anite tutorial

76
SAT(A) User Guide Document: B4605/UM/002 Issue: 2.1 July 2005 Anite Telecoms Limited Ancells Business Park Harvest Crescent Fleet Hampshire GU51 2UZ UK Tel: +44(0)1252 775200 Fax: +44 (0)1252 775299 www.anite.com/telecoms

Upload: navneet-kumar

Post on 16-Apr-2015

366 views

Category:

Documents


8 download

DESCRIPTION

tutorial on anite

TRANSCRIPT

Page 1: anite tutorial

SAT(A) User Guide

Document: B4605/UM/002 Issue: 2.1 July 2005

Anite Telecoms Limited Ancells Business Park Harvest Crescent Fleet Hampshire GU51 2UZ UK Tel: +44(0)1252 775200 Fax: +44 (0)1252 775299 www.anite.com/telecoms

Page 2: anite tutorial

SAFETY NOTES The following safety notes are used in this document. Before using the equipment, you must read this document and familiarise yourself with each safety requirement. You must also read any manuals associated with other items of equipment contained within the system and familiarise yourself with each safety requirement. WARNING Warning denotes a hazard to people. It calls attention to a procedure which, if

not correctly performed or adhered to, could result in injury or loss of life. Do not proceed beyond a warning note until the indicated conditions are fully understood and met.

CAUTION Caution denotes a hazard to the product. It calls attention to a procedure that, if not correctly performed or adhered to, would result in damage to or destruction of the product. Do not proceed beyond a caution sign until the indicated conditions are fully understood and met.

GENERAL SAFETY CONSIDERATIONS WARNING This is a Safety Class 1 product provided with a protective earthing

conductors incorporated in the mains power cables. The mains plugs shall be inserted only in a socket outlet provided with a matching protected earth contact. Any interruption of the protective earthing conductor inside or outside of the product is likely to make the product dangerous. Intentional interruption is prohibited.

WARNING This equipment must be connected to a primary earth before the mains supply is connected.

WARNING No operator serviceable parts inside. Refer servicing to qualified personnel. To prevent electrical shock do not remove covers.

WARNING The environmental operating conditions specified for the equipment must be observed. Do not allow the equipment to become wet, and do not allow water to enter the equipment. Do not operate the equipment when wet because in this condition the safety of the equipment may be degraded.

WARNING This product contains lethal voltages. Do not remove the covers of individual items of equipment. Any adjustments or service procedures that require operation of the equipment with protected covers removed should be performed only by trained personnel.

WARNING All mains fuses must be replaced only with the same type and rating. The use of other fuses or material may cause a fire hazard and is forbidden.

WARNING Any deviation from the instructions provided in this procedure, and the associated equipment manuals, may cause the protection provided by the equipment to be impaired.

CAUTION Always use the three pin AC power cord and plug supplied with this product. Failure to ensure adequate grounding may cause product damage.

CAUTION Before this equipment is switched on make sure its primary power circuitry has been adapted to the voltage of the AC power source. Failure to set the AC power input to the correct voltage could cause damage to the equipment when the AC power cable is plugged in.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page ii

Page 3: anite tutorial

CAUTION Do not obstruct the air inlets or outlets on the system or any item of

equipment. Restricting the flow of air could cause the equipment to overheat and may cause damage.

INSTRUMENT MARKINGS The following markings and caution and warning labels are used within the system. Be sure to observe all cautions and warnings. Refer to individual equipment User Manuals for details of their respective instrument markings.

Indicates that there are instructions in the documentation that you should read and comply with.

A power line switch.

▌ The ON position of a power line switch. O The OFF position of a power line switch.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page iii

Page 4: anite tutorial

COPYRIGHT © 2005 ANITE TELECOMS LIMITED All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying or otherwise without the prior permission of Anite Telecoms Limited. CONFIDENTIALITY This document and its contents shall not be used by, or disclosed to, any other party without the express written consent of Anite Telecoms Limited. REFERENCES [1] Programmer's Toolset (UTRAN) Programmer’s Manual (B2748/PM/001) [2] Programmer's Toolset Graphical User Interface (PT GUI) User Manual (B2748/UG/002) [3] Anite Network Licensing User Manual (NL/UM/01) [4] Anite Log Viewer User Manual (LV/UM/01) [5] HSDPA Demo Test Application User Manual (B5007/SW/001) All Anite documents mentioned in this document can be found at the Anite Telecoms Customer Support Website www.anite.com/telecoms/support. If you would like access to this website please contact [email protected]. PREFACE This Guide, together with the other documentation supplied with your system, will enable you to install and use your Anite SAT(A) system. You can find additional documentation on our support web site: www.anite.com/telecoms/support. The document is designed to be independent of the versions of software that you are using. Please note, however, that some of the screen-shot images will differ with different software versions. GENERAL FEEDBACK AND SUGGESTIONS We provide a dedicated email address [email protected] that is monitored by our Managing Director and progressed by our Business Process Manager. All feedback is analysed and actions taken to ensure that we continue to provide for the real needs of our customers.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page iv

Page 5: anite tutorial

CONTENTS Section Page 1 Introduction........................................................................................................................1

1.1 Introducing the SAT(A) platform ...................................................................................1

1.2 Introducing the PT application........................................................................................2

1.3 What do I need to read? ..................................................................................................2

2 Components of the SAT(A)...............................................................................................4

2.1 Items delivered with a new system .................................................................................4

2.2 Extensions and upgrades .................................................................................................4

2.3 About the 8960................................................................................................................5

2.4 About the ABP ................................................................................................................5

2.5 About the new Anite Combiner ......................................................................................6

2.6 About the PCC ................................................................................................................6

3 Setting up the hardware ....................................................................................................7

3.1 PCC .................................................................................................................................7

3.2 2G systems using the vertical combiner .........................................................................7

3.2.1 Example: SAT4(A)E ..................................................................................................9 3.2.1.1 Front connections ..................................................................................................9 3.2.1.2 Rear connections .................................................................................................10 3.2.1.3 Additional equipment for Test Case TC_21_1 ....................................................11

3.3 Systems using the horizontal combiner ........................................................................12

3.3.1 Front connections .....................................................................................................15

3.3.2 Rear connections ......................................................................................................16

3.3.3 Additional equipment for Test Case TC_21_1.........................................................19

3.3.4 Switching on and warming up..................................................................................19

4 Installing software on the PCC.......................................................................................20

4.1 Installing PT for 3G or multiRAT testing.....................................................................20

4.2 Uninstalling PT .............................................................................................................20

4.3 Installing the licence file ...............................................................................................21

5 Configuring the system....................................................................................................22

5.1 Assigning IP addresses..................................................................................................22

5.1.1 PCC IP addresses......................................................................................................22

5.1.2 8960 IP addresses .....................................................................................................23

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page v

Page 6: anite tutorial

5.1.2.1 Setting 8960 IP addresses....................................................................................24 5.1.2.2 Checking 8960 IP addresses................................................................................25

5.1.3 ABP and combiner IP addresses ..............................................................................27

5.2 Uploading Anite software to the 8960s.........................................................................30

5.3 Checking the 2G setup ..................................................................................................41

5.4 Updating PT firmware in the combiner and ABPs .......................................................43

5.5 Defining the RAT configuration ...................................................................................45

5.5.1 Defining RAT configuration in the SAT Configuration Tool..................................45

5.5.2 Defining RAT configuration in the HouseKeeping Utility ......................................47

5.6 Entering calibration data ...............................................................................................49

5.6.1 Entering 2G calibration data.....................................................................................50 5.6.1.1 Combiner calibration ..........................................................................................50 5.6.1.2 UE cable offset.....................................................................................................51 5.6.1.3 Power meter information.....................................................................................51

5.6.2 Entering 3G calibration data.....................................................................................52

6 Changing software versions ............................................................................................53

6.1 Changing the active PT release .....................................................................................53

6.2 Switching the 8960 software version ............................................................................54

6.3 Changing the combiner and ABP firmware ..................................................................56

7 Anite Log Viewer .............................................................................................................57

8 Using CleanUp to recover from program crashes ........................................................58

9 Routine maintenance .......................................................................................................59

9.1 Calibration.....................................................................................................................59

9.1.1 Customer calibration ................................................................................................59 9.1.1.1 I/Q calibration .....................................................................................................59 9.1.1.2 Open Loop ALC calibration ................................................................................62

9.1.2 Anite’s calibration service........................................................................................64

9.2 Software updates ...........................................................................................................64

10 Getting help ......................................................................................................................65

10.1 Documentation ..............................................................................................................65

10.2 Anite’s Help Desk.........................................................................................................65

10.3 Hardware repairs ...........................................................................................................65

11 Glossary ............................................................................................................................66

12 Document history.............................................................................................................67

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page vi

Page 7: anite tutorial

FIGURES Figure Page Figure 1 - 2G system using the vertical combiner .....................................................................8 Figure 2 - Vertical combiner: front connections........................................................................9 Figure 3 - Vertical combiner: rear connections .......................................................................10 Figure 4 - Connections for Test Case TC_21_1 ......................................................................11 Figure 5 - SAT8(A)UE system ................................................................................................12 Figure 6 - Cable brackets .........................................................................................................13 Figure 7 - Baffles .....................................................................................................................13 Figure 8 - SAT4(A)E/SAT3(A)UE system..............................................................................14 Figure 9 - SAT1(A)UE rear connections .................................................................................16 Figure 10 - Setting the Ethernet adapter IP address.................................................................23 Figure 11 - 8960 Instrument Setup screen ...............................................................................24 Figure 12 - 8960 Call Setup screen..........................................................................................25 Figure 13 - SAT Configuration Tool: hardware selection .......................................................26 Figure 14 - SAT Configuration Tool: Hardware tab ...............................................................26 Figure 15 - HouseKeeping: System Configuration tab............................................................27 Figure 16 - HouseKeeping: Device Settings tab......................................................................28 Figure 17 - HouseKeeping: Configure Anite Combiners and Baseband Processors window.29 Figure 18 - Anite Version Controller.......................................................................................31 Figure 19 - 8960 System Config screen...................................................................................31 Figure 20 - 8960 Application Switch screen: selection ...........................................................32 Figure 21 - 8960 Application Switch screen: confirmation.....................................................33 Figure 22 - 8960 Application Setup screen: selection .............................................................33 Figure 23 - Agilent File Utility: licence agreement .................................................................34 Figure 24 - Agilent File Utility: main window ........................................................................34 Figure 25 - Agilent File Utility: Options window ...................................................................35 Figure 26 - Agilent File Utility: scanning for applications......................................................36 Figure 27 - Agilent File Utility: licence file warning ..............................................................36 Figure 28 - Agilent File Utility: applications list.....................................................................37 Figure 29 - Agilent File Utility: Add Test Set window ...........................................................37 Figure 30 - Agilent File Utility: selecting the 8960s ...............................................................38 Figure 31 - Agilent File Utility: connection check confirmation box .....................................38 Figure 32 - Agilent File Utility: checking for applications and licences.................................39 Figure 33 - Agilent File Utility: serial number confirmation box ...........................................39 Figure 34 - Agilent File Utility: updated applications list .......................................................40 Figure 35 - Agilent File Utility: upload confirmation box ......................................................40 Figure 36 - Agilent File Utility: upload progress indicator .....................................................41 Figure 37 - SAT Configuration Tool: Test menu ....................................................................42 Figure 38 - SAT Configuration Tool: successful synchronisation test....................................42 Figure 39 - SAT Configuration Tool: successful EPCP card test............................................42 Figure 40 - HouseKeeping: Device Settings tab......................................................................43 Figure 41 - HouseKeeping: Firmware Upgrade tab.................................................................44 Figure 42 - HouseKeeping: Firmware Upgrade Progress........................................................44 Figure 43 - HouseKeeping: reboot dialogue box.....................................................................45 Figure 44 - SAT Configuration Tool: Hardware tab ...............................................................46 Figure 45 - SAT Configuration Tool: search result .................................................................46 Figure 46 - SAT Configuration Tool: search error result ........................................................47 Figure 47 - HouseKeeping: Device Settings tab......................................................................48 Figure 48 - SAT Configuration Tool: Calibration tab .............................................................50

