TRANSCRIPT

Invitation to Tender/ Request for Proposal (RFP)

Unique Identifier

240-114238630

Revision

Rev 0

Revision Date

July 2019

Group Technology and Commercial

Enquiry no

CORP 4073

ESKOM HOLDINGS SOC LTD

INVITATION TO TENDER/REQUEST FOR PROPOSAL (RFP)

FOR

IT PROFESSIONAL SERVICES

ANNEXURES TO CORP 4073

CONTENTS OF ANNEXURES TO CORP 4073

1.Annexure A: Acknowledgement Form22.Annexure B: Tenderers Particulars83.Annexure C: Integrity Declaration Form114.Annexure D: Confirmation of Receipt of Addenda to The Enquiry165.Annexure E: Tax Evaluation Questionnaire176.Annexure F: Supplier B-BBEE And Shareholder Information187.Annexure G: Contract Conditions198.Annexure H: Technical Response Form (B2) (Excel Template)449.Annexure I: List Of Roles4510.Annexure J: Roles and Roles Description48

Invitation to Tender/ Request for Proposal (RFP)

Unique Identifier

240-114238630

Revision

Rev 0

Revision Date

July 2019

Group Technology and Commercial

Enquiry no

CORP 4073

Invitation to Tender/ Request for Proposal (RFP)

Unique Identifier

240-114238630

Revision

Rev 0

Revision Date

July 2019

Group Technology and Commercial

Enquiry no

CORP 4073

240-114238630 Invite to tender/ Request for proposal (RFP) CONFIDENTIAL TE Group Technology & Commercial

Effective July 2016

Page 1 of 2

ANNEXURES

1. Annexure A: Acknowledgement Form

Invitation to Tender/Request for Proposal No. CORP 4073 ________________________________

Name of company/JV: _______________________________________

Country of registration____________________________________

Name of contact person:___________________________________

Contact details of contact person:

Tel (landline) ______________________

Cell phone________________________

e-mail address_______________________

Acknowledgement:

We are in receipt of the Invitation to Tender/Proposal from Eskom Holdings SOC Ltd and the following addenda issued by Eskom:

-------------------------------------------------------------------------------------------------------------------------

We confirm that the documentation received by us is: (Indicate by ticking the box)

Correct as stated in the Invitation to Tender / RFP Content List, and that each document is complete.

Or:Incorrect or incomplete for the following reasons:

Cataloguing Acknowledgement:

[Please select the relevant statement by ticking the appropriate box below]:

We agree to provide the cataloguing information as described in the tender submission.

We have already supplied Eskom with the cataloguing information pertaining to this enquiry in a previous contract/order [insert previous invitation to tender/RFQ number] __________

We do not intend to provide the cataloguing information for the required scope / specifications. for the reasons stated hereunder:

_________________________________________________________________________________________________________________________________________________________________________________________________________

I confirm that I am a Distributor/Importer/Agent and my Principal, being the Original Equipment Manufacturer (OEM) is or is not in the position to supply cataloguing information for items. See attached letter from OEM confirming his position.

Single tenderers

I, the undersigned, _________________________________________(Full names) hereby confirm that I am duly authorised to sign all documents in connection with this tender and any contract resulting from it, on behalf of ___________________ (insert the full legal name of the tenderer).

Signature: _______________

Designation: ____________________

Date: _________________

Joint Ventures

We, the undersigned, are submitting this tender in Joint Venture and hereby authorise Mr/Ms _______________________________________(full names), an authorised signatory of _______________________________________, (insert the full legal name of the business entity serving as the lead partner) acting in the capacity of lead partner, to sign all documents in connection with the tender and any contract resulting from it on our behalf.

We attach to this Schedule a copy of the joint venture agreement which incorporates a statement that all partners are liable jointly and severally for the execution of the contract and that the lead partner is authorised to incur liabilities, receive instructions and payments and be responsible for the entire execution of the contract for and on behalf of any and all the partners.

Legal Name of Joint Venture Member

Full Name and Capacity of Authorised Signatory

Signature

240-114238630 Invite to tender/ Request for proposal (RFP) CONFIDENTIAL TE Group Technology & Commercial

Effective July 2016

Page 7 of 8

2. Annexure B: Tenderers Particulars

The tenderer must furnish the following particulars where applicable:

Indicate the type of tendering structure by marking with an X (where applicable provide registration number):

Individual tenderer

Unincorporated Joint venture (registration number for each member of the JV)

Incorporated JV

Other

Please complete the following:

Name of lead partner/member in case of JV

CIPC Registration Number (for each individual company / JV member)

VAT registration number (for each individual company / JV member)

CIDB registration number (for each individual company/JV member if applicable)

Shareholding information (for each individual company/JV member) clearly identifying percentages owned by individual shareholders (full names & ID Numbers) and other entity shareholders (provide full legal/trading name and respective identifying registration/trust numbers)

Include as separate tender returnable if required.

Contact person

Telephone number

E-mail address

Postal address (also of each member in the case of a JV)

Physical address (also of each member of the JV)

If subcontractors are to be used, indicate the following for the main subcontractor(s). Add to the list of applicable.

Name of contractor

CIPC Registration number

VAT registration number

CIDB Registration number (if applicable)

Shareholding organogram /breakdown (for each individual company/JV member) clearly identifying percentages owned by individual shareholders (full names& ID Numbers) and other entities (provide full legal/trading name and respective identifying registration/trust numbers)

Proposed Scope of work to be done by sub-contractor

Contact person

Telephone number

Fax number

E-mail address

Postal address

Physical address

If you are currently registered as a vendor with Eskom, please provide your Vendor registration number with Eskom.________________

If you are currently registered as a vendor on the Treasury Central Supplier Database(CSD) please provide your supplier registration number with Treasury_____________

Please note that it is mandatory for you to register on National Treasurys CSD, if you intend doing work with any State department or State owned entity/company.

You may register online at National Treasury website on www.treasury.gov.za

Alternatively, you may contact:

Name: Babalwa Mhlophe

Designation Middle Manager: SD&L

Signature: _______________

Date: ___________________

3. Annexure C: Integrity Declaration Form

Declaration Of Interest

I/We understand that any natural/legal person, including employees of the State and/or those related to an Eskom employee/director (as per the definition of related set out hereunder), may tender to Eskom. However, in view of possible allegations of favouritism (the practice of showing favour to, or giving preference to some person/group, to the detriment of, or at the expense of another that is entitled to equal treatment or an equal opportunity), should the resulting tender, or part thereof, be awarded to such natural/legal person, as described herein, it is required that the tenderer/s declare such interest/relationship where:-

the tenderer/s employees/directors are also employees/contractors/consultants/ directors in the state or a state-owned entity.

the tenderer/s employees/directors are also employees/contractors/consultants/ directors of Eskom

the tenderer/s employees/directors are also employees/contractors/consultants or directors in another entity together with Eskom employees/consultants/contractors/ directors

the legal person/s (including its employees/contractors/directors/members/ shareholders) on whose behalf the tender documents are signed, is in some other way related to an Eskom employee/contractor/consultant/director involved in the tender evaluation/tender adjudication/tender negotiation. Related meaning that:-

an individual is related to another individual of they are married, or live together in a relationship similar to marriage;

or are separated by no more than two degrees of natural or adopted consanguinity or affinity;

an individual is related to a juristic person if the individual directly or indirectly controls the juristic person, as determined in accordance with the definition of control (as per Companies Act section 2(1) ) ; and

a juristic person is related to another juristic person if :-

(1)either of them directly/indirectly controls the other, or the business of the other, as determined in accordance with the definition of control(as per Companies Act section 2(1) );

(2) either is a subsidiary of the other; or

(3)a person directly/indirectly controls each of them, or the business of each of them, as determined in accordance with the definition of control

the tenderer/s and one or more of the tenderers in this tendering/RFP process have a controlling partner in common, or a relationship with each other, directly or through common third parties, that puts them in a position to have access to information about or influence on the tender/proposal of another tenderer, or influence the decisions of Eskom regarding this bidding process;

To give effect to the provisions above, please complete the table hereunder with all required information.

