adobe photoshop pdf - world banksiteresources.worldbank.org/extbujhydpowpro/resources/h...date:...
TRANSCRIPT
flow
NILE RIVER
Metres 0 200100
DUMBBELLISLAND
BUJAGALI-TORORO LINE (2X132kV)
BUJAGALI-NALUBAALE LINE (2X132kV)
KA
WA
ND
A-B
UJA
GA
LI L
INE
(2X
132
-220
kV)
POWERHOUSE
MAIN GATED SPILLWAY
WORKSHOP& STORE
POWERHOUSEACCESS ROAD
EXISTINGSITE ROAD
SUBSTATION
MAIN HIGHWAY
KAYUNGA
JINJA
SIPHON SPILLWAY EMBANKMENT DAM
Source: Scott Wilson Piesold (2005)
Permanent Fence Line
Inundated Land
Existing River Area
New high water levelwhen reservoir is filled
Transmisson Lines
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-3
GENERALPROJECT LAYOUT
BUJAGALI HYDROPOWER PROJECT SEA
Figure 1.2
Updated by:
Permanent Roads
Source: Adapted from NEMA (1997)
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-5
EIA PROCESS FLOWCHARTFOR UGANDA
BUJAGALI HYDROPOWER PROJECT SEA
Figure 2.1
Updated by:
DEVELOPER
SUBMISSION OF PROJECT BRIEF TOTHE AUTHORITY AND TO LEAD AGENCY
SCREEN 1 SCREEN 2 SCREEN 3(ANNEX 2)Whether projectis exempt from EIA
(ANNEX 3)Whether projectrequires mandatoryEIA
Whether adequatemitigation measureshave beenincorporated
CERTIFICATE OF APPROVAL OF EIA
AUTHORITY AND LEAD AGENCYCONSULTATION ON PROJECT BRIEF
PROJECT BRIEF FORWARDED TOLEAD AGENCY
SCOPING
T.O.Rs
REVIEW OFT.O.Rs
EI STUDY ANDCOLLECTION OF INFORMATION
PREPARE EIS*
STAKEHOLDER CONSULTATIONSON SCOPE
AUTHORITY, LEAD AGENCY ANDSTAKEHOLDER CONSULTATIONSON T.O.Rs
PUBLIC AND STAKEHOLDER CONSULTATIONS
PUBLIC AND STAKEHOLDER CONSULTATIONS
EIS*
LEAD AGENCY AND PUBLICCOMMENT AND REVIEW
ANY FURTHER STAKEHOLDER ANDLEAD AGENCY COMMENTS
CERTIFICATE OF APPROVALOF THE EIA
RECORD OF DECISION
REVIEW AND COMMENTON EIS*
APPROVAL OF EIS
DECISION ON PROJECT
ACTION BY DEVELOPER
GNI
NE
ER
CS
DU
TS
IE
YG
NIK
AM
NOI
SIC
ED
INPUTS/OUTPUTS
* EIS synonymous with SEA Report
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-6
BUJAGALI FALLS AND THESURROUNDING LANDSCAPE
BUJAGALI HYDROPOWERPROJECT SEA
Figure 3.1
Updated by:
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-58
LAKE VICTORIA OUTFLOWS: AGREED CURVE
BUJAGALI HYDROPOWER PROJECT SEA
Figure 3.2
Prepared by:
Owen Falls Agreed Curve
0
500
1000
1500
2000
2500
1131 1132 1133 1134 1135 1136 1137 1138
Lake Victoria elevation (mASL at Jinja gauge)
Dis
char
ge (m
3/s)
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-59
LAKE VICTORIA HYDROLOGY (1900-2005)
BUJAGALI HYDROPOWER PROJECT SEA
Figure 3.3
Prepared by:
Lake Victoria Net Basin Supply and Annual Average Outflow, 1900-2005
Lake Victoria Water Levels, 1900-2005
flow
NILE RIVER
Metres 0 200100
DUMBBELLISLAND
BUJAGALI-TORORO LINE (2X132kV)
BUJAGALI-NALUBAALE LINE (2X132kV)
KA
WA
ND
A-B
UJA
GA
LI L
INE
(2X
132
-220
kV)
POWERHOUSE
MAIN GATED SPILLWAY
WORKSHOP& STORE
POWERHOUSEACCESS ROAD
EXISTINGSITE ROAD
SUBSTATION
MAIN HIGHWAY
KAYUNGA
JINJA
SIPHON SPILLWAY EMBANKMENT DAM
