Republic of the Philippines

BALINGASAG WATER DISTRICT Balingasag Misamis Oriental

Tel.No. (0822) 333-2025

E-mail: [email protected]

ANNUAL ACCOMPLISHMENT REPORT

For Calendar Year 2013

TABLE OF CONTENTS

Historical Background 1

Vision and Mission 2 Philosophy and Values 3

Management and Board Composition 4-5

Part I: ADMINISTRATIVE AND COMMERCIAL SERVICES SECTION

Certificate of Appreciation from GSP 7 Blessing of New Service Vehicle 7

Recategorization of BWD 7

Christmas Raffle Promo 8-9 New Sets of Board of Directors 10

Board Resolutions 10-18

Different LGU Activities Participated by the BWD 18-19 Joint Blessing of Napaliran Pump Station & Genset 20

10th Year Anniversary 20

Year-end Evaluation 21

Additional Manpower 21 Monthly Collections and Disbursements 22-23

Part II: FINANCE SERVICES SECTION

Financial Performance for 2013 24-25

Comparative Graph from the Year 2003 to 2013 26 Acquisition for CY 2013 28

Summary Cash Flow Statement 29

Summary Statement of Changes in Equity 30

Summary Income Statement 31 Summary Balance Sheet 32

Notes to Financial Statements 33-38

Part III: OPERATIONS/TECHNICAL SECTION

Technical Overview 40-41

Comparative Data of Service Connection from 2008 to 2013 42 Power Consumption and Cost 46

Completed Projects 47

Conclusion 49-50

OUR VISION

“Utilizing standardized technology and organizational structure to excel in Giving Quality Services to the Community as a Water Provider.”

“Enriching People’s Lives by Enabling Every Household to Access Safe, Reliable,

Adequate and Potable Drinking Water; and Ensure to Meet the Ever Increasing Demand

of Water Supply Within the Vicinity.”

MISSION

OUR MISSION

ADMINISTRATIVE AND COMMERCIAL

SERVICES

CERTIFICATE OF APPRECIATION FROM GIRL SCOUT OF THE PHILIPPINES (GSP)

A 3rd year high school student of Baliwagan National High School is working on her Girl Scout of

the Philippines (GSP) Chief Medal Scheme. The said scheme focuses on Ecology and Waste Management

and Beautification at Purok 10, Baliwagan Misamis Oriental.

She solicited three (3) waste containers to be placed on a designated project area. The Board of

Directors and Management of the district passed a resolution to solicit waste containers to the said

student approved per Resolution No. 14 dated March 13, 2013.

Last October 24, 2013, the student together with her mentor/adviser visits the BWD Office and

personally gave the Certificate of Appreciation to the General Manager, Mr. Renee Sann R. Ubalde. The

Certificate was signed by the National Program Committee Chairperson, National President and the

National Executive Director of the Girl Scout of the Philippines given at the Aliw Theater, CCP Complex,

Pasay City.

BLESSING OF NEW SERVICE VEHICLE

The Balingasag Water District acquired a new service vehicle; FB Type L300 Van, through ORIX

Metro Leasing and Financing Corporation in Cagayan de Oro City last October 24, 2013.

The additional vehicle will be utilized in transportation of materials and equipment for the

maintenance operation of the district and will serve as service vehicle of Board of Director’s (BOD) and

staff during official travel especially on various forum, conventions and seminars.

The Management, staff and BOD proceeded to St. Rita’s Parish Church. The parish Priest, Fr.

Caduyag conducted the blessing of the new service vehicle. After the blessing ceremony, the group

proceeded to the BWD office where snacks were prepared.

RECATEGORIZATION OF THE DISTRICT

In compliance with the guidelines as provided for in the Department of Budget and Management

(DBM) Approved Revised Local Water District (LWD) Manual on Categorization, Re-Categorization and

Other Related Matters (LWD-Macro), the District was categorized under Category “D” effective March 14,

2012.

The district submitted to DBM its proposed Organizational Structure and Staffing Pattern (OSSP).

There will be three (3) sections, Commercial and Administration, Finance and Operation and

Maintenance. The management created three new positions, namely Administration Services Assistant A,

Administration Services Assistant C and Utilities/Customer Services Assistant C. The position title of Water

Maintenance Man C will be reclassified into Utilities/Customer Services Assistant E. Storekeeper D on the

plantilla of personnel will be considered coterminous to the incumbent (CTI).

The management submitted the pertinent documents to DBM its proposed OSSP last October 23,

2013 and it was approved on December 11, 2013. The district will submit the Plantilla of Personnel based

on the Position Allocation List of DBM.

CHRISTMAS RAFFLE PROMO

The Balingasag Water District has been organizing different promos on service connections for

several years to continue motivating the public for water service connections. This year, as one of the

highlights of the Christmas season, the district once again give privilege to all residents and encourage

more applicants by having a Christmas Raffle promo.

