analysts, fund managers

42
Analysts, Fund Managers & Investors’ Briefing (as at 12 December 2019) Listed on Bursa Malaysia on 8th August 2003. Protasco 5070 (Construction), A diversified group specialising in Engineering & Infrastructure

Upload: others

Post on 30-Jan-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Analysts, Fund Managers

Analysts,

Fund Managers &

Investors’ Briefing

(as at 12 December 2019)

Listed on Bursa Malaysia on 8th August 2003.

Protasco 5070 (Construction), A diversified group

specialising in Engineering & Infrastructure

Page 2: Analysts, Fund Managers

CLEAN ENERGY

Ikram Greentech

Sdn Bhd (100%)

I2 Energy Sdn Bhd

(51%)

I2 Solarpark One

Sdn Bhd (44%)

CONSTRUCTION MAINTENANCE PROPERTY

DEVELOPMENT

ENGINEERING &

CONSULTANCY

SERVICES

EDUCATION TRADING &

MANUFACTURING

HCM Engineering

Sdn Bhd (100%)

Roadcare (M)

Sdn Bhd (51%)

Protasco

Development Sdn

Bhd (100%)

Kumpulan Ikram

Sdn Bhd (100%)

Infrastructure

University

Kuala Lumpur

(100%)

Protasco Trading

Sdn Bhd (100%)

KPS-HCM Sdn

Bhd (49%)

DAL HCM Sdn

Bhd (Sarawak)

(30%)

(Managed by Ikram

Education Sdn Bhd)

Empayar Indera

Sdn Bhd (51%)

HCM Kijang Sdn

Bhd (60%)

Permint Granite –

HCM Sdn Bhd

(70%)

PJP Barisan HCM

JV Sdn Bhd

(30%)

^ % Equity owned by

Protasco Bhd

Page 3: Analysts, Fund Managers

CONSTRUCTION

Page 4: Analysts, Fund Managers

CONSTRUCTION

ROADS & BRIDGES

PREMIX OVERLAYING

PAVEMENT RECYCLING

PAVEMENT

RECYCLING

WORKS

PPA – PUTRAJAYA PHASE 1

BUILDINGS

ROAD CONSTRUCTION

FLYOVER CONSTRUCTION

Page 5: Analysts, Fund Managers

CONSTRUCTION -

OUTSTANDING ORDER BOOK

CONSTRUCTION PROJECTS RM Million RM Million*

Building Projects:

PPA Putrajaya (Precinct 16), Phase 2 (Total: RM301 m) 61

PPA Putrajaya (Precint 19), Phase 4 (Total: RM443 m/RM434 m) - awarded on 21 Dec 2017 434

Sub- Total 495

Road & Bridge Projects :

Road construction in Sibu & Bintulu, Sarawak (Total: RM77 m) 14

Infrastructure Works for Development of Pulau Indah Industrial Park, Phase 3C (Total: RM174

m/RM86m) –awarded in Jun 2017 4

Sub-Total 18

Total 513

* As at 30/9/2019

Page 6: Analysts, Fund Managers

MAINTENANCE

Page 7: Analysts, Fund Managers

ROAD MAINTENANCE WORKS

ROUTINE

MAINTENANCE

Maintenance of

Drainages

Maintenance of

Road Signages

Bridge

Maintenance

Grass Cutting

Maintenance of

Road Shoulder

“Pothole”

Patching

PERIODIC

MAINTENANCE

Premix overlaying

Milling of worn

course

Reconstruction

work

Pavement

recycling work

EMERGENCY

MAINTENANCE

Clearing of

landslide

Clearing of fallen

tree

Traffic

management due

to collapsed

bridge

Remedial work at

soil settlement

spot

Warning of water

level rising

Slope repair and

protection

Replacement of

road signages

Page 8: Analysts, Fund Managers

FEDERAL, STATE & RURAL ROADS MAINTENANCE

Roadcare (M) Sdn Bhd

Kelantan

Terengganu

Pahang

Selangor

Total Road Length :

7,263km

DAL HCM Sdn

Bhd

Kuching to Lawas

Total Road

Length : 751km

HCM Kijang Sdn

Bhd

Kelantan State

Roads

Total Road Length

: Approximately

2,000 km

Empayar Indera

Sdn Bhd

Perak State Roads

Total Road Length

: 1959 km

MAINTAINING

>10,000km FEDERAL & STATE ROADS

>15,000km RURAL ROADS

Empayar Indera

Sdn Bhd

Perak Agriculture

Roads

Total Road Length

: 13,084 km

Permint Granite -

HCM

Terengganu Rural

Roads

Total Road Length

: Approximately

2,500 km

PJP Barisan HCM

JV Sdn Bhd

Sarawak State Road

– Mukah Division

Total Road Length :

820 km

Page 9: Analysts, Fund Managers

A 10-year FRM concession of 7,263km

commencing from February 2016

• 51% equity

• Routine maintenance – recurring RM130

million per annum.

