Project ManagementCoordination & LiaisonConstruction Management Design (New, Seismic, Preliminary)Proposals and TenderConcepts and Ideas
L. Anders LoofC.Eng. MICE (UK)P.E. (California, USA)Chartered Architect RIBA (UK) [email protected]
Second Penang Bridge, MalaysiaProject Management – DPM, ICE (Design) during construction
16.5 km Sea ViaductsPrecast SegmentalCable Stayed Bridge
Coordination – LiaisonICE Design – Client – D&B Construction
Second Penang Bridge, MalaysiaProject Management – DPM, ICE (Design) during construction
Stonecutters Bridge, Hong KongConstruction Management – RCTO for Stay Cable Installation
1018m Main Span CSB224 Stay CablesLongest over 540m
Stonecutters Bridge, Hong KongConstruction Management – RCTO for Stay Cable Installation
Machang Bridge, South KoreaConstruction Management – Responsible All of CSB
16.5 km Sea ViaductsPrecast SegmentalCable Stayed Bridge1.7 km Sea Crossing
ILM 8x 70m Spans170+400+170m CSB130+150+130m Steel Box Girders
Managed as “win-win;- to quality
- on programme- few claims.
Machang Bridge, South KoreaConstruction Management – Responsible All of CSB
16.5 km Sea ViaductsPrecast SegmentalCable Stayed Bridge
Chong Zun Expressway, ChinaConstruction Management / Bridge Expert Audits
> 120 Bridges in Constructionalong 117 km Expressway, RMB 6.7bn Tot, 24% ADB
17 Drill & Blast Tunnels into Carst Layered Rock, one > 2km2x Balanced Cantilver Turned After Construct
“It is a very difficult project, possibly the most difficult inall of China. Some people doubted that we would ever
be able to build it.” – Xu Deyu of client, NCE 2005.06.16
Chong Zun Expressway, ChinaConstruction Management / Bridge Expert Audits
Chong Zun Expressway, ChinaConstruction Management / Bridge Expert Audits
Aswan Bridge, EgyptConstruction Management / Resident Engineer CSB
1km BridgeCable Stayed =125+250+125m
Aswan Bridge, EgyptConstruction Management / Resident Engineer CSB