Analysis and design of prestressed concrete box girder bridgePosted in Prestress Engineering, Project Reports, Research Papers | Email This Post |
By Miss.P.R. Bhivgade
Abstract:– Bridge construction today has achieved a worldwide level of importance. Bridges are the key elements in any road network Use of boxgirder is gaining popularity in bridge engineering fraternity because of its better stability, serviceability, economy, aesthetic appearance and structuralefficiency. The structural behavior of box girder is complicated, which is difficult to analyze in its actual conditions by conventional methods. In presentstudy a two lane simply supported Box Girder Bridge made up of prestressed concrete which is analysis for moving loads as per Indian Road Congress(IRC:6) recommendations, Prestressed Code (IS: 1343) and also as per IRC: 18 specifications. The analyzed of box girder using SAP 2000 14 BridgeWizard and prestressed with parabolic tendons in which utilize full section. The various span/ depth ratio considered to get the proportioning depth atwhich stresses criteria and deflection criteria get satisfied.
Keywords: Concrete Box Girder Bridge, Prestress Force, Eccentricity, Prestress Losses, Reinforcement, Flexure strength, shear strength, SAP Model.
I. INTRODUCTION Prestress concrete is ideally suited for the construction of medium and long span bridges. Ever since the development of prestressed concrete byFreyssinet in the early 1930s, the material has found extensive application in the construction of longspan bridges, gradually replacing steel which needscostly maintenance due to the inherent disadvantage of corrosion under aggressive environment conditions. One of the most commonly used forms ofsuperstructure in concrete bridges is precast girders with castinsitu slab. This type of superstructure is generally used for spans between 20 to 40 m. Tor Igirder bridges are the most common example under this category and are very popular because of their simple geometry, low fabrication cost, easyerection or casting and smaller dead loads. In this paper study the India Road Loading considered for design of bridges, also factor which are importantto decide the preliminary sizes of concrete box girders. Also considered the IRC:182000 for “Prestressed Concrete Road Bridges” and “Code of Practicefor Prestressed Concrete ” Indian Standard. Analyze the Concrete Box Girder Road Bridges for various spans, various depth and check the proportioningdepth.
II. FORMULATIONA. Loading on Box Girder Bridge The various type of loads, forces and stresses to be considered in the analysis and design of the various components of the bridge are given in IRC6:2000(Section II. But the common forces are considered to design the model are as follows:
Dead Load(DL): The dead load carried by the girder or the member consists of its own weight and the portions of the weight of the superstructure andany fixed loads supported by the member. The dead load can be estimated fairly accurately during design and can be controlled during construction andservice.
Superimposed Dead Load (SIDL): The weight of superimposed dead load includes footpaths, earthfills, wearing course, stayin place forms, ballast,waterproofing, signs, architectural ornamentation, pipes, conduits, cables and any other immovable appurtenances installed on the structure.
Live Load(LL): Live loads are those caused by vehicles which pass over the bridge and are transient in nature. These loads cannot be estimated precisely,and the designer has very little control over them once the bridge is opened to traffic. However, hypothetical loadings which are reasonably realistic needto be evolved and specified to serve as design criteria. There are four types of standard loadings for which road bridges are designed. i. IRC Class 70R loading ii. IRC Class AA loading iii. IRC Class A loading iv. IRC Class B loading
The model is design by considering IRC Class A loading, which is normally adopted on all roads on which permanent bridges and culverts areconstructed. Total load is 554, the Fig.1 show the complete details of Class A.
Other information regarding Live load combination as per IRC:6 2000 Clause No.207.1 Note No.4
B. Thickness of Web The thickness of the web shall not be less than d/36 plus twice the clear cover to the reinforcement plus diameter of the duct hole where‘d’ is the overalldepth of the box girder measured from the top of the deck slab to the bottom of the soffit or 200 mm plus the diameter of duct holes, whichever isgreater.
C. Thickness of Bottom Flange The thickness of the bottom flange of box girder shall be not less than 1/20th of the clear web spacing at the junction with bottom flange or 200 mmwhichever is more.
D. Thickness of Top Flange The minimum thickness of the deck slab including that at cantilever tips be 200 mm. For top and bottom flange having prestressing cables, the thicknessof such flange shall not be less than 150 mm plus diameter of duct hole.
