DESCRIPTION

AgileNCR 2010 conference was held in Gurgaon on 17th & 18th July 2010. This largest community driven conference was the Fourth edition of Agile NCR and was organized in collaboration with ASCI. This time the event was based on four major themes : 'Agile for newbies', ' Agile Adoption Challenges', 'Workshops and Software Craftsmanship', and ' Post Agile'.

TRANSCRIPT

Page 1: Agile Team Smells : Early Detection and Fixes by Anurag Shrivastava

Agile Team Smells

Agile NCR 2010

Presented by

Anurag Shrivastava, MD, Xebia IT Architects India Pvt. Ltd. and Founder of Agile NCR

Page 2: Agile Team Smells : Early Detection and Fixes by Anurag Shrivastava

Context

• Small company engaged in offshore software development using SCRUM and XP

• Technically challenging assignments• Typical teams have 3 to 8 persons• Highly self-organizing culture• All team members are equal• High focus on software quality

Page 3: Agile Team Smells : Early Detection and Fixes by Anurag Shrivastava

Daily Stand-ups are Going OK

Page 4: Agile Team Smells : Early Detection and Fixes by Anurag Shrivastava

Minor Problems with Quality Build

Page 5: Agile Team Smells : Early Detection and Fixes by Anurag Shrivastava

Retrospective went fine

Page 6: Agile Team Smells : Early Detection and Fixes by Anurag Shrivastava

Progress Charts are Little Old

Page 7: Agile Team Smells : Early Detection and Fixes by Anurag Shrivastava

Do Not Need a Tester

Page 8: Agile Team Smells : Early Detection and Fixes by Anurag Shrivastava

We pair well

Page 9: Agile Team Smells : Early Detection and Fixes by Anurag Shrivastava

Team Feels No Need for Collocation

Page 10: Agile Team Smells : Early Detection and Fixes by Anurag Shrivastava

Few Days In Between Sprints

Page 11: Agile Team Smells : Early Detection and Fixes by Anurag Shrivastava

Fixes

• Daily standup meetings must happen on time and every team member should be present

• Make sure that a successful quality build is one of the sprint success criteria

• Make sure that recurring problems are not simply voted out and every team member feels engaged in the retro

Page 12: Agile Team Smells : Early Detection and Fixes by Anurag Shrivastava

Fixes

• Check if the team gets excited about the progress

• Make sure that the team has a tester• Pair should be switched• Let team not worry about the costs• Make sure that Product Owner and Business

are disciplined

Page 13: Agile Team Smells : Early Detection and Fixes by Anurag Shrivastava

Thank you