Company Prof i le

Ár-La Magyarország Kft.Founded 1992

Page 2: angol referencia final

EARTHWORK, FOUNDATION AND UTIL ITY PROJECTS

We have remarkable references and more than 15 years experiences in extremely big

earthwork technological processes as general contractor.

During the execution and the organization of the projects our aim is to reach the highest

quality level of technical execution with the admissible efficiency. Therefore we continuously make

effort not to move the materials barycentre more than is needed and to handle them separately.

Our company can provide the necessary machines from its own equipment fleet for the

constructions, depending on the task volume and type. In need of materials we also deal with

mining activities in our operation for gravels, filler material, and sand. Our material transport and

work-in capacity can reach a 20000 m3 in a work shift (12 hours).

PreparationS I T E

Page 3: angol referencia final

EARTHWORK, FOUNDATION AND UTIL ITY PROJECTS

In our projects we do fieldwork, cuts, benches, refilling and attached levelling, we make

slopes and transport materials in or out of the site if necessary.

In the course of execution, we keep the expectations according to the plan with measure-

ment of geodetic distance, levels, test drilling and boring. We continuously monitoring the quality,

do the required soil mechanical exams and measurements. When the filling thickness requires we

do the consolidation measures as well.

By city constructions we can do customary under surface digging at various depth, area

and organization. We do slab, dig under extant buildings, and do earthwork between objects even

we have to take account of every movement.

Certainly during our projects we are capable to do all the related jobs such as: utility, foun-

dation, drainage systems, down piping, placing culvert aqueducts, construct bridges, tunnels, and

seeding, planting and filter crops as well.

Our major earthworks listed in the reference list.

PreparationS I T E

Page 4: angol referencia final

HIGHWAY CONSTRUCTION

We have references of much different kind of road constructions. We have done projects

on outer and municipal area roads building with different characters, different volumes and differ-

ent layer systems (asphalt, basalt fitting, paving blocks). Our equipment fleet, technical and man-

power capacities makes us capable to do general work, foundation-utility and deep structure work,

big volume of earthwork and to build complete flexible/solid pavement workmanlike.

Our jobs were: new built roads, new junctions while the road is in service, enlargement

– extension works, highway deep structure work, public procurement procedure for road building

and dewatering draining of water, also shopping and logistics centres combination depot pave-

ment construction with the adequate layer as the bearing force requirements.

ConstructionH I G H W A Y

Page 5: angol referencia final

ROAD CONSTRUCTION IN CIT IES

During the road construction after the crop opening we do the refills and cuts as the foun-

dation requires and if there is a need we change the ground material.

We make the protective layer according to the definite project plan either with ballast bed,

gravel, crashed concrete or CKT and we outwork it by finisher, manpower or machine.

We make professional asphalt pavement with hand or machinery outwork for new roads,

junctions, and roundabouts or their expansions and intersections. We construct asphalt pavement

blocks with different slopes position and footpath with curb stones for pedestrians with joint hard

shoulders.

ConstructionR O A D

Page 6: angol referencia final

BASALT BETON PAVEMENT ANDHIGH LOAD BEARING CAPACITY PAVEMENT

Special requirements such as high load bearing capacity, abrasion resistance, and dura-

bility we are able to make solid pavement concrete, basalt concrete overlay, both reinforced or

none reinforced, with complete dilatation as desired. To construct pavement blocks we have trap-

ezoid cross section blade damper system with different thickness, rough or polished.

When we make pavement blocks we pay attention to aesthetic and optical surface as well.

When there is certain design at the layout of the pavement–colour and/or shape- we put down the

blocks by hand, in the parking areas of shopping centres, otherwise we use machinery.

We are able to make ashlars as part of the general project or even separately, kerbstone

from natural material such as basalt or granite as needed.

During our projects we are capable to do the additional work also, like water drainage

tasks, open ditch or closed drainage system and together with its bridges and tunnels, utility, flood

control, acoustical control and dust control, tree planting, filter crop and slope stabilization by

seeding grass. You can learn more about our road works from our references.

Pavements

Page 7: angol referencia final

CAPACIT IES OF MACHINERY AND EQUIPMENT FROM OUR FLEET

Excavators

- 1 pc Hitachi ZX350 LC-5 35 ton track excavator /2,5 m3/- 1 pc Hitachi ZX250 LC-5 25 ton track excavator /1,9 m3/- 1 pc Hitachi ZX210 LC 21 ton track excavator- 1 pc Komatsu PC 210 23 ton hydraulic track excavator /1,5 m3/ with hydraulic breaker- 1 pc Caterpillar 324 DL 24 ton hydraulic track excavator- 1 pc Hyundai R200-7A wheel excavator- 1 pc Liebher L544 wheel loader /3 m3/- 1 pc Hyundai HL 740 7A wheel loader /2,5 m3/- 1 pc Terex 860 backhoe loader- 1 pc Komatsu WB 97 backhoe loader /0,85-1,35 m3/- 1 pc FIAT HITACHI FB90 backhoe loader with hydraulic breaker- 1 pc UNC-060 wheel loader, hydraulic breaker /0,3-0,5 m3 + drilling set/- 1 pc HITACHI SL 45 wheel loader /0,4 m3/- 2 pcs GEHL 5240 wheel loader, hydraulic breaker /0,4 m3/- 1 pc New Holland SL 170 wheel loader /0,4 m3/- 1 pc LOCUST wheel loader /0,4 m3/- 1 pc CASE wheel loader /0,6 m3/- 1 pc Komatsu SK 714 wheel loader /0,4 m3/- 1 pc Rubber Master RM 80 mobile crusher

