Page 1: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Appendix-C

TARIFF FILING FORMS (TRANSMISSION)

Page 34

Page 2: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

INDEX

Form No. Tariff Filing Formats (Transmission) Tick

FORM-1 Summary sheet √

FORM-2 Details of Transmission Lines and Substations √

FORM-3 Normative Parameters considered for tariff calculations √

FORM- 4 Details of Foreign loans

FORM-5 Abstract of Admitted Cost for the existing Projects

FORM-5A Abstract of Project Cost Estimates and Schedule of Commissioning for the new

Projects

FORM-5B Break-up of Project Cost for Transmission System

FORM-5C Break-up of Construction/Supply/Sevice packages

FORM-5D Details of elementwise cost

FORM- 6 Financial Package upto COD

FORM- 7 Details of Project Specific Loans

FORM- 8 Details of Allocation of corporate loans to various transmission elements

FORM-9 Statement of Additional Capitalisation after COD

FORM-10 Financing of Additional Capitalisation

FORM-11 Statement of depreciation √

FORM-12 Calculation of depreciation rate

FORM-13 Calculation of Weighted Average Rate of Interest on Actual Loans √

FORM-14 Calculation of Advance Against Depreciation

FORM-15 Calculation of Interest on Working Capital √

FORM-16 Draw Down Schedule for Calculation of IDC & Financing Charges

Other Information/ Documents

Sl. No. Information/Document Tick

1 Certificate of incorporation, Certificate for Commencment of Business, Memorandum

of Association, & Articles of Association ( For New Station setup by a company making

tariff application for the first time to CERC)

2 Regionwise and Corporate audited Balance Sheet and Profit & Loss Accounts with all

the Schedules & annexures for the new Transmission System & for the relevant years.

3 Copies of relevant loan Agreements

4 Copies of the approval of Competent Authority for the Capital Cost and Financial

package.

5 Copies of the Equity participation agreements and necessary approval for the foreign

equity.

6 Copies of the BPTA/TSA with the beneficiaries, if any

7 Detailed note giving reasons of time and cost over run, if applicable.

8 Any other relevant information, (Please specify)

Checklist of Forms and other information/ documents for tariff filing for Transmission System

Note: Electronic copy in the form of CD/Floppy disc shall also be furnished.

Page 35

Page 3: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

FORM- 1

(Rs. in Crs)

S.No. Particulars2014-15

(Actual)

1 2 3

1 Depreciation FORM- 11 601.09

2 Interest on Loan & financing charges FORM- 13A 440.31

3 Return on Equity1 503.59

4 Advance against Depreciation FORM- 14 0.00

5 Interest on Working Capital FORM- 15 70.51

6 O & M Expenses* 726.49

8 Provision for Taxes 83.66

9 Incentive 38.40

10 Less: Expenses Capitalized 0.00

11 Less: Other Income 167.23

12 Contingency Reserve 64.00

Total 2360.81

Petitioner

1 Details of calculations, considering equity as per regulation, to be furnished.

Summary Sheet

Name of the Tansmission Licensee Gujarat Energy Transmission Corporation Ltd.

Name of the Transmission System:

Name of the Region: Gujarat

Page 36

Page 4: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

1Kosamba-Ukai (Asoj-Ukai made LILO at

Kosamba)Bharuch S/C 400kV 91

22-3-88

(31-12-2011)

2Kosamba-Asoj (Asoj-Ukai made LILO at

Kosamba)Bharuch S/C 400kV 122.35

22-3-88

(31-12-2011)

3 Ukai Kosamba- 1 Bharuch DC 400kV 68 30.03.13

4 Ukai Kosamba- 2 Bharuch DC 400kV 68 30.03.13

5 Chorania Kosamba 1 Bharuch DC 400kV 228.5 05.07.14

6 Chorania Kosamba 2 Bharuch DC 400kV 228.5 05.07.14

7 Asoj-Wankabori Jambuva S/C 400kV 76 22-3-86

8 Chorania-Amreli Chorania S/C 400kV 164 01/08/2000

9 Asoj-Chorania-2 Jambuva S/C 400kV 177 18/12/2008

10 Asoj-Chorania-1 Jambuva S/C on D/C 400kV 166 29/03/1994

11 Asoj-SSP Jambuva S/C on D/C 400kV 83 28/09/2005

12 Kasor-SSP Nadiad S/C on D/C 400kV 146 07/12/2004

13 Kasor-GPEC Nadiad S/C 400kV 98 29/04/1999

14 Kasor-Chorania Nadiad S/C on D/C 400kV 103 02/10/1997

15 Vadavi-Dehgam(PGCIL)-1 Mehsana D/C 400kV 62.3 27/06/2007

16 Vadavi-Dehgam(PGCIL)-2 Mehsana D/C 400kV 62.3 27/06/2007

17 Soja-Dehgam(PGCIL) Himatnagar S/C 400kV 40 29-3-05

18 Dehgam(PGCIL)-Wanakbori Himatnagar S/C 400kV 67 29-3-05

19 Soja-Wanakbori Himatnagar S/C 400kV 95.1 22-10-88

20 Soja-Kansari Palanpur S/C 400kV 135 02/08/2000

21 Amreli-Jetpur-1 Amreli S/C 400kV 96 01/08/2000

22 Chorania-Hadala(LILO at Hadala)Chorania S/C

400kV 166.419.10.93

(27.3.07)

23 Hadala-Jetpur(LILO at Hadala)Gondal S/C

400kV 11519.10.93

(26.5.07)

24 Mundra(APL)-Hadala Gondal S/C 400kV 238 11/02/2011

25 Vadinar-Hadala-1 Gondal D/C 400kV 112.88 25-4-11

26 Vadinar-Hadala-2 Gondal D/C 400kV 112.88 25-4-11

27 Mundra(APL)-Varsana Anjar S/C 400kV 86.05 13/01/2011

28 Varsana-Hadala Anjar S/C 400kV 154 12/01/2011

29 APL-VARSANA -2 Anjar D/C 400kV 80.042 31.03.2015

30 APL-VARSANA -3 Anjar D/C 400kV 80.042 31.03.2015

31 Amreli-Jetpur-2 Amreli S/C on D/C 400kV 66 22.11.13

32 Amreli- Hadala Amreli S/C on D/C 400kV 173 22.11.13

1 Karamsad-Kasor-1 Nadiad D/C 220 KV 12.00 28/05/1997

2 Karamsad-Kasor-2 Nadiad D/C 220 KV 12.00 28/05/1997

3 Karamsad-Kasor-3[Kasor-Vertej] NadiadS/C ON D/C

Tower line220 KV 12.50 09/09/1998

4 Kasor-Botad Nadiad D/C 220 KV 144.00 08/09/1997

5 LILO at CCPP-1 [Dhuvaran] NadiadS/C ON D/C

Tower line220 KV 39.00 2.05.14

6 Karamsad-Ranasan-1 Nadiad D/C 220 KV 71.44 22/01/1976

7 Karamsad-Ranasan-2 Nadiad D/C 220 KV 71.44 22/01/1976

8 Karamsad-Salejada Nadiad S/C 220 KV 76.80 13/01/1999

9 Karamsad-Vartej NadiadS/C ON D/C

Tower line220 KV 191.20 06/01/1973

10 Karamsad-Gpec-1 Nadiad D/C 220 KV 94.50 16/09/1999

11 Karamsad-Gpec-2 Nadiad D/C 220 KV 94.50 16/09/1999

12 Kapadwanj-Ranasan-1 Nadiad D/C 220 KV 63.52 18/09/1993

13 Kapadwanj-Ranasan-2 Nadiad D/C 220 KV 63.52 18/09/1993

14 Wanakbori-Kapadwanj-1 Nadiad D/C 220 KV 35.76 18/09/1993

15 Wanakbori-Kapadwanj-2 Nadiad D/C 220 KV 35.76 18/09/1993

16 Khanpur-AECo.-1 Nadiad D/C 220 KV 30.08 08/01/1999

17 Khanpur-AECo.-2 Nadiad D/C 220 KV 30.08 08/01/1999

18 Khanpur-Kapadwanj-1 Nadiad D/C 220 KV 40.00 30/07/1999

19 Khanpur-Kapadwanj-2 Nadiad D/C 220 KV 40.00 30/07/1999

20 Khanpur-PGCL-1 Nadiad D/C 220 KV 11.77 16/12/1994

21 Khanpur-PGCL-2 Nadiad D/C 220 KV 11.77 16/12/1994

22 Ranasan-Gandhinagar-1 Nadiad D/C 220 KV 19.83 21/09/1976

Form 2

Details of Transmission Lines (As of 30th September, 2015)

Name of the Transmission Licensee: Gujarat Energy Transmission Corporation Limited

Name of Transmission System

Name of Region: Gujarat

400 KV Transmission Line

220 KV Transmission Line

Page 37

Page 5: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

23 Ranasan-Gandhinagar-2 Nadiad D/C 220 KV 19.83 15/11/1975

24 Ranasan-PGCL-1 Nadiad D/C 220 KV 19.63 16/12/1994

25 Ranasan-PGCL-2 Nadiad D/C 220 KV 19.63 16/06/1995

26 Salejada-Chorania Nadiad D/C 220 KV 75.30 10/03/1998

27 Salejada-Bhat-1 Nadiad D/C 220 KV 26.30 19/6/2010

28 Salejada-Bhat-2 Nadiad D/C 220 KV 26.30 19/6/2010

29 Bhat-Pirana-1 Nadiad D/C 220 KV 14.63 05/12/2011

30 Bhat-Pirana-2 Nadiad D/C 220 KV 14.63 05/12/2011

31 220KV Agiyol-Vijapur HMT S/C 220 35.2 17/12/1992

32 220KV Agiyol-Bhutiya-1 HMT D/C 220 35.6 31/05/2005

33 220KV Agiyol-Bhutiya-2 HMT D/C 220 35.6 30/10/2005

34 220KV Dhansura-Agiyol-1 HMT D/C 220 33.42 08/08/1990

35 220KV Dhansura-Agiyol-2 HMT D/C 220 35.81 29/09/2000

36 220KV Kadana-1-Dhansura HMT D/C 220 75.6 09/06/1984

37 220KV Kadana-2-Dhansura HMT D/C 220 75.6 24/12/1991

38 220KV Wanakbori-1-Dhansura HMT D/C 220 58.9 26/04/1991

39 220KV Wanakbori-2-Dhansura HMT D/C 220 58.9 31/10/1992

40 220KV Gandhinagar-Jamla 1 Line HMT D/C 220 22 21/08/1998

41 220KV Gandhinagar-Jamla 2 Line HMT D/C 220 22 21/08/1998

42 220KV Jamla-Kheralu 1 line HMT D/C 220 62 26/08/1998

43 220KV Jamla-Kheralu 2 line HMT D/C 220 62 26/08/1998

44 220KV Gandhinagar-Soja - 1 HMT S/C & D/C 220 16 26/11/1986

45 220KV Gandhinagar-Soja - 2 HMT S/C & D/C 220 16 29/11/1986

46 220KV Soja-Mehsana - 1 HMT S/C 220 35 25/11/1978

47 220KV Soja-Mehsana - 2 HMT S/C 220 35 24/11/1974

48 220KV Soja-Mitha HMT D/C 220 45.2 29/09/1996

49 220KV Soja-Santhal HMT D/C 220 37 29/09/1996

50 220KV Soja-Vijapur - 1 HMT D/C 220 27.5 21/01/1987

51 220KV Soja-Vijapur - 2 HMT D/C 220 27.5 01/11/1991

52 220KV Soja-Jamla-1 HMT D/C 220 3.5 30/03/1995

53 220KV Soja-Jamla-2 HMT D/C 220 3.5 23/02/1998

54 220Kv Kheralu - Palanpur CKT -1 Mehsana D/C 220 KV 43.00 24.03.1996

55 220Kv Kheralu - Palanpur CKT - 2 Mehsana D/C 220 KV 43.00 24.03.1996

56 220Kv Kheralau - Bhutiya CKT -1 Mehsana D/C 220 KV 49.30 20.01.2012

57 220Kv Kheralau - Bhutiya CKT -2 Mehsana D/C 220 KV 49.30 20.01.2012

58 220 kv Sankhari-Shivlakha line Mehsana S/C 220 KV 187.00 30/3/1979

59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012

60 220 kv Sankhari-Jangaral line no.2 Mehsana D/C 220 KV 32.29 08/09/2012

61 220kv Vadavi-Mitha 1 Mehsana D/C 220 KV 44.14 30.3.07

62 22okv Vadavi-Mitha 2 Mehsana D/C 220 KV 44.14 30.3.07

63 220kv Vadavi-Chhatral Mehsana D/C & S/C 220 KV 12.60 01.02.07

64 220kv Vadavi-Viramgam Mehsana D/C & S/C 220 KV 42.70 22.1.07

65 220 Kv G'nagar-Chhatral 1 Mehsana D/C 220 KV 27.30 25.03.78

66 220 Kv G'nagar-Chhatral 1 Mehsana D/C 220 KV 27.30 25.03.78

67 220 KV G'nagar(TPS)-Mehsana-1 Mehsana D/C 220 KV 52.00 30.3.79

68 220 KV G'nagar(TPS)-Mehsana-2 Mehsana D/C 220 KV 52.00 30.3.94

69 220 KV Mehsana-Radhanpur Line Mehsana D/C 220 KV 95.00 31.3.79

70 220KV Mehsana-Sankhari Mehsana D/C 220 KV 48.20 30.3.79

71 220KV Mitha-Sankhari-1 Mehsana D/C 220 KV 33.06 20.8.02

72 220KV Mitha-Sankhari-2 Mehsana D/C 220 KV 33.06 14.09.02

73 220KV Mitha-Santhal Mehsana D/C 220 KV 8.80 08/06/2001

74 220 kv Palanpur- Kansari Ckt-1 Palanpur D/C 220 KV 40.00 16.08.1991

75 220 kv Palanpur- Kansari Ckt-2 Palanpur D/C 220 KV 40.00 02.11.1995

76 Kansari-Jangral-1 Palanpur D/C 220 KV 37.00 16.09.2003

77 Kansari-Jangral-2 Palanpur D/C 220 KV 37.00 16.09.2003

78 220KV Kansari - Agathala Palanpur S/C 220 KV 28.0028.10.2010

(27.02.1998)

79 220KV Kansari - Tharad Palanpur S/C 220 KV 56.00 21.10.2000

80 Kansari-Deodar Ckt.No.1 Palanpur D/C 220 KV 53.00 17.06.2001

81 Kansari-Deodar Ckt.No.2 Palanpur D/C 220 KV 53.00 07.04.2001

82 220KV KANSARI-THAVAR CKT 1 Palanpur D/C 220 KV 28.00 18.01.2006

83 220KV KANSARI-THAVAR- CKT 2 Palanpur D/C 220 KV 28.00 12.02.2006

84 Deodar-Radhanpur Palanpur D/C 220 KV 35.00 31.03.1989

85 Deodar-Charanka Palanpur D/C 220 KV 88.0008.09.1989

(28.02.12)

86 Charanka-Shivlakha Palanpur D/C 220 KV 109.0008.09.1989

(28.02.12)

Page 38

Page 6: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

87 220KV THARAD-THAVAR CKT 1 Palanpur D/C 220 KV 50.00 25.06.2012

88 220KV THARAD-THAVAR- CKT 2 Palanpur D/C 220 KV 50.00 25.06.2012

89 220KV AGATHALA-THARAD Palanpur S/C 220 KV 30.0028.10.2010

(27.02.1998)

90 220KV Tharad - Deodar 1 Palanpur D/C 220 KV 38.676 23.11.2012

91 220KV Tharad - Deodar 2 Palanpur D/C 220 KV 38.676 23.11.2012

92 220KV Tharad-Amrapura (Kinteck)-1 Palanpur D/C 220 KV 86.585 30.03.2013

93 220KV Tharad-Amrapura (Kinteck)-2 Palanpur D/C 220 KV 86.585 24.06.2013

94 220kv Sankhari-Jangral-1 Palanpur S/C 220KV 34.00 30.03.2012

95 220kv Sankhari-Jangral-2 Palanpur S/C 220KV 34.00 30.03.2012

96 220kV Gondal – Kangasiyali Line Gondal D/C 220 KV 45.40 24.11.1996

97 220kV Kangasiyali – Nyara Line Gondal D/C 220 KV 33.50 24.11.1996

98 220kV Nyara-Tebhada No.1 Gondal D/C 220 KV 93.00 01.10.2011

99 220kV Nyara-Tebhada No.2 Gondal D/C 220 KV 93.00 30.03.2012

100 220 kV Hadala-Nyara line no. 1 Gondal D/C 220 KV 12.11 16.08.2007

101 220 kV Hadala-Nyara line no. 2 Gondal D/C 220 KV 12.11 16.08.2007

102 200 kV Hadala-Morbi line Gondal D/C 220 KV 59.46 26/05/2007

103 220 KV Hadala-Halvad-1 Gondal D/C 220 KV 84.83 11.08.2012

104 220 KV Hadala-Halvad-2 Gondal D/C 220 KV 84.83 11.08.2012

105 220kV Jetpur Rajkot Gondal S/C 220 KV 72.00 27.04.1983

106 220kV Jetpur Gondal Gondal S/C 220 KV 26.00 27.04.1983

107 220kV Jetpur Motipaneli Gondal S/C 220 KV 74.00 27.10.1983

108 220kV Jeptur Ranavav Gondal S/C 220 KV 104.00 27.10.1983

109 220kV Jetpur Shapur Gondal S/C 220 KV 46.50 22.12.1993

110 220kV Jetpur Jamnagar line-1 Gondal D/C 220 KV 92.00 30.9.1995

111 220kV Jetpur Jamnagar line-2 Gondal D/C 220 KV 92.00 30.09.1995

112 220kV Jetpur visavadr Gondal S/C 220 KV 54.50 2.05.1995

113 220kV Jetpur Sardargadh Gondal S/C 220 KV 65.00 20.12.1988

114 220 kV Morbi - Lalpar Gondal S/C 220 KV 7.24 11.01.12

115 220 kV Hadala-Sartanpar Line no. 1 Gondal D/C 220 KV 84.83 06.06.14

116 220 kV Hadala-Sartanpar Line no. 2 Gondal D/C 220 KV 84.83 06.06.14

117 220 kV Morbi - Bhimasar Gondal S/C 220 KV 113.00 16.05.12

118 220 kV Lalpar - Bhimasar Gondal S/C 220 KV 119.00 16.05.12

119 Motipaneli-Ranavav Junagadh S/C 220 KV 64.00 07/04/1998

120 Sardargadh-Keshod Junagadh S/C 220 KV 69.00 18/12/1997

121 Keshod - Timbadi Junagadh S/C 220 KV 66.00 09/01/1989

122 Motipaneli-Sadodar-1 (Windfarm) Junagadh D/C 220 KV 26.82 28.02.07

123 Motipaneli-Sadodar-2 (Windfarm) Junagadh D/C 220 KV 26.82 25/10/2008

124 Shapur-Keshod Junagadh D/C 220 KV 29.50 16.06.12

125 Dhokadva-Timbdi Junagadh S/C 220 KV 63.00 7.04.94

126 Motipaneli-Sardargadh-I Junagadh D/C 220 KV 35.52 21.02.12

127 Motipaneli-Sardargadh-II Junagadh D/C 220 KV 35.52 21.02.12

128 220 KV Chorania - Viramgam Surendranagar S/C 220 KV 71.00 12/04/1995

129 220KV Chorania - Dhrangadhra 1 Surendranagar D/C 220 KV 72.00 06/04/1995

130 220 KV Chorania - Dhrangadhra 2 Surendranagar D/C 220 KV 72.00 06/04/1995

131 220 KV Chorania - Limbadi 1 Surendranagar D/C 220 KV 3.00 19/10/1993

132 220 KV Chorania - Limbadi 2 Surendranagar D/C 220 KV 3.00 19/10/1993

133 220 KV Chorania - Sadla Surendranagar S/C & D/C 220 KV 90.82 19.10.1993 31.05.2014

134 220KV Sadla - Gondal Surendranagar S/C & D/C 220 KV 96.65 19.10.1993 31.05.2014

135 220 KV Chorania - Bala 1 Surendranagar D/C 220 KV 29.50 30/04/2009

136 220 KV Chorania - Bala 2 Surendranagar D/C 220 KV 29.50 30/04/2009

137 220 KV Dhrangadhra- Halvad -2 Surendranagar S/C 220 KV 70.00 30/05/1997

138 220 KVDhrangadhra-Halwad -1 Surendranagar S/C 220 KV 27.11 06/12/2004

139 220 KV Rajpar-Dudhrej Surendranagar D/C 220 KV 10.00 20/01/2009

140 220 KV Viramgam-Dhanki No.1 Surendranagar D/C 220 KV 30.49 17/01/2004

141 220 KV Viramgam-Dhanki No.2 Surendranagar D/C 220 KV 30.49 17/01/2004

142 220 KV Dhanki-Adalsar Surendranagar D/C 220 KV 9.19 29/09/2006

143 220 KV Dhanki-Bala Surendranagar D/C 220 KV 20.10 18/01/2008

144 220 KV Adalsar-Bala Surendranagar D/C 220 KV 10.85 22/10/2009

145 220 KV Bala - Rajpar Surendranagar D/C 220 KV 5.35 20/01/2009

146 220 KV Bala - Dudhrej Surendranagar D/C 220 KV 14.71 20/01/2009

147 220 KV Viramgam Neno line no-1 Surendranagar D/C 220 KV 26.50 27/10/2009

148 220 KV Viramgam-Neno line no- 2 Surendranagar D/C 220 KV 26.50 27/10/2009

149 220 KV Viramgam Bhat line no-1 Surendranagar D/C 220 KV 35.20 24/05/2010

150 220 KV Viramgam Bhat line no-2 Surendranagar D/C 220 KV 35.20 29/05/2010

151 220 KV Halvad Bhimsar 1 Surendranagar D/C 220 KV 145.96 04/10/2004

152 220 KV Halvad Bhimsar 2 Surendranagar D/C 220 KV 145.96 03/02/2012

Page 39

Page 7: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

153 220KV Bhimasar-Mansar 1 Surendranagar D/C 220 KV 142.00 13/05/2014

154 220KV Bhimasar-Mansar 2 Surendranagar D/C 220 KV 142.00 13/05/2014

155 220KV Mansar-Halvad-1 Surendranagar D/C 220 KV 12.00 29/03/2014

156 220KV Mansar-Halvad-2 Surendranagar D/C 220 KV 12.00 29/03/2014

157 220 KV Satranpar-Halvad1 Surendranagar D/C 220 KV 93.00 06/06/2014

158 220 KV Satranpar-Halvad2 Surendranagar D/C 220 KV 93.00 06/06/2014

159 220KV Amreli-INOX-1 Amreli D/C and M/C 220 KV 39.79 11.09.15

160 220KV Amreli-INOX-2 Amreli D/C and M/C 220 KV 39.79 01.09.15

161 220 kv SKD-Visavadar Amreli S/C 220 KV 94.60 30.11.83

162 220Kv SKD-Dhokdwa Amreli S/C 220 KV 65.00 18.01.97

163 22KV S'KUNDLA-220KV GPPC- 1 Amreli S/C 220 KV 149.16 26.01.99

164 22KV S'KUNDLA-220KV GPPC 2 Amreli S/C 220 KV 80.20 26.01.99

165 220Kv SKD-GPPL Amreli S/C 220 KV 54.60 24.07.06

166 220Kv GPPL-Kovaya Amreli S/C 220 KV 51.10 01.08.95

167 220Kv SKD-Kovaya No 02 Amreli S/C 220 KV 7.50 28.07.06

168220 KV BECL - LILO from Vartej -

SavarkundlaAmreli D/C 220 KV 113.09 08.07.15

169 220 kv Otha GPPC no 1 Amreli D/C 220 KV 69.69 26.01.1999

170 220 kv Otha GPPC no 2 Amreli D/C 220 KV 69.69 26.01.1999

171 220 kv Otha Sagapara No 1 Amreli D/C 220 KV 47.79 5.06.2013

172 220 kv Otha Sagapara No 2 Amreli D/C 220 KV 47.79 5.06.2013

173 220 KV Vallabhipur - Vartej Amreli S/C 220 KV 28.50 11.06.15

174 220KV Botad Valbhipur Amreli S/C 220 KV 43.4002.06.1966

LILO on Dt-11.06.2015

175 Vartej - Sagapra Amreli S/C 220 KV 38.60 07.02.99

176 220Kv SKD-Sagapara Amreli S/C 220 KV 78.00 29.01.99

177 220 KV Vartej - BECL Amreli S/C 220 KV 38.50 26.06.15

178 220 KV BECL - Savarkundla Amreli S/C 220 KV 113.09 26.06.15

179 220 KV Sagapara-BECL-1 Amreli D/C 220 KV 41.67 19.08.2014

180 220 KV Sagapara-BECL-2 Amreli D/C 220 KV 41.67 19.08.2014

181 220 KV Varsana-Tappar Line No.3 Anjar D/C 220 KV 3.79 23.10.10

182 220 KV Varsana-Tappar Line No.4 Anjar D/C 220 KV 3.79 23.10.10

183 220KV Nakhatrana - Nanikhakhar-1 Anjar D/C 220 KV 59.00 31/12/1997

184 220KV Nakhatrana - Nanikhakhar-2 Anjar D/C 220 KV 59.00 31/12/1997

185 220 KV Adani- Nani khakhar-1 Anjar D/C 220 KV 16.25 22/4/2009

186 220 KV Adani- Nani khakhar-2 Anjar D/C 220 KV 16.25 23/11/2008

187 220 KV Suthari-Nani-Khakhar line No.1 Anjar D/C 220 KV 78.61 21/12/06

188 220 KV Suthari-Nani-Khakhar line No.2 Anjar D/C 220 KV 78.61 21/12/06

189 220 kv Sindhodi - Nani Khakhar No.1 Anjar D/C 220 KV 82.49 07/02/2009

190 220 kv Sindhodi - Nani Khakhar No.2 Anjar D/C 220 KV 82.49 07/02/2009

191 220 kv CGPL - Nani Khakhar Anjar S/C 220 KV 15.47 22/11/2009

192 220KV Mokha -Tappar Line Anjar D/C 220 KV 47.59 23.12.2014

193 220KV Mokha -Nanikhakhar Line D/C 220 KV 57.60 23.12.2014

194 220 kv Nanikhakhar-Tappar line.2 Anjar D/C 220 KV 83.70 03/04/2004

195 220KV Welspun -Anjar Anjar D/C 220 KV 15.8130.03.79

( 09.01.06)

196 220KV Shivlakha-welspun Anjar D/C 220 KV 73.2430.03.79

( 09.01.06)

