GHAGHRA SUGAR LTD.
PROJECT SMART
P P - P I
U S E R ’ S T R A I N I N G M A N U A L
Production Planning – Process Industry Users’ Manual
Contents
Topic Page no.
OVERVIEW 3
MASTER DATA
Resources BOM Recipe
466
PROCESS ORDER EXECUTION
Creating a Process Order Releasing the Process Order Confirming the Process Order Calculation of overheads Settlement
8
1114151718
STOCK TRANSFERS
SAP Terminology Movement Types Stock Transfer
20
202021
ONLINE INFORMATION AVAILABLE 23
ORDER CANCELLATION
Complete Order Reversal Partial Order Reversal / Modification
26
2628
USEFUL INFORMATION 32
ANNEXURES
I. Resources of all plants.II. Sequence of activities, Principles and Stock
TransfersIII. Number range for process ordersIV. Sap Data – Bus Area, Plants and Mvmt.
TypesV. Master Recipes of all plants
33
3334
3536
37
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
2/37
Production Planning – Process Industry Users’ Manual
OVERVIEW
With the component PP-PI (Production Planning for Process Industries), SAP provides an
integrated planning tool for batch oriented process manufacturing. The following figure
illustrates various functionality offered by PP-PI.
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
3/37
Production Planning – Process Industry Users’ Manual
MASTER DATA
The master data configured in PP-PI chiefly consists of
1. Resources
2. BOMs
3. Recipes
4. Additional Material Master views
MRP-1,
MRP-2,
MRP-3,
MRP-4 and
Work Scheduling
Resources
A resource is used to carry out an operation within a production run. If we want to specify
where an operation is to be carried out, we must enter a resource in this operation. The
resource contains information on the location or area within a plant at which a particular
processing step is carried out. A resource can represent machine or labor resources, for
example, a reactor or an operator.
. Resources contain data used by production such as:
Costing,
Scheduling,
Capacity requirements planning.
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
4/37
Production Planning – Process Industry Users’ Manual
Relationship of Resources to Recipes
A standard task list / recipe consists of a series of work steps. To determine where or with
what resources an operation or activity is to be carried out, we must specify a resource.
To simplify the maintenance of operations, we can enter default values for them in a
resource. These default values are transferred into the operation when the resource is
allocated.
Relationship of Capacity to Resource
The term "capacity" refers to the ability to perform a task. In the R/3 System, capacities
define the output that processing units and people, among other things, can provide within
a certain time period. Several capacities can be assigned to one resource, distinguished
by their categories.
Resource capacities, that is, different capacity categories can include:
· Processing unit capacity
· Labor capacity
· Emissions
· Energy
The list of resources created in each plant is given in Annexure-I.
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
5/37
Production Planning – Process Industry Users’ Manual
Bill of material (BOM)
A bill of material is a formally-structured list for an object (semi-finished or finished
product) which lists all the component parts of the object with the name, reference
number, quantity, and unit of measure of each component.
In PP-PI the BOM is referred to as Material list and forms part of the recipe.
The BOM or material list contains all the material components required during the
production run, together with their quantity specifications.
RECIPE
In the master recipe, we describe the processes to be used for producing materials in our
plant as well as the resources and ingredients required for production.
In the master recipe, we can plan
· all the resources required for the production of a batch,
· all the materials used in the process & by – products,
· the operations and phases required for executing the process.
Just like material master records, bills of material and work centers, the master recipe is
considered as master data. It describes the processing steps required to produce a
material or provide a service in the process industries.
The master recipe is a resource-specific recipe, used for the preliminary planning of
production processes, and contains the specifications for manufacturing one or more
materials in non-discrete manufacturing processes. It contains operations and data on the
primary and secondary resources required, material allocations, operation texts and
standard values for operations. In a master recipe, you can plan the use of:
· Resources
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
6/37
Production Planning – Process Industry Users’ Manual
· Materials
· Capacities
· Costs
· Quantities
required for the process.
In the SAP System, master recipes are used in
· Process Order
· Scheduling
· Capacity Planning
· Costing
The entire list of recipes for all the plants including the Bill of Materials is listed in
Annexure II.
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
7/37
Production Planning – Process Industry Users’ Manual
PROCESS ORDER EXECUTION
In a process order, the process described in a master recipe is copied and adjusted to the
concrete production run.
Creation: For every material to be produced a process order is to be created on a daily
basis specifying the quantity to be produced .The no. of Process orders to be
created correspond to the no. of master recipes configured in the system e.g. for
Boiler House, the following recipes have been configured.
Production of Steam 45 KG
Production of Steam 21 KG
Releasing: The process order is to be released before actual production is carried out.
