A57 Link Roads
TR010034
2.8 Temporary Works Plans
APFP Regulation 5(2)(o)
Planning Act 2008
Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009
November 2021
A57 Link Roads 2.8 Temporary Works Plans
Planning Inspectorate Scheme Reference: TR010034 Application Document Reference: TR010034/APP/2.8 Page 2 of 10
Infrastructure Planning
Planning Act 2008
The Infrastructure Planning (Applications: Prescribed Forms and
Procedure) Regulations 2009
A57 Link Roads
Development Consent Order 202[x]
2.8 Temporary Works Plans
Regulation Number: Regulation 5(2)(o)
Planning Inspectorate Scheme Reference
TR010034
Application Document Reference TR010034/APP/2.8
Author: A57 Link Roads Project Team, National Highways and Atkins
Version Date Status of Version
Rev 2.0 November 2021 Section 51 Advice
Rev 1.0 June 2021
DCO Application
A57 Link Roads 2.8 Temporary Works Plans
Planning Inspectorate Scheme Reference: TR010034 Application Document Reference: TR010034/APP/2.8 Page 3 of 10
Table of contents
Chapter Pages
1. Introduction 4
1.1 Introduction and purpose of this document 4
1.2 Scope and format of the Temporary Works Plans 4
2. Schedule of plans included in this application document 6
A57 Link Roads 2.8 Temporary Works Plans
Planning Inspectorate Scheme Reference: TR010034 Application Document Reference: TR010034/APP/2.8 Page 4 of 10
1. Introduction
1.1 Introduction and purpose of this document
1.1.1 National Highways (the “Applicant”) has applied to the Secretary of State for Development Consent Order (“DCO”) to determine the Applicant’s proposals for the creation of new link roads and alteration to the existing A57; A57 Link Roads (the “Scheme”). The application is submitted to the Planning Inspectorate (the “Inspectorate”) in accordance with section 37 of the Planning Act 2008 (the “2008 Act”).
1.1.2 This document comprises part of the suite of Application documents and is submitted to comply with Regulation 5(2)(o) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 (as amended), which requires:
‘5(2)(o) ‘any other plans, drawings and sections necessary to describe the proposals for which development is sought, showing details of design, external appearance, and the preferred layout of buildings or structures, drainage, surface water management, means of vehicular and pedestrian access, any car parking to be provided, and means of landscaping.’
1.1.3 The Temporary Works plans are submitted for approval and will be certified under article 45 of the DCO once the Order is made. As this document is part of a suite of Application documentation, it should be read alongside and is informed by other Application documents. In particular, the plans should be read alongside the Book of Reference (APP-025) and Schedule 1 of the of the Development Consent Order (APP-020).
1.2 Scope and format of the Temporary Works Plans
1.2.1 Schedule One of the draft DCO (APP-020) seeks authorisation for temporary as well as permanent works.
1.2.2 The purpose of the Temporary Works Plans is to show the locations of proposed temporary construction compounds, construction access arrangements and other temporary measures required during the construction phase of the Scheme.
1.2.3 This document should be read alongside the plans and is informed by the other Application documents, in particular:
• Schedule One: Authorised Development of Draft Development Consent Order (APP-020)
• Land Plans (APP-007)
• Works Plans (APP-008)
• Scheme Layout Plans (APP-011)
A57 Link Roads 2.8 Temporary Works Plans
Planning Inspectorate Scheme Reference: TR010034 Application Document Reference: TR010034/APP/2.8 Page 5 of 10
1.2.4 Whilst the information shown on the Plans is commensurate with the preliminary design stage of the Scheme, Schedule 2 of the Draft Development Consent Order (Requirements) (APP-020) requires that the authorised development must be designed in detail and carried out in accordance with plans certified under article 4 of the DCO, which will include the Temporary Works Plans.
