an integrated gas grid model for upgraded biogas in future ... · 10/3/2016 abid rabbani dh...

15
2 nd International Conference on Smart Energy Systems and 4th Generation District Heating Aalborg, 27-28 September 2016 An integrated gas grid model for upgraded biogas in future renewable energy system Abid Rabbani SDU Life Cycle Engineering University of Southern Denmark

Upload: others

Post on 15-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: An integrated gas grid model for upgraded biogas in future ... · 10/3/2016 Abid Rabbani DH Networks 80 bar pipeline 17 bar pipeline 4 bar pipeline Bio-Methane Potential for Fyn Feedstock

2nd International Conference on Smart Energy Systems and 4th Generation District Heating Aalborg, 27-28 September 2016

An integrated gas grid model for upgraded biogas in future renewable energy system

Abid Rabbani SDU Life Cycle Engineering University of Southern Denmark

Page 2: An integrated gas grid model for upgraded biogas in future ... · 10/3/2016 Abid Rabbani DH Networks 80 bar pipeline 17 bar pipeline 4 bar pipeline Bio-Methane Potential for Fyn Feedstock

Feasibility study on utilizing natural gas grid for upgraded biogas

– Are there any bottlenecks due to flow capacities of the gas

grid?

– Can the low pressure distribution grid be used only for raw

biogas and medium pressure grid for upgraded gas only?

– To what extent can these grids balance the supply and

demand?

– How much raw & upgraded biogas contribute to the

electricity, heat and transport demands?

– How much gas would be exported/ imported? And under

what operating conditions?

Page 3: An integrated gas grid model for upgraded biogas in future ... · 10/3/2016 Abid Rabbani DH Networks 80 bar pipeline 17 bar pipeline 4 bar pipeline Bio-Methane Potential for Fyn Feedstock

The Funen Case

Adequate system size for analyses

Developed natural gas network

Could be replaced entirely by biomethane

Availability of feedstock

Modelling approach: An integrated grid model in “SIFRE” tool Balancing supply and demand for electricity, DH, Industrial process heat & transport sector

03 October 2016 3

Page 4: An integrated gas grid model for upgraded biogas in future ... · 10/3/2016 Abid Rabbani DH Networks 80 bar pipeline 17 bar pipeline 4 bar pipeline Bio-Methane Potential for Fyn Feedstock

Biogas Plants

10/3/2016 Abid Rabbani

DH Networks 80 bar pipeline 17 bar pipeline 4 bar pipeline

Bio-Methane Potential for Fyn

Feedstock Biogas production

(mio Nm3)

Manure 2 PJ 86

With Straw 5,7 PJ 214

No. of plants 10

Estimated size of plant

28 mio Nm3/y

Supply

Page 5: An integrated gas grid model for upgraded biogas in future ... · 10/3/2016 Abid Rabbani DH Networks 80 bar pipeline 17 bar pipeline 4 bar pipeline Bio-Methane Potential for Fyn Feedstock

Funen gas demand

Data from NGF Nature Energy

00,10,20,30,40,50,60,70,80,9

1

Jan

uar

y

Feb

ruar

y

Mar

ch

Ap

ril

May

Jun

e

July

Au

gu

st

Se

pte

mb

er

Oct

ob

er

No

vem

be

r

De

cem

be

r

PJ

Large Consumers Small Consumers

IPH Demand Color graduation: light to dark for % of total energy

Funen gas demand 5,62 PJ

Industrial demand 2,84 PJ

% of total 51%

Convertibility to el. 50-75 %

80 bar pipeline 17 bar pipeline 4 bar pipeline

03 October 2016 5

Page 6: An integrated gas grid model for upgraded biogas in future ... · 10/3/2016 Abid Rabbani DH Networks 80 bar pipeline 17 bar pipeline 4 bar pipeline Bio-Methane Potential for Fyn Feedstock

Compressed Biomethane Refilling stations

Transport Demand

Area CNG

stations

Annual Demand

(PJ)

Peak Load (MW)

West Fyn 2 0,38 36

North Fyn 1 0,19 18

Central Fyn 3 0,58 55

East Fyn 2 0,38 36

Southwest Fyn 3 0,58 55

Southeast Fyn 2 0,38 36

Total 13 2,5

LNG Terminal

Total 1 2,5 158

MR Stations CNG stations DH Networks 80 bar pipeline 17 bar pipeline 4 bar pipeline