It is only after the process order is released that the material needed for production is
reserved.
Saving: When the order is saved, the system generates a no. which is to be noted for
further reference.
The number range of process orders for each plant is detailed in Annexure - III.
Confirmation: After actual production, the raw materials consumption / quantity
Produced is confirmed. It is only when the order is confirmed that the system carries
out the goods movements. (Goods issues for raw materials, Goods Receipt for
finished products). Consequently the direct costs get loaded to the product.
Overhead calculation:
The total cost of indirect expenses, indirect labor, and indirect materials (indirect
costs) are termed as overheads. Overhead is allocated to the cost objects by
means of overhead rates that have been defined in CO module.
Settlement: When settlement is carried out, the actual costs incurred for the process
order, are settled to one or more receivers (such as the material to be produced).
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
8/37
Production Planning – Process Industry Users’ Manual
The settlement process automatically generates offsetting entries to credit the
process order.
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
9/37
Production Planning – Process Industry Users’ Manual
Participants’ Notes:
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
10/37
Production Planning – Process Industry Users’ Manual
Step by step procedure for process order Execution
I. Creating a Process Order (COR1)
1. Double click on the menu path Logistics Production-Process Process
Order Process Order Create With Material
You can directly access this screen by typing COR1 in the Command Line Box.
The initial screen for creating a production order appears.
2. Enter the following data:
Material no.: Enter the material no. of the product.
Production Plant: Enter plant code.
Planning Plant: Leave this field empty.
Process order type: Enter Plant code (The order type defined for each plant
is same as the plant code).
Process order: Leave this field empty. Press Enter.
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
11/37
Type COR1 here and press enter.
Production Planning – Process Industry Users’ Manual
Note: Option is available to create a process order by copying an existing order (Enter the
no. of the existing order in the field copy from Process order.
3. Enter the following data:
Total qty: Enter the quantity to be produced.
Start Date: Enter the production start date.
Leave all the remaining fields blank.
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
12/37
Production Planning – Process Industry Users’ Manual
4. Press ENTER. The order Finish Date appears. Verify it.
5. Click on icon. The material list appears.
6. Check material consumption figures. To make any changes proceed as follows:
Enter the revised quantity in the field Requirement quantity.
To add new material, enter the material no., the quantity required, storage
location, item category (L for stockable material. Press ENTER. The
system prompts for the operation/phase to which the material is to be
allocated, enter the operation number.
To delete a material, select it and click the Delete icon.
8. Click arrow to return to the header screen of the process order.
9. Click on the Save icon. The system generates the process order number. Note it
down.
Participants’ Notes:
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
13/37
Production Planning – Process Industry Users’ Manual
II. Releasing the Process Order
1. In creation mode, you can release the process order by selecting Process
OrderFunctionsRelease or by clicking on
It is also possible to release the order after saving it. You can directly access this screen
by typing COR5 in the Command Line Box.
Select Logistics Production-Process Process Order Process Order
Release.
1. Enter the following data
Order Type: Enter plant code
Plant: Enter plant code
Process order: Enter the process order number (which was
generated when the order was saved)
Leave all the other fields empty.
2. Click on Execute icon .
3. Select the order and click on Release icon .
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
14/37
Production Planning – Process Industry Users’ Manual
III. Confirming the Order
Select Logistics Production-Process Process Order Confirmation Enter
for Order
1. Process Order: Enter the Process Order no. to be confirmed. The main screen for
confirmation appears.
2. Select whether partial or final confirmation is to be processed by the system.
3. Yield to confirm: Enter production quantity to be confirmed.
4. Enter your Personnel Number.
5. Change the Execution start and Finish execution dates and times.
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
15/37
Production Planning – Process Industry Users’ Manual
6. Enter the Posting Date. This date is the date of production. For e.g: for a production of
6000 QTL of Gomti Sugar M-30 from 23.12.01 6:00 AM to 24.12.01 6:00 AM, the
posting date would be 23.12.01.
7. Click on the Goods Movement icon. The planned consumption
values as per the BOM are displayed.
8. Check consumption quantities and make any changes as required.
9. Click on the Save icon. The confirmation is saved.
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
16/37
Production Planning – Process Industry Users’ Manual
IV .Overhead cost calculation
Select Logistics Production-Process Process Order Period-end closing
Overhead costs Individual Processing
The initial screen for overhead calculation appears. Enter the following data.
Note: Enter Controlling area as 5000, when accessing this screen for the first time.
Order : Number of the process order for which the overheads
are to be loaded.
Period : Financial period
Fiscal year. : Financial year.
Deselect the Test Run field.