E. Losses in Prestress While assessing the stresses in concrete and steel during tensioning operations and later in service, due regard shall be paid to all losses and variations instress resulting from creep of concrete, shrinkage of concrete, relaxation of steel, the shortening (elastic deformation) of concrete at transfer, and frictionand slip of anchorage.
In computing the losses in prestress when untensioned reinforcement is present, the effect of the tensile stresses developed by the untensionedreinforcement due to shrinkage and creep shall be considered.
F. Calculation of Ultimate Strength Ultimate moment resistance of sections, under these two alternative conditions of failure shall be calculated by the following formulae and the smaller ofthe two values shall be taken as the ultimate moment of resistance for design:
i. Failure by yield of steel (underreinforced section) Mult = 0.9dbAsFp Where, As = the area of high tensile steel Fp = the ultimate tensile strength for steel without definite yield point or yield stress or stress at 4 per centelongation whichever is higher for steel with adefinite yield point. db = the depth of the beam from the maximum compression edge to the centre of gravity of the steel tendons.
ii. Failure by crushing concrete Mult = 0.176 bdb2fck Where, b = the width of rectangular section or web of beam fck= characteristics strength of concrete
G. Calculation of Section un cracked in flexure
b = width in the case of rectangular member and width of the rib in the case of T, I and L beams d = overall depth of the member fcp = compressive stress at centroidal axis due to prestress taken as positive.
III. ANALYSIS AND DESIGN OF POSTTENSIONED DECK TYPE BOXGIRDER BRIDGE A post tensioned deck type Box – Girder Bridges of clear span 30m and width of roadway is 7.5m. Assume Live Load as per IRC: 62000 vehicle is passing over deck given in chapter 4 and
table no. 4.2. The Bridge analysis for different L/d ratio starting from 15 to 20 and different L/d ratio considered are as follows:
Case 1 L/d= 19, d = 1.6 Case 2 L/d =18, d = 1.7 Case3 L/d = 17, d = 1.8 Case4 L/d= 16, d= 1.9 Case5 L/d= 15, d=2.0
Preliminary data Clear span = 30m Width of roadway = 7.5 m Overhang from face of girder = 1.2m Deck thickness = 0.2 m Bottom slab thickness = 0.2 m Girder thickness = 0.3 m
The tendon profile is considered as parabolic in nature. As per IRC:182000 fck= 50 Mpa, fci = 0.8fck = 40 Mpa, fct = 0.5fci = 20 Mpa, fcw = 0.33fck = 16.5 Mpa ft = 1/10fct = 2.0 Mpa, ftw = 0
As per IS:13431980 Ec = 5700fck1/2 = 40.30 kN/m2 fp = 1862 Mpa, n = 0.85, E = 2×105 Mpa
Validation of Resuts The bending moment, shear force and deflection result obtained by SAP 2000. The bending moment and shear force are calculated by consideringdifferent loading condition such as dead load, live load and superimposed load. Same as deflection calculated. This results are the Case:1.