03 October 2016 6

Page 7: An integrated gas grid model for upgraded biogas in future ... · 10/3/2016 Abid Rabbani DH Networks 80 bar pipeline 17 bar pipeline 4 bar pipeline Bio-Methane Potential for Fyn Feedstock

MR Stations CNG stations DH Networks 80 bar pipeline 17 bar pipeline 4 bar pipeline

West Fyn

North Fyn

East Fyn

Southwest Fyn

Central Fyn

Southeast Fyn

Total 6 units of supply and Demand

Each unit mainly consisting of 17 & 4 bar gas grid

All units connected to 80 bar transmission line

Different supply and demand characteristics

Localized gas grid of Funen

03 October 2016 7

Page 8: An integrated gas grid model for upgraded biogas in future ... · 10/3/2016 Abid Rabbani DH Networks 80 bar pipeline 17 bar pipeline 4 bar pipeline Bio-Methane Potential for Fyn Feedstock

Decentralized CHPs mode with H2 assisted upgrading

West Fyn

18 MWgas

7 MWe

31 MWgas

(@1 bar)

15 MWgas

43 MWe 2x18 MWgas

Supply units

Low pressure grid 4 bar

Demand units

Compressor

High pressure pipeline 80 bar

Medium pressure grid 17 bar

North Fyn

18 MWgas

7 MWe

31 MWgas

(@1 bar)

12 MWgas

43 MWe 18 MWgas

East Fyn

2x18 MWgas

2x7 MWe

2x31 MWgas

(@1 bar)

9 MWgas

2x43 MWe 2x18 MWgas

Southwest Fyn

2x18 MWgas

2x7 MWe

2x31 MWgas

(@1 bar)

40 MWgas

2x43 MWe 3x18 MWgas

Central Fyn

2x18 MWgas

2x7 MWe

2x31 MWgas

(@1 bar)

34 MWgas

2x43 MWe 3x18 MWgas

Southeast Fyn

2x18 MWgas

2x7 MWe

2x31 MWgas

(@1 bar)

27 MWgas

2x43 MWe 2x18 MWgas

150 MWgas

8 03 October 2016

Page 9: An integrated gas grid model for upgraded biogas in future ... · 10/3/2016 Abid Rabbani DH Networks 80 bar pipeline 17 bar pipeline 4 bar pipeline Bio-Methane Potential for Fyn Feedstock

Local biogas CHPs and 1 Central CHP plant

Supply units

Low pressure grid 4 bar

Demand units

Compressor

High pressure pipeline 80 bar

Medium pressure grid 17 bar

West Fyn

18 MWgas

7 MWe

31 MWgas

(@1 bar)

15 MWgas

2x18 MWgas

North Fyn

18 MWgas

7 MWe

31 MWgas

(@1 bar)

12 MWgas

18 MWgas

East Fyn

2x18 MWgas

2x7 MWe

2x31 MWgas

(@1 bar)

9 MWgas

2x18 MWgas

Southwest Fyn

2x18 MWgas

2x7 MWe

2x31 MWgas

(@1 bar)

40 MWgas

3x18 MWgas

Central Fyn

2x18 MWgas

2x7 MWe

2x31 MWgas

(@1 bar)

34 MWgas

500 MWe 3x18 MWgas

Southeast Fyn

2x18 MWgas

2x7 MWe

2x31 MWgas

(@1 bar)

27 MWgas

2x18 MWgas

150 MWgas

9 03 October 2016

Page 10: An integrated gas grid model for upgraded biogas in future ... · 10/3/2016 Abid Rabbani DH Networks 80 bar pipeline 17 bar pipeline 4 bar pipeline Bio-Methane Potential for Fyn Feedstock

Upgraded biogas

60% biogas upgraded

1% 61%

61%

100%

100%

0

100

200

300

400

500

600

700

800

900

IPH DH EL CNG LNG

GW

h

Share of upgraded gas

Biomethane

Biogas

0

5

10

15

20

25

30

35

40

09-02-2050 09-02-205015:00

10-02-205006:00

10-02-205021:00

11-02-205012:00

12-02-205003:00

12-02-205018:00

Pro

du

ctio

n (

MW

)

