Haixin Huang2
Status AGS and Booster are running well to provide beam for RHIC. Siemens status: No quick fix in sight. Repair the cooling fan for
Westinghouse today. Prepare to run AGS with it for a longer time. AGS vacuum valve incident last maintenance day is under review. New AGS BLM logic has been tested and put into use today. H10 noise problem greatly reduced after Yugang found a loose
capacitor in the old control board last Tuesday. Only two cases since then, instead of a few for each RHIC fill.
Booster injection field drift still happens from time to time but AGS injection seems stable for some time now.
H section unusual bad vacuum (correlated with drool loss at flattop): vacuum group will check leak to see if pump replacement is needed.
![Page 3: AGS/Booster Status March 11, 2014 Time Meeting Haixin Huang](https://reader036.vdocument.in/reader036/viewer/2022082405/5697bf771a28abf838c812e5/html5/thumbnails/3.jpg)
Haixin Huang3
Vacuum Level and Beam Loss Correlated
AGS vacuum *(-1/200)Beam decay at flattop
Neg
ativ