Thermal Integrity Profiling

( TIP )

1

ASTM D7949

It is obvious why we test

2

3

Typical Inspection

Dry Cast • Generally visual inspection only

Wet Cast • Since visual inspection is impossible

some NDT is needed. Options include: 1. CSL 2. PIT (pulse echo) 3. Gamma Gamma Logging 4. Thermal Profiling

Top 1/3 44%

Bottom 1/3 45%

Mid 1/3 11%

4

Jones & Wu, Geotechnology, Inc. Missouri and Kansas

“Experiences with Cross-hole Sonic Logging and Concrete Coring for Verification of Drilled Shaft Integrity”, ADSC GEO3 Construction Quality Assurance/Quality Control Technical Conference, Dallas Nov 2005

Percentage of Shafts with “Anomalies”

37% 38% Top 2D, 58%Bottom 2D, 32%

Middle, 10%

Billy Camp, S&ME Inc. Southeast USA “Crosshole Sonic Logging of South Carolina Drilled Shafts: A Ten Year Summary” - Presentation to ADSC Expo 2012, San Antonio March 2012

Thermal Integrity Profiling Advantages 100% Cross-section of the shaft Use temperature vs. depth vs. quadrant Test early after casting, speeds const. 12 to 48 hours (dependent on diameter)

Evaluates concrete quality, cover & alignment Only reports significant defects

5

Concrete

Temperature versus depth during curing

at cage

Cover

Cement Quantity

Strength

Shaft Serviceability

Durability

6

Thermal Integrity Profiling Use temperature vs. depth vs. quadrant

1 4 7

10 13 16 19 22 25 28 31 34 37 40 3 6

S1

S10

S19

S28S37

S46

20

30

40

50

60

70

80

Shaft Heat Signature Te

mpe

ratu

re

7

1 4 7

10 13 16 19 22 25 28 31 34 37 40 3 6

S1

S10

S19

S28S37

S46

20

30

40

50

60

70

80

Shaft Heat Signature Te

mpe

ratu

re

8

1 4 7

10 13 16 19 22 25 28 31 34 37 40 3 6

S1

S10

S19

S28S37

S46

20

30

40

50

60

70

80

Tem

pera

ture

Shaft Heat Signature

9

10 For uniform shaft, temperature is constant, except 1 diameter at top and bottom roll-off

Two TIP Methods Probe or Wire

11

Test Procedure using probes

12

• Remove water from tube, if applicable • Insert IR probe into tube • Collect data (top to bottom) • Repeat IR scan in all tubes

CSL Tubes

To Depth Encoder

THERMAL WIRE® Cables

Thermal Wire TAP Data Logger

Data Output

14

Level 1: Direct Observation (Field)

• Verify shaft length - Identify top and bottom • Confirm cage alignment • Locate changes in shaft diameter

Locate immediate areas of concern

15

view data instantly in field

16

8

13

18

23

28

33

38

43

48

53

110 120 130 140 150 160

Dept

h (ft

)

Degrees F

Shaft # 17 Thermal Wire Data

A3

B4

A3

B4

ODOT – I71 over Little Miami River Shaft # 17 Thermal Wire @18 hours

B4

A3

17

Level 2: Added Field Records

• Relate concrete volume to meas’d temperature

• Predict as-built shaft radius, shape, and cover

18

0

10

20

30

40

50

60

70

80

90

100

70 90 110 130 150

Temperature (deg F)D

epth

(ft)

0 2 4 6 8 10

Shaft Diam (ft)

Average

Grnd Surf

TOS

WT

BOC

TOLime

TOR

BOS

EffectiveDiam.

TheoreticalDiam.

Method ShaftNo Correction for

Over-pour Concrete

No Correction forTremie f illing /

volume

Truck volume and depth after each truck can establish the effective diameter for each shaft segment.

19

0

10

20

30

40

50

60

70

80

90

100

70 90 110 130 150

Temperature (deg F)D

epth

(ft)

0 2 4 6 8 10

Shaft Diam (ft)

Average

Grnd Surf

TOS

WT

BOC

TOLime

TOR

BOS

EffectiveDiam.

TheoreticalDiam.