Full Name & Capacity/ Position within tenderer (e.g. employee/Director/member/ owner/shareholder)

Identity Number

Confirm and provide details (including employee number) if you are a State/State owned entity employee/contractor/ director.

Full Names & Capacity/Position of Eskom employee/ director/ consultant and details of the relationship or interest(marital/

familial/personal/

financial etc.)

To your knowledge

is this person involved in the evaluation/

adjudication/

negotiation of tenders

If any employee/director/member/shareholder/owner of tenderer/s is also currently employed by Eskom, state whether this has been declared and whether there is authorisation(Y/N) to undertake remunerative work outside public sector employment, and attach proof to this declaration. _________________________

Do the tenderer/s and other tenderer in this tendering/RFP process share a controlling partner or have any relationship with each other, directly or through common third parties? (Y/N) If Yes, attach proof to this declaration.________________________

Declaration of fair tendering practices

This serves as a declaration that when goods/services are being procured, all reasonable steps have been taken to address and/or prevent the exploitation of the procurement process and the use of any unfair tendering practices.

A [tender/proposal] will be disqualified if the tenderer/s, or any of its directors have:

abused the institutions procurement process (e.g. bid rigging/collusion)

committed fraud or any other improper conduct in relation to such system.

Please complete the declaration with an X under YES or NO

Item

Question

Yes/No

No

1.1

Is the tenderer/s(or any of its directors/members/shareholders) listed on National Treasurys Database of Restricted Suppliers as companies/persons prohibited from doing business with the public sector, or listed on the Register for Tender Defaulters in terms of section 29 of the Prevention and Combatting of Corrupt Activities Act (No 12 of 2004)

The Database of Restricted Suppliers and the Register for Tender Defaulters can be accessed on the National Treasurys website (www.treasury.gov.za).

1.2

Was the tenderer/s (or any of its directors/members/shareholders) convicted by a court of law (including a court outside South Africa) for fraud and/or corruption with respect to the procurement/tendering processes/procedures during the past five years?

1.2.1

Provide details.

1.3

Was the tenderer/s(or any of its directors/members/shareholders) prohibited from doing business with any International Financial Development/funding Agency or Lending Institution

I, the undersigned, ________________________________________hereby confirm that I am duly authorised to sign all documents in connection with this tender and any contract resulting from it on behalf of ____________________________________ (insert the full legal name of the tenderer)

I declare that I have read and understood the provisions of the Supplier Integrity Pact, that all information furnished herein is correct, that it is understood that the tenderers tender/proposal may be rejected, and that Eskom will act against the tenderer should any aspect of this this declaration prove to be false.

Signature:

Designation and capacity in which signing:

Date:

Joint Ventures

I, the undersigned, ______________________________________________hereby confirm that acting in the capacity of lead partner, I am duly authorised to sign all documents in connection with the tender and any contract resulting from it on behalf of ______________________________________________________________(insert the full legal name of the JV ).

I declare that I have read and understood the provisions of the Supplier Integrity Pact, that all information furnished herein is correct, that it is understood that the JVs tender/proposal may be rejected, and that Eskom will act against the JV should any aspect of this this declaration prove to be false.

Signature:

Designation and capacity in which signing :

Date:

(A copy of the joint venture agreement which incorporates a statement that all partners are liable jointly and severally for the execution of the contract and that the lead partner is authorised to incur liabilities, receive instructions and payments and be responsible for the entire execution of the contract for and on behalf of any and all the partners is attached to the invitation to tender/Request for proposal).

4. Annexure D: Confirmation of Receipt of Addenda to The Enquiry

We confirm that the following communications received from the Employer before the submission of this proposal, amending the tender documents, have been taken into account in the proposal:

Item

Date Received

Title or Description

1.

2.

3.

4.

5.

6.

(Attach additional pages if more space is required)

__________________________________________________

Name and Designation

_____________________________________________________

Signature

5. Annexure E: Tax Evaluation Questionnaire

THE ATTACHED QUESTIONNAIRE TO BE COMPLETED AT CONTRACTING

6. Annexure F: Supplier B-BBEE And Shareholder Information

This template must be completed as instructed and returned as an excel file together with supporting attachments.

7. Annexure G: Contract Conditions

NEC3 Professional Services Contract (PSC3)

Contract between

Eskom Holdings SOC Ltd

(Reg No. 2002/015527/30)

and

A N Other

for

IT Professional Services and Turnkey projects

Insert title of the services

Contents:

Part C1

Agreements & Contract Data

Part C2

Pricing Data

Part C3

Scope of Work: The Scope

CONTRACT No.

PART C1:AGREEMENTS & CONTRACT DATA

Document reference

Title

C1.1

Form of Offer & Acceptance

C1.2a

Contract Data provided by the Employer

C1.2b

Contract Data provided by the Consultant

C1.1 Form of Offer & Acceptance

Offer

The Employer, identified in the Acceptance signature block, has solicited offers to enter into a contract for the procurement of:

IT Professional Services and Turnkey projects

The tenderer, identified in the Offer signature block, has

examined the draft contract as listed in the Acceptance section and agreed to provide this Offer.

By the representative of the tenderer, deemed to be duly authorised, signing this part of this Form of Offer and Acceptance the tenderer offers to perform all of the obligations and liabilities of the Consultant under the contract including compliance with all its terms and conditions according to their true intent and meaning for an amount to be determined in accordance with the conditions of contract identified in the Contract Data.

The offered total of the Prices exclusive of VAT is

Not Applicable Cost reimbursable

Value Added Tax @ 14% is

Not Applicable Cost reimbursable

The offered total of the Prices inclusive of VAT is

Not Applicable Cost reimbursable

This Offer may be accepted by the Employer by signing the Acceptance part of this Form of Offer and Acceptance and returning one copy of this document including the Schedule of Deviations (if any) to the tenderer before the end of the period of validity stated in the Tender Data, or other period as agreed, whereupon the tenderer becomes the party named as the Consultant in the conditions of contract identified in the Contract Data.

Signature(s)

Name(s)

Capacity

For the tenderer:

Name & signature of witness

Date

Acceptance

By signing this part of this Form of Offer and Acceptance, the Employer identified below accepts the tenderers Offer. In consideration thereof, the Employer shall pay the Consultant the amount due in accordance with the conditions of contract identified in the Contract Data. Acceptance of the tenderers Offer shall form an agreement between the Employer and the tenderer upon the terms and conditions contained in this agreement and in the contract that is the subject of this agreement.

The terms of the contract, are contained in:

Part C1Agreements and Contract Data, (which includes this Form of Offer and Acceptance)

Part C2Pricing Data

Part C3Scope of Work: The Scope

and drawings and documents (or parts thereof), which may be incorporated by reference into the above listed Parts.

Deviations from and amendments to the documents listed in the Tender Data and any addenda thereto listed in the Returnable Schedules as well as any changes to the terms of the Offer agreed by the tenderer and the Employer during this process of offer and acceptance, are contained in the Schedule of Deviations attached to and forming part of this Form of Offer and Acceptance. No amendments to or deviations from said documents are valid unless contained in this Schedule.

The tenderer shall within two weeks of receiving a completed copy of this agreement, including the Schedule of Deviations (if any), contact the Employers agent (whose details are given in the Contract Data) to arrange the delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to be provided in terms of the conditions of contract identified in the Contract Data at, or just after, the date this agreement comes into effect. Failure to fulfil any of these obligations in accordance with those terms shall constitute a repudiation of this agreement.

Notwithstanding anything contained herein, this agreement comes into effect on the date when the tenderer receives one fully completed and signed original copy of this document, including the Schedule of Deviations (if any).

Signature(s)

Name(s)

Mr Sean Maritz

Capacity

CIO and Group Executive Group Information Technology Division (Acting)

for the Employer

Eskom Holdings SOC Ltd

Reg No. 2002/015527/30

Name & signature of witness

Date

C1.2 PSC3 Contract Data

Part one - Data provided by the Employer

Clause

Statement

Data

1

General

The conditions of contract are the core clauses and the clauses for main Option

G:Term contract

dispute resolution Option

W1:Dispute resolution procedure

and secondary Options

X1:Price adjustment for inflation

X2Changes in the law

X7:Delay damages

X9:Transfer of rights

X10Employers Agent

X11:Termination by the Employer

X18:Limitation of liability

Z:Additional conditions of contract

of the NEC3 Professional Services Contract (April 2013)[footnoteRef:2] [2: Available from Engineering Contract Strategies Tel 011 803 3008 Fax 011 803 3009 and www.ecs.co.za ]

If 2005 Edition is to be used delete April 2013 and replace with June 2005 with amendments June 2006. Always delete this note before finalising this Data

10.1

The Employer is (Name):

Eskom Holdings SOC Ltd (reg no: 2002/015527/30), a state owned company incorporated in terms of the company laws of the Republic of South Africa

Address

Registered office at Megawatt Park, Maxwell Drive, Sandton, Johannesburg

Tel No.