Click on the execute icon.
The overheads are calculated and the completion message appears. Click on to
return to main screen.
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
17/37
Production Planning – Process Industry Users’ Manual
V . Settlement
Select Logistics Production-Process Process Order Period-end closing
settlement Individual processing.
The initial screen for the settlement appears .Enter the following data .
Order : Number of the process order for which the overheads
are to be loaded.
Period : Financial period
Fiscal year. : Financial year.
Processing
type.
: 1 (ie automatic).
Deselect the Test Run field.
Click on the execute icon. The orderis settled and the completion message appears .
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
18/37
Production Planning – Process Industry Users’ Manual
Participants’ Notes:
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
19/37
Production Planning – Process Industry Users’ Manual
Stock Transfer
BUSINESS AREA
Business areas are primarily used to facilitate external segment reporting across company codes, covering the company's main areas of operation (product lines, branches).
PLANT
A plant is a unit within a company that produces or makes available material or renders services.
STORAGE LOCATION
An organizational unit that allows differentiation of material stocks within a plant.
MOVEMENT TYPES
When you enter a goods movement in the system, you must enter a movement type to differentiate between the various goods movements. A movement type is a three-digit identification key for a goods movement. The following table contains examples of movement types.
Goods movement Movement type
Goods receipt for a purchase order 101Goods issue for a cost center 201Release from quality inspection stock 321
Control Functions of the Movement Type
The movement type has important control functions in Inventory Management.For example, the movement type plays an important role in
o updating of quantity fieldso updating of stock and consumption accountso determining which fields are displayed during entry of a document in the
system
A list of business areas, plants, storage locations and movement types relevant to production planning is given in Annexure V.
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
20/37
Production Planning – Process Industry Users’ Manual
Material produced in one plant through a process order may need to be consumed in another plant (e.g: Power) or sold through another plant (e.g: Bagasse). In some other situations, the stock needs to be moved between storage locations to enable further transactions to be performed on it (e.g: Gomti Sugar)
To enable this cross plant, SAP provides manual goods movements to be done between plants or between storage locations.
Stock Transfer
Select Logistics Materials Management Inventory Management Goods Movement Transfer Posting (Tcode: MB1B)
Enter the following data:
Document date: The date on which the document will be recorded.Posting date: The date of actual transaction
Movement Type: 301 for Inter plant transfer 311 for Inter storage location transfer
Plant: The plant from which material is to be transferredStorage location: The storage location from which material is to be transferred
Click on Enter to open the transaction screen.
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
21/37
Production Planning – Process Industry Users’ Manual
Enter the following data:
Receiving plant: Plant to which the material is to be transferred. This is missing in case of Storage Location Transfer.
Receiving Sloc.: Storage Location to which material is to be transferred.
Material: Code of the Material that is to be transferred.Quantity: The quantity of the material that is to be transferred.
Click on Save icon to save the document and post the transaction.
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
22/37
Production Planning – Process Industry Users’ Manual
Online Information Available
1. Costs :
The cost of production can be viewed in create/change mode of Process order as
follows:
Goto Costs Analysis
Note: During creation phase, select Process Order Function Determine Costs
Various options for comparison of Planned Vs Actual costs are available.
Note: Before an order is confirmed, through the same menu path, the planned
(Budgeted) costs can be viewed.
3. Production Reports
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
23/37
Production Planning – Process Industry Users’ Manual
From SAP main screen, select Information Systems Logistics
Production. Then select Material. The various reports available are
Dates (Deviations between planned and actual production dates)
Quantities (Planned and actual production quantities)
Product Costs (Planned and actual costs)
Material Usage (Planned and actual material usage)
Note: In these reports, we can view the information at different levels viz.
Company, plant, material, order or date. Standard analyses viz. ABC,
Comparison, Classification etc. are also available.
4. Cost Sheet
This report provides the cost sheet as required by Accounting / MI for all the
semi-finished / finished products. The information includes direct and indirect
costs, compiled in a monthly format.
Information for the previous month and the total record till this date of the year
are also provided for comparison and analysis.
Information System CO Reports Reports Cost Sheet
You could use transaction code ZC01
Enter the following data.
Controlling Area: 5000
Material No.:
Month (Actual): Month for which the material cost is required
Year (Actual): The year for which the report is being run.
Click the execute icon.
5. Quantity Efficiency
This report provides the per ton consumption quantities of all the input material
required to produce the semi-finished / finished product, there by providing an
indication of the process efficiencies.
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
24/37
Production Planning – Process Industry Users’ Manual
Information for the previous month and the total record till this date of the year
are also provided for comparison and analysis.