197 220KV Shivlakha -Anjar line Anjar D/C 220 KV 75.00 18.01.10

198 220KV Tappar-APL No.1 Anjar D/C 220 KV 82.16 20.01.10

199 220KV Tappar-APL No.2 Anjar D/C 220 KV 82.16 30.01.10

200 220KV Tapper-Vondh line Anjar D/C 220 KV 30.70 31.07.13

201 220 KV Vondh-Morbi Anjar D/C 220 KV 78.80 31.07.13

202 220KV Tapper-Hadala line Anjar D/C 220 KV 165.39 04.04.10

203 220KV Anjar-Kukma line-1 Anjar D/C 220 KV 27.90 13.08.91

204 220KV Anjar-Kukma line-2 Anjar D/C 220 KV 27.90 13.08.91

205 220KV Nakhatrana - Akrimota No.1 Anjar D/C 220 KV 99.00 18.02.2004

206 220KV Jamanvada - Akrimota No.2 Anjar D/C 220 KV 136.27 29.03.2012

207 220kV Nakhatrana-Jamanvada Line Anjar D/C 220 KV 69.99 29.03.2012

208 220KV Pandhro - Nakhatrana No. 1 Anjar D/C 220 KV 75.00 24.01.97

209 220KV Pandhro - Nakhatrana No. 2 Anjar D/C 220 KV 75.00 24.01.97

210 220 KV Akri-Panadhro line No.1 Anjar D/C 220 KV 27.50 09.01.2006

211 220 KV kukma- Panadhro No.1 Anjar D/C 220 KV 124.50 22.12.09

212 220 KV kukma- Panadhro No.2 Anjar D/C 220 KV 124.50 18.12.08

213 220 KV Shivlakha-Tappar 1 Anjar D/C 220 KV 55.00 29.1.08

214 220 KV Shivlakha-Tappar 2 Anjar D/C 220 KV 55.00 29.1.08

Page 40

Page 8: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

215 220 KV Shivlakha-Vandhiya 1 Anjar D/C 220 KV 21.65 16.10.09

216 220 KV Shivlakha-Vandhiya 2 Anjar D/C 220 KV 21.65 16.10.09

217 220 KV Suthari-Sindhodi line 1 Anjar D/C 220 KV 13.84 30-09-07

218 220 KV Suthari-Sindhodi line 2 Anjar D/C 220 KV 13.84 30-09-07

219 220 KV Shivlakha-Sankhari Anjar D/C 220 KV 174.00 30.03.1979

220220KV Shivlakha - 220KV PS-2 (Nani

hamirpar) lineAnjar D/C 220 KV 61.00 13.04.2015

221220KV PS-2 (Nani hamirpar) - Charanka

lineAnjar D/C 220 KV 116.00 13.04.2015

222 220 KV Shivlakha-Morbi 1 Anjar D/C 220 KV 73.00 17.2.04

223 220 KV Shivlakha-Morbi 2 Anjar D/C 220 KV 73.00 17.2.04

224 220kv Nakhatrana- Varsana- no.1 Anjar D/C 220 KV 107.00 07.05.2013

225 220kv Nakhatrana- Varsana- no.2 Anjar D/C 220 KV 107.00 07.05.2013

226 220 KV Mokha-OPG line Anjar D/C 220 KV 13.49 12.09.14

227220KV PS-2 (Nani hamirpar) -PS-1

(Manjuvas) line -1Anjar D/C 220 KV 11.01 15.04.2015

228220KV PS-2 (Nani hamirpar) -PS-1

(Manjuvas) line -2Anjar D/C 220 KV 11.01 15.04.2015

229 220KV Jamnagar-Essar-I Jamnagar D/C 220 KV 47.50 09.03.2006

230 220KV Jamnagar-Essar-II Jamnagar D/C 220 KV 47.50 09.03.2006

231 Ambheta-Vapi Navsari S/C 220 KV 46.9524.04.67

19.02.99

232 Bhilad-TAPS. Navsari S/C 220 KV 62.3727.04.67

23.10.03

233 Ichhapore-Essar-1. Navsari D/C 220 KV 16.00 23.05.94

234 Ichhapore-Essar-2. Navsari D/C 220 KV 16.00 13.07.95

235 Ichhapore-Kawas No. 1 Navsari S/C 220 KV 6.00 16.08.93

236 Ichhapore-RIL-1. Navsari D/C 220 KV 9.00 15.08.93

237 Ichhapore-RIL-2. Navsari D/C 220 KV 9.00 27.10.97

238 Navsari-Ambheta. Navsari S/C 220 KV 21.6424.04.67

19.02.99

239 Navsari-Bhilad. Navsari S/C 220 KV 88.7024.04.67

19.10.03

240 Navsari-Talangpur Navsari S/C 220 KV 30.5409.02.00

24.04.67

241 Navsari-Nasik-1. Navsari D/C 220 KV 70.0006.11.77

31.03.88

242 Navsari-Nasik-2. Navsari D/C 220 KV 70.0006.11.77

31.03.88

243 Navsari - Popda Navsari S/C 220 KV 22.55

24.06.67

25.04.81

28.06.14

244 Vav - Popda Navsari S/C 220 KV 28.45

24.06.67

25.04.81

28.06.14245 Talangpur-Essar-1. Navsari D/C 220 KV 30.60 03.09.01

246 Talangpur-Essar-2. Navsari D/C 220 KV 30.60 03.09.01

247 Ukai(Th.)-Ukai(Hy.)-1. Navsari D/C 220 KV 2.50 16/08/1981

248 Ukai(Th.)-Ukai(Hy.)-2. Navsari D/C 220 KV 2.50 26/08/1992

249 Ukai-Mota(Bardoli) No. 2 Navsari S/C 220 KV 52.80 15/11/1981

250 Vapi-Bhilad-2. Navsari D/C 220 KV 22.8128.02.1995

29.01.94

251 Vapi-Tarapur-2. Navsari S/C 220 KV 80.64 30/08/1969

252 Ichh -Kawas -2 Navsari D/C 220 KV 6.00 20.06.12

253 Vav-Mota(Bardoli) No. 2 Navsari S/C 220 KV 13.50 03/07/2003

254 Vav-Talangpur-1. Navsari D/C 220 KV 38.5422.01.00

24.04.67

255 Vav-Mota No. 1 Navsari D/C 220 KV 13.50 18/10/1981

256 Mota-Ukai(Th.)-KAPP-1. Navsari S/C 220 KV 52.80 18/10/1981

257 Vapi-Ambheti-1 Navsari D/C 220 KV 14.1824.04.67

19.02.99

258 Bhilad-Ambheti-1 Navsari D/C 220 KV 20.77 25/08/2005

259 Bhilad-Ambheti-2 Navsari D/C 220 KV 21.74 16/02/2008

260 Bhilad-Ambheti-3 Navsari D/C 220 KV 21.74 29/02/2008

261 Mota-Ambheta Line No-1 Navsari D/C 220 KV 47.11 30/09/2008

262 Mota-Ambheta Line No-2 Navsari D/C 220 KV 47.11 30/09/2008

263 Vav-Utran-2 Navsari S/C 220 KV 24.65 06/11/2009

264 Mora(L&T)-GSEG Navsari S/C 220 KV 2.9120.11.10

09.05.02

265 Mora(L&T)-L&T 1 Navsari D/C 220 KV 0.75 21.07.12

266 Mora(L&T)-L&T 2 Navsari D/C 220 KV 0.75 21.07.12

267 Gavasad-SLPP 1 Jambuva D/C 220 KV 107.40 20/02/2002

268 Gavasad-SLPP 2 Jambuva D/C 220 KV 107.40 20/02/2002

Page 41

Page 9: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

269 Gavasad-Kasor 1 Jambuva D/C 220 KV 52.67 29/05/2002

270 Gavasad-Kasor 2 Jambuva D/C 220 KV 52.67 04/10/2002

271 Gavasad-SLPP 3 Jambuva D/C 220 KV 109.57 23/01/2010

272 Gavasad-SLPP 4 Jambuva D/C 220 KV 109.57 03/01/2010

273 Gavasad-Kosamba-1 Jambuva D/C 220 KV 89.77 30/03/2013

274 Gavasad-Kosamba-2 Jambuva D/C 220 KV 89.77 30/03/2013

275 SLPP-Karjan Line Jambuva D/C 220 KV 89.29 23.05.14

276 Karjan-Gavasad Line Jambuva D/C 220 KV 43.33 21.05.14

277 Chandrapura-Godhra 1 Jambuva D/C 220 KV 35.00 05/01/1989

278 Chandrapura-Godhra 2 Jambuva D/C 220 KV 35.00 05/01/1989

279 Godhra-Kadana Jambuva D/C 220 KV 80.00 18/07/1984

280 Godhra-Savdasnamuvada (Lunawada) Jambuva D/C 220 KV 56.00 18/07/1984

281 Savdasnamuvada (Lunawada)-Kadana Jambuva D/C 220 KV 24.00 18/07/1984

282 Chandrapura-P.M.Steel Jambuva S/C 220 KV 10.00 10/09/1996

283 WTPS (Wankbori)-Godhra Jambuva S/C 220 KV 35.00 21/02/1979

284 Asoj-Chandrapura 1 Jambuva D/C 220 KV 35.00 02.02.84

285 Asoj-Chandrapura 2 Jambuva D/C 220 KV 35.00 22.02.83

286 Asoj Karamsad 1 Jambuva D/C 220 KV 44.00 07.07.85

287 Asoj Karamsad 2 Jambuva D/C 220 KV 44.00 21.07.83

288 Asoj -Wanakbori 1 Jambuva D/C 220 KV 63.00 25.07.85

289 Asoj- Wanakbori 2 Jambuva D/C 220 KV 63.00 15.09.83

290 Jambuva - Karamsad 1 Jambuva D/C 220 KV 48.42 26/10/1969

291 Jambuva - Karamsad 2 Jambuva D/C 220 KV 48.42 26/10/1969

292 Jambuva - Waghodia Jambuva S/C 220 KV 26.32 09/09/1978

293 Jambuva - Asoj Jambuva S/C 220 KV 24.50 02/01/1979

294 Waghodia - Asoj Jambuva S/C 220 KV 32.00 24/07/1993

295 Achhalia-Jambuva Line-1 Bharuch D/C 220 KV 47.00 16.08.81

(17.5.74)

296 Achhalia-Jambuva Line-2 Bharuch D/C 220 KV 47.0027.8.81

(19.5.74)

297 Achhalia-Jambuva Line-3 Bharuch D/C 220 KV 50.00 29.3.77

298 Achhalia-Jambuva Line-4 Bharuch D/C 220 KV 50.00 16.3.79

299 Dahej-GACL Line-1 Bharuch D/C 220 KV 1.50 16.06.1999

300 Dahej-GACL Line-2 Bharuch D/C 220 KV 1.50 28.01.1999

301 Haldarwa-Vagra Line Bharuch D/C 220 KV 29.002.12.08

(13.05.99)

302 Vagra-Dahej Line Bharuch D/C 220 KV 36.652.12.08

(13.05.99)

303 Haldarwa-Dahej Line Bharuch D/C 220 KV 62.00 11.09.1998

304 Dahej-ONGC- Petronet LNG Line-1 Bharuch D/C 220 KV 6.6331.8.08

(07.04.04)

305 Dahej- Petronet LNG Line-2 Bharuch D/C 220 KV 5.90 24.01.04

306 Dahej-Indogulf Line-1 Bharuch D/C 220 KV 5.50 11.09.1998

307 Dahej-Indogulf Line-2 Bharuch D/C 220 KV 5.50 11.09.1998

308 Haldarwa-Zagadia Bharuch S/C on D/C 220 KV 55.0016.10.93

April'67

309 Haldarwa-GPEC Line-1 Bharuch D/C 220 KV 10.29 18.09.1997

310 Haldarwa-GPEC Line-2 Bharuch D/C 220 KV 10.29 18.09.1997

311 Haldarwa-IPCL Line-1 Bharuch D/C 220 KV 59.20 9.12.1996

312Haldarwa-IPCL Line-2

Tap to M/s China Steel (0.147 Km)Bharuch D/C 220 KV

59.2 9.12.1996

13.05.14

313 Haldarwa-Jambuva Bharuch S/C on D/C 220 KV 61.5016.10.93

April'67

314 Kim-Utran Line-1 Bharuch D/C 220 KV 22.20 06.06.1993

315 Kim-Utran Line-2 Bharuch D/C 220 KV 22.20 06.06.1993

316 Kim-GSEG Line Bharuch D/C 220 KV 48.2520.11.10

(09.05.2002)

317 Kim-Mora Line Bharuch D/C 220 KV 49.1520.11.10

(09.05.2002)

318 Kim-Vav line-1 Bharuch S/C 220 KV 21.00 16.02.1995

319 Kim-Vav line-2 Bharuch S/C 220 KV 21.00 16.02.1995

320 Kim-Zagadia Bharuch S/C 220 KV 40.8229.3.2011

(26.10.69)

321 Kim-Kosamba Bharuch S/C on D/C 220 KV 24.6029.3.2011

(26.10.69)

322 Zagadia- Kosamba-3 Bharuch S/C on D/C 220 KV 25.2629.3.2011

(26.10.69)

323 Kosamba-Utran line-1 Bharuch D/C 220 KV 42.58 30.3.2011

324 Kosamba-Utran line-2 Bharuch D/C 220 KV 42.58 4.7.11

325 Kim - TPGL-1 Bharuch D/C 220 KV 4.06 20.02.2002

Page 42

Page 10: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

326 Kim - TPGL-2 Bharuch D/C 220 KV 4.06 20.02.2002

327 Achhalia-Ukai(Th) Line-1 Bharuch D/C 220 KV 84.0016.3.79

(17.5.74)

328 Achhalia-Ukai(Th) Line-2 Bharuch D/C 220 KV 84.0017.3.79

(19.5.74)

329 Achhalia-Ukai(Th) Line-3 Bharuch S/C 220 KV 84.00 10.1.89

330 Achhalia-Ukai(Hy) Line-1 Bharuch D/C 220 KV 83.0016.8.81

(29.3.77)

331 Achhalia-Ukai(Hy) Line-2 Bharuch D/C 220 KV 83.00 27.1.81

(26.10.69)

332 Zagadia-Jambuva Bharuch S/C 220 KV 61.508.10.98

(30.8.69)

333 Zagadia-Mangrol Line-1 Bharuch D/C 220 KV 35.00 29.10.98

334 Zagadia-Mangrol Line-2 Bharuch D/C 220 KV 35.00 10.2.99

335 Zagadia-RMGL Bharuch S/C 220 KV 0.30 18.2.97

336 Zagadia- Kosamba-1 Bharuch D/C 220 KV 24.20 13.07.2011

337 Zagadia- Kosamba-2 Bharuch D/C 220 KV 24.20 13.07.2011

338 Wagra-Railway-1 Bharuch D/C 220 KV 9.26 17.3.12

339 Wagra-Railway-2 Bharuch D/C 220 KV 9.26 22.3.12

340 Kosamba - GSEG 1 Bharuch D/C 220 KV 62.37 24.08.11

341 Kosamba - GSEG 2 Bharuch D/C 220 KV 62.37 24.08.11

342 Kosamba-Mobha Bharuch S/C 220KV 88.40 31.03.13

343 Kosamba-Suva Bharuch S/C 220KV 128.04 01.04.15

344 Suva-Mobha Bharuch S/C 220KV 77.19 31.03.15

345 220 KV Suva-GNFC 1&2 Bharuch D/C 220 KV 2.01 06.05.15

346 220 KV Suva-CHINA STEEL 2 Bharuch S/C 220 KV 1.56 21.04.15

347 220 KV Suva-CHINA STEEL 1 Bharuch S/C 220 KV 1.56 05.08.15

348 220 KV Suva-DGEN Bharuch S/C 220 KV 7.10 06.05.15

349 220 KV Suva-Dahej Bharuch S/C 220 KV 10.50 06.05.15

350 220 KV Dahej-DGEN Bharuch S/C 220 KV 2.43 10.02.15

1 Chiloda-G'nagar-1 Nadiad D/C 132 KV 9.43 10/01/1995

2 Chiloda-G'nagar-2 Nadiad D/C 132 KV 9.43 10/01/1995

3 Chiloda-Talod Nadiad S/C 132 KV 26.92 04/06/1995

4 Ranasan-Chiloda Nadiad S/C 132 KV 15.33 24/11/1980

5 Ranasan-PRL Nadiad S/C 132 KV 5.80 18/11/1986

6 Ranasan-S'mati-1 Nadiad D/C 132 KV 13.12 07/06/1986

7 Ranasan-S'mati-2 Nadiad D/C 132 KV 13.12 07/06/1986

8 Ranasan-Talod Nadiad S/C 132 KV 37.56 09/12/1974

9 Ranasan-Vatva-1 Nadiad D/C 132 KV 26.56 23/11/1969

10 Ranasan-Vatva-2 Nadiad D/C 132 KV 26.56 23/11/1969

11 Ranasan-Vijapur Nadiad S/C 132 KV 93.86 07/12/1973

12 Sabarmati-AECo.1 Nadiad D/C 132 KV 0.20 08/01/1999

13 Sabarmati-AECo.2 Nadiad D/C 132 KV 0.20 08/01/1999

14 Dhuvaran-Undel Nadiad S/C 132 KV 15.30 07/05/1997

15 Undel-Vatva-1 Nadiad D/C 132 KV 81.95 08.01.1965 15.07.2014

16 Dhuvaran-Vatva-2 Nadiad D/C 132 KV 81.95 08/01/1965

17 Vatva-Mehmedabad Nadiad S/C 132 KV 23.56 31/03/1970

18 Mehmedabad W Rly. I Nadiad D/C 132 KV 2.14 03/06/1973

19 Mehmedabad W Rly.-II Nadiad D/C 132 KV 2.14 17/03/1973

20 Nadiad-Mehmedabad Nadiad S/C 132 KV 11.50 31/07/1979

21 Karamsad-Nadiad Nadiad S/C 132 KV 27.15 15/06/1974

22 Karamsad-Ode Nadiad S/C 132 KV 36.00 20/12/1984

23 Karamsad-Dhuvaran-1 Nadiad S/C 132 KV 41.20 30/05/1971

24 Karamsad-Dhuvaran-2[Gotri Line] Nadiad S/C 132 KV 41.20 30/05/1971

25 Ode-W'Rly-1 Nadiad D/C 132 KV 17.30 20/12/1984

26 Ode-W'Rly-2 Nadiad D/C 132 KV 17.30 20/12/1984

27 132KV Agiyol-Idar HMT S/C 132 32 06/03/1998

28 132KV Agiyol-Talod HMT S/C 132 32 06/06/1998

29 132KV Idar-Vijapur HMT S/C 132 45 30/10/1969

30 132KV Visnagar-Vijapur HMT S/C 132 28 09/12/1970

31 132KV Sidhpur - Deesa Line Mehsana S/C 132 KV 42.00 29.011.1999

32 132kv Mehsana-Sidhpur no 1 Mehsana D/C & S/C 132 KV 48.00 29.11.99

33 132kv Mehsana-Sidhpur no 2 Mehsana S/C 132 KV 35.00 25.1.80

34 132kv Mehsana-Patan no 1 Mehsana D/C 132 KV 35.00 11/08/1995

35 132kv Mehsana-Patan no 2 Mehsana D/C 132 KV 35.00 11/08/1995

36 132kv Mehsana-Visnagar Mehsana S/C 132 KV 20.50 11/03/1991

37 132kV Nyara – Vikram Line Gondal D/C 132 KV 33.00 06.09.2002

38 132kV Nyara – Vajadi Line Gondal D/C 132 KV 15.00 03.03.2000

132 KV Transmission Line

Page 43

Page 11: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

39 132kV Vikram – Vajadi Line Gondal D/C 132 KV 18.00 28.08.1999

40 132kV Gondal-Jasdan GondalS/C on D/C

Tower 132 KV 50.00 15.04.65

41 132kV Gondal-Vikram GondalS/C on D/C

Tower 132 KV 39.00 15.04.65

42 132kV Gondal-Bhayavadar GondalS/C on D/C

Tower 132 KV 83.00 16.03.70

43 132kV Gondal-Haripur Gondal S/C 132 KV 101.00 20.10.78

44 132kV Gondal-Dhoraji GondalS/C on D/C

Tower 132 KV 58.00 15.04.65

45 132kV Jasdan - Theoliya-1( WF) Gondal D/C 132 KV 6.14 07.02.2013

46 132kV Jasdan - Theoliya- 2( WF) Gondal D/C 132 KV 6.14 07.02.2013

47 132kv Wankaner - Dhrol Line Gondal D/C 132 KV 68.00 30.01.71

48 132kv Wankaner - Lalpar Line Gondal S/C 132 KV 25.00 6.05.71

49 132kv Wankaner - Varsamedi -1 Gondal D/C 132 KV 65.00 30.10.09

50 132kv Wankaner - Varsamedi -2 Gondal D/C 132 KV 65.00 30.10.09

51 132kv Sikka-Dhrol Line Gondal D/C 132 KV 71.00 30.01.71

52 Shapur - Dhoraji Junagadh S/C 132 KV 31.80 04.11.12

53 Junagadh - Shapur Junagadh S/C 132 KV 35.50 20.03.70

54 Bhayavadar-Ranavav Junagadh S/C 132 KV 90.00 06/03/1997

55 Junagadh- Talala Junagadh S/C 132 KV 52.24 16/3/70

56 Haripur-Talala Junagadh S/C 132 KV 11.00 19/10/78

57 Timbdi-Talala No.1 Junagadh D/C 132 KV 22.00 16/12/96

58 Timbdi-Talala No.2 Junagadh D/C 132 KV 22.00 24/1/93

59 Timbdi-Ambuja No.1 Junagadh D/C 132 KV 12.00 22/12/92

60 Timbdi-Ambuja No.2 Junagadh D/C 132 KV 12.00 17/2/98

61 Timbdi-CCGL Junagadh S/C 132 KV 10.00 30/12/92

62 Dhuvaran (CCPP)-Limbdi-1 Surendranagar D/C 132 KV 138.00 18/11/76

63 Dhuvaran (CCPP)-Limbdi--2 Surendranagar D/C 132 KV 138.00 18/11/76

64 Limbdi-Wankaner Surendranagar D/C 132 KV 106.00 18/11/75

65 Sitagadh-Wankaner Surendranagar S/C 132 KV 42.00 18/11/75

66 CCPP-Dhandhuka-1 Surendranagar D/C 132 KV 95.60 20/01/73

67 CCPP-Dhandhuka-2 Surendranagar D/C 132 KV 95.60 20/01/73

68 Dhandhuka-Paliyad Surendranagar S/C 132 KV 86.00 20/01/73

69 Dhandhuka-Vikram Surendranagar S/C 132 KV 161.00 21/01/73

70 Dhandhuka-Barwala Surendranagar S/C 132 KV 78.00 21/10/93

71 132KV Sitagadh-Vakhtpar Surendranagar D/C 132 KV 19.11.2014

72 132KV Limbdi-Vakhatapr Surendranagar D/C 132 KV 19.11.2014

73 Paliyad-Jasdan Amreli S/C 132 KV 55.80 18/05/1905

74 Paliyad-Vikram Amreli S/C 132 KV 132.80 18/05/1905

75 132KV Barwala-Botad Line Amreli S/C 132 KV 25.0020.11.1971

LILO-28.03.2015

76 132KV Botad-Valbhipur Line Amreli S/C 132 KV 44.2020.11.1971

LILO-28.03.2015

77 132 KV Botad-Paliyad Line Amreli S/C 132 KV 25.00 22.12.2011

78 132 Kv Samkhiyali - Shikarpur line-1Anjar

D/C 132 KV 22.00 08.02.04

79 132 Kv Samkhiyali - Shikarpur line-2Anjar

D/C 132 KV 22.00 06.02.07

80 132KV Jamnagar-Wankaner Jamnagar S/C 132 KV 97.00 24/05/1905

81 132KV Jamnagar-Naghedi-I Jamnagar D/C 132 KV 12.00 24/05/1905

82 132KV Jamnagar-Naghedi-II Jamnagar D/C 132 KV 12.00 24/05/1905

83 132KV Sikka-Jamnagar Jamnagar D/C 132 KV 27.00 29/05/1905

84 132 KV Jamnagar-RPL Jamnagar D/C+ S/C 132 KV 37.00 24/06/1905

85 132 KV RPL-Sikka Jamnagar D/C+ S/C 132 KV 21.00 1978/02

86 132 KV Jamnagar-Khambhalia Jamnagar S/C 132 KV 64.00 1978/02

87 132KV Sikka-Naghedi Jamnagar S/C 132 KV 30.00 20/05/1905

88 132KV Sikka-Bhatia Jamnagar S/C 132 KV 78.60 30.7.02

89 132KV Khambhalia-Bhatia- 1 Jamnagar S/C 132 KV 43.00 11.3.92

90 132KV Bhatia-Enercon-1 Jamnagar S/C 132 KV 8.12 7.2.05

91 132KV Khambhalia-Bhatia- 2 Jamnagar S/C 132 KV 46.34 4.5.07

92 132KV Bhatia-Enercon-2 Jamnagar S/C 132 KV 8.12 3.5.07

93 132KV Bhatiya - Bhatiya-1 Jamnagar D/C 132 KV 1.16 31.01.14

94 132KV Bhatiya - Bhatiya-2 Jamnagar D/C 132 KV 1.16 31.01.14

95 132KV Sikka Bhomiyavadar Jamnagar S/C 132 KV 76.4004.09.04

26.05.12

96 132KV Ranavav Bhomiyavadar Jamnagar S/C 132 KV 35.4004.09.04

26.05.12

97 132KV Bhoomiyavadar MotaGunda Jamnagar D/C 132 KV 11.67 23.03.13

98 132kv SC&CI No 1 Jamnagar D/C 132 KV 1.00 7.03.88

Page 44

Page 12: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

99 132kv SC&CI No 2 Jamnagar D/C 132 KV 1.00 06.01.89

100 132KV Bhestan - Navsari line 1 Navsari S/C 132 KV 26.00 22.01.72

101 132kV Popda-Bhestan -1 Navsari S/C 132 KV 11.6822.01.72

20.10.2014

102 132KV Bhestan - Navsari line 2 Navsari S/C 132 KV 27.00 26.12.83

103 132kv Navsari-Atul line Navsari S/C 132 KV 48.12 22.10.72

104 132kv Bhestan-Railway-1. Navsari D/C 132 KV 2.40 13.12.73

105 132kv Bhestan-Railway-2. Navsari D/C 132 KV 2.40 17.11.73

106 132Kv Atul-Railway 1 Navsari D/C 132 KV 4.40 17.11.73

107 132Kv Atul-Railway 2 Navsari D/C 132 KV 4.40 17.11.73

108 Asoj-Nanadesari 1 Jambuva D/C 132 KV 19.76 24/07/1982

109 Asoj-Nanadesari 2 Jambuva D/C 132 KV 19.76 24/07/1982

110 Nandesari-GIPCL 1 Jambuva D/C 132 KV 2.14 13/02/1991

111 Nandesari-GIPCL 2 Jambuva D/C 132 KV 2.14 13/02/1991

112 Jawaharnagar-GIPLC 3 Jambuva D/C 132 KV 9.23 06/06/1985

113 Jawaharnagar-GIPLC 4 Jambuva D/C 132 KV 9.23 06/06/1985

114 Jawaharnagar-F'nagar 1 Jambuva D/C 132 KV 7.10 18/06/1973

115 Jawaharnagar-F'nagar 2 Jambuva D/C 132 KV 7.10 18/06/1973

116 Asoj- F'nagar 1 Jambuva D/C 132 KV 11.67 12/07/1984

117 Asoj- F'nagar 2 Jambuva D/C 132 KV 11.67 12/07/1984

118 F'nagar- GSFC-1 Jambuva D/C 132 KV 0.01 14/03/1991

119 F'nagar- GSFC-2 Jambuva D/C 132 KV 0.01 14/03/1991

120 Asoj- Manjusar 1 Jambuva D/C 132 KV 10.00 20/08/1997

121 Asoj- Manjusar 2 Jambuva D/C 132 KV 10.00 20/08/1997

122 Manjusar-Nirma 1 Jambuva D/C 132 KV 5.47 14/02/1998

123 Manjusar-Nirma 2 Jambuva D/C 132 KV 5.47 14/02/1998

124 Manjusar-ERDA Jambuva S/C 132 KV 1.63 12/09/2007

125 Gotri-Dhuvaran 1 Jambuva D/C 132 KV 47.50 25/07/1964

126 Gotri-Dhuvaran 2 Jambuva D/C 132 KV 47.50 25/07/1964

127 Gotri-Fertilizer 1 Jambuva D/C 132 KV 10.23 30/11/1968

128 Gotri-Fertilizer 2 Jambuva D/C 132 KV 10.23 30/11/1968

129 Karjan-Haldarwa Jambuva S/C 132 KV 22.21 19/05/1973

130 Karjan-JCT Jambuva S/C 132 KV 6.50 11/07/1974

131 Godhra-Dahod Jambuva S/C 132 KV 65.43 10/02/1983

132 Godhra-Limkheda Jambuva S/C 132 KV 42.00 09/02/2010

133 Limkheda-Dahod Jambuva S/C 132 KV 41.00 09/02/2010

134 Limkheda -Railway-1 Jambuva D/C 132 KV 2.00 21/09/2013

135 Limkheda - Railway-2 Jambuva D/C 132 KV 2.00 21/09/2013

136 Godhra-W. Railway 1 Jambuva D/C 132 KV 7.00 30/04/1984

137 Godhra-W. Railway 2 Jambuva D/C 132 KV 7.00 30/04/1984

138 Dahod-W. Railway 1 Jambuva D/C 132 KV 2.85 20/05/1989

139 Dahod-W. Railway 2 Jambuva D/C 132 KV 2.85 20/05/1989

140 Jambuva -Gotri 1 Jambuva D/C 132 KV 12.86 29/11/1976

141 Jambuva -Gotri 2 Jambuva D/C 132 KV 12.86 29/11/1976

142 Jambuva -J'nagar 1 Jambuva D/C 132 KV 37.00 15/01/1973

143 Jambuva -J'nagar 2 Jambuva D/C 132 KV 37.00 15/01/1973

144 Jambuva-Railway-1 Jambuva D/C 132 KV 2.20 25/03/1976

145 Jambuva-Railway-2 Jambuva D/C 132 KV 2.20 25/03/1976

146 Jambuva-Karjan Jambuva S/C 132 KV 20.76 16/06/1975

147 Jambuva- Tilakwada Jambuva S/C 132 KV 52.50 27/03/1998

148 Jambuva-Mordern Petro 1 Jambuva D/C 132 KV 12.50 11/08/1995

149 Jambuva-Mordern Petro 2 Jambuva D/C 132 KV 12.50 25/03/1996

150 Godhra - Vasedi (Chhotaudepur) Jambuva S/C 132 KV 76.60 27/03/1998

151 Asoj Railway Samlaya-1, 2 - Phase Jambuva D/C 132 KV 14.28 18.02.85

152 Asoj Railway Samlaya-2, 2 - Phase Jambuva D/C 132 KV 14.28 18.02.85

153 Karjan-Inox Jambuva S/C 132 KV 0.50 31.03.94

154 Achhalia-Ankleshwar Line-1 Bharuch D/C 132 KV 35.00 13.2.79

155 Achhalia-Ankleshwar Line-2 Bharuch D/C 132 KV 35.00 13.9.80

156 Achhalia–GNFC Line-1 Bharuch D/C 132 KV 36.00 16.7.79

157 Achhalia–GNFC Line-2 Bharuch D/C 132 KV 36.00 19.3.80

158 Achhalia–Valia Line-1 Bharuch D/C 132 KV 26.00 1.4.91

159 Achhalia-Valia Line-2 Bharuch D/C 132 KV 26.00 11.2.89

160 Achhalia-RPL 1 Bharuch D/C 132 KV 7.2025.11.96

21.6.2000

161 Achhalia-RPL 2 Bharuch D/C 132 KV 7.2025.11.96

21.6.2000

162 Bharuch-Ankleshwar Line-1 Bharuch D/C 132 KV 8.94 27.03.80

163 Bharuch-Ankleshwar Line-2 Bharuch D/C 132 KV 8.94 06.03.78

164 Bharuch–Railway Line-1 Bharuch D/C 132 KV 1.20 15.07.73

Page 45

Page 13: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

165 Bharuch–Railway Line-2 Bharuch D/C 132 KV 1.20 15.07.73

166 Haldarwa–Bharuch Bharuch S/C 132 KV 6.9412.12.95

(19.05.73)

167 Haldarwa–Karjan Bharuch S/C 132 KV 36.3512.12.95

(19.05.73)

