APPENDICES Appendix A: Photographic Record Appendix B: Survey Information Resulting In Plant Adaptation Recommendations
C19
Hayat Brown LLC Page 203 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Appendix A: Photographic Record
C19
Hayat Brown LLC Page 204 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
C19
Hayat Brown LLC Page 205 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Wall Foundations, Footings, CMU Walls -Existing Building
Wall Foundations, Footings, CMU Walls -Existing Building
C19
Hayat Brown LLC Page 206 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Wall Foundations, Footings, CMU Walls -Existing Building
Wall Foundations, Footings, CMU Walls -Existing Building
Wall Foundations, Footings, CMU Walls -Existing Building
Slab on Grade
C19
Hayat Brown LLC Page 207 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Cementitious Soffits
Cementitious Soffits
Cementitious Soffits
Cementitious Soffits
C19
Hayat Brown LLC Page 208 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Concrete Exterior Walls
Concrete Exterior Walls
Concrete Exterior Walls
Concrete Exterior Walls
C19
Hayat Brown LLC Page 209 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Concrete Exterior Walls
Concrete Exterior Walls
Concrete Exterior Walls
Concrete Exterior Walls
C19
Hayat Brown LLC Page 210 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Concrete Mechanical Screening
Exterior Block Wall
Exterior Block Wall
Exterior Block Wall
C19
Hayat Brown LLC Page 211 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Exterior Block Wall
Exterior Block Wall
Exterior Block Wall
Exterior Block Wall
C19
Hayat Brown LLC Page 212 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Exterior Block Wall
Exterior Block Wall
Aluminum Louvers - Large Units
Aluminum Louvers - Large Units
C19
Hayat Brown LLC Page 213 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Aluminum Louvers - Large Units
Glass Block
Glass Block
Glass Block
C19
Hayat Brown LLC Page 214 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Glass Block
Glass Block
Storefronts - Glazed Metal Framed
Storefronts - Glazed Metal Framed
C19
Hayat Brown LLC Page 215 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Storefronts - Glazed Metal Framed
Exterior Steel Doors
Exterior Steel Doors
Exterior Aluminum Clad Doors
C19
Hayat Brown LLC Page 216 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Exterior Aluminum Clad Doors
Rolling Door, Steel
Roof Coverings, Adhered Membrane, EPDM
Roof Coverings, Metal Panels, Standing Seam
C19
Hayat Brown LLC Page 217 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Roof Coverings, Metal Panels, Standing Seam
Roof Coverings, Metal Panels, Standing Seam
Roof Coverings, Metal Panels, Standing Seam
Roof Coverings, Modified Bitumen
C19
Hayat Brown LLC Page 218 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Roof Coverings, Modified Bitumen
Roof Coverings, Modified Bitumen
Roof Coverings, Modified Bitumen
Roof Coverings, Modified Bitumen
C19
Hayat Brown LLC Page 219 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Interior Construction
Interior Construction
Interior Construction
Interior Construction
C19
Hayat Brown LLC Page 220 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Interior Construction
Interior Partitions Concrete Block (CMU) Existing Building
Interior Windows & Storefronts
Fire Doors
C19
Hayat Brown LLC Page 221 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Fire Doors
Fire Doors
Steel, Interior Doors
Steel, Interior Doors
C19
Hayat Brown LLC Page 222 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Steel, Interior Doors
Wood Fully Glazed Doors
Wood Fully Glazed Doors
Wood, Solid Interior Doors
C19
Hayat Brown LLC Page 223 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Wood, Solid Interior Doors
Exterior Concrete Stairs
Exterior Concrete Stairs
Exterior Concrete Stairs
C19
Hayat Brown LLC Page 224 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Exterior Concrete Stairs
Exterior Concrete Stairs
Exterior Concrete Stairs
Exterior Concrete Stairs
C19
Hayat Brown LLC Page 225 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Concrete, Bleacher at Playground
Concrete, Bleacher at Playground
Concrete, Interior Stairs
Concrete, Interior Stairs
C19
Hayat Brown LLC Page 226 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Concrete, Interior Stairs
Concrete, Interior Stairs
Concrete, Interior Stairs
Concrete, Interior Stairs
C19
Hayat Brown LLC Page 227 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Concrete, Interior Stairs
Interior Utility Metal Stairs
Interior Utility Metal Stairs
Metal, Painted, Exterior Railing
C19
Hayat Brown LLC Page 228 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Metal, Painted, Exterior Railing
Ceramic Tile, Interior Wall Finish
Ceramic Tile Flooring
Ceramic Tile Flooring
C19
Hayat Brown LLC Page 229 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Concrete Flooring
Concrete Flooring
Metal Floor Grating