Permanent Fence Line
Inundated Land
Existing River Area
New high water levelwhen reservoir is filled
Transmisson LinesPermanent Roads
Air and Noise Sampling SitesB
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-7
AIR QUALITY AND NOISE SAMPLING SITES
BUJAGALI HYDROPOWER PROJECT SEA
Figure 3.4
Updated by:
E
F
A
B
G D
C
Source: Scott Wilson Piesold (2005)
KIKUBAMUTWEPROPOSED BUJAGALI HYDROPOWER FACILITY
BUJAGALI FALLS
KIMAKACENTRAL FOREST RESERVE
MALINDI
NAMINYANORTH
NAMINYA
BUJAGALI ISLANDS
BUJAGALI CAMP SITE
NAMIZI
KALAGALA/ITANDAAPPROX 10 km
Jinja Wildlife Sanctuary“Indicative”
Forest Reserve
Dam
Land Bird Survey Areas
Water Bird Survey Areas
Vegetation Survey Areas
Disease Vectors Survey Sites(1998)
Note: Boundaries of the Central Forest Reserves are Approximate
SCALE 1:50,000
0 500 1000 M
Source: Forest Department (1999); WS Atkins (1999b); GoU (1953)
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-8
TERRESTRIAL ECOLOGYSTUDY SITES
BUJAGALI HYDROPOWER PROJECT SEA
Figure 3.5
Updated by:
Source: NAFIRRI (2006)
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006
AQUATIC FLORA AND FAUNA SURVEYSITES USED IN FIRRI SURVEYS
BUJAGALI HYDROPOWER PROJECT SEA
Figure 3.6
Updated by:
10045-H-9
#
490000
490000
500000
500000
510000
510000
520000
520000
530000
530000
540000
540000
550000
550000
560000
560000
250000 250000
260000 260000
270000 270000
280000 280000
290000 290000
300000 300000
10 0 10
N
EW
S
Namasagali
Kilometers
Kirindi
Buyala
Dumbbell siteKalange
Jinja
Lake Victoria
Source: Photographer unknown (Estimated Date: Late 1940s)
NALUBAALE DAM (FORMERLY KNOWN AS OWEN FALLS)
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-10
THE SOURCE OF THE RIVER NILE PRIOR TOCONSTRUCTION OF NALUBAALE DAM
BUJAGALI HYDROPOWER PROJECT SEA
Figure 3.7
Updated by:
Lake Victoria
Flow
Source: Forest Department 1999, WS Atkins 1999b.
SCALE 1:50,000
0 500 1000 M
JINJADISTRICT
JINJA
DISTRIC
T
MUKONODISTRICT
MU
KON
OD
ISTRICT
District boundary
Project-affected Village
Road
Resettlement Land Nile High Club
Bujagali Speke Camp and Picnic Site
Jinja Nile Resort
Sub-county Office LC3
MabiraCentral Forest Reserve
NaminyaResettlement
Kikubamutwe
Malindi
Naminya
Bujagali
Kyabirwa
Ivunamba
Namizi
Buloba
Buloba
ProposedBujagali HydropowerFacility
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006
SOCIO-ECONOMICFEATURES
BUJAGALI HYDROPOWER PROJECT SEA
Figure 3.8
Updated by:
Site
10045-H-11
Nalubaale and Kiira Hydropower Facilities
To Nairobi/Mombasa
IvunambaKikubamutwe
TerminalRoundabout
JinjaRoundabout
Njerugyratory
JINJATown
Centre
To Kampala
PROJECTSITE
10045-H-13
Source: WS Atkins, 1999
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006
SCHEMATIC DIAGRAM OF THE ROADNETWORK AROUND THE PROJECT SITE
BUJAGALI HYDROPOWER PROJECT SEA
Figure 3.10
Updated by:
Permanent site access road Temporary site access road
-4000
6000
16000
26000
36000