The Christmas Raffle Promo 2013 includes the following mechanics:

Concessionaire’s account must have no balances as of December 16, 2013 Must have an above minimum consumption BWD’s Board of Directors and employees including their relatives up to 3rd degree are not

qualified One qualified account corresponds to one raffle ticket Deadline for the raffle ticket will be on December 20, 2013

Raffle draw will be on December 23, 2013, 10:00 a.m. at the Balingasag Water District Office

During the raffle draw, if an account name is drawn as winner more than once, only with higher prize shall be given; winner for the other prize shall be drawn again

The prizes were water dispenser, washing machine, electric fan, electric pot and rice cooker for

the 1st, 2nd, 3rd, 4th and 5th prizes respectively. There will be five (5) winners for a grocery items worth

Five hundred (P500.00) pesos and Five (5) winners for assorted items of Two hundred fifty (P250.00)

pesos.

The raffle draw was conducted last December 23, 2013 at 10:30 am. Dir. Beverly S. Vega and

Dir. Enrico R. Valmores were present during the promo which was held outside the teller section. There

were also concessionaires who were around to witness the raffle.

The lucky winners were the following:

1st Jermie Carreon

2nd Rengen Badilla

3rd Marilyn Ecarro

4th Maribel Auza

5th Francsico Baring

Consolation (P500.00)

1 Bonifacio Galleto

2 Ritchel Pasilang

3 Cinderella Abellana

4 Calixtra Aboc

5 Church in Balingasag

Consolation (P250.00)

1 Geronimo de los Santos

2 Niza Ampo

3 Eddie Baja

4 Edgar Cabungcal

5 Jonald Amarado-B

Mr. Carreon (2nd from left), the 1st prize winner posed with the BWD Staff

The winner must present the duplicate copy of his raffle entry and two (2) valid Identification

Cards to claim their prizes.

NEW SETS OF BOARD OF DIRECTOR

Everybody was in great sorrow after hearing the bad news about the death of the late BOD

Chairperson M. Editha I. Madroño last May 30, 2013.

The Board of Directors conducted their regular meeting last June 5, 2013. At 10:00 am It was moved and seconded that the new Chairperson is Dir. Beverly S. Vega and the new Secretary is Dir. Enrico R. Valmores. Dir. Ociones and Dir. Pelaez retained their positions as the Treasurer and P.R.O,

respectively. The newly elected Chairperson Dir. Vega thanked the rest of the directors for the trust and

support. According to her, she will try her very best to do her responsibility as a BOD Chairperson of the District.

Last July 1, 2013, the BOD Secretary solicited nominees to three (3) different organizations for

possible appointment, who is now vacant due to untimely death of Dir. Ma. Editha I. Madroño.

The list of nominees (Mr. Theodore D. Tagarda and Mr. Leo K. Tan) was furnished to Mayor

Alexis S. Quina and he appointed Mr. Tagarda of Vikings Association with a term of office from August 1,

2013 to December 31, 2018.

BOARD RESOLUTIONS

The Board of Directors passed a total of Seventy five (75) Resolutions for 2013. The resolutions

with their corresponding date and resolution number were as follows:

NO. DATE SUBJECT

01 January 10, 2013 A Resolution ending the “Christmas Promo” effective

January 9, 2013 and have a “Fiesta Promo 2013”

effective January 10 to February 17, 2013 02 January 10, 2013 A Resolution appropriating an amount of Three

Thousand Pesos (P 3,000.00) as solicitation to open Supercross Competition Committee of LGU-Balingasag, Balingasag Misamis Oriental

03 January 31, 2013 A Resolution authorizing the management of Balingasag

Water District to temporarily deposit its Savings account

from Rural Bank of Balingasag (RBB) to FICCO-Balingasag Branch

04 January 31, 2013 A Resolution authorizing the GM, BOD Chairman, Secretary, Treasurer, PRO to attend the 34th PAWD

Convention to be held on February in Manila 05 February 05, 2013 A Resolution ending the “Fiesta Promo 2013” effective

February 8, 2013 and have a “Valentine Promo” effective February 11 until February 28, 2013 and a one day “Anniversary Promo” on February 19, 2013

06 February 05, 2013 A Resolution authorizing the management to Pull-out all

accessories including water meters to in-active

concessionaires after the six (6) months grace period as a measure to minimize BWD’s NRW

07 February 05, 2013 A Resolution appropriating a total amount of Four Thousand Pesos (P 4,000.00) as solicitation to St. Rita’s College, St. Peter’s College, Holy Child Montessori, and

Misamis Oriental Institute of Science and Technolgy (MOIST) for their yearbook/souvenir program

08 February 26, 2013 A Resolution appropriating a total amount of One Thousand Pesos (P 1,000.00) as solicitation to Brgy. 4

Women’s Organization 09 February 26, 2013 A Resolution authorizing the General Manager to

approve and sign the Deed of Donation of a 240 sq.m land located in Musi-Musi owned by Teresa V. Arong

10 February 26, 2013 A Resolution approving the condonation of penalty of Longalong, Winston amounting to Two Thousand Five Hundred Pesos (P 2,500.00) and outright payment of its

50% unpaid bill and the remaining balance payable in P 500.00 per month

11 February 26, 2013 A Resolution approving the total cost of the two (2) projects amounting to Six Hundred Thirty Thousand Five

Hundred Thirty Three Pesos and 37/100 (P 630,533.37) charge to the annual budget of 2013