• Periodic maintenance and emergency works

– based on actual work carried out (estimated to

be RM100 – RM120 million per annum).

• Covering the states of Selangor, Pahang,

Kelantan and Terengganu.

This concession expires in February

2026

CONCESSIONS Federal Road Maintenance (FRM)

Renewal: A 10-year FRM concession of

751km commencing from September 2018

• DAL HCM JV

• Routine maintenance – recurring RM24 million

per annum.

• Periodic maintenance and emergency works

– approximately RM55 million per annum

• Covering federal roads from Kuching to Lawas

in Sarawak

This concession expires in August 2028

Page 10: Analysts, Fund Managers

1. Contract Extension. A 5+2 years contract for 1,959 km, State Road Maintenance for

the State of Perak.

Awarded by Perak State Government

Contract sum: : RM126.1 million for 2 years or approximately RM315 million for 5

years subject to review every 2 years during contract period

Date of commencement Jan 2020 & expires in Dec. 2024 + 2.

Empayar Indera Sdn Bhd (51% equity)

2. Contract Extension. A 5+2 years contract for 13,084 km, Agriculture Road

Maintenance for the State of Perak.

Awarded by Perak State Government

Contract sum: RM90.1 million for 2 years or approximately RM225 million for 5 years

subject to review every 2 years during contract period

Date of commencement March 2019 & expires in Feb. 2024 + 2.

Empayar Indera Sdn Bhd (51% equity)

LONG TERM CONTRACTS – State/Agriculture Roads

Page 11: Analysts, Fund Managers

3. A 10-year contract of State Road Maintenance for the State of Kelantan.

Awarded by Kijang Kuari Sdn Bhd/ JKR Kelantan

Contract Sum: RM25.7 million for 2 years or 129 million for 10 years (contract

sum is reviewed every 2 years)

HCM Kijang Sdn Bhd (60% Equity)

This LTC expires in August 2026

4. A 5-year contract of Rural Road Maintenance for the State of Terengganu.

Awarded by JKR Terengganu

Contract Sum: RM49.9 million for 5 years

Permint Granite-HCM Sdn Bhd (70% Equity)

This LTC expires in April 2022

LONG TERM CONTRACTS – State/Rural Roads

Page 12: Analysts, Fund Managers

5. A 10-year contract of State Road Management & Maintenance for the State

of Sarawak – Package 3, Mukah Division (about 820 km)

Awarded by Jabatan Kerja Raya, Sarawak

Contract Sum: approximately RM24.6 million per annum. The contract rates are

subject to review every 3 years with a maximum increase of 7.2% per revision.

PJP Barisan HCM JV Sdn Bhd (30% Equity)

Date of commencement from 1 January 2020 to 31 December 2029.

LONG TERM CONTRACTS – State/Rural Roads

Page 13: Analysts, Fund Managers

EVELOPMENT

ROPERTY

P

D

Page 14: Analysts, Fund Managers

Artist’s impression for

illustration purposes only

• Est. Gross Dev. Value :

RM10.0 Billion (based on

current market price)

Project Duration : 20 – 25

Years

Land Area : 100 Acres

Mix Development comprising:

- High Rise Apartments

- Shop Offices

- SOHO

- Convention Centre

- Hotel

- Office Suites

- Retail Lots

- Hypermart / Cineplex

DE CENTRUM CITY

Page 15: Analysts, Fund Managers

3

2

2 – Phase 2A Unipark GDV RM220 Million. Completed in July 2017

4 – De Centrum Phase 3A & 3B Estimated GDV RM550 Million Unit size about 450-650 sf Price Range: 260K – 397K Expected Launching 2H2018

DE CENTRUM CITY MASTER PLAN

1 – De Centrum Phase 1 GDV RM280 Milllion. Completed in Dec 2015

1

4

De Centrum

Mall

Hotel

5 Star

Hotel Office

Signature Tower

+ Retail

Signature Tower

+ Retail

Convention Centre

Retail

Entertainment

Unipark Condo

Luxury Villas

& Suites

Signature Tower

+ Retail

Signature Tower

+ Retail Luxury Condominium

Wisma Protasco

+ Retail

Mosque Ser. Apt

Ser. Apt

Office B

A C

D

Infrastructure University

Kuala Lumpur (IUKL)

3 – De Centrum Phase 2B GDV RM350 Milllion.

Lifestyle Studio

3A

3B

Page 16: Analysts, Fund Managers

Types Units % Sold

Apartments 320

100% SOHO 192

Shop Lots 54

Retail Mall 1 Retained

Selling Price: RM500/ sq. ft. (average)

PERSPECTIVE

De Centrum Phase 1

GDV : RM280 Million Completion in Dec.

