case study 1 – s&t location boxes

Post on 23-Feb-2016

51 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Case study 1 – S&T Location Boxes. WATER PROOFING OF GLAND AREA IN POINT MACHINE. - PowerPoint PPT Presentation

TRANSCRIPT

Case study 1 – S&T Location Boxes

WHERE CABLES ARE PRONE TO

DAMAGE , BECAUSE OF

SEVERE ABRASION AND MECHANICAL

ABUSE.

REPAIR OF JACKET WITH VINYL TAPES

IS NOT DURABLE.

3M PROVIDES EASY TO APPLY AND DURABLE

SOLUTION WITH SCOTCH

31 MINING TAPE.

PROBLEMS FACED:CONSTANT VIBRATION.RODENTS.WATER INGRESS.MOISTURE INGRESS.SOLUTION:3M SCOTCH31 MINING TAPE WITH WATER PROOF MASTIC AND HIGH MECHANICAL STRENGTH HYPALON .

WATER PROOFING OF GLAND AREA IN POINT MACHINE.

top related