46000
56000
Jan-
99
Apr-9
9
Jul-9
9
Oct-9
9
Jan-
00
Apr-0
0
Jul-0
0
Oct-0
0
Jan-
01
Apr-0
1
Jul-0
1
Oct-0
1
Jan-
02
Apr-0
2
Jul-0
2
Oct-0
2
Jan-
03
Apr-0
3
Jul-0
3
Oct-0
3
Jan-
04
Apr-0
4
Jul-0
4
Oct-0
4
Jan-
05
Apr-0
5
Jul-0
5
Oct-0
5
Jan-
06
Apr-0
6
Jul-0
6
Month
MWh
& Ti
me (
hrs)
Total Load Shedding Time (hrs) Total MWh Shedded
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-14
Load Shedding Trend in Uganda (1999-2006)
BUJAGALI HYDROPOWER PROJECT SEA
Figure 4.1
Updated by:
50
25
025
50
75
100
125150
175
200
225250
275
300
325
350375
400
425
Mon'03
02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hour of Day
MW
T O T A L DE M A N D DO M E ST I C DE M A N D T O T A L L O A D SH E DT O T A L G E N E R A T I O N T O T A L T H E R M A L G E N E R A T I O N T O T A L E SK O M G E N E R A T I O NK E N Y A I M PO R T
261
235225 227 219
250
279
249263 269 272 273 281
272 272286 290
380 384 376366
352 352
300
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-15
Current Typical Daily Load Curve (2006)
BUJAGALI HYDROPOWER PROJECT SEA
Figure 4.2
Updated by:
DEMOCRATIC REPUBLICOF THE CONGO
50KM
Victo
riaN
ile
Alb
ert
Nile
Victoria
Nile
LakeKyoga
U G A N D A
BushenyiMbarara
Kiboga
Kitgum
Kotido
Lira
Masaka
Masindi
Moroto
Soroti
Fort Portal
Arua
Mbale
Tororo
Kampala
Gulu
Entebbe
Jinja
Bujagali
Alb
ert
NileArua
Victo
riaN
ile
Kalagala
Bujagali
Karuma
Masindi
Ayago South
Murchison Falls
Murchison Falls National Park
KENYA
ETHIOPIA
ERITREA
SUDAN
EGYPT
SOMALIA
LIBYA
CHAD
CENTRALAFRICAN REPUBLIC
UGANDA
BURUNDI
RWANDA
DJIBOUTI
JORDANISRAEL
LEBANON
KUWAIT
QATAR
BAHRAIN
U. A. E.
YEMEN
SYRIA
IRAQ IRAN
SAUDI ARABIA
TANZANIA
OMAN
Mediterranean Sea
Red Sea
Gulf of Aden
PersianGulf
Indian
Ocean
Beni Suef
Dire Dawa
Al Jawf
Bangassou
Bossangoa
Ndele
Aozou
Faya-Largeau
Aswan
El-Minya
El-Suweis (Suez)
Aseb
Asela
Goba
Mekele
Bakhtaran
Eldoret
Kisumu
Mombasa
Banghazi
Salalah
Al Madinah (Medina)
Makkah (Mecca)
Berbera
Chisimayu
Hargeysa
Al Fashir
Atbarah
Juba
Port Sudan
Wau
Tabora Tanga
Gulu
Al Ghaydan
Al MukallaTaizz
Bukavu
Bumba
Kisangani
Esfahan
ShirazAl Basrah
Mbandaka
El-Iskandariya(Alexandria)
Al Manamah
Bujumbura
Djibouti
Asmara
Addis Abbaba
Baghdad
Amman
Nairobi
Kuwait
Ad Dawhah
Kigali
Ar Riyad (Riyadh)
Mogadishu (Mugdisho)
Abu Dhabi(Abu Zaby)
Sanaa
Bangui
Cairo (El-qahira)
Tel Aviv
Bayrut (Beirut)
Khartoum (Al Khurtum)
Kampala
Damascus
DEMOCRATIC REPUBLICOF THE CONGO
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-16
POTENTIAL HYDROPOWER DEVELOPMENTSITES ON THE VICTORIA NILE
BUJAGALI HYDROPOWER PROJECT SEA
Figure 4.3
Updated by:
Source: W.S. Atkins (1999)
Namizi Kyabirwa
Kabowa
To Kamuli
BudondoCentre
Minor Road
KibibiBusowoko
Site EBUSOWOKO
FALLS
Namiyagi
MaligitaKirungu
WakisiCentre
Kikubamutwe
Buyala
Site C and DBUYALA
FALLS
Site AKYABIRWA
FALLS
BUJAGALIFALLS
Malindi
Buloba
Naminya
Buwenda
JINJATOWN
To Kamuli
To Kayunga
