Brownsville Revitilization ProjectSpring 2014 - Third Year2 Person GroupSite and Hotel DesignModel Photos
Brownsville Taking a Look at the Past in Order to Create a New Beginning Regional Map
West Brownsville
California
Brownsville
Brownsville Surrounding Area and Site Proposed Rails to Trails: Establish an Attraction for Outdoors Enthusiast
West Brownsville
California
Brownsville
West Brownsville
California
Brownsville
Railroad Travel: Major Roads: Proposed Rails to Trails: Railroad Travel: Major Roads: Railroad Travel: Major Roads:
West Brownsville
California
Brownsville
Dunlap Creak: Monongahela River: Target Riverfront: Dunlap Creak: Monongahela River: Target Riverfront
Dunlap Creak Bridge Section
California
BrownsvilleFredericktown
West Brownsville
Labelle
Site
Existing Industries: Coke ProductionCoal MiningFerry Boat Production
Current Industries:Barge ProductionPopulation Loss Since 2000: -16.87%
Future Attractions: - Outdoor Sports, Kayaking, Paddle Boarding, Mountain Biking, Rock Climbing- Hotel: Provides rooms for California College, Outdoor Sports Enthusiast- Restaurant: Services Hotel and Revitalized Downtown Area - Office Downtown: Branch Offices of Pittsburgh- Retail Shopping: Outdoor Sports Shops- Mine Tours
Questions To Ask: How do you acknowledge the historic nature of Brownsville without copying it?
Which Elements of the ow do you acknowledge the historic nature of Brownsville without copying it?
Brownsville Railroad Erecting Shop
Wythe Hotel, Heinz Center, 408 Greenwich, Clyfford Still Museum
Scale 1/32” = 1’-0” Site Section [restaurant]
0’ 6’ 10’ 20’ Scale 1/32” = 1’-0” Site Section [hotel] 0’ 6’ 10’ 20’
Site Plan Scale: 1/32” : 1’
Existing Site Plan
Restaurant
Hotel
Hotel Ballroom
Park
Building Open To Street
Boat Dock and Recreational Pier
UP UP UP UP UP
Fire Egress (Occupancy Group R)2 �re stairs per �oor1 area of refuge per stairFully sprinkled rooms and halls
70ft
80ft
30ft
50ft
70ft
UP
ADA Diagram1 area of refuge per �re stair2 full service elevatorsADA accessible bathrooms in all rooms
HVAC HVAC HVACHot WaterCold
Water
HVAC/Water Diagram
1' overhang1' overhang
1' overhang
1' overhang
2' overhang
6" overhang
Sun Studies [sectional/plan]
West Walls
Winter SunWinter
Winter
WinterWinter
Spring/Fall
Spring/ Fall
Spring/ Fall
Spring/ Fall
Spring/ Fall
SummerSummer
Summer
Summer
Summer
East Walls
Win
ter
Spr
ing/
Fall
Sum
mer
Room Ventilation
Joint Detail
Pin Connection
Steel Beam W8-10
Steel Column W12
Steel Girder W16-20
Lateral Bracing System
Structural Diagram
Scal
e1/
8”=
1’-0
”Gro
und
Floo
rPla
n
0’3’
5’10
’
Scal
e1/
8”=
1’-0
”Sec
ond
Floo
rPla
n
0’3’
5’10
’
Scal
e1/
8”=
1’-0
”Th
irdFl
oorP
lan
0’3’
5’10
’
Scal
e 1/
8” =
1’-0
” Fo
urth
Flo
or P
lan
0’
3’
5
’
10
’
Scal
e1/
8”=
1’-0
”Fi
fth
Floo
rPla
n
0’3’
5’10
’
Scal
e1/
8”=
1’-0
”Si
xth
Floo
rPla
n
0’3’
5’10
’
UP
DE
NO
ND
EN
ON
EPOXY GROUT
BLUE STONE SLATE
RADIANT HEATING SYSTEM
CONCRETE SLAB
RIGID BOARD INSULATION
GRAVEL
EARTH
Interior Perspectives
Exterior Perspective B Wall Section 3/8” : 1’ Scale Insulated Wall Panel DetailExterior Perspective A Site Photos
Skylight
Steel Hinge BracketLouvre Blade
Alum. “SF” FrameBuilt-up Roofing
5/8” GWB Roof Finish
Window Condition
Concrete Panel - Board Formed (6”)
Concrete Panel - Board Formed (6”)
Custom Bracket on Beam for Concrete
Floor Finish - Acoustic, Weather, Flooring
Steel Decking w/Concrete (4”)
Steel Beam W8 Shape
5/8” GWB on 1” Air Gap
Steel Girder W20 Shape
Concrete Foundation Wall (1’)
Pavement
Gravel Support/Absorption
Steel Column W12 Shape
Balcony Door System
Balcony Roof Insulation
Balcony Drainage
Vertical Fin/Overhang
Scale 1/8” = 1’-0” West Elevation 0’ 3’ 5’ 10’
Scale 1/16” = 1’-0” North Elevation 0’ 3’ 5’ 10’ Scale 1/16” = 1’-0” East Elevation 0’ 3’ 5’ 10’ Scale 1/16” = 1’-0” North Elevation 0’ 3’ 5’ 10’
0’ 3’ 5’ 10’ Scale 1/8” = 1’-0” Longitudinal Section 0’ 3’ 5’ 10’ Scale 1/8” = 1’-0” Transverse Section 0’ 1.5’ 2.5’ 5’