OIL & GAS INDUSTRY Customized trends in Simulation Training
Agenda• Objectives for Technology Training has Evolved
• Customized Training – The Time is Now
• Customized Training – The possibilities are Immense
• Customized Training – The technology is Mature
• Customized Training – Why is it good for EVERYONE
Technology Objectives have EvolvedMethods changed Radically to Support current Technology
The Rig technology has increased exponentially
Mechanical Support Technology has evolved 3D Printing
Technology pipeline to be developed to meet labor demand
May impact profitability of Big Players
“The first company with a “break-out strategy” could position itself as the leader, in a highly competitive recruiting and retention environment”
Industry Skill / Knowledge Shortage has advanced
New Hire Skill Set expectations have amplified
New Hire Training, Pre Rig experience has augmented
Trailing an Experienced Hand is not enough
Training NEEDS to begin before Rig Completion - HOW
What is involved in a customized simulation
Need for Customization• “All operations are essentially the same”
Yet – every process is different,
– every situation is different,
– every professional operating equipment is different,
– every equipment manufacturer is different,
• It is possible to continue with ‘”Generic”’ training and derive trivial, incremental benefits, session after session.
• Customized Training can raise the standards of the objective achievement exponentially.
• The Trainee is more engaged, more absorbed, more interested because the training is now aimed directly at making her specific work:
– safer, enhanced, more productive and more satisfying.
Customization Possibilities– Nearly EVERY aspect of simulation training can be customized to
meet very specific situational requirements and objectives
• Customized Software – to depict and manage the exact process or hazard being simulated
• Customized Hardware – to include in the simulation the exact make/model of machinery and equipment that will be used in the field, without bending metal
• Customized Environment – Let the training happen on Your Rig, Your Control Room, Your Operator Chair, Your Control system wherever the maximum benefit
• People being trained are Your people – they should receive Your training, if they are to be effective for You
.
Custom Simulation Environments
– For “near real”, immersive, and interactive virtual environments
– Custom mathematical and physics models to get the precise consequences and response you are looking for, as in the ‘Real World’
– To practice your own custom ‘SOP’s’ and Best Practices.
– Capture Knowledge of seasoned hands
EVERY Rig is differentEVERY Trainee is differentEVERY Objective is the same
Land rigs
Custom Rigs, Processes and Models
Jack-up rigs
Semi-submersible rigs
Drill Ships
Custom Rigs, Processes and Models
Rig Pass Module
Familiarize with the Rig that You will work on.
Know all the ‘hidden’ dangers, Health / Safety requirements, and obstacles that you may encounter, before you get on-board.
Compelling, immersive visualization
Highly detailed equipment simulation
Integrated, Configurable down-hole scenarios
“Customized Rigs, Tools and Processes”
Custom Rigs, Processes and ModelsSurface Tool Operations
• Know the exact capabilities and limitations of the equipment you will use
• Know how to use the equipment before you start to use it
– Improve Productivity
– Reduce risk and danger
Customized rig controls - Top drive, DW, Roughneck, Pipe racker, Well center slips, Fingerboard, Conveyor etc.Custom Drilling
Chair
Custom Rigs, Processes and Models
Process Controls
• Operating procedures
• Communication
Every detail counts
The Goal
To achieve the Training Objectives in
Your specific environments' with Your people. on time
Custom Rigs, Processes and Models
Down Hole Model
• Custom Drill String
• Custom Drill Bits
• Variable BOPs
• Variable Geostrata
• Variable Well Plan
• What ever fits your training objectives'
Custom Offshore Operations
Towing
Your Procedures
Your Safety
Your SOP’s
Your Lessons Learned
Custom Offshore Operations
Rig Towing and Positioning
Custom Offshore Operations
Rig Anchoring
Offshore Crane Handling Simulator
Custom Cranes
Custom Controls
Custom Cargoes
Custom Procedures
Custom Environments'
Customized Modeling
User-defined customized well scenarios can be generated from 2-D well plan parameter interface
Accurate dynamics
Customized HIL
Integration of custom process controllers -PLC’s
Sensors simulation
Actuators simulation
PID controllers
Anti-Collision systems
HIL Testing Advantages• HIL Testing can be done during all stages of the development and testing process. (The costs of correcting errors are much less if they are found earlier in the design process).
• All the components and sub-systems may not be physically available at any point in time to allow for full scale physical testing – with HIL testing, a desired test sequence can be followed at any stage of the development process.
• The HIL systems can be duplicated in multiple locations, which run the same models so that testing can be done on “identical” components or systems and issues can be duplicated for testing solutions.
HIL Testing Advantages (cont’d.)
•HIL testing capability has proven to significantly reduce the overall development time and greatly improve the quality and reliability of the final product.
•HIL system models can improved the communication of specifications between suppliers and OEMs.
•And of-course the HIL platform provides the ability to simulate a variety of scenarios that may be too difficult, unsafe, time consuming or expensive to perform in a ‘real’ environment
HIL Testing - CONS-Complexity of having to create a full simulated test environment before first use
-Results obtained will be as accurate as the fidelity of the simulation model
-Every component and sub-system associated with the system / component under test needs to be modelled – this can impact the cost of simulation and the possibility of minor errors creeping in
-The models need to be computationally efficient so that they can run in real-time with very small integration step sizes.
-Test can only cover that which has been modelled – there is no possibility of ‘unknown’ errors being revealed
Thank You
Bill Schraer
281 -736 – 9509
info@WorkForceDevelopment.co