Vehicles:

- 1 pc Mercedes Axor trailer transporter /33 ton/- 13 pcs MERCEDES ACTROS 4140, 4 axle, all-terrain (8x6) tipper truck /18 m3/- 5 pcs IVECO 4 axle tipper truck /18 m3/- 2 pcs MAN TGA (8×4) tipper truck /18 m3/

FleetO U R

Page 8: angol referencia final

CAPACIT IES OF MACHINERY AND EQUIPMENT FROM OUR FLEET

Work-in equipments:- 1 pc Komatsu D65 21 ton bulldozer- 1 pc Caterpillar D6 TXL bulldozer- 1 pc FIAT-HITACHI FD 175 bulldozer /17 ton, 5,1 m3/- 1 pc FIAT-ALIS FD 7 bulldozer- 1 pc grader 20 ton- 1 pc NOBAS 17 ton automotive static rubber roadroller- 1 pc Ammann ASC 150 14 ton vibro pat foot road roller- 1 pc Ammann AP 240 rubble roadroller- 1 pc STA VV 1100 D 11 ton automitive vibro pat foot road roller- 1 pc STA VH 250 automotive vibro road rollerRoad construction equipments:- 1 db Intrame M-120 asphalt mixer plant- 1 db Vögele S 1600-2 track asphalt paver- 1 db hydraulic pavement layer toolOther equipments:- 2 pcs Liaz watering truck- 1 pc Csepel watering truck- 1 pc SCHÖRLING universal road cleaning truck- 1 pc Csepel service truck- 1 pc Feng-Shou 254-4 tractor- 1 pc BAGOD 2500 trailer- 1 pc RENAULT MASCOT tipper truck /7 ton/- 1 pc Ford Transit 5 ton pick up- 2 pcs Ford Transit van- 7 pcs Ford Transit van- 2 pcs Ford Transit bus

FleetO U R

Page 9: angol referencia final

REFERENCE HIGHWAYS & STRUCTURAL ENGINEERING

Structural Engineering

2009. TBG Concrete plant (building at work), Budapest. X. Basa str.2008. TBG Concrete plant, Csömör Concrete plant, Vecsés – structural engineering2007. Concrete plant Budapest XXII. Bányalég str.2004. Holcim Concrete plant, Pomáz2003. Holcim Concrete plant, Kistarcsa2002. Holcim Concrete plant, Dunaharaszti2000. KINCSEM PARK structural engineering

Highways

2005. M5 highway – earthwork

1999-2000. Kaposvár ringroad no 61.

1997-1998. M3 highway - earthwork

1997-1998. M3 highway - earthwork

EngineeringS T R U C T U R A L

Page 10: angol referencia final

REFERENCEROAD CONSTRUCTION

Road reconstruction

2011. Budapest road reconstruction of 2011. Budapest XVII. Pesti str. cycle track Budapest. XV. Zsókavár str. 2. - 44. reconstruction of service road and its environment2009. Páty reconstruction of mainroad and drainage system2000. MAHART Port asphalt pavement by F2 building

Road construction

2010. Tahitótfalu, road construction of Rózsa str., Koós K., Visegrádi, Kertész str. Csömör, road construction of Táncsics, Mező and József A. str. Budapest XVII. Késmárk str. 11-13. service road construction2008. Kecskemét, Auchan shopping centre infrastructure development – main road no. 52 and subsidiary roads2007. Vecsés Concrete plant’s pavement2006. Auchan Shopping centres landscape architecture – road construction and parking site Csömör, Dunakeszi, Solymár, Soroksár, Székesfehérvár, Kecskemét road construction

WorkD E M O L I T I O N

Page 11: angol referencia final

REFERENCEROAD CONSTRUCTION

2005. Farkasréti Temető – road and environmental construction Csömör Dechatlon road construction2004. Óbudai Auchan shopping centre – road construction Csömöri regional waste plant MAHART-Port high load bearing capacity pavement2002-2003. Budaörs Trend Centre subsidiary roads2002. Csömör innercity area road construction2001. Csömör Cemetery road construction Csömör Palotai road construction Budapest. XVI. – Feldebrő str. road construction Budapest. XVI. – Tiszakömlő str. road construction2000. Kaposvár Damjanich str. – road construction1999-2000. Kaposvár road construction no 61. 1999. South-Pest cleaning plant Tök Compost plant – road and pavement1997. Csepel Szabadkikötő Rt.1996. Várpalota Compost plant

