River Road AreaRiver Road AreaSewer ImprovementsSewer Improvements
Neighborhood Advisory Committee
July 22, 2004
Today’s MeetingToday’s Meeting
• Program Review
• River Road Projects• EQ Basin/Pump Station - Brookford Park• Sewer installation• Force main installation
• Next Meeting Date
Program ReviewProgram Review
• 4 Sanitary Sewer Overflows in River Road Area
• Must be eliminated by November of 2006• Stiff penalties for missed deadlines
Proposed River Road Proposed River Road Area ProjectsArea Projects• Underground Equalization Basin – River Road
Park
• Underground Pump Station – River Road Park
• New Force Main Sewer – Brookford Drive
• New Relief Sewer– Beverly and River Road
• Beverly Pump Station – West of Trail
Project SchedulesProject Schedules
• Projects will be built concurrently
• Construction bids – October/November 2004
• Break Ground – Spring 2005
• Completed by November 2006
Equalization BasinEqualization Basin
• Underground facility
• 3 million gallon storage capacity
• 120 ft. x 240 ft.
• 17 ft. deep
• To be located at River Road Park ball diamond site• Tanks from old Toledo Water Plant currently
located there
Equalization BasinEqualization Basin
Equalization Basin Equalization Basin Issues & DiscussionIssues & Discussion• Construction Access Road
• From River Road to site (between playgrounds)• Reduces amount of construction equipment entering
site from Brookford
• Grading• Part of Treatment Plant project
• Fill to reorient sledding hill• Fill to shift baseball diamond to west• Fill to improve park-like setting
Issues and DiscussionIssues and DiscussionContinuedContinued• Baseball diamond
• Will be lost for one season due to construction• Options for replacement of the field
• Outfield
• Parking
• Bleachers
• Maintenance building• City reviewing options
River Road Park River Road Park Pump StationPump Station• Located next to
Equalization Basin• Bulk of facility
underground• Electrical panel above
ground
Force Main SewerForce Main Sewer
• New sewer from Beverly pump station on west side of Anthony Wayne Trail down Brookford to the Equalization Basin
• To be located on south side of Brookford
• Shouldn’t disturb street – except for crossings at OLPH and Island Avenue
• Traffic maintained• Will work with committee to minimize disruption
New Relief SewersNew Relief Sewers
• From River Road, Midland or Hemlock down River Road to Brookford
• New water line will be installed at same time• Should help resolve water pressure problems
• Preferred sewer location is in east lane of River Road
New Relief SewersNew Relief Sewers
• On Beverly from Brookford to Medford
• Both relief sewer lines should help reduce basement flooding in area
• Traffic control
Beverly Pump StationBeverly Pump Station
• Underground – with electrical panel(s) above ground
• Will pump waste from Beverly sewer to new EQ basin
CommentComment
• Questions
• Discussion
Future MeetingsFuture Meetings
• Next meeting date?
• Best time and location?