168 Valia–Guj. Gardian Line-1 Bharuch D/C 132 KV 10.00 28.9.92

169 Valia–Guj. Gardian Line-2 Bharuch D/C 132 KV 10.00 28.9.92

1 Attarsumba-Bhailikui Nadiad S/C 66 KV 6.10 17.03.92 19.04.14

2 Bhailikui-Nirmali Nadiad S/C+D/C 66 KV 6.00 17.03.92 19.04.14

3 Ambaliyara-Nirmali Nadiad S/C 66 KV 11.96 03/05/1993

4 Karamsad-Mehlav Nadiad S/C+D/C 66 KV 16.38 05/06/1976

5 Mehlav-Changa Nadiad S/C+D/C 66 KV 7.98 05/06/1976

6 Changa-Kasor Nadiad S/C 66 KV 8.50 10/12/1994

7 Changa-Uttarsanda Nadiad S/C 66 KV 12.00 11/09/1993

8 Changa-Vaso Nadiad S/C 66 KV 13.36 24/07/1977

9 Vaso-Limbali Nadiad S/C 66 KV 9.8010/6/2010

5.6.2015

10 Limbali-Limbasi Nadiad S/C 66 KV 16.10 06/10/2010

11 Demai tap line Nadiad S/C 66 KV 9.60 18/12/2003

12 Kamla-N.S.Mill Nadiad S/C 66 KV 1.00 27/01/1994

13 Kapadwanj-Kapadwanj Nadiad S/C 66 KV 0.50 28/02/1997

14 Kapadwanj-Attarsumba Nadiad S/C 66 KV 13.50 04/03/1997

15 Kapadwanj-Kathlal Nadiad S/C 66 KV 24.50 19/09/1993

16 Kapadwanj-Torna Nadiad S/C 66 KV 11.90 30/10/1999

17 Kapadvanj-Reliya Nadiad S/C 66 KV 13.44 03/11/2008

18 Kapadvanj-Malitadi Nadiad S/C 66 KV 18.50 21.4.2014

19 Malitadi-Wagharoli Nadiad S/C 66 KV 13.70 15.11.2014

20 Torna-Khalal Nadiad S/C 66 KV 18.00 21.10.2014

21 LILO Apruji Nadiad S/C 66 KV 9.03 8.6.2015

22 Reliya-Demai Nadiad S/C 66 KV 12.20 13.03.2013

23 Reliya-Jorapura Nadiad S/C 66 KV 22.10 11.03.2008

24 Kheda- Samadara Nadiad S/C+D/C 66 KV 5.32 20/09/1992

25 M'bad-Nenpur Nadiad D/C 66 KV 8.93 06.06.69 22.07.14

26 Nenpur-Barejadi Nadiad D/C 66 KV 7.00 06.06.69 22.07.14

27 M'bad-Jinger Nadiad S/C+D/C 66 KV 24.22 06/08/1969

28 Jinger-Kathalal Nadiad S/C+D/C 66 KV 30.60 08/10/2011

29 LILO Aklacha Nadiad D/C 66 KV 2.03 4.06.2015

30 M'bad-Mater-Kheda tap Nadiad S/C+D/C 66 KV 18.26 30/07/1973

31 Mater-Limbasi Nadiad S/C+D/C 66 KV 11.59 30/07/1973

32 M'bad-Mahudha-H'was Tap Nadiad S/C 66 KV 37.78 06/06/1969

33 LILO Varsola Nadiad S/C 66 KV 37.78 26.06.2015

34 Mehmedabad- Barejadi-2 (Hirapur Tap) Nadiad S/C 66 KV 14.53 02/05/1999

35 Nadiad-Kamla Nadiad S/C 66 KV 1.56 29/08/1996

36 Mahudha-Alina Nadiad S/C 66 KV 13.60 6.06.2015

37 Nadiad-Kamla-Palaiya Nadiad S/C 66 KV 17.43 10/11/1979

38 Umreth-Chaklashi Nadiad S/C+D/C 66 KV 15.03 10/11/1979

39 Palaiya-Chaklashi Nadiad S/C+D/C 66 KV 17.12 10/11/1979

40 Ode-Bhalej Nadiad S/C 66 KV 13.80 04/12/1982

41 Bhalej-Umreth Nadiad S/C 66KV 8.40 04/12/1982

42 Ode-Rakhiyal Nadiad S/C+D/C 66 KV 12.59 28/10/2002

43 Rakhiyal-Umreth Nadiad S/C+D/C 66 KV 10.42 28/10/2002

44 Sevalia-Balasinor Nadiad S/C 66 KV 16.00 31/01/1987

45 Jorapura-Balasinor Nadiad S/C+D/C 66 KV 23.30 15/04/2009

46 LILO at Malitadi Nadiad D/C 66 KV 9.70 18.05.2015

47 Balasinor-Anjan Cement Nadiad S/C 66 KV 12.50 04/11/2009

48 Umreth-Thasra Nadiad S/C 66 KV 18.002/7/1979

31.05.2015

49 Thasra-Sevalia Nadiad S/C 66 KV 16.00 07/02/1979

50 Barejadi-Vinzol Nadiad S/C 66 KV 9.56 23/11/1990

51 Vinzol-Bilasiya-Kanbha Tap Nadiad S/C 66 KV 28.67 23/11/1990

52 Bilasiya-Bhuvaldi Nadiad D/C+S/C 66 KV 11.99 23/11/1990

53 Bhuvaldi-Vehlal Nadiad D/C 66 KV 0.70 28.7.14

54 Bavla- Claris Nadiad S/C 66 KV 8.56 05/06/2007

55 Changodar-KISAN Ind. Nadiad S/C 66 KV 5.80 05/011998

56 Changodar-Bhat Nadiad S/C 66 KV 5.91 30/03/2009

57 Bhat-Moraiya Nadiad S/C 66 KV 4.20 30/03/2009

58 Hirapur- Kanbha Nadiad S/C 66 KV 17.00 05/12/1999

66 KV Transmission Line

Page 46

Page 14: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

59 Jetalpur-Navagam Nadiad S/C 66 KV 9.09 03/05/1994

60 Salejada-Bavla-Juval Rupavati Tap Nadiad S/C 66 KV 7.30 07/08/1980

61 Juval Rupavati-Kerala-1 Nadiad S/C 66 KV 7.80 10/09/1987

62 Juval Rupavati-Kerala-2 Nadiad S/C 66 KV 10.50 16.5.2015

63 Juval Rupavati-Valthera Nadiad S/C+D/C 66 KV 9.46 24/03/1987

64 Valthera-Koth Nadiad S/C+D/C 66 KV 9.68 24/03/1987

65 Koth-Simej Nadiad S/C 66 KV 10.30 29.1.14

66 Simej-Raipur Nadiad S/C 66 KV 7.14 22.1.2015

67 Kerala-Zamp Nadiad S/C 66 KV 22.5011/3/2005

16.5.2015

68 Zamp-Lakhtar Nadiad S/C 66 KV 40.33 03/11/2005

69 Zamp-Daduka Nadiad S/C 66 KV 16.80 24.12.2014

70 Moraiya - Dishman Nadiad S/C 66 KV 8.63 03/07/2008

71 Moraiya-Laxon Nadiad S/C 66 KV 3.10 06/05/2012

72 Moraiya-Cadila Nadiad S/C 66 KV 1.50 08/04/2012

73 Bavla-Rajoda Nadiad S/C 66 KV 11.85 17/05/1988

74 Nanidevti-Rajoda Nadiad S/C 66 KV 8.50 17/05/1988

75 Nanidevti- Madhavnagar Nadiad S/C 66 KV 9.50 29.9.14

76 Rajoda-Diamond Textile Nadiad UG 66 KV 3.20 21.1.14

77 Navagam tap(Salejada-B'jadi) Nadiad S/C 66 KV 3.80 31/08/1981

78 Navagam- ONGC Nadiad S/C 66 KV 0.85 24/08/1992

79 Salejada- Aia Eng[Spare] Nadiad S/C 66 KV 19.50 08/06/2007

80 Salejada-Dholka GIDC Nadiad S/C 66 KV 10.33 13/1/2012

81 Dholka GIDC-Shetra Nadiad S/C+D/C 66 KV 18.2 17/08/1991

82 Shetra-Samadara Nadiad S/C+D/C 66 KV 14.4 17/08/1991

83 Dholka GIDC-Samadara Nadiad S/C+D/C 66 KV 30.40 17/08/1991

84 Samadara-COCO COLA Nadiad S/C 66 KV 2.75 20/10/2010

85 Salejada-Bidaj-(Navagam Tap) Nadiad S/C 66 KV 36.20 31/03/1992

86 Barejadi- Bidaj Nadiad S/C 66 KV 8.00 31/03/1992

87 Bidaj-Chiripal Nadiad S/C 66 KV 2.30 31/11/2011

88 Salejada-Juval Rupavati-2 Nadiad S/C 66 KV 2.30 31/11/2011

89 Salejada-Bavla Nadiad S/C 66 KV 13.96 02/12/1983

90 Salejada-Dholka Nadiad S/C 66 KV 1.77 07/08/1980

91 Salejada-Juval Rupavati Nadiad S/C 66 KV 6.50 07/08/1980

92 Salejada-Ingoli Road Nadiad S/C 66 KV 22.34 31/03/2003

93 Ingoli Road-Simej Nadiad S/C+D/C 66 KV 12.50 31/03/2003

94 Salejada-Kerala Nadiad D/C 66 KV 17.22 06/05/2008

95 Kerala-Bhat Nadiad D/C 66 KV 10.22 06/05/2008

96 Kerala-Bhat - 2 Nadiad D/C 66 KV 17.22 06/05/2008

97 Bhat-Sanathal - 1 Nadiad S/C+D/C 66 KV 11.05 06/05/2008

98 Bhat-Vishalpur Nadiad S/C+D/C 66 KV 8.40 06/05/2008

99 Vishalpur-Sanathal Nadiad D/C 66 KV 6.11 08.02.2013

100 Bhat-AIA NadiadM/C-D/C-

cable66 KV 2.70 11.06.2013

101 Bhat-Intas Nadiad M/C 66 KV 4.13 26/01/2013

102 Bhat-Rajoda Nadiad M/C 66 KV 10.19 28/01/2013

103 Bhat-Moraiya-1 Nadiad S/C 66 KV 2.63 6.02.1993

104 Bhat-Moraiya-2 Nadiad M/C 66 KV 2.63 28/01/2013

105 Bhat-Moraiya-3[Spare] Nadiad M/C 66 KV 2.63 28/01/2013

106 Sanathal-Shella Nadiad S/C 66 KV 5.00 06/12/2012

107 Sanathal-Sanand Nadiad S/C 66 KV 18.50 07/12/2009

108 Sanand-Bavla Nadiad S/C 66 KV 22.80 17/05/1988

109 Vatva-Barejadi-1 Nadiad D/C 66 KV 12.40 05/08/1965

110 Vatva-Barejadi-2 Nadiad D/C 66 KV 12.40 05/08/1965

111 Vatva-Jetalpur Nadiad S/C 66 KV 18.16 03/05/1994

112 Vatva-Naranpura-Vadsar Nadiad D/C 66 KV 13.83 17/06/1964

113 Vatva-Naranpura-2 Nadiad D/C 66 KV 13.83 17/06/1964

114 Vatva-Lambha Nadiad UG 66 KV 5.60 08.05.2015

115 Vatva-Odhav Nadiad D/C 66 KV 13.90 25/06/1966

116 Odhav-Naroda Nadiad D/C 66 KV 10.60 24/06/2008

117 Vatva-Kathawada Nadiad D/C 66 KV 16.90 25/06/1966

118 Kathawada-Naroda Nadiad D/C 66 KV 5.20 10/11/2011

119 Zamp tap(Salejada-Lakhtar) Nadiad S/C 66 KV 0.68 03/11/2005

120 Zamp-SKF Nadiad S/C 66 KV 20.00 28/05/2009

121 Bahiyal-Kuha Nadiad S/C 66 KV 16.26 16/08/2005

122 Bhadaj-Science City Nadiad S/C+D/C 66 KV 2.64 08/02/2008

123 Bopal-Science City Nadiad S/C+D/C 66 KV 10.04 25/12/2009

124 Bhadaj-Science City Nadiad S/C 66 KV 3.50 08/02/2008

Page 47

Page 15: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

125 Bopal-Sanand Nadiad S/C 66 KV 12.40 27/05/1905

126 Chiloda-Chhala Nadiad S/C 66 KV 12.65 08/07/1986

127 Chhala-Halisa Nadiad S/C 66 KV 7.40 31/01/2004

128 Chiloda-Sadra Nadiad S/C 66 KV 12.50 27/11/1980

129 Dehgam-Vehlal Nadiad S/C 66 KV 9.40 01/02/1966

130 Khanpur-Bahial Nadiad S/C 66 KV 20.29 28/03/1994

131 Khanpur-Dehgam-1 Nadiad D/C 66 KV 9.50 22/09/1994

132 Khanpur-Dehgam-2 Nadiad D/C 66 KV 9.80 21/09/1994

133 Khanpur-Halisa-1 Nadiad D/C 66 KV 9.05 23/03/1994

134 Khanpur-Halisa-2 Nadiad D/C 66 KV 9.45 29/04/2005

135 Khanpur- Mota-Jalundra - 1 Nadiad D/C 66 KV 20.62 23/06/2007

136 Khanpur- Mota-Jalundra - 2 Nadiad D/C 66 KV 20.62 23/06/2007

137 Khanpur-Kadjodara Nadiad S/C 66 KV 11.40 30/03/2002

138 Khanpur-Talod-1 Nadiad D/C 66 KV 30.00 21/09/1994

139 Khanpur-Talod-2 Nadiad D/C 66 KV 28.50 22/09/1994

140 Ranasan-Bhat Nadiad S/C 66 KV 4.00 05/02/2003

141 Bhat-Chandkheda Nadiad UG 66 KV 7.00 19.4.14

142 Bhat-Modher Dairy Nadiad Cable 66 KV 3.50 01.03.2013

143Ranasan-Chiloda-Naroda-1-Dabhoda

LILONadiad D/C 66 KV 23.52 24/11/1980

144 Chiloda-Solankipura Nadiad S/C+D/C 66 KV 16.20 0/05/2011

145 Solankipura-Dabhoda Nadiad S/C+D/C 66 KV 7.20 28/07/2009

146 Ranasan-Bhat-Kudasan Nadiad D/C+Cable 66 KV 12.95 24/11/1980

147 Kudasan-Chiloda Nadiad D/C+Cable 66 KV 15.35 24/11/1980

148 LILO at Shahpur Nadiad D/C 66 KV 7.00 27.7.14

149 Ranasan-Reliance-1 Nadiad D/C 66 KV 1.90 27/11/1980

150 Ranasan-Muthiya Nadiad D/C 66 KV 0.50 1.10.1986

151 Muthiya-Reliance Nadiad D/C 66 KV 3.48 1.10.1986

152 Sabarmati-Bhadaj Nadiad S/C 66 KV 19.74 29/12/1969

153 Sabarmati-Godrej City Nadiad S/C+Cable 66 KV 11.60 11/04/1974

154 Godrej City - Tragad-1 Nadiad S/C+Cable 66 KV 5.68 11.4.1974

155 Godrej City - Tragad-2 Nadiad UG 66 KV 3.50 19.11.2014

156 Chandkheda- Tragad Nadiad UG 66 KV 10.30 1.11.2014

157 Tragad - IFFCO Nadiad UG 66 KV 9.25 11.4.1974

158 Karamsad -V.U.Nagar Nadiad S/C 66 KV 4.50 27/03/1997

159 Karamsad-V.V.nagar Nadiad S/C 66 KV 5.30 16/12/1974

160 Karamsad-Anand Nadiad S/C 66 KV 7.00 30/05/1970

161 Karamsad-Jol Nadiad S/C 66 KV 5.70 30/05/1970

162 Karamsad-Singlav(Old Borsad) Nadiad S/C 66 KV 12.80 20/12/1972

163 Karamsad-Petlad-1 Nadiad S/C 66 KV 10.50 06/06/1971

164 Karamsad-Petlad-2 Nadiad S/C 66 KV 10.50 06/06/1971

165 Karamsad-Virsad Nadiad S/C 66 KV 21.00 29/03/1991

166 Karamsad-Karamsad Nadiad S/C 66 KV 0.18 14/6/2011

167 Singlav-Borsad Nadiad S/C 66 KV 6.80 20/12/1972

168 Borsad-Haldari Nadiad S/C 66 KV 16.81 23/01/1976

169 Haldari-Anklav Nadiad S/C 66 KV 8.20 23/01/1976

170 Jol-Anand Nadiad S/C 66 KV 8.32 30/05/1970

171 Petlad-Nar Nadiad S/C 66 KV 17.93 04/04/1974

172 Cambay-Nar Nadiad S/C 66 KV 19.00 22/03/1990

173 Tap-Neja Nadiad S/C 66 KV 8.00 27/05/2005

174 Virsad-Ras Nadiad S/C 66 KV 6.00 20/03/1991

175 Undel-Vatadara Nadiad S/C 66 KV 15.70 16/06/1996

176 Vatadara-Ras Nadiad S/C 66 KV 10.40 16/06/1996

177 Undel-Cambey-1 Nadiad S/C 66 KV 4.25 22/11/1996

178 Undel-Cambey-2 Nadiad S/C 66 KV 4.93 22/11/1996

179 Ode-Sarsa Nadiad S/C+D/C 66 KV 12.50 20/12/1983

180 Sarsa-Vasad Nadiad S/C+D/C 66 KV 9.50 20/12/1983

181 Mogar-Anand Nadiad S/C 66 KV 9.30 28/01/1972

182 Neja-Khanpur Nadiad S/C 66 KV 17.19 28/09/2009

183 Khanpur-Limbasi Nadiad S/C 66 KV 21.00 22.5.2015

184 Anklav-Navakhal Nadiad S/C 66 KV 4.60 28/9/2009

185 Undel-Vadgam-1 Nadiad S/C 66 KV 27.95 03/04/2012

186 Undel-Vadgam-2 Nadiad S/C 66 KV 27.95 03/04/2012

187 66KV Agiyol-Hansalpur HMT S/C 66 14 02/12/1993

188 66KV Agiyol-HMT-1 HMT S/C 66 11 28/12/1990

189 66KV Agiyol-HMT-2 HMT S/C 66 0.3 22/12/1990

190 66KV Agiyol-Sonasan HMT S/C 66 16.25 31/12/1992 14/042015

191 66 KV Sonasan Prantij Tap Amodara HMT S/C 66 17.03 31/12/1992 14/042015

Page 48

Page 16: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

192 66KV Agiyol-Nikoda HMT S/C 66 7.9 13/02/2002

193 66KV Agiyol-Kaniyol HMT S/C 66 13.2 09/05/1995

194 66KV Agiyol-Hajipur HMT S/C 66 12 13/02/2002

195 66KV Agiyol-Dalpur HMT S/C 66 15 17/05/2008

196 66KV Hmt 2-Gambhoi HMT S/C 66 8 26/02/2000

197 66KV HMT-2-Rupal HMT S/C 66 13.16 17/01/2012

198 66KV Nikoda-Fatepura HMT S/C 66 6.06 23/07/2007

199 66KV Nikoda-Gadhi HMT S/C 66 12.355 30/01/2010

200 66KV Gambhoi-Ranasan-Medhasan tap HMT S/C 66 25.34 10/06/1981

201 66KV Gadhoda-Prantij HMT S/C 66 16.5 19/10/1969

202 66KV Kaniyol-Chandarani HMT S/C 66 12.149 28/06/2009

203 66KV Chandarani-Kalidungri HMT S/C 66 16.267 23/01/2009

204 66KV Hansalpur-Munpur HMT S/C 66 9.64 29/01/2010

205 66KV Himatnagar1-Gadhoda HMT S/C 66 4.8 20/07/2012

206 66KV Dalpur-Hajipur HMT S/C 66 4.3 20.4.2014

207 66KV Dalpur-Asian HMT S/C 66 1.96 29.5.2014

208 66 KV Rupal Punsari HMT S/C 66 17.92 23/10/2013

209 66KV Dhansura-Modasa-1 HMT S/C 66 19 13/10/1990

210 66KV Dhansura-Modasa-2 HMT S/C 66 18.92 17/03/1985

211 66KV Dhansura- Vasnirel HMT S/C 66 9.27 30/06/1976 05/062015

212 66KV Vasnirel-Bayad-Demai Tap HMT S/C 66 22.72 30/06/1976 05/062015

213 66KV Dhansura-Taalod-Bayad Tap HMT S/C 66 24.83 09/03/1993 30/04/2015

214 66KV Taalod-Sathamba HMT S/C 66 7.71 09/03/1993 30/04/2015

215 66KV Dhansura-Akrund HMT S/C 66 11.46 02/05/2011

216 66KV Akrund-Ambaliyara HMT S/C 66 11.74 02/05/2011

217 66KV Dhansura-Bayal(D) HMT S/C 66 14 27/03/2001

218 66KV Dhansura-Vadagam HMT S/C 66 5 07/02/1979 25/09/2014

219 66 KV Vadagam- Harsol HMT S/C 66 17 07/02/1979 25/09/2014

220 66KV Talod-Harsol HMT S/C 66 6.8 29/06/2011

221 66KV Dhansura-Rozad HMT S/C 66 14.52 28/11/1980

222 66KV Talod-Prantij-Tajpur Tap HMT S/C 66 13.16 25/02/1992

223 66KV Talod-Ransan HMT S/C 66 28.82 25/02/1975

224 66KV Talod-Rozad HMT S/C 66 14 26/03/1991

225 66KV Talod-D'muvadi HMT S/C 66 6.28 01/08/1972

226 66KV Talod-Khanpur HMT S/C 66 19.5 04/02/1989

227 66KV D'muvadi-Tajpur HMT S/C 66 6.95 01/05/1990

228 66KV Rozad-Madhavgadh HMT S/C 66 11.8 01/09/2008

229 66KV Modasa-Meghraj-Shinawad Tap HMT S/C 66 24.59 14/06/1984

230 66KV Meghraj-Rellavada HMT S/C 66 15.3 31/03/2002

231 66KV Rellawada -Kasana HMT S/C 66 11.72 18/03/2008

232 66KV Modasa-Nani Isrol HMT S/C 66 8 09/03/1993 25/07/2014

233 66KV Nani Isrol-Tintoi HMT S/C 66 10 09/03/1993 25/07/2014

234 66KV Tintoi-Kheradi HMT S/C 66 11.48 03/10/2006 20/06/2015

235 66KV Kheradi-Palla HMT S/C 66 7.7 03/10/2006 20/06/2015

236 66KV Modasa-Dugarwada HMT S/C 66 7 30/04/1989 25/07/2014

237 66KV Dugarwada-Malpur HMT S/C 66 19.5 30/04/1989 25/07/2014

238 66KV Modasa-Medhasan HMT S/C 66 11.75 03/10/2006

239 66KV Sathamba-Virpur HMT S/C 66 22 26/03/2002

240 66KV Sathamba-Gabat HMT S/C 66 8.5 30/08/1988

241 66KV Sathamba-Indran HMT S/C 66 8.84 20/03/1990 01/06/15

242 66KV Indaran-Jorapura HMT S/C 66 17 20/03/1990 01/06/15

243 66KV Ambaliyara-Nirmali HMT S/C 66 6.9 29/01/1976

244 66KV Malpur-Ramgadhi HMT S/C 66 13 02/02/2011

245 66KV Azure-Bayal D 1 HMT D/C 66 3.8 06/10/2011

246 66KV Azure-Bayal D 2 HMT D/C 66 3.8 06/10/2011

247 66KV Bayal(D)-Punsari HMT S/C 66 8.17 25/07/2011

248 66KV Virpur-Salaiya HMT S/C 66 7.32 08/09/2011 10/08/2015

249 66KV Salaiya- Debhari HMT S/C 66 9.43 08/09/2011 10/08/2015

250 66KV Dhansura-Khadol HMT S/C 66 11.34 25/07/2012 08/05/2015

251 66KV Khadol-Aniyor HMT S/C 66 12.95 25/07/2012 08/05/2015

252 66KV Gabat-Aatash-1 HMT D/C 66 8.3 22/12/2012

253 66KV Gabat-Aatash-2 HMT D/C 66 8.3 22/12/2012

254 66KV Rozad- Untarda HMT S/C 66 13.45 16/05/2014

255 66 KV Sathamba Jalampura HMT S/C 66 2.5 23/11/2014

256 66 KV Rellawada- Navagam HMT S/C 66 5.29 29/05/2015

257 66 KV Navagam- Lusadiya HMT S/C 66 7.87 29/05/2015

258 66KV Bhutiya-Badoli HMT S/C 66 4.4 28/08/2006

259 66KV Bhutiya-Idar HMT S/C 66 7.5 28/09/2006

Page 49

Page 17: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

260 66KV Bhutiya-Khedbrahma HMT S/C 66 19.5 28/09/2006

261 66KV Bhutiya-Choriwad HMT S/C 66 7.4 08/04/2006

262 66KV Bhutiya-Panol HMT S/C 66 5.281 19/04/2010

263 66KV Bhutiya-Palla HMT S/C 66 45 11/10/2010

264 66KV Bhutiya-Bhiloda HMT S/C 66 25 10/12/2010

265 66KV Bhutiya -Lairanasan HMT S/C 66 16.75 09.07.2014

266 66KV Badoli - Chitroda HMT S/C 66 9.22 3/17/1998 04.10.2013

267 66KV Bhutiya-Tandaliya HMT S/C 66 19.6 04/09/2013

268 66KVChitroda Kaniyol- HMT S/C 66 15.60 3/17/1998 04.10.2013

269 66KV Chorivad-Kundala HMT S/C 66 14 14/04/1989

270 66KV Idar-Panol HMT S/C 66 9.6 31/03/2005

271 66KV Idar-Vasai-Badoli Tap HMT S/C 66 16.8 13.02.78 25.08.13

272 66KV Vasai- Mau HMT S/C 66 16.8 13.02.78 25.08.13

273 66KV Mau -Bhiloda HMT S/C 66 7.6 13.02.78 16.09.2014

274 66KV Idar-Chorivad HMT S/C 66 18.5 10/06/1989

275 66KV Idar-Netramali -Surpur Tap HMT S/C 66 17.8 22.08.82 25.04.15

276 66KVSurpur - Lai Ranasan HMT S/C 66 3.4 22.08.82 25.04.15

277 66KV Netramli - Jadar HMT S/C 66 8.5 22.08.82 22.05.13

278 66KV LaiRanasan-Sundarpur HMT S/C 66 11 03/08/2001

279 66KV Hansalpur-Jadar HMT S/C 66 14.2 02/12/1993

280 66KV Panol-Vadali HMT S/C 66 7.2 30/04/2005

281 66KV Bhiloda-Torda HMT S/C 66 13 27/03/2010

282 66KV Torda-Ubsal HMT S/C 66 13.3 27/03/2010 20/062015

283 66KV Ubsal-Dantod HMT S/C 66 13.1 27/03/2010 20/062015

284 66KV Dantod-Vijaynagar HMT S/C 66 18.02 13/02/2005

285 66KV Khedbrama-Hingatiya HMT S/C 66 16.189 09/06/1989

286 66KV Hingatiya-Ma'Champa HMT S/C 66 11.651 17/12/2009

287 66KV Ma'Champa-Ambaji HMT S/C 66 18 05/01/1993

288 66KV Vadali-Khedbrama HMT S/C 66 12 19/08/1995

289 66KV Ma'Champa-Golwada HMT S/C 66 12 11/03/2011

290 66KV Golwada-Poshina HMT S/C 66 12.3 20/04/2011

291 66KV Vadali-Babsar HMT S/C 66 18 23/02/2012

292 66KV Jamla-Mansa-1 HMT S/C 66 9 13/09/1999