12 March 13, 2013 A Resolution approving the “Earth Consciousness Promo” of the Balingasag Water District effective March 2013 until April 30, 2013

13 March 13, 2013 A Resolution authorizing the General Manager and the

Board of Directors to travel to Butuan City/Cebu City to attend the Basic Policy Maker’s Seminar

14 March 13, 2013 A Resolution approving to solicit three (3) Waste Containers to Baliwagan National High School for the GSP Chief Medal Scheme of Ms. Jale Rose A. Baldon

15 March 13, 2013 A Resolution approving for additional appropriation in

the total amount of One Hundred Ten Thousand Pesos

(P 110,000.00) for purchase of steel cabinet, fire extinguisher, application of tax declaration and for the blessing of BWD’s projects charge to any unappropriated

funds of BWD 16 March 26, 2013 A Resolution appropriating an amount of Five Thousand

Pesos (P 5,000.00) as solicitation to Parish Pastoral Council

17 April 10, 2013 A Resolution appropriating an amount of Five Hundred Pesos (P 500.00) as solicitation to Alternative Learning

System 18 April 23, 2013 A Resolution appropriating an amount of Two Thousand

Pesos (P 2,000.00) as solicitation to Blanco Brgy. Council 19 May 07, 2013 A Resolution adopting the provisions under LWD-Macro

and approving the creation, upgrading and reclassification of positions of the balingasag water district personnel based on the new LWD-Macro

20 May 07, 2013 A Resolution appropriating an amount of two thousand

pesos (P 2,000.00) as solicitation to St. Rita’s College of

Balingasag batch’ 63 21 May 07, 2013 A Resolution Approving The “Back To School Promo”

Effective May 07, 2013 Until June 30, 2013

22 May 07, 2013 A Resolution Approving the Release of Burial Assistance from MAWD amounting to Twenty Five Thousand Pesos (P 25,000.00) to the dependent of late Dir. Alberto

Palarca 23 May 07, 2013 A Resolution Amending The Name Of Application

Fee/Installation Fee To Maintenance Fee And Amending The Reconnection Fee From Fifty Pesos (P 50.00) To Two Hundred Pesos (P 200.00)

24 May 07, 2013 A Resolution approving to install Sprinkler type faucet

for the GSP Chief Medal Scheme of Ms. Maria Teresa V. Salesa of Misamis Oriental Institute of Science and Technology (MOIST)

25 May 16, 2013 A Resolution Appropriating And Releasing An Amount Of

Ten Thousand Pesos (P 10,000.00) For The Purchase Of

Electronic Camera For The Balingasag Water District

26 May 16, 2013 A Resolution appropriating and releasing the payment for damages claimed by Mr. Elizardo Roa in the amount of eleven thousand seven hundred twenty five pesos (p

11,725.00) during the pipeline explosion incident at Brgy. Blanco, Balingasag

27 May 16, 2013 A Resolution approving and authorizing the management of Balingasag Water District to apply for a car loan through bank financing and designating the General

Manager to enter into a contract and to sign all the pertinent documents relative to the acquisition of the multi purpose vehicle

28 June 05, 2013 A Resolution authorizing the newly elected Chairman

and Treasurer of the Board of Directors of the

Balingasag Water District to sign any banking transaction with the FICCO Balingasag-Balingasag Branch and further approving any two of the three

authorized signatories to sign any banking transaction with the aforementioned bank

29 June 05, 2013 A Resolution authorizing GM Renee Sann R. Ubalde with

BOD-Chairperson Beverly S. Vega and/or BOD Treasurer

Atty. Cristina Teresa Ociones as the signatories of the BWD’s account in Land Bank of the Philippines (LBP) Velez Branch

30 June 05, 2013 A Resolution requesting the Northern Mindanao-Natural

Resources Management Council (NorMin-NRMC) for

financial assistance for the death of BOD-Chairperson M. Editha I. Madroño of the Balingasag Water District

31 June 05, 2013 A Resolution requesting the Mindanao Association of

Water Districts (MAWD) for financial assistance for the

death of BOD Chairperson M. Editha I. Madroño of the Balingasag Water District

32 June 05, 2013 A Resolution recognizing and giving of Posthumous

Award to the late BOD Chairperson Ma. Editha I.

Madroño for her unwavering service rendered to the Balingasag Water District during her term

33 June 19, 2013 A Resolution Designating the PS Bank Velez Branch,

Cagayan de Oro City to provide the Car loan services to

the Balingasag Water District, Balingasag Misamis Oriental

34 June 19, 2013 A Resolution approving to release an amount of One

Hundred Forty Nine Thousand Eight Hundred Pesos (P

149,800.00) as downpayment to PS bank auto loan for the BWD car financing program charge to CAPEX

35 June 19, 2013 A Resolution approving for additional appropriation amounting to Sixteen Thousand Pesos (P 16,000.00) for

additional purchase of two (2) steel cabinets charge to any unappropriated funds of BWD

36 June 19, 2013 A Resolution ending the “Back to School Promo” and have a “Rainy days Promo” effective July 1, 2013 until August 31, 2013