Metal Floor Grating
C19
Hayat Brown LLC Page 230 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Vinyl Tile Flooring
Vinyl Tile Flooring
Vinyl Tile Flooring
Vinyl Tile Flooring
C19
Hayat Brown LLC Page 231 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Vinyl Tile Flooring
Wood Flooring
Carpet Flooring
Carpet Flooring
C19
Hayat Brown LLC Page 232 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Carpet Flooring
Carpet Flooring
Carpet Flooring
Gypsum Board, Finished Ceilings
C19
Hayat Brown LLC Page 233 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Gypsum Board, Finished Ceilings
Gypsum Board, Finished Ceilings
Gypsum Board, Finished Ceilings
Acoustical Tile Ceiling
C19
Hayat Brown LLC Page 234 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Acoustical Tile Ceiling
Acoustical Tile Ceiling
Acoustical Tile Ceiling
Acoustical Tile Ceiling
C19
Hayat Brown LLC Page 235 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Acoustical Tile Ceiling
Acoustical Tile Ceiling
Elevator, Geared, 3-5 Floor, 3,000 Lbs :- Elevator
Elevator, Geared, 3-5 Floor, 3,000 Lbs:- Elevator
C19
Hayat Brown LLC Page 236 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Elevator, Geared, 3-5 Floor, 3,000 Lbs :- Elevator
Elevator, Geared, 3-5 Floor, 3,000 Lbs:- Elevator
Typical Plumbing Fixtures :- Lavatories
Typical Plumbing Fixtures:- Lavatories
C19
Hayat Brown LLC Page 237 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Typical Plumbing Fixtures :- Urinals
Typical Plumbing Fixtures:- Urinals
Typical Plumbing Fixtures :- Toilet
Commercial Grade Kitchen Sinks, multiple compartments:- Kitchen Sink
C19
Hayat Brown LLC Page 238 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Emergency Eye wash and Shower - Plumbed :- Eye Wash
Plumbing Fix., Drinking Fountain, Various:- Drinking Fountain
Plumbing Fix., Drinking Fountain, Various :- Drinking Fountain
Plumbing Fix., Drinking Fountain, Various:- Drinking Fountain
C19
Hayat Brown LLC Page 239 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Domestic Water Distribution Piping :- Water service in Boiler Room
Domestic Water Distribution Piping:- Sprinkler branch line at water main.
Domestic Water Distribution Piping :- Typical domestic water piping above ceiling
Tank, Water Storage:- Original domestic hot water storage tank/steam heat exchanger with
abandoned tank coil.
C19
Hayat Brown LLC Page 240 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Tank, Water Storage :- Abandoned steam boiler (Boiler #4) used to generate domestic hot water.
Tank, Water Storage
Tank, Water Storage :- Abandoned feed water system of abandoned steam domestic hot water
system.
Water Flow Meter, 6.00 In:- Water Meter
C19
Hayat Brown LLC Page 241 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Water Heater (Boiler), Gas, 801~1,400 MBH :- Boiler
Water Heater (Boiler), Gas, 801~1,400 MBH:- Boiler
Waste Piping :- Upgraded piping section connected to old piping.
Waste Piping:- Upgraded piping section connected to old piping.
C19
Hayat Brown LLC Page 242 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Waste Piping :- Typical waste piping
Pump, Sewage Ejector, Duplex:- Ejector Pump
Pump, Sewage Ejector, Duplex :- Shut Off Switches
Rainwater Drainage Piping:- Storm Piping
C19
Hayat Brown LLC Page 243 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Gas Distribution Piping, Boilers and Domestic Water Heaters Service :- Gas piping at Domestic
Water Heater
Gas Distribution Piping, Boilers and Domestic Water Heaters Service:- Gas train at Boiler
Gas Supply and Distribution, Laboratory :- Gas bibs at Laboratory Table
Boiler, Gas, Hot Water/Steam, 7,600~10,000 MBH:- Heating Hot Water Boiler, Firebox
C19
Hayat Brown LLC Page 244 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Boiler, Gas, Hot Water/Steam, 7,600~10,000 MBH :- Boiler #1
Boiler, Gas, Hot Water/Steam, 7,600~10,000 MBH:- Equipment Tag: Boiler #1
Boiler, Gas, Hot Water/Steam, 7,600~10,000 MBH :- Boiler #2
Boiler, Gas, Hot Water/Steam, 7,600~10,000 MBH:- Equipment Tag: Boiler #2
C19
Hayat Brown LLC Page 245 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Boiler, Gas, Hot Water/Steam, 7,600~10,000 MBH :- Equipment Tag: Boiler #3
Boiler, Gas, Hot Water/Steam, 7,600~10,000 MBH:- Boiler #3
Boiler, Gas, Hot Water/Steam, 7,600~10,000 MBH :- Surface rust at boiler casing, no leaks
Boiler, Gas, Hot Water/Steam, 7,600~10,000 MBH:- Boiler Control Panel
C19
Hayat Brown LLC Page 246 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Chiller, Scroll, Water-Cooled, 400 Ton :- Two modular water-cooled scroll chillers
Chiller, Scroll, Water-Cooled, 400 Ton:- Inside view of chiller
Chiller, Scroll, Water-Cooled, 400 Ton :- Chiller Label
Cooling Tower, Galv Steel / Avg, 501~1,000 Ton, 3-Cell Tower:- 3-Cell Cooling Tower
C19
Hayat Brown LLC Page 247 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Cooling Tower, Galv Steel / Avg, 501~1,000 Ton, 3-Cell Tower :- Cooling Tower Label