To Kampala
Note: Not to Scale
Wakisi
Site BDUMBBELL
ISLAND
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-17
POTENTIAL HYDROPOWER DEVELOPMENTSITES AROUND BUJAGALI
BUJAGALI HYDROPOWER PROJECT SEA
Figure 4.4
Updated by:
FlowVICTORIA NILE
DUMBBELLISLAND
Namizi KyabirwaKabowa
To Kamuli
BudondoCentre
Minor Road
KibibiBusowoko
BUSOWOKOFALLS
Namiyagi
MaligitaKirungu
WakisiCentre
Kikubamutwe
Buyala
BUYALAFALLS
KYABIRWAFALLS
BUJAGALIFALLS
Malindi
Buloba
Naminya
Buwenda
VICT ORIA NILE
JINJATOWN
To Kamuli
To Kayunga
To Kampala
Wakisi
KEY
Dam
Area of Inundation
NOT TO SCALE
Source: W.S. Atkins (1999)
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-18
“B1” ALTERNATIVE CONFIGURATIONAT DUMBBELL ISLAND
BUJAGALI HYDROPOWER PROJECT SEA
Figure 4.5
Updated by:
FlowVICTORIA NILE
Source: W.S. Atkins (1999)
Namizi
Embankmentand spillway
Kabowa
To Kamuli
BudondoCentre
Minor Road
KibibiBusowoko
BUSOWOKOFALLS
Namiyagi
MaligitaKirungu
WakisiCentre
Kikubamutwe
Buyala
BUYALAFALLS
KYABIRWAFALLS
BUJAGALIFALLS
MalindiBuloba
Naminya
Kyabirwa Buwenda
JINJATOWN
To Kamuli
To Kayunga
To Kampala
KEY
Dam
Area of Inundation
NOT TO SCALE
Wakisi
DUMBBELLISLAND
Tailrace
Headrace Channel
Intake
PowerStation
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-19
“B2” ALTERNATIVE CONFIGURATIONAT DUMBBELL ISLAND
BUJAGALI HYDROPOWER PROJECT SEA
Figure 4.6
Updated by:
FlowVICTORIA NILE
Source: AESNP (2001)
DRINKING WATER
SEWAGE TREATMENT - SITE OFFICE
WATER FOR CONCRETE PRODUCTION
ph-ADJUSTMENT
DOSINGKMnO4OPTIONAL
COMPRESSED AIRDISINFECTION
IRONMANGANESEFILTER
TO DISTRIBUTION SYSTEM
WATER RESERVOIR
TOILET/WASHING
KITCHEN/RESTAURANT
WORKSHOPS
GREASESEPARATOR
OILSEPARATOR
SLUDGESEPARATOR INFILTRATION
TO RIVER
TO PRODUCTION
WATER RESERVOIRSEDIMENTATION
DOSING OFCHEMICALFLOCCULANT OPTION DEPENDING
ON WATER QUALITY
RIVER
DRAINAGE AND LEAKAGE WATER FROMA CONSTRUCTION SITE
TO RIVER
ph-ADJUSTMENT
CHEMICALFLOCCULANT
(OPTION)SEDIMENTATION
DAMS
OIL SKIMMER
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-25
PRELIMINARY LAYOUT-WATER HANDLING
BUJAGALI HYDROPOWER PROJECT SEA
Figure 5.2
Updated by:
Source: Knight Piésold (1998).
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-28
LOCATION OF POSSIBLESAND SOURCES
BUJAGALI HYDROPOWER PROJECT SEA
Figure 5.3
Updated by:
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-29
TYPICAL CONCRETEBATCHING PLANT
BUJAGALI HYDROPOWER PROJECT SEA
Figure 5.4
Updated by:
Source: Produced by Skako AS, Denmark for Veidekke, Norway (1999) Drawing: C898-042
Source: Impregilo (1997) Drawing: R34010
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-35
CRETER CRANE
BUJAGALI HYDROPOWER PROJECT SEA
Figure 5.5
Updated by:
Source: Impregilo (1997) Drawing: R34010
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-36
TOWER CRANES
BUJAGALI HYDROPOWER PROJECT SEA
Figure 5.6
Updated by:
Source: Forest Department 1999, WS Atkins 1999b.
