api rp 78 overview - | iadd

38
API RP 78 Overview RECOMMENDED PRACTICES FOR WELLBORE POSITIONING

Upload: others

Post on 09-Jan-2022

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: API RP 78 Overview - | IADD

API RP 78 Overview RECOMMENDED PRACTICES FOR WELLBORE POSITIONING

Page 2: API RP 78 Overview - | IADD

Why are we doing this? The Operator Wellbore Survey Group (OWSG) committee recognized a need for a comprehensive body of work that defined a minimum standard and formed a subcommittee address.

As this evolved it was realized that this was a significant not only for the operators but all that worked in the field of surveying.

To ensure inclusiveness the OWSG subcommittee decided this would be best managed under a standards organization – API was chosen.

4/6/2016 API RP78 KICK OFF MEETING

Page 3: API RP 78 Overview - | IADD

Overview

o Discuss high level of what it means to be an API section

o What is the Purpose and Scope of the proposed RP

o More details of the proposed sections

o The recommended path forward to manage the task at hand

o Who to contact with in API if you would like to participate

o The next engagement

4/6/2016 API RP78 KICK OFF MEETING

Page 4: API RP 78 Overview - | IADD

API RP 78 Scope and Purpose MINIMUM GUIDELINE FOR OPERATIONS THAT ARE CONSIDERED MAINSTREAM IN INDUSTRY AND IN PRACTICE

4/6/2016 API RP78 KICK OFF MEETING

Page 5: API RP 78 Overview - | IADD

Purpose The purpose of this Recommend Practice is to provide a framework and minimum guidance for the planning, acquisition, quality assurance, storage, and use of wellbore position data for the well lifecycle. This includes the assessment of well objectives as they pertain to collision assessment and reserves targeting.

4/6/2016 API RP78 KICK OFF MEETING

Page 6: API RP 78 Overview - | IADD

Scope This recommended practice covers the effective representation of the trajectory; e.g., position measurement, trajectory calculation, rendering and presentation, uncertainty calculation and use with respect to other wells.

This recommended practice is not designed provide a method for determining the most accurate position, only a position that is properly represented by a mathematical error model that considers both the tool type and the environment that it was run.

Note: Remediation is beyond the scope of this document

4/6/2016 API RP78 KICK OFF MEETING

Page 7: API RP 78 Overview - | IADD

Scope (Cont) This recommended practice will include: o Methodologies for assessing well position objectives o Recommended planning processes to achieve well positioning objectives o Recommendation for database integrity and minimum software functional

requirements o Methods for managing and calculating wellbore proximity in relation to HSE and

Economic risk o Quality assurance processes utilized before, during, and following surveying

operations o Guidelines for assignment of position uncertainty models in accordance to data

quality and field acceptance criteria o Utilization of conventional industry methodologies for trajectory interpolation and

mathematical processing as it pertains to wellbore surveying o Guidelines for maps, visual renderings, and other deliverables

4/6/2016 API RP78 KICK OFF MEETING

Page 8: API RP 78 Overview - | IADD

Scope (Cont) Examples of what the recommended practice will not include:

Advanced geomatics, earth sciences (i.e., magnetics and gravity estimations), non-mainstream surveying techniques, emerging survey correction mathematical theory, positional uncertainty model derivation or developments, and directional drilling principles may be mentioned as they pertain to wellbore surveying but are not defined or addressed in detail.

4/6/2016 API RP78 KICK OFF MEETING

Page 9: API RP 78 Overview - | IADD

Managing the task “HERDING CATS IS AN UNDERSTATEMENT”

4/6/2016 API RP78 KICK OFF MEETING

Page 10: API RP 78 Overview - | IADD

Initial Steering Committee

4/6/2016 API RP78 KICK OFF MEETING

Page 11: API RP 78 Overview - | IADD

Core Team Lisa Grant

Bill Allen

Neil Bergstrom

Pete Clark

Ed Dew

Paul Gupta

Jonathon Lightfoot

Jordan Meyer

Son Pham

Will Tank

4/6/2016 API RP78 KICK OFF MEETING

Page 12: API RP 78 Overview - | IADD

The Outline/Strawman

4/6/2016 API RP78 KICK OFF MEETING

Page 13: API RP 78 Overview - | IADD

Outline

4/6/2016 API RP78 KICK OFF MEETING

Page 14: API RP 78 Overview - | IADD

“Sections”

4/6/2016 API RP78 KICK OFF MEETING

Page 15: API RP 78 Overview - | IADD

Section makeup Members:

◦ A member of the initial steering committee (or delegate)

◦ SMEs

◦ Others that have an interest or passions

Function: ◦ Add content to the strawman section assigned to that section/group

◦ Ensure the content is technically correct

◦ Return the content to the steering committee for integration into larger document

4/6/2016 API RP78 KICK OFF MEETING

Page 16: API RP 78 Overview - | IADD

Roles - Section Lead o Ensure that the team stays focus on what is in scope

o Create timeline

o Ensure delivery timelines are met and managed, organize gatherings within sections, set expectations

o Communication back to the Steering Committee

o Ensure consistency across “Sections”