(011) 800 3361

11.2(9)

The services are

IT professional services and Turnkey projects

11.2(10)

The following matters will be included in the Risk Register

To be logged as and when identified

11.2(11)

The Scope is in

Part 3: Scope of Work

12.2

The law of the contract is the law of

the Republic of South Africa

13.1

The language of this contract is

English

13.3

The period for reply is

5 calendar days

13.6

The period for retention is

5 years following Completion or earlier termination.

2

The Parties main responsibilities

25.2

The Employer provides access to the following persons, places and things

access to

Eskom facilities

access date

As and when needed.

3

Time

31.2

The starting date is.

11.2(3)

The completion date for the whole of the services is.

31 May 2021

31.1

The Consultant is to submit a first programme for acceptance within

4 weeks of the Contract Date where applicable

32.2

The Consultant submits revised programmes at intervals no longer than

4 weeks where applicable.

4

Quality

40.2

The quality policy statement and quality plan are provided within

4 weeks of the Contract Date.

42.2

The defects date is

26 weeks after Completion of the whole of the services.

5

Payment

50.1

The assessment interval is

Between the 26th day of each successive month.

50.3

The expenses stated by the Employer are

Item

N/A

Amount

N/A

51.1

The period within which payments are made is

Within 30 days of the submission of the valid VAT invoice.

51.2

The currency of this contract is the

South African Rand.

51.5

The interest rate is

The publicly quoted prime rate of interest charged by Standard Bank of South Africa Limited at the time an amount payable in SA Rand was due.

6

Compensation events

There is no reference to Contract Data in this section of the core clauses and terms in italics used in this section are identified elsewhere in this Contract Data.

7

Rights to material

There is no reference to Contract Data in this section of the core clauses and terms in italics used in this section are identified elsewhere in this Contract Data.

8

Indemnity, insurance and liability

81.1

The amounts of insurance and the periods for which the Consultant maintains insurance are

Event

Cover

Period following Completion of the whole of the services or earlier termination

Liability for failure by the Consultant to use the skill and care normally used by professionals providing services similar to the services

Whatever the Consultant deems necessary in respect of each claim, without limit to the number of claims

See Notes to Consultants in Annexure A

death of or bodily injury to a person (not an employee of the Consultant) or loss of or damage to property arising from or in connection with the Consultants Providing the Services.

Whatever the Consultant deems necessary for any occurrence or series of occurrences arising out of one event without limit to the number of claims.

See Notes to Consultants in Annexure A

death of or bodily injury to employees of the Consultant arising out of and in the course of their employment in connection with this contract

As prescribed by the Compensation for Occupational Injuries and Diseases Act No. 130 of 1993 and the Consultants common law liability for people falling outside the scope of the Act with a limit of indemnity of not less than R500 000-00 (five hundred thousand) in respect of each claim, without limit to the number of claims

As Consultant deems necessary

81.1

The Employer provides the following insurances

Refer to Annexure A for details of insurance provided by the Employer.

82.1

The Consultants total liability to the Employer for all matters arising under or in connection with this contract, other than the excluded matters, is limited to

The total of the Prices

9

Termination

There is no reference to Contract Data in this section of the core clauses and terms in italics used in this section are identified elsewhere in this Contract Data.

10

Data for main Option clause

G

Term contract

21.4

The Consultant prepares forecasts of the total Time Charge and expenses at intervals no longer than

4 weeks.

11

Data for Option W1

W1.1

The Adjudicator is

the person selected from the ICE-SA Division (or its successor body) of the South African Institution of Civil Engineering Panel of Adjudicators by the Party intending to refer a dispute to him. (see www.ice-sa.org.za). If the Parties do not agree on an Adjudicator the Adjudicator will be appointed by the Arbitration Foundation of Southern Africa (AFSA).

W1.2(3)

The adjudicator nominating body is:

the Chairman of the ICE-SA Division (or its successor body) of the South African Institution of Civil Engineering. (See www.ice-sa.org.za).

W1.4(2)

The tribunal is:

arbitration

W1.4(5)

The arbitration procedure is

the latest edition of Rules for the Conduct of Arbitrations published by The Association of Arbitrators (Southern Africa) or its successor body.

The place where arbitration is to be held is

South Africa

The person or organisation who will choose an arbitrator

if the Parties cannot agree a choice or

if the arbitration procedure does not state who selects an arbitrator, is

the Chairman for the time being or his nominee of the Association of Arbitrators (Southern Africa) or its successor body.

12

Data for secondary Option clauses

X1

Price adjustment for inflation

X1.1

The index is

Year on Year CPI at time of Contract anniversary date, or as negotiated at renewal date.

X2

Changes in the law

X2.1

The law of the project is

South African Law

X7

Delay damages

X7.1

Delay damages for late Completion of the whole of the services are

In the case of a fixed cost deliverable, with set delivery/payment dates, the following will apply in the case of delays:

2.5 % of value of the Deliverable can be levied against the Consultant. The Consultant will be granted a grace period of 10 calendar days after the deemed end date of the deliverable/task order. On day 11 the delay damages will be invoked, after which 5 calendar days are given to resolve the issue. If not resolved on day 5, a further 2.5% delay damages will be invoked on day 21. The delay damages will be limited to 10% of the Deliverable value.

Furthermore, no delay damages shall be incurred should the delay result from circumstances outside of the control of the Consultant or due to the Employers act or omission. As such delay damages shall only apply where the delay results from the fault of the Consultant in delivering the Deliverable.

X9

Transfer of rights

All intellectual property owned by Consultant shall remain the sole and exclusive property of the Consultant and all intellectual property owned by Employer (including Employer proprietary software) shall remain the sole and exclusive property of Employer.

In relation to Employer proprietary software and other intellectual property and software owned by third parties and licences (subject to the consent of such licensor) to Employer, no title, licence or other similar rights therein or thereto shall pass to the Consultant.

Material prepared expressly and exclusively for the Employer shall vest in the Employer provided that the Employer has effected payment of the agreed charges in respect thereof to the Consultant. All intellectual property generally developed in the provision of the services shall vest in the Consultant.

X10

The Employers Agent

X10.1

The Employers Agent is

Name:

Frans Marais

Address

Eskom Holdings SOC Ltd

Megawatt Park

Maxwell Drive

Sunninghill

Sandton

2109

The authority of the Employers Agent is

to carry out all the actions of the Employer in this contract with the exception of those required by clauses 51.1 and 81.1.

X11

Termination by the Employer

For fixed cost deliverables only:

X11.1 The Employer may terminate the Consultants obligation to Provide the Services for a reason not stated in this contract by notifying the Consultant.

X11.2 If the Employer terminates for a reason not stated in this contract, an additional amount is due on termination which is 5% of the difference between

the forecast of the final total of the Prices in the absence of termination and

the total of the other amounts and costs included in the amount due on termination.

X18

Limitation of liability

X18.1

The Consultants liability to the Employer for indirect or consequential loss is limited to:

R0.00 (Zero Rand)

X18.2

The Consultants liability to the Employer for Defects that are not found until after the defects date is limited to:

The total of the Prices

X18.3

The end of liability date is

one year after Completion of the whole of the services/task order.

Z

The Additional conditions of contract are

Z1 to Z11 always apply.

Z1

Cession delegation and assignment

Z1.1

The Consultant does not cede, delegate or assign any of its rights or obligations to any person without the written consent of the Employer.

Z1.2

Notwithstanding the above, the Employer may on written notice to the Consultant cede and delegate its rights and obligations under this contract to any of its subsidiaries or any of its present divisions or operations which may be converted into separate legal entities as a result of the restructuring of the Electricity Supply Industry.