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page vii

Page 8: anite tutorial

Figure 49 - SAT Configuration Tool: calibration file error.....................................................51 Figure 50 - SAT Configuration Tool: Power Meter tab ..........................................................51 Figure 51 - HouseKeeping: Device Settings tab......................................................................52 Figure 52 - Anite Version Controller.......................................................................................54 Figure 53 - 8960 System Config screen...................................................................................55 Figure 54 - 8960 Application Setup screen: selection .............................................................55 Figure 55 - Anite Log Viewer: Options...................................................................................57 Figure 56 - I/Q calibration: System Configuration screen 1....................................................59 Figure 57 - I/Q calibration: System Configuration screen 2....................................................60 Figure 58 - I/Q calibration: Service dialogue box ...................................................................60 Figure 59 - I/Q calibration: progress bar..................................................................................61 Figure 60 - I/Q calibration: completion ...................................................................................61 Figure 61 - Open Loop ALC calibration: Call Setup screen ...................................................62 Figure 62 - Open Loop ALC calibration: dialogue box...........................................................62 Figure 63 - Open Loop ALC calibration: progress bar............................................................63 Figure 64 - Open Loop ALC calibration: completion .............................................................63

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page viii

Page 9: anite tutorial

TABLES Table Page Table 1 - Sections relevant to different audiences .....................................................................2 Table 2 - RF connections .........................................................................................................15 Table 3 - 10 MHz reference connections.................................................................................16 Table 4 - Intra-ABP sync connections .....................................................................................17 Table 5 - Inter-ABP sync connections .....................................................................................17 Table 6 - LVDS connections....................................................................................................17 Table 7 - Ethernet connections ................................................................................................18 Table 8 - IP addresses for 8960s and ABPs.............................................................................24 Table 9 - UIP numbering in a multiRAT system.....................................................................49

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page ix

Page 10: anite tutorial

1 Introduction This document describes two Anite products: the SAT(A) test platform, and components of the PT (Programmer’s Toolset) application that are used with it. These two products are described together because: • Parts of the PT application are used with many of Anite’s test applications. • Tools and utilities delivered with PT are used to configure the SAT(A) platform. 1.1 Introducing the SAT(A) platform The SAT(A) platform described here is Anite’s latest version, which can be used for testing the full range of 3GPP User Equipment: 2G (GSM, GPRS and EGPRS) and 3G (WCDMA, including HSDPA). This is an extension of Anite’s well-established 2G-only SAT(A); customers can upgrade and add to their existing SAT(A) configurations to take advantage of these 3G capabilities. SAT(A) is a modular platform, enabling customers to choose the capabilities needed for a desired test configuration. All SAT(A) configurations include these elements: • One or more Agilent 8960 test sets, running Anite software. • A PCC (PC Controller) running Anite software. • An Anite Combiner. (New SAT(A) systems include the new horizontal Anite

Combiner, but customers who have a 2G SAT(A) delivered before July 2005 can continue to use their current vertical RF combiner in 2G test configurations.)

3G SAT(A) configurations include these additional elements: • Additional Agilent hardware and software in the 8960s. • For each 3G transceiver, an ABP (Anite Baseband Processor). A SAT(A) configuration is described using the following nomenclature: • The total number of transceivers is denoted by the number n thus: SATn(A). So a

SAT3(A) configuration has a total of three transceivers. • The types of 3GPP services supported are denoted by the letter X in SATn(A) X. X can

be one or more of these three values: - G (for GERAN, meaning GSM and GPRS), - E (for EDGE, meaning EGPRS as well as GSM and GPRS) and - U (for UTRAN, meaning WCDMA and HSDPA). So a SAT3(A)E supports GSM, GPRS and EGPRS only, but a SAT3(A)UE supports all the services.

• A SAT(A) configuration that contains 2G and 3G transceivers is called a ‘multiRAT’ platform. In this document, the number of each type of transceiver is denoted by combining the terminology above. For example SAT3(A)E/SAT3(A)UE is a multiRAT configuration of three 2G and three multiRAT (3G+2G) transceivers, with one Anite Combiner and one PCC.

Currently, the SAT(A) platform can have up to eight transceivers, and up to three of these can be 3G transceivers. Later in 2005, it will be possible to have any combination of 2G and 3G transceivers within the total of eight. Anite also plans that the limit of eight transceivers will be raised to twelve in due course.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 1

Page 11: anite tutorial

1.2 Introducing the PT application Anite supplies these software applications to run on the SAT(A) platform. • PT (Programmer’s Toolset) - PT provides the ability to control the SAT(A) platform

through APIs (application programming interfaces). PT is used in several ways: - Customers who wish to write their own test applications in C or C++ or use the

Anite HSDPA Test Applications that are installed with PT (UTRAN), need to purchase a separate licence for the PT program. The APIs are documented in the PT (UTRAN) Programmer’s Manual [1]. The Test Applications are documented in the HSDPA Demo Test Application User Manual [5].

- Customers who prefer to simpler interface can use the PT GUI application described in the PT GUI User Manual [2].

- Users of the other Anite applications described below need not be concerned with PT except to the extent that those applications rely on it.

• CT (Conformance Toolset) - CT licences enable customers to run pre-defined

conformance test cases supplied by Anite, and to create their own test cases using the TTCN language.

• SAS - An application that simulates networks. • ACT - An application to run conformance test cases for application enablers such as

MMS. 1.3 What do I need to read? This document has been structured with four kinds of reader in mind… a) Users of PT (UTRAN) or PT GUI on a 3G or multiRAT SAT(A) platform. b) Users of CT (UTRAN) on a 3G or multiRAT SAT(A) platform. c) Users of SAS on a 2G, 3G or multiRAT SAT(A) platform. d) Users of ACT on a 2G or 3G SAT(A) platform. …and the table below shows which sections are relevant to which readers.

Table 1 - Sections relevant to different audiences

Users of:

(a) PT (UTRAN)

(b) CT (UTRAN)

(c) SAS

(d) ACT

Setting up and configuring a 3G or multiRAT SAT(A) system. (Sections 3.3 & 5)

Setting up and configuring a 2G-only SAT(A) system. (Sections 3.2 and parts of 5)

See PT (GERAN) user manuals

See CT (GSM) CT (EGPRS) user manuals

Installing PT. (Section 4)

PT components installed with

SAS

PT components installed with

ACT Changing software versions. (Section 6)

Configuring Anite Log Viewer. (Section 7)

Use default configuration

Use default configuration

Use default configuration

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 2

Page 12: anite tutorial

We recommend that you read at the outset all the sections that apply to you. However, the document is also designed (as far as possible) as a reference manual, allowing you to read sections in isolation. For that reason, you will find that some material is repeated in different places. Please note that when you use Anite’s HSDPA Layer 1 Test Application (HsdpaUi), parts of this User Guide will not apply. In particular: • The application uses a single transceiver only. • The IP address of the ABP being used must be set within HsdpaUi. • The application does not use the combiner calibration file, so you should either operate

without the combiner, or adjust your measurements to take account of losses in the combiner and RF cables.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 3

Page 13: anite tutorial

2 Components of the SAT(A) This section lists the components that are delivered with a new 3G or multiRAT SAT(A) system, and describes the main components in more detail. 2.1 Items delivered with a new system If you are taking delivery of a new SAT(A) system comprising n 2G transceivers and m 3G transceivers, you will receive the following items: • n Agilent 8960s of type SAT(A)E and m of type SAT(A)UE, each including a power

lead, an Agilent user manual, calibration data and certificate, a 10 MHz reference cable (BNC), and a cross-over Ethernet cable (RJ45 - not used). (More information about 8960s is given in Section 2.3.)

• m ABPs, each including a power lead, an LVDS (Low Voltage Differential Signal) cable, three sync cables (BNC, one long, two short), and a Certificate of Conformance and Test Result Sheet. (More information about the ABP is given in Section 2.4.)

• An Anite Combiner fitted with a U-shaped RF cable and an RF splitter link, and including a power lead, 12 N-type RF cables, 22 Ethernet cables (RJ45), 9 N-type terminations and 3 BNC terminations, a CD-ROM containing two calibration files, a calibration certificate and data, a Certificate of Conformance and Test Result Sheet. (More information about the new Anite Combiner is given in Section 2.5.)

• A PCC: a PC with Windows 2000 Service Pack 4 installed, and including a monitor, keyboard, mouse, power leads and monitor cables. The PCC is fitted with two Ethernet PCI adapter cards and an EPCP card. If you have purchased Test Case TC_21_1, the PC is also fitted with a GPIB card and cable. (More information about the PCC is given in Section 2.6.)

• A Dongle Pack, comprising a dongle (licence hardware key) and a floppy disk containing your licence file.

• CD-ROMs containing Microsoft, third party and Anite software: please see the shipping list for details. (This software is also pre-installed.)

• Five 2G SIM cards and (in 3G and multiRAT systems) five 3G USIM cards. • Baffles and cable brackets: please see the shipping list for details. 2.2 Extensions and upgrades Shipments of parts to extend or upgrade an existing SAT(A) system will vary in content, depending on what equipment you already have and what extension or upgrade you have ordered. Please see the shipping list that accompanies your delivery. If you intend to continue using an existing PCC when extending or upgrading an existing 2G SAT(A) system to include 3G transceivers, please note that your PCC must meet these requirements: • Windows 2000 with at least Service Pack 4 installed. • To install the software you must have Windows 2000 Login administrative privileges,

with the ability to update the registry during installation.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 4

Page 14: anite tutorial

2.3 About the 8960 Agilent’s standard 8960 supports air interface signalling at Layer 2 and Layer 3 to enable calls to UE (User Equipment) to be established and maintained. Anite supplies new 8960s in two customised versions: 2G only, or multiRAT 2G/3G. The specification for the 2G version, supporting GSM, GPRS and EGPRS, sold by Anite as ‘SAT(A)E’, is: • 8960 Series 10 - E5515C Wireless Communications Test Set, build revision 4.5 or

later. • Hardware options:

- 002: Second RF source. - 003: Flexible CDMA base station emulator.

• Agilent software licences: - 6590A: GSM/GPRS RF Modem. - 6590A-101: GSM/GPRS. - 6590A-102: EGPRS.

The specification for the multiRAT 2G/3G version, supporting GSM, GPRS, EGPRS, WCDMA and HSDPA, sold by Anite with an ABP as ‘SAT(A)UE’, is: • 8960 Series 10 - E5515C Wireless Communications Test Set, build revision 4.5 or

later. • Hardware options:

- 002: Second RF source. - 003: Flexible CDMA base station emulator. - 004: Digital bus (BBIO card) with firmware version 05042701.