SCALE 1:50,000
0 500 1000 M
JINJADISTRICT
JINJA
DISTRIC
T
MUKONODISTRICT
MU
KON
OD
ISTRICT
District boundary
Project-affected Village
Road
Resettlement Land
MabiraCentral Forest Reserve
NaminyaResettlement
Kikubamutwe
Malindi
Naminya
Bujagali
Kyabirwa
Ivunamba
Namizi
Buloba
Buloba
ProposedBujagali HydropowerFacility
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006
LOCATION OF CONSULTED COMMUNITIES
BUJAGALI HYDROPOWER PROJECT SEA
Figure 6.1
Updated by:
Site
10045-H-37
Nalubaale and Kiira Hydropower Facilities
JINJA
BUDONDO SUB-COUNTY
WAKISI SUB-COUNTY
SUB-COUNTY
PEHUNCHE
BEST
WORST
DALESICE
GHAZI BAROTHA
CHIVOR
GUAVIOBUJAGALI
TEHRI
ERTANPLAYASITAIPU
TARBELA
VICTORIA
MANGLA NARMADA SAGAR
KEDUNG OMBO
PAK MUN
CABORA BASSA
KAINJI
ASWAN HIGH
NAM NGUM
SAMUEL
BALBINA
AKOSOMBO
KOMPIENGA
PORTO PRIMAVERA
SERRA DA MESAFUMAS
VOLGA
NAM THEUN 2
ZAYA
GUATAPE
ATATURKKHAO LAEM
YACYRETA
SPRINAGARIND
BAKUNTUCURUI
ILHA SOLTEIRA
THREE GORGES
GRAND COULEEARUN III
NAM THEUN-HINBOUN
TACOMA
SOGAMOSOBENMORE
VICTORIA
EMBORACAO
GURI COMPLEX
LA GRANDE
0.000
0 1 00101 000,01000,1
0.001
0.010
0.100
1.000
10.000
100.000
1000.000
ZIMAPAN
SOBRADINHO
ha/MW
Oustees/M
W
Source: Adapted from Goodland (1997)
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-42
HYDROPOWER “EFFICIENCY” RATIO OF BUJAGALI COMPARED TO OTHER LARGE DAMS IN THE WORLD
BUJAGALI HYDROPOWER PROJECT SEA
Figure 7.1
Prepared by:
Boundary of land take area
Portion of plot within the land take area
Portion of plot outside the land take area
Residential Building
TOTALLY AFFECTED PLOTS PARTIALLY AFFECTED PLOTS
Land for land compensation, andCash compensation, andResettlement.
, If the remaining plots are sustainable:
Cash compensation of land, andCash compensation of crops, andCash compensation ofbuilding (in Situation B-3 only).
Or
Land for landcompensation, andCash compensationof crops, andResettlement.
, If theremaining plotsare sustainable:
Cash compensationof land, andCash compensationof crops.
Or
Land for landcompensation, andCash compensationof crops, andResettlement.
, If theremaining plotsare sustainable:
Cash compensationof land , andCash compensationof crops.
Or
Land for landcompensation, and
Cash compensationof crops, and
Resettlement.
SITUATION A-1
946 HOUSEHOLDS/6959 INDIVIDUALS
SITUATION A-2
79 HOUSEHOLDS/511 INDIVIDUALS
SITUATION B-1
241 HOUSEHOLDS/1027 INDIVIDUALS
SITUATION B-2
22 HOUSEHOLDS/203 INDIVIDUALS
SITUATION B-3
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-43
NUMBERS AND CATEGORIZATION OF PROJECT-AFFECTED PERSON AND
RESETTLEMENT & COMPENSATION PACKAGES
BUJAGALI HYDROPOWERPROJECT SEA
Figure 7.2
Updated by:
LEGEND
M/C - MotorcyclesPT - Public TransportP/C - Pedal CyclesHGV - Heavy Goods Vehicle
P/C%
ToNairobi/Mombasa
CarsM/CPTP/C
HGV TOTAL HGV% OTHER%
(PV)
267
338
219114851 2023 3% 57% 40%
Terminal Roundabout
Jinja Roundabout
778225602869739 3213 23% 27% 50%
JINJA
Ivunamba
Key
East bank
223
802
254
555
93 1927 5% 29% 66%
Kikubamutwe
To Kampala
2611
671
2561
1899
1261 9003 14% 21% 65%
24861598
2453
3542
607 10686 6% 33% 61%
West Bank
Igan
ga R
oad
Bridge
Jinja Town Road
Kayunga Road
Ivunamba Road
PROJECTSITE
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-45
BASELINE TRAFFIC COUNTS (2006)12 HOUR MOVEMENTS: WEEKDAYS
BUJAGALI HYDROPOWER PROJECT SEA
Figure 7.4
Updated by:
LEGEND