Z2

Joint ventures

Z2.1

If the Consultant constitutes a joint venture, consortium or other unincorporated grouping of two or more persons or organisations then these persons or organisations are deemed to be jointly and severally liable to the Employer for the performance of this contract.

Z2.2

Unless already notified to the Employer, the persons or organisations notify the Employer within two weeks of the Contract Date of the key person who has the authority to bind the Consultant on their behalf.

Z2.3

The Consultant does not alter the composition of the joint venture, consortium or other unincorporated grouping of two or more persons without the consent of the Employer having been given to the Consultant in writing.

Z3

Change of Broad Based Black Economic Empowerment (B-BBEE) status

Z3.1

Where a change in the Consultants legal status, ownership or any other change to his business composition or business dealings results in a change to the Consultants B-BBEE status, the Consultant notifies the Employer within seven days of the change.

Z3.2

The Consultant is required to submit an updated verification certificate and necessary supporting documentation confirming the change in his B-BBEE status to the Employer within thirty days of the notification or as otherwise instructed by the Employer.

Z3.3

Where, as a result, the Consultants B-BBEE status has decreased since the Contract Date the Employer may either re-negotiate this contract or alternatively, terminate the Consultants obligation to Provide the Services.

Z3.4

Failure by the Consultant to notify the Employer of a change in its B-BBEE status may constitute a reason for termination. If the Employer terminates in terms of this clause, the procedures on termination are those stated in core clause 91. The payment on termination includes a deduction of the forecast of the additional cost to the Employer of completing the whole of the services in addition to the amounts due in terms of core clause 92.1.

Z4

Ethics

Z4.1

Any offer, payment, consideration, or benefit of any kind made by the Consultant which constitutes or could be construed either directly or indirectly as an illegal or corrupt practice, as an inducement or reward for the award or in execution of this contract constitutes grounds for terminating the Consultants obligation to Provide the Services or taking any other action as appropriate against the Consultant (including civil or criminal action).

Z4.2

The Employer may terminate the Consultants obligation to Provide the Services if the Consultant (or any member of the Consultant where the Consultant constitutes a joint venture, consortium or other unincorporated grouping of two or more persons or organisations) is found guilty by a competent court, administrative or regulatory body of participating in illegal or corrupt practices.

Such practices include making of offers, payments, considerations, or benefits of any kind or otherwise, whether in connection with any procurement process or contract with the Employer or other people or organisations and including in circumstances where the Consultant or any such member is removed from the an approved vendor data base of the Employer as a consequence of such practice.

Z4.3

If the Employer terminates in terms of this clause, the procedures on termination are those stated in core clause 91. The payment on termination includes a deduction of the forecast of the additional cost to the Employer of completing the whole of the services in addition to the amounts due in terms of core clause 92.1.

Z5

Confidentiality

Z5.1

The Consultant does not disclose or make any information arising from or in connection with this contract available to Others. This undertaking does not, however, apply to information which at the time of disclosure or thereafter, without default on the part of the Consultant, enters the public domain or to information which was already in the possession of the Consultant at the time of disclosure (evidenced by written records in existence at that time). Should the Consultant disclose information to Others in terms of clause 23.1, the Consultant ensures that the provisions of this clause are complied with by the recipient.

Z5.2

If the Consultant is uncertain about whether any such information is confidential, it is to be regarded as such until notified otherwise by the Employer.

Z5.3

In the event that the Consultant is, at any time, required by law to disclose any such information which is required to be kept confidential, the Consultant, to the extent permitted by law prior to disclosure, notifies the Employer so that an appropriate protection order and/or any other action can be taken if possible, prior to any disclosure. In the event that such protective order is not, or cannot, be obtained, then the Consultant may disclose that portion of the information which it is required to be disclosed by law and uses reasonable efforts to obtain assurances that confidential treatment will be afforded to the information so disclosed.

Z5.4

The taking of images (whether photographs, video footage or otherwise) of the Employers project works or any portion thereof, in the course of Providing the Services and after Completion, requires the prior written consent of the Employer. All rights in and to all such images vests exclusively in the Employer.

Z6

Waiver and estoppel: Add to core clause 12.3:

Z6.1

Any extension, concession, waiver or relaxation of any action stated in this contract by the Parties, or the Adjudicator does not constitute a waiver of rights, and does not give rise to an estoppel unless the Parties agree otherwise and confirm such agreement in writing.

Z7

Provision of a Tax Invoice. Add to core clause 51

Z7.1

The Consultant (if registered in South Africa in terms of the companies Act) is required to comply with the requirements of the Value Added Tax Act, no 89 of 1991 (as amended) and to include the Employers VAT number 4740101508 on each invoice he submits for payment.

Z8

Notifying compensation events

Z8.1

Delete from the last sentence in core clause 61.3, unless the Employer should have notified the event to the Consultant but did not.

Z9

Employers limitation of liability

Z9.1

The Employers liability to the Consultant for the Consultants indirect or consequential loss is limited to R0.00 (zero Rand)

Z10

Termination: Add to core clause 90.1, at the second main bullet point, fourth sub-bullet point, after the words "against it":

Z10.1

or had a business rescue order granted against it.

Z11

Delay damages: Addition to secondary Option X7 Delay damages (if applicable in this contract)

Z11.1

If the Consultants payment of delay damages reaches the limits stated in this Contract Data for Option X7, the Employer may terminate the Consultants obligation to Provide the Services.

Z11.2

If the Employer terminates in terms of this clause, the procedures on termination are those stated in core clause 91. The payment on termination includes a deduction of the forecast of the additional cost to the Employer of completing the whole of the services in addition to the amounts due in terms of core clause 92.1.

Z12

Change in contact person details - Consultant

Z12.1

It is the Consultants responsibility to inform Eskom when there is a change in the Contact Persons details.

Z13

Resource and rates

Z13.1

Eskom reserves the right to negotiate resource rates per individual task order.

See Annexure A for base rates.

Z13.2

Eskom reserves the right to ask for new roles and new rates when needed.

Z14

SD&L obligations

Z14.1

See Annexure B

The Consultant will train 1 resource for every R5 million paid. It will apply cumulatively.

Skills development candidates shall be currently unemployed graduates from TVTCs (Technical and Vocational Training Colleges) universities or schools. These candidates shall also be representative of the population demographics of South Africa.

Z15

RFP responses

Z15.1

The number of CVs per submission per role will be limited to three (3) with each CV not exceeding 4 pages. If a panel member fails to submit a responsive bid, for a third time, the panel member will be removed from the panel for periods of 6 months.

Annexure A:Notes to Consultants

This is guidance to Consultants to assist their decision making about what cover to arrange in the insurance to be provided by the Consultant. The guidance is not part of the contract and the Employer carries no liability for it. The Consultant must obtain its own advice.

For the purpose of works contracts, insurance provided by Eskom (the Employer) has been arranged on the basis of project or contract value, where the value is the total of the Prices at Completion of the whole of the works including VAT.

A project is a collection of contracts or work packages to be undertaken as part of a single identified capital expansion or refurbishment of a particular asset or facility.

A contract is a single contract not linked to or being part of a project.

Further information and full details of all Eskom provided policies and procedures may be obtained from:

http://www.eskom.co.za/Tenders/InsurancePoliciesProcedures/Pages/EIMS_Policies_

From_1_April_2014_To_31_March_2015.aspx

The Insurance which the Consultant is to provide against his liability for claims made against him arising out of his failure to use reasonable skill and care (first row in the Insurance Table of clause 81.1 in the PSC3) should also indemnify the Consultant for those sums which he could become legally liable to pay as damages arising from any claim first made against him and reported to Insurers some time after Completion of the whole of the services. Hence the Consultant needs to ensure that his cover is in place at least until all his liabilities under the contract have expired. Such claims could arise out of any negligent act, error or omission committed or alleged to have been committed by the Consultant in the conduct of professional services in connection with the contract.

Annexure B:The Employers Panel of Adjudicators

The following persons listed in alphabetical order of their surname have indicated their willingness to be included in the Eskom Panel of Adjudicators. Their CVs may be obtained by using the contact details provided.