A57 Link Roads 2.8 Temporary Works Plans
Planning Inspectorate Scheme Reference: TR010034 Application Document Reference: TR010034/APP/2.8 Page 6 of 10
2. Schedule of plans included in this application document
Document title Document number Version
2.8 Temporary Works Plan – Key Plan Regulation 5(4)
TR010034/APP/2.8 [HE551473-BBA-LDC-A57_AL_SCHEME-DR-ZL-020800]
P02
2.8 Temporary Works Plan –Regulation 5(2)(o) Sheet 1 of 2
TR010034/APP/2.8 [HE551473-BBA-LDC-A57_AL_SCHEME-DR-ZL-020801]
P02
2.8 Temporary Works Plan –Regulation 5(2)(o) Sheet 2 of 2
TR010034/APP/2.8 [HE551473-BBA-LDC-A57_AL_SCHEME-DR-ZL-020802]
P02
A
5
7
(
T
)
H
Y
D
E
R
O
A
D
2
M67
A
6
0
1
8
B
A
C
K
M
O
O
R
A
5
7
(
T
)
M
O
T
T
R
A
M
M
O
O
R
S
T
A
L
Y
B
R
I
D
G
E
R
O
A
D
A
5
7
W
O
O
L
L
E
Y
L
A
N
E
W
O
O
L
L
E
Y
B
R
I
D
G
E
R
O
A
D
C
A
R
R
H
O
U
S
E
L
A
N
E
A
6
0
1
8
R
O
E
C
R
O
S
S
R
O
A
D
O
L
D
R
O
A
D
M67
JUNCTION 4
B
6
1
7
4
MOTTRAM IN
LONGDENDALE
HOLLINGWORTH
A
6
2
8
(
T
)
TINTWISTLE
ROE
CROSS
HARROP
EDGE
STAYLYBRIDGE
MOTTRAM
RISE
C
O
A
C
H
R
O
A
D
A
5
7
GAMESLEY
MOTTRAM
HILL
MUDD
WARHILL
HATTERSLEY
A
5
7
M
O
T
T
R
A
M
R
O
A
D
A560 S
TO
CK
PO
RT
R
OA
D
HADFIELD
BROOKFIELD
1
OLD
H
ALL LA
NE
Scheme Name
Drawing Suitability
DO
N
OT
S
CA
LE
Millim
etre
s
100
10
0
Drawing Number
Scheme Originator Volume
Location Type RoleNumber
-
- - -
--
Scale: Rev:
Client
RevisionStatus Issue Date
Description
RevisionStatus Issue Date
Description
RevisionStatus Issue Date
Description
RevisionStatus Issue Date
Description
RevisionStatus Issue Date
Description
This Drawing is saved on ProjectWise. Plotted: 17/11/2021 11:21:56 By: HUME4391
Status
A57 LINK ROADS
@ A1
This map is based on Ordnance Survey material with the permission of Ordnance Survey on behalf of the
Controller of Her Majesty's Stationery Office. © Crown copyright. Unauthorised reproduction infringes
Crown copyright and may lead to prosecution or civil proceedings. Highways England 100030649, 2021.
A1
Original Size:
Drawing Title
PINS Ref. No:
SHEET OF
Scale 1:5000
100m 0m 100m 200m 300m
DCO APPLICATION
A4 P01 14/05/21
S51 ADVICE
A4 P02
P02
020800ZLDRA57_AL_SCHEME
LDCBBAHE551473
17/11/21
11
1:5000
TR010034/APP/2.8
REGULATION 5(4)
KEY PLAN
TEMPORARY WORKS PLANS
DCO APPLICATION A4
DERBYSHIRE
COUNTY
COUNCIL
TAMESIDE
METROPOLITAN
BOROUGH
COUNCIL
2
SHEET NUMBER FOR TEMPORARY
WORKS IN THIS AREA
LEGEND
DEVELOPMENT CONSENT
ORDER (DCO) BOUNDARY
LOCAL AUTHORITY BOUNDARY
NOTES
1. THE PROPOSED WORKS WILL BE SUBJECT TO DETAILED
DESIGN DEVELOPMENT. ANY CHANGES WILL BE LIMITED TO
BEING WITHIN THE DCO BOUNDARY OR THE RELEVANT
LIMITS OF DEVIATION, AND SUBJECT TO THE REQUIREMENTS
OF SCHEDULE 2 OF THE DEVELOPMENT CONSENT ORDER
(TR010034/APP/3.1).
EXISTING BRIDLEWAY
PROPOSED TEMPORARY
BRIDLEWAY DIVERSION
XX
EXISTING ROUTE TO BE
TEMPORARILY DIVERTED
TOPSOIL AND MATERIALS STORAGE
STRUCTURES WORKSITES
SITE ACCESS / EGRESS
LOCAL AUTHORITY BOUNDARY
NOTES
1. THESE PLANS SHOULD BE READ IN CONJUNCTION WITH
SCHEDULE 1 OF THE DEVELOPMENT CONSENT ORDER
(TR010034/APP/3.1).