37 June 19, 2013 A Resolution designating GM Ubalde with Dir. Vega

and/or Dir. Ociones as the authorized signatories for the

transfer of the Balingasag Water District’s Savings Account from FICCO-Balingasag to Land Bank of the Philippines (LBP)-Velez Branch

38 June 19, 2013 A Resolution appropriating an amount of Two Thousand

Pesos (P 2,000.00) as solicitation to St. Rita’s College of

Balingasag Batch’ 63 39 July 09, 2013 A Resolution approving the release of burial assistance

from Normin-NRMC amounting to Ten Thousand Pesos (P 10,000.00) and from PAWD amounting to Five

Thousand Pesos (P 5,000.00) to the dependent of late Dir. Madroño

40 July 09, 2013 A Resolution appropriating an amount of One Hundred Sixty Thousand Pesos (P 160,000.00) for the rehabilitation of Pipeline outlet (pump-B) project of the

Balingasag Water District 41 July 23, 2013 A Resolution approving the installation of additional

Communal faucet at Brgy. Binitinan, Balingasag Misamis Oriental

42 July 23, 2013 A Resolution authorizing GM Renee Sann R. Ubalde to sign the Memorandum of Agreement (MOA) between Brgy. Binitinan and Balingasag Water District

43 July 23, 2013 A Resolution approving the additional policy of paying an

inspection fee/service request fee amounting to One Hundred Fifty Pesos (P 150.00) for concessionaires who are requesting for meter verification/inspection due to

high consumption 44 July 23, 2013 A Resolution approving the release of burial assistance

from Mindanao Association of Water Districts (MAWD) amounting to Twenty Five Thousand Pesos (P 25,000.00) to the dependent of late Dir. Madroño

45 August 13, 2013 A Resolution authorizing the management of the

Balingasag Water District to open a new Savings Account at Land Bank of the Philippines (LBP) Velez Branch, Cagayan de Oro City and designating GM Ubalde

with Dir. Vega and/or Dir. Ociones as the authorized signatories

46 August 13, 2013 A Resolution appropriating an amount of Two Thousand Pesos (P 2,000.00) as solicitation to Napaliran Barangay

Council for their fiesta celebration in honor of the Patron Saint, Sr. San Roque

47 August 13, 2013 A Resolution amending BOD Resolution No. 23 s. 2013 regarding the increase of Reconnection fee from Fifty Pesos (P 50.00) to Two Hundred Pesos (P 200.00) of

which only Fifty Pesos (P 50.00) service fee shall be charged if arrears is paid on the day of the disconnection

48 August 13, 2013 A Resolution authorizing the BWD management to hire

one additional security guard as additional to the

existing three security guards to provide security services to the Balingasag Water District, Balingasag Misamis Oriental

49 August 13, 2013 A Resolution designating Orix Metro Financing for BWD’s

service vehicle acquisition and authorizing GM Renee

Sann R. Ubalde to transact and sign all the pertinent documents

50 August 13, 2013 A Resolution granting adjustment to the billing of Mrs.

Melchora Valmores provided that she cannot ask any

adjustment from BWD within 5 years 51 August 13, 2013 A Resolution adopting the GAD (Gender and

Development) Program for Balingasag Water District pursuant to Programs and Policies of the Civil Service Commission

52 August 13, 2013 A Resolution authorizing the GM to acquire additional

communication thru mobile phone plan charge to 2013

budget for communication 53 August 28, 2013 A Resolution appropriating/releasing a total amount of

One Hundred Fifty Thousand Pesos (P 150,000.00) for

Pipeline Expansion at Entrance road highway going to Public Market charge to 2013 budget

54 August 28, 2013 A Resolution appropriating/approving the procurement

of 1 unit Chlorinator Pump for San Jose Pump Station in

the amount of Thirty Thousand Pesos (P 30,000.00) charge to any unused funds of BWD

55 August 28, 2013 A Resolution extending the “RAINY DAYS PROMO” of the Balingasag Water District until October 31, 2013

56 September 10, 2013 A Resolution Appropriating & Releasing a total amount of Seventeen Thousand Pesos (P 17,000.00) for the

BWD Community Tax as required by Orix Metro Financing for the BWD’s service vehicle acquisition

57 September 10, 2013 A Resolution changing the billing cycle of the Balingasag Water District from Calendar days to Working days

58 September 30, 2013 A Resolution approving and appropriating a total amount of Forty Thousand Pesos (P 40,000.00) for the

procurement of materials for the portable tent, chairs, printer, and computer tables charged to unused funds of BWD for 2013 through re-aligned budget

59 September 30, 2013 A Resolution appropriating an amount of One Thousand

Pesos (P 1,000.00) as solicitation to Balingasag Central

School for the Teachers’ Day Celebration 60 October 8, 2013 A Resolution amending Resolution No. 33 s. 2013, to

designate the Orix Metro Leasing and Finance Corporation instead of PS Bank Velez Branch, Cagayan de Oro City to provide the Car loan services to the

Balingasag Water District, Balingasag Misamis Oriental

61 October 8, 2013 A Resolution authorizing the management to release funds for payment of initial cash outlay to Orix Metro Leasing and Finance Corporation in the acquisition of

vehicle for day-to-day operations of the Balingasag Water District, Balingasag Misamis Oriental