Name

Location

Contact details (phone & e mail)

Nigel ANDREWS

Gauteng

+27 11 836-6760

[email protected]

Andrew BAIRD

Gauteng

+27 11 803 3008

[email protected]

Christopher BINNINGTON

Gauteng

+27 11 888-6141

[email protected]

Peter HIGGINS

UK

+44 1293 873 868

[email protected]

Bruce LEECH

Gauteng

+27 11 290 4000

[email protected]

Nigel NILEN

Gauteng

+27 11 465 3601; [email protected]

Peter THURLOW

Gauteng

+27 11 787 6226

[email protected]

Information about the Panel and appointment of the selected Adjudicator is available from Eskom Supply Chain Operations management.

C1.2 Contract Data

Part two - Data provided by the Consultant

Clause

Statement

Data

10.1

The Consultant is (Name):

Contact person:

E-mail address

Tel No.

Fax No.

11.2(3)

The completion date for the whole of the services is

31 May 2021

11.2(10)

The following matters will be included in the Risk Register

To be logged as and when identified.

11.2(13)

The staff rates are:

See Annexure A

25.2

The Employer provides access to the following persons, places and things

access to

Eskom facilities

50.3

The expenses stated by the Consultant are as per Eskoms T&S standards.

Part 2: Pricing Data

PSC3 Option G

Document reference

Title

C2.1

Pricing assumptions : Option G

C2.2

Staff rates, expenses and the task schedule.

C2.1 Pricing assumptions: Option G

How work is priced and assessed for payment

From Option G: Term contract

Identified and defined terms

11

11.2

(17) The Price for Services Provided to Date is, for each Task, the total of

the Time Charge for work which has been completed on time based items on the Task Schedule and

a proportion of the lump sum price for each other item on the Task Schedule which is the proportion of work completed on that item.

(20) The Prices are

the Time Charge for items described as time based on the Task Schedule and

the lump sum price in the Task Schedule for each other item.

From the Core Clauses:

Identified and defined terms

11.2

(13) The Time Charge is the sum of the products of each of the staff rates multiplied by the total staff time appropriate to that rate properly spent on work in this contract.

and

Assessing the amount due

50.3

The amount due is

the Price for Services Provided to Date,

the amount of the expenses properly spent by the Consultant in Providing the Services and

other amounts to be paid to the Consultant less amounts to be paid by or retained from the Consultant.

Any tax which the law requires the Employer to pay to the Consultant is included in the amount due.

C2.2 Staff rates, expenses & the task schedule

The staff rates are:

See Annexure A

The expenses are (subject to change):

Kms:

Km Rate:

From workplace (i.e. Megawatt Park / Eskom Convention Centre) to the venue of Business appointment or meeting. Claims must specify distance travelled destination and purpose.

When Eskom provides offices for the duration of the contract, then kms from consultants office to Eskoms office cannot be claimed. Kms from the consultants home to Eskom office also cannot be claimed.

R3.18 per kilometre (effective 1 March 2016)

Car rentals:

All travellers may not hire vehicles from a category higher than Group B or an equivalent class. Group B vehicles contain the following specifications:

5 Door

Manual

Air Conditioning

Radio/CD

Power Steering

Airbags

Central Locking

ABS

Accommodation:

Domestic hotel accommodation may not exceed one thousand three hundred rand (R1 400), inclusive of VAT, per night per person (including dinner, breakfast and parking).

Cost of Meals:

Travelling on Eskom business: the cost of a meal should not exceed R142.50 (including VAT).

Alcoholic beverages cannot be claimed for.

Flights:

Economy class.

To be made and paid for by consultants. This must then be claimed back once a month together with all other T&S expenses on a VAT invoice.

Telephone calls:

When Eskom provides offices and telephone facilities, any telephone claims (cell phone) must be properly motivated. Claims will only be paid if call details are specified.

Part 3: Scope of Work

Document reference

Title

This cover page

C3.1

Employers Scope

C3.1: Employers scope

The scope of work is to supply IT resources and/or to deliver work on a Turnkey basis on an as and when needed basis.

There will be a full scope document for each request

Invoicing and payment

The following details shall be shown on or attached to each Invoice to show how the amount due has been assessed:

The Consultant shall address the tax invoice to Eskom Holdings SOC Ltd and include on it the following information:

Name and address of the Consultant and the Employers Agent;

The contract number and title;

Consultants VAT registration number;

The Employers VAT registration number 4740101508;

Total amount invoiced excluding VAT, the VAT and the invoiced amount including VAT;

(add other as required)

Invoices shall be mailed to [email protected]

Annexure A: Roles and Rates

Annexure B: SD&L Obligations

Skills Development Framework for ICT Professional service

Dear Supplier

As a condition of being awarded a contract by Eskom all suppliers are required to fulfil skills development obligations. Effective 01 June 2016, suppliers in the ICT professional service panel are required to comply with this requirement by taking on the responsibility of paying for the cost of skills development which may be undertaken by the training providers that are accredited by the MICT SETA.

Assignment of candidates

The supplier is required to assign one candidate for every R5, 000,000.00 (five million rand) of the cumulative contract amount paid. Contained in the table below, is the type of skills that must be developed over the five year contract duration. The assignment of candidates shall be carried out within one month of reaching or exceeding this threshold.

The supplier shall assign the candidates to the MICT SETA accredited training providers from which they shall be issued with certified qualifications as a proof of having attained the competency and proficiency in the skills listed in Table 1.

The supplier, before commencing with the skills development effort, shall select the skill types from the Table 1 and Eskom shall advise and confirm based on whether the targets have been reached.

Table 1: Skills Development for ICT Professional Services

No

Skill type

Number

1

Business architect

20

2

Data Architect

20

3

Information Security Business Analyst

5

4

Information Security Systems Analyst

5

5

Integration analyst

10

6

Integration Architect

10

7

Integration System Analyst

10

8

Mobility Solutions Architect

10

9

Performance Scripter - Senior

10

10

SAP ABAP Developer

10

11

SAP Technical Architect

15

12

SAP technical specialist

15

13

SAS Administrator

5

14

Senior BI Developer (SAP Business Objects and SAS Developers)

10

15

Senior SAP Basis Administrator

5

16

SharePoint Developer

5

17

Snr Application Technical/Server Specialist

10

18

Software Quality Specialist

10

19

Test Analyst Senior

10

20

Test Environment Specialist

5

Availability of candidates

Eskom and MICT SETA have lists of eligible students from which the suppliers may draw candidates for skills development. The candidates selected for skills development shall be currently unemployed graduates from TVTC (Technical and Vocational Training Centre) colleges, universities and matriculants.

These candidates shall be representative of the population demographics of South Africa.

Reporting

During contract award, the supplier shall be issued with the following two SD&L templates to track skills development commitments:

The implementation schedule template

The supplier data collection template

The skills development sheets of the implementation schedule template shall be completed by the supplier and submitted to the Supplier Development & Localisation: Monitoring & Reporting team (SD&L) each time new candidates are assigned for skills development.

Every quarter of the year, the supplier shall report to the Supplier Development & Localisation team in Eskom on the progress of fulfilling the skills development obligation by completing the skills development sheet of the supplier data collection template.

8. Annexure H: Technical Response Form (B2) (Excel Template)

This annexure is an excel template and must be completed as instructed. The completed template must be returned as an excel file together with supporting attachments.

