Agenda
Session 1 Commercial Opportunities
Session 2Furniture, Fixtures and Equipment Opportunities
Session 3 ICT Opportunities
Session 4Maintenance and Facility Management Opportunities
![Page 3: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/3.jpg)
Operation and Maintenance and Facility Management
Opportunities
![Page 4: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/4.jpg)
4
S.No Description of Tender Document Type of Tender
1Design, supply & Installation of Kitchen Equipment for the main kitchen and staff canteen at Muscat International Airport
Design and Build
2Design, Supply, Installation, Testing & Commissioning of Civil, MEP and Fire Alarm & Protection System In leasable offices within MIA-PTB at Muscat International Airport
Design and Build
3 Construction of Central Warehouse Building at Muscat International Airport Build
4Design and Implementation of Energy Conservation Strategy for Muscat International and Salalah Airport
Consultancy
5Consultancy services for Supervision of Testing & Commissioning, Snagging and Handover activities for Cargo/Material Handling Equipment at New Cargo Terminal Building at Muscat International Airport
Consultancy
Operation and Maintenance Opportunities
![Page 5: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/5.jpg)
5
S.No Description of Tender Document Type of Tender
6Consultancy Services for Supervision of Testing & Commissioning, Snagging and Handover activities for MRO Special Equipment/facilities at Aircraft Maintenance, Repair and Overhaul facility at Muscat International Airport
Consultancy
7Consultancy services for Supervision of Testing & Commissioning, Snagging and Handover Activities for Inflight Catering Special Equipment/Facilities at In Flight Catering Building at Muscat International Airport
Consultancy
8Design & Supervision Consultancy Services for Construction of Central Warehouse Building at MIA
Consultancy
9Comprehensive Maintenance Services for Special purpose vehicles at Muscat International Airport
Operation & Maintenance
10Comprehensive Electromechanical and Civil operation and maintenance Services for Cargo Terminal Building at Muscat International Airport
Operation & Maintenance
Operation and Maintenance Opportunities
![Page 6: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/6.jpg)
6
S.No Description of Tender Document Type of Tender
11Comprehensive Electromechanical and Civil Operation and Maintenance Services for Inflight Catering Building at Muscat International Airport
Operation & Maintenance
12Comprehensive Electromechanical and Civil Operation and Maintenance Services for Aircraft Maintenance, Repair and Overhaul facility at Muscat International Airport
Operation & Maintenance
13Comprehensive Maintenance Services for Engineering Workshop equipment at Muscat International Airport
Operation & Maintenance
14Comprehensive Operation and Maintenance services for Central and external utility Services at Muscat International Airport
Operation & Maintenance
15Tender for Maintenance of Kitchen Equipment in Passenger Terminal Building at Muscat International Airport
Maintenance
16Comprehensive Operational & Maintenance services for Electromechanical and Civil Facilities in Passenger Terminal Building at New Muscat International Airport
Operation & Maintenance
Operation and Maintenance Opportunities
![Page 7: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/7.jpg)
Scope of Work
• Kitchen Equipment.
• Service, Counters, Joinery.
• Refrigeration Equipment.
• Shelving.
• Stainless steel fabrication
• Mobile Equipment.
• Ware Washing.
• Main Cooking Hood/Canopy.
• Pot washer Canopy.
• Dish washer Canopy.
• Drainage solutions.
• Air Conditionioning & Ventilation works.
• Plumbing Works
• Electrical Works.
• Architectural & Civil Works.
Design, Supply & Installation of Kitchen Equipment for Main Kitchen and Staff
Canteen
![Page 8: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/8.jpg)
Scope of Work
• Architectural & Civil Works.
• Air Conditionioning & Ventilation works.
• Plumbing Works (Cold Water)
• Fire Protections Works.
• Condensate Drainage System Works.
• Electrical Works.
• BMS/SCADA Interface.
• Passive IT Systems Interface.
