IRMIS3 Status and PlansGabriele Carcassi

10/11/2010

IRMIS3 modules

Module name Goal StatusInfrastructure

Components

(Lightweight) inventory

Cabling

eLog

Lattice

Save Restore

Magnet measurement

PV Crawler

Epics DB generation

Nothing Prototype Alpha Beta Production

Infrastructure

Requirements• Build/packaging – production• Logging – production• Security (AuthZ/AuthN) – prototype

TBD• Improve logging

Not covered• Nothing that we are aware

Available in the distribution with general support• Maintainer: Gabriele Carcassi

Component module

Requirements• Ability to edit component types – production• Ability to edit components (installations) in hierarchy –

production TBD

• Final UI touches Not covered

• Nothing that we are aware Available in the distribution with general support

• Maintainer: Gabriele Carcassi

Cabling module

Requirements• Ability to edit cable types – production• Ability to edit cable tray/partition/paths – production• Ability to edit cables – production

TBD• Load test (missing data)• UI consolidation

Not covered• Nothing that we are aware

Available in the distribution with general support• Maintainer: Gabriele Carcassi

Lightweight inventory module

Requirements• Ability to track parts – production• Ability to install/uninstall parts – production

TBD• Installation/uninstallation history – will export to the eLog

Not covered• Shipping and receiving – not planned• Components lifecycle – not planned• Travelers – not planned

Available in the distribution with general support• Maintainer: Gabriele Carcassi

eLog module

Requirements• Data model – prototype• UI – prototype• API – nothing

TBD• Requirement verification and implementation

Not covered

Not available• Maintainer: Don Dohan

Lattice module

Requirements• Data model – prototype• PVAccess service/API – prototype

TBD• Requirement verification and implementation

Not covered• Multiple lattices using different “as-built” parameters

Not available• Maintainer: Don Dohan

Old version available in the distribution as is• Maintainer: Gabriele Carcassi

Save restore module

Requirements• Data model – prototype• PVAccess service/API – prototype

TBD• Requirement verification and implementation

Not covered

Not available• Maintainer: Don Dohan

Magnetic measurement module

Requirements• Data model – prototype

TBD• Requirement verification and implementation

Not covered

Not available• Maintainer: Don Dohan

PV Crawler module

Requirements• PV Crawler – production in IRMIS2• API – alpha• UI – nothing

TBD• Test and bundle the crawler with IRMIS3, finalize API and

implement UI Not covered

• Nothing that we are aware Not available

• Maintainer: ?

EPICS db generation module

Requirements• Channel description for component types – prototype• Control hierarchy can be mined to guide/validate db• ?

TBD• ??

Not covered• ???

Not available• Maintainer: ????