9. Annexure I: List Of Roles

No

ROLE

1

Application Technical/Server Analyst

2

Application Technical/Server Lead

3

ARIS Specialist

4

BI Microsoft SSRS Developer

5

Business architect

6

Certified Ethical Hacker / Penetration Tester

7

Data Architect

8

Digital Certificate Scanning Specialist

9

Functional Tester - Junior

10

Functional Tester - Senior

11

Information Security Business Analyst

12

Information Security Crisis Management Specialist

13

Information Security Solution Architect

14

Information Security Systems Analyst

15

Integration analyst

16

Integration Architect

17

Integration business analyst

18

Integration Developer

19

Integration Message Analyst/Designer

20

Integration Solution Architect

21

Integration Specialist

22

Integration System Analyst

23

Integration Technical Architect

24

Integration Technical Specialist

25

Intermediate SAP Basis Administrator

26

Investigation & Digital Forensics Specialist

27

ISO/IEC 27001 Lead Auditor

28

IT Vulnerability Management Expert

29

Mobility Developer

30

Mobility Solutions Architect

31

Monitoring Analyst

32

Performance Scripter - Junior

33

Performance Scripter - Senior

34

Project Manager

35

SAP ABAP Developer

36

SAP Business Analyst

37

SAP Module Specialist

38

SAP PI Developer and architecture

39

SAP Technical Architect

40

SAP technical specialist

41

SAS / Netezza Administrator - Senior

42

SAS Administrator

43

Security Incident and Event Management (SIEM) and Security Operations Centre (SOC) Services Specialist

44

Senior BI Developer (SAP Business Objects and SAS Developers)

45

Senior BI Microsoft SSRS developers

46

Senior DBA

47

Senior Developer

48

Senior Monitoring Specialist

49

Senior SAP Basis Administrator

50

Senior SAS developers

51

Senior SharePoint Advisor

52

SharePoint Developer

53

Snr Application Technical/Server Specialist

54

Snr Java Developer/.Net/Delphi/Cobol

55

Snr Monitoring Developer

56

SOA Governance Specialist

57

Software Quality Specialist

58

Solution Architect

59

Systems Analyst

60

Technical Test Analyst

61

Test Analyst - Junior

62

Test Analyst - Senior

63

Test Automation - Junior

64

Test Automation - Senior

65

Test Environment Specialist

66

Test Manager - Intermediate

67

Test Manager - Senior

68

Senior Smart Plant Business Analyst

69

Senior Smart Plant Systems Analyst

70

Senior Smart Plant Developer

71

Senior Smallworld Systems Analyst

72

Senior Smallworld Developer

73

Senior Smallworld DBA

74

ESRi ArcGIS Designer

75

ESRi ArcGIS Developer and Configurator

76

Mobility Systems Analyst

77

CC&B Batch Scheduler

10. Annexure J: Roles and Roles Description

Project Manager

Manages Project Scope:

Plans scope management by documenting how the project scope will be defined, validated and controlled;

Collects requirements by determining, documenting and managing stakeholder needs and requirements;

Defines scope by developing a detailed description of the project and product;

Creates a Work Breakdown Structure by subdividing project deliverables and project work into smaller more manageable components;

Validates scope by formalising acceptance of the completed project deliverables.

Controls scope by monitoring the status of the project and product scope and managing changes to the scope baseline.

Manages Project Time:

Plans schedule management by establishing the policies, procedures and documentation for planning, developing, managing, executing and controlling the project schedule;

Defines activities by identifying and documenting the specific actions to be performed to produce the project deliverables;

Sequences activities by identifying and documenting relationships amongst the project activities;

Estimates activity resources by estimating the type and quantities of material, human resources, equipment or supplies required to perform each activity;

Estimates activity duration by estimating the number of work periods needed to complete individual activities with estimated resources;

Develops a schedule by analysing activity sequences, durations, resource requirements and schedule constraints to create the project schedule model;

Controls the schedule by monitoring the status of project activities to update project progress and manage changes to the schedule baseline to achieve the plan.

Manages Project Cost:

Plans cost management by establishing the policies, procedures and documentation for planning, managing, expending and controlling project costs;

Estimates cost by developing an approximation of the monetary resources needed to complete project activities;

Determines budget by aggregating the estimated costs of individual activities or work packages to establish an authorised cost baseline;

Controls cost by monitoring the status of the project to update the project costs and managing changes to the cost baseline.

Manages Project Quality:

Plans quality management by identifying quality requirements and I or standards for the project and its deliverables and documenting how the project will demonstrate compliance with the relevant quality requirements;

Performs quality assurance by auditing the quality requirements and the results from quality control measurements to ensure that appropriate quality standards and operational definitions are used;

Controls quality by monitoring and recording results of executing the quality activities to assess performance and recommend necessary changes.

Manages Project Risk:

Plans risk management by defining how to conduct risk management activities for a project;

Identifies risks by determining which risks may affect the project and documenting their characteristics;

Performs qualitative risk analysis by prioritising risks for further analysis or action by assessing and combining their probability of occurrence and impact;

Performs quantitative risk analysis by numerically analysing the effect of identified risks on overall project objectives;

Plans risk responses by developing options and actions to enhance opportunities and to reduce threats to project objectives;

Controls risks by implementing risk response plans, tracking identified risks, monitoring residual risks, identifying new risks and evaluating risk process effectiveness throughout the project.

Manages Project Stakeholders:

Identifies stakeholders by identifying the people, groups, organisations that could impact or be impacted by a decision, activity or outcome of the project, analysing and documenting relevant information regarding their interests, involvement, interdependencies, influence and potential impact on project success;

Plans stakeholder management by developing appropriate management strategies to effectively engage stakeholders throughout the project lifecycle, based on the analysis of their needs, interests and potential impact on project success;

Manages stakeholder engagement by communicating and working with stakeholders to meet their needs I expectations, address issues as they occur and foster appropriate stakeholder engagement in project activities throughout the project lifecycle;

Controls stakeholder engagement by monitoring overall project stakeholder relationships and adjusting strategies and plan for engaging stakeholders.

Manages Project Integration:

Develops the project charter by developing a document that formally authorises the existence of the project and provides the project manager with the authority to apply organisation resources to project activities;

Develops the project management plan by defining, preparing and coordinating all subsidiary plans and integrating them into a comprehensive project management plan;

Directs and manages project work by leading and performing the work defined in the project management plan and implementing approved changes to achieve the project's objectives;

Monitors and controls project work by tracking, reviewing and reporting the progress to meet the performance objectives defined in the project management plan;

Performs integrated change control by reviewing all change requests, approving changes and managing changes to deliverables, organisational process assets, project documents and the project management plan, and communicating their disposition;

Closes the project or the phase by finalising all activities across the all the project management process groups to formally complete the project or phase.

Manages Human Resources:

Plans human resource management by identifying and documenting project roles, responsibilities, required skills, reporting relationships and creating a staffing management plan;

Acquiring a project team by confirming human resource availability and obtaining the team necessary to complete project activities;

Develops the project team by improving competencies, team member interaction and overall team environment to enhance project performance;

Manages the project team by tracking team member performance, providing feedback, resolving issues and managing team changes to optimise project performance.

Manages Project Communication:

Plans communication management by developing an appropriate approach and plan for project communications based on stakeholder's information needs and requirements, and available organisational assets;

Manages communication by creating, collecting, distributing, storing, retrieving and the ultimate disposition of project information in accordance to the communications management plan;

Controls communication by monitoring and controlling communications throughout the entire project lifecycle to ensure the information needs of the project stakeholders are met.

Information Security

Functionality Evaluation criteria for: Certified Ethical Hacker I Penetration Tester

Evaluation Gatekeeper Criteria

Weighting

Number of years' experience the company has in business area relevant to the scope

15%

Number of years' experience of their human resources' relevant to the scope

15%

The respondent must provide a list of all reference clients their human resources have provided relevant Information Security services to in the last two (2) years and details of the service. Eskom reserves the right to validate the references.

20%

The respondent must produce proof of each proposed job roles that are accredited I certified members and in good standing with relevant recognised international bodies for a specific role(s) as per the scope. The bodies can include, but not limited to:

Global Information Assurance Certification (GIAC)

Council of Registered Ethical Security Testers (CREST)

International Systems Security Consortium (ISC2)

Information Systems Audit and Control Association (ISACA)

SABSA Certified Professional Architect (SCPA)

Sherwood Applied Business Security Architecture (SABSA)

20%

The respondent must indicate it's adopted Internationally recognised Information Security Governance I Standard framework. Provide the details thereof.

15%

The respondent must indicate the number of resources that they currently employ and will be available for the initiative as per the roles stipulated in the scope

15%

Total

100%

Functionality Evaluation criteria for: IT Vulnerability Management Expert

Evaluation Gatekeeper Criteria

Weighting

Number of years' experience the company has in business area relevant to the scope

15%

Number of years' experience of their human resources' relevant to the scope

15%

The respondent must provide a list of all reference clients their human resources have provided relevant Information Security services to in the last two (2) years and details of the service. Eskom reserves the right to validate the references.