• Agilent software licences: - 6590A: GSM/GPRS RF Modem. - 6590A-101: GSM/GPRS. - 6590A-102: EGPRS. - 6590A-103: RF Modem

(Some customers may have a third version, supporting GSM and GPRS only, sold by Anite as SAT(A)G. This product is still supported, but is no longer sold.) Each type of 8960 runs Anite software, uploaded from the PCC as described in Section 5.2. 2.4 About the ABP While an 8960 alone can act as a 2G transceiver, a 3G or multiRAT transceiver consists of an 8960 paired with an ABP (part number B5007.500), the ABP providing additional processing capabilities necessary for W-CDMA and HSDPA operation. The ABP unit contains three Compact PCI processor boards, running firmware downloaded from the PCC as described in Section 5.4.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 5

Page 15: anite tutorial

2.5 About the new Anite Combiner The new Anite Combiner (part number B5007.700) performs four functions: • Combining the RF connections of the 8960s, and providing the connection to the UE. • Providing functions that are common to several 3G transceivers during soft handover:

these functions are managed through a Compact PCI processor board in the Anite Combiner, known as the CRMP (Centralised RLC/MAC Processor).

• Housing two Gigabit Ethernet switches, which provide data connections between the components of the SAT(A) platform.

• Providing a 10MHz rubidium frequency reference for all the RF components of the SAT(A) platform.

For clarity in this document, the new Anite Combiner is referred to as the ‘horizontal combiner’, to distinguish it from the previous version of combiner (part number B4605.100), which is referred to here as the ‘vertical combiner’. 2.6 About the PCC To enable it to communicate with all the elements of the SAT(A) platform, the PCC is fitted with two cards: • One EPCP single board computer card - This runs Anite’s RLC/MAC software for

EGPRS transceivers in a SAT(A) system. (Note that although the EPCP card is supplied with power by the PC, it does not connect to the PC’s bus; it communicates only through its external Ethernet connection.)

• An Ethernet PCI adapter card - This, together with the internal Ethernet adapter on the PCC’s motherboard, carries control signals.

A second Ethernet PCI adapter card is also fitted, to enable you to connect the PCC to another network, such as a corporate network, subject to the IP addressing rules described in Section 5.1.1.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 6

Page 16: anite tutorial

3 Setting up the hardware This section explains how to arrange the hardware units in a SAT(A) system and how to connect them together. It covers both 2G systems that use the vertical combiner (Section 3.2) and 2G, 3G and multiRAT systems using Anite’s new horizontal combiner (Section 3.3). Before unpacking the equipment, please inspect the delivered packages and make a note of any signs of damage, in case it proves necessary to make a claim against the shipping company. Unpack the equipment carefully to avoid damage, or loss of small components such as the SIM cards and terminators. If possible, retain the original packaging in case you need to return any component to Anite. Please check that you have received all the items listed on the shipping list that accompanied your delivery. CAUTION The 8960 units are heavy and will require two people to lift them: the accompanying Agilent document provides guidance on handling. 3.1 PCC Please follow the instructions provided by Dell for setting up the PC. Note that the PC’s power supply may require switching manually for different mains supply voltages. Plug the dongle into the PC’s parallel port. All software is pre-installed when your SAT(A) system is delivered. The software is also provided on CD-ROM, in case reinstallation is required. 3.2 2G systems using the vertical combiner Anite no longer sells the vertical combiner referred to in this section; this description has been included for the benefit of customers who already have this type of combiner. Place the vertical combiner and 8960s on a suitable workbench. 8960s can be stacked, but a stack must not be higher than two 8960s. For ease of cabling, place the vertical combiner in the centre of the arrangement. Leave a ventilation gap between the combiner and the 8960s. In systems with more than four 8960s it is necessary to place baffles between them, to avoid overheating. For 2G systems, the correct baffles have part number B4605/600. Place the baffles between the outer and inner 8960s so the shaped sides of the baffle fit against the sides of the 8960s.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 7

Page 17: anite tutorial

This figure illustrates a system with eight transceivers.

Figure 1 - 2G system using the vertical combiner

One 8960 is designated as the ‘master 8960’: this is numbered #1 in the illustration. The master 8960 controls the synchronisation of the others and is connected in a different way from them, so the arrangement of the units is important. The master 8960 is the unit with the lowest IP addresses. In a new system, IP addresses are pre-configured and indicated on the packaging. If you are configuring a system yourself, you can designate the master 8960 when you set the IP addresses as described in Section 5.1. The general principles for connections are described now, and detailed instructions for one configuration are given in the next section. Together, this provides enough information for connecting any configuration. • RF connections are made at the front panels of the 8960s and the combiner. • 10 MHz reference connections are made at the rear, in a daisy-chain fashion. • Ethernet connections are made at the rear of the 8960s and the PCC; the other end of

every Ethernet cable connects to two Ethernet switches in the combiner. The two Ethernet switches are connected together.

• Mains power connections are made at the rear. The RF and BNC cables are numbered, and labelled at each end with the connection to which they should be attached. For calibration reasons, it is especially important to follow this labelling for RF cables. Each system is supplied with enough cables and terminators to build a system of any size up to eight transceivers, so you may have some unused cables and terminators when the system connections are completed. Keep these in a safe place, especially the RF cables, which will be required when the system is next re-calibrated by Anite.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 8

Page 18: anite tutorial

3.2.1 Example: SAT4(A)E 3.2.1.1 Front connections

Figure 2 - Vertical combiner: front connections

• Green lines - Use the appropriately numbered RF cable to connect from the RF In/Out

connector on each 8960 to the corresponding GSM/GPRS RF connector on the combiner unit.

• Orange line - Use the GSM SYNC cable to connect from the RF Out Only connector on the master 8960 #1 to the GSM/GPRS RF synchronisation connector on the combiner.

• Black line - Use the loopback cable to connect the SAT Test In and SAT Test Out connectors on the combiner to each other. Do the same for the U-SAT Test In and U-SAT Test Out connectors.

• Attach terminators to all unused connectors.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 9

Page 19: anite tutorial

3.2.1.2 Rear connections

Figure 3 - Vertical combiner: rear connections

• Red lines - Using the 10 MHz reference cables supplied with the 8960s:

- Connect the 10 MHz reference output 3 on the combiner to the 10 MHz IN connector on the master 8960 #1. Then connect the 10 MHz OUT connector on the master 8960 #1 to the 10 MHz IN connector on 8960 #2.

- Connect the 10 MHz reference output 1 on the combiner unit to the 10 MHz IN connector on 8960 #3. Then connect the 10 MHz OUT connector on 8960 #3 to the 10 MHz IN connector on 8960 #4.

- If you have a 6- or 8-transceiver system, connect the 10 MHz OUT connector on 8960 #2 to the 10 MHz IN connector on 8960 #5; and connect the 10 MHz OUT connector on 8960 #5 to the 10 MHz IN connector on 8960 #6.

- If you have an 8-transceiver system, connect the 10 MHz OUT connector on 8960 #4 to the 10 MHz IN connector on 8960 #7; and connect the 10 MHz OUT connector on 8960 #7 to the 10 MHz IN connector on 8960 #8.

• Blue lines - Using the supplied Ethernet cables: - Connect the LAN PORT connector on each 8960 to any of the SAT ports of the

Ethernet switches in the combiner unit. (Do not use the connections labelled U-SAT.)

- Connect together the two Ethernet switches in the combiner unit, using the patch cable and any ports in each switch. (Do not use the connections labelled U-SAT.)

- Connect the PCC’s internal Ethernet adapter, labelled ‘8960 ABP Connection’, to any port of the Ethernet switches in the combiner unit. (Do not use the connections labelled U-SAT. You do not need to use the PCC’s other Ethernet connectors.)

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 10

Page 20: anite tutorial

- Connect the EPCP port labelled CN12 in the PCC (the port labelled CN13 is not used) to any port of the Ethernet switches in the combiner unit. (Do not use the connections labelled U-SAT.)

• Connect mains power to the 8960s and the combiner. These units have power supplies that automatically detect the voltage in use, so no adjustment has to be made for local power supplies.

3.2.1.3 Additional equipment for Test Case TC_21_1 If you are using Anite’s CT application to run the 2G RLM Test Case TC_21_1, you will need the following additional equipment: • A National Instruments NI488.2 GPIB PCI card - Installed in the PCC. • A GPIB cable - Supplied with the card. • A Gigatronics 8541C Power Meter - Anite does not supply this. • Gigatronics 80401A Modulation Power Sensor (18GHz/N) and cable - Anite does not

supply these. The power meter must be correctly calibrated: please refer to the procedure in the Gigatronics Operations and Maintenance Manual. To connect the power meter and power sensor: • Connect the GPIB cable from the GPIB card in the PCC to the power meter. • Connect the power sensor cable to the ‘A’ port of the power meter. • Connect the power sensor to the upper ‘DL Power Sensor’ port on the vertical

combiner, as shown below.

Figure 4 - Connections for Test Case TC_21_1

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 11

Page 21: anite tutorial

3.3 Systems using the horizontal combiner All new systems - 2G, 3G and multiRAT - are shipped with the horizontal combiner. 3G transceivers are formed by arranging an ABP and its 8960 as a pair, with the ABP on top of the 8960. Transceivers can be stacked, but a stack must not be higher than two transceivers. Every 8960 and ABP is designated with a number. In a new system,. Because of cable lengths, transceivers should be physically arranged as shown in the diagram below; for a system with fewer than eight transceivers, simply ignore the higher-numbered units. (If you are taking delivery of a new system, the numbers are marked on the units and the ‘Read Me First’ note accompanying your shipment contains a diagram showing the layout.)

Figure 5 - SAT8(A)UE system

#1

#2

#5

#6

#3

#4

#7

#8

#1

#2

#5

#6

#3

#4

#7

#8

baffle baffle baffle

ABPs

8960s

ABPs

8960s

combiner

First, fit cable brackets: these guide the RF cables that run between the 8960s and the combiner. There are two types of cable bracket: • Side bracket (part number B5007/420/A) - Screw this onto the right-hand side of each

8960, using three M4 captive screws. Before fitting it, remove the self-adhesive plastic overlay that covers the screw holes on the side of the 8960.

• Top bracket (part number B5007/420/B) - Screw this onto the top of either the 8960 or the ABP, using four M3 captive screws.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 12

Page 22: anite tutorial

The diagram below shows an example system with the two types of cable bracket in place.

Figure 6 - Cable brackets

POWER

STATUS

BASEBAND PROCESSOR

POWER

STATUS

BASEBAND PROCESSOR

POWER

STATUS

BASEBAND PROCESSOR

POWER

STATUS

BASEBAND PROCESSOR

POWER

STATUS

BASEBAND PROCESSOR

POWER

STATUS

BASEBAND PROCESSOR

POWER

STATUS

POWER

STATUS

TEST SET 7

BASEBAND PROCESSOR

TEST SET 3 TEST SET 11

TEST SET 4

COMBINER

TEST SET 8 TEST SET 12

TEST SET 9

SYNC

TEST SET 5

TEST SET 10

DL POWER MONITOR

TEST SET 6

TEST SET 1

MS / UETEST SET 2

POWER

STATUS

BASEBAND PROCESSOR

Place the ABPs and 8960s on a suitable workbench. In systems with more than two transceivers it is necessary to place baffles between transceivers, to avoid overheating. Baffles come in two heights. Use the shorter baffles (part number B4605/600) between short stacks (two 2G transceivers or one 3G transceiver). In all other cases use the taller baffles (part number B5007/421/A). The diagram below shows how to fit baffles.

Figure 7 - Baffles

BASEBAND PROCESSOR

STATUS

POWER

STATUS

POWER

TEST SET 3 TEST SET 7

TEST SET 4 TEST SET 8

TEST SET 11

TEST SET 12

COMBINER

BASEBAND PROCESSOR

STATUS

POWER

STATUS

POWER

TEST SET 2

DL POWER MONITOR

SYNC

TEST SET 9

TEST SET 10

TEST SET 5

TEST SET 6

TEST SET 1

MS / UE

BASEBAND PROCESSOR

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 13

Page 23: anite tutorial

If you are configuring a system yourself, please observe these numbering rules: • Numbering of 8960s starts at 1 and continues upwards continuously. So in a system

with n transceivers, the 8960s are numbered #1, #2…#n. 8960 #1 is also known as the ‘master 8960’.