LV - Light VehicleHGV - Heavy Goods Vehicle
ToNairobi/MombasaCars/LV
Buses
HGV’s TOTAL
----6
---- 6
Terminal Roundabout
Jinja Roundabout
1002426 150
JINJA
Ivunamba
Key
East bank
500
30
26 556
100
0
0 100
Kikubamutwe
To Kampala
400
30
26 456
300
----
---- 300
West Bank
Igan
ga R
oad
Bridge
Jinja Town Road
Kayunga Road
Ivunamba Road
PROJECTSITE
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-46
PREDICTED PROJECT TRAFFIC DURING CONSTRUCTION
12 HOUR MOVEMENTS: WEEKDAYS
BUJAGALI HYDROPOWER PROJECT SEA
Figure 7.5
Updated by:
Source: AESNP (2001)
LEGEND
M/C - MotorcyclesPT - Public TransportP/C - Pedal CyclesHGV - Heavy Goods Vehicle
ToNairobi/Mombasa
P/C%
CarsM/CPTP/C
HGV HGV% OTHER% 267
338
225
1148
----
3%
----51
2029
---- 3%<1%
57%
878
225
626
869
13%
----
4%
----765
3363 5%
4% 23% 26% 51%
40%
Terminal Roundabout
Jinja Roundabout JINJAIvunamba
Key
East bank
Kikubamutwe
To Kampala
3011
671
2591
1899
15%
----
1%
----
1287 2%
9549 5%
14% 20% 66%
723
802
284
555
224%
----
12%
----
119 28%
2483 29%
5% 22% 73%
27861598
2453
3542
12%----
----
----
607 ----10986 3%
6% 32% 62%
West Bank
Igan
ga R
oad
Bridge
Jinja Town Road
Kayunga Road
Ivunamba Road
PROJECTSITE
TOTAL
% Increase Over Baseline
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-47
TOTAL PREDICTED TRAFFIC DURING CONSTRUCTION
12 HOUR MOVEMENTS: WEEKDAYS
BUJAGALI HYDROPOWER PROJECT SEA
Figure 7.6
Updated by:
DEMOCRATIC REPUBLICOF THE CONGO
Victo
riaN
ile
Alb
ert
Nile
Victoria
Nile
LakeKyoga
U G A N D A
Entebbe
KENYA
ETHIOPIA
ERITREA
SUDAN
EGYPT
SOMALIA
LIBYA
CHAD
CENTRALAFRICAN REPUBLIC
UGANDA
BURUNDI
RWANDA
DJIBOUTI
JORDANISRAEL
LEBANON
KUWAIT
QATAR
BAHRAIN
U. A. E.
YEMEN
SYRIA
IRAQ IRAN
SAUDI ARABIA
TANZANIA
OMAN
Mediterranean Sea
Red Sea
Gulf of Aden
PersianGulf
Indian
Ocean
Beni Suef
Dire Dawa
Al Jawf
Bangassou
Bossangoa
Ndele
Aozou
Faya-Largeau
Aswan
El-Minya
El-Suweis (Suez)
Aseb
Asela
Goba
Mekele
Bakhtaran
Eldoret
Kisumu
Mombasa
Banghazi
Salalah
Al Madinah (Medina)
Makkah (Mecca)
Berbera
Chisimayu
Hargeysa
Al Fashir
Atbarah
Juba
Port Sudan
Wau
Tabora Tanga
Gulu
Al Ghaydan
Al MukallaTaizz
Bukavu
Bumba
Kisangani
Esfahan
ShirazAl Basrah
Mbandaka
El-Iskandariya(Alexandria)
Al Manamah
Bujumbura
Djibouti
Asmara
Addis Abbaba
Baghdad
Amman
Nairobi
Kuwait
Ad Dawhah
Kigali
Ar Riyad (Riyadh)
Mogadishu (Mugdisho)
Abu Dhabi(Abu Zaby)
Sanaa
Bangui
Cairo (El-qahira)
Tel Aviv
Bayrut (Beirut)
Khartoum (Al Khurtum)
Kampala
Damascus
DEMOCRATIC REPUBLICOF THE CONGO
Bujagali
Nalubaale andKiira
Karuma
Kalagala
JINJA
KAMPALA
Ayago South
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-48
LOCATION OF EXISTING & PROPOSED HYDROPOWER PROJECTS
ON THE VICTORIA NILE
BUJAGALI HYDROPOWER PROJECT SEA
Figure 7.7
Updated by:
Murchison Falls National Park
Source: WS Atkins, Cumulative Impact Assessment (March 2000)
Scenario 1:
Scenario 2:
Scenario 3:
consists of Nalubaale + Kiira + Bujagali + Kalagala
consists of Nalubaale + Kiira + Bujagali + Karuma
consists of Nalubaale + Kiira + Bujagali + Kalagala + Karuma
Cost (million USD)
snosrepdecalpsidtnenamreP
)ah(ekat
dnaltnenamreP
Megawatts
4500
4000
3500
3000
2500
2000
1500
1000
500
0
Nalubaa
leKiir
a Phase
I +II
Bujagali
Phase
I
Bujagali
Phase
I+II
Kalagala
Karum
a
Scenar
io1
Scenar
io2
Scenar
io3
Kiira P
hase
1
Option/Combined Scenario
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-49