2015

Shops at the Mall – Super7 Supermarket, KFC,

Pizza Hut, Watsons, Penang Nasi Kandar,

Middle East Restaurants, 7-11, TM Dealer,

Bookstore, Singlock Locksmith, 1957 Malaysia

Coffee, F&B Kiosks, Money Changer, Mr DIY,

Electronics Store, etc.

Best Mixed Development

Award 2015

By Property Insight

SUCCESSFULLY COMPLETED PHASE 1

Page 17: Analysts, Fund Managers

Block D – Fully Sold

Block C - 83% Sold

Phase 2A Unipark 240 units apartments

80 units duplex

GDV : RM220 Million.

Selling Price: RM450/sq.ft.

Completed (CCC Obtained)

SUCCESSFULLY COMPLETED PHASE 2A

Page 18: Analysts, Fund Managers

GDV : RM372 Million.

Land size 137 acres

Development period 7 to 12 years

Proposed development – Landed Properties

(703 units terraced houses, 32 units semi-D, 71 units bungalow

3 homestead units and a commercial lot)

Expected launching: 1H2020

JOINT DEVELOPMENT

AGREEMENT, TAMPIN LAND Between De Centrum Retail Sdn Bhd & Penmaland

Sdn Bhd

Page 19: Analysts, Fund Managers

GDV : RM350 Million.

De Centrum Phase 2B - Luxury Villas & Suites

Selling Price: RM610/sq. ft.

504 Suites & 13 Luxury Villas

Preview in November 2015

Official launching to be decided

based on market conditions

De Centrum Phase 2B (Rimbawan)

Luxury Villas & Suites

Best Boutique Lifestyle Development

Award 2016

By Property Insight

YET TO BE LAUNCHED

Page 20: Analysts, Fund Managers

GDV : RM63 Million.

Selling Price: RM350- RM450/sq.ft

Unit size range:2,460 – 5,054sf (66 units)

Land size: 6 Acres

Soft Launch in Sept. 2018

Sentrio (2 to 3-Storey Shop Office)

Pasir Gudang, Johor

Page 21: Analysts, Fund Managers

GDV : RM160 Million.

Selling Price: RM433/sq.ft - 525/sq. ft.

Unit size ranging from 460sf – 850sf (568 units),

15 units of Retail Lots

Land size: 1.85 Acres

Soft Launch: Sept. 2018

TELIPOT Apartment

Kota Bharu, Kelantan ~JV with Pekan Bistari (60:40)

Page 22: Analysts, Fund Managers

De Centrum Phase 3A & 3B

-Lifestyle Suites

GDV : RM550 Million

1,600 units suites

Unit Size: 550 – 650 sf

Selling Price: RM580-610/sq.ft.

Land size: 6.9 acres

Tentative Launching 2H2020

Page 23: Analysts, Fund Managers

LAND BANKS LAND SIZE

De Centrum City, Kajang 79 acres

Pasir Gudang, Johor 14.5 acres

Sandakan, Sabah 6.7 acres

Total 100.2 acres

PROPERTY DEVELOPMENT – LAND BANKS

Page 24: Analysts, Fund Managers

ONSULTANCY

&

ERVICES

NGINEERING

E

C

S

Page 25: Analysts, Fund Managers

Engineering Services &

Consultancy

• Site Investigations

• Laboratory Testing

• Slope Studies

• Pavement Evaluation & Data

Collection

• Geotechnical & Structural

• Forensic Engineering

• Design Works

• Materials Certification

• Product Listing

• Research & Development

• Quality Control & Assurance.

Page 26: Analysts, Fund Managers

1. Engineering Services & Capacity Building Kumpulan Ikram Sdn Bhd & Datuk Bandar Kuala Lumpur

Agreement period: 3+2 years (November 2017 – November 2020)

Scope of work : Engineering Services & Capacity Building (Geotechnical, Pavement & Structural Services)

Contract Value : RM10 million per annum (subject to actual consumption)

2. Engineering Services & Capacity Building Kumpulan Ikram Sdn Bhd & Tenaga Nasional Berhad (TNB)

Agreement period: Yearly renewal of contract

Scope of work : Engineering Services & Capacity Building (Geotechnical, Pavement & Structural Services)

Contract Value : RM10 million per annum (subject to actual consumption)

Engineering and Capacity Building Agreement with

DBKL & TNB

Page 27: Analysts, Fund Managers

27

Road Scanner (with laser technology and GPS)

PAVEMENT EVALUATION

Asphalt Coring Compressive Strength Test

Long Term Pavement Condition Assessment & Consultancy Services with

i) Toll road concessionaires i.e. ANIH, MRCB, Ranhill, SKVE, SILK, IJM and Prolintas

ii)JKR, LLM, Federal & State road concessionaires (Roadcare, FRM Sarawak, Empayar Indera)

Agreement period : Period up to 5 years (2016 – 2021)

Scope of work for Pavement data collection & evaluation, road inventory data collection, road asset management system and consultancy.