Cooling Tower, Galv Steel / Avg, 501~1,000 Ton, 3-Cell Tower:- Tower fill with abundant scale buildup
Cooling Tower, Galv Steel / Avg, 501~1,000 Ton, 3-Cell Tower :- Tower frame with evidence of past
algae growth
DX Outdoor Unit, Ave. 1 Ton, Elevator Machine Room Service:- HVAC Unit
C19
Hayat Brown LLC Page 248 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
DX Outdoor Unit, Ave. 1 Ton, Elevator Machine Room Service :- HVAC Unit
DX Outdoor Unit, Ave. 2 Ton, Rooms 202, 204 Service:- HVAC Unit
DX Outdoor Unit, Ave. 2 Ton, Rooms 202, 204 Service :- HVAC Unit
Air Distribution System, Central AHU, VAV, Ductwork, Ducted Return:- Typical flexible duct
connection to lighting/diffuser fixture
C19
Hayat Brown LLC Page 249 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Air Distribution System, Central AHU, VAV, Ductwork, Ducted Return :- VAV box (unfinished
installation)
Air Distribution System, Central AHU, VAV, Ductwork, Ducted Return:- New diffuser in renovated classroom (ductwork original)
Air Distribution System, Central AHU, VAV, Ductwork, Ducted Return :- Diffuser
Air Distribution System, Central AHU, VAV, Ductwork, Ducted Return:- Typical AHU in Stair
MER
C19
Hayat Brown LLC Page 250 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Air Distribution System, Central AHU, VAV, Ductwork, Ducted Return :- Broken flexible
connection at AHU
Air Distribution System, Central AHU, VAV, Ductwork, Ducted Return:- Heating/Cooling 4-pipe
Coil in ductwork, Girls Locker Room
Air Distribution System, Central AHU, VAV, Ductwork, Ducted Return :- Typical Return Fan in
Stair MER
Air Distribution System, Central AHU, VAV, Ductwork, Ducted Return
C19
Hayat Brown LLC Page 251 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Air Distribution System, Central AHU, VAV, Ductwork, Ducted Return :- AHU in 1st Floor
Gymnasium, UDC Side
DX Split Indoor Unit, 1 Ton, Ductless:- Fan Coil Unit
DX Split Indoor Unit, 1 Ton, Ductless :- Fan Coil Unit
DX Split Indoor Unit, 2 Ton, Ductless:- Unit in Room 202
C19
Hayat Brown LLC Page 252 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
DX Split Indoor Unit, 2 Ton, Ductless :- Unit in Room 204
Exhaust / Ventilation:- Exhaust Fan
Exhaust / Ventilation :- Exhaust Fan
Exhaust / Ventilation:- Exhaust Fan
C19
Hayat Brown LLC Page 253 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Exhaust System, Fume Hood :- Exhaust Hood
Exhaust System, Fume Hood:- Exhaust Hood
Exhaust System, Fume Hoods :- Old culinary classroom
Heating, Hydronic, Baseboard, Large:- Heaters
C19
Hayat Brown LLC Page 254 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Heating, Hydronic, Baseboard, Large :- Heaters
Heating, Hydronic, Baseboard, Large:- Heater
Heating, Hydronic, Convection, 2-Pipe, Cabinet Type :- Heaters
Heating, Hydronic, Convection, 2-Pipe, Cabinet Type:- Heaters
C19
Hayat Brown LLC Page 255 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Piping, Condenser Water Supply and Return :- Condenser water piping on Roof
Piping, Condenser Water Supply and Return:- Condenser water filtration system in Boiler Room
Piping, Condenser Water Supply and Return :- Chemical treatment system for tower in Boiler
Room
Piping, Condenser Water Supply and Return:- Condenser water pumps in Boiler Room
C19
Hayat Brown LLC Page 256 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Piping, Condenser Water Supply and Return :- Condenser water piping in Boiler Room
Piping, HW/CHW, 4-Pipe Distribution:- Chilled Water Pumps in Boiler Room
Piping, HW/CHW, 4-Pipe Distribution :- Expansion Tanks in Boiler Room
Piping, HW/CHW, 4-Pipe Distribution:- Typical chilled water piping and hot water piping above
ceiling
C19
Hayat Brown LLC Page 257 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Piping, HW/CHW, 4-Pipe Distribution :- Chilled and hot water piping in Boiler Room
Piping, HW/CHW, 4-Pipe Distribution:- Chilled and Hot Water Pumps in each lower Stair MER
Piping, HW/CHW, 4-Pipe Distribution :- Chilled and Hot Water Piping in each lower Stair MER
Cabinet Unit Heater, Hydronic:- Typical Cabinet Heater
C19
Hayat Brown LLC Page 258 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Cabinet Unit Heater, Hydronic :- Typical Cabinet Heater
Unit Heater, Electric, 10 kW:- Unit Heater
Unit Heater, Electric, 10 kW :- Unit Heater
Unit Heater, Hydronic, 26 to 55 MBH:- Typical Unit Heater in a Stair MER
C19
Hayat Brown LLC Page 259 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Unit Heater, Hydronic, 26 to 55 MBH :- Unit in Elevator Machine Room, pipes disconnected
A/C Package, Heat Pump, Air Source, 30 Ton:- HVAC Unit
A/C Package, Heat Pump, Air Source, 30 Ton :- HVAC Unit
A/C Package, Heat Pump, Air Source, 7.0~10.0 Ton Cooling, 35~45 MBH Heat:- HVAC Unit
C19
Hayat Brown LLC Page 260 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
A/C Package, Heat Pump, Air Source, 7.0~10.0 Ton Cooling, 35~45 MBH Heat :- HVAC Unit
Meter, Natural Gas:- Gas Meter
Meter, Natural Gas :- Gas Meter
Meter, Natural Gas:- Gas Meter
