River Road AreaRiver Road AreaSewer ImprovementsSewer Improvements

Neighborhood Advisory Committee

July 22, 2004

Today’s MeetingToday’s Meeting

• Program Review

• River Road Projects• EQ Basin/Pump Station - Brookford Park• Sewer installation• Force main installation

• Next Meeting Date

Program ReviewProgram Review

• 4 Sanitary Sewer Overflows in River Road Area

• Must be eliminated by November of 2006• Stiff penalties for missed deadlines

Proposed River Road Proposed River Road Area ProjectsArea Projects• Underground Equalization Basin – River Road

Park

• Underground Pump Station – River Road Park

• New Force Main Sewer – Brookford Drive

• New Relief Sewer– Beverly and River Road

• Beverly Pump Station – West of Trail

Project SchedulesProject Schedules

• Projects will be built concurrently

• Construction bids – October/November 2004

• Break Ground – Spring 2005

• Completed by November 2006

Equalization BasinEqualization Basin

• Underground facility

• 3 million gallon storage capacity

• 120 ft. x 240 ft.

• 17 ft. deep

• To be located at River Road Park ball diamond site• Tanks from old Toledo Water Plant currently

located there

Equalization BasinEqualization Basin

Equalization Basin Equalization Basin Issues & DiscussionIssues & Discussion• Construction Access Road

• From River Road to site (between playgrounds)• Reduces amount of construction equipment entering

site from Brookford

• Grading• Part of Treatment Plant project

• Fill to reorient sledding hill• Fill to shift baseball diamond to west• Fill to improve park-like setting

Issues and DiscussionIssues and DiscussionContinuedContinued• Baseball diamond

• Will be lost for one season due to construction• Options for replacement of the field

• Outfield

• Parking

• Bleachers

• Maintenance building• City reviewing options

River Road Park River Road Park Pump StationPump Station• Located next to

Equalization Basin• Bulk of facility

underground• Electrical panel above

ground

Force Main SewerForce Main Sewer

• New sewer from Beverly pump station on west side of Anthony Wayne Trail down Brookford to the Equalization Basin

• To be located on south side of Brookford

• Shouldn’t disturb street – except for crossings at OLPH and Island Avenue

• Traffic maintained• Will work with committee to minimize disruption

New Relief SewersNew Relief Sewers

• From River Road, Midland or Hemlock down River Road to Brookford

• New water line will be installed at same time• Should help resolve water pressure problems

• Preferred sewer location is in east lane of River Road

New Relief SewersNew Relief Sewers

• On Beverly from Brookford to Medford

• Both relief sewer lines should help reduce basement flooding in area

• Traffic control

Beverly Pump StationBeverly Pump Station

• Underground – with electrical panel(s) above ground

• Will pump waste from Beverly sewer to new EQ basin

CommentComment

• Questions

• Discussion

Future MeetingsFuture Meetings