Information System CO Reports Reports Quantity efficiency
You could use transaction code ZC02.
Enter the following data:
Controlling Area: 5000
Material No: Material for which the input efficiency is to be calculated
Month (Actual): Month for which the material cost is required
Year (Actual): The year for which the report is being run.
Click the execute icon.
Participants’ Notes:
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
25/37
Production Planning – Process Industry Users’ Manual
ORDER REVERSAL
Caution: A wrongly confirmed Process order needs to be cancelled as soon as possible. A delay in the reversal of process orders would result in the price of the semi-finished / finished products going haywire and might lead to a situation where the price becomes negative.
Complete Order cancellation
Before doing order cancellation, reverse the order settlement and overhead calculations.
1. Reversal of Order Settlement:
Select Logistics Production-Process Process Order Period-end closing
Settlement Individual processing.
The initial screen for the settlement appears. Enter the following data .
Order : Number of the process order for which the overheads are
to be loaded.
Period : Financial period
Fiscal year. : Financial year.
Processing type. : 1 (ie automatic).
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
26/37
Production Planning – Process Industry Users’ Manual
Deselect the Test Run field.
Select Settlement Reverse. The settlement is reversed and the completion
message appears .
Click on to return to main screen.
2. Reversal or Overhead Calculation:
Select Logistics Production-Process Process Order Period-end closing
Overhead costs Individual Processing
The initial screen for overhead calculation appears. Enter the following data.
Note: Enter Controlling area as 5000, when accessing this screen for the first time.
Order : Number of the process order for which the overheads are to be
loaded.
Period : Financial period
Fiscal year. : Financial year.
Deselect the Test Run field.
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
27/37
Production Planning – Process Industry Users’ Manual
Select Overhead Calculation Reverse. The overheads are calculated and the
completion message appears. Click on to return to main screen.
3. Cancellation of Process Order Confirmation:
Select Logistics Production - Process Process Order Confirmation Cancel (Tcode: CORS)
Enter the Process Order Number that needs to be cancelled.
A warning message appears asking you to confirm your intent to cancel the order. Click on Yes.
The Process Order opens in display mode.
Note: You cannot change / modify any quantities in this procedure.
Click on Goods Movement icon to view the list of all materials and quantities.
Click on Save icon. Enter the text for reason of cancellation and click on to cancel the order.
Note: Open the Process Order Confirmation display (Tcode: XXXX), select the cancellation entry and click on Goods Movement to determine whether all the reversals have been successfully posted.
Partial Order Modification / Cancellation:
In certain cases, it is not necessary to cancel the entire order confirmation. For
these instances, manual goods movement can be employed to produce the results
desired.
Note: Before proceeding with the goods movement, reverse the Process Order
Settlement and Calculation of Overheads as illustrated above.
Case I: Additional Production or Decrease in Production keeping all
the other components constant.
Open the Goods Receipt for Order as follows:
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
28/37
Production Planning – Process Industry Users’ Manual
Logistics Materials Management Inventory Management
Goods Movement Goods Receipt For Order (Tcode: MB31)
Enter the Document Date and the Posting Date as required. The posting
date has to be the same as that of the order confirmation posting date.
Enter the following data:
Delivery Note: -/-
Doc Header Text: -/-
Movement Type: 101 for Production increase
102 for Production reduction
Plant: Plant of production
Stor. Location: Concerned Storage Location
Click on Enter.
On the details screen, modify the quantity as desired and click on
icon.
Enter the following string in the text field.
-/-/-/xxx
Note: xxx is a string of 3 characters. You can input your own 3 chracter
string to help you identify the transaction later.
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
29/37
Production Planning – Process Industry Users’ Manual
Click on Save icon to post the transaction.
Note: Open the process order in the display mode (Tcode: COR3) to
confirm the change, and then proceed to calculate overhead costs and
order settlement, as illustrated above.
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
30/37
Production Planning – Process Industry Users’ Manual
Case II: Modification or reduction in input components
Open the Good Issue Screen as follows:
Logistics Materials Management Inventory Management Goods Movement Goods Issue (Tcode: MB1A)
Enter the following data:
Posting Date and Document Date: Date of Production
Movement Type: 261 for additional consumption
262 for reduction in consumption
Plant: Plant of consumption
Storage Location: Concerned Storage Location
Click on Enter.
On the details screen, enter the following
Order: Process Order Number
Material: Input Material Code
Quantity: Modification quantity
Click on Save icon to post the transaction.
Note: Open the process order in the display mode (Tcode: COR3) to
confirm the change, and then proceed to calculate overhead costs and
order settlement, as illustrated above.