Design, Supply, Installation, Testing & Commissioning of Civil, MEP and Fire Alarm & Protection System in Leasable Offices
within PTB
![Page 9: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/9.jpg)
Scope of Work
• Design of Warehouse building
• Preparation of Tender Document
• Appointing construction contractor
• Supervision of works
• Handover & Takeover
Design & Supervision Consultancy Services for Construction of Central Warehouse Building
![Page 10: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/10.jpg)
Tender for Construction of Central Warehouse Building
Scope of Works
• Architectural & Civil Works
• Air Conditionioning & Ventilation works
• Plumbing Works (Cold Water)
• Fire Protections Works
• Condensate Drainage System Works
• Electrical Works
• BMS/SCADA Interface
• Passive IT Systems Interface
• Warehouse equipment and racking systems
![Page 11: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/11.jpg)
Scope of Work
• Energy Conservation study
• Proposal
• Preparation of Tender Document
• Supervision
• Post Implementation Study
• Final Report
Design and Implementation of Energy Conservation Strategy for Muscat International and Salalah Airport
![Page 12: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/12.jpg)
Scope of Work
• Establish Commissioning
working group
• Develop commissioning Plans
and implementation strategy
• Develop commissioning
schedule
• Report on commissioning and
commissioning progress
• Develop tracking tools and
measurement metrics
Gross Area: 33,000 Sq.m , Capacity : 260,000 tons per annum
List of Major equipment
• Elevated Transfer Vehicle
• Unit Load Device
• Transfer Vehicle
• Buildup/Breakdown
System
• Bulk Cargo Storage
system
• Freezer/Cooler room
• Storage Decks
• Turn Tables
• Live Animal Center
• Cargo Handling system
Consultancy services for Supervision of Testing & commissioning, snagging and handover activities for Cargo/Material handling equipment at New
Cargo Terminal Building
![Page 13: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/13.jpg)
List of Major equipment
• Material Handling and
distribution
• Tugs
• Automated storage/Retrieval
system
• Vertical Tyre storage system
• Material Handling Equipment
• Various Workshops like EBU,
battery, wheel & brakes, NDT,
paint shop, cabin interior, seat
shop, safety equipment shop
Consultancy services for Supervision of Testing & Commissioning, snagging and Handover activities for MRO Special Equipment/Facilities at Aircraft Maintenance
Hangar
Gross Area: 40,000 Sq.m ,
Scope of Work
• Establish Commissioning
working group
• Develop commissioning Plans
and implementation strategy
• Develop commissioning
schedule
• Report on commissioning and
commissioning progress
• Develop tracking tools and
measurement metrics
![Page 14: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/14.jpg)
List of Major Equipment
• Food Production Equipment
• Cart Transport system
• Ware Wash equipment
• Waste removal system
• Stainless steel equipment
• Laundry & dry cleaning
equipment
• In-house logistics
Consultancy services for Supervision of Testing & Commissioning, Snagging and Handover activities for Special Equipment/Facilities at In Flight Catering Building
Capacity : 24,000 meals/day
Scope of Work
• Establish Commissioning
working group
• Develop commissioning Plans
and implementation strategy
• Develop commissioning
schedule
• Report on commissioning and
commissioning progress
• Develop tracking tools and
measurement metrics
![Page 15: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/15.jpg)
Scope of Work
• Fire Vehicles
• Rubber removal vehicles
• Surface friction tester
• High Pressure drainage cleaning
vehicle
Comprehensive Maintenance Services for Special purpose Vehicles
![Page 16: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/16.jpg)
Scope of Work
• Electrical Installations
• Mechanical & Plumbing Installations
• HVAC Installations
• Chiller and associated equipment
• FDAS Systems
• Fire Protection/Fire Fighting Installations
• Building Lightings
• BMS/SCADA
• Civil & Architectural installations
• Fabric Fit outs
• Doors
• Furniture's
Comprehensive Electromechanical and Civil Operation and Maintenance Services for Cargo
Terminal Building
Gross Area: 33,000 Sq.m , Capacity : 260,000 tons per annum
![Page 17: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/17.jpg)
Scope of Work
• Electrical Installations
• Mechanical & Plumbing Installations
• HVAC Installations
• Chiller and associated equipment
• FDAS Systems
• Fire Protection/Fire Fighting Installations
• Building Lightings
• BMS/SCADA
• Civil & Architectural installations
• Fabric Fit outs
• Doors
• Furniture's
Comprehensive Electromechanical and Civil Operation and Maintenance Services for
Inflight catering Building
Capacity : 24,000 meals/day
![Page 18: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/18.jpg)
Scope of Work
• Electrical Installations
• Mechanical & Plumbing Installations
• HVAC Installations
• Chiller and associated equipment
• FDAS Systems
• Fire Protection/Fire Fighting Installations
• Building Lightings
• BMS/SCADA
• Civil & Architectural installations
• Fabric Fit outs
• Doors
• Furniture's
Comprehensive Electromechanical and Civil Operation and Maintenance Services for Aircraft
Maintenance, Repair and Overhaul facility
Gross Area: 40,000 Sq.m
![Page 19: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/19.jpg)
Scope of Work
• Carpentry workshop equipment
• Mechanical workshop equipment
• Electrical Workshop equipment
• Welding workshop equipment
• Plumbing workshop equipment
• HVAC workshop equipment
• Other workshop equipment
Comprehensive Maintenance Services for Engineering Workshop Equipment
![Page 20: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/20.jpg)
Scope of Work
• Sewage Lifting Stations
• Sewage Pumping Stations
• Pump house
• Irrigation water pump house
• Other systems
Comprehensive Operation and Maintenance services for Central and
External Utility Services
![Page 21: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/21.jpg)
Tender for Maintenance of Kitchen
Equipment in Passenger Terminal buildingScope of Work
• Kitchen Equipment.
• Service, Counters, Joinery.
• Refrigeration Equipment.
• Shelving.
