anthony bontrager portfolio

32
ANTHONY BONTRAGER PROFESSIONAL | GRADUATE | UNDERGRADUATE ARCHITECTURE PORTFOLIO

Upload: anthony-bontrager

Post on 08-Apr-2016

228 views

Category:

Documents


1 download

DESCRIPTION

Architectural Portfolio Professional | Graduate | Undergraduate

TRANSCRIPT

ANTHONY BONTRAGER

PROFESSIONAL | GRADUATE | UNDERGRADUATE

ARCHITECTURE

PORTFOLIO

PROFESSIONAL EXPERIENCE

UPON REQUEST

REFERENCES

SOFTWARE KNOWLEDGE

EDUCATION

BALL STATE UNIVERSITYMUNCIE, IN|MAY 2013|

COLLEGE OF ARCHITECTURE AND PLANNINGBACHELOR OF SCIENCE IN ARCHITECTURE• GRADUATED WITH 3.29 GPA

TEG ARCHITECTS, LLCJEFFERSONVILLE, IN|JUNE 2013 - AUGUST 2014|

POSITION: ARCHITECTURAL INTERN

ARIZONA STATE UNIVERSITYTEMPE, AZ|MAY 2016|

HERBERGER INSTITUTE FOR DESIGN AND THE ARTSMASTER OF ARCHITECTURE• CURRENT GPA: 3.55

ARUBACANADAITALY

TRAVELING

REVITAUTOCADRHINO3DS MAX

SKETCHUPDIGITAL FABADOBE INDESIGNADOBE ILLUSTRATOR

ADOBE PHOTOSHOPMICROSOFT OFFICEMODEL MAKINGSKETCHING

THAILANDTURKS AND CAICOS

DEVENNEY GROUPARCHITECTS, LLCPHOENIX, AZ|MAY 2015 - CURRENT|

POSITION: ARCHITECTURAL INTERN

ARIZONA STATEUNIVERSITYTEMPE, AZ|MAY 2015 - CURRENT|

POSITION: GRADUATE TEACHING ASSISTANT

INDESIGN ENGINEERING/ARCHITECTURE BUILDING ARIZONA STATE | 2015

LATTIE F. COOR RE-SKIN ARIZONA STATE | 2014

BOY SCOUTS OF AMERICA CAMP MASTER PLANNING TEG ARCHITECTS | 2013

TBD ARCHITECTURE FIRM BALL STATE | 2013

CRIPE ASSOCIATES COMPETITION BALL STATE | 2012

THE ESTOPINAL GROUP COMPETITION BALL STATE | 2012

PHOTOGRAPHY

HAND DRAWINGS & SKETCHES

TABLE OF CONTENTS

ARCH 522 | HARTMAN | 2015

ASU + DESIGN COLLABORATIVETEMPE, AZ

ASU BUILDING + DESIGN COLLABORATIVE IS AN EXTENSION OF THE COLLEGE AVENUE COMMONS BUILDING, AND WORKS TO INTEGRATE THE PROGRAMS OF CONSTRUCTION MANAGEMENT

AND ARCHITECTURAL DESIGN. THE BUILDING IS SIMPLE IN FORM AND MAKES MODEST GESTURES TOWARDS THE CONTEXTUAL FORCES OF EVENT-DAY TRAFFIC AND

ASU USER TRAFFIC. DURING THE DAY, THE BUILDING WELCOMES THE PUBLIC AND PRIVATE USERS TO ENGAGE IN THE LEARNING

EXPERIENCES ENCAPSULATING THE DESIGN. DURING THE NIGHT AND EVENT DAYS, THE BUILDING

BECOMES AN ENTERTAINMENT HUB.

LEARNV. GAIN OR ACQUIRE KNOWLEDGE OF OR SKILL IN (SOMETHING) BY STUDY, EXPERIENCE, OR BEING TAUGHT.

COLLABORATEV. WORK JOINTLY ON AN ACTIVITY, ESPECIALLY TO PRODUCE OR CREATE SOMETHING.

INTEGRATEV. COMBINE (ONE THING) WITH ANOTHER SO THAT THEY BECOME A WHOLE.