293 66KV Jamla-Mansa-2 HMT S/C 66 10.5 06/12/1997

294 66KV Jamla-Gozaria-1 HMT S/C 66 7 14/07/1995 21/01/2014

295 66KV Jamla-Boru HMT S/C 66 7.5 14/07/1995 21/01/2014

296 66KV Boru-Gozaria HMT S/C 66 14 18/12/1995

297 66KV Jamla-GIDC HMT S/C 66 13.5 21/01/2002 29/09/2014

298 66KV Jamla-Langhnaj HMT S/C 66 14 09/05/1998

299 66KV Jamla-Nardipur-Randheja HMT S/C 66 22 06/12/1997

300 66KV Jamla-Randheja HMT S/C 66 16 20/12/2004

301 66KV Jamla-Itla HMT S/C 66 5.25 03/09/2008

302 66KV Jamla-Soja HMT S/C 66 6 30/09/1998

303 66KV Jamla -Veda HMT S/C 66 4.25 17/12/2004

304 66KV Langhnaj-Mandali HMT S/C 66 12 15/10/1993

305 66KV Lodra-Lodra Pumping HMT S/C 66 3.5 28/04/2004

306 66KV Manekpur-Sadra HMT S/C 66 11 28/04/2004

307 66KV Manekpur-Unava HMT S/C 66 6.35 08/04/2009

308 66KV Mansa,Lodra-Manekpur HMT S/C 66 26 18/08/1989

309 66KV Nardipur-Soja HMT S/C 66 7 12/04/1987

310 66KV Randheja-Torent AEC HMT S/C 66 10 02/01/1996

311 66KV Randheja-Moti Adaraj HMT S/C 66 9 06/06/2005

312 66KV Langhnaj-Aakhaj HMT S/C 66 6.6 22/01/2010

313 66KV Vijapur-Ranasan HMT S/C 66 5.6 19/04/2003

314 66KV Vijapur-Sundarpur HMT S/C 66 18.2 14/02/1980

315 66KV Vijapur-Lodra HMT S/C 66 10.05 10/10/1991

316 66KV Vijapur-Vihar HMT S/C 66 17 23/03/1993

317 66KV Pilvai -Mansa HMT S/C 65 16.1 15.07.1979 21.3.2014

318 66KV Vijapur-Pilvai HMT S/C 66 4.15 15.07.1979 21.3.2014

319 66KV Ranasan-Hirpura HMT S/C 66 11.67 19/07/2007

320 66KV Ranasan-Dedhrota HMT S/C 66 25 20/10/1969

321 66kv Tatosan-Malosan HMT S/C 66 10.50 27/06/2014

322 66 KV Vijapur-Malosan HMT S/C 66 14.10 27/06/2014

323 66KV Tatosan-Vadasan HMT S/C 66 6.5 02/07/2011

324 66KV Visnagar-Kamana HMT S/C 66 8.5 29.12.75 12.10.12

325 66KV Visnagar-Vadnagar HMT S/C 66 14 15/02/1984

326 66KV Visanagar-Bhalak HMT S/C 66 9 15/03/2005

327 66KV Visnagar-Tatosan HMT S/C 66 14 29/12/1975

Page 50

Page 18: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

328 66KV Vasai-Kada HMT S/C 66 12.5 22/08/1999

329 66KV Valam-Motidau(PS) HMT S/C 66 8.198 02/05/2007

330 66KV Gozaria-Charada HMT S/C 66 7.2 16/12/2004

331 66KV Gozaria-Vasai HMT S/C 66 8.2 06/09/1980

332 66KV Vihar-Vasai HMT S/C 66 8.2 17/08/1993

333 66 KV GIDC Vasai HMT S/C 66 8.1 29/09/2014

334 66KV Sundarpur-Jantral HMT S/C 66 8.3 26/06/1992

335 66KV Sundarpur-Ladol HMT S/C 66 7.1 04/08/2003

336 66 kv Kheralu-Kheralu Mehsana S/C 66 2.33 06.02.1994

337 66 kv Kheralu-Satlasana Mehsana S/C 66 29.16 29.01.1997

338 66 Kv Satlasana-Gorad Mehsana S/C 66 22.00 4.10.2007

339 66 Kv Gorad-Ambaji Mehsana S/C 66 10.00 14.12.2011

340 66 Kv Kheralu- Varetha Mehsana S/C 66 15.50 02.03.2004

341 66 Kv Varetha-Nava Sudasana Mehsana S/C 66 8.54 21.12.2009

342 66 Kv Varetha-Otalpur Mehsana S/C 66 10.20 14.11.2011

343 66 kv Kheralu-Sakri Mehsana S/C +D/C 66 14.00 22.03.2004 25.03.2014

344 66Kv Sakri Kodram Mehsana S/C +D/C 66 8.00 22.03.2004 25.03.2014

345 66kv Kheralu-Kodram Mehsana S/C 66 15.00 24.12.2004

346 66 kv Kodram-Piluchha Mehsana S/C +D/C 66 9.0013.03.1993

25.11.14

347 66kv Pilucha Vadgam Gidasan Mehsana S/C +D/C 66 16.0013.03.1993

25.11.14

348 66 kv Kheralu-Kahoda-Sidhapur Mehsana S/C 66 27.60 09.09.2002

349 66 kv Kheralu-Umta Mehsana S/C 66 16.00 16.05.1996

350 66 kv Umta-Karli Mehsana S/C 66 12.00 16.05.1996

351 66 kv Kheralu - Khanpur Mehsana S/C 66 13.00 09.09.2002

352 66kv Khanpur-Undhai Mehsana S/C+D/C 66 4.0013.02.2002

25.08.2014

353 66kv Undhai Rampur Mehsana S/C+D/C 66 10.0013.02.2002

25.08.2014

354 66kv Kheralu-Mandali Mehsana S/C 66 14.00 08.07.2004

355 66 Kv Mandali-Dasaj Mehsana S/C 66 11.80 5.08.2005

356 66 Kv Kheralu-Rasulpur Mehsana S/C 66 4.50 14.06.2007

357 66 kv Kheralu-Vadnagar Mehsana S/C 66 12.00 7.02.1997

358 66 kv Vadnagar-Jantral Mehsana S/C 66 14.00 28.02.1997

359 66 kv Unjha-Bhandu Mehsana S/C 66 15.00 08.09.1977

360 66Kv Manud - Unava Mehsana S/C 66 16.00 24.02.2006

361 66 kv Sidhapur-Unjha-Karli Mehsana S/C 66 26.00 1.05.1972

362 66KV Karli Tap Line (Sidhpur- Unjha) Mehsana S/C 66 14.00 29.11.1985

363 66 kv Sidhapur-Chhapi Mehsana S/C 66 12.00 27.01.1979

364 66 kv Chhapi-Vadgam Mehsana S/C 66 11.50 05.06.1980

365 66 kv Sidhapur-Kakoshi Mehsana S/C 66 19.00 18.01.1970

366 66Kv Kakoshi - Basu Mehsana S/C 66 11.00 18.01.1970

367 66 kv Sidhapur-Khali Mehsana S/C 66 3.50 14.03.1990

368 66Kv Khali - Kamliwada Mehsana S/C 66 13.00 14.08.2003

369 66 kv Sidhapur-Kahoda Mehsana S/C 66 13.00 16.03.1990

370 66 kv Sidhapur-Sujanpur Mehsana S/C 66 6.85 14.02.1980 09.06.2014

371 66 kv Sujanpur-Mudana Mehsana S/C 66 5.50 14.02.1980 09.06.2014

372 66 kv Mudana-Kanodar Mehsana S/C 66 14.50 14.02.86

373 66Kv Jangral - Kalyana Mehsana S/C 66 12.34 11.08.2007

374 66KV Khanpur - Techava Line Mehsana S/C 66 12.45 20.07.2012

375 66KV Satlasana- Nava sudasana Mehsana S/C 66 11.00 29.05.2013

376 66kv Satlasna Dharoi line. Mehsana S/C 66 5.44 14.07.2014

377 66kv Undhai Jantral Mehsana S/C 66 13.35 25.08.2014

378 66Kv Khali-Tundav Mehsana S/C +D/C 66 11.65 1/12/1981 09.06.2015

379 Patan-Tundav-Balisna Mehsana S/C +D/C 66 32.65 1/12/1981 09.06.2015

380 PATAN-Kamliwada Mehsana S/C 66 KV 10.00 31/12/79

381 KAMLIVADA-KHALI Mehsana S/C 66 KV 13.00 31.12.79

382 PATAN-KHALI-BALISANA Mehsana S/C 66 KV 30.00 12/01/1981

383 BALISANA-MANUND Mehsana S/C 66 KV 12.00 20/3/92

384 SANKHARI-CHANASMA 1 Mehsana S/C 66 KV 18.00 17/8/95

385 SANKHARI-CHANASMA 2 Mehsana S/C 66 KV 13.00 17/8/95

386 CHANASMA-KAMBOI Mehsana S/C 66 KV 12.00 11/10/1992

387 CHANASMA-MODHERA Mehsana S/C 66 KV 16.00 11/11/1983

388 PATANA-ADIYA Mehsana S/C 66 KV 16.00 12/01/1981

389 ADIA-HARIJ Mehsana S/C 66 KV 15.00 22/7/99

390 ADIA-KATRA Mehsana S/C 66 KV 21.00 30/4/11

Page 51

Page 19: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

391 Katra-Harij Mehsana S/C 66 KV 15.00 10.5.11

392 HARIJ-Sami Mehsana S/C 66 KV 15.00 17/5/94

393 PATAN-Kansa Mehsana S/C 66 KV 21.00 12/08/1990

394 KANSA-Anganwada Mehsana S/C 66 KV 20.00 26/10/97

395 SANKHARI-Saduthla Mehsana S/C 66 KV 30.00 21/7/97

396 ANAWADA-Dunawada Mehsana S/C 66 KV 15.00 31/1/98

397 SANKHAR-Patan&Anawada Mehsana S/C 66 KV 20.00 08/09/1998

398 SANKHARI-Patan2 Mehsana S/C 66 KV 11.00 08/09/1998

399 SAMI-Sankheswer Mehsana S/C 66 KV 25.00 17/5/94

400 SAMI-Mujpur Mehsana S/C 66 KV 14.00 27/9/03

401 Sankhari - Norta Mehsana S/C 66 KV 11.00 14.07.99 16.06.14

402 Norta-Manud Mehsana S/C 66 KV 15.00 14.07.99 16.06.14

403 SANKHARI-Adia Mehsana S/C 66 KV 19.00 21/11/01

404 SANKHARI-Rajpur Mehsana S/C 66 KV 6.00 17/6/05

405 SANKHARI-Khorsam Mehsana S/C 66 KV 25.00 09/06/2005

406 CHANASMA-Keshani Mehsana S/C 66 KV 10.00 23/8/82

407 KESHANI-Dhinoj Mehsana S/C 66 KV 15.00 18/3/05

408 MANUND-Unava Mehsana S/C 66 KV 11.40 23/2/06

409 JANGRAL-Kimbuva Mehsana S/C 66 KV 13.00 16.1.00

410 RADHANPUR-Bhadrada Mehsana S/C 66 KV 19.00 2.11.01

411 Lanco-Bhadrada-1 Mehsana S/C 66 KV 0.22 27.12.10

412 Lanco-Bhadrada-2 Mehsana S/C 66 KV 0.22 27.12.10

413 Jayhind-Bhadrada-1 Mehsana S/C 66 KV 2.68 22.2.12

414 Jayhind-Bhadrada-2 Mehsana S/C 66 KV 2.68 22.2.12

415 Sinad- Bhadrada Mehsana S/C 66 KV 29.00 07.05.08 25.07.14

416 Bhadrada- Sami Mehsana S/C 66 KV 19.00 07.05.08 25.07.14

417 Chadiyana-Lanco-Bhadrada-1 Mehsana D/C 66 KV 3.80 24.10.11

418 Chadiyana-Lanco-Bhadrada-2 Mehsana D/C 66 KV 3.80 24.10.11

419 Astronfield-Bhadrada-1 Mehsana D/C 66 KV 12.50 19.6.12

420 Astronfield-Bhadrada-2 Mehsana D/C 66 KV 12.50 19.6.12

421 Misarbear-Anganwada 1 Mehsana D/C 66 KV 5.80 4.10.11

422 Misarbear-Anganwada 2 Mehsana D/C 66 KV 5.80 4.10.11

423 Precious-Dunawada 1 Mehsana D/C 66 KV 5.80 8.10.11

424 Precious-Dunawada 2 Mehsana D/C 66 KV 5.80 8.10.11

425 Anganwada- Devpura Mehsana D/C 66 KV 7.88 19.06.2013

426 Dunawada- Katra Mehsana D/C 66 KV 12.40 13.02.2013

427 Sami-Nani Chandur Mehsana S/C 66KV 18.00 14.05.2015

428 66kv Vadavi-Borisana Mehsana S/C 66 KV 5.40 09.07.07

429 66kv Vadavi-Meda-Aadraj Mehsana S/C 66 KV 2.10 18..01.07

430 66kv Vadavi-Moti-Bhoyan Mehsana S/C 66 KV 9.32 08.03.07

431 66kv Vadavi-Kalol Mehsana S/C 66 KV 7.00 07.09.07

432 66kv Vadavi-Kadi Mehsana S/C 66 KV 15.00 06.08.09

433 66kv Vadavi-Rangpurada Mehsana S/C 66 KV 9.00 06.08.09

434 66kv Vadavi-Khatraj Mehsana S/C 66 KV 12.70 02.04.10

435 66KV Vadavi- J.K.Laxmi Cement line Mehsana S/C 66 KV 7.23 25.10.2008

436 66kv Vadavi Shantigram 1 Mehsana S/C 66 KV 16.6 15.07.2015

437 66kv Vadavi Shantigram 2 Mehsana S/C 66 KV 14.8 15.07.2015

438 66 Kv Adalaj- Sabarmati Tap line Mehsana S/C 66 KV 18.0006.06.65

14.03.10

439 66 Kv Borisana-CTF Mehsana S/C 66 KV 6.30 10.03.92

440 66 Kv Borisana--Adalaj Mehsana S/C 66 KV 13.0006.06.65

14.03.10

441 66 Kv Borisana-Vadsar Mehsana S/C 66 KV 16.60 06.06.65

442 66 Kv Chhatral-Borisana- 1 & 2 Mehsana D/C 66 KV 7.0010.03.89

30.10.02

443 66 Kv Chhatral-GIDC- 1&2 Mehsana D/C 66 KV 5.0024.05.89

11.05.89

444 66 Kv Chhatral-IFFCO Mehsana S/C 66 KV 13.00 22.10.78

445 66 Kv Chhatral-Dhanot Mehsana S/C 66 KV 3.00 01.01.73

446 66 Kv Chhatral-Kalol Mehsana S/C 66 KV 10.40 20.05.79

447 66 Kv Chhatral-Karannagar Mehsana S/C 66 KV 6.00 23.01.92

448 66 Kv Chhatral-Meda Adraj Mehsana S/C 66 KV 14.50 05.05.94

449 66 Kv Chhatral-Nandasan Mehsana S/C 66 KV 13.00 11/06/1905

450 66 Kv Chhatral-Nardipur- 1&2 Mehsana D/C 66 KV 14.0024.11.79

09.01.81

451 66 Kv Chhatral-Rangpurda Mehsana S/C 66 KV 21.00 24.06.82

452 66 Kv Chhatral-Santej- 1&2 Mehsana D/C 66 KV 19.5019.01.95

20.05.98

453 66 Kv GIDC-Rajpur Mehsana S/C 66 KV 7.00 17.09.09

454 66 Kv GIDC-Torrent Mehsana S/C 66 KV 3.50 24.07.07

Page 52

Page 20: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

455 66 Kv Kadi-Laxmimura Mehsana S/C 66 KV 4.50 01.07.08

456 66 Kv Laxmimura-Suraj Mehsana S/C 66 KV 9.00 01.07.08

457 66 Kv Meda Adraj- Piyaj Mehsana S/C 66 KV 7.00 19.03.03

458 66 Kv Meda Adraj-Medha Mehsana S/C 66 KV 13.00 27.02.95

459 66 Kv Moti-Bhoyan-Vadsar Mehsana S/C 66 KV 5.00 19.09.09

460 66 Kv Nandasann-Nirma Mehsana S/C 66 KV 8.00 01.01.89

461 66 Kv Rajpur-Nandasan Mehsana S/C 66 KV 4.50 15/06/1905

462 66 kv Moti Bhoyan-Naranpura (Adalaj ) Mehsana S/C 66 KV 16.00 06.09.10

463 66 Kv Santej-Arvind Inter Mehsana S/C 66 KV 5.00 15.05.96

464 66 Kv Santej-Arvind Mill Mehsana S/C 66 KV 8.00 22.01.98

465 66 Kv Santej-Shah Alloys Mehsana S/C 66 KV 3.00 23.11.95

466 66 Kv Suraj-Katosan Mehsana S/C 66 KV 12.0001.07.80

31.08.99

467 66 Kv Khatraj-Arvind line Mehsana S/C 66 KV 0.73 01.06.12

468 66 Kv Kalol-Sintex Mehsana S/C 66 KV 1.20 23.11.11

469 66 Kv Dhnot-Karannagr-Kadi Mehsana S/C 66 KV 7.40 22.07.10

470 66KV Rangpurda- sadra Mehsana S/C 66 KV 13.25 14.04.2010

471 66KV Khatraj- Santej Mehsana S/C 66 KV 7.03 09.02.2013

472 66KV Sadra-Katosan Mehsana S/C 66 KV 10.93 07.09.2013

473 66 Kv Suraj-Mudarda Mehsana S/C 66 KV 5.00 08.03.11

474 Mehsana-Basna Mehsana S/C 66 KV 7.50 29.12.75

475 Mehsana-Palavasna-Kherva Mehsana S/C 66 KV 22.00 29.11.74

476 Mehsana-Linch Mehsana S/C 66 KV 16.50 18.1.60

477 Mehsana-Nagalpur Mehsana S/C 66 KV 14.40 21.8.01

478 Mehsana-Bhandu Mehsana S/C 66 KV 12.00 2.3.76

479 Mehsana-Motap Mehsana S/C 66 KV 15.00 16.12.92

480 Mitha-Motap-Santhal Mehsana S/C 66 KV 21.00 20.8.01

481 Mitha-Balol Mehsana S/C 66 KV 7.56 9.5.01

482 Mitha-Asjol Mehsana S/C 66 KV 16.00 18.8.01

483 Mitha-Palavasna-Nagalpur Mehsana S/C 66 KV 10.40 9.5.01

484 Mitha-Jotana-Suraj Mehsana S/C 66 KV 14.40 2.2.02

485 Mitha-Linch-1 Mehsana S/C 66 KV 12.40 2.12.04

486 Mitha-Linch-Jotana Mehsana S/C 66 KV 19.40 3.3.04

487 Mitha - ADUndra Mehsana S/C 66 KV 24.28 30.6.07

488 Mitha- Modhera Mehsana S/C 66 KV 16.60 25.8.07

489 Linch-Mandali Mehsana S/C 66 KV 16.40 18.10.77

490 Asjol - Becharaji Mehsana S/C 66 KV 14.00 18.8.01

491 Linch Heavymetal Mehsana S/C 66 KV 11.00 16.8.11

492 Nandasan- Mandali (Langhnaj Tap) Mehsana S/C 66 KV 5.20 15.10.93

493 Basana-Kamana Mehsana S/C 66 KV 8.80 26.10.12

494 Modhera- Chanasma Mehsana S/C 66 KV 17.55 11.11.83

495 Modhera-Pratapnagar Mehsana S/C 66 KV 15.05 22.12.96

496 Kherva-Udalpur Mehsana S/C 66 KV 4.81 17.12.03

497 Bhandu-Valam Mehsana S/C 66 KV 11.70 7.6.04

498 Dhinoj-Motap Mehsana S/C 66 KV 7.00 15.06.05

499 Modhera-Modhera ps-1 Mehsana S/C 66 KV 2.63 2.5.07

500 Modhera-Modhera ps-2 Mehsana S/C 66 KV 3.10 27.5.07

501 66kv Modhera-Maniyari Mehsana S/C 66 KV 9.50 22/01/2009

502 Maniyari-Becharaji Mehsana S/C 66 KV 13.50 13.4.11

503 66KV Basna- Udalpur Mehsana S/C 66 KV 12.32 13.12.2012

504 66KV Mudarada- Mc'Can Food Mehsana S/C 66 KV 8.00 30.07.13

505 66kv Undahi Rampur Mehsana S/C 66KV 10.00 25.08.2014

506 66kv Undhai Jantral Mehsana S/C 66KV 13.35 25.08.2014

507 66kv Satlasna Dharoi line. Mehsana S/C 66KV 5.44 14.07.2014

508 VAKHA-DEODAR Palanpur S/C 66 KV 6 27/12/89

509 VAKHA-RAIYA Palanpur S/C 66 KV 13 19/12/89

510 VAKHA-KHODA Palanpur S/C 66 KV 15 20/05/89

511 VAKHA-Khimana Palanpur S/C 66 KV 34 26/02/12

512 VAKHA-PADARDI Palanpur S/C 66 KV 14 13/12/90

513 VAKHA-THARA-1 Palanpur S/C 66 KV 14 30/05/92

514 VAKHA-THARA-2 Palanpur S/C 66 KV 17 14/09/95

515 VAKHA-TERVADA-1 Palanpur S/C 66 KV 12 19/09/95

516 VAKHA-TERVADA-2 Palanpur S/C 66 KV 12 29/06/2000

517 SHIHORI-UMBARI Palanpur S/C 66 KV 6.6 05.11.99 05.08.14

518 UMBARI-KAMBOI Palanpur S/C 66 KV 7.4 05.11.99 05.08.14

519 SHIHORI-DUNGRASAN Palanpur S/C 66 KV 8 03/10/1987

520 SHIHORI-PADARDI Palanpur S/C 66 KV 9 12/08/1991

Page 53

Page 21: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

521 RAIYA-ARNIVADA Palanpur S/C 66 KV 23 25/6/2005

522 THARA-DUNGRASAN Palanpur S/C 66 KV 7.5 03/10/1987

523 SHRINAD(R'pur)-Radhanpur 1(Bhadrada) Palanpur S/C 66 KV 30 09/01/2005

524 SHRINAD(R'pur)-Radhanpur-2 Palanpur S/C 66 KV 5 24/8/2005

525 SHRINAD(R'pur)-UN Palanpur S/C 66 KV 18 09/01/2005

526 Shrinath(R'pur)-Bandhavad Palanpur S/C 66 KV 13 17.01.09 02.07.14

527 Bandhavad-Jakhel Palanpur S/C 66 KV 23 17.01.09 02.07.14

528 Tervada-Jakhel Palanpur S/C 66 KV 15 1.8.09

529 Radhanpur-Varahi Palanpur S/C 66 KV 15 01/01/1991

530 Radhanpur-Dahisar Palanpur S/C 66 KV 20 08/05/1996

531 Shrinath(R'pur)-Bhadrada Palanpur S/C 66 KV 20 02.02.08 24.07.14

532 Bhadrada-Sami Palanpur S/C 66 KV 22 02.02.08 24.07.14

533 SHRINAD(R'pur)-IOC Palanpur S/C 66 KV 7 23.7.08

534 Varahi-Santalpur Palanpur S/C 66 KV 32.5 11/05/1996

535 Santalpur-HPCL Palanpur S/C 66 KV 1.5 24/4/2007

536 Kamboi-Sapra Palanpur S/C 66 KV 4.6 05.11.99 31.07.14

537 Sapra-Anganvada Palanpur S/C 66 KV 8.6 05.11.99 31.07.14

538 KHODA-KHIMANA Palanpur S/C 66 KV 4.5 27.12.07

539 ARNIVADA-BHILDI Palanpur S/C 66 KV 12 29.6.01

540 KAMBOI-JANGRAL Palanpur S/C 66 KV 17.5 15.07.09

541 VAKHA-MEETHA Palanpur S/C 66 KV 19 19.05.93

542 MITHA-MERA(Vadia Tap) Palanpur S/C 66 KV 9 19.05.93

543 MITHA-Bhabhar Palanpur S/C 66 KV 8 19.05.93

544VAKHA(220kv)-66kv Vakha--

ChamanpuraPalanpur S/C 66 KV 27 30.05.1992

545 KHIMANA-Ramvas Palanpur S/C 66 KV 7.79 12.11.11

546 Chamanpura-Kotda(F) Palanpur S/C 66 KV 1.376 18.08.11

547 Thara-Khariya Palanpur D/C 66 KV 7.5 09.12.11

548 Khariya-Un Palanpur D/C 66 KV 14.5 09.12.11

549 KHIMANA-Shihori Palanpur S/C 66 KV 13 26.02.12

550 SANTALPUR-Charanka No.1 Palanpur D/C 66 KV 22 06.02.12

551 SANTALPUR-Charanka No.2 Palanpur D/C 66 KV 22 06.02.12

552 Dahisar-PLG PV-1 Palanpur D/C 66 KV 0.77 20.01.12

553 Dahisar-PLG PV-2 Palanpur D/C 66 KV 0.77 20.01.12

554 Jakhel-Changa (P) Palanpur S/C 66 KV 4.0 18.09.12

555 Ramvas-Rampura (P) Palanpur S/C 66 KV 5.0 26.10.12

556 Shrinath-Charanka(220) No.1 Palanpur D/C 66 KV 49.0 20.02.13

557 Shrinath-Charanka(220) No.2 Palanpur D/C 66 KV 49.0 20.02.13

55866kv (220kv)Charanka-66kv Charanka-

Link linePalanpur U/G Cable 66 1.35 31.12.2011

559 SUN EDITION-GPPC-LANCO Palanpur U/G Cable 66 3.715 03.01.2012

560 ALEX-AES Palanpur U/G Cable 66 2.325 24.01.2012

561 PALACE-ROHA-AVTAR Palanpur U/G Cable 66 5.350 02.01.2012

562 EMAMI-SUNCLEAN-SOLAR FIELD Palanpur U/G Cable 66 3.715 03.01.2012

563 NKG-ZF-GMR Palanpur U/G Cable 66 2.210 02.01.2012

564 YANTRA-SURANA Palanpur U/G Cable 66 2.325 02.01.2012

565 KINDLE ENGG. Palanpur U/G Cable 66 0.940 26.03.2014

566 GSEC Palanpur U/G Cable 66 0.958 15.01.2015

567 TORRENT Palanpur U/G Cable 66 1.954 04.02.2015

568 66kv Tharad-Tharad line Palanpur S/C 66 KV 1.20 04.09.1998

569 66kv Tharad-Dudhva line Palanpur S/C 66 KV 13.88 29.12.2010

570 66kv Dudhva-Didarada line Palanpur S/C 66 KV 13.80 18.08.1994

571 66kv Didarada-Piluda line Palanpur S/C 66 KV 10.20 06.01.2006

572 66kv Tharad-Bhordu line Palanpur S/C 66 KV 24.00 26.12.1992 28.07.2014

573 66kv Bhordu Rah line Palanpur S/C 66 KV 24.00 26.12.1992

574 66kv Tharad-Tithgam line Palanpur S/C 66 KV 19.00 15.07.1999

575 66kv Tithgam-Runi line Palanpur S/C 66 KV 20.00 22.05.2006

576 66kv Agthala(220kv)-66kv Jalota Palanpur S/C 66 KV 16.00 05.07.2012 28.07.2014