CF-BG => CF-CHP-BGCF-BG => CF-IPH-BGCF-BG => CF-UP

CHP

IPH Boiler

Upgrading

53% 47%

CH4 upgrading Biogas H2

Page 11: An integrated gas grid model for upgraded biogas in future ... · 10/3/2016 Abid Rabbani DH Networks 80 bar pipeline 17 bar pipeline 4 bar pipeline Bio-Methane Potential for Fyn Feedstock

• Medium pressure grid in stress during Centralized CHP production

Central Fyn East Fyn North Fyn SEast Fyn SWest Fyn West Fyn

-600

-400

-200

0

200

400

600

800

1000

Central FynEast FynNorth FynSEast FynSWest FynWest FynM

Wh

x10

00

CH4 flows within areas

Decentralized Central CHP

0 10 20 30 40

Compression for LP injection

Compression for MP injection

Compression for HP injection

24%

46%

29%

MWh

Electricity consumption of compressors

• High consumption in MP grid ~ upgraded gas volume

• Different compression levels depending on the upgrading technology

Page 12: An integrated gas grid model for upgraded biogas in future ... · 10/3/2016 Abid Rabbani DH Networks 80 bar pipeline 17 bar pipeline 4 bar pipeline Bio-Methane Potential for Fyn Feedstock

03 October 2016 12

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0,0

1,0

2,0

3,0

4,0

5,0

6,0

7,0

8,0

0,0 5,0 10,0 15,0 20,0 25,0

Tota

l pre

ssu

re lo

ss

Min

imu

m P

ipel

ine

Pre

ssu

re (

bar

)

Gas demand (MW)

Maximum Biogas Capacity in low-pressure grid

Junction Pressure (P1) Bar Pressure at outlet (P2) Bar Total pressure loss (DP) %

33 MW Biomethane

(18 MW)

Pipeline characteristics

Material: PE Plastic

Diameter: 107 mm

Friction factor: 0,01

Length: 1 km

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0,00

10,00

20,00

30,00

40,00

50,00

60,00

0 200 400 600 800 1000 1200 1400

Tota

l pre

ssu

re lo

ss

Min

imu

m P

ress

ure

(b

ar)

Gas demand (MW)

Minimum Biomethane pressures Junction Pressure (P1) Bar Pressure at outlet (P2) Bar Total pressure loss (DP) %

Pipeline characteristics

Material: Steel

Diameter: 312 mm

Friction factor: 0,015

Length: 20 km

(500 MW) CHP

Page 13: An integrated gas grid model for upgraded biogas in future ... · 10/3/2016 Abid Rabbani DH Networks 80 bar pipeline 17 bar pipeline 4 bar pipeline Bio-Methane Potential for Fyn Feedstock

0

500

1000

1500

2000

2500

3000

3500

4000

IPH DH EL CNG LNG

100% 21% 24% 100% 100%

MW

h x

100

0

Energy in different sectors

Production

Demand

52% 30%

3% 15%

Primary Energy Supply

Biogas Electricity Compression Imported Gas

• Biomethane grid fully catering to Transport sector

• Though gas import is 15% in volume, import actually occurs 38% of time

Page 14: An integrated gas grid model for upgraded biogas in future ... · 10/3/2016 Abid Rabbani DH Networks 80 bar pipeline 17 bar pipeline 4 bar pipeline Bio-Methane Potential for Fyn Feedstock

Concluding remarks

The system is capable of balancing the supply & demand majority of the time

60% of biogas is upgraded to biomethane

More strain is observed on MP biomethane grid

Improvements through: – Optimization of the storages to increase flexibility

of upgrading

&

– Operational strategies for compressors to minimize gas imports

Page 15: An integrated gas grid model for upgraded biogas in future ... · 10/3/2016 Abid Rabbani DH Networks 80 bar pipeline 17 bar pipeline 4 bar pipeline Bio-Methane Potential for Fyn Feedstock

2nd International Conference on Smart Energy Systems and

4th Generation District Heating, Aalborg, 27-28 September 2016

Thank you