KEY
XX
CONSTRUCTION TRAFFIC
ACCESS ROUTES
DEVELOPMENT CONSENT ORDER
(DCO) BOUNDARY
TEMPORARY ROAD DIVERSION
EXISTING FOOTPATH
PROPOSED TEMPORARY
FOOTPATH DIVERSION
EXISTING FOOTWAY / CYCLE TRACK
PROPOSED TEMPORARY FOOTWAY /
CYCLE TRACK DIVERSION
CONSTRUCTION SITE COMPOUND
A
5
7
(
T
)
H
Y
D
E
R
O
A
D
M
6
7
M
O
T
T
R
A
M
R
O
A
D
S
T
O
C
K
P
O
R
T
R
O
A
D
A
6
0
1
8
B
A
C
K
M
O
O
R
A
5
7
(
T
)
M
O
T
T
R
A
M
M
O
O
R
S
T
A
L
Y
B
R
I
D
G
E
R
O
A
D
C
A
R
R
H
O
U
S
E
L
A
N
E
A
6
0
1
8
R
O
E
C
R
O
S
S
R
O
A
D
O
L
D
R
O
A
D
M67
J4
B
6
1
7
4
R
i
g
h
t
C
e
n
t
r
a
l
R
e
s
e
r
v
a
t
i
o
n
R
i
g
h
t
B
a
r
r
i
e
r
O
f
f
s
e
t
1.25m
R
i
g
h
t
H
a
r
d
s
t
r
i
p
H
1
-2.500%
1.00m
R
i
g
h
t
L
a
n
e
M
1
-2.500%
3.65m
R
i
g
h
t
L
a
n
e
-2.500%
3.65mR
i
g
h
t
H
a
r
d
s
t
r
i
p
H
1
-2.500%
1.00m
R
i
g
h
t
V
e
r
g
e
5.000%
2.50m
R
i
g
h
t
E
a
r
t
h
w
o
r
k
s
-
1
:
3
.
0
0
0
1.25m
0
.
0
0
0
64.046
0
.
0
0
0
8
7
.
0
7
2
0
.
0
0
0
9
4
.
0
0
0
0
.0
0
0
5
5
.
9
5
6
0
.
0
0
0
9
5
.
1
2
6
0
.
0
0
0
8
3
.
0
5
6
0
.
0
0
0
1
0
0
.
0
0
0
1
1
4
.
6
9
6
B
R
O
A
D
B
O
TT
O
M
R
O
A
D
MOTTRAM IN
LONGDENDALE
MUDD
HATTERSLEY
WARHILL
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
EXIT
ENTRANCE
A
5
7
(
T
)
M
O
T
T
R
A
M
M
O
O
R
C
A
R
R
H
O
U
S
E
L
A
N
E
0
.
0
0
0
64.046
0
.
0
0
0
8
7
.
0
7
2
0
.
0
0
0
9
4
.
0
0
0
0
.0
0
0
5
5
.
9
5
6
0
.
0
0
0
9
5
.
1
2
6
0
.
0
0
0
8
3
.
0
5
6
0
.
0
0
0
1
0
0
.
0
0
0
1
1
4
.
6
9
6
MOTTRAM IN
LONGDENDALE
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
RE
FE
R T
O S
HE
ET
1
F
O
R
C
O
N
T
I
N
U
A
T
I
O
N
RE
FE
R T
O S
HE
ET
2
F
O
R
C
O
N
T
I
N
U
A
T
I
O
N
Scheme Name
Drawing Suitability
DO
N
OT
S
CA
LE
Millim
etre
s
100
10
0
Drawing Number
Scheme Originator Volume
Location Type RoleNumber
-
- - -
--
Scale: Rev:
Client
RevisionStatus Issue Date
Description
RevisionStatus Issue Date
Description
RevisionStatus Issue Date
Description
RevisionStatus Issue Date
Description
RevisionStatus Issue Date
Description
This Drawing is saved on ProjectWise. Plotted: 17/11/2021 11:16:35 By: HUME4391
Status
A57 LINK ROADS
@ A1
This map is based on Ordnance Survey material with the permission of Ordnance Survey on behalf of the
Controller of Her Majesty's Stationery Office. © Crown copyright. Unauthorised reproduction infringes
Crown copyright and may lead to prosecution or civil proceedings. Highways England 100030649, 2021.
A1
Original Size:
Drawing Title
PINS Ref. No:
SHEET OF
Scale 1:2500
50m 0m 50m 100m 150m
DCO APPLICATION
A4 P01 14/05/21
S51 ADVICE
A4 P02
P02
020801ZLDRA57_AL_SCHEME
LDCBBAHE551473
17/11/21
21
1:2500
TR010034/APP/2.8
REGULATION 5(2)(o)
PLANS
TEMPORARY WORKS
DCO APPLICATION A4
1
N.T.S
SHEET LAYOUT
2
A
5
7
(
T
)
M
O
T
T
R
A
M
M
O
O
R
A
5
7
W
O
O
L
L
E
Y
L
A
N
E
W
O
O
L
L
E
Y
B
R
I
D
G
E
R
O
A
D
C
A
R
R
H
O
U
S
E
L
A
N
E
0
.0
0
0
6
4
.