Table.1 Deflection
Load Case DL +SIDL
LiveLoad
PrestressingForce
Deflection (atmidspan) 30.8 mm 25.2
mm
14.36 mm
Table.2 Bending Moment(t.m)
Span(m) 0.0L 0.1L 0.2L 0.3L 0.4L 0.5L
DL 0.00 353.56 628.56 824.98 942.84 982.12
LL 0.00 218.76 381.63 494.10 564.85 587.82
SIDL 0.00 53.46 95.04 124.74 142.56 148.50
Total 0.00 625.78 1105.231443.821650.261718.45
Table.3 Shear Force (t)
Span(m) 0.0L 0.1L 0.2L 0.3L 0.4L 0.5L
DL 130.9 104.7 78.57 52.4 26.3 0.0
LL 32.92 23.29 14.27 7.42 2.62 0.0
SIDL 19.80 15.84 11.88 7.92 3.90 0.0
Total 183.6 143.9 104.7 67.7 32.8 0.0
Table.4 Calculation of Prestress Force
Table.5 Calculation of Eccentricity
Eccentricity(mm)
PrestressingForce (kN)
The eccentricitywhich giveminimum
prestressing force(e) = 731mm440 21617.96
548 19380.69
650 17655.06
731 16489.15
Table.6 Calculation of Prestress Losses (As per IS:13431980)
Span
(m)^S ^C ^E ^A ^F ^R Total n
0.0L
8E05
0.0 0.0 0.0 0.0 90 90 0.95
0.1L 2.6 2.3 78 9.7 90 182.6 0.9
0.2L 2.6 2.4 39 22 90 155.8 0.91
0.3L 2.6 2.4 26 36.7 90 157.7 0.91
0.4L 2.7 2.5 20 54.3 90 169.0 0.9
0.5L 9.1 8.3 16 171 90 294.0 0.85
Where, ^S = Shrinkage ^C= Creep ^E = Shortening of concrete ^A = Slip in anchorage ^F = Friction ^R = Relaxation n= Efficiency After Losses, effective Prestressing Force (P) = P (1Losses) = 14011.51 kN
Table.7 Calculation of Stresses at top and bottom fibre
Span(m)
At Transfer At Service Load
TopFibre
Bottomfibre
Topfibre
BottomFibre
0.0L 4.16 4.16 4.16 4.16
0.1L 2.98 5.48 6.35 0.00
0.2L 1.91 6.67 8.37 0.00
0.3L 2.112 6.44 7.46 0.00
0.4L 2.24 6.29 6.88 0.00
0.5L 3.00 6.24 6.42 0.00
Compressive Stress at Transfer = 6.66 < 0.5 fcj = 20 mpa Service = 8.367 < 0.33 fck = 16.5 mpa
Tensile stress at Initial Stage = 2.979 < 3mpa
(As per IS:1343 – 1980) Working Stage = No tensile stress
Table.8 Calculation of Ultimate Flexure Strength
Span(m)
Ultimate MomentMu = (1.5DL +2.5
LL) (kN.m)
Failure byyielding of
steel(kN.m)
Failure bycrushing
ofconcrete(kN.m)
0.0L 0.00
340578.53 5970560
0.1L 11574.43
0.2L 20394.85
0.3L 26598.28
0.4L 30402.45
0.5L 31654.88
Table.9 Calculation of Ultimate Shear strength
Span(m)
UltimateMomentVu =(1.5DL+2.5 LL)(kN.m)
ShearcapacityVcw(kN)
BalanceShear(kN)
Spacing(mm)
0.0L 3084.27 363.85 2720.43 55
0.1L 2391.35 419.97 1971.38 75
0.2L 1713.50 432.54 1280.96 100
0.3L 1089.90 470.56 619.34 200
0.4L 517.85 492.95 24.90 300
0.5L 0.00 0.00 0.00 0
Design of Reinforcement in Box Girder Bridge P =14011.51 kN, d = 1350 mm, bw = 200 mm Assume 150 mm wide and 150 mm deep distribution plate, located concentrically at centre. ypo /y0 = 75/150 = 0.5 , As per IRC:182000, From table value of Fbst/ Pk = 0.17 and Fbst = 452.753 kN Using 12 mm diameter links, area of steel links are, Ast = 1254 mm/2 Providing 24 bars of 12 mm dia, 750mm also bar of 12 mm dia @ 110 mm c/c horizontally to form mesh.
Side Face Reinforcement As per clause 18.6.3.3 of IS:13431980 Ast = 0.05 x 1350 x 300/100 = 202.5 mm/2 Provide 6 – 12 mm dia on each face of web
Design of Deck Slab Using M30 grade concrete and Fe415 Total moment due to DL+SIDL+LL = 1427.0 kN.m Depth required = 150.4 < 250 mm
Main Reinforcement Ast = 3192.6824 mm/2 Providing 16mmØ bars dia 100 mm c/c Design of Transverse Reinforcement M = 0.3ML + 0.2(MDL + MSIDL) M = 324 kN.m Ast = 724.74 mm/2 Providing 12 mm dia bars @ 160 mm c/c
IV. COMPARSION OF RESULT FOR VARIOUS SPAN/ DEPTH RATIO The comparison of prestress force, deflection and stresses values are obtained for various span/depth ratio ( table no. 10 & 11) for box girder bridge. Thevalues are calculated as per IS:13431980.