577 66kv Jalota-66kv Kotda (F) Palanpur S/C 66 KV 16.00 05.07.2012 28.07.2014

578 66kv Tharad-Kuvana line Palanpur S/C 66 KV 17.00 27.01.1999

579 66kv Agthala(220 kv)-Lakhni line Palanpur S/C 66 KV 8.00 04.10.2010

580 66kv Kuvana-Lakhni line Palanpur S/C 66 KV 8.60 31.01.2000

581 66kv Lakhni-Agthala line Palanpur S/C 66 KV 5.00 30.03.2004

582 66kv tithgam-Balodhan line Palanpur S/C 66 KV 16.00 01.02.1992

583 66kv Balothan-Bhabhar line Palanpur S/C 66 KV 13.00 01.02.1992

584 66kv Tharad-Del line Palanpur S/C 66 KV 15.00 21.12.2010

585 66kv Del-Makhanu line Palanpur S/C 66 KV 10.00 28.10.2003

586 66kv Makhanu-Mpaldi line Palanpur S/C 66 KV 5.00 25.08.2005

Page 54

Page 22: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

587 66kv Makhanu-Kotarwada line Palanpur S/C 66 KV 9.00 04.06.2011

588 66kv kotarwada-Mera line Palanpur S/C 66 KV 8.80 04.06.2011

589 66kv Tharad-Tadav line Palanpur S/C 66 KV 25.00 15.01.1996

590 66kv Tharad-Wav line Palanpur S/C 66 KV 47(12.3) 20.07.2001 17.07.2013

591 66KV Wav-Jaloya Palanpur S/C 66 KV 25.3 20.07.2001 17.07.2013

592 66kv Tharad-Pathamada line Palanpur S/C 66 KV 18.80 01.01.2005

593 66kv Kotada(F)-Vatam line Palanpur S/C 66 KV 5.50 29.01.2008

594 66kv Vatam-Rantila-Mpaldi line Palanpur S/C 66 KV 7.50 29.01.2008

595 66kv Rantila-Lakhni line Palanpur S/C 66 KV 12.50 29.01.2008

596 66kv Mitha-Vadiya line Palanpur S/C 66 KV 13.00 30.05.2006

597 66kv Lavana-Keshargam line Palanpur S/C 66 KV 11.50 10.02.2009

598 66KV Vadiya-Mera Palanpur S/C 66 KV 13.5 19.01.2006

599 66KV Chamanpura-Kotda(F) Palanpur S/C 66 KV 10 23.01.2008

600 66KV Mitha-Bhabhar Palanpur S/C 66 KV 9 25.05.1989

601 66KV Tadav-Jaloya line Palanpur S/C 66 KV 46.05 03.06.2015

602 66KV THAVAR-DHANERA LINE 1 Palanpur S/C 66 KV 8.00 21.12.2006

60366KV THAVAR-DHANERA -RAMUN LINE

2Palanpur S/C 66 KV 28.00 29.12.2006

604 66KV THAVAR-JADIYALI LINE Palanpur S/C 66 KV 20.00 28.12.2006

605 66KV THAVAR-JADIYA LINE Palanpur S/C 66 KV 9.00 21.12.2006

606 66KV Thavar-Nanuda line Palanpur S/C 66 KV 15.00 13.05.2008 03.05.2014

607 66KV Nanuda-Lawara line Palanpur S/C 66 KV 15.00 13.05.2008 03.05.2014

608 66KV THAVAR-MALOTRA LINE Palanpur S/C 66 KV 4.78 03.12.2008

609 66KV THAVAR-DUVA LINE Palanpur S/C 66 KV 22.80 23.01.2009

610 66KV VODA- DHANERA LINE Palanpur S/C 66 KV 17.50 25.08.2008

611 66KV JADIYALI-RAH LINE Palanpur S/C 66 KV 16.00 27.03.1989

612 66KV DEVSARI-KOTDA(D) LINE Palanpur S/C 66 KV 17.00 24.03.2005

613 66KV RAH-GHODASAR LINE Palanpur S/C 66 KV 7.50 30.03.1996 & 19.03.2015

614 66 KV GHODASAR-ASODAR LINE Palanpur S/C 66 KV 8.00 30.03.1996 & 19.03.2015

615 66kv Rah-Duva Palanpur S/C 66 KV 13.10 25.02.2009

616 66KV ASODAR-PATHAMADA LINE Palanpur S/C 66 KV 5.70 05.01.2005

617 66KV LAWARA-KUVARLA line Palanpur S/C 66 KV 19.30 24.02.2009 & 16.09.2014

618 66KV KUVARLA-DHARNODHAR LINE Palanpur S/C 66 KV 4.50 24.02.2009 & 16.09.2014

619 66KV JADIYA-DHARNODHAR LINE Palanpur S/C 66 KV 8.68 17.03.2001

620 66 KV MALOTRA - SHIYA LINE Palanpur S/C 66 KV 12.25 03.05.2010 & 06.11.2014

621 66 KV SHIYA-NANAMEDA LINE Palanpur S/C 66 KV 7.25 03.05.2010 & 06.11.2014

622 66 KV NANAMEDA VAKTAPURA LINE Palanpur S/C 66 KV 14.22 02/01/1900

623 66 KV KASARI SHERPURA LINE Palanpur S/C 66 KV 5.50 11.06.2010

624 66 KV SHERPURA RAMUN LINE Palanpur S/C 66 KV 16.36 11.06.2010

625 66 KV KASARI ZERDA LINE 1 Palanpur S/C 66 KV 4.00 16.08.1986

626 66 KV KASARI ZERDA LINE 2 Palanpur S/C 66 KV 4.00 30.07.2001

627 66 KV ZERDA KHIMAT LINE Palanpur S/C 66 KV 18.50 01/01/1900

628 66 KV KHIMAT NANAMEDA LINE Palanpur S/C 66 KV 18.40 13.03.1993

629 66 KV KHIMAT PANTHAVADA LINE Palanpur S/C 66 KV 12.00 12.02.1994

630 66 KV PANTAVADA VITHODAR LINE Palanpur S/C 66 KV 106.00 21.03.2009

631 66 KV KANSARI VODA LINE LINE Palanpur S/C 66 KV 27.50 15.05.2008

632 66 KV AGTHALA CHEKRA LINE Palanpur S/C 66 KV 17.10 04.10.2010

633 66 KV CHEKRA KOTDA(D) LINE Palanpur S/C 66 KV 10.00 04.10.2011

634 66 KV AGTHALA TARUVA LINE Palanpur S/C 66 KV 19.60 04.10.2010

635 66 KV TARUVA ASODAR LINE Palanpur S/C 66 KV 5.50 09.07.2010

636 66 KV JADIYALI NANDLA LINE Palanpur S/C 66 KV 8.35 01.10.2012

637 66 KV RAH LUVANA LINE Palanpur S/C 66 KV 11.60 10.02.2009

638 66 kv Palanpur-Palanpur -1 Ckt-1 Palanpur S/C 66 KV 3.50 28.12.1989

639 66 kv Palanpur-Palanpur -1 Ckt-2 Palanpur S/C 66 KV 16.00 25.07.2001

640 66 kv Palanpur-Palanpur-2 Palanpur S/C 66 KV 0.30 27.04.1993

641 66 kv Palanpur-Lalawada Palanpur S/C 66 KV 7.00 25.07.2001

642 66 kv Lalawada-Kanodar Palanpur S/C 66 KV 11.00 27.07.2001

643 66 kv Palanpur-Hebatpur Palanpur S/C 66 KV 8.00 27.07.1998

644 66 kv Hebatpur-Iqbalgadh Palanpur S/C 66 KV 15.00 27.12.1988

645 66 kv Palanpur-Chandisar Palanpur S/C 66 KV 20.00 25.02.1991

646 66 kv Palanpur-Jalotra Palanpur S/C 66 KV 18.00 06.03.1990

647 66 kv Palanpur-Vadgam Palanpur S/C 66 KV 13.00 05.01.1995

648 66 kv Palanpur-Malan Palanpur S/C 66 KV 11.00 04.02.1997

649 66 kv Jalotra-Gangava Palanpur S/C 66 KV 19.50 12.08.1991

Page 55

Page 23: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

650 66 kv Gangava-Danta Palanpur S/C 66 KV 6.10 11.09.2009

651 66 kv Kodram-Panchda Palanpur S/C 66 KV 10.00 20.08.2005

652 66 kv Vadagam-Kodram Palanpur S/C 66 KV 24.00 13.03.1993

653 66 kv Ranpur-Dantiwada Palanpur S/C 66 KV 16.00 30.09.1987

654 66 kv Vithodar-Jegol Palanpur S/C 66 KV 19.00 20.03.2005

655 66 kv M'champa-Ambaji Palanpur S/C 66 KV 41.00 15.01.1993

656 66 kv Iqbalgadh-Amirgadh Palanpur S/C 66 KV 18.00 20.08.1989

657 66 kv Malan-Virampur Palanpur S/C 66 KV 16.00 11.04.2007

658 66 kv Vadgam-Chhapi Palanpur S/C 66 KV 13.00 14.02.1980

659 66 kv Basu-Gadh Palanpur S/C 66 KV 15.00 17.11.2003

660 66 kv Chandisar-HPCL Palanpur D/C 66 KV 2.64 28.03.2007

661 66 kv Palamnpur-Bhutedi Palanpur S/C 66 KV 17.05 03.11.2007

662 66 kv Bhutedi-Dantiwada Palanpur S/C 66 KV 8.00 07.07.2009

663 66 kv Amirgadh-Maharaja Cem. Palanpur S/C 66 KV 0.90 06.08.2008

664 66 kv Kanodar-Gadalwada Palanpur S/C 66 KV 6.50 16.06.2011

665 66 kv Malan-Vasan Palanpur S/C 66 KV 8.00 06.11.2011

666 66 kv Gorad-Ambaji Palanpur S/C 66 KV 23.60 14.12.2011

667 66 kv Panchda-Moriya Palanpur S/C 66 KV 15.70 12.12.2011

668 66 kv Virampur-Bhayla Palanpur S/C 66 KV 10.00 16.05.2012

669 Jangral-Gadh Palanpur S/C 66 KV 18.00 27.07.1981

670 66 kv Bhutedi-Hebatpur Palanpur S/C 66 KV 11.00 14.2.2013

671 66KV Chandisar-Bhakhar Palanpur S/C 66 KV 6.12 15.10.2013

672 Jangral-Gadh Palanpur S/C 66 KV 18.00 27.07.1981

673 Jangral-Kimbuva Palanpur S/C 66 KV 13.00 16.01.2001

674 Jangral-Samau Palanpur S/C 66 KV 12.00 27.06.2005

675 Jangral-Jangral Palanpur S/C 66 KV 0.50 02.11.2003

676 Jangral-Aseda Palanpur S/C 66 KV 17.00 17.06.2006

677 Jangral-Kamboi Palanpur S/C 66 KV 17.50 20.08.2009

678 Jangral-Kalana Palanpur S/C 66 KV 12.00 10.08.2007

679 Deesa-Ranpur Palanpur S/C 66 KV 15.00 30.09.1987

680 Deesa- Junadeesa Palanpur S/C 66 KV 9.00 07.05.1988 28.02.2014

681 Junadeesa- Manekpura Palanpur S/C 66 KV 8.00 07.05.1988 28.02.2014

682 Deesa-Gadh Palanpur S/C 66 KV 21.00 01.01.1974

683 Deesa-Kansar-1 Palanpur S/C 66 KV 18.00 16.08.1991

684 Deesa-Kansar-2 Palanpur S/C 66 KV 19.00 16.08.1991

685 Deesa-Lorwada Palanpur S/C 66 KV 9.00 20.01.1996

686 Kansari-Lorwada Palanpur S/C 66 KV 19.00 31.07.2004

687 Lorwada-Bhildi Palanpur S/C 66 KV 8.00 10.2.1996

688 Bhildi-Arniwada Palanpur S/C 66 KV 8.00 29.06.2001

689 Kansari-Baiwada Palanpur S/C 66 KV 5.00 10.2.1996

690 Ghada-Vithodhar Palanpur S/C 66 KV 11.70 13.03.2002

691 Kansari-Samsherpura Palanpur S/C 66 KV 5.50 30.12.1994

692 Kansari-Nagfana Palanpur S/C 66 KV 4.90 11.05.2005 03.05.2014

693 Nagfana-Pechhdal Palanpur S/C 66 KV 15.70 11.05.2005 03.05.2014

694 Pechhdal-Devsari Palanpur S/C 66 KV 6.98 20.07.2010

695 Kansari-Motakapra Palanpur S/C 66 KV 22.00 12.03.1992

696 Motakapra-Shergadh Palanpur S/C 66 KV 11.00 10.03.2000

697 Motakapra-Agathala Palanpur S/C 66 KV 9.00 21.01.1995

698 Shergadh-Soni Palanpur S/C 66 KV 4.90 2.09.2011

699 Kansari-Vithodhar Palanpur S/C 66 KV 15.70 15.06.2006

700 Shamsherpura-Dama Palanpur S/C 66 KV 8.10 04.08.2009

701 Lorwada-Balodhar Palanpur S/C 66 KV 13.50 26.08.2009

702 Manekpura-Bhatsan Palanpur S/C 66 KV 11.88 03.08.2009

703 Bhatsan-Samau Palanpur S/C 66 KV 8.46 03.08.2009

704 Agathala-Agathala Palanpur S/C 66 KV 1.00 11.10.2010

705 Agathala-Shergadh Palanpur S/C 66 KV 10.50 04.10.2010

706 Baiwada-Ghada Palanpur S/C 66 KV 11.26 17.06.2010

707 Aseda-Samdhi Palanpur S/C 66 KV 8.00 17.06.2006

708 Samdhi-Rasana Palanpur S/C 66 KV 7.00 23.6.2011

709 Samau- Sadarpur Palanpur S/C 66 KV 8 30.10.2013

710 Rasana- Chandisar Palanpur S/C 66 KV 6.1 21.11.2013

711 Jasdan-Jasdan-II (Gadhadiya) GONDAL S/C 66 KV 8.6 22.02.01

712 Jasdan -II (Gadhadiya) - Kamlapur GONDAL S/C 66 KV 12.8 22.02.01

713 Jetpur-Virpur GONDALS/C on D/C

Tower 66 KV 13 09.04.1983

714 Gondal-Gomta GONDALS/C on D/C

Tower 66 KV 8 11.03.13

715 Gomta-Virpur GONDALS/C on D/C

Tower 66 KV 9.00 11.03.13

Page 56

Page 24: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

716 Gondal-Kolithad GONDAL S/C 66 KV 13.5 1965 & 1994

717 Kolithad-Anida GONDAL S/C 66 KV 10.3 29.03.14

718 Virpur-Lilakha GONDALS/C on D/C

Tower 66 KV 8.5 12.07.94

719 Gondal-Movia GONDAL S/C 66 KV 8 30.07.90

720 Movia- Shreenathgadh GONDAL

S/C + partialy

S/C on D/C

tower

66 KV 11.5 30.07.90 & 03.12.11

721 Vasavad-Motadevaliya GONDALS/C on D/C

TOWER66 KV 11.5 29.08.09

722 Motadevaliya - Derdi GONDALS/C on D/C

TOWER66 KV 18.5 29.08.09

723 Gondal-"K" s/S GONDAL S/C 66 KV 6 25.10.78

724 Tap to "K" s/S line GONDAL S/C 66 KV 1.2 12/06/1905

725 Hadamtala Kotda line GONDAL S/C 66 KV 9.5 19.07.07

726 Kotda-Sardhar GONDAL S/C 66 KV 17 20.04.1991

727 Gondal-Siddheshwar-I GONDALS/C ON D/C

Tower Line66 KV 26 18/05/1905

728 Gondal-Hadamtala GONDALS/C ON D/C

Tower Line66 KV 14 18/05/1905

729 66kV Hadamtala - Road Pipaliya GONDALS/C ON D/C

Tower Line66 KV 7.8

1965

29.05.14

730 66kV Road Pipaliya - Siddheswar GONDALS/C ON D/C

Tower Line66 KV 9.2

1965

29.05.14

731 66kV ROAD PIPALIYA- Ravi Techno forge GONDAL S/C 66 KV 0.4 02.08.14

732 Jasdan-Sardhar GONDAL S/C 66 KV 24 05.02.90

733 Tap to Lodhika GONDAL S/C 66 KV 14 12/06/1905

734 66kV JASDAN - MOTADADVA GONDAL S/C 66 KV 14.2 28.06.07

735 66kV JETPUR MEVASA GONDAL S/C 66 KV 11.5 23.11.83

736 66kV Sultanpur-Deradi GONDAL S/C 66 KV 13 25.04.08

737 66kV JETPUR LILAKHA GONDAL S/C 66 KV 13 14.07.08

738 66 kV Motadadva-Ramod line GONDAL S/C 66 KV 14.2 26.08.09

739 66 kV Kamlapur-Lakhanka line GONDAL S/C 66 KV 14 25.03.09

740 66kV Gondal-Jamwadi GONDALS/C ON D/C

Tower Line66 KV 3 08.03.10

741 66kV Jamwadi-Umrali GONDALS/C ON D/C

Tower Line66 KV 22 24.02.10

742 66kV Umrali- Jetpur GONDALS/C ON D/C

Tower Line66 KV 30 24.02.10

743 66 kV Faldang-Tramba GONDAL S/C 66 KV 16 29.03.10

744 66kV Jasdan - Virangar GONDAL S/C 66 KV 11 14.07.11

745 66kV Virnagar-Bhadala GONDAL S/C 66 KV 17.743 30.07.11

746 66kV Gondal-Gondal-2 U/G line GONDAL U/G Cable 66 KV 0.696 19.10.11

747 66kV Jamwadi-Rotary tech Line GONDAL S/C 66 KV 9.232 12.11.11

748 shreenathgadh-Vasavad GONDAL

S/C + partialy

S/C on D/C

tower

66 KV 13 30.07.90 & 03.12.11

74966kV Gadhadiya - GFL windfarm Line

no.1GONDAL D/C 66 KV 25.3 21.04.11

75066kV Gadhadiya - GFL windfarm Line

no.2GONDAL D/C 66 KV 25.3 21.04.11

75166kV Motadadva - Halenda windFarm

Line no.1GONDAL D/C 66 KV 10.4 29.9.11

75266kV Motadadva - Halenda windFarm

Line no.2GONDAL D/C 66 KV 10.4 29.9.11

75366kV Bhadla - Parevada windfarm Line

no.1GONDAL D/C 66 KV 18 27.06.12

75466kV Bhadla - Parevada windfarm Line

no.2GONDAL D/C 66 KV 18 27.06.12

755 66kV Gondal-Shrinathgadh line GONDAL S/C 66 KV 18.7 11.06.13

756 66kV Lilakha - Amarnagar line GONDAL S/c & D/C 66 KV 15 18.07.13

757 66kV Amarnagar - Sultanpur line GONDAL S/c & D/C 66 KV 9 18.07.13

758 66kV Jasdan - Shivrajpur line GONDAL S/c & D/C 66 KV 12.5 14.08.13

759 66kV Shivrajpur - Jivapar line GONDAL S/c & D/C 66 KV 9.5 14.08.13

760 66 Kv Anida Vachhra - Kharedi Line GONDAL S/c & D/C 66 KV 17.3 29.03.14

761 66kV Hadamtala - Rajapra W/F - 01 GONDAL D/C 66 KV 13 01.06.2014

762 66kV Hadamtala - Rajapra W/F - 02 GONDAL D/C 66 KV 13 01.01.2014

763 66kV Kolithad - Umrali line GONDAL S/C 66 KV 17 26.08.2014

764 Jasdan-Gadhadiya-02 GONDAL S/C 66 KV 9.22 15.07.2015

765 66kV Faldang Rajsamadhiyala GONDAL S/C & D/C 66 KV 12 04.08.2015

766 66kV Rajsamadhiyala Sardhar GONDAL S/C & D/C 66 KV 13 04.08.2015

Page 57

Page 25: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

767 Puniitnagar-Laxminagar (U/G) -1 GONDAL D/C 66kV 4.6 10.11.1998

76866kv Puniitnagar-Laxminagar (U/G) -

2GONDAL D/C 66kV 4.62 10.11.1998

769 Dudhsagar-Navagam O/H GONDAL S/C 66kV 4 28.01.1969

770 GIDC -Polytechnic GONDAL S/C 66kV 4 12.09.2012

771 Padadhari-Liara GONDAL S/C 66kV 18 14.04.1986

772 Vikram-Kotharia GONDAL D/C 66kV 6 26.07.1981

773 Vikram-Polytechnic GONDAL D/C 66kV 12 12.09.2012

774 Vikram-Punitnagar I GONDAL D/C 66kV 5 12.09.2012

775 Vikram-Punitnagar-II GONDAL D/C 66kV 5 15.09.1997

776 66kv Kangashiyali - Vikram line No.1 GONDAL S/C 66kV 2.2 29.06.2011

777 66kv Kangashiyali - Vikram line No.2 GONDAL S/C 66kV 2.4 04.08.2011

778 66kv Kangashiyali - Shaper line No.1 GONDAL S/C 66kV 4.5 29.06.2011

779 66kv Kangashiyali - Shaper line No.2 GONDAL D/C 66kV 4.5 04.08.2011

780 Vikram-Vikram Steel GONDAL D/C 66kV 0.05 26.01.1988

781 Nyara-Taraghadi GONDAL S/C 66kV 15 07.10.2002

782 Hadala - Nyara-3 GONDAL S/C 66kV 18.1 11.06.14

783 Hadala-Popatpara GONDAL S/C 66kV 15.4 11.06.14

784 Nyara-Ghanteshwar-I GONDAL S/C 66kV 4 24.11.1996

785 Nyara-Ghanteshwar-II GONDAL S/C 66kV 4 24.11.1996

786 66kv Ghanteshwar-Raiyadhar-I GONDAL D/C 66kV 8.3 02.07.2014

787 66kv Ghanteshwar-Raiyadhar-II GONDAL D/C 66kV 8.3 02.07.2014

788 Nyara-Nagarpipaliya GONDAL D/C 66kV 28 23.03.2005

789 Nyara-Metoda GONDAL D/C 66kV 15.5 21.07.2006

790 Nyara-Rotary GONDAL S/C 66kV 15.5 12.10.2006

791 Targhadi-Padadhari GONDAL S/C 66kV 16 07.10.2002

792 Shapar-Siddheshwar-I GONDAL S/C 66kV 3.58 26.07.1981

793 Shapar-Siddheshwar-II GONDAL S/C 66kV 3.58 26.07.1981

794 G.I.D.C. - Kotharia GONDAL D/C 66kV 6 26.07.1981

795 Popatpara-Navagam GONDAL S/C 66kV 6 14.04.1986

796 Punitnagar-Rolex(Express) GONDAL S/C 66kV 0.6 14.09.2004

797 Ghanteshwar - Raiyadhar - 1 GONDAL D/C 66kV 8.3 04.07.14

798 Ghanteshwar - Raiyadhar - 2 GONDAL D/C 66kV 8.3 04.07.14

799 Navagam - Kuvadava GONDAL U/G 66kV 15.783 25.02.2008

800 Vikram -Rolex GONDAL D/C 66kV 6.847 09.05.2008

801 Metoda - Rotary line GONDAL D/C 66kV 1.7 05.02.2009

802 Metoda - Central line GONDAL U/G 66kV 1.7 07.11.2012

803 Siddheswar - Veraval (U/G) GONDAL D/C 66kV 1 31.03.2009

804 66kv Nyara - Stadium line GONDAL D/C 66kV 17.69 20.10.2014

805 66kv Nyara - Gauridad GONDAL D/C 66kV 18.593 12.08.2015

806 66kV Gauridad - Hadala GONDAL D/C 66kV 6.52 12.08.2015

807 66kv Nyara - Hadala line - 2 GONDAL 66kV 18.1 16.08.2007

808 66kv Hadala - Stadium line GONDAL 66kV 0.9 10.04.2014

809 66kv Hadala - Navagam line - 1 GONDAL D/C 66kV 20.065 09.04.2014

810 66kv Hadala - Navagam line - 2 GONDAL D/C 66kV 20.065 09.04.2014

811 66kv Hadala - Popatpara line GONDAL 66kV 15.4 11.06.2014

812 66kv Kagadadi - Hadala Line GONDAL U/G 66kV 13 08.06.2006

813 66kv Hadala - Hadala W/W Line GONDAL U/G 66kV 13 11.06.2014

814 66kv Navagam-DSR U/G GONDAL U/G 66kV 3.19 28.01.1969

815 66kv DSR - Echjay -Steel U/G GONDAL D/C 66kV 1.2 04.01.2010

816 66kv P'nagar-Mavadi U/G GONDAL U/G 66kV 4.45 03.10.2009

817 66kv Nikava-Mota Bhadukiya GONDAL S/C 66kV 11.58 13.02.2010

818 66kv Sindhawadhar - DSR GONDAL S/C 66kV 30 01.02.1965

819 66Kv Nagarpipaliya - Nikawa GONDAL S/C 66kV 7.5 29.04.2011

820 66Kv Neknam - Kagdali GONDAL S/C 66kV 11.2 23.10.2011

82166Kv Laxminagar - Shastrimedan (U

/G )GONDAL U/G 66kV 3.1 28.02.2012

82266kv Kangashiyali - P'Nagar line

No.1(U/G)GONDAL U/G 66kV 6.9 feederbay only charge

82366kv Kangashiyali - P'Nagar line

No.2(U/G)GONDAL U/G 66kV 6.9

82466kv Kangashiyali - P'Nagar line

No.3(U/G)GONDAL U/G 66kV 6.9

Page 58

Page 26: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

82566kv Kangashiyali - P'Nagar line

No.4(U/G)GONDAL U/G 66kV 6.9 22.08.2012

82666kv Kangashiyali - P'Nagar line

No.5(U/G)GONDAL U/G 66kV 6.9 22.08.2012

827 66kv Kangashiyali - Vavadi (U/G) GONDAL U/G 66kV 3 22.05.2012

828 66kv Vavadi - Punit Nagar (U/G) GONDAL U/G 66kV 5.6 22.08.2012

829 DSR -Polytechnic Line - 1 GONDAL U/G 66kV 4.9 12.09.2012

830 DSR -Polytechnic Line - 2 GONDAL U/G 66kV 4.9 12.09.2012

831 66kv Raiyadhar - University (U/G) line GONDAL U/G 66kV 5.7 27.11.2012

83266kv Raiyadhar - Shastrimaidan (U/G)