0
4
6
0
.0
0
0
8
7
.0
7
2
0
.
0
0
0
9
4
.0
0
0
0
.
0
0
0
5
5
.9
5
6
0
.0
0
0
9
5
.1
2
6
0
.0
0
0
8
3
.0
5
6
0
.
0
0
0
1
0
0
.0
0
0
1
1
4
.6
9
6
0
.0
0
0
1
8
.
0
9
6
0
.0
0
0
3
0
.0
7
1
W
O
O
L
L
E
Y
B
R
ID
G
E
T
A
M
E
S
I
D
E
M
B
C
D
E
R
B
Y
S
H
I
R
E
C
C
MOTTRAM IN
LONGDENDALE
M
A
R
K
E
T
S
T
R
E
E
T
W
E
D
N
E
S
H
O
U
G
H
A
5
7
(
T
)
H
Y
D
E
R
O
A
D
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
EXISTING BRIDLEWAY
PROPOSED TEMPORARY
BRIDLEWAY DIVERSION
XX
EXISTING ROUTE TO BE
TEMPORARILY DIVERTED
TOPSOIL AND MATERIALS STORAGE
STRUCTURES WORKSITES
SITE ACCESS / EGRESS
LOCAL AUTHORITY BOUNDARY
NOTES
1. THESE PLANS SHOULD BE READ IN CONJUNCTION WITH
SCHEDULE 1 OF THE DEVELOPMENT CONSENT ORDER
(TR010034/APP/3.1).
KEY
XX
CONSTRUCTION TRAFFIC
ACCESS ROUTES
DEVELOPMENT CONSENT ORDER
(DCO) BOUNDARY
TEMPORARY ROAD DIVERSION
EXISTING FOOTPATH
PROPOSED TEMPORARY
FOOTPATH DIVERSION
EXISTING FOOTWAY / CYCLE TRACK
PROPOSED TEMPORARY FOOTWAY /
CYCLE TRACK DIVERSION
CONSTRUCTION SITE COMPOUND
0
.0
0
0
8
7
.0
7
2
9
4
.0
0
0
0
.
0
0
0
5
5
.9
5
6
0
.0
0
0
9
5
.1
2
6
0
.0
0
0
8
3
.0
5
6
1
0
0
.0
0
0
1
1
4
.6
9
6
MOTTRAM IN
LONGDENDALE
A
5
7
(
T
)
H
Y
D
E
R
O
A
D
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
R
E
F
E
R
T
O
S
H
E
E
T
1
F
O
R
C
O
N
T
IN
U
A
T
IO
N
R
E
F
E
R
T
O
S
H
E
E
T
2
F
O
R
C
O
N
T
IN
U
A
T
IO
N
Scheme Name
Drawing Suitability
DO
N
OT
S
CA
LE
Millim
etre
s
10
01
00
Drawing Number
Scheme Originator Volume
Location Type RoleNumber
-
- - -
--
Scale: Rev:
Client
RevisionStatus Issue Date
Description
RevisionStatus Issue Date
Description
RevisionStatus Issue Date
Description
RevisionStatus Issue Date
Description
RevisionStatus Issue Date
Description
This Drawing is saved on ProjectWise. Plotted: 17/11/2021 11:32:59 By: HUME4391
Status
A57 LINK ROADS
@ A1
This map is based on Ordnance Survey material with the permission of Ordnance Survey on behalf of the
Controller of Her Majesty's Stationery Office. © Crown copyright. Unauthorised reproduction infringes
Crown copyright and may lead to prosecution or civil proceedings. Highways England 100030649, 2021.
A1
Original Size:
Drawing Title
PINS Ref. No:
SHEET OF
Scale 1:2500
50m 0m 50m 100m 150m
DCO APPLICATION
A4 P01 14/05/21
S51 ADVICE
A4 P02
P02
020802ZLDRA57_AL_SCHEME
LDCBBAHE551473
17/11/21
22
1:2500
TR010034/APP/2.8
REGULATION 5(2)(o)
PLANS
TEMPORARY WORKS
DCO APPLICATION A4
1
N.T.S
SHEET LAYOUT
2
WARHILL
BROOKFIELD
HADFIELD
HOLLINGWORTH
© Crown copyright (2021). You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence: visit www.nationalarchives.gov.uk/doc/open-government-licence/ write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email psi@nationalarchives.gsi.gov.uk. Printed on paper from well-managed forests and other controlled sources. Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ National Highways Limited registered in England and Wales number 09346363
top related