• In a multiRAT system, the 3G transceivers take the highest numbers in the sequence. So in a system with three 2G transceivers and five 3G transceivers, the ABPs are numbered #4, #5…#8.

• Each ABP is paired with the 8960 that has the same number. So, in the same system, ABP #4 is paired with 8960 #4, and so on.

The figure below illustrates these rules.

Figure 8 - SAT4(A)E/SAT3(A)UE system

#1

#2

#5

#6

#3

#4

#7

#5

#6

#7

The #-numbering of units determines cabling arrangements (this section) and IP addressing (Section 5.1). It is also relevant to which ABPs are inactive if you choose to configure some 3G transceivers as 2G-only (Section 5.5). The general principles for connections are these. • RF connections are made at the front panels of the 8960s and the combiner. • 10 MHz reference connections are made at the rear, in a daisy-chain fashion. • Sync connections are made at the rear of each ABP, in a daisy-chain fashion. • LVDS connections are made between the rear of each 8960 and its paired ABP. • Ethernet connections are made at the rear of the 8960s, ABPs and the PCC; the other

end of every Ethernet cable connects to the Ethernet switches in the combiner. The two Ethernet switches are connected together.

• Mains power connections are made at the rear. The next two sections provide detailed instructions for connecting up the largest SAT configuration, a SAT12(A)UE. (However, since the largest configuration currently supported is SAT5(A)E/SAT3(A)UE, connections that apply only to larger configurations are printed in grey.) For a smaller configuration, just ignore the connections to units that are not present. When connecting up a SAT platform, we recommend that you print the tables here, cross out the connections that do not apply, and then tick each remaining connection as you make it. The RF, BNC and Ethernet cables are numbered. RF cables are also labelled at each end with the connection to which they should be attached: for calibration reasons, it is especially important to follow this labelling.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 14

Page 24: anite tutorial

Each system is supplied with enough cables and terminators to build a system of any size up to eight transceivers, so you may have some unused cables and terminators when the system connections are completed. Keep these in a safe place, especially the RF cables, which will be required when the system is next re-calibrated by Anite. 3.3.1 Front connections RF connections are made at the front panels of the 8960s and the combiner, using the RF cables supplied with the combiner. Each 8960 connects to the combiner. In addition, there is an RF synchronisation connection between the master 8960 #1 and the combiner.

Table 2 - RF connections

From To Cable Colour* Unit Port Unit Port

100 Grey Combiner SYNC 8960 #1 RF OUT ONLY 101 Black Combiner TEST SET 1 8960 #1 RF IN/OUT 102 Black Combiner TEST SET 2 8960 #2 RF IN/OUT 103 Black Combiner TEST SET 3 8960 #3 RF IN/OUT 104 Black Combiner TEST SET 4 8960 #4 RF IN/OUT 105 Black Combiner TEST SET 5 8960 #5 RF IN/OUT 106 Black Combiner TEST SET 6 8960 #6 RF IN/OUT 107 Black Combiner TEST SET 7 8960 #7 RF IN/OUT 108 Black Combiner TEST SET 8 8960 #8 RF IN/OUT 109 Black Combiner TEST SET 9 8960 #9 RF IN/OUT 110 Black Combiner TEST SET 10 8960 #10 RF IN/OUT 111 Black Combiner TEST SET 11 8960 #11 RF IN/OUT 112 Black Combiner TEST SET 12 8960 #12 RF IN/OUT

*The colour of the cable’s identification label. Attach terminators to all unused connectors.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 15

Page 25: anite tutorial

3.3.2 Rear connections The diagram below shows the connectors at the rear of an 8960 (bottom), an ABP (middle) and a combiner (top). Connections are shown for a SAT1(A)UE.

Figure 9 - SAT1(A)UE rear connections

10 MHz reference connections are made using the BNC cables supplied with each 8960: between the combiner and 8960s, and in a daisy-chain fashion between 8960s.

Table 3 - 10 MHz reference connections

From To Cable Colour* Unit Port Unit Port

320 Blue Combiner 10 MHz O/P 1 8960 #1 10 MHz IN 321 Blue 8960 #1 10 MHz OUT 8960 #2 10 MHz IN 322 Blue Combiner 10 MHz O/P 2 8960 #3 10 MHz IN 323 Blue 8960 #3 10 MHz OUT 8960 #4 10 MHz IN 324 Blue 8960 #2 10 MHz OUT 8960 #5 10 MHz IN 325 Blue 8960 #5 10 MHz OUT 8960 #6 10 MHz IN 326 Blue 8960 #4 10 MHz OUT 8960 #7 10 MHz IN 327 Blue 8960 #7 10 MHz OUT 8960 #8 10 MHz IN 328 Blue 8960 #6 10 MHz OUT 8960 #9 10 MHz IN 329 Blue 8960 #9 10 MHz OUT 8960 #10 10 MHz IN 330 Blue 8960 #8 10 MHz OUT 8960 #11 10 MHz IN 331 Blue 8960 #11 10 MHz OUT 8960 #12 10 MHz IN

*The colour of the cable’s strain relief sleeve.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 16

Page 26: anite tutorial

Intra-ABP sync connections are made using the short BNC cables supplied with each ABP. The first (lowest-numbered) ABP has two such connections; others have just one.

Table 4 - Intra-ABP sync connections

From To Cable Colour* Unit Sub-assembly, Port Unit Sub-assembly, Port

300 Black First ABP DIO A, SYNC O/P1 First ABP DIO A, SYNC I/P 300 Black ABP all units DIO B, SYNC O/P1 ABP all units DIO B, SYNC I/P

*The colour of the cable’s strain relief sleeve. Inter-ABP sync connections are made in a daisy-chain fashion, using the BNC cables supplied with the combiner. In the table below, the “first” ABP is the lowest-numbered one present in the system. (For example, in the SAT4(A)E/SAT3(A)UE system shown in Figure 8, the “first” ABP is #5, the “second” is #6, and the “third” is #7.)

Table 5 - Inter-ABP sync connections

From To Cable Colour* Unit Sub-assembly, Port Unit Sub-assembly, Port

301 Grey First ABP DIO A, SYNC Chain O/P Second ABP DIO A, SYNC I/P 302 Grey First ABP DIO A, SYNC O/P2 Third ABP DIO A, SYNC I/P 303 Grey Third ABP DIO A, SYNC Chain O/P Fourth ABP DIO A, SYNC I/P 304 Grey Second ABP DIO A, SYNC Chain O/P Fifth ABP DIO A, SYNC I/P 305 Grey Fifth ABP DIO A, SYNC Chain O/P Sixth ABP DIO A, SYNC I/P 306 Grey Fourth ABP DIO A, SYNC Chain O/P Seventh ABP DIO A, SYNC I/P 307 Grey Seventh ABP DIO A, SYNC Chain O/P Eighth ABP DIO A, SYNC I/P 308 Grey Sixth ABP DIO A, SYNC Chain O/P Ninth ABP DIO A, SYNC I/P 309 Grey Ninth ABP DIO A, SYNC Chain O/P Tenth ABP DIO A, SYNC I/P 310 Grey Eighth ABP DIO A, SYNC Chain O/P Eleventh ABP DIO A, SYNC I/P 311 Grey Eleventh ABP DIO A, SYNC Chain O/P Twelfth ABP DIO A, SYNC I/P

*The colour of the cable’s strain relief sleeve. LVDS connections are made between each 8960 and its paired ABP, using the LVDS cable supplied with each ABP.

Table 6 - LVDS connections

From To Cable Unit Sub-assembly, Port Unit Port

B5007/522 ABP all units DIO A, LVDS Interface A 8960 all units Digital Bus Ethernet connections are made using the cables supplied with the combiner. One end of every cable connects to an Ethernet switch in the combiner. There are Ethernet connections to every 8960, every ABP, three connections to the PCC (two Ethernet adapters and the EPCP card), and two connections to the CRMP within the combiner. Also, the two Ethernet switches are connected together.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 17

Page 27: anite tutorial

Table 7 - Ethernet connections

From To Cable Colour* Unit Sub-assembly, Port Unit Sub-assembly, Port

212 Grey Combiner Top Ethernet Switch, 1 Combiner CRMP ETH2 201 Red Combiner Top Ethernet Switch, 2 PCC ‘CRMP Connection’ 220 Yellow Combiner Top Ethernet Switch, 3 ABP #1 Ethernet 221 Yellow Combiner Top Ethernet Switch, 4 ABP #2 Ethernet 222 Yellow Combiner Top Ethernet Switch, 5 ABP #3 Ethernet 223 Yellow Combiner Top Ethernet Switch, 6 ABP #4 Ethernet 224 Yellow Combiner Top Ethernet Switch, 7 ABP #5 Ethernet 225 Yellow Combiner Top Ethernet Switch, 8 ABP #6 Ethernet 226 Yellow Combiner Top Ethernet Switch, 9 ABP #7 Ethernet 227 Yellow Combiner Top Ethernet Switch, 10 ABP #8 Ethernet 228 Yellow Combiner Top Ethernet Switch, 11 ABP #9 Ethernet 229 Yellow Combiner Top Ethernet Switch, 12 ABP #10 Ethernet 230 Yellow Combiner Top Ethernet Switch, 13 ABP #11 Ethernet 231 Yellow Combiner Top Ethernet Switch, 14 ABP #12 Ethernet 210 Grey Combiner Top Ethernet Switch, 16 Combiner Bottom Ethernet Switch, 16 211 Grey Combiner Bottom Ethernet Switch, 1 Combiner CRMP ETH1 200 Red Combiner Bottom Ethernet Switch, 2 PCC ‘8960 ABP Connection’ 240 Green Combiner Bottom Ethernet Switch, 3 8960 #1 LAN Port 241 Green Combiner Bottom Ethernet Switch, 4 8960 #2 LAN Port 242 Green Combiner Bottom Ethernet Switch, 5 8960 #3 LAN Port 243 Green Combiner Bottom Ethernet Switch, 6 8960 #4 LAN Port 244 Green Combiner Bottom Ethernet Switch, 7 8960 #5 LAN Port 245 Green Combiner Bottom Ethernet Switch, 8 8960 #6 LAN Port 246 Green Combiner Bottom Ethernet Switch, 9 8960 #7 LAN Port 247 Green Combiner Bottom Ethernet Switch, 10 8960 #8 LAN Port 248 Green Combiner Bottom Ethernet Switch, 11 8960 #9 LAN Port 249 Green Combiner Bottom Ethernet Switch, 12 8960 #10 LAN Port 250 Green Combiner Bottom Ethernet Switch, 13 8960 #11 LAN Port 251 Green Combiner Bottom Ethernet Switch, 14 8960 #12 LAN Port 202 Red Combiner Bottom Ethernet Switch, 15 PCC EPCP SBC, C12

*The colour of the cable’s strain relief sleeve.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 18

Page 28: anite tutorial

3.3.3 Additional equipment for Test Case TC_21_1 If you are using Anite’s CT application to run the 2G RLM Test Case TC_21_1, you will need the following additional equipment: • A National Instruments NI488.2 GPIB PCI card - When a SAT(A) system is ordered

with this test case, the GPIB card is fitted in the PCC before shipment. • A GPIB cable - Supplied with the card. • A Gigatronics 8541C Power Meter - Anite does not supply this. • Gigatronics 80401A Modulation Power Sensor (18GHz/N) and cable - Anite does not

supply these. The power meter must be correctly calibrated: please refer to the procedure in the Gigatronics Operations and Maintenance Manual. To connect the power meter and power sensor: • Connect the GPIB cable from the GPIB card in the PCC to the power meter. • Connect the power sensor cable to the ‘A’ port of the power meter. • Connect the power sensor to the upper ‘DL Power Sensor’ port on the combiner. 3.3.4 Switching on and warming up Check that all connections are correctly made, then connect the power leads and switch on the PCC, 8960s, ABPs and the combiner: • The 8960s will then perform power-up self-checks. Check that all the 8960s are

running properly by confirming that the Anite logo is shown on the their displays. • Check that the STATUS and POWER indicators on the ABPs are green. If a STATUS

indicator is red, the unit may be faulty: please contact Anite’s Help Desk (see Section 10).