Method ShaftNo Correction for

Over-pour Concrete

No Correction forTremie f illing /

volume

Average temperature is related to average radius

20

21

-5

0

5

10

15

20

25

30

35

40

45

50

55

60

-3 -2 -1 0 1 2 3

Dep

th (f

t)

Shaft Radius (ft)Sequoia Abutment 2 Pile C

TIP Projects

RW Harris Test Site • Probe Method, 3 tubes • 48 Inch Diameter • 25 Feet Depth • Concrete Placement – Tremie • Purpose built defects, sandbags installed

Tampa, FL • Instrumented with 4 Thermal Wires • 36 Inch Diameter • 75 Feet Depth • Concrete Placement - Tremie • Temporary Casing Installed to 40ft

Bridge 100722 Pier 3-1L Shaft 1

26

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

90 95 100 105 110 115 120 125 130 135Temperature (deg F)

Dep

th (f

t)

-60

-55

-50

-45

-40

-35

-30

-25

-20

-15

-10

-5

0

5

10

15

Elev

atio

n (ft

)

T1

T2

T3

T4

Avg

TOS

BOS

BOC

Bridge 100722Pier 3-1L Shaft 1

casi

ng

26

27

Bridge 100718 Pier 6-6 Shaft 3 0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

90 95 100 105 110 115 120 125 130 135Temperature (deg F)

Dep

th (f

t)

-60

-55

-50

-45

-40

-35

-30

-25

-20

-15

-10

-5

0

5

10

15

Elev

atio

n (ft

)

T1

T2

T3

T4

Avg

TOS

BOS

BOC

Bridge 100722Pier 3-1L Shaft 1

28 28

Sequoia, CA • Instrumented with 4 Thermal Wires • 37 Inch Diameter • 60 Feet Depth

37 inch diameter shaft 18.5 in. radius, 15 in. cage radius Gradient = 2 inch Per 5.1oF Sequoia Project – soft bottom 15 cu.y installed (13.8 theoretical)

Rock

37 inch shaft

Granular

Casing

8

30

31

Sequoia Project – soft bottom 15 cu.y installed (13.8 theoretical)

Rock Rock

37 inch shaft

Granular

Casing

8

Reporting: Sequoia Results

32

-50

-45

-40

-35

-30

-25

-20

-15

-10

-5

0

50 70 90 110 130

Dept

h (f

t)

Temperature (F)

000

001

003

004

Average

-5

0

5

10

15

20

25

30

35

40

45

50

55

60

-3 -2 -1 0 1 2 3

Dep

th (f

t)

Shaft Radius (ft)Sequoia Abutment 2 Pile C

32

Cleveland Innerbelt Bridge - OH • Instrumented with 6 Thermal Wires • 66 Inch Diameter • 180 Feet Depth • Concrete Placement - Tremie • Temporary Casing Installed to 28ft • Cage Spliced

34

35

4 hours – after end casting

20 trucks 5 hrs to fill

0.8 hr

2.5

hrs

2 hr break

Let’s watch temperature change during 6 day curing …

2 days

66 inch diameter shaft - Cleveland

Extra pumping 2 hr delay

Can assess shaft over a wide range of time

36

6 days 4 days

37

TIP can look outside cage also and estimate the shaft profile

CSL looks only inside the cage

38

TIP can look outside cage also and estimate the shaft profile

Retaining Wall Drilled Shaft - OH • Instrumented with 4 Thermal Wires • 21 Inch Diameter • 36 Feet Depth • Concrete Placement - Free Fall • Temporary Casing Installed to 24ft • Casing extracted using vibro hammer • Observed or Measured:

– Exterior to cage, materials caved in during casing extraction – Interior to cage, 18 inches of water & loose material at toe

(retaining wall – not an issue to contractor)

TIP Results at Peak Temp – 11 Hours

Temporary casing removed with vibratory hammer

Debris fell between cage and inner-wall of shaft –resulting in necking indicated by reduced temperature readings Early Rolloff Indicating Soft-Toe

Weighted tape showed 1.5 ft of water and soft soil at shaft bottom

CSL vs. TIP

Anomaly visible outside of cage

Anomaly not visible

TIP – At Peak Temp.

CSL – Results after 2 days

Anomaly not visible

Anomaly not visible

Soft Toe visible in both methods

?????

Thermal Integrity Profiling

45

• Temperature during curing at cage is related to concrete quality, volume, and cover

• Thermal Integrity Profiler evaluates concrete both inside and outside the cage, assessing both cover and alignment

• Evaluates shaft during curing (as early as 12 hrs)allows construction to progress much earlier

Thanks for your attention

Jim Zammataro Pile Dynamics, Inc.