lineGONDAL U/G 66kV 7.5 Not charged

833 66kv Veraval - Sarvoday U/G line - 1 GONDAL U/G 66kV 2.5 19.12.2012

834 66kv Veraval - Sarvoday U/G line - 2 GONDAL U/G 66kV 2.5 19.12.2012

835 66kv Neelkanth - Kotharia U/G line GONDAL U/G 66kV 3.25 09.07.2013

836 66kv Taraghadi - Motakhijadiya line GONDAL S/C 66kV 16.428 18.01.2014

837 66kv Vikram - Tramba line - 1 GONDAL D/C 66kV 13.535 22.11.2014

838 66kv Vikram - Tramba line - 2 GONDAL D/C 66kV 13.535 21.10.2014

839 66kv Tramba-Kheradi line GONDAL S/C 66kV 7.06 12.05.2014

840 66 kV Central - Khirashra GONDAL S/C 66kV 6.2 20.04.2015

841 66 kV Kuvadva - Jeydeep cotton GONDAL S/C 66kV 3.45 31.03.2014

842 66 kV Kotda Piplana GONDAL D/C 66kV 10.5 26.08.15

843 66 kV Piplana Padavala GONDAL D/C 66kV 10.5 26.08.15

844 66KV Bela Rangpar Line GONDAL S/C 66kV 4.5 15.12.12

845 66KV Devaliya Vejalpar Line GONDAL S/C 66kV 9.5 26.06.10

846 66KV Dhuva Rafaleshwar Line GONDAL S/C 66kV 6.88 23.11.08

847 66KV Ghutu Bharatnagar line GONDALO/H + U/G

Cable66kV 3.351 25.11.13

848 66KV Ghutu Dungarpur Line GONDAL S/C 66kV 21.14 07.02.08

849 66KV Jambudiya Sartanpar GONDAL S/C 66kV 6.77 11.07.14

850 66KV Jetpar Vejalpar GONDAL S/C 66kV 13.41 08.08.12

851 66KV Jodhpar Coral Line GONDALOverhead+UG

cable 66kV 1.42 02.01.15

852 66KV Jodhpar Lilapar GONDAL S/C 66kV 4.5 16.03.2011

853 66KV Kalikanagar Sartanpar GONDAL S/C 66kV 8.45 12.07.14

854 66KV Lajai Chanchapar GONDAL S/C 66kV 12.54 06.05.10

855 66KV Lajai Tankara GONDAL S/C 66kV 7.4 01.04.09

856 66KV Lakhadhirpur Antique GONDAL S/C 66kV 0.35 25.01.08

857 66KV Lakhadhirpur Ghutu GONDAL S/C 66kV 4.3 07.02.08

858 66KV Lakhadhirpur Silktouch GONDAL Tower + U/G Cable 66kV 1.65 22.01.14

859 66KV Lalpar Jambudiya GONDAL S/C 66kV 2 30.7.12

860 66KV Lalpar Kalikanagar GONDAL S/C 66kV 6.18 07.03.11

861 66KV Lalpar Lilapar Line GONDAL S/C 66kV 6 07.02.09

862 66KV Lalpar Rafadeshwar GONDAL S/C 66kV 4.5 07.02.09

863 66KV Lalpar Trajpar GONDAL U/G Cable 66kV 1.4 19.12.13

864 66KV Lilapar - Ravapar GONDAL S/C 66kV 4.49 06.06.11

865 66KV Lilapar Tirthak Paper mill GONDAL U/G Cable 66kV 0.451 12.02.14

866 66KV Mahendranagar Lakhdhirpur GONDAL S/C 66kV 7.6 07.02.08

867 66KV Mahendranagar Zealtop GONDALOverhead+UG

cable 66kV 1.947 24.09.14

868 66KV Mansar PipaliyaLine GONDAL S/C 66kV 26.978 16.04.2015

869 66KV Mitana Neknam GONDAL S/C 66kV 6.16 19.08.13

870 66KV Morbi Bela GONDAL S/C 66kV 7 15.12.12

871 66KV Morbi Bharatnagar GONDAL S/C 66kV 0.697 2.3.09

872 66KV Morbi Khareda 2 GONDAL S/C 66kV 18.22 03.08.2015

873 66KV Khareda Charadva GONDAL S/C 66kV 9.22 03.08.2015

874 66KV Morbi Ghutu GONDAL S/C 66kV 2.834 09.07.11

875 66KV Morbi Khareda-1 GONDAL S/C 66kV 16 30.06.06

876 66KV Morbi Mahendranagar GONDAL S/C 66kV 5 29.06.06

877 66KV Morbi Morbi A-1 with Jodhpar tap GONDAL D/C 66kV 19.47 06.11.04

878 66KV Morbi Morbi A-2 GONDAL D/C 66kV 7 13.07.97

879 66KV Morbi Morbi B-1 GONDAL D/C 66kV 11.25 21.04.98

880 66KV Morbi Unchi Mandal GONDAL S/C 66kV 11.5 11.01.13

881 66KV Morbi Vajepar Tap Amreli GONDAL S/C 66kV 11.29 30.05.97

882 66KV Morbi-B-Virpar GONDAL S/C 66kV 7 03.08.2012

883 66KV MTK Line(EHV Consumer) GONDAL S/C 66kV 32 30.04.02

884 66KV Rangpar Jetpar GONDAL s/C 66kV 8.4 15.12.15

885 66KV Sartanpar Rafaleshwar Ckt -1 GONDAL Overhead+UG cable 66kV 3.827 3.9.14

Page 59

Page 27: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

886 66KV Sartanpar Rafaleshwar Ckt -2 GONDAL Overhead+UG cable 66kV 3.827 3.9.14

887 66KV Tankara Bangawadi GONDAL S/C 66kV 13 09.06.89

888 66KV Tankara Mitana GONDAL S/C 66kV 13.16 19.08.13

889 66KV Trajpar Jaxx GONDAL S/C 66kV 1.05 31.08.14

890 66KV Trajpar Lakhdhirpur GONDAL UG cable line 66kV 1.85 19.12.13

891 66KV Unchi Mandal charadava GONDAL U/G Cable 66kV 12.5 11.1.13

892 66KV Vajepar Morbi B GONDAL S/C 66kV 2 25.06.2010

893 66KV Virpar Lajai line GONDAL D/C 66kV 4 25.06.2010

894 66KV AmreliRoad Mansar GONDAL S/C 66kV 12.26 30.05.97

895 66KV Wankaner - Pipaliyaraj line GONDAL S/C 66kV 17 10.01.14

896 66kv Wankaner Jadeshvar GONDAL S/C 66kV 15 24.01.98

897 66kv Jadeshwar Tankara GONDAL S/C 66kV 12 24.01.98

898 66kv Wankaner Dhuva GONDAL S/C 66kV 12 25.03.04

899 66kv Dhuva - Umiya GONDAL S/C 66kV 0.6 27.11.08

900 66kv Wankaner - Bhojpara GONDAL S/C 66kV 5 24.03.11

901 66kv Bhojpara - Lunsar GONDAL S/C 66kV 15 24.03.11

902 66kv Lunsar Rajgadh GONDAL S/C 66kV 8.9 16.05.13

903 66kv Rajgadh Chupani GONDAL S/C 66kV 10.5 16.05.13

904 66kv Wankaner Daldi GONDAL S/C 66kV 16 14.07.11

905 66kv Daldi Than GONDAL S/C 66kV 19 14.07.11

906 66kv Wankaner Limbada GONDAL S/C 66kV 7.5 27.08.09

907 66kv Limbada - Mahika GONDAL S/C 66kV 10 27.08.09

908 66kv Wankaner Mahika GONDAL S/C 66kV 18 30.03.04

909 66KV Mahika - Thikariyala line no 1 GONDAL S/C 66kV 12 27.05.10

910 66KV Thikariyala - Chotila GONDAL S/C 66kV 15 10.06.10

911 66KV Thikariyala - Bamanbore GONDAL S/C 66kV 7 27.05.10

912 66KV Dhrol-Dhrol-1 GONDAL D/C 66kV 1.5 31.03.2002

913 66KV Dhrol-Dhrol-2 GONDAL D/C 66kV 1.5 31.03.2002

914 66KV Dhrol-Keshiya GONDAL S/C 66kV 13 31.03.2002

915 66KV Dhrol-Dudhai GONDAL S/C 66kV 26 31.03.2002

916 66KV Dhrol-Liyara GONDAL S/C 66kV 13.5 31.03.2002

917 66KV Dhrol-Latipar GONDAL S/C 66kV 20 31.03.2002

918 66KV Latipar-Bangavadi GONDAL S/C 66kV 7.5 28.06.2007

919 66KV Latipar Bhalambha - 1 GONDAL D/C 66kV 19.05 26.08.2010

920 66KV Latipar Bhalambha - 2 GONDAL D/C 66kV 19.05 26.08.2010

921 66KV Mahika - Satapar GONDAL D/C 66kV 10 11.05.12

922 66KV Satapar-Rajpara GONDAL D/C 66kV 10 3.05.14

923 66KV Mahika - Thikariyala line no 2 GONDAL D/C 66kV 12 8.10.13

924 66KV Thikariyala Rajpara line GONDAL D/C 66kV 8 8.10.13

925 66KV Jadeshwar - Tithwa - 1 GONDAL D/C 66kV 5 25.03.11

926 66KV Jadeshwar - Tithwa - 2 GONDAL D/C 66kV 5 25.03.11

927 66KV Sartanpat - Lakaddhar GONDAL D/C 66kV 5.23 27.06.14

92866KV Lakaddhar Dhuva U/G

CableLineGONDAL U/G Single CKT 66kV 2.8 23.05.12

929 66 KV Sartanpar-Matel Line GONDAL D/C 66kV 10.68 24.06.14

930 66 KV Matel-Lakaddhar line GONDAL D/C 66kV 5.82 28.09.12

931 66 KV Dhrol - Dhangda line GONDAL D/C 66kV 10 11.12.2012

932 66kv Dhrol-Khiri line GONDAL S/C 66kV 10 27.05.2013

933 66 kV Matel-Rajgadh line GONDAL S/C on D/C 66kV 8.5 26.08.13

934 66 kV Jamdudhai Padana line GONDAL S/C 66kV 19.3 31.12.2013

935 66 kV Pipaliyaraj Sindhavadar line GONDAL S/C 66kV 11 10.01.14

936 66 KV 220kv Sartanpar Sartanpar line 1 GONDAL D/C 66kV 0.295 12.07.14

937 66 KV 220kv Sartanpar Sartanpar line 2 GONDAL D/C 66kV 0.295 11.07.14

938 66 kv Lunsar Mandasar line GONDAL S/C 66kV 6.4 31.03.2015

939 66kV Dhuva JetGranito GONDAL S/C 66kV 1.2 20.07.2015

940 Junagadh-Bilkha-I Junagadh D/C 66 KV 14.00 05/07/1993

941 Junagadh-Bilkha-II Junagadh D/C 66 KV 14.00 05/07/1993

942 Bilkha-Bhesan Junagadh S/C 66 KV 18.90 20/06/1984

943 Jetpur "B" Devkigalol Junagadh S/C 66 KV 11.00 10/01/1984

944 Devkigalol-Bhesan Junagadh S/C 66 KV 8.39 10/01/1984

945 Visavadar-Motimonpari Junagadh S/C 66 KV 24.40 09/09/1994

946 Visavadar-Visavadar - I Junagadh D/C 66 KV 5.60 11/09/1988

947 Visavadar-Visavadar - II Junagadh D/C 66 KV 10.50 28/03/1998

948 Vadia-Tori Junagadh S/C 66 KV 20.00 09/09/1992

949 Visavadar-Dhebar-I Junagadh D/C 66 KV 6.45 06/10/1995

Page 60

Page 28: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

950 Visavadar-Khambhalia Junagadh S/C 66 KV 13.20 11/09/1988

951 Khambhalia-Bilkha Junagadh S/C 66 KV 7.20 14.07.07

952 Visavadar-Vekaria Junagadh S/C 66 KV 19.50 24/02/1996

953 Vekaria-Bhader Junagadh S/C 66 KV 7.50 25.06.09

954 Shapur-Zanzarda-I Junagadh D/C 66 KV 9.50 15/04/1965

955 Junagadh-Zanzarda Junagadh S/C 66 KV 12.05 15/04/1965

956 Shapur-Zanzarda-II Junagadh D/C 66 KV 9.50 15/04/1965

957 Tap to Prabhatpur Junagadh S/C 66 KV 4.46 28/03/1998

958 Motakotda-Dhari Gundali Junagadh S/C 66 KV 13.90 15/06/1999

959 Dhari Gundali-Chuda Junagadh S/C 66 KV 8.76 07.06.13

960 Majewadi-Junagadh Junagadh S/C 66 KV 8.00 02/06/2000

961 Choki-Junagadh Junagadh S/C 66 KV 15.15 15/04/1965

962 Visavadar-Kotda Junagadh S/C 66 KV 13.00 19/03/1997

963 Majevadi-Zanzarda Junagadh S/C 66 KV 13.90 16/01/2000

964 Dhebar-Bhalgam Junagadh S/C 66 KV 8.67 27/03/2004

965 Jetpur-Mendapara Junagadh S/C 66 KV 36.70 15/04/1965

966 Jetpur-ArabTimbadi Junagadh S/C 66 KV 22.28 4/15/1965 28.10.13

967 ArabTimbadi-Mendapara Junagadh S/C 66 KV 18.38 4/15/1965 28.10.13

968 Mendapara-Junagadh Junagadh S/C 66 KV 25.20 14.07.10

969 Jetpur-Choki Junagadh S/C 66 KV 21.50 15/04/1965

970 Jetpur-Amarapar Junagadh S/C 66 KV 14.78 03/12/1986

971 Amarapar-Vadia Junagadh S/C 66 KV 11.41 31.05.13

972 Visavadar-Baradiya Junagadh S/C 66 KV 25.00 26/04/2006

973 Visavadar-Dhebar-II Junagadh D/C 66 KV 5.43 24/11/2005

974 Bhesan-Chuda Junagadh S/C 66 KV 13.04 20.03.10

975 Shapur-Vadla Junagadh S/C 66 KV 5.46 14.07.11

976 Bhalgam - Navi Haliyad Junagadh S/C 66 KV 7.26 22.02.07

977 Shapur-Navagam Junagadh S/C 66 KV 8.29 14.07.11

978 Navagam-Araniyara Junagadh S/C 66 KV 10.26 24.10.11

979 Agatray-Kanja Junagadh S/C 66 KV 11.73 1.08.78

980 Shapur-Shapur No.I Junagadh S/C 66 KV 0.23 16.06.12

981 Shapur-Shapur No.II Junagadh S/C 66 KV 0.23 16.06.12

982 Shapur-Kanza Junagadh D/C 66 KV 11.40 01/08/1978

983 Manavadar-Pajod Junagadh S/C 66 KV 12.67 21/05/1905

984 Sardargadh-Bantia Junagadh D/C 66 KV 14.50 15/05/2007

985 Bantiya-Shapur Junagadh D/C 66 KV 12.305/15/2007

(16-06-12)

986 Pajod-Kutiyana Junagadh S/C 66 KV 17.21 21/05/1905

987 Sardargadh-Sardargadh I Junagadh D/C 66 KV 0.50 04/05/1998

988 Sardargadh-Sardargadh II Junagadh D/C 66 KV 0.50 04/05/1998

989 Sardargadh-Manavadar Junagadh S/C 66 KV 12.78 24/05/2000

990 Sardargadh-Mervadar I Junagadh S/C 66 KV 23.00 14/10/1999

991 Sardargadh-Mervadar II Junagadh S/C 66 KV 23.00 27.02.12

992 Sardargadh-Pajod Junagadh S/C 66 KV 14.22 23/11/1999

993 Sardargadh-Lath Junagadh S/C 66 KV 9.26 20/12/1997

994 Lath-Tanasava Junagadh S/C 66 KV 9.64 16.07.11

995 Sardargadh-Patanvav Junagadh S/C 66 KV 11.00 07/09/1999

996 Patanvav-Motimarad Junagadh S/C 66 KV 12.00 18/06/1999

997 Sardargadh-Sheradi Junagadh S/C 66 KV 8.97 3/2/2000 22.07.14

998 Sheradi-Kutiyana Junagadh S/C 66 KV 20.98 3/2/2000 22.07.14

999 Sardargadh-Dhank Junagadh S/C 66 KV 31.50 10/08/2001

1000 Sardargadh-Mandodara Junagadh S/C 66 KV 21.68 05/06/1998

1001 66KV Mandodara-Nandiya Junagadh S/C 66 KV 7.47 27.07.11

1002 66KV Bantiya-Bhader Junagadh S/C 66 KV 10.11 11.08.11

1003 Shapur-Katakpara Junagadh S/C 66 KV 23.88 16.06.12 22.07.14

1004 Katakpara-Manavadar Junagadh S/C 66 KV 8.99 16.06.12 22.07.14

1005 Kanja-JPPL Junagadh S/C 66 KV 2.15 4.05.11

1006 Vadala-Navagam Junagadh S/C on D/C 66 KV 6.025 14.07.2011

1007 Pajod-Mahiyari Junagadh S/C 66 KV 16.50 18.05.2012

1008 Mahiyari-Barej Junagadh S/C 66 KV 18.325 08.11.2012

1009 Mevasa-Jamkandorna Junagadh S/C 66 KV 15.60 1984/2007

1010 Jetpur-Jetpur A Junagadh S/C 66 KV 7.00 06/11/1981

1011 Jetpur-Jetpur B Junagadh S/C 66 KV 7.50 03/09/1998

1012 Jetpur-Mandalikpur Junagadh S/C 66 KV 14.40 12/11/1998

1013 Mandalikpur-Dhoraji Junagadh S/C 66 KV 10.40 11/12/1998 26.12.13

1014 Dhoraji-Supedi Junagadh S/C 66 KV 10.70 11/12/1998 26.12.13

1015 Supedi-Upleta Junagadh S/C 66 KV 10.00 12/11/1998

1016 Upleta-Kolki Junagadh S/C 66 KV 14.00 07/07/1979

Page 61

Page 29: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

1017 Kolki-Kharachia Junagadh S/C 66 KV 12.00 31.05.10

1018 Paneli-Kharachia Junagadh S/C 66 KV 13.00 18/04/1998

1019 Paneli-Jamjodhpur Junagadh S/C 66 KV 11.00 1976/98

1020 Paneli-Vanavad (Tap to Jamjodhpur) Junagadh S/C 66 KV 40.90 02.08.08

1021 Bhayavadar-Khajurada Junagadh S/C 66 KV 22.40 03.06.97

1022 Khajurada-Supedi Junagadh S/C 66 KV 28.40 08.07.13

1023 Paneli-Shethvadala Junagadh S/C 66 KV 21.90 1998/2010

1024 Shethvadal-Samana Junagadh S/C 66 KV 11.90 16.06.10

1025 Jamkandorna-Raydi Junagadh S/C 66 KV 10.75 30/06/1989

1026 Raydi-Motimarad Junagadh S/C 66 KV 22.75 5.07.10

1027 Jamkandorna-Satodad Junagadh S/C 66 KV 12.50 24.03.94

1028 Satodad-Chitravad Junagadh S/C 66 KV 13.50 02.05.13

1029 Samana-Navagam Junagadh S/C 66 KV 16.00 13/07/2007

1030 Paneli-Vanana Junagadh S/C 66 KV 19.50 21.04.98

1031 Vanana-Sonvadia Junagadh S/C 66 KV 18.00 14.08.13

1032 Paneli-Bhayavadar-Kharachia Junagadh S/C 66 KV 25.00 18/04/1999

1033 Tansava-Dhank Junagadh S/C 66 KV 14.00 07/08/1995

1034 Motipaneli- Motipaneli UG Cable Junagadh S/C 66 KV 0.15 6.10.10

1035 Motipaneli-Mandasan line Junagadh S/C 66 KV 8.86 29.11.10

1036 Bhayavadar- Chitravad Junagadh S/C 66 KV 15.50 07.06.11

1037 Tanasva-Green Infra-Mervadar-1 Junagadh S/C 66 KV 5.98 5.11.11

1038 Tanasva-Green Infra-Mervadar-2 Junagadh S/C 66 KV 5.98 5.11.11

1039 Tanasava-Aravali Line-1 Junagadh S/C 66 KV 12.43 6.02.12

1040 Tanasava-Aravali Line-2 Junagadh S/C 66 KV 12.43 6.02.12

1041 Mervadar-Ganges Line-1 Junagadh S/C 66 KV 0.16 27.02.12

1042 Mervadar-Ganges Line-2 Junagadh S/C 66 KV 0.16 27.02.12

1043 Mervadar-CBC Junagadh S/C 66 KV 1.52 20.04.12

1044 Mervadar-GMPL Line Junagadh S/C 66 KV 2.09 20.04.12

1045 Bhayavadar-Arani Junagadh S/C 66 KV 8.36 11.08.14

1046 Keshod-Keshod Junagadh S/C 66 KV 5.00 09/01/1989

1047 Keshod-Agatray Junagadh S/C 66 KV 10.00 06/02/1989

1048 Keshod-Ishara Junagadh S/C 66 KV 11.10 17/11/1994

1049 Ishara-Khirasara Junagadh S/C 66 KV 9.90 24.05.11

1050 Keshod-Madhavpur Junagadh S/C 66 KV 25.00 30/01/1989

1051 Keshod-Malia Junagadh S/C 66 KV 13.00 18/12/1989

1052 Malia-Chorvad Junagadh S/C 66 KV 11.00 08/04/1996

1053 Keshod-Mendarda Junagadh S/C 66 KV 28.00 30/09/1989

1054 Keshod-Chorvad Junagadh S/C 66 KV 24.00 09/02/1995

1055 Keshod-Bhatsimroli Junagadh S/C 66 KV 11.00 30/12/1988

1056 Bhatsimroli-Mangrol Junagadh S/C 66 KV 11.50 30.12.88

1057 Keshod-Mangrol Junagadh D/C 66 KV 22.50 26/05/2002

1058 Mendarda-Khodiyar Junagadh S/C 66 KV 13.50 08/03/2004

1059 Keshod-Ajab Junagadh S/C 66 KV 14.50 14/08/2003

1060 Madhvpur-Shil Junagadh S/C 66 KV 9.05 21/10/1993

1061 Keshod-Ranigpara Junagadh S/C 66 KV 17.50 03/07/1981

1062 Ranigpara-Shapur Junagadh S/C 66 KV 30.50 21.12.12

1063 Moraj-Veraval Junagadh S/C 66 KV 12.00 03/07/2003

1064 Malia-Kadaya Junagadh S/C 66 KV 17.68 18/10/2000

1065 Kadaya-Chuldi Junagadh S/C 66 KV 7.60 16.04.13

1066 Keshod-Koylana Junagadh S/C 66 KV 8.30 21/12/2004

1067 Koylana - Amrapur Junagadh S/C 66 KV 18.40 16/06/2008

1068 P.Patan-GIDC Veraval (U/G cable) Junagadh S/C 66 KV 1.60 29.09.09

1069 GHCL-Sutrapada Junagadh S/C 66 KV 5.50 14.07.87

1070 Ajab-Patrama Junagadh S/C 66 KV 16.93 8.03.04

1071 Patrama-Khodiyar Junagadh S/C 66 KV 9.46 23.05.11

1072 Chorvad-Veraval Junagadh S/C 66 KV 19.00 23/05/1905

1073 Keshod-Budhecha Junagadh S/C 66 KV 20.50 6.06.06

1074 Sutrapada-Patan Junagadh S/C 66 KV 12.00 11.11.95

1075 Veraval-Adri Junagadh S/C 66 KV 9.55 27.02.08

1076 Koylana-Malia Junagadh S/C 66 KV 9.35 7.08.08

1077 Gosar-Madupur-I Junagadh D/C 66 KV 12.19 10.08.10

1078 Gosar-Madupur-II Junagadh D/C 66 KV 12.19 10.08.10

1079 Talala- Veraval Junagadh D/C 66 KV 24.00 3.07.03

1080 Talala- Moraj Junagadh D/C 66 KV 12.00 16.10.70

1081 Timbdi-Pranchi Junagadh S/C 66 KV 3.00 16.02.90

1082 Timbdi-Patan No.1 Junagadh D/C 66 KV 24.00 13.11.95

1083 Timbdi-sutrapada Junagadh D/C 66 KV 17.00 5.10.96

Page 62

Page 30: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

1084 Timbdi-Kodinar Junagadh S/C 66 KV 16.00 16.02.90

1085 Timbdi-Devli-Kodinar Junagadh D/C 66 KV 22.00 8.01.98

1086 Timbdi-Kodinar Junagadh D/C 66 KV 11.00 16.02.90

1087 Timbdi-Ghantwad Junagadh D/C 66 KV 18.00 30.09.99

1088 Timbdi - Bhetali Junagadh S/C 66 KV 10.91 17.04.06

1089 Kansari-Una Junagadh S/C 66 KV 9.00 19.11.97

1090 Kansari-Dhokadava Junagadh S/C 66 KV 12.00 18.01.97

1091 Kansari-Diu Junagadh D/C 66 KV 28.80 4.06.02

1092 Kansari-Samter Junagadh S/C 66 KV 10.50 26.02.00

1093 Samter-Timbi Junagadh S/C 66 KV 12.06 15.03.14

1094 Kansari-Bodidar Junagadh S/C 66 KV 23.40 23.07.14

1095 Bodidar-Adpokar Junagadh S/C 66 KV 6.84 26.07.14

1096 Kansari-Kesariya-Una tap Junagadh S/C 66 KV 18.00 11.06.02

1097 Dhokadava-Rabarika Junagadh S/C 66 KV 37.00 19.04.87

1098 Una- Diu Junagadh D/C 66 KV 23.00 15.03.89

1099 Dhokadava-Girgadhda Junagadh S/C 66 KV 18.00 27.12.91

1100 Ghatvad-Alidar Junagadh S/C 66 KV 9.72 4.06.06

1101 Kesariya - Advi Junagadh S/C 66 KV 15.00 20.07.90

1102 Devli-Jantrakhadi Junagadh S/C 66 KV 16.50 17.04.02

1103 Jantrakhadi-Advi Junagadh S/C 66 KV 16.00 25.04.13

1104 Talala-Jashadhar Junagadh S/C 66 KV 14.32 26.02.08

1105 Jashadhar-Ankolwadi Junagadh S/C 66 KV 14.39 26.02.08

1106 Jashadhar-Pranchi Junagadh s/c 66 KV 10.92 26.02.10

1107 Timbdi-Lodhva Junagadh S/C 66 KV 14.39 31.03.09

1108 Timbadi-Sindhaj Junagadh S/C 66 KV 13.02 5.08.10

1109 Keshariya Monosteel -I (Solar) Junagadh S/C 66 KV 6.30 31.03.12

1110 Keshariya Monosteel -II (Solar) Junagadh S/C 66 KV 6.30 31.03.12

1111 Dhrangadhra-Dhrangadhra-1 Surendranagar S/C 66 KV 7.30 16/04/1991

1112 Dhrangadhra-Navalgadh Surendranagar S/C 66 KV 11.50 19.03.2009 05.09.2013

1113 Navalgadh- Khodu line Surendranagar S/C 66 KV 21.50 19.03.2009 05.09.2013

1114 Dhrangadhra-Sadla Surendranagar S/C 66 KV 42.00 19/03/2009

1115 D'dhra-Narali Surendranagar S/C 66 KV 13.59 03/02/2009

1116 D'dhra-Bavli Surendranagar S/C 66 KV 17.00 30/11/1991

1117 Dhrangadhra Baisabgadh Surendranagar S/C 66 KV 13.00 21/09/2005

1118 Baisabgadh Chuli Surendranagar S/C 66 KV 10.00 21/06/2010

1119 D'dhra-Narichana Surendranagar S/C 66 KV 14.00 22/01/2000

1120 D'dhra-Kankawati Surendranagar S/C 66 KV 17.00 07/09/1991

1121 D'dhra-Vavdi Surendranagar S/C 66 KV 9.00 07/12/1996

1122 Bavli-Kondh Surendranagar S/C 66 KV 10.80 08/09/2009

1123 Kankawati-Malaniyad Surendranagar S/C 66 KV 12.00 25/02/1999

1124 Narichana-Kondh Surendranagar S/C 66 KV 11.00 31/01/2001

1125 Narichana-Raigadh Surendranagar S/C 66 KV 8.00 25/05/1966

1126 Kondh-Sara Surendranagar S/C 66 KV 14.00 23/03/1991

1127 Sara -Tarnetar Surendranagar S/C 66 KV 19.00 23/08/208

1128 Halwad-Halvad-1 Surendranagar D/C 66 KV 3.50 05/01/2004

1129 Halvad-Charadva Surendranagar S/C 66 KV 27.00 04/10/2001

1130 Halvad - Ishwarnagar tap line Surendranagar S/C 66 KV 7.50 01/04/2007

1131 Halvad-Ghanshyamgadh Surendranagar S/C 66 KV 10.00 05/01/2004

1132 Halwad-Ranakpur Surendranagar S/C 66 KV 5.30 24/07/2004

1133 Halvad-Bhalgamda-1 Surendranagar S/C 66 KV 14.00 04/10/2004

1134 Halvad-Bhalgamda-2 Surendranagar S/C 66 KV 12.46 23/07/2004

1135 Halwad-Malaniyad Surendranagar S/C 66 KV 12.50 28/02/2007

1136 Bhalgamda-Dighadiya line Surendranagar S/C 66 KV 7.50 23.07.2008 08.04.2014

1137 Dighadiya-Sara line Surendranagar S/C 66 KV 15.50 23.07.2008 08.04.2014

1138 Halvad-dhavana Surendranagar S/C 66 KV 9.80 27/07/2011

1139 Sara-Virpar (Dadholiya) Surendranagar S/C 66 KV 7.30 07/07/2011

1140 Halvad-Merupar Surendranagar S/C 66 KV 17.08 09/05/2012

1141 Merupar-Sundaribhawani Surendranagar S/C 66 KV 14.29 09/05/2012

1142 Halvad-Chandragadh Surendranagar S/C 66 KV 15.00 09/01/2009

1143 66Kv charadwa chupni Surendranagar S/C 66 KV 15.00 23/02/1988

1144 Chandragadh-Chuli Surendranagar S/C 66 KV 13.00 09/01/2009

1145 Kamalpur-Methan Surendranagar S/C 66 KV 28.50 15/12/2003

1146 Dhrangadhra-Gurukul new Surendranagar S/C 66 KV 4.40 31/12/2010

1147 Halvad-Gurukul new Surendranagar S/C 66 KV 26.30 03/03/2011

1148 Limbdi-S'nagar-1 Surendranagar D/C 66 KV 30.00 01/08/1971

1149 Limbdi-S'nagar-2 Surendranagar D/C 66 KV 30.00 01/08/1971

1150 Limbdi-Chuda Surendranagar S/C 66 KV 36.00 15/04/1991

1151 Limbdi-Sayla Surendranagar S/C 66 KV 34.00 17/11/1984

Page 63

Page 31: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

1152 Chuda-Ranpur Surendranagar S/C 66 KV 24.00 15/04/1991

1153 Sayla-Muli Surendranagar S/C 66 KV 14.00 24/03/1999

1154 S'nagar-Dudhrej-R'sitapur Surendranagar S/C 66 KV 20.00 10/08/1974

1155 S'nagar-Wadhwan-R'sitapur Surendranagar S/C 66 KV 22.10 10/08/1974

1156 Wadhwan-Lakhtar Surendranagar S/C 66 KV 2.10 22/12/2005

1157 Khodu- Digsar Surendranagar S/C 66 KV 10.00 17/01/2007

1158 Khodu-Sadla Surendranagar S/C 66 KV 12.00 11/03/1994

1159 Sadla - Dholia Surendranagar S/C 66 KV 10.50 29/05/2007

1160 Sadla - Vadadhra Surendranagar S/C 66 KV 15.00 03.11.2011 0.304.2014

1161 Sadla(220KV)-Sadla Surendranagar S/C 66 KV 4 03.11.2011 0.304.2014

1162 Sadla(220KV)-Kuntalpur Surendranagar S/C 66 KV 4.5 05.06.2014

1163 66KV Limbdi-Tuva Surendranagar S/C 66 KV 22.08 31.05.2014

1164 66KV Rajsitapur-Navalgadh-2 Surendranagar S/C 66 KV 8 16/04/91

1165 66KV Rajapara-Mahidad-1 Surendranagar D/C 66 KV 11.5 29/05/12

1166 66KV Rajapara-Mahidad-2 Surendranagar D/C 66 KV 11.5 29/05/12

1167 Dholiya - Umarda Surendranagar S/C 66 KV 10.50 24/10/2008

1168 Raigadh - Kuntalpur Surendranagar S/C 66 KV 12.00 30/07/2008

1169 Dhandhuka - Panshina Surendranagar S/C 66 KV 15.00 31/03/2010

1170 Vavdi-Ishadra line Surendranagar S/C 66 KV 2.80 20/12/2013

1171 Botad - Moti Vavdi Surendranagar S/C 66 KV 23.00 31/03/2010

1172 Limbdi Vastadi line Surendranagar S/C 66 KV 23.46 31.05.2014

1173 Dhandhuka - Dholera Surendranagar S/C 66 KV 29.00 11/02/2010

1174 Kamlapur-Lakhanka Surendranagar S/C 66 KV 18.71 21/08/2009

1175 66 kv Ratanpar-Sudamda Surendranagar S/C 66 KV 25.05 19/12/2012

1176 Sudamda - Dhandhalpur Surendranagar S/C 66 KV 15.00 21/01/2012

1177 Sadla - Waa Solar-1 Surendranagar D/C 66 KV 4.50 15/12/2012

1178 Sadla - Waa Solar-2 Surendranagar D/C 66 KV 4.50 15/12/2012

1179 Kuntalpur - Louroux-1 Surendranagar D/C 66 KV 12.00 17/1/2012

1180 Kuntalpur - Louroux-2 Surendranagar D/C 66 KV 12.00 17/1/2012

1181 Chharodi - Vendor Park-1 Surendranagar S/C 66 KV 7.52 03/03/2009

1182Viramgam - Sananad Tap from Nani

DevtiSurendranagar S/C 66 KV 20.46 03/03/2009

1183 Kanz-Vanod Surendranagar S/C 66 KV 31.70 28/07/2000

1184 Vanod-Vadgam Surendranagar S/C 66 KV 23.00 27/11/2000

1185 Viramgam-Lakhtar Surendranagar S/C 66 KV 40.43 25/03/1985

1186 Viramgam Zamp tap line from Lakhtar Surendranagar S/C 66 KV 12.98 25/03/1985

1187 Viramgam- Mandal Surendranagar S/C 66 KV 29.00 25/07/1983

1188 Viramgam-Patdi tap from Mandal Surendranagar S/C 66 KV 20.00 25/07/1983

1189 Viramgam-Khavad Surendranagar S/C 66 KV 22.53 15/12/1983

1190 Rangporda-Khavad Surendranagar S/C 66 KV 14.25 15/12/1983

1191 Viramgam-Viramgam(Fulwadi) Surendranagar S/C 66 KV 3.00 25/07/1976

1192 Viramgam- Mandal New Surendranagar S/C 66 KV 29.00 21/03/2009

1193 Viramgam-CORE Surendranagar S/C 66 KV 17.41 15/05/1995

1194 Viramgam-Kanz Surendranagar S/C 66 KV 25.70 14/11/1992

1195 Viramgam - Chharodi-1 line Surendranagar S/C 66 KV 24.87 15/04/1990

1196 Viramgam - Chharodi-2 Surendranagar S/C 66 KV 23.86 10/06/1994

1197 Viramgam-Kamalpur Surendranagar S/C 66 KV 19.50 23/03/1986

1198 Viramgam -Jakhwada Surendranagar S/C 66 KV 12.25 02/11/2004

1199 Jakhwada - Chharodi Surendranagar S/C 66 KV 16.30 02/11/2004

1200 Vendorpark-Changodar Surendranagar S/C 66 KV 36.90 17/04/1998

1201 Vendor Park - Moraiya Surendranagar S/C 66 KV 31.80 17/04/1998

1202 Azure Power-Dhama Surendranagar D/C 66 KV 3.831 22/06/2011

1203 ESP Urja-Dhama Surendranagar D/C 66 KV 3.907 22/11/2011

1204 Visual Percept-Dhama Surendranagar D/C 66 KV 17.5 12/08/2011

1205 Chattle-Patdi Surendranagar D/C 66 KV 7.911 29/12/2012

1206 Responsive-Kamalpur Surendranagar D/C 66 KV 4.191 12/09/2012

1207 Emco-Dhama- 1 Surendranagar D/C 66 KV 3.401 21/01/2012

1208 Emco-Dhama- 2 Surendranagar D/C 66 KV 3.401 21/01/2012

1209 66KV Dhrangadhra Hirapur-1 Surendranagar S/C 66 KV 19.00 16/09/1987

1210 Mi My Solar - Dhama Surendranagar D/C 66 KV 6.581 26/10/2012

1211 Millenium - Dhama Surendranagar D/C 66 KV 3.015 25/03/2012

1212 Mandal- Vadgam Surendranagar D/C 66 KV 19.2 30/12/2012

1213 Vendor Park - Bol Surendranagar S/C 66 KV 4.00 24/06/2013

1214 Bol- Sanad-II Surendranagar S/C 66 KV 3.00 24/06/2013

1215 Vastadi - Chokdi Surendranagar S/C 66 KV 10.80 31/05/2012

1216 66KV Chokdi-Chachka Surendranagar S/C 66 KV 6 07/02/2014

1217 66Kv Sara virpar Line Surendranagar S/C 66 KV 7.30 07/07/2011

Page 64

Page 32: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

1218 Vadgam-Dhama line - 1 Surendranagar S/C 66 KV 13.50 18/9/2012

1219 Vadgam-Dhama line - 2 Surendranagar S/C 66 KV 13.50 07/08/2011

1220 Viramgam-IOCL line Surendranagar S/C 66 KV 2.50 14/2/2012

1221 66KV Charadva-Devaliya Surendranagar S/C 66 KV 12.50 23.11.1995

1222 66KV Hirapur Rajsitapur Surendranagar S/C 66 KV 13.50 27.12.98

1223 66KV Than-2 Daldi Surendranagar Power cable 66 KV 0.87 30.08.2005

1224 66KV Tarnetar-Than-2 Surendranagar S/C 66 KV 12.50 30.08.2005

1225 66KV Mansar-Sarambhada Surendranagar S/C-D/C 66 KV 8.60 04.07.2007

1226 66KV Dhrangadhra-Khodu Surendranagar S/C 66 KV 27.60 19.03.2009

1227 66KV Halwad-Halwad (GIDC) Surendranagar S/C 66 KV 0.87 15.05.2013

1228 66KV Ranpur-NWRWKSD Surendranagar Cable+Hframe 66 KV 5.00 04.06.2013

1229 66KV Ranpur-Abellon 1 Surendranagar S/C 66 KV 11.12 13.11.2013

1230 66KV Ranpur-Abellon 2 Surendranagar S/C 66 KV 11.12 13.11.2013

1231 66KV Kankawati-Ranmalpur Surendranagar S/C 66 KV 8.00 18.11.2013

1232 66KV Malaniyad-Ranmalpur Surendranagar S/C 66 KV 8.00 18.11.2013

1233 Dhavana-Ratanpar Surendranagar S/C 66 KV 10.62 02.01.2014

1234 66KV Viramgam- Haq Steel line Surendranagar S/C 66KV 1.50 12.12.2014

1235 66KV Dudhrej-NC33 Surendranagar UG Cable 66 KV 3.00 15.03.2014

1236 66KV Mansar-Halwad Surendranagar S/C-D/C 66 KV 3.90 14.10.2014

1237 66KV Chandarva-Motivavdi Surendranagar S/C 66KV 7.68 21.10.2014

1238 66KV Paliyad-Alampar Surendranagar S/C 66KV 12.25 16.01.2015

1239 66KV Limbdi-Khandiya Surendranagar S/C 66KV 20.00 23.04.2015

1240 66KV Chuda-Khandiya Surendranagar S/C 66KV 22.50 23.04.2015

1241 66kV Umarada - Devpara line Surendranagar S/C 66KV 11.76 28.02.2015

1242 66kV Lunsar - Mandasar line Surendranagar S/C 66KV 6.41 31.03.2015

1243 66KV NC-26 Surendranagar S/C 66KV 1.70 01.04.2015

1244 66KV NC-30 Surendranagar S/C 66KV 2.00 01.04.2015

1245 66KV Mathak-Charadava Surendranagar S/C 66KV 5.00 16.06.15

1246 66KV Mathak-Chupni Surendranagar S/C 66KV 9.00 16.06.15

1247 66KV Viramgam-Thorimubarak Surendranagar S/C 66KV 5.00 09.05.2015

1248 66KV Lakhtar-Thorimubarak Surendranagar S/C 66KV 35.43 09.05.2015

1249 66 Kanz-Vithalapur Surendranagar S/C 66KV 18 21.07.2015

1250 66KV Vanod-Vithalapur Surendranagar S/C 66KV 13.8 21.07.2015

1251 66KV Bol-I to Bol-II Surendranagar (UG Cable) 66KV 4.31 12.08.2015

1252 66KV Mandal-Honda line Surendranagar

S/C

(Tower+UG

cable)