• Check that the POWER indicator on the combiner is green. Allow 20 minutes for the

combiner to warm-up: this is required for its rubidium reference source to reach the correct operating temperature. During the warm-up period the combiner’s STATUS indicator will remain red.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 19

Page 29: anite tutorial

4 Installing software on the PCC If you have purchased a new SAT(A) system, you can skip this section, since the software was installed before delivery. 4.1 Installing PT for 3G or multiRAT testing Anite provides two versions of PT: • PT (UTRAN) for 3G testing. • PT (GERAN) for 2G testing - this is installed alongside PT (UTRAN) for multiRAT

testing. If you already have a previous release of PT installed on the PCC, then before installing the new version please: • Close all applications, including Anite applications. In particular, stop GuildFTP.exe

and AniteLicenser.exe, both of which are accessible via the system tray. • Run Cleanup by selecting Start | Programs | Anite Telecoms | Programmer’s

Toolset (UTRAN) | Cleanup UTRAN. Run setup.exe from the root directory of the CD-ROM (or CD-ROM image, if downloaded from Anite’s support website). Then follow the on-screen instructions. During installation, the question ‘Do you have a MultiRAT system?’ will be displayed. If you click Yes, PT (GERAN) software will also be installed. This process will also install on the PCC: • Software tools: the HouseKeeping Utility, Anite Version Controller, the Agilent File

Utility, Anite Log Viewer, the CleanUp utility and - if PT (GERAN) is installed - the SAT Configuration Tool.

• User documentation. • Software that can be transferred from the PCC to other components of the SAT(A)

system. 4.2 Uninstalling PT When you install a new release of PT (UTRAN) or PT (GERAN), you do not need to uninstall older releases. Anite recommends that you leave old releases installed, so that you can revert to them if needed: the reasons and method for doing this are described in Section 6. Should you decide that you no longer need an older PT release, you can uninstall it as follows. • Close all applications, including Anite applications. In particular, stop GuildFTP.exe

and AniteLicenser.exe, both of which are accessible via the system tray. • Run Cleanup by selecting Start | Programs | Anite Telecoms | Programmer’s

Toolset (UTRAN) | Cleanup UTRAN. • Open the Control Panel (select Start | Settings | Control Panel). • Select Add/Remove Programs. • Select the release that you want to uninstall. • Click Change/Remove and follow the on-screen instructions.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 20

Page 30: anite tutorial

4.3 Installing the licence file Your Anite software is protected by a licence and will run only if you have a valid licence file installed on the PCC and a corresponding Anite dongle attached to the PCC’s parallel (printer) port. Six files are supplied on a floppy disk: • Sat.lic, the licence file • Serial.lic, where Serial is the serial number of the dongle. • Software Licence.txt, which contains details of the licence file. • Serial.exe, a tool that displays the dongle number. • Verifier.exe, a tool that verifies that the dongle and licence file correspond. • Readme.doc, which details how to install a new licence file and licence updates.

(Users of Anite’s Network Licensing system, which separately manages the use of CT test cases, can also refer to the Anite Network Licensing User Manual [3].)

To install the licence file: • Stop AniteLicenser.exe, which is accessible via the system tray. • Copy the six files to the PCC’s root directory (C:\), ensuring that any previous version

of Sat.lic is replaced. • Restart the PCC.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 21

Page 31: anite tutorial

5 Configuring the system This section explains how to set the software parameters that configure your SAT(A) system. There are six subsections: • Assigning IP addresses to the components of the system. • Loading software into the 8960s. • Checking the setup of the SAT’s 2G elements. • Loading PT firmware into the combiner and ABPs. • Defining 2G and 3G transceivers in a multiRAT system. • Entering calibration data. If you have purchased a new system, it will have been configured before delivery, so you can skip this section unless you wish to change the configuration. If you have purchased transceivers to add to an existing SAT system, they will have been configured appropriately. However, in some cases it will be necessary for you to follow this section to re-configure your existing system. 5.1 Assigning IP addresses This section describes how to assign IP addresses to the components of SAT(A). These components have IP addresses: the PCC, the 8960s, the ABPs, and the CRMP within the combiner. All these addresses are set manually. Three subnets are used: • 201.20.1.x: the CRMP and one of the PCC’s Ethernet adapters. • 201.20.2.x: the CRMP, 8960s, ABPs and another of the PCC’s Ethernet adapters. • 201.20.3.x: the ABPs. 5.1.1 PCC IP addresses The IP address of the PCC’s second Ethernet PCI adapter card, labelled ‘Corporate LAN (optional)’, can be set to any value, so long as it does not use any of the three subnets listed above. For example, it may be configured to connect to another network, such as a corporate network. If, however, you are using a proxy server to connect to that network, you will need to change the proxy settings in Windows as follows: • Select Start | Settings | Control Panel | Internet Options: the Internet Properties

window opens. • Click on the Connections tab. • Click the LAN Settings button: the LAN Settings window opens. • If you have chosen to use a proxy server, the Advanced button will be visible: click it

to open the Proxy Settings window. • In the box labelled ‘Do not use proxy server for addresses beginning with’ enter these

subnets: 201.20.1.* 201.20.2.* 201.20.3.*

• Click OK to close each of the windows. IP addresses must be assigned to the other two Ethernet adapters:

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 22

Page 32: anite tutorial

• The internal Ethernet adapter on the PCC’s motherboard has IP address 201.20.2.1. On a new SAT system, this adapter is named ‘8960 ABP Connection’ in Windows Network and Dial Up Connections and on its connector label.

• The first Ethernet PCI adapter card has IP address 201.20.1.1. On a new SAT system, this adapter is named ‘CRMP Connection’ in Windows Network and Dial Up Connections and on its connector label.

Assign these IP addresses in Windows: • Select Start | Settings | Control Panel | Network and Dial Up Connections. • Right-click on the required Ethernet adapter in the list and select Properties. • Select Internet Protocol (TCP/IP) and click Properties. • Type in the required IP address. • Click OK twice to return to the list of Ethernet adapters. • Repeat for the second Ethernet adapter.

Figure 10 - Setting the Ethernet adapter IP address

5.1.2 8960 IP addresses Normally, you will not need to change the IP addresses of your 8960s. This will only be required when, for example, an 8960 is moved from one SAT system to another. Each 8960 unit has a reserved set of four consecutive IP addresses, two of which are used by the Anite software. These two are known as the ‘LAN IP address’ and the ‘Protocol IP address’.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 23

Page 33: anite tutorial

The IP addresses of an 8960 are linked to the unit’s number as follows.

Table 8 - IP addresses for 8960s and ABPs

8960 IP addresses 8960 unit number (See Section 3)

LAN IP address Set by user

second IP address Hidden (set automatically)

Protocol IP address Set by user

fourth IP address Hidden (set automatically)

ABP IP address (See Section 5.1.3)

#1 (master) 201.20.2.4 201.20.2.5 201.20.2.6 201.20.2.7 201.20.2.128 #2 201.20.2.8 201.20.2.9 201.20.2.10 201.20.2.11 201.20.2.129 #3 201.20.2.12 201.20.2.13 201.20.2.14 201.20.2.15 201.20.2.130 #4 201.20.2.16 201.20.2.17 201.20.2.18 201.20.2.19 201.20.2.131 #5 201.20.2.20 201.20.2.21 201.20.2.22 201.20.2.23 201.20.2.132 #6 201.20.2.24 201.20.2.25 201.20.2.26 201.20.2.27 201.20.2.133 #7 201.20.2.28 201.20.2.29 201.20.2.30 201.20.2.31 201.20.2.134 #8 201.20.2.32 201.20.2.33 201.20.2.34 201.20.2.35 201.20.2.135

5.1.2.1 Setting 8960 IP addresses To set the LAN IP address: • Press the System Config key on the 8960 front panel. • Press the Instrument Setup key: a screen like this will be displayed.

Figure 11 - 8960 Instrument Setup screen

• Use the dial to select LAN IP address in the list. • Press the Enter key to enter the input mode. • Use the keypad to enter the new LAN IP address. • Use the Cancel or Enter keys to cancel or confirm the new address.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 24

Page 34: anite tutorial

Whenever the LAN IP address is changed, the protocol IP address must also be changed. To change the protocol IP address, the Anite application must be running on the unit. To change the protocol IP address: • Press the Call Setup key on the 8960 front panel: a screen like this will be displayed.

Figure 12 - 8960 Call Setup screen

• Press the key next to Protocol IP Address. • Use the keypad to enter the new protocol IP address. • Use the Cancel or Enter keys to cancel or confirm the new address. When the new address is confirmed, the reserved IP addresses will also change. The reserved IP address displayed is the highest in the set of four IP addresses allocated to a unit. Now, to update the IP addresses, switch the 8960 off then on to reboot it. 5.1.2.2 Checking 8960 IP addresses When you have set the IP addresses of all the 8960s, you can use the SAT Configuration Tool to confirm that they are properly configured and connected. Start the SAT Configuration Tool: • If you have a 2G-only SAT, select Start | Programs | Anite Telecoms |

Programmer’s Toolset (GERAN) | Administration | SAT Configuration Tool. • If you have a 3G or multiRAT SAT, select Start | Programs | Anite Telecoms |

Programmer’s Toolset (UTRAN) | SATConfig. First, a dialogue box asks you to choose which type of SAT you are using. Choose Agilent and click OK.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 25

Page 35: anite tutorial

Figure 13 - SAT Configuration Tool: hardware selection

Then, the Anite SAT Configuration Tool window opens.

Figure 14 - SAT Configuration Tool: Hardware tab

The SAT Controller NIC Card panel should display 210.20.2.1, as shown here. If not, select from the menu Setup | Options | Select Network Card and choose the entry with that address. Now click Find Agilent. You will now see a dialogue box with information about 8960 software versions. We will deal with this later (Section 5.5), so at this stage you should dismiss the dialogue box by clicking OK or No. The values in the IP Entry Boxes panel will now all adopt the subnet 210.20.2.x, and set the fourth octet of each field to the expected values of LAN IP address (4, 8, 12, etc). The SAT Configuration Tool will now search for 8960s at those addresses shown. As each 8960 is

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 26

Page 36: anite tutorial

found, the fourth octet will change from grey to white, to indicate that an 8960 with that address has been found. Check that the result matches your SAT configuration. If it does not, perform the checks listed below, then click Find Agilent to try again. • Check that the combiner is switched on. • Check that every 8960 is switched on, is displaying the correct IP address, the Anite

logo and ‘ExtRef’, is not displaying any warning message, and responds when a front panel key is pressed.

• Check that all cables are connected as described in Section 3, and that no cable is damaged.