MAJOR BENEFITS AND ENVIRONMENTALCOSTS OF FIVE HYDROPOWER OPTIONS
AND COMBINATIONS OF OPTIONS
BUJAGALI HYDROPOWER PROJECT SEA
Figure 7.8
Updated by:
Vi ctoria
Nile
Alb
e r
Ni le
V ictoria
Nile
LakeKyoga
U G A N D A
BushenyiMbarara
Kotido
Masaka
Moroto
Arua
Tororo
Kampala
Gulu
Entebbe
Jinja
lb
Vi ctoria
Nile
Murchison Falls National Park
Lake Albert
Lake Victoria
Lake Victoria
Pre 1954
Ripon Falls
Vi ctoria
Nile
Alb
e rt
Ni le
V ictoria
Nile
LakeKyoga
U G A N D A
BushenyiMbarara
Kitgum
Kotido
Masaka
Moroto
Arua
Tororo
Kampala
Gulu
Entebbe
Jinja
Alb
e rt
Ni le
Vi ctoria
Nile
Murchison Falls National Park
Lake Albert
Lake Victoria
1954 Owen Falls (Nalubaale)
Owen Falls (Nalubaale)
Vi ctoria
Nile
Alb
e rt
Ni le
V ictoria
Nile
LakeKyoga
U G A N D A
BushenyiMbarara
Kitgum
Kotido
Masaka
Moroto
Arua
Tororo
Kampala
Gulu
Entebbe
Jinja
Alb
e rt
Ni le
Vi ctoria
Nile
Murchison Falls National Park
Lake Albert
Lake Victoria
2001 Owen Falls Extension (Kiira)
Owen Falls (Nalubaale)Owen Falls Extension (Kiira)
Vi ctoria
Nile
Alb
e rt
Ni le
V ictoria
Nile
LakeKyoga
BushenyiMbarara
Kitgum
Kotido
Masaka
Moroto
Arua
Tororo
Kampala
Gulu
Entebbe
Jinja
Bujagali
Alb
e rt
Ni le
Vi ctoria
Nile
Bujagali
Murchison Falls National Park
Lake Albert
Lake Victoria
2010 Bujagali
Nalubaale & Kiira
Vi ctoria
Nile
Alb
e rt
Ni le
V ictoria
Nile
LakeKyoga
U G A N D A
BushenyiMbarara
Kitgum
Kotido
Masaka
Moroto
Arua
Tororo
Kampala
Gulu
Entebbe
Jinja
Bujagali
Alb
e rt
Ni le
Vi ctoria
Nile
Bujagali
Karuma
Murchison Falls National Park
Lake Albert
Lake Victoria
2012 Karuma
Nalubaale & Kiira
▪ No development on Nile.▪ Jinja is fishing harbour and regional administrative centre. No extensive heavy industry.▪ Little tourism.▪ Local environment impacted only by low level subsistance agriculture and fishing.▪ Ripon Falls provides hydrological control between Lake Victoria and the Nile.▪ Railway bridge constructed over the Nile at Jinja.▪ Murchison Falls National Park established in 1954.
▪ Nalubaale (formerly Owen Falls Dam) constructed just downstream of Ripon Falls with flooding between Owen Falls and Ripon Falls.▪ With the blasting of Ripon Falls and reliable source of power, Jinja becomes the industrial hub of Uganda, Dam provides a roadway across the river.▪ Barrier to fish movement between Lake Victoria and Victoria Nile created by Nalubaale.▪ A period of above average rainfall results in historically high lake levels.▪ Water released from Nalubaale in accordance with the "Agreed Curve" which mimics natural flows.▪ At high lake levels water in excess of that needed for power generation “spilled”.
▪ Kiira (formerly Owen Falls Extension) constructed in parallel to Nalubaale to increase peak generating capacity.▪ No increased impoundment.▪ No impacts on growing tourism industry based around Bujagali and other rapids downstream.▪ From 2001 to 2006 water released from combined operation of Nalubaale and Kiira exceeds the “Agreed Curve”, contributing to lower water levels in Lake Victoria.▪ 2005 to 2006 low lake levels force reduced operation or Nalubaale and Kiira, resulting in severe load shedding.▪ 2006 emergency thermal generators constructed to alleviate load shedding.▪ Subsequently water releases expected to be to the “Agreed Curve”.▪ Some limited resettlement required to accommodate canal.