Case III: Modification or reduction in by-product production.
Adopt the same method as Case II, changing the movement type to 531 (for
additional production) or 532 (for reduction in production).
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
31/37
Production Planning – Process Industry Users’ Manual
USEFUL INFORMATION
Material Stock: Use this report to verify the total stock available across plants
for a given material.
Logistics Materials Management Inventory Management
Environment Stock Stock Overview (Tcode: MMBE)
Stock for posting date: Use this report to
o View opening and closing stock for a particular period
o Total postings per movement type
o Analysis of material documents
Logistics Materials Management Inventory Management
Environment Stock Stock for Posting Date (Tcode: MB5B)
Stock Check: During order confirmation, in the goods movement
screen, position cursor in the plant / storage location field for any material and
press F4 button on your keyboard. A window appears listing the stocks
available for that material across plants / storage locations.
Unable to release order: Open the material (Tcode: MM03) in display mode
and check if the MRP views for that material have been maintained.
Production taking more than 24 hours: Open the material in display mode
and check the quantity entered in the work scheduling view is correctly entered
or not.
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
32/37
Production Planning – Process Industry Users’ Manual
ANNEXURE I – RESOURCES
WrkCntr Plnt Cat Resp. Description
BOILER21 GBH1 0008 PBH BOILER FOR 21 KG STEAM
BOILER45 GBH1 0008 PBH BOILER FOR 45 KG STEAM
DMPLANT GBH1 0008 PBH DEMINERALISATION PLANT
MILLING GMIL 0008 PME CANE MILLING
DGSET GPP1 0008 PEL DIESEL GENERATOR SET
TURBINE GPP1 0008 PEL TURBINE FOR POWER PRODUCTION
PROCESS GSPP 0008 PHP SUGAR PROCESS PLANT
PACKING GSSC 0008 PHP SUGAR PACKING
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
33/37
Production Planning – Process Industry Users’ Manual
ANNEXURE II
SEQUENCE OF ACTIVITIES, PRINCIPLES AND STOCK TRANSFERS
Process Orders have to be confirmed in the following order
1. DM Water Production
2. Steam 45 KG Production
3. Steam 21 KG Production
4. Power Internal Generation (Power through DG Set if required)
5. Mixed Juice Production
6. Loose Sugar Production
7. Gomti Sugar Packing (all grades)
Some of the materials are moved across plants for either consumption or sale.
Depending on the business area, the materials have to be either manually moved
across plants or moved manually through stock transfer posting.
Materials for Transfer Posting
Material Sending Plant /Sloc. Reciving Plant / Sloc.
Power Internal GPP1/GPP1 GSPP/GSPP
GMIL/GMIL
Bagasse GMIL/GMIL GBH1/GBAY
Steam 45 KG GBH1/GBH1 GMIL/GMIL
Steam 21 KG GBH1/GBH1 GSPP/GSPP
Steam 1.25 KG GPP1/GPP1 GSPP/GSPP
GBH1/GBH1 GSPP/GSPP
Condensate GSPP/GSPP GBH1/GBH1
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
34/37
Production Planning – Process Industry Users’ Manual
Materials moving automatically through process order
The following materials are directly consumed in the process order from their
original plant of production. To do this, change the plant and the storage location of
the materials in the process order confirmation, goods movement screen. The
movement across plants happens automatically.
Material Order Plant / Sloc. Changed Plant / Sloc.
Power Internal GBH1/GBH1 GPP1/GPP1
Steam 45 KG GPP1/GPP1 GBH1/GBH1
Mixed Juice GSPP/GSPP GMIL/GMIL
Loose Sugar GSSC/GSSC GSPP/GSPP
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
35/37
Production Planning – Process Industry Users’ Manual
ANNEXURE III – PROCESS ORDER NUMBER RANGES
Plant Order Type Number Range
GBH1 GBH1 120000001 - 122000000
GPP1 GPP1 122000001 - 123000000
GMIL GMIL 118000001 - 119000000
GSPP GSPP 119000001 - 120000000
GSSC GSSC 123000001 - 125000000
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL
36/37
Production Planning – Process Industry Users’ Manual
ANNEXURE IV – PROCESS ORDER NUMBER RANGES
Business Area Plant
SGPW GBH1
GPP1
SGSU GMIL
GSPP
GSSC
Movement Type Description
101 Goods Receipt
102 Goods Receipt – Reversal
261 Goods Issue for Consumption
262 Goods Issue for Consumption – Reversal
531 Goods Receipt By-product
532 Goods Receipt By-product - Reversal
Project SMART Ghaghra Sugar Ltd.Compiled by ISD, DSCL