66 KV 20.48 21.09.2015

1253 66kv Amreli-Amreli'A' Amreli S/C 66 KV 12.00 15.09.2001

1254 66 KV Amreli - Gawadaka Amreli S/C 66 KV 22.50 18.11.2008

1255 66 KV Amreli-A-Amreli-B Amreli S/C 66 KV 14.50 07.07.1981

1256 66kv Skd-Liliya Amreli S/C 66 KV 23.00 01.06.1992

1257 66kv Chalala-Sarambhada Amreli S/C 66 KV 18.00 13.10.90

1258 66kv Bagasara-Kukavav Amreli S/C 66 KV 18.00 29.03.91

1259 66kv Sarambhada-Bagasara Amreli S/C 66 KV 14.00 13.10.90

1260 66kv Gawadaka -Amreli 'B' Amreli S/C 66 KV 10.50 18.11.2008

1261 66 KV Simrean - Amreli- B Amreli S/C 66 KV 29.00 01.01.2008

1262 66 KV Simran-APPL Amreli S/C 66 KV 8.00 25.2.2011

1263 66KV Liliya -gundaran Amreli S/C 66 KV 16.00 09.09.08

1264 66kv Amreli-M'Pipriya line Amreli S/C 66 KV 19.00 01.05.2009

1265 66KV Babra - Nadala Line Amreli S/C & D/C 66 KV 29.57 23.07.2015

1266 66KV Nadala - Kotdaptha Line Amreli S/C & D/C 66 KV 16.03 23.07.2015

1267 66 KV Babra - Kuvargadh Line Amreli S/C & D/C 66 KV 14.00 22.11.2014

1268 66 KV Chital - Kuvargadh Line Amreli S/C & D/C 66 KV 16.64 22.11.2014

1269 66 KV Amreli - Chital Amreli S/C 66 KV 7.00 21.05.01

1270 66KV Kotadapitha -Khambhada. Amreli S/C 66 KV 18.00 01.02.2010

1271 66 KV Lathi - Malaviapipariaya Amreli S/C 66 KV 6.06 01.05.2009

1272 66 KV Kotadapitha-SEPC-01 Amreli S/C 66 KV 5.00 4.3.2011

1273 66 KV Kotadapitha-SEPC-02 Amreli S/C 66 KV 5.00 13.7.2011

1274 66 KV Tori - Kukavav Amreli S/C 66 KV 13.50 31.03.1991

1275 66KV Khambhala-Theolia line No.1 & 2 Amreli D/C 66 KV 13.44 15.12.2012

1276 66 KV Dhasa-Babra Amreli S/C 66 KV 18.00 08.12.1983

1277 66 KV Dhasa-Lathi Amreli S/C 66 KV 16.00 13.05.1966

1278 66 KV Gadhakada - Vijapadi Amreli S/C 66 KV 16.00 07.01.08

1279 66KV Virdi- Gariyadhar-1 Amreli S/C 66 6.00 22.07.2014

1280 66KV Lunidhar - Amreli - 1 Amreli S/C 66 15.00 12.03.2014

1281 66 KV LUNIDHAR- ANKADIYA Amreli S/C 66 7.974 10.10.2014

1282 66kv Savarkundla-Virdi Amreli S/C 66 KV 31 22.04.14

Page 65

Page 33: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

1283 66KV Paliyad-Botad No-I Amreli S/C 66 KV 16.71 15.08.92

1284 66KV PALIYAD-HADDAD LINE Amreli S/C 66 KV 9.83 04.12.92

1285 66KV HADDAD-BOTAD LINE Amreli S/C 66 KV 8.00 04.12.92

1286 66KV Paliyad-Vichhiya Amreli S/C 66 KV 26.56 16.10.93

1287 66KV Samdhiyala(Botad) - Botad -2 Amreli S/C 66 KV 6.16 05.12.91

1288 66KV Botad-2 to Botad-1 Amreli S/C 66 KV 6.97 05.12.91

1289 66KV Samdhiyala(Botad) - Salangpur Amreli S/C 66 KV 6.70 05.12.91

1290 66KV Salangpur-Lathidad Amreli S/C 66 KV 8.29 27.02.93

1291 66KV Lathidad-Keriya Amreli S/C 66 KV 16.85 27.02.93

1292 66KV Keriya-Lakheni Amreli S/C 66 KV 8.62 27.02.93

1293 66 KV Dhasa-Gadhali Amreli S/C 66 KV 18.7325.01.90

LILO Dt-01.08.2014

1294 66 KV Gadhali-Gadhada Amreli S/C 66 KV 14.5925.01.90

LILO Dt-01.08.2014

1295 66 KV Paliyad - Turkha Amreli S/C 66 KV 13.11 28.02.00

1296 66 KV Gadhada-Tatam Amreli S/C 66 KV 14.77 29.03.91

1297 66 KV Tatam-Botad Amreli S/C 66 KV 13.44 29.03.91

1298 66 KV Paliyad-Bhimdad Amreli S/C 66 KV 22.0921.7.2012

LILO Dt-11.01.2014

1299 66 KV Bhimdad-Rojmal Amreli S/C 66 KV 23.5421.7.2012

LILO Dt-11.01.2014

1300 66KV Rojmal-Gadhada line Amreli S/C 66 KV 14.66 21.7.2012

1301 66KV Gadhada-Kalatalav Amreli S/C 66 KV 21.17 8.05.06

1302 66KV VICHHIYA-BANDHANI Amreli S/C 66 KV 16.72 06.07.07

1303 66 KV Paliyad - Ratanpar Amreli S/C 66 KV 5.88 20.09.02

1304 66 KV Ratanpar- Sudamada Amreli S/C 66 KV 10.55 18/05/1905

1305 66KV Dhasa-Malapara. Amreli S/C 66 KV 7.45 18/05/1905

1306 66 KV Dhasa-Babra Amreli S/C 66 KV 23.43 08.12.1983

130766 KV Dhasa-Bajud(Tap Dharwala &

Sanosara)Amreli S/C 66 KV 33.20 01.09.89

1308 66KV Dharwala- Dhola Amreli S/C 66 KV 10.00 01.09.89

1309 66 KV Dhasa-Lathi Amreli S/C 66 KV 20.54 13.05.1966

1310 66 KV Dhasa - Damnagar Amreli S/C 66 KV 13.72 19/05/1905

1311 66 KV Dhasa - Chavand Amreli S/C 66 KV 12.04 13.6.02

1312 66 KV (Samdhiyala) -Motivavdi Amreli S/C 66 KV 16.50 10.6.2010

1313 66 KV Turkha Sanali Amreli S/C 66 KV 9.55 22.10.2011

1314 66 KV Bandhani-Ambardi Amreli S/C 66 KV 6.58 19.11.2011

1315 66 KV Sanosara BPPL line Amreli S/C 66 KV 2.05 18.2.2012

1316 66 KV Noghanvadar -Mandavi line Amreli S/C 66 KV 11.26 5.6.2012

1317 66 KV Malapara -Jambarvala line Amreli S/C 66 KV 12.51 21.7.2012

1318 66 KV Gadhada Jambarwala line Amreli S/C 66 KV 23.05 21.7.2012

1319 66KV Barwala-navda line Amreli S/C 66 KV 8.87 19.12.2012

1320 66KV Barwala-GWIL line Amreli S/C 66 KV 8.87 18.12.2012

1321 66 KV Kalatalav Ujalvav Line Amreli S/C 66 KV 7.56 23.02.2013

1322 66kv Rojmal Windfarm line 1 & 2 Amreli D/C 66 KV 3.77 26.6.2013

1323 66kv Chavand ss - Chavand ww ss Amreli S/C 66 KV 0.22 02.04.2013

1324 66kv Gadhada GWIL Amreli S/C 66 KV 3.85 08.05.2013

1325 66kv Vinchhiya- Vadali -1 Amreli D/C 66 KV 22.29 28.09.2013

1326 66KV Bandhani-Sanali Amreli S/C 66 KV 10.91 08.05.2014

1327 66KV Kalatalav-Lakheni Amreli S/C 66 KV 11.29 21.07.2014

1328 66KV Barwala-Maxan Amreli S/C 66 KV 17.5 20.06.2015

1329 66KV Paliyad-Alampar Amreli S/C 66 KV 12.11 11.11.2014

1330 66 KV Savarkundla-Savarkundla Amreli S/C 66 KV 2.90 1992

1331 66 KV Savarkundla-Simran Amreli S/C 66 KV 12.25 14.10.2008

1332 66 KV Savarkundla-Badhada Amreli S/C+D/C 66 KV 9.33 19.04.2014

1333 66 KV Badhada-Samadhiyala Amreli S/C+D/C 66 KV 15.75 19.04.2014

1334 66 KV Savarkundla-Jafrabad No.2 Amreli D/C 66 KV 52.83 03.08.1982

1335 66 KV Savarkundla-Gadhakada Amreli S/C+D/C 66 KV 13.86 07.01.2008

1336 66 KV Gadhakada-Vijapadi Amreli S/C+D/C 66 KV 16.10 07.01.2008

1337 66 KV Savarkundla-Vanda Amreli S/C 66 KV 20.09 16.08.1985

1338 66 KV Savarkundla-Chalala No. 1 Amreli S/C 66 KV 19.78 23.01.1988

1339 66 KV Savarkundla-Chalala No. 2 Amreli S/C 66 KV 19.55 01.02.1994

1340 66 KV Savarkundla-Gariyadhar (Virdi) Amreli S/C 66 KV 23.60 1966

1341 66 KV Chalala-Dhari Amreli S/C 66 KV 10.92 28.03.1990

1342 66 KV Dhari-Dudhala Amreli S/C 66 KV 18.46 20.11.1997

1343 66 KV Dhari-Kagdadi Amreli S/C 66 KV 28.57 11.10.2014

1344 66 KV Kagdadi-Bhader Amreli S/C 66 KV 9.09 11.10.2014

1345 66 KV Bhader-Dalkhaniya Amreli S/C 66 KV 15.19 01.06.2006

Page 66

Page 34: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

1346 66 KV Vanda-Jesar Amreli S/C 66 KV 21.13 16.08.1985

1347 66 KV Savarkundla-Ambardi Amreli D/C 66 KV 20.26 02.08.2015

1348 66 KV Samadhiyala-Khambha Amreli S/C+D/C 66 KV 23.61 04.10.2005

1349 66 KV Jafrabad-PSL 1 Amreli D/C 66 KV 8.64 25.09.2008

1350 66 KV Ambardi-Jafrabad No. 1 Amreli D/C 66 KV 36.90 02.08.2005

1351 66 KV Jafrabad-PSL 2 Amreli D/C 66 KV 8.38 25.09.2008

1352 66 KV Samadhiyala-Devla Amreli S/C 66 KV 12.61 20.11.2009

1353 66 KV Khambha-Rabarika Amreli S/C+D/C 66 KV 23.19 04.03.2010

1354 66 KV Dalkhaniya-Kubda Amreli S/C 66 KV 7.83 22.12.2011

1355 66 KV Barman-Sunkon No. 1 Amreli D/C 66 KV 12.19 24.05.2012

1356 66 KV Barman-Sunkon No. 2 Amreli D/C 66 KV 12.20 24.05.2012

1357 66 KV Khambha-Dedan Amreli S/C 66 KV 9.64 19.01.2013

1358 66 KV Savarkundla-Liliya Amreli S/C 66 KV 23.00 01.06.1992

1359 66 KV Rajula-Kadiyali Amreli S/C+D/C 66 KV 11.99 1996

1360 66 KV Jesar-Khuntavda Amreli S/C 66 KV 10.12 20.05.2014

1361 66 KV Savarkundla-Mota Agariya Amreli S/C 66 KV 35.54 06.07.2015

1362 66kv Mota Agriya-Rajula Amreli S/C 66 KV 10.94 06.07.2015

1363 66kv Barpatodi-Barman Amreli S/C 66 KV 11.44 25.05.2015

1364 66kv Rajula-Barpatodi Amreli S/C 66 KV 9.92 25.05.2015

1365 66kv Dedan - Mota Barman Line Amreli S/C 66 KV 9.52 19.06.2015

1366 66 kv Otha-Dudhala 2 line Amreli S/C 66 KV 24.652 22.06.2004

1367 66 kv Bhaguda - Bagdana line Amreli S/C 66 KV 14.808 27.06.2007

1368 66 kv Otha - Kalsar Amreli S/C 66 KV 12.105 30.09.2008

1369 66 kv Bagdana - Kadamgiri line Amreli S/C 66 KV 13.526 30.11.2009

1370 66 kv Otha Belampar line Amreli S/C 66 KV 12.116 31.03.2013

137166 kv KP Energy (WF) - Kadamgiri Line

No.1 Amreli S/C 66 KV 4.643 30.6.2012

137266 kv KP Energy (WF) - Kadamgiri Line

No.2Amreli S/C 66 KV 4.507 30.6.2012

1373 66kv Kalsar-Datha Line Amreli S/C 66 KV 15.209 30.09.2008

1374 66kv otha-Bhaguda Line Amreli S/C 66 KV 14.351 27.06.2007

1375 66kv Dudhal - 2 Khutavada Amreli S/C 66 KV 12.256 12.12.2012

1376 66kv Otha-Mahuva Amreli S/C 66 KV 21.456 22.06.2004

1377 66kv Otha-Vadli Amreli S/C 66 KV 15.493 22.10.1996

1378 66kv Mahuva -Vangar Amreli S/C 66 KV 17.322 12.01.2009

1379 66kv Mahuva-Vadli Amreli S/C 66 KV 15.461 22.10.1996

1380 66kv Mota Khutavada-Billa Amreli S/C 66 KV 7.61 14.03.2013

1381 66kv Vangar- Dungar Amreli S/C 66 KV 13.532 12.01.2009

1382 66kv Khutavda-Babariyadhar Amreli S/C 66 KV 16.941 4.08.2012

1383 66kv Vijapadi-Babariyadhar Amreli S/C 66 KV 16.801 4.08.2012

1384 66kv Kadiyali-Dungar Amreli S/C 66 KV 13.34 21.07.2010

1385 66kv Otha - Pasvi-Pithalpur Tap Amreli S/C 66 KV 36.756 1.09.1998

1386 66kv Pasvi - Talaja Amreli S/C 66 KV 12.475 1.09.1998

1387 66kv Talaja - Manar Amreli S/C 66 KV 16.636 28.02.1999

1388 66kv Sagapara-Devaliya Tap Thadach Amreli S/C 66 KV 30.280 4.12.1981

1389 66kv Devaliya-Talaja Amreli S/C 66 KV 5.549 4.12.1981

1390 66kv Thadach-Bagdana Amreli S/C 66 KV 16.295 23.12.1995

1391 66kv Datha Pithalpur Amreli S/C 66 KV 11.535 17.06.2011

1392 66kv Dihor Trapaj line Amreli S/C 66 KV 11.371 14.12.2011

1393 66kv Mannar Shri Ram Oxygen line Amreli S/C 66 KV 2.281 28.06.2012

1394 66 kv Thadach- Veer energy No 1 Amreli S/C 66 KV 9.726 28.06.2012

1395 66 kv Thadach- Veer energy No 1 Amreli S/C 66 KV 9.737 28.06.2012

1396 66kv Trapaj-Kukad Line Amreli S/C 66 KV 4.944 31.05.2014

1397 Vartej - Navagam Amreli S/C 66 KV 5.00 16.02.72

1398 Navagam- Sihor Amreli S/C 66 KV 11.00 16.02.72

1399 Vartej - Sihor tap to Nesda and Ghanghli Amreli S/C 66 KV 20.00 16.02.72

1400 Vartej - Sardarnagar Amreli S/C 66 KV 11.80 21.07.71

1401 Sardarnagar - Bunder Amreli S/C 66 KV 6.40 21.07.71

1402 Vartej - Bunder Amreli S/C 66 KV 15.90 21.07.71

1403 Bunder - Excel Amreli S/C 66 KV 0.10 15.05.14

1404 Vartej - Chitra Amreli S/C 66 KV 4.00 11.10.78

1405 Vartej - Nari (Nari - 2) Amreli S/C 66 KV 7.30 19.10.72

1406 Nari - City (Nari-2) Amreli S/C 66 KV 4.20 19.10.72

1407 Vartej - Unity (City) Amreli S/C 66 KV 15.50 07/06/1905

1408 Vartej - Kharkadi Amreli S/C 66 KV 20.50 13.03.14

1409 Kharkadi - Sar Amreli S/C 66 KV 16.50 02.04.66

1410 Sar - Songadh Amreli S/C 66 KV 13.47 02.04.66

Page 67

Page 35: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

1411 Songadh - Ghodidhal Amreli S/C 66 KV 9.25 02.04.66

1412 Ghodidhal - Sagapara Amreli S/C 66 KV 15.30 02.04.66

1413 Sagapara - Nonghanvadar Amreli S/C 66 KV 20.00 21.09.99

1414 Sagapara - Palitana Amreli S/C 66 KV 8.00 01.07.00

1415 Sagapra - Tana Amreli S/C 66 KV 14.00 13.09.99

1416 Sagapara - Songadh Amreli S/C 66 KV 21.00 17.09.98

1417 Bajud -Songadh Amreli S/C 66 KV 6.54 01.09.89

1418 Sihor - Songadh Amreli S/C 66 KV 10.00 29.06.95

1419 Sidsar - Mamsa Amreli S/C 66 KV 10.00 11.11.93

1420 Sidsar - Bhumbhli Amreli S/C 66 KV 16.50 21.02.99

1421 Nari - Nirma O/G Amreli S/C 66 KV 11.21 01.08.99

1422 Nari - Nirma I/C Amreli S/C 66 KV 11.21 01.08.99

1423 Mamsa - Ukharala Amreli S/C 66 KV 5.70 27.09.03

1424 Mamsa - Nathugadh Amreli S/C 66 KV 25.00 10.11.93

1425 Tansa - Nathugadh Amreli S/C 66 KV 11.85 12.03.2011

1426 Ghanghli - Vallbhipur tap to Maglana Amreli S/C 66 KV 18.90 16.02.72

1427 Tansa-Suzlon Amreli S/C 66 KV 5.80 11.10.05

1428 Tana-Dihor Amreli S/C 66 KV 11.04 07.11.07

1429 Dihor - Tansa Amreli S/C 66 KV 17.77 26/12/10

1430 Sagapara-Dihor Amreli S/C 66 KV 20.00 19.12.08

1431 Valbhipur-Motidharai Amreli S/C 66 KV 13.68 26-07-2009

1432 Motidharai Parnavi Amreli S/C 66 KV 8.35 26.05.10

1433 Sagapara - Gheti Tap Palitana Amreli S/C 66 KV 13.81 12.12.11

1434 Ghenti-Mangadh Amreli S/C 66 KV 13.15 12.12.11

1435 Mangadh-Bhandariya Amreli S/C 66 KV 10.26 12.12.11

1436 Sagapara-Palitana B Amreli S/C 66 KV 5.05 12.12.11

1437 Valkategate-Bunder road Amreli S/C 66 KV 1.09 12.12.11

1438 Valkat Gate - Steelcast Amreli S/C 66 KV 0.96 04/01/2013

1439 Vartej - Nesda Amreli S/C 66 KV 11.88 01/02/2013

1440 Vartej - Desainagar Amreli S/C 66 KV 4.43 23/01/2013

1441 Nesda - M D Inducto Amreli S/C 66 KV 0.05 01/02/2013

1442 Dhola - Sanosara Amreli S/C 66 KV 7.17 25/07/2013

1443 V'pur - Nirma Amreli S/C 66 KV 33.19 06.08.15

1444 Dharvala - Dhola Amreli S/C 66 KV 10.00 01.09.89

1445 Ghanghali-Ghanghali-3 (UG Cable) Amreli S/C 66 KV 0.12 21.02.2014

1446 Vartej-Sidsar-1 ( UG Cable) Amreli S/C 66 KV 8.47 05.03.2014

1447 Vartej-Sidsar-2 ( UG Cable) Amreli S/C 66 KV 8.47 05.03.2014

1448 Sidsar-Mamsa-2( UG Cable) Amreli S/C 66 KV 12.583 18.03.2014

1449 Sihor-Sihor-2(UG Cable) Amreli S/C 66 KV 0.09 24.04.2014

1450 Mamsa-2-Narmada Concast(UG Cable) Amreli S/C 66 KV 2.578 15.04.2014

1451 Palitana-B - Shetrunji dam Amreli S/C 66 KV 8.2 04.04.2014

1452 66 Kv Anjar - Kukma Anjar S/C+D/C 66 KV 29.55 26.08.2013

1453 66kv Kukma-Bhuj Anjar S/C+D/C 66 KV 14.55 26.08.2013

1454 66 Kv Anjar - Reldi Anjar S/C+D/C 66 KV 23.98 26.04.2013

1455 66kv Reldi - Kukma Anjar S/C+D/C 66 KV 14.83 23.08.2013

1456 66kv Kukma Bhujodi Anjar S/C+D/C 66 KV 10.0523.08.2013

1457 66kv Bhujodi-Bhuj Anjar S/C+D/C 66 KV 18.00 11.02.2014

1458 66 kv Bhuj - Mankuva Anjar S/C 66 KV 18.00 5.11.76

1459 66 kv Bhuj - Sukhpar Anjar D/C 66 KV 6.305.07.1982

13.08.2009

1460 66 kv Sukhpar- Deshalpar Anjar D/C 66 KV 19.305.07.1982

13.08.2009

1461 66kv Bhuj Dahisara Dahisara tap tap line S/C 66 KV 30.00

25.05.76

21.08.2014

21.09.20151462 66KV Baladiya -Sanosara S/C 66 KV 16.00 21.09.2015

1463 66kv Sanosara- Kotda[Ch] Line Anjar S/C 66 KV 5.03 21.08.2014

1464 66 kv Bhuj - Madhapar - Bhuj'B' Anjar S/C 66 KV 22.00 16.04.87

1465 66 kv Bhuj 'B'-Loriya-Lakhond Anjar S/C 66 KV 31.00 16.04.87

1466 66 kv Loriya - Khavada Anjar S/C 66 KV 48.00 25.12.99

1467 66 kv Khavada - Vighacot Anjar S/C 66 KV 89.50 2.08.07

1468 66 kv Khavada - Bhediabat Anjar S/C 66 KV 52.77 25.08.07

1469 66 kv Kukma- Madhapar -1 Anjar S/C 66 KV 5.56 24.12.08

1470 66 kv Kukma- Madhapar -2 Anjar S/C 66 KV 5.24 25.06.13

1471 66 kv Kukma- Kotda (C) Anjar S/C 66 KV 8.6111.04.94

22.12.08

1472 66 kv Kukma- lakhond Anjar S/C 66 KV 6.28 23.12.08

Page 68

Page 36: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

1473 66KV kotda (C) - Tharavda Anjar S/C 66 KV 7.20 29.10.04

1474 66 kv Dahinsara - Baladia Anjar S/C 66 KV 10.00 15.03.2000

1475 66 kv Bidada - Kera Anjar S/C 66 KV 34.844/4/1998

05.10.2013

1476 66 kv Dahisara - Kera Anjar S/C 66 KV 18.15 05.10.2013

1477 66 kv Bidada - Dahisara-2 Anjar S/C 66 KV 32.00 27/11/1998

1478 66 kv Bidada - Darshadi Anjar S/C 66 KV 23.00 28/9/2003

1479 66KV Bidada - Asambiya Anjar S/C 66 KV 7.37 28.02.2015

1480 66KV Asambiya - Nani Mau -Don Tap Anjar S/C 66 KV 16.78 28.02.2015

1481 66 kv Koday - Mandvi Anjar S/C 66 KV 12.00 03/05/1999

1482 66KV Koday -Gundiyali line -1 Anjar D/C 66 KV 9.64 28.02.2015

1483 66KV Koday -Gundiyali line -2 Anjar D/C 66 KV 9.64 28.02.2015

1484 66 kv Bidada - Nanikhakhar Anjar S/C 66 KV 6.00 04/04/1998

1485 66 KV Bidada-Siracha-1 Anjar S/C 66 KV 19.16 09/06/2009

1486 66 KV Bidada-Siracha-2 Anjar S/C 66 KV 19.16 09/01/2009

1487 66 KV Siracha-Mundra industrial Anjar S/C 66 KV 13.64 09/01/2009

1488 66 KV Siracha-APL Anjar S/C 66 KV 2.45 09/06/2009

1489 66 kv Bidada - Bhujpar Anjar S/C 66 KV 16.50 03/05/1999

1490 66 kv Mundra - Bhujpur Anjar S/C 66 KV 22.00 03/05/1999

1491 66kV Bhujpur - 66KV Baraya line Anjar S/C 66 KV 9.55 15.06.2015

1492 66 kv Bhujpur - Jindal Anjar S/C 66 KV 6.09 12/06/2006

1493 66 kv Talvana - Koday Anjar S/C 66 KV 7.60 29.04.10

1494 66 kv Bidada - Talvana Anjar S/C 66 KV 23.30 03/05/1999

1495 66 kv Loriya - Nirona Anjar S/C 66 KV 18.00 2.08.10

1496 66 KV Khavda- solaris Anjar S/C 66 KV 20.00 17.6.10

1497 66 kv Lakhond-chapredi Anjar S/C 66 KV 9.27 27.7.12

1498 66kv Loriya Dhordo Anjar S/C 66 KV 59.50 08.12.2012

1499 66kv Dhordo Khavda Anjar S/C 66 KV 53.50 08.12.2012

1500 66 kv Anjar - Gandhidham B line no -1 Anjar D/C 66 KV 12.0017.01.75

07.03.05

1501 66 kv G'dham 'B' - Mithi Rohar Anjar D/C 66 KV 2.3017.01.75

15.05.04

1502 66 kv Mithirohar- IFFCO line Anjar D/C 66 KV 5.0017.01.75

15.05.04

1503 66 kv Mithirohar-MID- india line Anjar S/C 66 KV 5.50 18.04.05

1504 66KV Mithirohar - GPT Anjar S/C 66 KV 1.50 12.12.05

1505 66 kv Kandla - IFFCO (T) Anjar D/C 66 KV 1.00 17.01.75

1506 66 kv FTZ - Kandla (T) Anjar D/C 66 KV 16.00 17.01.75

1507 66 kv Anjar - G'dham -B line no - 2 Anjar D/C 66 KV 8.5017.01.75

23.09.10

1508 66 kv G'dham -B - FTZ line Anjar D/C 66 KV 18.5017.01.75

23.09.10

1509 66 kv Anjar - FTZ (H-frame) Anjar D/C 66 KV 19.00 30.07.75

1510 66 KV Anjar - FTZ(KPT-2) Anjar D/C 66 KV 19.00 30.09.06

1511 66 kv FTZ - KPT Anjar D/C 66 KV 8.0028.06.2000

28.09.06

1512 66KV FTZ - Shefali Anjar S/C 66 KV 8.60 30.12.05

1513 66 kv Anjar - KPT Anjar D/C 66 KV 27.00 28.06.2000

1514 66 kv Chirai-Anjar Line (Tap at Sukhpar) Anjar S/C 66 KV 29.5706.08.75 20.02.2000

