Installation & Operation Instructions
for Mineral Insulated Heating Cable
Embedded Snow Melting Applications
PJ964
161-562581-084
September 2012
CIT-1
Snow Sensor
APS-4C/3C
Snow/Ice
Controller
Junction
Box
SIT-6E
Pavement Sensor
JB-7
Junction Box
DRAFT 9/13/12
2
Mineral Insulated Heating CableEmbedded Snow Melting Applications Installation and Operation Instructions
Inspection
-
General Design and Installation Notes:
-
-
1. -
Figure 1
2. -
Figure 2
3. -
4. -
Installing Cable in Concrete:
Figure 1
Figure 2
Expansion and Construction Joints:
Figure 3A Figure 3B
-
-
Special Surface Treatments
Figure 4
Heater Unit Termination:
-
Figure 5
Installing Cable in Asphalt:
Figure 4 Figure 5
Slab Temperature Sensor:
Control, Monitoring, and Power Distribution
-
-
-
-
Figure 6 -
Figure 7Figure 8
Wiring:
Figure 6 Figure 7
Figure 8
1.-
2.
3.
-
4.
5.-
6.
7.
8.-
9. -
-
10.
11. -
Installing Cable in Stairs (Single Pour):
Figure 9
7
1.-
2.
3.
-
4. -
5.
-
6.-
7.
8.
9.-
10. -
-
11.
12. -
Installing Cable in Stairs (Two Pour or existing):
Figure 10
1347 HEIL QUAKER BLVD., LAVERGNE, TN 37086
Phone: (615) 793-3900 www.chromalox.com
Limited Warranty:
Please refer to the Chromalox limited warranty applicable to this product athttp://www.chromalox.com/customer-service/policies/termsofsale.aspx.
Visual Inspection
-
-
-
De-energize circuit(s) before performing insulation re-sistance check
Insulation Resistance Check
-
-
-
COMMISSIONING AND PREVENTATIVE MAINTENANCE
System Tests