4/6/2016 API RP78 KICK OFF MEETING

Page 17: API RP 78 Overview - | IADD

Roles - Technical Lead o Ensure that the statements are technically valid incorporating the

strength of the supporting members

o Ensure that the scope is met and identify gaps – “macro view”

o Ensure content reflects industry practices

o Communicates with Section Lead to ensure Section goals are met

o Sits (or delegates a proxy) for Comments Reconciliation Committee

4/6/2016 API RP78 KICK OFF MEETING

Page 18: API RP 78 Overview - | IADD

Roles - Supporting Member o Provide technical content and validation

o Works more “micro view”

o Expert Authority

4/6/2016 API RP78 KICK OFF MEETING

Page 19: API RP 78 Overview - | IADD

Surface Location

4/6/2016 API RP78 KICK OFF MEETING

Section Lead

Bert Kampes

Technical Lead

TBD

Page 20: API RP 78 Overview - | IADD

Survey Program

4/6/2016 API RP78 KICK OFF MEETING

Section Lead

Lisa Grant

Technical Lead

Ross Lowden

Page 21: API RP 78 Overview - | IADD

Survey Mathematics

4/6/2016 API RP78 KICK OFF MEETING

Section Lead

Pete Clark

Technical Lead

Chad Hanak

Page 22: API RP 78 Overview - | IADD

Software

4/6/2016 API RP78 KICK OFF MEETING

Section Lead

Bill Allen

Technical Lead

TBD

Page 23: API RP 78 Overview - | IADD

Database

4/6/2016 API RP78 KICK OFF MEETING

Section Lead

Jordan Meyer

Technical Lead

TBD

Page 24: API RP 78 Overview - | IADD

Position Uncertainty

4/6/2016 API RP78 KICK OFF MEETING

Section Lead

Will Tank

Technical Lead

Andy McGregor

Page 25: API RP 78 Overview - | IADD

Anti-Collision

4/6/2016 API RP78 KICK OFF MEETING

Section Lead

Steve Sawaryn

Technical Lead

TBD

Page 26: API RP 78 Overview - | IADD

QA/QC

4/6/2016 API RP78 KICK OFF MEETING

Section Lead

Roger Goobie

Technical Lead

Harry Wilson

Page 27: API RP 78 Overview - | IADD

Maps, Plots, Graphics

4/6/2016 API RP78 KICK OFF MEETING

Section Lead

Bill Allen

Technical Lead

TBD

Page 28: API RP 78 Overview - | IADD

Planning/Engineering

4/6/2016 API RP78 KICK OFF MEETING

Section Lead

Pete Clark

Technical Lead

Julie Cruse

Page 29: API RP 78 Overview - | IADD

Planning/Eng to Operations/Executions Transition/Handover (Potential Move into Operations)

4/6/2016 API RP78 KICK OFF MEETING

Section Lead

Will Tank

Technical Lead

TBD

Page 30: API RP 78 Overview - | IADD

Operations/Execution

4/6/2016 API RP78 KICK OFF MEETING

Section Lead

Ed Dew

Technical Lead

TBD

Page 31: API RP 78 Overview - | IADD

Post Survey Execution

4/6/2016 API RP78 KICK OFF MEETING

Section Lead

Jonathan Lightfoot

Technical Lead

TBD

Page 32: API RP 78 Overview - | IADD

Terms and Definitions

4/6/2016 API RP78 KICK OFF MEETING

Section Lead

Son Pham

Technical Lead

TBD

Page 33: API RP 78 Overview - | IADD

Resources Needed o Graphics and Illustrations

o e.g. elevation reference diagrams, maps, sample plats or staking diagrams, MWD axis, well locations,

o Flow Chart Generations

o Technical Writers

o Consistency and common voice

o Missing??

4/6/2016 API RP78 KICK OFF MEETING

Page 34: API RP 78 Overview - | IADD

Comment Review Steering Committee

4/6/2016 API RP78 KICK OFF MEETING

Page 35: API RP 78 Overview - | IADD

Comment Review Steering Committee Members:

◦ Members of the initial steering committee ◦ Members of Industry that have been actively involved, ideally a

minimum of one from each subcommittee

Function: ◦ To reconcile comments

NOTE: Only one ballot per company and voting is allowed if there is active participation in the standard creation process. Comments are allowed from all interested parties.

4/6/2016 API RP78 KICK OFF MEETING

Page 36: API RP 78 Overview - | IADD

References The RP 78 is not met to replace the work already completed

Reference include but are not limited to: ◦ The Introduction to Wellbore Positioning E-Book

◦ Collision Avoidance Workgroup practices and guidance documents

◦ Error Model Workgroup practices and guidance documents

◦ Other ISCSWA work products and guidance documents

◦ Collection of SPE Papers

4/6/2016 API RP78 KICK OFF MEETING

Page 37: API RP 78 Overview - | IADD

Participation / Next Steps o Sign up for a Section of Interest

o Each section membership will be assessed and possibly “Re – Balanced” if required

o Final groups will be created

4/6/2016 API RP78 KICK OFF MEETING

Page 38: API RP 78 Overview - | IADD

Questions

4/6/2016 API RP78 KICK OFF MEETING