▪ Bujagali results in impoundment of water between Dumbbell Island and Nalubaale/Kiira. (8 km)▪ Some islands submerged and some people displaced. (In 2001)▪ Increased power to Ugandan grid resulting in improved power stability and developmental benefits, the emergency thermal generators are shut down.▪ Considerable benefits to local communities through jobs and implementation of various social action plans▪ Changes to tourism especially white water rafting due to submergence of rapids between Dumbbell Island and Nalubaale/Kiira operations shift further downstream.▪ Operation of Bujagali Dam reuses the same water released from Nalubaale and Kiira, allowing twice the amount of power to be generated from the same amount of water released. Downstream flows continue to be controlled by Nalubaale and Kiira, with no or minimal influence from Bujagali.▪ Focus of rafting shifts to Kalagala, tourism expands, Kalagala area protected by government of Uganda.
▪ Run of the river Karuma project provides additional power to Ugandan grid with associated developmental & regional benefits.▪ No Impoundment or river blockage due to project design. Downstream flows continue to be controlled by Nalubaale and Kiira.▪ No changes to river hydrology anticipated except in the stretch which has had flow diverted.▪ Relatively few people resettled.▪ No further impact to tourism anticipated.
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-50
CUMULATIVE EFFECTS OF HYDROPOWER DEVELOPMENTS ON THE VICTORIA
NILE IN UGANDA(1954-2012)
BUJAGALI HYDROPOWER PROJECT SEA
Figure 7.9
Updated by:
Lake Victoria
Lake Victoria
Lake Victoria
Lake Victoria
NOTE: NOT TO SCALE
DemocraticRepublic of Congo
Kenya
Kalagala area
UGANDA
DemocraticRepublic of Congo
Kenya
UGANDA
DemocraticRepublic of Congo
Kenya
UGANDA
DemocraticRepublic of Congo
Kenya
UGANDA
DemocraticRepublic of Congo
Kenya
UGANDA
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-52
SEAP COMPONENT PLANS
BUJAGALI HYDROPOWERPROJECT SEA
Figure 8.1
Prepared by:
Social & Environmental Action Plan (SEAP)
Sponsor’s Action Plan Contractor’s Action Plan
Public Consultation and Disclosure Plan (PCDP)
Assessment of Past Resettlement Activities and Action Plan (APRAP)
Community Development Action Plan (CDAP)
Environmental Mitigation & Monitoring Plan (EMMP)
Labour Force Management Plan (LFMP)
Traffic Management Plan (TMP)
Waste Management Plan (WMP)
Labour Force Management Plan (LFMP)
Environmental Mitigation & Monitoring Plan (EMMP)
Regulatory & Management Framework: Legislation/Policies, Environmental Review,
Change Management
Health & Safety Management Plan (HSMP)
Pollutant Spill Contingency Plan (PSCP)
Emergency Preparedness and Response Plan (EPRP)
Hazardous Materials Management Programme (HMMP)
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-53
SPONSOR'S IMPLEMENTATION TEAM STRUCTURE (INDICATIVE)
BUJAGALI HYDROPOWERPROJECT SEA
Figure 8.2
Prepared by:
Project Manager & Project Director
Implementation Manager
Engineering Manager
Financial Manager
Social & Environmental Manager
Team Leader–Biophysical Unit
Team Leader–Social Unit
Community Liaison Manager
Health and Safety Manager
Human Resources Manager
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-53
SPONSOR'S IMPLEMENTATION TEAM STRUCTURE (INDICATIVE)
BUJAGALI HYDROPOWERPROJECT SEA
Figure 8.2
Prepared by:
Project Manager & Project Director
Implementation Manager
Engineering Manager
Financial Manager
Social & Environmental Manager
Team Leader–Biophysical Unit
Team Leader–Social Unit
Community Liaison Manager
Health and Safety Manager
Human Resources Manager
Site Environmental Officer
Environmental Field
Co-ordinator
Drivers/Labourers
Environmental Engineers
Field Inspectors Task Manager –
Monitoring & Reporting
Other Task Managers as required
Mapping/ Document
Management
BUJAGALI ENERGY LIMITEDPrepared for:
Project Name:Date: December, 2006 10045-H-54
EPC CONTRACTOR’S ENVIRONMENTAL TEAM STRUCTURE (INDICATIVE)
BUJAGALI HYDROPOWERPROJECT SEA
Figure 8.3
Prepared by: