital consisting of inpatient rooms, two advanced

operating suites, an emergency room, a laboratory and a full radiology suite. The hospital is capable of inpatient and outpatient surgical procedures, providing 24/7 access to emergency medical care.

Scope of Work

Our scope of work included 3D Modeling, Coordination and Shop Drawing Preparation.

Trades Covered: HVAC, MP & PL

Software Used: AutoCAD FAB-MEP-2014

LOD: 400

MEP Engineer SW Associates Consulting Engineers

Developer/Owner PM Realty Group

Challenges & Solutions

Pinnacle Value Addition

Created duct riser drawing, wall sleeve and opening drawing for the fire rated wall according to the fire damper; Raised 25 RFIs pertaining to design & coordination issues(such as missing continuation and required storm connection in 2nd floor, missing VTR Information) and adjusted window position and routing.

Mesa, Arizona, USA

Sub Contractor* TD Industry

Project Speciality

Creation of the duct riser drawing and damper sleeve drawing for fire rated wall.

1. Coordination Challenge: We have faced coordination challenge in Level 2 (Floor) of the Building as every element is not possible to accommodate within the available space.

Solution: Our lead coordinator raised RFIs to the client for changing a few designs owing to the coordination problem. Consequently, the design has been updated by the architect from the client's side.

2. Input Challenge/Missing Information: Lack of equipment submittal during the initial phase of the model creation.

Solution: We have raised RFIs and conducted Webex meeting every week to get the missing information from the client.