62 October 8, 2013 A Resolution appropriating and releasing an amount of

Two Thousand Five Hundred Pesos (P 2,500.00) as

solicitation to Balingasag Central School for football uniforms of their football team

63 October 8, 2013 A Resolution approving for additional appropriation in the amount of Seventy Thousand Pesos (P 70,000.00) for Normin and MAWD Forum

64 October 29, 2013 A Resolution ending the “Rainy days Promo” of the

Balingasag Water District and have a “Christmas Promo

2013” effective November 1, 2013 until December 31, 2013

65 October 29, 2013 A Resolution approving the adjustment of Mr. Romeo Pangilinan’s account due to leaks and accumulation of

consumption provided that he will submit an Affidavit of Undertaking to BWD

66 October 29, 2013 A Resolution temporary designating LBP-Velez Branch as depository bank using BWD’s savings account on Guaranty deposits for the accumulated checks not

received by FICCO

67 November 11, 2013 A Resolution Approving the Christmas Raffle Promo 2013 of the Balingasag Water District to be drawn on

December 23, 2013 with an estimated budget of Thirty Thousand Pesos (P 30,000.00) for the prizes

68 November 26, 2013 A Resolution approving to realign/augment the Budgetary Appropriation for Calendar Year 2013 of the Balingasag Water District, Balingasag, Misamis Oriental

69 November 26, 2013 A Resolution authorizing the Management to release the year-end bonus and cash gift to the employees of Balingasag Water District, Balingasag Misamis Oriental

70 November 26, 2013 A Resolution appropriating an amount of Five Thousand

Pesos (P 5,000.00) as financial assistance to the victims

of typhoon Yolanda in Samar and Leyte 71 December 10, 2013 A Resolution approving the 2014 Budget Proposal

including the estimated income, expenses, cash flows and capital expenditures of the Balingasag Water District

72 December 10, 2013 A Resolution approving the initial release of Productivity Enhancement Incentive (PEI) as advance payment to all permanent and casual employees in the amount of Five

Thousand Pesos (P 5,000.00) each on December 10, 2013

73 December 10, 2013 A Resolution approving the initial release of BOD Performance-Based Incentive (PBI) in the amount of

Five Thousand Pesos (P 5,000.00) each with a waiver as per Executive Order No. 65 pending recommendations and approval by GCG and Office of the President

74 December 10, 2013 A Resolution approving the adjustment of BFAR-LGU’s

account for the period of October, November, and

December 2013 on 50% condonation as per BWD’s leakage policy

75 December 18, 2013 A Resolution appropriating a total amount of Two Thousand Two Hundred Pesos (P 2,200.00) as solicitation to Balingasag Central School GPTA, Hataw

Balingasag, Rosario National High School, and Balingasag Children’s Choir

DIFFERENT LGU ACTIVITIES PARTCIPATED BY THE BWD

A. STO. NINO FIESTA CELEBRATION

The municipality of Balingasag is celebrating its town fiesta in honor of Sr. Sto. Niño

every 3rd Sunday of January. A civic parade is happening every Saturday before the fiesta proper.

All private/public agency, schools, different organizations and interested individuals were invited

to join the parade activity.

The Balingasag Water District as an active agency joined the civic military parade. J. P

Roa was the assembly area and the parade started at 7 o’clock and ended at 10 o’clock. The

length of time shows the numerous groups participating the activity.

B. ARAW NG BALINGASAG/BALINGASAG NIGHT

The Local Government Unit of Balingasag has lined up different activities in honor of Sta.

Rita de Cascia.

A parade participated by government and private agencies started at 7:30 in the morning

around the town proper (from the Public Kiosk to barangay 1). All participating agencies

assembled at the Jose P. Roa Park.

There was a short program after the parade. Sugbang bangus commenced at 10:30 in

the morning. Grills stand were lined up from the LGU-Palace to the J.P. Park.

In the evening, there was Balingasag night. Each participant will provide their own foods

for the said gathering. The Provincial Band of Misamis Oriental was invited to serenade the

evening by playing rock and mellow sounds. A fireworks display followed at 10:00 o’clock in the

evening headed by the municipal Mayor.

C. PASIGAHAN SA PLAZA

It has been a Christmas activity of the town to adorn the trees at the town plaza as one of the

highlights of Christmas season. Private and public agencies were invited to join the said activity.

The participants will decorate their respective tree through the use of recycled materials to

minimize environmental waste. Each participating group is allowed to use up to one thousand (1,000)

lights. The district has utilized the pulled out polyethylene pipe; rolled and wrapped with foils.

There was a short program on December 15, 2013 at 6:00 pm which is the opening day of

Pasigahan sa Plaza. The lighted trees will be one of the highlights of the town during Christmas season

until the Sto. Niño town fiesta. There were dance and song numbers from different schools and

institutions. The municipal Mayor, Atty. Alexis S. Quina gave his message for the participants and

audiences.