C19
Hayat Brown LLC Page 261 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Building Controls (SF), DDC, Average :- Typical DDC control panel at AHU
Building Controls (SF), DDC, Average:- Typical control valve at AHU
Building Controls (SF), DDC, Average :- Typical thermostat
Building Controls (SF), DDC, Average:- BMS Computer Screen: AHU and RF readings
C19
Hayat Brown LLC Page 262 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Building Controls (SF), DDC, Average :- BMS Computer Screen: All AHUs table readings
Building Controls (SF), DDC, Average:- BMS Computer Screen: AHUs 1st Floor Layout
Building Controls (SF), DDC, Average :- BMS Computer Screen: AHUs 2nd Floor Layout
Building Controls (SF), DDC, Average:- Deteriorated control valve at AHU
C19
Hayat Brown LLC Page 263 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Building Controls (SF), DDC, Average :- Typical VAV DDC controller above ceiling
Building Controls (SF), Pneumatic, Average:- Typical pneumatic thermostat
Building Controls (SF), Pneumatic, Average :- Pneumatic control panels for AHU serving Locker
Room
Building Controls (SF), Pneumatic, Average:- Air compressor station in Boiler Room
C19
Hayat Brown LLC Page 264 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Building Controls (SF), Pneumatic, Average :- Typical pneumatic thermostat
Building Controls (SF), Pneumatic, Average:- Temporary air compressors used to feed
thermostats in various rooms.
Fire Extinguisher :- Fire extinguisher with expired inspection tag
Fire Extinguisher:- Fire extinguisher with expired inspection tag, various locations
C19
Hayat Brown LLC Page 265 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Fire Extinguisher :- Missing Fire Extinguisher: Ground Floor
Fire Extinguisher:- Missing Fire Extinguisher: UDC Side - In front of Room 320
Main Service Switch, 3000 Amps :- Main Service Switch
Main Service Switch, 3000 Amps:- Main Service Switch
C19
Hayat Brown LLC Page 266 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Disconnect Switches for Chillers :- Disconnect Switches for Chillers
Disconnect Switches for Chillers:- Disconnect Switches for Chillers
Motor Control Center, 900 Amps, 8 sections :- Motor Control Center
Motor Control Centers, 600 Amps, 3 Sections:- Motor Control Center
C19
Hayat Brown LLC Page 267 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Motor Starter, 2.000 HP, 208 V :- Motor Starters
Panel Board:- Panelboards
Panel Board :- Panelboards
Panel Board:- Panelboards
C19
Hayat Brown LLC Page 268 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Primary Transformer, Dry, 150kVA :- Transformers
Primary Transformer, Dry, 150kVA:- Transformers
Secondary Transformer, Dry, 112.5 kVA :- Transformer
Secondary Transformer, Dry, 112.5 kVA:- Transformer
C19
Hayat Brown LLC Page 269 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Secondary Transformer, Dry, 15 kVA :- Transformer
Secondary Transformer, Dry, 30 kVA:- Transformer
Secondary Transformer, Dry, 30 kVA :- Transformer
Switchboard, 3000 Amps, 2 sections:- Main Switchboard
C19
Hayat Brown LLC Page 270 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Switchboard, 3000 Amps, 2 sections :- Main Switchboard
Transfer Switch, Auto, 480 V, 150 Amps:- Automatic Transfer Switch
Occupancy Sensors, Indoor Lighting :- Occupancy Sensors
Flood Light, Exterior, Older:- Exterior Security Lights
C19
Hayat Brown LLC Page 271 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
HID Lighting :- HID Lighting
HID Lighting:- HID Lighting
HID Lighting - Older :- HID Lighting
HID Lighting - Older:- HID Lighting
C19
Hayat Brown LLC Page 272 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Lighting Equipment - Fluorescent :- Fluorescent Lighting Older
Lighting, Exterior Fixture, High Output Flood, Various:- Exterior Security Lights
Lighting, Exterior Fixture, High Output Flood, Various :- Exterior Security Lights
Lighting, Exterior Fixture, High Output Flood, Various:- Exterior Security Lights
C19
Hayat Brown LLC Page 273 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Lighting, Exterior Fixture, High Output Flood, Various :- Exterior Security Lights
Lighting, Interior, Fluorescent,:- Newer Fluorescent Lighting
Lighting, Interior, Fluorescent, :- Newer Fluorescent Lighting
Sound System:- Local Sound System
C19
Hayat Brown LLC Page 274 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Fire Alarm Systems :- Fire Alarm System
Fire Alarm Systems:- Fire Alarm System
Fire Alarm Systems :- Fire Alarm System
Security and Detection Systems - CCTV:- CCTV System
C19
Hayat Brown LLC Page 275 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Security and Detection Systems - CCTV :- CCTV System
Card Reader:- Card Reader
Card Reader :- Card Reader
Card Reader:- Card Reader
C19
Hayat Brown LLC Page 276 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Intrusion Detection - Charter School Section :- Intrusion Alarm System
Intrusion Detection - University Section:- Intrusion Alarm System