• Check that the indicator light is lit on each Ethernet switch port in use. (You can ignore the Reserve for UTRAN panel for the present: we will return to that later.) Now close the Anite SAT Configuration Tool window. 5.1.3 ABP and combiner IP addresses ABPs and combiners are delivered already configured with IP addresses. You should only need to change them if, for example, an ABP is moved from one SAT system to another. ABP and combiner IP addresses are set by using the HouseKeeping Utility, as follows: • Ensure that the combiner and ABPs are connected and switched on. • Start HouseKeeping by selecting Start | Programs | Anite Telecoms | Programmer’s

Toolset (UTRAN) | HouseKeeping. • Click on the System Configuration tab.

Figure 15 - HouseKeeping: System Configuration tab

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 27

Page 37: anite tutorial

• In the SAT U panel, click on the SAT(A) radio button. This will take you to the Device Settings tab.

Figure 16 - HouseKeeping: Device Settings tab

• In the PC Controller panel, type 201.20.1.1 in the IP Address text box. (This is the IP

address of the PCC’s Ethernet adapter ‘CRMP Connection’.) • In the Centralised RLC/MAC Processor panel, type 201.20.1.2 in the IP Address

text box. (This is the first of the CRMP’s two IP addresses.) • (For the moment, ignore the Combiner and UE Cable panels: we will come back to

those later.)

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 28

Page 38: anite tutorial

• Click the Configure Devices button: this window opens:

Figure 17 - HouseKeeping: Configure Anite Combiners and Baseband Processors window

Click Search for Anite Combiners and Baseband Processors. The HouseKeeping Utility will now search for devices connected on subnets 201.20.1.x and 201.20.2.x. Its findings are displayed in the window illustrated above: • Any combiner(s) found appear in the list box on the left side of the Combiners panel.

A combiner’s CRMP has two IP addresses: when you select a combiner on the left, the two addresses are shown in the fields on the right. The “Ethernet 1” IP Address should be 201.20.1.2 and “Ethernet 2” IP Address should be 201.20.2.2. You can change either or both of these addresses by typing in the new value and then clicking the Set button. Then switch the combiner off and on to reboot it, which puts the address change into effect.

• A list of ABPs found appears in the list box on the left side of the Baseband Processors panel. When you select an entry in that list, the IP address of that ABP is shown in the “Ethernet” IP Address field. (Shown below is the Recommended 8960 IP Address for that ABP address. This cannot be changed; it simply reproduces the information in Table 8.) However, it is not possible to tell which entry in the list corresponds to which physical ABP unit. So to properly check that each ABP has the correct IP address it is necessary to follow this ‘build-up’ procedure: - Switch off all ABPs except one. - Click Search for Anite Combiners and Baseband Processors. - Click on the ABP that appears on the left side of the Baseband Processors panel:

this is the ABP that you left connected. - Check that its IP address, as shown in the “Ethernet” IP Address field, accords

with Table 8. If not, change it by typing in the correct address and then clicking the Set button. Then switch the ABP off and on to reboot it, which puts the address change into effect.

- Repeat for each ABP in the system, selecting each time the ABP that newly appears.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 29

Page 39: anite tutorial

If a device does not appear in a list box, check first that it is switched on and properly connected, then click the Search for Anite Combiners and Baseband Processors button again. If the device still does not appear, the problem may be that it has an IP address other than 201.20.1.x or 201.20.2.x. Follow these steps: • In the Set Network ID panel, select 201.20.2.1, then click the Broadcast button. This

will assign all ABPs and CRMPs - including the missing device - into subnet 201.20.2.x.

• In the Set Network ID panel, click the Broadcast Reboot button. This will reboot all those ABPs and combiners, putting any address change into effect.

• Wait 30 seconds, then click the Search for Anite Combiners and Baseband Processors button again. The missing device should now appear, and you can adjust its IP address as described above, if necessary.

• You will also need to restore the “Ethernet 1” IP Address in the Combiners panel to its correct value, as described above.

The other features of HouseKeeping’s ‘Configure Anite Combiners and Baseband Processors’ window are: • A Reboot all Anite Combiners and Baseband Processors button: this will reboot all

ABPs and combiners identified in the list boxes. • The Duplicate IP Addresses field: this lists IP addresses that are assigned to more than

one device. You can correct this using the ‘build-up’ procedure described above. When you have finished setting IP addresses, click the Close button, to reveal again the main HouseKeeping window. To save your settings, select from the menu File | Save File, then close the HouseKeeping window. The other menus in HouseKeeping are: • File - entries here allow the opening, saving and exiting of the HouseKeeping

configurations. • Help - the About entry displays the version number of HouseKeeping. • System and Device - these are not used with SAT(A). The other tabs of the HouseKeeping window are: • E-MMI System Configuration - this is not used when setting up. • UIP Status - this is not used with SAT(A). 5.2 Uploading Anite software to the 8960s After installing a new release of PT (UTRAN), you need to check whether the Anite software in your 8960s needs to be updated. To do this, start the Anite Version Controller by selecting Start | Programs | Anite Telecoms | Version Controller. A window like this will open:

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 30

Page 40: anite tutorial

Figure 18 - Anite Version Controller

In the drop-down menus of the Version panel, select the version of PT (UTRAN) that you are using. The System Requirements panel will now show: • Which version of Anite application software needs to be running in your 8960s: this is

the entry that begins ‘SAT(A)’. Make a note of this. • Which version of ABP firmware is required: this is the entry that begins ‘SAT(A)U’.

(This is for information only; you do not need to make a note of it.) Click Exit to close the window. Now check each of your 8960s in turn to check whether the version of Anite software you just noted is present and running: 1) Press the System Config key on the front panel of the first 8960. A screen like this will

appear: in this example, the Anite application (which is named ‘GSM/GPRS RF Modem’) is currently running.

Figure 19 - 8960 System Config screen

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 31

Page 41: anite tutorial

2) If your 8960 is running version of Anite application software you noted earlier, you can move on to the next 8960 in your system. If it is running the Anite application, but not the correct version, skip to step 3. If it is running another application, switch to the Anite application as follows: - Press the Application Selection key, then the Application Switch key. The

screen displays a list of all the applications installed in your 8960. - Using the dial, scroll through the list to select the entry ‘GSM/GPRS RF

Modem’.

Figure 20 - 8960 Application Switch screen: selection

- Push the dial in to select the Anite application. The screen displays a message asking whether you wish to switch. Use the dial to select Yes, then push the dial in.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 32

Page 42: anite tutorial

Figure 21 - 8960 Application Switch screen: confirmation

- You will now see the System Config screen again, now showing the Anite application.

3) Press the Application Selection key, then the Application Setup key. The screen displays a list of all the applications installed in your 8960. Using the dial, scroll through the list to select the entry ‘GSM/GPRS RF Modem’, then push the dial in. The screen displays a list of all versions of the Anite application installed on the 8960.

Figure 22 - 8960 Application Setup screen: selection

4) If the version of the Anite application you noted earlier is already present, use the dial

to select it, then push the dial in. The screen displays a message asking whether you

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 33

Page 43: anite tutorial

wish to switch. Use the dial to select Yes, then push the dial in. Finally, switch the 8960 off then on, to reboot it. Then move on to the next 8960 in your system.

5) If that version is not present, you will need to ‘upload’ it from the PC using the Agilent 8960 File Utility, described next. First, though, finish checking all your 8960s by repeating this procedure.

If the procedure just described shows that any of your 8960s does not have required version of the Anite application, you need to ‘upload’ it from the PCC using the Agilent 8960 File Utility. Launch the utility from the desktop icon or from the Start menu. The first dialogue box that appears is a licence agreement.

Figure 23 - Agilent File Utility: licence agreement

Click Accept to proceed to the main window.

Figure 24 - Agilent File Utility: main window

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 34

Page 44: anite tutorial

The first time you use Agilent File Utility, it needs to be configured to take its software images from the PCC. To do this, choose Options. The settings should be as shown in the following window.

Figure 25 - Agilent File Utility: Options window

Correct the values if necessary and then click OK. You will return to the main window. To install the new software on all 8960s in a system, choose the option LAN Connection (Multiple Test Sets). The utility will then scan the hard disk of the controller PCC for applications. A window opens to show the progress of this function. Wait for the scanning process to complete. The window closes automatically.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 35

Page 45: anite tutorial

Figure 26 - Agilent File Utility: scanning for applications

You may see a warning about licence files. This is a normal message and does not indicate an error. If you see a message box like the one shown here, click Yes.

Figure 27 - Agilent File Utility: licence file warning

The bottom half of the next window shows the list of applications found on the hard disk. The list on your system may be different from the picture below, depending on your configuration.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 36

Page 46: anite tutorial

Figure 28 - Agilent File Utility: applications list

Next, the list of 8960s must be entered in the top half of the window. You need to add an entry for each 8960 in your system: • Click Add Test Set To List: a window opens.

Figure 29 - Agilent File Utility: Add Test Set window

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 37

Page 47: anite tutorial

• Referring to Table 8, enter the LAN IP address and a name for the 8960. (The name is any text you choose; we recommend that you include the # number of the 8960.) You do not need to enter the serial number: the Agilent File Utility will obtain it later by interrogating the 8960. Click OK.

• The 8960 appears in the top half of the main window. • Repeat these steps for each 8960 in your system. When all the 8960s have been entered, select the list of 8960s by clicking each entry while holding down the Ctrl key.

Figure 30 - Agilent File Utility: selecting the 8960s

Click the Connect To Test Sets button.

Figure 31 - Agilent File Utility: connection check confirmation box

Click Yes on the confirmation box. The utility then checks each 8960 in turn to find which applications and licences are present. A window opens to show the progress of this function.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 38

Page 48: anite tutorial

Figure 32 - Agilent File Utility: checking for applications and licences

If, while this procedure is taking place, you see the dialogue box shown below, the reason is that Windows was not configured as described at the start of Section 5.1.1. The dialogue box refers to the 8960 whose IP address is currently listed against ‘Current Action’ in the window shown above. Use Table 8 to determine the # number of that 8960. Then find its serial number by pressing the System Config key on its front panel, enter that in the dialogue box, and click OK.

Figure 33 - Agilent File Utility: serial number confirmation box

When the application check is complete, the main window reappears with information about the applications installed on each 8960.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 39

Page 49: anite tutorial

Figure 34 - Agilent File Utility: updated applications list

Note that the values in the Locations column have changed. The possible values are: • Local only - the application exists only on the PCC’s hard disk. • X Test Sets - the application exists on X 8960s, but not on the PCC’s hard disk. • Local + X Test Sets - the application exists on X 8960s, and also on the PCC’s hard

disk. Select the list of 8960s again and select the application and version you wish to upload. Then click Upload To Test Sets. A dialogue box appears.

Figure 35 - Agilent File Utility: upload confirmation box

Click OK to proceed: a window opens to show progress.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 40

Page 50: anite tutorial

Figure 36 - Agilent File Utility: upload progress indicator

Do not switch off the 8960 power until the upload process is complete, otherwise an error will occur when the unit is switched on again. When the upload process is complete: • Close the Agilent File Utility. • Switch the 8960s off then on, to reboot them 5.3 Checking the 2G setup If you have a 3G-only SAT system, you can skip this section. Start the SAT Configuration Tool: • If you have a 2G-only SAT, select Start | Programs | Anite Telecoms |

Programmer’s Toolset (GERAN) | Administration | SAT Configuration Tool. • If you have a multiRAT SAT, select Start | Programs | Anite Telecoms |

Programmer’s Toolset (UTRAN) | SATConfig. In the initial Hardware Selection window, choose Agilent and click OK. The SAT Configuration Tool window opens. Go to the Test menu.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 41

Page 51: anite tutorial

Figure 37 - SAT Configuration Tool: Test menu

First, choose Combiner Connections. This causes the 8960s to be synchronised together, thereby checking that all of the connections between 8960s and combiner, and between 8960s, are correct. If this test is successful, this dialogue box appears.