20%

The respondent must produce proof of each proposed job roles that are accredited I certified members and in good standing with relevant recognised international bodies for a specific role(s) as per the scope. The bodies can include, but not limited to:

Global Information Assurance Certification (GIAC)

Council of Registered Ethical Security Testers (CREST)

International Systems Security Consortium (ISC2)

Information Systems Audit and Control Association (ISACA)

SABSA Certified Professional Architect (SCPA)

Sherwood Applied Business Security Architecture (SABSA)

20%

The respondent must indicate it's adopted Internationally recognised Information Security Governance I Standard framework. Provide the details thereof.

15%

The respondent must indicate the number of resources that they currently employ and will be available for the initiative as per the roles stipulated in the scope

15%

Total

100%

Functionality Evaluation criteria for: Security Incident and Event Management (SIEM) and Security Operations Centre (SOC) Services Specialist

Evaluation Gatekeeper Criteria

Weighting

Number of years' experience the company has in business area relevant to the scope

15%

Number of years' experience of their human resources' relevant to the scope

15%

The respondent must provide a list of all reference clients their human resources have provided relevant Information Security services to in the last two (2) years and details of the service. Eskom reserves the right to validate the references.

20%

The respondent must produce proof of each proposed job roles that are accredited I certified members and in good standing with relevant recognised international bodies for a specific role(s) as per the scope. The bodies can include, but not limited to:

Global Information Assurance Certification (GIAC)

Council of Registered Ethical Security Testers (CREST)

International Systems Security Consortium (ISC2)

Information Systems Audit and Control Association (ISACA)

SABSA Certified Professional Architect (SCPA)

Sherwood Applied Business Security Architecture (SABSA)

20%

The respondent must indicate it's adopted Internationally recognised Information Security Governance I Standard framework. Provide the details thereof.

15%

The respondent must indicate the number of resources that they currently employ and will be available for the initiative as per the roles stipulated in the scope

15%

Total

100%

Functionality Evaluation criteria for: Investigation & Digital Forensics Specialist

Evaluation Gatekeeper Criteria

Weighting

Number of years' experience the company has in business area relevant to the scope

15%

Number of years' experience of their human resources' relevant to the scope

15%

The respondent must provide a list of all reference clients their human resources have provided relevant Information Security services to in the last two (2) years and details of the service. Eskom reserves the right to validate the references.

20%

The respondent must produce proof of each proposed job roles that are accredited I certified members and in good standing with relevant recognised international bodies for a specific role(s) as per the scope. The bodies can include, but not limited to:

Global Information Assurance Certification (GIAC)

Council of Registered Ethical Security Testers (CREST)

International Systems Security Consortium (ISC2)

Information Systems Audit and Control Association (ISACA)

SABSA Certified Professional Architect (SCPA)

Sherwood Applied Business Security Architecture (SABSA)

20%

The respondent must indicate it's adopted Internationally recognised Information Security Governance I Standard framework. Provide the details thereof.

15%

The respondent must indicate the number of resources that they currently employ and will be available for the initiative as per the roles stipulated in the scope

15%

Total

100%

Functionality Evaluation criteria for: ISO/lEG 27001 Lead Auditor

Evaluation Gatekeeper Criteria

Weighting

Number of years' experience the company has in business area relevant to the scope

15%

Number of years' experience of their human resources' relevant to the scope

15%

The respondent must provide a list of all reference clients their human resources have provided relevant Information Security services to in the last two (2) years and details of the service. Eskom reserves the right to validate the references.

20%

The respondent must produce proof of each proposed job roles that are accredited I certified members and in good standing with relevant recognised international bodies for a specific role(s) as per the scope. The bodies can include, but not limited to:

Global Information Assurance Certification (GIAC)

Council of Registered Ethical Security Testers (CREST)

International Systems Security Consortium (ISC2)

Information Systems Audit and Control Association (ISACA)

SABSA Certified Professional Architect (SCPA)

Sherwood Applied Business Security Architecture (SABSA)

20%

The respondent must indicate it's adopted Internationally recognised Information Security Governance I Standard framework. Provide the details thereof.

15%

The respondent must indicate the number of resources that they currently employ and will be available for the initiative as per the roles stipulated in the scope

15%

Total

100%

Functionality Evaluation criteria for: Information Security Crisis Management Specialist

Evaluation Gatekeeper Criteria

Weighting

Number of years' experience the company has in business area relevant to the scope

15%

Number of years' experience of their human resources' relevant to the scope

15%

The respondent must provide a list of all reference clients their human resources have provided relevant Information Security services to in the last two (2) years and details of the service. Eskom reserves the right to validate the references.

20%

The respondent must produce proof of each proposed job roles that are accredited I certified members and in good standing with relevant recognised international bodies for a specific role(s) as per the scope. The bodies can include, but not limited to:

Global Information Assurance Certification (GIAC)

Council of Registered Ethical Security Testers (CREST)

International Systems Security Consortium (ISC2)

Information Systems Audit and Control Association (ISACA)

SABSA Certified Professional Architect (SCPA)

Sherwood Applied Business Security Architecture (SABSA)

20%

The respondent must indicate it's adopted Internationally recognised Information Security Governance I Standard framework. Provide the details thereof.

15%

The respondent must indicate the number of resources that they currently employ and will be available for the initiative as per the roles stipulated in the scope

15%

Total

100%

Functionality Evaluation criteria for: Information Security Business Analyst

Evaluation Gatekeeper Criteria

Weighting

Number of years' experience the company has in business area relevant to the scope

15%

Number of years' experience of their human resources' relevant to the scope

15%

The respondent must provide a list of all reference clients their human resources have provided relevant Information Security services to in the last two (2) years and details of the service. Eskom reserves the right to validate the references.

20%

The respondent must produce proof of each proposed job roles that are accredited I certified members and in good standing with relevant recognised international bodies for a specific role(s) as per the scope. The bodies can include, but not limited to:

Global Information Assurance Certification (GIAC)

Council of Registered Ethical Security Testers (CREST)

International Systems Security Consortium (ISC2)

Information Systems Audit and Control Association (ISACA)

SABSA Certified Professional Architect (SCPA)

Sherwood Applied Business Security Architecture (SABSA)

20%

The respondent must indicate it's adopted Internationally recognised Information Security Governance I Standard framework. Provide the details thereof.

15%

The respondent must indicate the number of resources that they currently employ and will be available for the initiative as per the roles stipulated in the scope

15%

Total

100%

Functionality Evaluation criteria for: Information Security Systems Analyst

Evaluation Gatekeeper Criteria

Weighting

Number of years' experience the company has in business area relevant to the scope

15%

Number of years' experience of their human resources' relevant to the scope

15%

The respondent must provide a list of all reference clients their human resources have provided relevant Information Security services to in the last two (2) years and details of the service. Eskom reserves the right to validate the references.

20%

The respondent must produce proof of each proposed job roles that are accredited I certified members and in good standing with relevant recognised international bodies for a specific role(s) as per the scope. The bodies can include, but not limited to:

Global Information Assurance Certification (GIAC)

Council of Registered Ethical Security Testers (CREST)

International Systems Security Consortium (ISC2)

Information Systems Audit and Control Association (ISACA)

SABSA Certified Professional Architect (SCPA)

Sherwood Applied Business Security Architecture (SABSA)

20%

The respondent must indicate it's adopted Internationally recognised Information Security Governance I Standard framework. Provide the details thereof.

15%

The respondent must indicate the number of resources that they currently employ and will be available for the initiative as per the roles stipulated in the scope

15%

Total

100%

Functionality Evaluation criteria for: Information Security Solution Architect

Evaluation Gatekeeper Criteria

Weighting

Number of years' experience the company has in business area relevant to the scope

15%

Number of years' experience of their human resources' relevant to the scope

15%

The respondent must provide a list of all reference clients their human resources have provided relevant Information Security services to in the last two (2) years and details of the service. Eskom reserves the right to validate the references.