• Stainless steel fabrication
• Mobile Equipment.
• Ware Washing.
• Main Cooking Hood/Canopy.
• Pot washer Canopy.
• Dish washer Canopy.
![Page 22: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/22.jpg)
Comprehensive Operational & Maintenance services for Electromechanical and Civil facilities in Passenger Terminal Building
Scope of Work
• Electrical Installations
• Mechanical & Plumbing Installations
• HVAC Installations
• Chilled water pumps
• FDAS Systems
• Fire Protection/Fire Fighting Installations
• Building Lightings
• BMS/SCADA
• Civil & Architectural installations
• Fabric Fit outs
• Doors
• Furniture'sGross Area: 335,000 Sq.m
![Page 23: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/23.jpg)
FACILITY MANAGEMENT OPPORTUNITIES
FACILITY MANAGEMENT OPPORTUNITIES
![Page 24: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/24.jpg)
1. Provision for Cleaning services at Passenger Terminal Building
2. Provision for cleaning services for airside facilities and ancillarybuildings
3. Provision for cleaning services for Landside facilities and ancillarybuildings
4. Provision for waste management and Pest Control service
5. Provision for Irrigation & Landscaping Maintenance Services
Facility Management Contracts
Facility Management Contracts at Muscat International Airport
![Page 25: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/25.jpg)
Provision for Cleaning services at Passenger Terminal Building at Muscat International Airport
Gross Area: 335,000 Sq.m (Passenger Terminal Building, Piers)
Scope:Ensure the cleanliness of Passenger TerminalBuildings at all times, while placing utmostemphasis for cleaning services to operate inline with service levels of the airportindustry, in order to meet passengersatisfaction.
Provision for Cleaning services at Passenger Terminal Building
![Page 26: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/26.jpg)
Provision for cleaning services for Airside Facilities and Ancillary buildings at Muscat International Airport
Scope:Ensure the cleanliness of AirsideFacilities and Ancillary Buildings atall times, while placing utmostemphasis for cleaning services tooperate in line with service levels ofthe airport industry, in order tomeet passenger satisfaction.
Provision for cleaning services for Airside Facilities and Ancillary buildings
![Page 27: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/27.jpg)
Provision for cleaning services for Landside Facilities and Ancillary buildings at Muscat International Airport
Scope:Ensure the cleanliness of LandsideFacilities and Ancillary Buildings atall times, while placing utmostemphasis for cleaning services tooperate in line with service levels ofthe airport industry, in order tomeet passenger satisfaction.
Provision for cleaning services for Landside Facilities and Ancillary buildings
![Page 28: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/28.jpg)
• PTB
• Offices
Primary WAP
• Common Waste Zones
• Waste Stores
Secondary
WAP
Waste Disposal Facility
Tertiary WAP
Airp
ort b
ou
nd
aryWaste Processing
Scope: Improve resource usage efficiency through reducing the volume ofwaste being sent to landfill for disposal by diverting waste withcommercial value to either recycling or energy recovery/compostingfacilities
Provision for Waste Management and Pest Control Services at Muscat International Airport
Provision for Waste Management and Pest Control Services
![Page 29: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/29.jpg)
Waste Clearance
Waste Clearance
![Page 30: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/30.jpg)
WASTE SORTING CATEGORIES
WET WASTEPAPER & CARD
BOARDPLASTICS GLASS
ALUMINIUMMETAL
WASTE SORTING CATEGORIES
![Page 31: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/31.jpg)
Pest Control
Parameters Measurement
Rodent Control Degree of Infestation, Effectiveness of controls
Insect Control Degree of Infestation, Effectiveness of controls
Seasonal Pest Management Preparation & Prevention
Hazardous Pest Management Preparation & Prevention
General Pest Control Schedules
Effective Completion
Customer Satisfaction Survey
Compliances Environmental Friendly
Prevention of pest by scheduling effective controlling activates in PTB,Ancillary Buildings and surrounding areas of Airport premises by usingenvironmentally friendly pesticides chemicals
Pest Control
![Page 32: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/32.jpg)
Provision for Irrigation & Landscaping Maintenance Services
Scope:Maintain the appearance oflandscaped areas (both interior andexterior landscapes), includingnursery, and health of plants, usingsustainable methods e.g. use ofwater and energy efficientequipment, integrated pestmanagement, composting etc.
Provision for Irrigation & Landscaping Maintenance Services
![Page 33: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/33.jpg)
Manpower
Machinery Material
ASQ*
Target
Our Target
*ASQ: Airport Service Quality
![Page 34: Agenda - omanairports.co.om FM_PP.pdf• BMS/SCADA Interface. • Passive IT Systems Interface. Design, Supply, ... Consultancy services for Supervision of Testing & Commissioning,](https://reader030.vdocument.in/reader030/viewer/2022020316/5b3143a87f8b9ae1108b86ef/html5/thumbnails/34.jpg)
Thank you
34