In the midst of the program, special awards were given to three (3) unique trees. The third place

goes to Alvanz and Son Hardware; the second is Balingasag Water District and the first place goes to

Pryce Gases, Incorporated. The district received a cash prize of Two thousand pesos (P2,000.00).

JOINT BLESSING OF NAPALIRAN PUMP STATION AND GENSET

The Balingasag Water District acquired a 150 kva generator set to be utilized during power

interruption by MORESCO II to ensure 24 hours water services to its concessionaires.

On the other hand, the Management has successfully rehabilitated the deep well at barangay

Napaliran. The barangay Council passed a resolution allowing the BWD to repair/operate the deep well

situated at the plaza of the said barangay.

The BOD has conducted their regular meeting on April 10, 2013 and it was unanimously

approved by the BOD to have a joint blessing of the aforementioned projects on April 23, 2013.

The Board of Directors, Management and Staff will proceed to the genset house at barangay

Blanco. There was a short program followed by the blessing of the new generator set by the Assistant

Parish Priest, Fr. Eleuterio Datoy. The opening remarks and short talk was given by Chairman Ma. Editha

I. Madrono and Mayor Alexis Quina respectively. The barangay Council of Blanco and Napaliran were

also invited to witness the blessing ceremony.

The group will proceed to barangay Napaliran for the blessing of the District’s Well no. 2. A short

program was also conducted. Lunch was prepared at the BWD office for the visitors and barangay

officials together with BWD Board of Directors, Management and Staff.

10th YEAR ANNIVERSARY

The Balingasag Water District celebrated its 10th year of public service on the 19th of February

2013. As part of the event, the Board of Directors and Management unanimously approved to have a

one day Special Promo on the day of its anniversary. The new promo mechanics will have an installation fee of Two hundred fifty pesos only ( P

250.00) for residential applicants plus free 6 meters P.E Pipe and Five hundred pesos (P 500.00) for commercial applicants plus free 6 meters P.E Pipe. The said promo will be applicable to the first 30 applicants only.

The management has prepared various foods for the staff and BOD to join together in the

afternoon. There were litson baboy, sugbang bangus, adobo, kinilaw and fruits as the different menus for the anniversary.

YEAR-END EVALUATION

As the year 2013 ends, the Balingasag Water District will have an assessment on the

performance and accomplishment of the district.

The Board of Directors, Management and Staff has decided to conduct its year-end evaluation in

one of the prestigious resort in the municipality. There will be a short program with a special message

from one of the Board of Directors and the General Manager. There were different food menus; litson

baboy, paklay, kinilaw, fried chicken, adobo, calderita, sugbang bangus and desserts which will be joined

together after the program.

There were various parlor games participated by On-The –Job trainees, Volunteers and staff

where cash prizes await the winning group or individual. The management also rented a videoke to add

more fun to the activity; the staff and BOD sang their favourite hits while the rest enjoyed dancing.

ADDITIONAL MANPOWER

The number of service connections increases every month. As of January 2013, the total number

of concessionaire is Three thousand twenty three (3,023). This indicated that service connection of the

district is increasing every now and then, thus there is a need of hiring additional staff to cope up the

volume of office and maintenance works.

The newly hired personnel were as follows;

Name Date Hired Designation

Jumbo E. Japuz 16-Jan-13 Plumber

Franklin C. Villadores 16-Jan-13 Plumber

Leny N. Oclarit 16-Jan-13 Clerk

Ryan A. Mayuman 16-Jan-13 Plumber

Leizl Jane J. Bacorro 18-Jan-13 Accounting Clerk

Jay Arong 1-Jul-13 Pump Operator

Nomar Borres 15-Aug-13 Plumber

Eduardo Nebres 01-Dec-13 Driver

MONTHLY COLLECTIONS AND DIBURSEMENTS

Month Collection Disbursement

Jan 1,547,095.36 1,502,481.25

Feb 1,404,536.88 1,922,572.19

Mar 1,312,704.75 1,657,307.90

Apr 1,466,719.01 1,407,307.56

May 1,636,503.49 1,580,458.11

Jun 1,585,712.71 1,255,934.93

Jul 1,455,072.83 1,262,611.71

Aug 1,369,049.25 1,298,836.65

Sep 1,548,509.75 1,082,088.10

Oct 1,513,318.06 1,465,322.20

Nov 1,438,222.94 1,535,967.36

Dec 1,419,820.19 1,632,387.46

0.00

500,000.00

1,000,000.00

1,500,000.00

2,000,000.00

2,500,000.00

Jan

Feb

Mar

Ap

r

May Jun

Jul

Au

g

Sep

Oct

No

v

Dec

Collection

Disbursement

As shown in the graph and table, the disbursements for the month of February, March, November and

December were higher than its corresponding collection.

The district has disbursed Five hundred eleven thousand seventy one pesos & 43/100 (P511,071.43) to

Power Link Aksa Philippines for the payment of generator set in February. The materials utilized in the construction

of Napaliran and Blanco pump houses were one of the factors affecting the expenses in March.

November and December was the time for the granting of bonuses; PEI and 13th month pay to casual and

permanent employees. The management also settled its pending accounts from its suppliers. Thus, making the

expenses higher than the collections.