20%

The respondent must produce proof of each proposed job roles that are accredited I certified members and in good standing with relevant recognised international bodies for a specific role(s) as per the scope. The bodies can include, but not limited to:

Global Information Assurance Certification (GIAC)

Council of Registered Ethical Security Testers (CREST)

International Systems Security Consortium (ISC2)

Information Systems Audit and Control Association (ISACA)

SABSA Certified Professional Architect (SCPA)

Sherwood Applied Business Security Architecture (SABSA)

20%

The respondent must indicate it's adopted Internationally recognised Information Security Governance I Standard framework. Provide the details thereof.

15%

The respondent must indicate the number of resources that they currently employ and will be available for the initiative as per the roles stipulated in the scope

15%

Total

100%

Functionality Evaluation criteria for: Digital Certificate Scanning Specialist

Evaluation Gatekeeper Criteria

Weighting

Number of years' experience the company has in business area relevant to the scope

15%

Number of years' experience of their human resources' relevant to the scope

15%

The respondent must provide a list of all reference clients their human resources have provided relevant Information Security services to in the last two (2) years and details of the service. Eskom reserves the right to validate the references.

20%

The respondent must produce proof of each proposed job roles that are accredited I certified members and in good standing with relevant recognised international bodies for a specific role(s) as per the scope. The bodies can include, but not limited to:

Global Information Assurance Certification (GIAC)

Council of Registered Ethical Security Testers (CREST)

International Systems Security Consortium (ISC2)

Information Systems Audit and Control Association (ISACA)

SABSA Certified Professional Architect (SCPA)

Sherwood Applied Business Security Architecture (SABSA)

20%

The respondent must indicate it's adopted Internationally recognised Information Security Governance I Standard framework. Provide the details thereof.

15%

The respondent must indicate the number of resources that they currently employ and will be available for the initiative as per the roles stipulated in the scope

15%

Total

100%

Test resources

Role

Years of Experience

Role description

Test Manager Senior

Between 6 and

11 years test management experience with greater than 11 years IT experience

On one major or more than one smaller initiative(s), oversee test analysts and testers in the analysing of requirements to establish test scenarios/business processes and determine test cases

Draft and/or oversee the creation and maintenance of test plans according to Eskom standards

Utilise HP QC for the management of testing

Install requirements traceability to test scenarios/test cases

Create and manage test schedules

Create and manage test approaches

Manage and report test defects

Manage manual and automation testers

Monitor and report on test coverage

Interface with and ensure all impacted parties are informed of progress, risks, and issues timeously

Guidance to Testing CoE teams on practices regarding solution test management

Training of test resources on solution testing best practices

Governance of compliance with test outputs and practices

Direction to customers of the Testing CoE regarding solution quality practices

Reviews of test repositories and the artefacts in them to ensure currency

Overseeing the updating of practices and processes re solution quality

Training on or education of updated solution quality practices etc.

Test Manager Intermediate

Less than 6 years test management experience

On one major or more than one smaller initiative(s), oversee test analysts and testers in the analysing of requirements to establish test scenarios/business processes and determine test cases

Draft and/or oversee the creation and maintenance of test plans according to Eskom standards

Utilise HP QC for the management of testing

Install requirements traceability to test scenarios/test cases

Create and manage test schedules

Create and manage test approaches

Manage and report test defects

Manage manual and automation testers

Monitor and report on test coverage

Interface with and ensure all impacted parties are informed of progress, risks, and issues timeously

Guidance to Testing CoE teams on practices regarding solution test management

Training of test resources on solution testing best practices

Governance of compliance with test outputs and practices

Direction to customers of the Testing CoE regarding solution quality practices

Reviews of test repositories and the artefacts in them to ensure currency

Overseeing the updating of practices and processes re solution quality

Training on or education of updated solution quality practices etc.

Test Analyst Senior

Greater than 5 years test analysis experience

Analyse requirements to establish test scenarios/business processes and determine test cases

Draft and/or oversee the creation and maintenance of test plans according to Eskom standards

Utilise HP QC for the management of testing

Install requirements traceability to test scenarios/test cases

Create and manage test schedules

Create and manage test approaches

Manage and report test defects

Manage manual and automation testers

Monitor and report on test coverage

Interface with and ensure all impacted parties are informed of progress, risks, issues

Test Analyst Junior

Between 3 and

5 years test analysis experience

Analyse requirements to establish test scenarios/business processes and determine test cases

Draft and/or oversee the creation and maintenance of test plans according to Eskom standards

Utilise HP QC for the management of testing

Install requirements traceability to test scenarios/test cases

Create and manage test schedules

Create and manage test approaches

Manage and report test defects

Manage manual and automation testers

Monitor and report on test coverage

Interface with and ensure all impacted parties are informed of progress, risks, issues

Functional Tester Senior

Greater than 3 years "tester" experience

Execute manual tests according to the defined test plans and schedules in accordance with Eskom standards

Log and track defects regarding testing

Report risks, issues and progress to test analysts/test manager

Ensure HP QC is updated with test status

Functional Tester Junior

Less than 3 years "tester" experience

Execute manual tests according to the defined test plans and schedules in accordance with Eskom standards

Log and track defects regarding testing

Report risks, issues and progress to test analysts/test manager

Ensure HP QC is updated with test status

Technical Test Analyst

Greater than 12 years IT experience

with+- 10

years Testing

related experience

Analyse requirements regarding test environments and after analysing project or support initiatives, map actual test usage of environments to available physical resources available to draft and/or oversee the usage of test environment plans

Recommend test environment usage extensions and evictions

Analyse test environment requirements to determine resource requirements and recommend the acquisition of test environment equipment

Create and manage test usage schedules

Define and verify test environment entry and exit criteria

Manage test lab usage and equipment

Produce reports on test environment usage highlighting issues and risks

Manage technical test analysts in the execution of their test environment duties

Interface with and ensure all impacted parties are informed of progress, risks, issues

Test Environment Specialist

Greater than 12 years IT experience with

+_ 10 years Testing related experience

A testing specialist with in-depth knowledge of all IT aspects with specialist knowledge of testing the usage management of test environments.

Will guide and on all testing matters especially test environment usage concepts, controls and measures

Definition of processes, practices, templates and guidelines relative to testing and test environment usage management.

Transfer of knowledge to other TCoE resources

Active role in TCoE guidance

Active in establishing test approaches and adoption of new test processes and legislative matters impacting testing.

Software Quality

Expert - Test

Subject Matter Expert(SME)

Greater than 20 years IT experience

with+- 12 years Testing

related experience

Oversee solution quality practice implementation and usage

Provide guidance and do skills transfer to Eskom core team.

Oversee continuous improvement of Solution Quality assurance

Governance of Solution Quality practices

Measurement of efficiency and effectiveness of quality practices

Guidance on effective and efficient Test approaches and test strategies

Assurance of applicability re Solution Quality Assurance practices

Ensuring all related intellectual capital is appropriately stored

Ensure impacting areas and processes are not going to negatively impact re-use of artefacts

Ensure synergies between TESTING COE teams are being optimally achieved

Identifying continuous improvements to solution quality practices, processes, standards and procedures and overseeing the adoption of these

Performance Scripter Senior

Greater than 10 years performance testing experience

Definition of performance test approach/method

Arrange and drive workshops with the clients and SMEs

Provide guidance on performance test automation including; which tests to be included in performance testing

Performance testing approach

Measure effectiveness of performance testing

Put in place processes and practices to ensure performance test scripts remain current

Guiding performance testers in the execution of their duties

Resolution of any issues which could impact performance testing

Ensure performance scripts are version managed

Arrange scheduling of performance tests

Test and debug performance test scripts

Verify and secure documentation re performance test scripts

Obtain approval from the relevant stakeholders for the completed performance tests

Schedule regular performance runs to ensure performance test scripts are current

Performance Scripter Junior

Less than 10 years performance testing experience

Definition of performance test approach/method

Arrange and drive workshops with the clients and SMEs

Provide guidance on performance test automation including:

which tests to be included in performance testing

Performance testing approach

Measure effectiveness of performance testing

Put in place processes and practices to ensure performance test scripts remain current

Guiding performance testers in the execution of their duties

Resolution of any issues which could impact performance testing

Ensure performance scripts are version managed

Arrange scheduling of performance tests

Test and debug performance test scripts

Verify and secure documentation re performance test scripts

Obtain approval from the relevant stakeh