integration of mobile technology with contract management - oracle primavera p6 collaborate 14
Post on 15-Aug-2015
19 Views
Preview:
TRANSCRIPT
REMINDER
Check in on the
COLLABORATE mobile app
Integration of Mobile Technology With Contract Management
Prepared by:
Chris P. O’Grady
Business Technology Consulting
Burns & McDonnell
Use of Mobile Applications with Primavera Contract Management for large scale construction projects.
Session ID#: 15433
BMcD Mobile Applications
BMcD Mobile Applications
■ Daily Report
■ Task Safety Observations (TSO)
■ Request for Information (RFI)
■ OneTouchMobile
Application Features
■ Work off-line / Synchronize when available
■ iPad is the primary target device
■ MEAP
▪ iPad/iOS
▪ Android
▪ Windows
▪ Secure domain login
Daily Report - General
Daily Report - Equipment
Daily Report – Field Force
Daily Report - Visitors
Daily Report - Schedule
Daily Report - Schedule
Daily Report - Weather
Daily Report - Photos
Daily Report – Schedule Detail
Daily Report – Schedule OTPM
MEAP (Safety)
TSO - Login
TSO – Form Selection
TSO - General
TSO – Question List
TSO – Answering a Question
TSO – Questions Answered
RFI - Login
RFI - List
RFI - General
RFI - Status
RFI - Question
RFI - Answer
RFI - Details
RFI – Photo
OneTouchMobile
OneTouchMobile
■ Mobile Data Collection Applications
OneTouchMobile
■ Multiple Field Data Collection Applications within one Project
■ Secure File Transfer In/Out of iPad
■ Complete Offline Capabilities
■ Full Integration with Backend Systems -GIS, OneTouchPM,CM
■ Access to all Features and Data in Field
■ GPS integration, internal or bluetooth
OneTouchMobile
■ Full Featured Attributes
OneTouchMobile
■ Integrated Photographs
■ Cache Imagery Locally on iPad
■ Measure Distance and Area
■ Connect to Multiple Imagery Sources
■ Navigate to Features (Compass, Route)
■ Identify Position (Lat Long, UTM,…)
■ Search Features, Addresses, Locations
OneTouchMobile
Please complete the session evaluation We appreciate your feedback and insight
You may complete the session evaluation either
on paper or online via the mobile app
top related