real estateplan adolfo suÁrez madrid-barajas airport · adolfo suárez madrid-barajas airport. a...

Post on 30-Jul-2020

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

REAL ESTATE PLAN

ADOLFO SUÁREZ MADRID-BARAJAS AIRPORT

Adolfo Suárez Madrid-Barajas AirportA landmark airport

53.4 million

387 thousand

Passengers

Operations

+5.9%

+2.5%

Gateway to Latin America

25% market shareEurope - Latin America

27 destinations283 frequencies per week

In an unbeatable situation to be the main hub between Asia andLatin America

25% seatsBetween Latam and Asia

+ 77.1% Asia

Airport connectivity compared to 2016

611,000 Latin Americansliving in Madrid

Leader in air cargotransport

470 thousand MT Cargo+13.1%

92 companiesAir cargo centre

Committed to sustainability, innovation and the environment

Madrid, a cosmopolitan city and the economic capital of southern Europe

5th cityin Europe in attracting property investment

€211,000 millionIt accounts for 19% of Spain’s GDP

9.3% GDP

The airport’s sharein the Region of Madrid

3,532 ha15 km

2/3 of theM-30’s area

CLOSE SCALEWithin growth

trends

Strategic locationM-12

Main roads

Underground

Regional rail network

High-speed train

Superbconnectivity

Airport integrated in and connected with Madrid

M-12

M-12

Business corridor

Economic activities

Logistics corridor

Logistics activities

Economic dynamism

Next to the main economic activity corridors

M-12

Unique metropolitan development opportunity for Madrid

Gateway to connectivity and the global economy

Based on three development areas

Sustainability and Innovation as design criteria

Logistics centre

Global business hubPassenger service

LEISURE AND RETAIL CENTRE

AIRPORT CITY

A-1

A-2

M-50

AERONAUTICAL ACTIVITIES

LOGISTICS HUB

140 haGreen areas

2.7 million m²Gross floor area

920 haMarketable land

562 haGross developed land

ADDITIONAL USES

LOGISTICS HUB

Overview of the land

€2,997 million Investment

M-12

LOGISTICS HUB AIRPORT CITY LEISURE AND RETAIL CENTRE

AERONAUTICAL ACTIVITIES

ADDITIONAL USES

Terminal T4

Terminals T123

Air Cargo Centre

Between Runways South

Between Runways North

Proposed uses

5 hangars already in operation

6 ha plots / 52,000 m2GFA

74,000 m²Gross floor area

€99 millionINVESTMENT

9 haNew net

plots developed

Aeronauticalactivities

Terminal T4

Terminals T123

Air Cargo Centre

Between Runways South

Between Runways North

Making sure the airport remains a leading aircraft maintenance centre

Aeronauticalactivities

€1,096 million Investment

257 haNet plots

1,486,000 m2GFAGross floor area

426,500 m²Green areas

Logistics hub

Terminal T4

Terminals T123

Air Cargo Centre

Between Runways South

Between Runways North

Development of the largest logistics hub in Spain with direct access to the main communication routes

Logistics hub

AirportCity

€965 million Investment

62 haNet plots

652,000 m2GFAGross floor area

380,000 m²Green areas

Terminal T4

Terminals T123

Air Cargo Centre

Between Runways South

Between Runways North

Turning the airport into the main global hub for business development

AirportCity

AirportCity

Innovative and sustainable urban design

AirportCity

Leisure and retail

centre

€681 million Investment

57 haNet plots

341,000 m²GFAGross floor area

298,000 m²Green areas

Terminal T4

Terminals T123

Air Cargo Centre

Between Runways South

Between Runways North

A leisure and services range that will be a hotspot for Madrid and its airport

Leisure and retail

centre

0 16 years 40 years

Stage 1Launch

Stage 2Development

Stage 3Consolidation

€953 millionInitial investment

€1,692 millionCumulative investment

€2,997 millionCumulative investment

1,478,000 m²Cumulative gross floor area

2,680,000 m²Cumulative gross floor area

Enabling additional development

Upgrading and improving the land

8 years

557,000 m²Initial gross floor area

Upgrading current entrances

Sustainable and innovative design

2018

2018

2019

2020

Real Estate Plan Strategy

Setting up the management structure

Plans, designs and tenders

Start of works

First properties

2017

562 ha New land developed

Economic development opportunity

Integrated and sustainable

Environmentallyresponsible

2,680,000 m2

Total gross floor area

Leading and innovative range of

uses

€2,997 millionTotal investment

Contribution to the community

244 haLand available for

additional uses

With the ability to continue growing

THANK YOU

top related