PUBLIC VS PRIVATETHE FIRST FLOOR IS COMPLETELY DEDICATED TO THE INTERACTION BETWEEN PUBLIC AND STUDENT USERS. A CLEAR STORY ALLOWS AN ELEVATED VIEW OF THE FABRICATION LAB FROM THE STREET LEVEL, ALLOWING PUBLIC USERS TO WITNESS AND ENGAGE IN THE PROCESSES OF CONSTRUCTION AND DESIGN.

LEV

EL

0LE

VE

L 1

LEV

EL

2

UNSCRIPTEDON THE UPPER TERRACES, THE BUILDING PROVIDES INFORMAL COLLABORATION ZONES OUTSIDE THE CLASSROOM SPACES AND IN-BETWEEN THE TWO WINGS OF THE DESIGN. THE ALTERNATING CIRCULATION PATHS AND CELEBRATORY STAIR INCREASES THE USE OF MANUAL CIRCULATION, WHILE ALSO PROMOTING THE CHANCE FOR IMPROMPTU MEETINGS BETWEEN STUDENTS AND FACULTY.

LEV

EL

3LE

VE

L 4

NORMATIVE VS. ADAPTIVETHE STRUCTURE OF THE TWO WINGS SPEAKS TO THE LEARNING AND PRACTICING SIDE OF ARCHITECTURE. WHEREAS THE NORTH ACADEMIC WING EMPLOYS A NORMATIVE, CONCRETE GRID STRUCTURE, FAMILIAR TO THE PROCESSES TAUGHT IN THAT WING, THE SOUTHERN PROFESSIONAL WING UTILIZES A MORE ADAPTIVE USE OF STRUCTURAL CONCEPTS. HERE, THE CREATIVE DISCOVERY BETWEEN STEEL, CONCRETE, AND STRUCTURE IS CELEBRATED, CREATING AN ICONIC FOLDING ENVELOPE THAT REACHES OUT TO ITS NORMATIVE COUNTERPART.

ARCH 521 | BURNETTE | 2014

LATTIE F. COOR RE-SKINTEMPE, AZTHE LATTIE F. COOR HALL HAS POOR PERFORMANCE IN ENERGY AND COOLING USAGE, AND THE SKIN OF THE BUILDING DOES NOT MEET ASU’S 2030 CHALLENGE. THE INTENT TO BRING NATURAL LIGHTING INTO EVERY SPACE OF THE INTERIOR IS NOT BEING ACHIEVED, AND THE USE OF SHADOW BOXES CREATES A SUPER-HEATING EFFECT WITHIN THE BUILDING. AN INVERSION OF THE CIRCULATION OF THE BUILDING AND ADDITION OF A PERFORATED GLASS FIBER REINFORCED CONCRETE SKIN IS THE SOLUTION TO THESE ISSUES.

FORE

ST M

ALL

PROPOSED UPPER FLOORS

FORE

ST M

ALL

EXISTING UPPER FLOORS

SOLUTION• REVERSED PROGRAM ALLOWING LIGHT TO CORE• PERFORATED SHADE SYSTEM FOR CURTAIN WALL COOLING• FRAMED VIEWS TO EXTERIOR

DEPTHTHE EXISTING CONDITION OF THE BUILDING CONTAINS A VARIETY OF DEPTHS WITHIN THE EXTERIOR WALL ITSELF. THE PROPOSED SKIN CONTINUES THIS DEPTH ON THE OUTSIDE OF THE BUILDING AND EXPRESSES THE TRUE IDENTITY OF THE CURTAIN WALL, NOT SIMPLY A CLEAR GLASS VOLUME. THE SKIN ALSO ADDS ANOTHER LAYER FOR THE EXPRESSION OF NATURAL LIGHT INTO THE BUILDING.

SHADOW BOXESSET DIRECTLY ON THE INTERIOR SIDE OF THE GLASS FACADE.

CURTAIN WALLTHE BUTT JOINT CURTAIN WALL WRAPS AROUND ALL FOUR SIDES OF THE UPPER FLOORS OF THE BUILDING, LIKE A FLOATING ICE CUBE IN THE DESERT.

