STATE HIGH RENEWAL PROJECT “KICK-OFF” MEETING

July 14, 2014

Crabtree, Rohrbaugh & Associates, Architects

Agenda

Opening Remarks

Overview/Purpose

Design Team Introductions

Schematic Design ConceptsSite PlanBuilding

General Timeline

Your Thoughts/Questions

Page 2: Agenda

State High Renewal – Schematic Design Concepts

Site Improvement Goals

•Access Management and Circulation•Vehicular and Pedestrian

•Sufficient Parking at Appropriate Locations•Short-Term/Visitor•Event

•Improved Storm Water Management•Minimize Impervious Footprint

•Enhanced ADA Accessibility •Maintain Physical Education and Athletic Facilities

Page 3: Agenda

State High Renewal – Schematic Design Concepts

Overall Campus

Concept for Future Community Field Improvements (Not Part of the Renewal)

Concept for Future Community Field Improvements (Not Part of the Renewal)New Athletic Field

(Grass, Included in Renewal)

New Athletic Field (Grass, Included in Renewal)

Page 4: Agenda

State High Renewal – Schematic Design Concepts

4-Way, Signalized Intersection

4-Way, Signalized Intersection 4-Way,

Signalized Intersection

4-Way, Signalized Intersection

Drop-off and ADA parking

Drop-off and ADA parking

Main Parking North (Band Practice)

Main Parking North (Band Practice)

Main Parking South (Track)Main Parking South (Track)

Bus Staging for Dismissal and Event Parking

Bus Staging for Dismissal and Event Parking

Drop-off Loop & Visitor Parking

Drop-off Loop & Visitor Parking

Primary SWM Area (South)

Primary SWM Area (South)

Primary SWM Area (North)

Primary SWM Area (North)

Separate Bus AccessSeparate Bus Access

Page 5: Agenda

Architectural Massing Study Views

State High Renewal – Schematic Design Concepts

Page 6: Agenda

Massing Study - Aerial View Looking North

State High Renewal – Schematic Design Concepts

Page 7: Agenda

Massing Study - Aerial View Looking South

State High Renewal – Schematic Design Concepts

Page 8: Agenda

Massing Study – Looking West (above O’Bryan Ln.)

State High Renewal – Schematic Design Concepts

Page 9: Agenda

Massing Study – Looking South

State High Renewal – Schematic Design Concepts

Page 10: Agenda

Massing Study – Looking Southeast

State High Renewal – Schematic Design Concepts

Page 11: Agenda

Massing Study – Looking Southeast (above Welch)

State High Renewal – Schematic Design Concepts

Page 12: Agenda

Massing Study - Main Entry View

State High Renewal – Schematic Design Concepts

Page 13: Agenda

State High Renewal – General Timeline

• Overall Goal – Construction Start Summer 2015•Approximate 30 month duration – in Phases

•Municipal and State Approvals •Concurrent with Construction Documents and District Process•Municipal

•Land Development Plans (Preliminary & Final)•Conditional Use for Parking Reduction (with Prelim. LD)•Zoning (Building Height and other Variances)•Traffic Study

•State•NPDES (Storm Water)•PennDOT for Traffic Signal Permits

Page 14: Agenda

State High Renewal – General Timeline

Page 15: Agenda

STATE HIGH RENEWAL PROJECT “KICK-OFF” MEETING