2013 ANNUAL ACCOMPLISHMENT

REPORT

BALINGASAG WATER DISTRICT

Balingasag, Misamis Oriental

OPERATION AND MAINTENANCE SECTION

Prepared by: Noted by:

CHRISTOPHER S.BELAMIA RENEE SANN R.UBALDE Utilities Services Asst.-A General Manager

Technical Overiew

A. Water source

There are two source of water supply of Balingasag Water District the one is the San

Jose Spring, located at Upper Musi-musi, Blanco, Balingasag, Misamis Oriental, with a

maximum flow of Eighty One Liters per second (81 LPS), per feasibility study conducted by the office of the Local Water Utilities Administration (LWUA) and the newly installed located at the

Napaliran which is existing hand pump of the Barangay which is develop by the Water District

to help ease the shortage of Potable water supply of the latter .It was named as Deep Well # 1 with flow per testing estimated to Ten Liters per Second (10 LPS). Brgy. San Isidro was

proposed to be an Additional Source of water it is being Studied and presumed to supply water

with equivalent flow of Brgy.Napaliran

SOURCE DATA

San Jose Spring

Maximum Flow 81 Liters Per Second

Pumping Flow Capacity 60 Liters Per Second

Available Flow 31 Liters per Second

Napaliran Deep Well # 1

Maximum Flow(Estimated) 10 Liters Per Second

Pumping Flow Capacity 3 Liters Per Second

Available Flow 7 Liters Per Second

The water shortage experienced at the Napaliran and Mambayaan was addressed by BWD through installation of additional water source.

SERVICE AREA

1 BALIWAGAN 10 Barangay 1 (Pob.)

2 BINITINAN 11 Barangay 2 (Pob.)

3 BLANCO 12 Barangay 3 (Pob.)

4 COGON 13 Barangay 4 (Pob.)

5 DUMARAIT 14 Barangay 5 (Pob.)

6 HERMANO 15 Barangay 6 (Pob.)

7 LINGGANGAO 16 TALUSAN

8 MANDANGOA 17 WATERFALL

9 NAPALIRAN

Out of Thirty (30) Barangays in the Municipality of Balingasag, eleven (11) barangays are unreachable for BWD water services, seventeen (17) Barangays have service connections

some are partly supplied and the rest are still in the priority for expansion projects of the

Balingasag Water District, the 1st Priority are the Following: a. Mambayaan b. San Isidro c.

Dumarait

Projected Population within Service Area as of December 31, 2012 is 49,369. While the

projected population that comprised of thirty (30) barangays is 69,618.

*** Population and number of household are 69,618 and 13,924 respectively*** Note- Figure

estimation is based on the Actual Data from Municipal Planning Development Center Office (MPDC) Survey as of December 31, 2012 with a total

B. Pump Data

San Jose Pumping Station 1. Pump – 2 units at 25 hp each, and 1 unit 40 hp

2. Capacity -15 LPS @ 25 hp, and 30 LPS @ 40 hp

3. Total Pumping -60 LPS 4. TDH– 70 meters

5. Type – End Suction Horizontal Centrifugal Pump

6. Back up – Perkins Generator Set 50 KVA

7. Transmission Pipeline -200 mmᴓ Cement Line Cement Coated(CLCC)

8. Total Length -300 meters

C. Napaliran Deep Well # 1

1. Pump-1 unit Submersible Pump 3 hp 2. Capacity-Three Litres per Second(3 LPS)

D. Reservoir

1. Make-Reinforced Concrete Ground Reservoir

2. Capacity – 550 m3 of water 3. Elevation – 61 meters

4. Main Pipeline – 250 mm Ɵ UPVC

OPERATION AND MAINTENANCE UPDATE

The Operation and Maintenance Section

has a variety of duties, principally related

to the installation, repair and replacement

of water main pipelines, performs all

“underground” maintenance, upkeep pump

houses, grounds, storage tanks and

pumping facilities. This Section is also

responsible for maintenance of water

distribution equipment and facilities

including valves, hydrants and some meter

maintenance. Attends for Concessionaires

service leaks and repairs and minor

construction and repair works.

Hence, the following are the graphs for

the accomplishments of the different

activities in the Operation and

Maintenance Section for the year ending

December 31, 2012.

Service Connection Data:

Month 2008 2009 2010 2011 2012

January 30 30 66 54 44

February 23 42 55 21 20

March 18 16 28 31 41

April 21 14 22 14 18

May 17 12 24 30 35

June 28 10 33 28 40

July 21 24 28 20 22

August 17 21 16 28 34

September 18 14 27 24 10

October 13 20 31 23 37

November 10 12 28 22 15

December 46 54 43 35 26

Total 262 269 401 330 357

The Comparative Data of Service Connections from 2008 to 2012 showed that there is a rapid increase of new

service connection resulting from BWD promotion to help community to avail water with less registration fee.