Figure 38 - SAT Configuration Tool: successful synchronisation test

If the test is not successful, check that all cables are connected as described in Section 3, and that no cable is damaged. Then run this test again. Next, choose PCP Connections. This checks that the EPCP card software is running correctly, and that the EPCP card is communicating with the 8960s. If this test is successful, this dialogue box appears.

Figure 39 - SAT Configuration Tool: successful EPCP card test

If the test is not successful, check that the SAT Configuration Tool settings are correct: see Section 5.1.2.2. Close the Anite SAT Configuration Tool window.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 42

Page 52: anite tutorial

5.4 Updating PT firmware in the combiner and ABPs Parts of the PT (UTRAN) software run as firmware in the combiner and ABPs. After installing a new release of PT (UTRAN), you will need to update the firmware in your combiner and ABPs. This is done using the HouseKeeping Utility, as follows: • Ensure that the combiner and ABPs are connected and switched on. • Start HouseKeeping by selecting Start | Programs | Anite Telecoms | Programmer’s

Toolset (UTRAN) | HouseKeeping. • Click on the System Configuration tab. • In the SAT U panel, select the SAT(A) radio button. This will take you to the Device

Settings tab.

Figure 40 - HouseKeeping: Device Settings tab

In the UIPs panel, enter in the Number of Enabled Devices spin box the number of ABPs in your SAT(A) system. The Device List field will now show that many entries: if your system has n ABPs, the list will show ‘UIP 1’, ‘UIP 2’…‘UIP n’. (The numbering here is not the same as ABP numbering; this is explained in Section 5.5.2.) Now click on the Firmware Upgrade tab.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 43

Page 53: anite tutorial

Figure 41 - HouseKeeping: Firmware Upgrade tab

The field PT (UTRAN) Version to Install displays the currently-installed version of PT (UTRAN). Click the Find Devices button: the field Devices and Versions will display the combiner and all the ABPs in your SAT(A) system, together with the versions of PT (UTRAN) firmware currently running in each. If any of the devices are running older versions, click the Upgrade Minimum UIPs button to download firmware to those devices only. Alternatively, you can click Upgrade All UIPs to download firmware to all devices. The progress of the download will be displayed.

Figure 42 - HouseKeeping: Firmware Upgrade Progress

When all the required devices have been upgraded you will be asked whether you wish to reboot them.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 44

Page 54: anite tutorial

Figure 43 - HouseKeeping: reboot dialogue box

Click Yes to complete the firmware installation. 5.5 Defining the RAT configuration This section explains how to inform the PT application which transceivers are operating in 3G mode and which in 2G mode. This has to be done separately in two places: in the SAT Configuration Tool and in the HouseKeeping Utility. 5.5.1 Defining RAT configuration in the SAT Configuration Tool Start the SAT Configuration Tool by selecting Start | Programs | Anite Telecoms | Programmer’s Toolset (UTRAN) | SATConfig. In the initial Hardware Selection window, choose Agilent and click OK. The SAT Configuration Tool window opens.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 45

Page 55: anite tutorial

Figure 44 - SAT Configuration Tool: Hardware tab

The IP addresses shown are those you set earlier (Section 5.1.2). Set the number of 3G transceivers you require using the Reserve for UTRAN spin box. Please note that in PT (UTRAN) 3.0, this value cannot exceed 3. Then click Find Agilent. The SAT Configuration Tool will ask you to reboot one or more 8960s - the ones whose 2G/3G mode has been changed. (It will identify them by their IP addresses; you can use Table 8 to convert this to their # numbers.) Do this by switching them off then on. Then, click Find Agilent again. The SAT Configuration Tool will now interrogate the 8960s, then display its findings.

Figure 45 - SAT Configuration Tool: search result

If the number of 8960s and the version of the Anite software application are as expected, click Yes. If either of these values is not correct, or if one of these error messages appears… • The SAT Configuration Tool cannot detect any 8960s.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 46

Page 56: anite tutorial

• One or more 8960s is running an application other than Anite’s. • Different versions of the Anite application are running on different 8960s:

Figure 46 - SAT Configuration Tool: search error result

…then the problem is likely to be in earlier configuration steps: please re-visit Sections 5.1 and 5.2. 5.5.2 Defining RAT configuration in the HouseKeeping Utility Start HouseKeeping by selecting Start | Programs | Anite Telecoms | Programmer’s Toolset (UTRAN) | HouseKeeping. Click on the System Configuration tab. In the SAT U panel, click the SAT(A) radio button. This will take you to the Device Settings tab.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 47

Page 57: anite tutorial

Figure 47 - HouseKeeping: Device Settings tab

In the UIPs panel, set the number of 3G transceivers in the Number of Enabled Devices spin box - the same value as you just used in the SAT Configuration Tool. The Device List field will now show ABPs to be used, listing them as ‘UIP 1’, ‘UIP 2’, etc. In a 3G-only system, UIP numbering is the same as ABP numbering. But in a multiRAT system they are different, because UIP numbering always starts at 1. This table shows the relationship.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 48

Page 58: anite tutorial

Table 9 - UIP numbering in a multiRAT system

ABP number Total number of transceivers

Number of 3G transceivers ‘UIP 1’ ‘UIP 2’ ‘UIP 3’

3 #6 #7 #8 2 #7 #8

8

1 #8 3 #5 #6 #7 2 #6 #7

7

1 #7 3 #4 #5 #6 2 #5 #6

6

1 #6 3 #3 #4 #5 2 #4 #5

5

1 #5 3 #2 #3 #4 2 #3 #4

4

1 #4 3 #1 #2 #3 2 #2 #3

3

1 #3 2 #1 #2 2 1 #2

When you click on an entry in the Device List field, the IP address field will show the address of the corresponding ABP. (You can check this by converting from UIP number to ABP # number using the table above, then looking up the IP address of that ABP # in Table 8.) Select from the menu File | Save File to save your settings, then close the HouseKeeping window. 5.6 Entering calibration data Calibration ensures that signal power levels are adjusted to compensate for losses in the combiner and RF cables. The software controls these adjustments using data in calibration files. So if the combiner or an RF cable is changed or re-calibrated, new calibration data must be entered, as described below. Calibration data for the combiner is provided in files on a CD-ROM with each new system: • 2G calibration data is in a file named ssss.csv. • 3G calibration data is in a file named AMRCssss.csv. (ssss is the serial number of the combiner.) Copy these files into any directory in the PCC, and make a note of the directory name. (In a new system, the calibration files will be in directory C:\Program Files\Anite\Cal.)

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 49

Page 59: anite tutorial

New versions of the files are provided each time the system is calibrated by Anite. Please note that calibration data is correct only when the RF cables are correctly connected: you cannot swap cables between combiner connections. (8960s are calibrated independently, and so may be swapped without loss of accuracy.) 5.6.1 Entering 2G calibration data 2G calibration data is entered using the SAT Configuration Tool. Start the SAT Configuration Tool: • If you have a 2G-only SAT, select Start | Programs | Anite Telecoms |

Programmer’s Toolset (GERAN) | Administration | SAT Configuration Tool. • If you have a 3G or multiRAT SAT, select Start | Programs | Anite Telecoms |

Programmer’s Toolset (UTRAN) | SATConfig. In the initial Hardware Selection window, choose Agilent and click OK. The SAT Configuration Tool window opens. Click on the Calibration tab.

Figure 48 - SAT Configuration Tool: Calibration tab

5.6.1.1 Combiner calibration In the SAT Calibration File panel, use the Browse button to select the 2G calibration file for your combiner. When a file is selected, the combiner serial number and the last calibration date appear in the panel. If the file selected is not of the correct type, this error message will appear.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 50

Page 60: anite tutorial

Figure 49 - SAT Configuration Tool: calibration file error

If this happens, check that you have selected the correct calibration file for your combiner. (The Dual RAT option in the Setup menu, and the Dual RAT Calibration File panel will always be disabled, so you only need to specify one calibration file.) 5.6.1.2 UE cable offset In the Mobile RF Cable Offset (dB) field, enter a value to compensate for the signal lost in the connection from the combiner to the UE. This value must be in the range from 0 to -4 dB. The value will often be 0 dB. Select from the menu File | Save. 5.6.1.3 Power meter information This section is only applicable if you are using Anite’s CT application to run the 2G RLM Test Case TC_21_1. For the hardware set-up, please see Section 3.2.1.3 (vertical combiner) or 3.3.3 (horizontal combiner). Click on the Power Meter tab.

Figure 50 - SAT Configuration Tool: Power Meter tab

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 51

Page 61: anite tutorial

Click the Use checkbox, then enter the serial number, calibration date and GPIB address of your power meter (an address of 30 is recommended). Select from the menu File | Save. Then close the Anite SAT Configuration Tool window. Finally, set the GPIB address in your power meter to match the address you have just entered: instructions for this are in the Gigatronics Operations and Maintenance Manual. 5.6.2 Entering 3G calibration data 3G calibration data is entered using the HouseKeeping Utility. Start HouseKeeping by selecting Start | Programs | Anite Telecoms | Programmer’s Toolset (UTRAN) | HouseKeeping. Click on the System Configuration tab. In the SAT U panel, click on the SAT(A) radio button. This will take you to the Device Settings tab.

Figure 51 - HouseKeeping: Device Settings tab

In the Combiner panel, click the Combiner Present checkbox, then use the Browse button to select the 3G calibration file for your combiner. In the UE Cable panel, enter the same value you entered in the SAT Configuration Tool for Mobile RF Cable Offset (dB). Select from the menu File | Save File to save your settings, then close the HouseKeeping window.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 52

Page 62: anite tutorial

6 Changing software versions This section explains how to change the versions of software running on the PCC, the 8960s, the combiner and ABPs. There are three situations in which you may need to do this: • To comply with conformance test rules - If you are running test cases using one of

Anite’s conformance test applications, CT or ACT, there are circumstances where the conformance test authority’s rules allow or require you to load an older version of the Anite application. Each version of Anite’s conformance test applications requires the matching version of PT.

• For compatibility with user-written code - If you write your own code to work with specific releases of PT, you may need to switch between those different versions of PT.

• To diagnose a problem - If you find that a test case or user-written program behaves differently after you have installed a new Anite application, you may need to revert to an older version to diagnose whether the difference was due to the upgrade or some other cause.

Changing the version of PT for any of these reasons may in turn mean changing the versions of Anite software running in the 8960s, and the PT firmware running in the combiner and ABPs. 6.1 Changing the active PT release As explained in Section 4.2, it is possible to have multiple versions of PT installed on the hard disk of your PCC. At any time, one of these is the ‘active release’: when you start PT, it is the active release that loads. The description that follows here assumes that you wish to change the active release to a version of PT that you have previously installed, ie to a version that is already present on your PCC’s hard disk. Close all applications, including Anite applications. In particular, stop GuildFTP.exe and AniteLicenser.exe, both of which are accessible via the system tray. Run Cleanup by selecting Start | Programs | Anite Telecoms | Programmer’s Toolset (UTRAN) | Cleanup UTRAN. Start the Anite Version Controller by selecting Start | Programs | Anite Telecoms | Version Controller. A window like this will open.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 53

Page 63: anite tutorial

Figure 52 - Anite Version Controller

In the Version panel, choose PT UTRAN in the first drop-down menu, then choose in the second drop-down menu the version you wish to make active. The System Requirements panel will now show: • Which version of Anite application software needs to be running in your 8960s: this is

the entry that begins ‘SAT(A)’. Make a note of this. • Which version of ABP firmware is required: this is the entry that begins ‘SAT(A)U’.