Table.10 Comparison of Deflection for various span/depth ratio.
Span/DepthPrestressForce(kN)
Eccentricity(mm)
Deflection
DLPrestressForce
DL +LL–
PrestressForce
1.6 16.48 731 11.2 36.4
1.7 15.66 777 11.4 33.6
1.8 14.83 829 9 30
1.9 14.02 886 6.6 26.6
2.0 13.20 950 5.6 25.3
Note: All dimension in tonnes and mm. • Permissible (DLPrestress Force) = 12 mm • Permissible (DLLLPrestress Force)= 85.7 mm
Table.11 Comparison of stress for various span/depth ratio
Span/
Depth
PrestressForce
(tonne)
Eccen
Tricity
(mm)
Stress at mid span(N/mm2)
At Transfer AtWorking
Top Bottom Top
1.6 16.48 731 3.0 4.1 6.74
1.7 15.66 777 2.8 3.8 6.33
1.8 14.83 829 2.6 3.6 5.91
1.9 14.02 886 2.4 3.4 5.48
2.0 13.20 950 2.2 3.2 5.08
Note: Stress at mid span at working bottom = 0
V. CONCLUSION This paper gives basic principles for portioning of concrete box girder to help designer to start with project. Box girder shows better resistance to thetorsion of superstructure. The various trail of L/d ratio are carried out for Box Girder Bridges, deflection and stress criteria satisfied the well withinpermissible limits. As the depth increases, the prestressing force decreases and the no. of cables decrease. Because of prestressing the more strength ofconcrete is utilized and also well governs serviceability.
VI. REFERENCES 1. IRC: 18 – 2000 “ DESIGN CRITERIA FOR PRESTRESSED CONCRETE ROAD BRIDGES (POST – TENSIONED CONCRETE)” THE INDIANROADS CONGRESS. 2. IRC: 6 2000 “STANDARD SPECIFICATIONS AND CODE OF PRACTICE FOR ROAD BRIDGES”THE ROAD CONGRESS. 3. IS: 1343 – 1980 “ CODE OF PRACTICE FOR PRESTRESSED CONCRETE” INDIAN STANDARD. 4. Andre Picard and Bruno Massicotte, Member “SERVICEABILITY DESIGN OF PRESTRESSED CONCRETE BRIDGES” JOURNAL OF BRIDGEENGINEERING / FEBRUARY 1999 5. Ferhat Akgul and Dan M. Frangopol “Lifetime Performance Analysis of Existing Prestressed Concrete Bridge Superstructures” JOURNAL OFSTRUCTURAL ENGINEERING © ASCE / DECEMBER 2004 6. James H. Loper,1 Eugene L. Marquis,2 Members and Edward J. Rhomberg Fellow. “PRECAST PRESTRESSED LONGSPAN BRIDGES”JOURNAL OF STRUCTURAL ENGINEERING © ASCE 7. John R. Fowler, P.Eng, Bob Stofko, P.Eng. “Precast Options for Bridge Superstructure Design” Economical and Social Linkages Session of the 2007Annual Conference of the Transportation Association of Canada Saskatoon, Saskatchewan. 8. Krishna Raju “DESIGN OF BRIDGES” OXFORD & IBH PUBLISHING CO. PVT. LTD. 9. Prof. Dr.Ing. G. Rombach “Concepts for prestressed concrete bridges Segmental box girder bridges with external prestressing” Technical University,HamburgHarburg, Germany. 10. Tushar V. Ugale, Bhavesh A. Patel and H. V. Mojidra (2006).
We at engineeringcivil.com are thankful to Er. Priyanka Bhivgade for submitting her research on “Analysis and design of prestressed concrete boxgirder bridge” to us. We are hopeful that this will be of great use to all civil engineers who are willing to understand the design of prestressed concretebox girder.
More Entries :
How do engineer determine the number of cells for concrete box girder bridges?
Which type of multiplecell box girder is better, cells connected by top flanges or cells connected both by top and bottom flanges?Why does the presence of tension reinforcement lead to increasing deflection in concrete structures?What are the functions of different reinforcement in a typical pile cap?Plate Girder In BuildingsWhat are the limitations of grillage analysis?What is the effect of shear lag in a typical boxgirder bridge?In the construction of a twospan bridge (span length = L) by using spanbyspan construction, why is a length of about 1.25L bridge segment isconstructed in the first phase of construction?