0

100

200

300

400

500

330

Chart Title

2008

2009

2010

2011

2012

Water Production Table:

Month Jan Feb Mar Apr May June Jul Aug Sept Oct Nov Dec

Revenue water 41,121 37,385 41,635 40,243 42,999 40,942 41,208 41,556 41,114 42,182 41,285 45,010

NRW 24,440 22,209 24,712 19,114 20,524 18,788 19,787 18,566 19,374 22,898 22,588 24,236

Total Producti

on 65,561 59,594 66,347 59,357 63,406 59,568 60,895 60,122 60,658 65,074 63,873 69,246

The chart shown on top is the Non Revenue Water (NRW) and Revenue

of Balingasag Water District, the chart

can be observed that BWD has an average system loss of Thirty Five

Percent (35%) while the revenue S ix

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Revenue

NonRevenue

The pie graph represents BWD’s Operation and Maintenance annual accomplishment for the Previous year 2012.The Highest was the repair followed by replacement of water

meter hence this two factor is the greatest factor of NRW (Non-Revenue Water) of BWD.The Technical section was striving hard to eliminate system loss.

4. POWER CONSUMPTION AND COST

74%

3%

15% 5%

1% 2%

Repair Check meter Service connection

Replaced meter Pulled out meter Special Works

Repairs Check meter/Transfer

Meter Pulled

out Replaced

meter Special works Service

connection

1800 60 31 125

48

357

The Average Power consumption is 29,219 kw-hr and Power Cost is Php.172, 000.00 respectively. Graph shows that power consumption is declining from high to average with a rate of Php. 5.87 per kilowatt-hr.

0.00

50,000.00

100,000.00

150,000.00

200,000.00

250,000.00

300,000.00

Power cost

Power consumption

Month Power Cost (Pesos) Power Consumption (kwhr)

January 206,772.21 36,180

February 205,471.02 34,070

March 172,528.32 28,890

April 167,581.37 28,970

May 163,018.73 27,630

June 152,412.25 25,914

July 167,500.57 28,880

August 162,631.52 27,705

September 167,904.56 30,811

October 145,843.62 25,822

November 167,631.37 28,852

December 174,567.58 25,730

For the year 2012 BWD has completed a lot of projects for the improvement of the System upon serving more to the concessionaires, these are the following stated below to

wit:

A. Additional Pumping Station

Additional Pumping Station was put up last year with a capacity of 3 (Three) liters per second (LPS) with a Brake horsepower (BHP) equivalent to 5 (Five)

Horsepower (hp) that can serve up to 300 household intended for Napaliran and Mambayaan due to exigency of potable water of the said vicinity.

B.Pipeline Expansion and Rehabilitation

Pipeline rehabilitation and expansion conducted at Hermano from ¾“to 2” and 1 ½” SDR 11 PE Pipe to suffice the necessity for potable water with a length of 300 meters coming from existing Blow off to last Box Culvert .

C.Mandangoa Pipeline Expansion

Completion of the Brgy. Mandangoa Pipeline expansion from National Highway to Mandangoa with actual length of 1,300m (One thousand three

Hundred meters). D.Installation of Flow meters

Installation of 3 (three) flow meters 50mmᴓ located at Crossing

Baliwagan,Binitinan and Hermano.

E.Replacement of PE Pipe to GI Pipe 100mmᴓ at the Brgy 1 National Highway

Pipeline rehabilitation was conducted at the Brgy.1 National Highway Located near the Box culvert to improve the Pipeline Stability. It was replaced due to its damage from road repairs works conducted by DPWH Gingoog based from PE Pipe 100mmᴓ to G.I Pipe Schedule 40(Forty) Supreme type .It’s position was

relocated beside the culvert to make it safer hence its last position was lying over the Culvert.

F.Replacement of Defective Air Release

Replacement of defective air release was conducted by BWD technical team located at the Napaliran Bridge,Padilla Box Culvert and:

Pumping Station at Musi musi from Check swing valve to Plastic Air Release. G.Construction of Pipe rack

Construction of pipe rack located at the BWD Reservoir for relocation of Reserve pipe intended for BWD Pipeline Maintenance.

A. Deep well # 1 Housing and Perimeter Construction

Deep well # 1 has no housing currently it was planned to put

up a housing intended for operator and electrical apparatus and controllers to avoid damages that will affect the daily

operation initial estimate of expenses is equivalent to

60,000.00 materials including laborer.

B. Additional Power House Construction

Additional Power house intended for additional Generator Set

With a power Capacity of 150 KVA with 1800 revolution per

minute intended for Power outages, back up power to sustain

system requirement.

C.Linggangao Pipeline Expansion

Pipeline expansion for linggangao with a length equivalent to 300 meters and 150 meters 1” PE Pipe

Estimated concessionaire living the within the vicinity is 30

household.

This report is intended as a status report on the activities being undertaken as an

accomplishment report of the BWD Operation and Maintenance Section for the Previous year

2012. And this was made doable through the aid of God and the support of the Board of

Directors and the Management of Balingasag Water District.

Replacement of uPVC Pipe to Steel Pipe

Size 250mmᴓ

Length 684 meters

Type Cement Lined /Mortar Coated Steel Pipe

Expenses including Installation and Delivey Php. 3,990,000.00

Labor(Excavation/Backfilling) 24,000.00

Labor(Retrieval and Hauling) 10,000.00

Total Expenses 4,024,000.00