(This is for information only; you do not need to make a note of it.) Then click the Install Selected Version button and follow the on-screen instructions. Once the process is complete, you can check that the active release is indeed the version you selected. Click the Show Installed Version button. The name of the box on the right will change to Installation Information and will show the name of the active release. Click Exit to close the window. 6.2 Switching the 8960 software version Section 5.2 described how to upload Anite software to your 8960s. Each time you upload a version of Anite software to an 8960, it is stored on the unit’s hard disk alongside other previously-uploaded versions. This section describes how to change the version of Anite software that is running in an 8960.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 54

Page 64: anite tutorial

• Press the System Config key on the front panel of the first 8960. A screen like this will appear, showing which version of the Anite application is currently running.

Figure 53 - 8960 System Config screen

• Press the Application Selection key, then the Application Setup key. The screen

displays a list of all the applications installed in your 8960. Using the dial, scroll through the list to select the entry ‘GSM/GPRS RF Modem’, then push the dial in. The screen displays a list of all versions of the Anite application installed on the 8960.

Figure 54 - 8960 Application Setup screen: selection

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 55

Page 65: anite tutorial

• Use the dial to select the version you noted from Anite Version Controller (see previous section), then push the dial in. The screen displays a message asking whether you wish to switch. Use the dial to select Yes, then push the dial in.

• Finally, switch the 8960 off then on, to reboot it. 6.3 Changing the combiner and ABP firmware Please follow the procedure in Section 5.4.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 56

Page 66: anite tutorial

7 Anite Log Viewer The Anite Log Viewer allows you to view the .lfa log files created during testing. For full instructions about using the Anite Log Viewer, please read the Anite Log Viewer User Manual [4]: select Start | Programs | Anite Telecoms | Log Viewer User Manual. Before using the Anite Log Viewer, you need to ensure that it is configured correctly: • Start Anite Log Viewer by selecting Start | Programs | Anite Telecoms | Log Viewer. • Select from the menu View | Options.

Figure 55 - Anite Log Viewer: Options

• In the Directories panel, specify the directories as follows:

- DLL Root Directory should be C:\Program Files\Anite\LogViewer\DLLs. - Log File Root Directory should be C:\. - Filter Directory should be C:\Program Files\Anite\LogViewer\Filter.

• In the ‘C’ Source Options panel:

- C Source Editor - if you have a dedicated C source code editor installed, enter its path. Alternatively use Windows Notepad: C:\WINNT\Notepad.exe.

- C Source Editor Command Line - type: “<File>”. If your C source code editor supports jumping to a specific line within the source code, you can enter a command string specified by your editor’s manufacturer instead.

• If you have installed a TTCN editor, in the TTCN Source Options panel:

- TTCN Editor - select your TTCN editor’s executable. CT (UTRAN) users should use: C:\Anite\Conformance Toolset\Bin\ GotoTTCN111.exe.

- TTCN Editor Command Line – PT (UTRAN) users should enter “<TestSuite>” <Description> <Behaviour>.

• Save your settings by clicking the OK button.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 57

Page 67: anite tutorial

8 Using CleanUp to recover from program crashes The CleanUp utility is designed to clean up the PT (UTRAN) system when a user-written test application fails and leaves the system in an unstable condition. It will remove all running instances of Real Time Diagnostics (RTD) and Real Time Trace (RTT). CleanUp should be run even if the programs do not appear on the task bar, because they may still be running invisibly in the background. Before using CleanUp, close down as many of the PT (UTRAN) programs as possible. Then start Cleanup by selecting Start | Programs | Anite Telecoms | Programmer’s Toolset (UTRAN) | Cleanup UTRAN. CLEANUP.exe is located in C:\Program Files\Anite\UTRA\PT UTRAN\bin\. It recognises the following command line switches: • /demo

Terminates the following programs: - Real Time Diagnostics (RTD) - Real Time Trace (RTT) - Anite Log Viewer - SAT(H)U - UEHarness

• /ptgui Terminates PTGUI

• /? Displays all running processes

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 58

Page 68: anite tutorial

9 Routine maintenance 9.1 Calibration New systems are calibrated before delivery: each 8960 and combiner is accompanied by a calibration certificate. Re-calibration occurs in two ways, described in this section: • Customers should calibrate their 8960s once per year or whenever the 8960 front panel

displays a calibration message. This is described in Section 9.1.1. • Every two years, the whole system should be calibrated by Anite, as described in

Section 9.1.2. 9.1.1 Customer calibration This section describes two kinds of calibration to be carried out by the customer: • I/Q Calibration (Section 9.1.1.1) should be carried out once per year. • ALC calibration (Section 9.1.1.2) should be run after an I/Q calibration is done, or

whenever the 8960 front panel displays a calibration message. This happens when the ambient temperature has changed by more than 5ºC since the previous calibration.

The 8960 should be powered on and left to warm up for a period of at least 30 minutes before performing this procedure. 9.1.1.1 I/Q calibration Press the System Config key on the 8960 front panel.

Figure 56 - I/Q calibration: System Configuration screen 1

Press the More key, next to 1 of 2 on the right-hand side of the screen.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 59

Page 69: anite tutorial

Figure 57 - I/Q calibration: System Configuration screen 2

Press the F7 key to open the Service dialogue box.

Figure 58 - I/Q calibration: Service dialogue box

Only the first IQ modulator needs to be calibrated. You can ignore the second modulator. Press the Enter key to start the calibration. A progress bar appears. The procedure will take up to ten minutes to complete.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 60

Page 70: anite tutorial

Figure 59 - I/Q calibration: progress bar

A message appears when the calibration is complete.

Figure 60 - I/Q calibration: completion

Now switch the 8960 off then on to reboot it. Then perform an Open Loop ALC calibration (next section).

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 61

Page 71: anite tutorial

9.1.1.2 Open Loop ALC calibration When the 8960 has rebooted, the following screen will be displayed. (If not, press the Call Setup key to display it.) To allow the system to fully initialise, wait for at least 20 seconds before continuing.

Figure 61 - Open Loop ALC calibration: Call Setup screen

Press the F3 key to open the Open Loop Calibration dialogue box.

Figure 62 - Open Loop ALC calibration: dialogue box

Use the down arrow key to select Yes, then press Enter to start the calibration. A progress bar appears. The procedure will take up to ten minutes to complete.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 62

Page 72: anite tutorial

Figure 63 - Open Loop ALC calibration: progress bar

A message appears when the calibration is complete.

Figure 64 - Open Loop ALC calibration: completion

Finally, reboot the 8960.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 63

Page 73: anite tutorial

9.1.2 Anite’s calibration service Every two years, all of the Agilent 8960s and the combiner unit must be returned to Anite for calibration. It is important that calibration is completed by the due date, as accuracy of test results cannot be certain unless the equipment is within the required level of tolerance. Calibration is carried out as part of the maintenance agreement between Anite Telecoms and the customer. To arrange for the calibration to take place, please contact us, by email to [email protected], or by telephone to your nearest Anite Telecoms office. The calibration will be carried out by Agilent, at the nearest office to your site. Please always contact Anite Telecoms first - do not contact Agilent directly. 9.2 Software updates New versions of Anite products are released periodically. When a new version is released an email is sent to all customers who have a current maintenance contract. You can download a new release from the Anite Telecoms website, or you can request that new software releases be sent to you on CD-ROM. If you would prefer the CD-ROM option, please contact Anite Telecoms by email at [email protected] with your request. Each new release of Anite products includes installation instructions. A new product release may include a new version of Anite software for your 8960s, which you upload as described in Section 5.2.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 64

Page 74: anite tutorial

10 Getting help 10.1 Documentation While this User Guide is designed to tell you everything you need to know about the SAT(A) platform, you can find more information about Anite’s software at our support website www.anite.com/telecoms/support. The documentation there includes: • A document setting out the latest versions of Anite software. • A list of known issues. • Change notes. • Separate user manuals for PT GUI [2], Anite Network Licensing [3] and Anite Log

Viewer [4]. • More information about PT (UTRAN), including the manual for programming using

the PT (UTRAN) API [1]. • Information about SIM codes. To access Anite’s support website you will need a username and password; you can obtain this by emailing our Help Desk. 10.2 Anite’s Help Desk For customers with a current maintenance contract, Anite offers assistance by email via its Help Desk. [email protected] is the central email address for all our Help Desk locations, which are open during local office hours from Monday to Friday, except on public holidays. When contacting the Help Desk about a problem, please include a description of the problem and these files: • The .lfa signalling log file for 3G. • The AniteRPLog.txt signalling log file for 2G. • The diagfile.txt file, an internal diagnostic file for 3G. 10.3 Hardware repairs Hardware repairs are free of charge to customers with a maintenance contract at Service Levels 1 and 2 (unless the equipment has been damaged through misuse). Repairs under Service Level 3 are chargeable. Shipping costs are chargeable in all cases. If any component of your SAT(A) system needs a hardware repair, please contact our Help Desk, giving details of the component concerned. We will then arrange for our nearest repair centre to collect the component from you. Please note that cable brackets should be removed before shipping an 8960 or ABP. We aim to complete repairs within five working days of the equipment arriving at our repair centre. In cases where a repair would take longer, or where the component cannot be repaired, we will contact you to agree alternative arrangements such as a replacement.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 65

Page 75: anite tutorial

11 Glossary 8960 E5515C Wireless Communications Test Set from Agilent Technologies Inc

(see Section 2.3) ABP Anite Baseband Processor (see Section 2.4) ACT Anite’s application to run conformance test cases for application enablers API Applications Program Interface ARFCN Absolute Radio Frequency Channel Number CRMP Centralised RLC/MAC Processor, a component in the Anite Combiner (see

Section 2.5) CT Anite’s Conformance Toolset application DLL Dynamic-Link Library Dongle Anite’s licence hardware key IP Internet Protocol LVDS Low Voltage Differential Signalling MAC Medium Access Control multiRAT Multiple radio access technology: UTRAN + GERAN PCC PC Controller: the PC that controls a SAT(A) system PT Anite’s Programmer’s Toolset application RAT Radio Access Technology RLC Radio Link Control RF Radio Frequency SAS Anite’s network simulation application SAT Anite’s test platform, comprising one or more transceivers, a PCC and a

combiner (see Section 1.1) UE User Equipment

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 66

Page 76: anite tutorial

12 Document history Issue Date Remarks 1.0 June 2005 First issue to accompany the launch of SAT(A)UE. 2.0 June 2005 • Corrected umber of supported 3G transceivers.

• Removed section on PT GUI and referenced PT GUI manual. • Clarified physical layout. • Added adapter naming and labelling. • Added new section 5.3 and new Table 9. • Deleted appendix. • Minor editing changes updates.

2.1 July 2005 • Sections 1.2 & 1.3 - added references to HSDPA Test Applications.

• Section 2.1 - corrected shipping list. • Section 2.3 - added BBIO FPGA firmware version. • Section 3.3 - clarified cable colours. • Section 3.3 - clarified baffle arrangements. • Section 3.3 - added information about cable brackets. • Section 3.3 - Ethernet switch ports no longer optional. • Tables 4 & 5 - corrected errors. • Figure 10 - corrected. • Section 5.6 - nominated directory. • Sections 3.2.1.3 & 3.3.3 - new sections. • Section 5.6 - added default cable loss value. • Section 9.1.1.2 - added 20-second pause.

SAT(A) User Guide (B4605/UM/002 Issue 2.1) Page 67