Intrusion Detection - University Section :- Intrusion Alarm System
Vehicle Control Bollard
C19
Hayat Brown LLC Page 277 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Vehicle Control Bollard
Lightning Protection System:- Lightning Protection
Emergency Lights :- Emergency Lighting
Exit Lighting Fixture:- Exit Lighting
C19
Hayat Brown LLC Page 278 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Exit Lighting Fixture :- Exit Lighting
Generator, Natural Gas, 90 kW:- Emergency Generator
Generator, Natural Gas, 90 kW :- Emergency Generator
Sink, Epoxy Resin, Laboratory:- Laboratory sink basin blocked, no water/gas used.
C19
Hayat Brown LLC Page 279 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Sink, Epoxy Resin, Laboratory :- Science Lab Sink
Sink, Epoxy Resin, Laboratory:- Laboratory Sinks with acid waste lines, neutralization tank
inaccessible
Kitchen Food Service Equipment, Abandoned :- Fryers
Kitchen Food Service Equipment, Abandoned:- Exhaust Hood
C19
Hayat Brown LLC Page 280 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Kitchen Food Service Equipment, Abandoned :- Kitchen Sink
Kitchen Food Service Equipment, Abandoned:- Exhaust Fan
Kitchen Food Service Equipment, various types :- Warmers
Kitchen Food Service Equipment, various types:- Dish Washer
C19
Hayat Brown LLC Page 281 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Kitchen Food Service Equipment, various types :- Refrigerator
Kitchen Food Service Equipment, various types:- Convection Ovens
Kitchen Food Service Equipment, various types :- Freezer
Concrete, Driveways
C19
Hayat Brown LLC Page 282 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Parking Lot, Asphalt Paved
Parking Lot, Asphalt Paved
Parking Lot, Asphalt Paved
Parking Lot, Asphalt Paved
C19
Hayat Brown LLC Page 283 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Parking Lot, Asphalt Paved
Parking Lot, Asphalt Paved
Parking Lot, Asphalt Paved
Parking Lot, Asphalt Paved
C19
Hayat Brown LLC Page 284 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Pedestrian Paving, Asphalt
Pedestrian Paving, Asphalt
Pedestrian Paving, Asphalt
Pedestrian Paving, Asphalt
C19
Hayat Brown LLC Page 285 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Pedestrian Paving, Concrete
Pedestrian Paving, Concrete
Pedestrian Paving, Concrete
Pedestrian Paving, Concrete
C19
Hayat Brown LLC Page 286 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Pedestrian Paving, Concrete
Pedestrian Paving, Concrete
Pedestrian Paving, Concrete
Pedestrian Paving, Concrete
C19
Hayat Brown LLC Page 287 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Pedestrian Paving, Concrete
Pedestrian Paving, Concrete
Pedestrian Paving, Pavers, Concrete
Pedestrian Paving, Exterior Ramp, Wood
C19
Hayat Brown LLC Page 288 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Chain Link Fence - New
Chain Link Fence - New
Chain Link Fence 4’
Chain Link Fence 4’
C19
Hayat Brown LLC Page 289 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Chain Link Fence 4’
Chain Link Fence- Tall
Chain Link Fence- Tall
Chain Link Fence- Tall
C19
Hayat Brown LLC Page 290 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Sliding Gate, Motor Operated
Retaining Wall, Cast in Place Concrete
Retaining Wall, Cast in Place Concrete
Retaining Wall, Cast in Place Concrete
C19
Hayat Brown LLC Page 291 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Play Equipment - Large
Play Equipment - Large
Play Equipment - Midsize
Play Equipment - Midsize
C19
Hayat Brown LLC Page 292 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Play Equipment - Midsize
Play Equipment - Midsize
Play Equipment - Midsize
Play Equipment - Midsize
C19
Hayat Brown LLC Page 293 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Play Equipment - Midsize
Playing Fields, Basketball Court, Complete
Playing Fields, Basketball Court, Complete
Playing Fields, Resilient Playground Surface - New
C19
Hayat Brown LLC Page 294 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Playing Fields, Resilient Playground Surface - New
Playing Fields, Resilient Playground Surface - Older
Playing Fields, Resilient Playground Surface - Older
Playing Fields, Resilient Playground Surface - Older
C19
Hayat Brown LLC Page 295 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Landscaping
Landscaping
Landscaping
Landscaping
C19
Hayat Brown LLC Page 296 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Landscaping, Planters, Precast Concrete
Landscaping, Planters, Precast Concrete
Landscaping, Planters, Precast Concrete
Landscaping, Planters, Precast Concrete
C19
Hayat Brown LLC Page 297 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Landscaping, Planters, Precast Concrete
C19
Hayat Brown LLC Page 298 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Appendix B: Survey Information Resulting In Plant
Adaptation Recommendations
C19
Hayat Brown LLC Page 299 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Access Control
