4 Mayo, 2006

CETA

Miguel Cárdenas Montes

CETA-CIEMAT

miguel.cardenas@ciemat.es

Centro Extremeño de Tecnología Avanzada

CETA

Summary

Objectives

Capacities

Chronogram

AL

ICE

+ C

IEM

AT

+ C

ET

A +

EE

LA

Centro Extremeño de Tecnologías Avanzadoas

Madrid, 4 de Mayo 2006. p 2

Objectives

CETA-CIEMAT aims to:To create a center of excelence at Extremadura in the areas of Grid Technologies and e-Science.

The center is located at Trujillo (Extremadura).

AL

ICE

+ C

IEM

AT

+ C

ET

A +

EE

LA

Centro Extremeño de Tecnologías Avanzadoas

Madrid, 4 de Mayo 2006. p 3

Capacities, CPU

At the end 2005 CIEMAT purchased for the CETA the following computing resources:97 Blades: Dell PowerEdge 1855 Dual Xeon 3.2GHz, 4 Gb RAM.56 HP Proliant BL25p, dual Opteron (2.0 GHz) dual core, 4 Gb RAM.A

LIC

E +

CIE

MA

T +

CE

TA

+ E

EL

A

Centro Extremeño de Tecnologías Avanzadoas

Madrid, 4 de Mayo 2006. p 4

Capacities, SPECs

Following the SpecInt2K showed at spec.org for these computers:DELL 1555*2*97 = 301,670 SpecInt2KHP 1508*4*56 = 337,792 SpecInt2K

Total = 639,462 SpecInt2KAL

ICE

+ C

IEM

AT

+ C

ET

A +

EE

LA

Centro Extremeño de Tecnologías Avanzadoas

Madrid, 4 de Mayo 2006. p 5

Capacities, Storage I

Storage over hard disk:22 dual Xeon with 2 HBA, 11 blades Raid DS4100, with 154 hard disks of 400 GB each of one,11 blades EXP100, with 154 hard disks of 400 GB each of one.The configuration is 11 “logical bricks” with 2 servers plus 1 DS4100 plus 1 EXP100.

Total 120 Tb.

AL

ICE

+ C

IEM

AT

+ C

ET

A +

EE

LA

Centro Extremeño de Tecnologías Avanzadoas

Madrid, 4 de Mayo 2006. p 6

Capacities, Storage II

Storage over tape:IBM LTO tape library 3584,with 4 drivers, and 400 tapes units of 400 GB.

Total 160 TB.AL

ICE

+ C

IEM

AT

+ C

ET

A +

EE

LA

Centro Extremeño de Tecnologías Avanzadoas

Madrid, 4 de Mayo 2006. p 7

Present Status

At this moment the hardware is out the boxes, switch off in the CPD of Madrid, waiting for the new fan system (after the new space gained).When the fan system be ready the computers will be switch on.In parallel, at Trujillo we are creating a provisional (and little) CPD, where some computer (not a lot of) will be moved.

AL

ICE

+ C

IEM

AT

+ C

ET

A +

EE

LA

Centro Extremeño de Tecnologías Avanzadoas

Madrid, 4 de Mayo 2006. p 8

and the future

We foresee the following chronogramThis summer the infrastructure de EELA will be ready at Madrid. In the fall, a new cluster of EELA will be ready at Trujillo. The new center at Trujillo will be completely ready in 18 months.

AL

ICE

+ C

IEM

AT

+ C

ET

A +

EE

LA

Centro Extremeño de Tecnologías Avanzadoas

Madrid, 4 de Mayo 2006. p 9