Total Contract Value : RM 5.0 – 7.0 million annually

Page 28: Analysts, Fund Managers

SLOPE FAILURE AT BUKIT NANAS, KL IKRAM ENGINEERING - Design & Build

Page 29: Analysts, Fund Managers

STRUCTURAL CONSULTANCY, AUDIT & LAB TEST

IKRAM ENGINEERING

Stadium Sultan Mizan Zainal Abidin,Kuala

Terengganu - Steel Roof Collapsed

Jaya Supermarket, Petaling Jaya

-Structure Collapsed

KLIA 2

- Safety Checks at Runway & Parking Bay

KLIA 2

Page 30: Analysts, Fund Managers

ANUFACTURING

&

RADING

T

M

Page 31: Analysts, Fund Managers

related materials

• Building Construction Materials

• Pavement Related Materials &

Machinery

• Highway Safety Products

• Bridge-Joints

• Cold-Mix

Trading of construction

Page 32: Analysts, Fund Managers

SWEDSUN BRIDGE EXPANSION JOINT SYSTEM

INSTALLATION PROCESSES

Page 33: Analysts, Fund Managers

DUCATION

E

Page 34: Analysts, Fund Managers

FACULTIES • Engineering & Technology Infrastructure

• Architecture & Built Environment

• Business & Accounting

• Arts, Communication & Education

• Creative Media & Innovative Technology

• Applied Science & Foundation Studies

Established in 1998 as a college

Upgraded to full fledged university in 2012

Population: 3,000 students, from 50 countries

Offer programs from foundation to postgraduate

Campus in Unipark Suria (within De Centrum City)

Page 35: Analysts, Fund Managers

ENERGY

CLEAN

Page 36: Analysts, Fund Managers

CLEAN ENERGY

Newly embark division

Focus on solar energy and mini hydropower in

Malaysia as owner, co-owner or EPC contractor

Developing a 6.8MW solar farm in Malacca, 44% stake,

PPA 21 years from Dec. 2020 – 2041, RM92 m & IRR

10%

Page 37: Analysts, Fund Managers

HIGHLIGHTS

FINANCIAL

Page 38: Analysts, Fund Managers

Year 2013 2014 2015 2016 2017 2018

Issued and paid up

capital (‘000 units) 392,928 417,662 412,845 422,181 424,209 494,857

EPS (sen) 12.26 (11.12) 16.17 10.04 6.62 (9.81)

* FY2016: Issued & paid up capital and EPS had been adjusted from bonus issues which was completed on 25 November 2016.

* FY2014: before impairment of investment in Indonesia for RM104M.

970

1,062

1,305

1,110

939 892

122 139 149 100 103

4 48 57 67 42 28

-48 (200)

-

200

400

600

800

1,000

1,200

1,400

2013 2014 2015 2016 2017 2018

RM

mil

Year

Past 6 Years Track Records Turnover EBITDA Operating profit

Page 39: Analysts, Fund Managers

(Revenue Contributions by Sectors for FY2018 )

OUR

BUSINESS

CONSTRUCTION, 25%

MAINTENANCE, 49% PROPERTY

DEVELOPMENT, 1%

TRADING & MANUFACTURING,

16%

ENGINEERING, EDUCATION &

CLEAN ENERGY, 9%

Page 40: Analysts, Fund Managers

(Profit Contribution by Sectors for FY 2018)

OUR

BUSINESS

Maintenance, 95%

Trading & Manufacturing, 5%

Page 41: Analysts, Fund Managers

Future

MAINTENANCE 50%

CONSTRUCTION 25%

PROPERTY DEVELOPMENT

15%

ENGINEERING, TRADING,

EDUCATION & CLEAN ENERGY

10%

Page 42: Analysts, Fund Managers

DIVIDENDS (Net)

FINANCIAL YEAR SEN PER SHARE

YE 2019 1.2^

YE 2017 5.5 #

YE 2016 6.0**

YE 2015 13.0

YE 2014 5.0

YE 2013 10.0

YE 2012 14.0*

YE 2011 8.0

YE 2010 10.0

YE 2009 9.0

YE 2008 7.0 # Based on enlarged share capital after bonus (1 for 6 shares);

* Include a special dividend of 6.0 sen per share

** Based on enlarged share base after bonus 1 for 4 shares

^ 2ND Dividend 0.6 sen – ex-date 30/12/2019 & payable on 10/1/2020