SKINGLASS FIBER REINFORCED CONCRETE SKIN COVERS THE EXISTING SHADOW BOXES TO COOL THE SUPER-HEATED CONDITIONS AND SHADES THE OPEN

VISION PANELS. STILL ALLOWS NATURAL LIGHT TO THE INTERIOR, AND FRAMES VIEWS

FROM THE BUILDING. GFRC CONTINUES THE GROUND LEVEL MATERIALITY AND TONALITY TO THE FLOATING VOLUME.

DETAIL KEY1 STEEL ANGLE2 EXTENDED MULLION3 PERFORATED GFRC SKIN4 1” IG UNIT5 STRUCTURAL SLAB6 RAISED FLOOR SYSTEM7 BATT INSULATION8 GYPSUM WALLBOARD9 ALUM. FACED SHADOW BOX

3

45

6

7

8

9

1

2

TEG ARCHITECTS | LEAD DESIGNER | 2013

BOY SCOUTS OF AMERICAKENTUCKY

THE BOY SCOUTS OF AMERICA PROJECT IS THE MASTER PLANNING OF 3 SEPARATE CAMPS, LOCATED IN SOUTHERN INDIANA AND KENTUCKY. THE 3 EXISTING CAMPS CALL FOR

UPGRADES PERTINENT TO EACH SITE. WELCOME CENTERS, DINING HALLS, TRADING POSTS, AND ADIRONDACKS, ARE DESIGNED TO UPDATE

THE SITES, CREATE INTEREST FROM THE CAMPERS, AND REVENUE FROM DONORS. THE MASTER PLAN PACKET

CONSISTS OF SITE PLANS, FLOOR PLANS, ELEVATIONS, AND RENDERINGS.

September 23, 2013

N

1680 4Enlarged Plans

Pg

Boy Scouts of America Camp Crooked Creek

September 23, 2013

N

500250

0175

Site Map

Pg

Boy Scouts of A

merica

Cam

p Crooked C

reek

SITE PLAN WELCOME CENTER VICINITY MAP

CAMP CROOKED CREEK (PICTURED BEFORE)

CAMP CROOKED CREEK, LOCATED IN SHEPHERDSVILLE, KENTUCKY, REQUIRES MINIMAL UPDATES. ALONG WITH BASIC OVERALL CAMP MAINTENANCE, THE UPDATES INCLUDE A WELCOME CENTER WITH STAFF SLEEPING AREAS, A POOL AREA WITH CHANGING BAYS AND STORAGE, AND ADIRONDACK SHELTERS FOR A MORE MODERN TAKE ON CAMPING.

WELCOME CENTER FLOOR PLAN

SITE PLAN

N

PgSeptem

ber 23, 2013Enlarged Plans

Boy Scouts of A

merica

Tunnel Mill R

eservation

1000

2050

FLOOR PLAN

DINING HALL VICINITY MAP

N

Pg September 23, 2013 Enlarged Plans

Boy Scouts of AmericaTunnel Mill Reservation

16 048

TUNNEL MILL RESERVATIONTHE UPDATES TO TUNNEL MILL RESERVATION, LOCATED IN CHARLESTOWN, INDIANA, INCLUDE AN ADDITION TO THE EXISTING DINING HALL, RENOVATION TO THE EXISTING WELCOME CENTER AND TRADING STORE, AND RENOVATED CAMP SITES. A NEW BRANDING SIGN FOR THE ENTRANCE TO THE CAMP IS ALSO INCLUDED.

DINING HALL FLOOR PLAN

N

5002500 175 PgSeptember 23, 2013Site Map

Boy Scouts of America Camp Roy C. Manchester

N

10050

020

PgSeptem

ber 23, 2013Enlarged Plans

Boy Scouts of A

merica

Cam

p Roy C

. Manchester

N

32160 4 PgSeptember 23, 2013Enlarged Plans

Boy Scouts of America Camp Roy C. Manchester

SITE PLAN WELCOME CENTER & DINING HALL FLOOR PLANS

CORE BUILDINGS VICINITY MAP

CAMP ROY C. MANCHESTER

CAMP ROY C. MANCHESTER, LOCATED IN BENTON, KENTUCKY, CALLS FOR UPDATES WITHIN IT’S CORE BUILDING AREA. THESE UPDATES INCLUDE A WELCOME CENTER, DINING HALL, AND TRADING POST. OTHER ADDITIONS AROUND THE CAMP INCLUDE ADIRONDACK SITES, SHOOTING RANGES, BOAT STORAGE, AND BOAT DOCK EXTENSION.

