January 28-30, 2014 KM3NeT, Electronics Workshop A‘dam
Peter JansweijerNikhefAmsterdamElectronics- Technology
1
KM3NeT CLBv2
January 28-30, 2014 KM3NeT, Electronics Workshop A‘dam
Peter JansweijerNikhefAmsterdamElectronics- Technology
CLBv2-Proto StatusBefore proceeding to CLBv2-
Proto2…
CLBv2
2
January 28-30, 2014 KM3NeT, Electronics Workshop A‘dam
Peter JansweijerNikhefAmsterdamElectronics- Technology
Timing Demo (SPEC-DIO / CLBv2)◦ White Rabbit 1 ns accurate◦ See also: http://pi1222.physik.uni-erlangen.de/Electronics/35
Ethernet Demo (Linux PC + Optical Network card / CLBv2)◦ Ping and basic UDP packet transfer (same as described in https://
docs.google.com/a/km3net.de/document/d/1m7cePSND1q4xHkX-Y96CDXsBKivap8j55cWaLbH7mjw/edit)
◦ aap
CLBv2_Proto DEMO (Yesterday)
3
PPS PPS
January 28-30, 2014 KM3NeT, Electronics Workshop A‘dam
Peter JansweijerNikhefAmsterdamElectronics- Technology
White Rabbit Switch
Near future: timing and Ethernet
4
PPS PPS10MHz
PPS
Use switch as is:◦ no broadcast (yet)◦ Standard firmware/software
Timing Reference
Grand Master Mode
January 28-30, 2014 KM3NeT, Electronics Workshop A‘dam
Peter JansweijerNikhefAmsterdamElectronics- Technology
Determine clock stabilityUse a proper master clock
◦external PPS and 10 MHz reference 10 MHz Rubidium standard + KC705 as
PPS source “= divide by 10.000.000”◦SPEC in grand master mode◦Or WR Swtich-v3…
White Rabbit timing
5
Sloppy first order measurement: time
between PPS(horizontal 20 ps/div)
January 28-30, 2014 KM3NeT, Electronics Workshop A‘dam
Peter JansweijerNikhefAmsterdamElectronics- Technology
Apart from the listing “KM3NeT_ELEC_2014_001_Doc-Prototype_design_changes_ELEC_draft”◦Just received a warning possible
reset issue with the CDCM61004 (GSI, Stefan Rauch; need to investigate further…)
Electrical issuesMechanical issues
Before proceeding to CLBv2-Proto2
6
January 28-30, 2014 KM3NeT, Electronics Workshop A‘dam
Peter JansweijerNikhefAmsterdamElectronics- Technology
1 Gbit flash issue BPI flash instead of SPI flash?
Determine timing margin Constraints 125 MHz + 10% = 140 MHz (P&R for XC160T-1 of current design
seems successful) Try Slow-Slew rate to suppress noise?
System test Readout of a complete assembled (½) DOM including PMT’s (needs integrated
firmware, embedded & DAQ software, shore station and rudimentary optical network)
Verify: Throughput Noise
Form a system test we also learn to setup a proper test procedure Write a test procedure document Write test software / Build test equipment
EMI We did our best to have a clock-enable on the Octopus boards to avoid noise
on the PMT bases. How noisy is the CLBv2? We don’t want to spoil the 24 bit Piezo ADC (a 144 DB signal/noise ratio!) This may lead to a mechanical issue (reversing component side of the PCB
and/or extra shielding)
Electrical Issues
7
January 28-30, 2014 KM3NeT, Electronics Workshop A‘dam
Peter JansweijerNikhefAmsterdamElectronics- Technology
Apart from the listing “KM3NeT_ELEC_2014_001_Doc-Prototype_design_changes_ELEC_draft”
Holes around the FPGA to mount an industry standard heat sink? choose a proper heat-sink sort out the mechanical structure
Consider alternative SFP location solve fiber routing issue try the molex SFP flex rigid, later probably design custom SFP flex rigid to serve our
needs. Get rid of the RJ45 connectors (Piezo & Hydrophone)
Piezo is mounted on the octopus board so this is no longer needed on the CLBv2? Hydrophone only uses two signals “Clk” and “AES_OUT” plus power. Use a smaller
connector and remove RS485 (saves money, power and noise?). How does the hydrophone fit in mechanically anyhow?
EMI Verify readout of a complete assembled DOM including PMT’s (needs integrated
firmware, embedded & DAQ software, shore station and rudimentary optical network) Extra shieling needed?
Mechanical Issues
8
January 28-30, 2014 KM3NeT, Electronics Workshop A‘dam
Peter JansweijerNikhefAmsterdamElectronics- Technology
Firmware integration (WRPC, IPMUX, LM32_2nd, State Machine, TDCs, Hydro, Multi-boot)
Embedded software (+ connection to WR embedded software)
Rudimentary optical network◦ one point to point link, 2 SFP’s◦ Note that the Molex SFP tail must be used since the SFP cage will
no longer be accessible once the DOM is assembled Rudimentary shore station (one WR switch V3) DAQ software As least 19 PMT’s and bases 1 Octopus large, 1 Octopus small Piezo, Hydrophone, Nano beacon, AHRS ½ DOM integration Test & learn!
Roadmap towards CLBv2-Proto2
9
January 28-30, 2014 KM3NeT, Electronics Workshop A‘dam
Peter JansweijerNikhefAmsterdamElectronics- Technology
There must be knowledge transfer from 7-Solutions to the collaboration.
To my opinion, the best way to do this is to repeated the 7-solutions work at different locations:1. All partners gain knowledge (including 7-
Solutions)2. We have multiple test sites
My first step towards this is to use a WR switch as is and later change firmware/software…
General remark
10
January 28-30, 2014 KM3NeT, Electronics Workshop A‘dam
Peter JansweijerNikhefAmsterdamElectronics- Technology
Questions?Discussion…
11
January 28-30, 2014 KM3NeT, Electronics Workshop A‘dam
Peter JansweijerNikhefAmsterdamElectronics- Technology
Backup SlidesMore details…
12
January 28-30, 2014 KM3NeT, Electronics Workshop A‘dam
Peter JansweijerNikhefAmsterdamElectronics- Technology
Clocking
13
Phase Compensated Clocks
top related