WorkE N V I R O N M E N T A L

Page 12: angol referencia final

REFERENCEEARTHWORKS

2010. Makó Béta projekt, plant 560.000 m3 Csongrád Tesco 33.100 m3 Dunakeszi Tesco 28.650 m3 Pécs, Tesco 44.000 m3

2009. Pécs Málom Industrial Park 1.100.000 m3

2007. Maglód Auchan 1.336.000 m3

2006. Budapest Central Waste Plant 400.000 m3 Budapest XVIII. Szent László st.immunization of mazout lakes 210.000m3,43ha HANKOOK Tyre Factory, Dunaújváros 400.000 m3

2005. Óbuda AUCHAN AQUINCUM parking site M5 highway AUCHAN Csömör Budapest XII.Farkasréti Cemetery changing of material ground2004. Csömör Compost plant 25.000 m3 Kecskemét, Malom Center 56.000 m3

2003. SAMSUNG Göd 30.000 m3 Budapest X. Kincsem Park stables 35.000 m3

2002. Budapest IX. MILLENIUM CITY CENTRE MUSEUM block 100.000 m3

2000. Kincsem Park 250.000 m3 KAPOSVÁR - no. 61. main ringroad 117+250-119+262 320.000 m3

1999. OBI Store /Budapest., IX./ changing of material ground and earthwork 70.000 m3

1996-1998. Csepel - filling of low terrain area 500.000 m3

1996. FORD plant expansion, cut works 120.000 m3

1995. EXPO Hungarian Pavilon 100.000 m3

DamsC O N S T R U C T I O N O F

Page 13: angol referencia final

REFERENCESTRUCTURAL ARCHITECTURE

2005 – 2006. Farkasréti Cemetery supporting wall system and crypts2005. Jászberény – commercial park2004. Százhalombatta – commercial park KINCSEM PARK stables2003. Logistic Park1999. OBI Store Várpalota Compost plant Tök Compost plant1997. M7 highway segment km 33,7 OMV filling station Várpalota Compost plant

ArchitectureS T R U C T U R A L

Page 14: angol referencia final

REFERENCEPIT EXCAVATION

2011. Budapest XIII. Kassák L. str. Green House Office 35.000 m3 Budapest XVIII. Forgó str., Air Traffic Contol building ANS III. 18.000 m3

2009. Pécs, Conference and Concerthall 13.500 m3

2007-2008. Corvin Átrium 228.000 m3

2007. Spirál Office, Budapest, Dózsa Gy. str 40.000 m3

2005. Budapest XIII. Kassák L. u. 24. 16.000 m3 CASTRUM House 25.000 m3

2004. Budapest. XIII. Váci str. GTC II. 60.000 m3 Budapest VI. Király str. block of flats 35.000 m3

2003. Budapest IX. Páva str. block of flats 30.000 m3 Budapest VII. Elisabeth Center 30.000 m3 HOMASÍTA Store 15.000 m3

2002. Budapest XIII. ASTRON HOTEL 30.000 m3

2001. Budapest. XI. Irinyi J. u. SKANSKA Office 65.000 m3

2000. on the area GANZ in Buda, garage C2 earthwork with Milano method 40.000 m3 LEHEL Market 80.000 m3

1998. AKADÉMIA BANK CENTER Arany János str. 55.000 m3

ExcavationP I T

Page 15: angol referencia final

REFERENCEUTIL ITY BUILDING

2011. Tahitótfalu, innercity drainage system works Budapest XVIII. Forgó str., Air Traffic Control building ANS III. drainage system2010. Pécs, Auchan2008. Kecskemét, Auchan infrastructural development Vecsés Concrete plant infrastructural development2007. Budaörs Concrete plant moderning of drainage system Csömör, Gárdonyi and Széchenyi str.2006. Csömör innercity drainage system works Csömör, Dunakeszi, Solymár, Soroksár, Székesfehérvár, Kecskemét drainage system works2005. Óbuda Auchan-Aquincum - drainage system AUCHAN Csömör drainage system 2004. Kincsem Park stables, drainage system2003-2004. Budafok, drainage system works2003. Auchan Óbuda, drainage system Holcim, Dunaharaszti Concrete plant utility building Holcim, Budapest. X. Concrete plant utility building2002. Csömör utility building works Holcim Budapest XV. Concrete plant utility building2001. Dömsöd drainage system2000. Csömör drainage system works KINCSEM PARK drainage system Csepeli Szabadkikötő Rt. site building, South-Pest Waste plant1999. Csepeli Szabadkikötő Rt. utility building Tök Compost plant

BuildingU T I L I T Y

Page 16: angol referencia final

REFERENCELANDSCAPE ARCHITECTURE

2009. Pécs Málom Industrial Park

2008. Kecskemét, Auchan

2005 – 2006. RKB RT.

2000. South-Pest Waste plant

1997. Csepel-island water cleaning plant

1998. Budapest VIII. Fiumei str, Cemetery

1997 - 2011. Budapest X. Újköztemető Cemetery maintenance works 90 ha

1996. Budapest VIII. Fiumei Temető Funária Garden

ArchitectureL A N D S C A P E

Page 17: angol referencia final