RENDERINGS PRODUCE BY TEG ARCHITECTS LLC 3D TEAM

ARCH 402 | FISHER | 2013

TBD ARCHITECTSSANTA MONICA, CA

THIS 30 PERSON FIRM LOCATED IN SANTA MONICA, CALIFORNIA. THE BASIS OF THIS DESIGN IS VOLUMES AND LIGHT. THE LAYOUT CONSISTS OF

VOLUMES, DISTINGUISHING SPACES OF PASSIVE AND ACTIVE AREAS WITHIN THE BUILDING. THE ACTIVE GROUND

FLOOR CONSISTS OF STUDIO SPACES AND CONFERENCE AREAS, CONTRASTING

THE UPPER FLOOR, CONSISTING OF OFFICES AND

LIBRARY.

1st FLOOR

2nd FLOOR

SITE PLAN

DEPTHTHE STAGGERING OF THE FLOOR PLAN IS EMULATED ON THE NORTH AND SOUTH FACADES THROUGH THE SHADE BOXES. THESE SHADES ALLOW FOR INDIRECT DAYLIGHT TO LIGHTEN THE SPACE, WHILE ELIMINATING THE DIRECT SUNLIGHT FROM THE WORKING SURFACES.

STEEL TRUSS

CEDAR SIDING

GLAZING

WINDOW MULLION

FORMED CONCRETE

SUPPLY DUCT

PLUMBING/ELECTRIC

FOOTER

DROP CEILING

RAISED FLOORING

SKYLIGHT

SKYLIGHT REFLECTOR

CRIPE ASSOCIATES COMPETITION | SPODECK | 2012

PRESERVING PINCKNEYCHARLESTON, SCTO ACTIVATE SHUTES’ FOLLY ISLAND THROUGH THE USE OF EDUCATIONAL AND RECREATIONAL PROGRAMS, WHILE PRESERVING THE DELICATE ECOLOGY OF THE ISLAND AND INFRASTRUCTURE OF CASTLE PINCKNEY. A WELCOME CENTER PLACED ON THE NORTH SIDE OF THE ISLAND, IN CONTRAST TO THE CASTLE ON THE SOUTHERN END, THE BUILDING UNVEILS THE ENTIRE ISLAND FOR THE USER TO EXPLORE.

PRESERVATION REHABILITATION

RESTORATION RECONSTRUCTION

PRESERVATIONCASTLE PINCKNEY IS A REVITALIZED INTERPRETIVE MUSEUM AND EVENT AREA, TRANSFORMED THROUGH THE FOUR STANDARDS OF PRESERVATION.

IN PARTNERSHIP WITH JACOB LECEA. INDIVIDUALLY PRODUCED COMPUTER MODEL, RENDERINGS, AND PHYSICAL MODEL, ALONG WITH COLLABORATIVE DESIGN WORK AND SCHEMATIC DESIGN.

BELVEDERE 1 TO PATRIOTS POINT

WELCOME CENTER

STOPPERS

SOLAR LIGHT

WOOD RUNNERS

WOOD STRUCTURE

METAL CONNECTORS

CONCRETE PILES

RECYCLED PLASTICFLOTATION DEVICE

DOCK CONFIGURATION

THE WELCOME CENTER IS CONNECTED TO CASTLE PINCKNEY THROUGH THE USE OF A FLOAT DOCK SYSTEM CONTAINING TWO BELVEDERES, OR NODES, AS RESTING SPOTS AND LOOKOUT POINTS.

ISLAND OVERVIEW

PHOTOGRAPHY

HAND DRAWINGS & SKETCHES

574.536.8039

[email protected]

THANK YOU

“AN IDEA IS SALVATION BY IMAGINATION.”-FRANK LLOYD WRIGHT