Does the facility have a key card proximity entry system Yes
Are all windows at grade level locked or fixed at all times No
There is one clearly marked and designated entrance for visitors
No
Signs are posted for visitors to report to main office or through a designated entrance
No
. Comments N/A
Lighting is provided at entrances and points of possible intrusion
Yes
Outside hardware has been removed from all doors except at points of entry
No
Basement windows are protected with grill or well cover No
Restricted areas are properly identified No
Access to electrical panels is restricted Yes
Are there control gates to separate gym, cafeteria, stage, lobby and restrooms from rest of school and classrooms during after hours without changing means of egress
No
Are all perimeter doors equipped with recessed magnetic contact – door position door sensors
Yes
Are interior doors with specific vulnerability equipped with door position monitoring sensors
No
ADA
Adequate number of designated parking stalls and signage for cars are not provided
10
Adequate number of designated parking stalls and signage for vans are not provided
3
Signage indicating accessible parking spaces for cars and vans are not provided
4
Curb ramps are required from the parking area to the sidewalks providing access to the building
0
Signage directing to accessible parking or accessible building entrances to the facility are not provided
8
C19
Hayat Brown LLC Page 300 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Fire Protection
Does the facility have a fire sprinkler system No
Does the facility have wall mounted fire extinguishers Yes
Does the kitchen and cooking area have hood vent mounted fire suppression systems
No
Does combustion equipment have dedicated fire sprinkler system e.g. boilers, hot water heater
No
Are current fire protection system inspections up to date and onsite
Yes
A record of Fire Inspection by the local or state Fire Officer is maintained
Yes
Exit signs are clearly visible and pointing in the correct direction
Yes
Does the facility have monitored fire alarm system Yes
Is the fire alarm control panel solid-state, modular design type, incorporating the following standard features: lamp test, red alarm and amber LEDs per zone, positive and negative ground fault indicators , power ON indicator, two (2) auxiliary form C alarm contacts with disconnect switches and lights, one (1) auxiliary form C trouble contact, regulated 24Vdc four-wire smoke detector power supply, and remote reset connection
Yes
Is the power supply to the fire alarm control panel from an individual circuit
Yes
Does the activation of any initiating device including but not limited to manual pull stations, smoke detectors, heat detectors and flow switches shall cause all signals to sound continuously until manually reset; flash all visual alarm indicator lights; illuminate respective zone indicator lamps in the control panel; illuminate respective zone indicator lamps in the graphic display on the door of the control panel; and illuminate respective zone indicator lamps in the remote annunciator
Yes
Are the audible and visual devices such as combination horn/strobe indicating type wired to separate zones so that audible devices correctly provide code three temporal output and visual devices correctly provide ADA compliant strobe effect
Yes
Is the fire alarm wiring enclosed in ¾” metal conduit raceway to the manufacturer’s instructions
Yes
C19
Hayat Brown LLC Page 301 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Is there a smoke detector directly above the fire alarm control panel
Yes
. Comments N/A
Are there duct-type smoke detectors on the supply side of HVAC units rated greater than 2000 cfm but less than 15,000 cfm
Yes
Are there duct-type smoke detectors on both the supply side and return side of the HVAC units rated 15,000 cfm or more
Yes
. Comments N/A
Green Roof Feasibility
Asset Consider: Green Roof Investments
Quantity 1 SF
Unit Cost $0.01
Total Cost $0.01
Is the roof a sloped system No
Is the roof less than 5 years in age No
Does the roof have significant amounts of penetration and equipment
No
Will structural modification need to be made to support a green roof
Yes
C19
Hayat Brown LLC Page 302 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Hazardous Materials
. Comments Not Determined
. Comments Not Determined
. Comments Not Determined
. Comments Not Determined
. Comments Not Determined
. Comments Not Determined
Has the facility been tested for Lead in Water Yes
Does the facility have a Lead in water OM plan in place No
Does the facility have a UST No
. Comments N/A
Does the facility have a AST No
. Comments N/ A
Are transformers PCB free Yes
Is there any known PCB containing equipment onsite No
C19
Hayat Brown LLC Page 303 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
LEED
SS Sustainable Sites - Possible Points: 0
SS.C1 Is the school LEED Certified Design and Construction
No
If No, level of effort to achieve Hard