Comments
Hameed Ajmal Sheikh May 7, 2013 at 12:47 am
It is very useful information for design engineers especially Bridge Design engineer.I shall be thankful if you could send me the Excel sheets forthis design as I intend to use it in near future.Thanks and regards Engr. Hameed A Sheikh
Reply Link QuoteYoseph Asrat July 9, 2013 at 5:19 am
I got more information from the documents about bridge design.If u send me more other information about bridge design or other relateddocuments I develop my knowledge for the future. Thanks for your cooperation.
Eng. Yoseph Asrat.
Reply Link QuoteSharma RL September 6, 2013 at 11:10 am
I find it very interesting and knowledgeable. Kindly send more information,Excel sheets and other relevant details Thanks Sharma RL
Reply Link QuoteSHOAIB AHMED December 10, 2014 at 8:48 pm
It is very useful information for design engineers especially Bridge Design engineer.I shall be thankful if you could send me the Excel sheets forthis design as I intend to use it in near future.Thanks and regards Engr. SHOAIB AHMED
Reply Link QuoteMd.Nurul Amin February 24, 2015 at 11:56 am
It is very useful information for design engineers especially Bridge Design engineer.It will be more helpful if the the Excel sheets for this design isattached.With thanks and regards Engr. Md.Nurul Amin
Reply Link QuotePost a comment
Name Email Website
Post your comment
Share InformationSubmit Content Ask An Expert
What is Civil Engineering
Civil Engineering HomeCivil Engineering DisciplinesCivil Engineering History
Journals Books & Softwares
Free Civil Engineering Magazines and White PapersCivil Engineering BooksCivil Engineering JournalsCivil Engineering Softwares
Civil Engineering Branches
BuildingBridge EngineeringConcrete EngineeringHighway EngineeringHydraulicsMarine EngineeringPiles EngineeringPrestress EngineeringSoil EngineeringSteelworksSurveyingTimber Engineering
Civil Engineering Jobs
Civil Engineering Jobs
Knowledge Center
Construction EquipmentsCivil Engineering DisastersCivil Engineering EventsCivil Engineering FactsCivil Engineering InformationCivil Engineering Notes From UniversitiesCivil Engineering PresentationsCivil Engineering QuotesCivil Engineering VideosCivil Engineering WondersConstruction TermsFamous Civil EngineersInterviewsMaterial and Site TestingMeasurement UnitsMix DesignProject ReportsResearch PapersStudent CornerHelp Others
Civil Engineering Universities/Events
Civil Engineering UniversitiesCivil Engineering 2016Aakaar 2015 , IIT BombayAll Civil Engineering EventsAdvertise Your Event Here
Gallery Civil Engineering Pictures
BridgesCivil Engineers And WorkersConstruction EquipmentsConstruction SiteRoads And HighwaysSkyscrapers
Search Search
Civil Engineering Forum
Award
Top Contributors
You can list yourself here by submitting civil engineering related topics to us.Er. VikrantEr. Raj M. KhanSreenivasa Hassan JayaramRamasesh IyerEr. Kaushal KishoreVincent T. H. CHU
Yahoo Group Civil Engineering Portal
Subscribe to EngineeringCivil.com Enter email address
Powered by groups.yahoo.com
Recently Added
Civil Engineering 2016Aquifer Characteristics in UYO MetropolisCONCRETE QUALITY CONTROL DURING CONSTRUCTIONDesign of Steel Truss by StaddproAnalysis of Steel Truss in Stadd ProContributing Factors for the Successful Project Management in the Construction IndustryConcrete Strength Acceptance Criteria IRC:152011Analysis of beam using Stadd ProAnalysis of portal frame by Stadd ProAnalysis of frame structure by Stadd Pro
Civil Engineering Links
Gemini GeekThe BiggerCivil Engr. Software DatabaseImpressive BuildingsCivil Engineering Links
About Us | Contact Us | Disclaimer | Copyright Policy | Privacy Policy | Media | Testimonials
All Rights Reserved:20072015 |