SS.C2 Does the facility have a Building Exterior and Hardscape Management Plan
No
If No, level of effort to achieve Easy
SS.C3 Does the facility have an Integrated Pest Management, Erosion Control, and Landscape Management Plan
No
If No, level of effort to achieve Easy
SS.C4 Does the facility provide car pooling or Alternative Commuting Transportation options or incentives
No
If No, level of effort to achieve Hard
SS.C6 Does the facility have retention ponds rain gardens to control the quantity of Storm water
No
If No, level of effort to achieve Hard
SS.C7.1 Does the facility have non asphalt / macadam based paving such as light colored pavers or concrete
No
If No, level of effort to achieve Hard
SS.C7.2 Does the facility have a cool roof (white or light color roof surface)
No
If No, level of effort to achieve Hard
SS.C8 Are measures installed preventing operable exterior lighting from encroaching on adjacent properties
No
If No, level of effort to achieve Hard
WE.P1 The facility has a Minimum Indoor Plumbing Fixture and Fitting Efficiency policy
No
If No, level of effort to achieve Easy
C19
Hayat Brown LLC Page 304 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
WE.C1 Does the facility have a water meter for the whole building
Yes
Does the facility have sub meters for boiler wtr, cooling tower wtr, irrigation wtr, fire sprinkler
No
If No, level of effort to achieve Hard
WE.C2 Are all of the plumbing fixtures at the facility non-water saving devices
No
If No, level of effort to achieve Easy
Are some of the plumbing fixture at the facility are non-water saving devices (10-25%)
No
If No, level of effort to achieve Easy
Are all of the plumbing fixture at the facility water saving devices (100%)
No
If No, level of effort to achieve Easy
WE.C3 Does the school use native planting that does not require irrigation
Yes
Does the school have an irrigation system with a rain gauge and time system
No
If No, level of effort to achieve Hard
Does the school hand water on an as needed basis
No
If No, level of effort to achieve Easy
WE.C4 Does the Cooling Tower utilize a Chemical Management System
Yes
Does the Cooling Tower utilize a Non-Potable Water Source (not public drinking water system)
No
If No, level of effort to achieve Hard
EA.P1 Does the school have an Energy Efficiency Best Management Practices policy
No
If No, level of effort to achieve Easy
C19
Hayat Brown LLC Page 305 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
EA.P2 Has an energy audit been performed and were E.C.M.s implemented to achieve Min Energy Eff Performance
No
If No, level of effort to achieve Hard
EA.P3 Does the school have a Fundamental Refrigerant Management program
No
If No, level of effort to achieve Hard
EA.C2.1 Have building lighting and HVAC systems been Investigated and Analyzed for retro Commissioning
No
If No, level of effort to achieve Hard
EA.C2.2 Has the school performed retro Commissioning of the building lighting and HVAC systems
No
If No, level of effort to achieve Hard
EA.C2.3 Is the school performing ongoing Commissioning of the building lighting and HVAC systems
No
If No, level of effort to achieve Not Feasible
EA.C3.1 Does the school have a HVAC or Lighting —Building Automation System
Yes
EA.C3.2 re the HVAC and lighting systems individually metered at 40%
No
If No, level of effort to achieve Hard
Are the HVAC and lighting systems individually metered at 80%
No
If No, level of effort to achieve Hard
EA.C4 Does the school use on-site or off-site renewable energy
No
If No, level of effort to achieve Hard
EA.C5 Does the school have an Enhanced Refrigerant Management
No
If No, level of effort to achieve Easy
EA.C6 Does the school have an Emissions Reduction Reporting program
No
If No, level of effort to achieve Hard
C19
Hayat Brown LLC Page 306 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
MR.P1 Does the school have a Sustainable Purchasing Policy
No
If No, level of effort to achieve Easy
MR.P2 Does the school have a Solid Waste Management Policy
No
If No, level of effort to achieve Easy
MR.C1 Does the school have a Sustainable Purchasing program for Ongoing Consumables
No
If No, level of effort to achieve Easy
MR.C2.1 Is a Sustainable Purchasing policy used for purchasing at least 40% of Electric-Powered Equipment
No
If No, level of effort to achieve Hard
MR.C2.2 Is a Sustainable Purchasing policy used for purchasing at least 40% of Furniture
No
If No, level of effort to achieve Easy
MR.C3 Is a Sustainable Purchasing policy used when making Facility Alterations and Additions
No
If No, level of effort to achieve Hard
MR.C4 Is a Sustainable Purchasing policy used to reduce Mercury content in Lamps purchased
No
If No, level of effort to achieve Easy
MR.C5 Is a Sustainable Purchasing policy used when making Food purchases at the school
No
If No, level of effort to achieve Easy
MR.C6 Has the school performed a Waste Stream Audit No
If No, level of effort to achieve Easy
MR.C7 Has the school implemented a policy to reduce the quantity Ongoing Consumables going into landfills
No
If No, level of effort to achieve Easy
MR.C8 Has the school implemented a policy to reduce the quantity durable goods (furniture, equipment) going into landfills
No
C19
Hayat Brown LLC Page 307 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
If No, level of effort to achieve Easy
MR.C9 Does the school recycle building materials during construction which prevents material going to landfill
No
If No, level of effort to achieve Easy
IEQ.P1 Has the school performed a Minimum Indoor Air Quality (IAQ) Performance evaluation of the facility
No
If No, level of effort to achieve Easy
IEQ.P2 Is the facility and surrounding area smoke free - Environmental Tobacco Smoke (ETS) Control
Yes
IEQ.P3 Does the school have a Green Cleaning Policy No
If No, level of effort to achieve Easy
IEQ.C1.1 Does the school have an Indoor Air Quality Management Program
No
If No, level of effort to achieve Easy
IEQ.C1.2 Does the school have Outdoor Air Delivery Monitoring
No
If No, level of effort to achieve Hard
IEQ.C1.3 Has the school modified the HVAC systems to allow Increased Ventilation
No
If No, level of effort to achieve Hard
IEQ.C1.4 Does the school have a plan to Reduce Particulates in Air Distribution
No
If No, level of effort to achieve Hard
IEQ.C1.5 Does the school have a policy to enhance IAQ performance during Facility Alterations and Additions
No
If No, level of effort to achieve Easy
IEQ.C2.1 Has the school performed an Occupant Survey for IAQ
No
If No, level of effort to achieve Easy
IEQ.C2.2 Does the school allow for the Controllability of Systems—Lighting by occupants
Yes
C19
Hayat Brown LLC Page 308 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
IEQ.C2.4 Does the school take advantage of Daylight and Views for tenant comfort
No
If No, level of effort to achieve Hard
IEQ.C3.1 Does the school have a High Performance Cleaning Program
No
If No, level of effort to achieve Easy
IEQ.C3.2 Does the school have a Custodial Effectiveness Assessment
No
If No, level of effort to achieve Easy
IEQ.C3.3 Does the school Purchase Sustainable Cleaning Products and Materials
No
If No, level of effort to achieve Easy
IEQ.C3.4 Does the school use Sustainable Cleaning Equipment
Yes
IEQ.C3.5 Does the school have Indoor Chemical and Pollutant Source Control
No
If No, level of effort to achieve Easy
IEQ.C3.6 Does the school have an Indoor Integrated Pest Management
Yes
IO.C1.1 Does the school have an Innovation in Operations program
No
If No, level of effort to achieve Easy
IO.C2 Does the school have a LEED Accredited Professional on staff
No
If No, level of effort to achieve Not Feasible
IO.C3 Is the school Documenting Sustainable Building Cost Impacts
No
If No, level of effort to achieve Easy
C19
Hayat Brown LLC Page 309 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Safety Security
Do all areas of the school, including bathrooms, hallways, and offices, have the ability to receive an announcement via the P.A. System
No
Do all areas of the school have the ability to privately call the main office or for emergency
No
Does the general office, principal’s office, assistant principal’s office have CCTV receptacles
No
Is there an automated notification system to lockdown the building envelope
No
Does the facility have a monitored burglar alarm system Yes
Are all classrooms and all other rooms that are grade-accessible will be equipped with motion detector
No
Are all general corridor or lobby areas plus rooms with specific vulnerability equipped with motion detectors?
Yes
Is the main office and one or more additional locations(s) accessed by designated staff equipped with IDS arm/disarm keypads
Yes
Are alarm monitoring and response performed by DCPS via their existing central alarm monitoring facility via either dial-up telephone lines or LAN/WAN
No
Is there a video surveillance system that provides general surveillance of the site, common areas and building entry and exit points
Yes
Does the facility have monitored video surveillance system at the interior
Yes
. Comments Partially
Does the facility have monitored video surveillance system at the exterior
Yes
. Comments Partially
Does the facility have exterior door hardware that allows controlled access to the building?
Yes
Does the facility have exterior card access readers that allow controlled access to the building?
Yes
Does the facility have allow occupants a quick, unimpeded egress from the building?
Yes
Does the facility have interor door hardware that allows controlled access to classrooms?
Yes
C19
Hayat Brown LLC Page 310 of 310 Powered by iPlan™ © 4tell™ Solutions, LP
Does the facility have interior card access readers that allow controlled access within the building?
No
Does the facility have Magnetometers that monitor for the entry of "unwanted items" into the building?
No
Does the facility have equipment that allows announcements to be made during large gatherings?
Yes