08.10.2013

1515 66 kv Sukhpar - Amardi line Anjar S/C 66 KV 7.99 08.10.2013

1516 66 kv Anjar - Vidi Anjar S/C 66 KV 5.00 18.03.2013

1517 66 kv Vidi - Khedoi Anjar S/C 66 KV 8.00 18.03.2013

1518 66KV Anjar - Khokhara S/C 66 KV 14.53 16.02.2015

1519 66KV Dudhai -Khokhara S/C 66 KV 31.14 16.02.2015

1520 66 KV Anjar -Varsamedi line Anjar S/C 66 KV 9.84 01.09.2014

1521 66 KV Varsamedi-Chirai line Anjar S/C 66 KV 26.34 01.09.2014

1522 66 kv Anjar - Ratnal Anjar S/C 66 KV 13.00 09.10.02

1523 66 kv Ratnal-Dhaneti Line Anjar S/C 66 KV 8.00 07.06.05

1524 66 kv Anjar - Varsana Anjar S/C 66 KV 15.00 21.08.04

1525 66 kv Varsana- PSL Anjar S/C 66 KV 4.00 21.04.05

1526 66kv Varsana - ISL Anjar S/C 66 KV 3.50 08.04.05

1527 66KV Varsana - Varsana Ispat Anjar S/C 66 KV 5.60 26.12.05

1528 66 kv Chirai-Anjar Line Anjar S/C 66 KV 60.00 28.10.05

1529 66 KV Khedoi - Mokha Anjar S/C 66 KV 18.0030.06.80

30.03.06

1530 66KV Mokha - Patri Anjar S/C 66 KV 21.97 28.02.2015

1531 66KV Mundra - Patri Anjar S/C 66 KV 18.32 28.02.2015

1532 66KV Mokha(Vadala) - Nilkanth line Anjar S/C 66 KV 9.7530.03.06

12.09.2014

Page 69

Page 37: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

1533 66KV Mokha(Vadala) -Mokha line Anjar S/C 66 KV 4.2530.03.06

12.09.2014

1534 66 KV Mundra- Mundra industrial Anjar S/C 66 KV 6.0001.05.01

20.02.06

1535 66 kv Mundra industrial - Willmar Anjar S/C 66 KV 0.9101.05.01

20.02.06

1536 66 kv Mundra - Adani Port - Tap MICT Anjar D/C 66 KV 14.38 05.09.02

1537 66 kv Dudhai -kanaiyabe Anjar S/C 66 KV 16.1205.03.97

27.06.08

1538 66 kv kanaiyabe-Dhaneti Anjar S/C 66 KV 8.3405.03.97

27.06.08

1539 66 kv Dhaneti -Padhdhar Anjar S/C 66 KV 10.3005.03.97

07.04.2014

1540 66 kv Padhdhar -Lakhond Anjar S/C 66 KV 5.60 07.04.2014

1541 66Kv Dhaneti- Global Anjar S/C 66 KV 7.50 03.05.05

1542 66Kv Dhaneti- ESSAR Anjar S/C 66 KV 8.60 03.02.07

1543 66 KV Khedoi - Mann Ind. Anjar S/C 66 KV 2.52 11.01.07

1544 66 KV Mundra Industrial - HPCL Anjar S/C 66 KV 5.08 24.04.07

1545 66 kv Tappar- Dudhai Anjar S/C 66 KV 14.20 15.05.08

1546 66 kv Tappar- Amardi Anjar S/C 66 KV 16.00 05.08.08

1547 66 kv Tharavda- Khambhara Anjar S/C 66 KV 12.88 25.06.08

1548 66 kv Tappar- Ratnamani Anjar S/C 66 KV 8.50 22.09.08

1549 66KV FTZ - Kidana Anjar S/C 66 KV 6.5018.06.05

17.07.08

1550 66 KV Kidana - SAL Anjar S/C 66 KV 2.0018.06.05

17.07.08

1551 66 KV khedoi- Suzlon(vadaliya) No.1 Anjar D/C 66 KV 7.42 09.01.09

1552 66 KV khedoi- Suzlon(vadaliya) No.2 Anjar D/C 66 KV 7.42 09.01.09

1553 66KV Mokha -Mokha line -2 Anjar S/C 66 KV 2.67 01.01.2015

1554 66KV Mokha -PCBL Anjar S/C 66 KV 0.57 01.01.2015

155566 kv Varsana- Everest Kanto ( Ankur

Chemfood) Cyl. Ltd.Anjar D/C 66 KV 3.93 19.08.10

1556 66KV Tappar - Varsana line-1 Anjar D/C 66 KV 8.54 03.08.10

1557 66KV Tappar - Varsana line-2 Anjar D/C 66 KV 8.54 11.09.14

1558 66 KV Mundra IND - HPCL Mittal line Anjar D/C 66 KV 5.18 11.01.11

1559 66KV Dudhai Welspun-1 Anjar D/C 66 KV 8.30 22.10.11

1560 66KV Dudhai Welspun-2 Anjar D/C 66 KV 8.30 24.10.11

1561 66KV kidana Renka Sugar Anjar S/C 66 KV 3.25 07.01.12

1562 66KV Varsana Sumilon Anjar S/C 66 KV 4.50 12.01.2013

1563 66kV Kaniyabe - Taxus Solar - 1 Anjar D/C 66 KV 2.31 31.03.2013

1564 66kV Kaniyabe - Taxus Solar - 2 Anjar D/C 66 KV 2.31 31.03.2013

1565 66KV Dhaneti BKT line Anjar S/C H frame 66 KV 4.69 06.06.2013

1566 66 kv Mokha-Ruchi soya Anjar S/C H frame 66 KV 14.21 27.08.2013

1567 66 kv Tappar - Jai Bharat -1 Anjar D/C 66 KV 15.01 07.02.2014

1568 66 kv Tappar - Jai Bharat -2 Anjar D/C 66 KV 15.01 04.04.2014

1569 66KV Kidana - AKBTPL line Anjar S/C 66 KV 14.47 11.10.2014

1570 66 kv Adhoi - Vajepar Anjar S/C 66 KV 28.001.9.96

10.1.12

157166 kv Samkhiyali - Adhoi (tap to

Shivalkha)Anjar S/C 66 KV 12.00 30.9.1995

1572 66 kv Vajepar - Chobari Anjar S/C 66 KV 25.00 1.9.96

1573 66 kv Samakhiyali- Vondh-1 Anjar S/C 66 KV 11.50 31.07.2013

1574 66 kv Vajepar - Balasar Anjar S/C 66 KV 38.00 26.11.1999

1575 66 kv Balasar - Amrapar Anjar S/C 66 KV 24.18 21.3.2011

1576 66 kv Shivlakha Samkhiyali 1 Anjar D/C 66 KV 17.96 10.3.2007

1577 66 kv Shivlakha Samkhiyali 2 Anjar D/C 66 KV 17.96 10.3.2007

1578 66 kv Shivlakha Samkhiyali no.3 Anjar S/C 66 KV 15.50 15.5.2005

1579 66 kv Shivlakha - Gail-samakhyali no.4 Anjar S/C 66 KV 16.50 5.12.2004

1580 66 KV Shivlakha-RRB Vestas 1 Anjar D/C 66 KV 12.70 10.09.07

1581 66 KV Shivlakha-RRB Vestas 2 Anjar D/C 66 KV 12.50 10.09.07

1582 66 kv Shivlakha - Veer Energy 1 Anjar D/C 66 KV 12.70 11.7.2007

1583 66 kv Shivlakha - Veer Energy 2 Anjar D/C 66 KV 12.70 11.7.2007

1584 66 kv Shivlakha - Rapar Anjar S/C 66 KV 32.99 15.5.2004

1585 66 kv Shivlakha - Khirai Anjar S/C 66 KV 17.30 07.08.2013

1586 66kV Khirai-Pragpar Anjar S/C 66 KV 16.30 07.08.2013

1587 66 kv Pragpar - Bhimasar Anjar S/C 66 KV 13.00 2.05.94

1588 66 kv Rapar - Pragpar Anjar S/C 66 KV 12.00 2.05.94

1589 66kv Samakhayali-Electrotherm Anjar S/C 66 KV 3.00 24.3.2005

Page 70

Page 38: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

1590 66 KV Samakhyali - ASR Line Anjar S/C 66 KV 2.50 8.10.2005

1591 66KV SMK- New Tech Anjar S/C 66 KV 6.20 28.12.2005

1592 66KV SMK-Gallant Anjar S/C 66 KV 2.10 20.12.05

1593 66KV Amardi - Hans Ispat Anjar S/C 66 KV 2.90 28.12.05

1594 66 KV Samakhiyali - Vondh-2 Anjar S/C 66 KV 15.00 31.07.2013

1595 66 kv Bhachau-Shikra Anjar S/C 66 KV 15.90 6.2.07

1596 66 KV Chirai- NRE coke Anjar S/C 66 KV 5.20 22.12.05

1597 66 kv Chirai - Sikra Anjar S/C 66 KV 13.20 2.6.2007

1598 66KV SMK- Jangi(Suzlon) 1 Anjar D/C 66 KV 14.50 2.8.08

1599 66KV SMK- Jangi(Suzlon) 2 Anjar D/C 66 KV 14.50 2.8.08

1600 66 kv Shivlakha - Shikarpur(suzlon) 1 Anjar D/C 66 KV 9.42 29.9.08

1601 66 kv Shivlakha - Shikarpur(suzlon) 2 Anjar D/C 66 KV 9.42 29.9.08

1602 66 Kv Samakhiyali-Ajanta Anjar S/C 66 KV 16.40 14.8.10

1603 66kV Shivlakha-Backbone 1 Anjar D/C 66 KV 1.70 1.1.2012

1604 66kV Shivlakha-Backbone 2 Anjar D/C 66 KV 1.70 05.04.2014

1605 66kV Shivlakha- Chitrod 1 Anjar D/C 66 KV 5.30 12.9.12

1606 66kV Shivlakha- Chitrod 2 Anjar D/C 66 KV 5.30 12.9.12

1607 Chitrod- Semisolar 1 Anjar D/C 66 KV 10.00 09.10.12

1608 Chitrod- Semisolar 2 Anjar D/C 66 KV 10.00 09.10.12

1609 Chitrod-Konark 1 Anjar D/C 66 KV 5.17 19.10.12

1610 Chitrod-Konark 2 Anjar D/C 66 KV 5.17 19.10.12

1611 Chitrod-ICML 1 Anjar D/C 66 KV 12.00 15.09.12

1612 Chitrod-ICML 2 Anjar D/C 66 KV 12.00 15.09.12

1613 66KV Shikra-Sunborne 1 Anjar D/C 66 KV 16.2011.06.12

04.06.12

1614 66KV Shikra-Sunborne 2 Anjar D/C 66 KV 16.2011.06.12

04.06.12

1615 66KV Samkhiyali-Adhoi Line no-2 Anjar S/C 66 KV 17.00 1.9.96

1616 66KV Amrdi-Monosteel Anjar S/C 66 KV 3.15 03.05.12

1617 66kV Shivlakha-Euro No.1 Anjar S/C 66 KV 1.90 22.12.12

1618 66kV Shivlakha-Euro No.2 Anjar S/C 66 KV 1.90 22.12.12

1619 66kV Vondh-Bhachau Line Anjar S/C 66 KV 9.50 31.07.2013

1620 66kV Vondh - Chirai Anjar S/C 66 KV 23.50 31.07.2013

1621 66kV Rapar-Vajepar Anjar S/C 66 KV 17.20 31.08.2013

1622 66 KV Shivlakha EPPL LINE Anjar D/C 66 KV 0.61 14.09.15

1623 66 KV Shivlakha BEL LINE Anjar D/C 66 KV 0.79 14.09.15

1624 66kv Gadhsisa- Nanimau Anjar S/C 66 KV 7.00 15.04.2010

1625 66 Kv Mothala - Khirsara Anjar S/C 66 KV 23.00 19.03.1997

1626 66 Kv Nakhatrana(Angia)-Nakhatrana Anjar S/C 66 KV 5.00 20.09.1995

1627 66 Kv Nakhatrana(Angia) - Mankuva Anjar S/C 66 KV 35.00 22.11.1999

1628 66 KV Angia-Kotda (Ja) Anjar S/C 66 KV 19.00 19.03.1978

1629 66 Kv Kotda(J)- Netra Anjar S/C 66 KV 13.00 28.03.1995

1630 66 Kv Netra - Deshalpar(Gutali) Anjar S/C 66 KV 11.8425.03.1995

07.08.2014

1631 66 Kv Deshalpar(Gutali) - Ravapar Anjar S/C 66 KV 21.72 07.08.2014

1632 66 Kv Ravapar - Dayapar Anjar S/C 66 KV 28.00 30.03.1995

1633 66 Kv Kothara - Nalia Anjar S/C 66 KV 17.00 30.03.1992

1634 66 Kv Nakhatrana (Angia) - Vithon Anjar S/C 66 KV 5.00 24.01.2002

1635 66 Kv Deshalpar - Gadhsisa Anjar S/C 66 KV 22.00 21.07.1985

1636 66 Kv Dayapar - Panandhro Anjar S/C 66 KV 15.00 18.03.1997

1637 66 kv Nakhatrana (Angia) - Deshalpar Anjar S/C 66 KV 25.00 05.10.2003

1638 66kv Deshalpar - Khirsara Anjar S/C 66 KV 13.00 30.03.1992

1639 66kv Pandhro - GMDC - I (Solar) Anjar D/C 66 KV 5.00 12.09.1997

1640 66kv Pandhro - GMDC - II (Solar) Anjar D/C 66 KV 5.00 12.09.1997

1641 66kv Don- Bayath Anjar S/C 66 KV 18.00 12.02.2005

1642 66kv Don- Mandvi Anjar S/C 66 KV 14.00 03.06.1989

1643 66kv Don- Nani Mau Anjar S/C 66 KV 19.00 15.04.2010

1644 66 kv Bayath-Changdai (Suzlon) Anjar S/C 66 KV 6.00 12.10.2005

1645 66 kv Kothara-Wanku(Windmill) NO.1 Anjar D/C 66 KV 12.00 12.10.2005

1646 66 kv Kothara-Wanku(Windmill) NO.2 Anjar D/C 66 KV 12.00 12.10.2005

1647 66KV Mothala-Rava Line S/C 66 KV 9.42 29.05.2015

1648 66KV Rava-Kothara Line S/C 66 KV 18.80 29.05.2015

1649 66 kv Angia - Mothala Anjar S/C 66 KV 31.00 11.04.2006

1650 66 KV Don- Layza No.1 (Suzlon) Anjar D/C 66 KV 14.00 28.12.2007

Page 71

Page 39: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

1651 66 KV Don- Layza No.2 (Suzlon) Anjar D/C 66 KV 14.00 28.11.2008

1652 66kv Mothala -Dumra line Anjar S/C 66 KV 19.26 01.03.2009

1653 66kv Naliya -Vagoth line Anjar S/C 66 KV 31.52 27.07.2011

1654 66KV Vaghoth -Sanghi Ind. Anjar S/C 66 KV 15.77 02.06.2014

1655 66kV Darshadi-Jamthada line Anjar S/C 66 KV 4.39 21.08.2014

1656 66kv Netra -Bitta line No.1 Anjar D/C 66 KV 19.24 13.12.2011

1657 66kv Netra -Bitta line No. 2 Anjar D/C 66 KV 19.24 13.12.2011

1658 66kv Rasaliya-Angiya(Nakha) line-1 Anjar D/C 66 KV 29.61 07.03.2012

1659 66kv Rasaliya-Angiya(Nakha) line-2 Anjar D/C 66 KV 29.61 07.03.2012

1660 66kV Naliya-Parjau Line Anjar S/C 66 KV 14.92 26.07.2012

1661 66kV Naliya-Netra Line Anjar S/C 66 KV 33.75 11.07.2013

1662 66kv Mothala -Hajapar line Anjar S/C 66 KV 9.36 05.08.2013

1663 66kv Hajapar - Dumra line Anjar S/C 66 KV 16.37 05.08.2013

1664 66KV Angiya-Nana Nakhatrana Line Anjar S/C 66 KV 7.60 26.05.2015

1665 66KV Dayapar-NaniChher Line Anjar S/C 66 KV 41.00 27.05.2015

1666 66KV Dayapar -Baranda line Anjar S/C 66 KV 54.355 11.06.2015

1667 66kv Kalawad-Nagajar Jamnagar S/C 66 KV 13.46 1965+09

1668 66kv Sikka -Sikka TPS I Jamnagar D/C 66 KV 2.00 11/06/1905

1669 66kv Sikka-Sikka TPS No.II Jamnagar D/C 66 KV 2.00 11/06/1905

1670 66kv Naghedi- B-S/S -Shapar Jamnagar S/C 66 KV 28.00 20/05/1905

1671 66kv Sikka-Shapar Line Jamnagar S/C 66 KV 15.001.05.10

1967

1672 66kv Jamnagar-Matwa (Modpar) Jamnagar S/C 66 KV 16.00 18/05/1905

1673 66kv Matwa (Modpar) -Kalawad Jamnagar S/C 66 KV 21.00 18/05/1905

167466kv Jamnagar-Haripar-Chandragadh

Tap Line Jamnagar S/C 66 KV 26.90 31.12.2012

1675 66kv Jamnagar-Banugar Jamnagar S/C 66 KV 19.60 1998/2005

1676 66kv Banugar-Jamvanthli Jamnagar S/C 66 KV 20.20 1998/2005

1677 66kv Lalpur-Babarzar Jamnagar S/C 66 KV 16.00 13/06/1905

1678 66kv Naghedi-Bedeshwar Jamnagar S/C 66 KV 6.00 08/06/1905

1679 66kv Naghedi-Satrasta (O/H) No.1 Jamnagar S/C 66 KV 4.00 22/02/1905

1680 66kv Naghedi-Satrasta (U/G) No.2 Jamnagar S/C 66 KV 2.50 18/06/1905

1681 66kv Jamnagar-Morkanda Jamnagar S/C 66 KV 3.50 06/06/1905

1682 66kv Jamnagar-Jam "B"( Tower ) Jamnagar S/C 66 KV 14.00 06/06/1905

1683 66kv Jamnagar-Hapa Jamnagar S/C 66 KV 6.00 21/06/1905

1684 66kv Naghedi-Jamnagar "C"(U/G) No.1 Jamnagar D/C 66 KV 1.50 24/06/1905

1685 66kv Naghedi-Jamnagar "C"(U/G) No.2 Jamnagar D/C 66 KV 1.50 24/06/1905

1686 66KV Jamnagar-Dhudashiya Jamnagar S/C 66KV 27.29 23.07.13

1687 66KV Dhudashiya-Kalawad 'B' Jamnagar S/C 66KV 14.00 29.03.2014

1688 66KV Kalawad 'B'-Kalawad Jamnagar S/C 66KV 5.00 29.03.2014

1689 66kv Jamnagar-Kalawad Jamnagar S/C 66 KV 39.00 24/06/1905

1690 66kv TPS-GSFC-1 Jamnagar D/C 66 KV 8.00 12/06/1905

1691 66kv TPS-GSFC-2 Jamnagar D/C 66 KV 8.00 12/06/1905

1692 66KV Haripar-Lalpur Jamnagar S/C 66 KV 9.80 31.12.2012

1693 66kv Modpar-Pipartoda Jamnagar S/C 66 KV 18.30 28/06/1905

1694 66kv Modpar-Beraja Jamnagar S/C 66 KV 17.575.05.08

20.05.11

1695 66kv Beraja-Morvadi Jamnagar S/C 66 KV 13.435.05.08

20.05.11

1696 66kv Morkanda(-"B"s/s Jamnagar S/C 66 KV 5.00 06/06/1905

1697 66kv Nagajar-MotaVadala Jamnagar S/C 66 KV 16.0016.07.11

1965

1698 66kv MotaVadala-Kharedi Jamnagar S/C 66 KV 36.2016.07.11

1965

1699 66kv Nagajar-Khengarka Jamnagar S/C 66 KV 12.94 02/07/1905

1700 66kv Jamnagar-Aliyabada Jamnagar S/C 66 KV 11.63 12.04.12

1701 66 KV Jamnagar B -G,I,D,C,.-Ph-III(U/G) Jamnagar S/C 66 KV 1.59 30.10.12

1702 66KV Khiri Dhragda Jamnagar S/C 66KV 6.80 27.05.13

1703 66KV Bhadukiya-Toda Jamnagar S/C 66KV 12.88 09.10.13

1704 66KV LalBunglow-Satrasta Jamnagar U/G 66KV 3.79 23.08.13

1705 66KV LalBunglow-Bedeshwar Jamnagar S/C 66KV 1.53 23.08.13

1706 66KV Sikka-Meghpar Jamnagar S/C 66 KV 6.79 28.5.99

1707 66KV Sikka-Vadinar Jamnagar S/C 66 KV 21.00 28.11.78

1708 66KV Meghpar-Vadinar Jamnagar S/C 66 KV 12.50 25.05.12

1709 66KV Khambhalia-Kanchanpur Jamnagar S/C 66 KV 14.00 10.8.09

1710 66KV Kanchanpur-Modpar Jamnagar D/C+S/C 66 KV 37.00 1.5.10

1711 66KV Modpar-Meghpar Jamnagar S/C 66 KV 19.00 10.8.09

Page 72

Page 40: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

1712 66KV Khambhalia -Vadatra Jamnagar S/C 66 KV 15.00 19.1.02

1713 66KV Bhatia-Kalyanpur Jamnagar S/C 66 KV 18.00 7.5.95

1714 66KV Lalpur-MotaKhabda Jamnagar S/C 66KV 9.93 11.09.2014

1715 66KV Chandragadh-Pipli Jamnagar S/C 66KV 7.90 08.08.2014

1716 66KV Bhatia- Korada Jamnagar S/C 66 KV 28.0031.3.82

03.01.12

1717 66KV Korada- Varvala Jamnagar S/C 66 KV 14.0031.3.82

03.01.12

1718 66KV Bhatia-Lamba Jamnagar S/C 66 KV 20.00 1.3.90

1719 66KV Bhatia-Bhogat Jamnagar S/C 66 KV 16.00 8.6.04

1720 66KV Bhatia- Navadra Jamnagar S/C 66 KV 28.00 23.6.04

1721 66KV Kalyanpur-Patelka Jamnagar S/C 66 KV 7.70 7.5.95

1722 66KV Kalyanpur-Bhadthar Jamnagar S/C 66 KV 23.00 9.4.05

1723 66KV Varvala-Arambhada Jamnagar S/C 66 KV 24.00 16.1.93

1724 66KV Bhatia-Varvala Tower-1 Jamnagar D/C 66 KV 42.00 2.2.06

1725 66KV Bhatia-Varvala Tower-2 Jamnagar D/C 66 KV 42.00 08.08.12

1726 66KV Lamba-Lamba W/F Jamnagar S/C 66 KV 3.50 1.3.90

1727 66KV Arambhada-Tata Jamnagar S/C 66 KV 6.00 07/06/1905

1728 66KV Kalyanpur-Dagarwad Jamnagar S/C 66 KV 13.76 26.8.09

1729 66KV Meghpar-Bharat-Oman-1 Jamnagar D/C 66 KV 11.59 17.06.09

1730 66KV Meghpar-Bharat-Oman-2 Jamnagar D/C 66 KV 11.59 17.06.09

1731 66KV Varvala-Baradiya-1 Jamnagar D/C 66 KV 11.69 28.9..09

1732 66KV Varvala-Baradiya-2 Jamnagar D/C 66 KV 11.69 17.12.09

1733 66KV Varvala-Vasai-1 Jamnagar D/C 66 KV 4.23 30.08.11

1734 66KV Varvala-Vasai-2 Jamnagar D/C 66 KV 4.23 30.08.11

1735 66KV Varvala-Mithapur-1 Jamnagar D/C 66 KV 14.98 20.1.12

1736 66KV Varvala-Mithapur-2 Jamnagar D/C 66 KV 14.98 20.1.12

1737 66kv Bhadthar-Vinjalpar line-1 Jamnagar D/C 66 KV 12.70 23.03.12

1738 66kv Bhadthar-Vinjalpar line-2 Jamnagar D/C 66 KV 12.70 23.03.12

1739 66KV Sonvadiya - Sanosari Jamnagar S/C 66 KV 15.31 25.06.13

1740 66KV Sanosari - Babarzar Jamnagar S/C 66 KV 14.31 25.06.13

1741 66KV Vadtra-Goinj Jamnagar S/C 66 KV 13.64 19.5.12

1742 66 kv Bhadthar-Bhankhokhari Jamnagar S/C 66 KV 11.05 02.07.12

1743 66KV Ranavav – Chhaya Jamnagar S/C 66 KV 13.0527.04.74

30.06.10

1744 66 KV Ranavav - Vanana Jamnagar D/C+S/C 66 KV 9.0027.04.74

16.04.12

1745 66 KV Vanana - Porbandar Jamnagar S/C 66 KV 7.5027.04.74

16.04.12

1746 66KV Ranavav – GIDC Porbandar Jamnagar S/C 66 KV 9.50 25.04.74

1747 66KV Ranavav – Bokhira Jamnagar D/C 66 KV 15.00 16.09.96

1748 66KV Ranavav – Bakhrala Jamnagar S/C 66 KV 15.5125.11.93

29.06.11

1749 66 KV Bakharala Bagvadar Jamnagar S/C 66 KV 9.4325.11.93

29.06.11

1750 66kv Ranavav -Bagvadar Jamnagar S/C 66 KV 19.71 19.08.2010

1751 66KV Ranavav – Ramgadh Jamnagar S/C 66 KV 11.2024.05.65

8.06.10

1752 66KV Ramgadh-kandorana Jamnagar S/C 66 KV 14.2024.05.65

8.06.10

1753 66KV Ranavav – Bhod Jamnagar S/C 66 KV 9.05 07.05.13

1754 66KV Bhod – Ranakandorana Jamnagar S/C 66 KV 9.00 07.05.13

1755 66kv Bhatia-Gadhaka Jamnagar S/C 66KV 16.39 12.02.2014

1756 66kv Bhatia-Ran Jamnagar S/C 66KV 11.24 04.03.2014

1757 66kv Babrazar-Motirafudal Jamnagar S/C 66KV 12.23 10.05.2014

1758 66kv Gunda-Morjar line Jamnagar S/C on D/C 66KV 11.21 23.09.2014

1759 66KV kandorana – Kutiyana -2 Jamnagar S/C 66 KV 10.9024.05.65

18.05.11

1760 66KV Tap to Gosa line Jamnagar S/C 66 KV 18.90 14.11.1996

1761 66 KV Bagavadar - Ambarama Jamnagar S/C 66 KV 14.0412.06.94

8.07.11

1762 66KV Chhaya – Porbandar line Jamnagar S/C 66 KV 4.1127.04.74

30.06.10

1763 66 KV Rana-kandorana - Vansjaliya Jamnagar S/C 66 KV 21.00 28.10.93

1764 66KV kandorana -Kutiyana-1 Jamnagar S/C 66 KV 11.60 24.05.65

1765 66KV Kutiyana - Khageshri Jamnagar S/C 66 KV 18.00 1.18.07

1766 66 KV Ambarama-visavada Jamnagar S/C 66 KV 12.5612.06.94

8.07.11

1767 66 KV GIDC - Bokhira Jamnagar S/C 66 KV 9.50 16.09.96

1768 66 KV Bagvadar - Advana Jamnagar S/C 66 KV 15.00 21.12.01

1769 66 KV Bhanvad - Modapar Jamnagar S/C 66 KV 8.2010.12.04

11.07.11

Page 73

Page 41: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

1770 66 KV Mopadar - Gunda Jamnagar S/C 66 KV 21.1010.12.04

11.07.11

1771 66KV Bokhira-Kuchhadi-1 Jamnagar D/C 66 KV 7.08 28.03.08

1772 66KV Bokhira-Kuchhadi-2 Jamnagar D/C 66 KV 7.08 28.03.08

1773 66KV Bagvadar-Ranpar Jamnagar S/C 66 KV 10.44 22.06.13

1774 66KV Ranpar - Bhomiyavadar Jamnagar S/C 66 KV 12.49 22.06.13

1775 66KV Bhomiyavadar - Gunda Jamnagar S/C 66 KV 26.25 5.10.09

1776 66KV Bhanvad-Vanavad Jamnagar S/C 66 KV 14.0020.04.11

2001

1777 66kV Motipaneli-Jamjodhpur-Vanavad Jamnagar S/C 66 KV 16.0020.04.11

2001

1778 66kv Chhaya-Odadar-1 Jamnagar D/C 66 KV 13.66 30.06.10

1779 66kv Chhaya-Odadar-1 Jamnagar D/C 66 KV 13.66 30.06.10

1780 66kv Gunda-enarcon-1 Jamnagar D/C 66 KV 3.44 16.03.2011

1781 66kv Gunda-enarcon-2 Jamnagar D/C 66 KV 3.44 16.03.2011

1782 66KV Bhanvad-Sonvadia Jamnagar S/C 66 KV 18.0022.12.11

1991

178366KV Helabeli(GHI)-Khageshri (Solar)

Line -1 Jamnagar D/C 66 KV 13.34 30.12.11

178466KV Helabeli(GHI)-Khageshri (Solar)

Line -2 Jamnagar D/C 66 KV 13.34 30.12.11

1785 66kV Moserbaer-Ranakandorana Jamnagar S/C 66 KV 7.28 31.03.12

1786 66kV Hiraco-Ranakandorana (Solar) Line Jamnagar S/C 66 KV 10.86 12.04.12

1787 66kv Khageshri-APCA(solar) Line No-1 Jamnagar D/C 66 KV 11.81 18.06.12

1788 66kv Khageshri-APCA(solar) Line No-2 Jamnagar D/C 66 KV 11.81 01.08.12

1789 66kv Bokhira-Tumbada line Jamnagar S/C 66 KV 7.50 26.07.12

1790 66KV Visavada-Baradiya (W/F) line - 1 Jamnagar D/C 66KV 3.30 19.09.2014

1791 66KV Visavada-Baradiya (W/F) line - 2 Jamnagar D/C 66KV 3.30 19.09.2014

1792 66kV Jamnagar Suvarda line Jamnagar S/C +U/G 66KV 6.352 16.03.15

1793 66kV Kublavadar Goinj line Jamnagar D/C 66KV 4.88 27.03.15

1794 66kV Babarzar Motirafudad Jamnagar S/C 66KV 12.23 31.03.14

1795 66kV Naghedi GIDC Phase III Jamnagar U/G 66KV 5.82 18.07.14

1796 66kv Navsari-Navsari Navsari S/C 66 KV 0.05 14.01.69

1797 66kv Navsari-Tata SSL. Navsari S/C 66 KV 3.00 28.02.83

1798 66kv Navsari-Eklera-1 Navsari D/C 66 KV 29.0014.02.69

29.05.12

1799 66kv Navsari-Vesma Navsari D/C 66 KV 20.7814.02.69

22.11.12

1800 66kV Vesma- Bhagavati NavsariD/C &U/G

Cable66KV 11.98

29.05.12

17.01.2015

1801 66kV Eklera- Bhagavati NavsariD/C &U/G

Cable66KV 16.2

29.05.12

17.01.2015

1802 66kv Navsari- Eroo 1 Navsari D/C 66 KV 5.85 15.08.72

1803 66kv Navsari- Eroo 2 Navsari 66 KV 5.85 15.08.72

1804 66kv Navsari-Gandevi-1 Navsari S/C 66 KV 20.0017.03.52

12.12.68

1805 66kv Navsari-Bilimora-2 Navsari D/C 66 KV 26.00 12.12.68

1806 66kv Bilimora-Gandevi 1 Navsari S/C 66 KV 6.0012.12.68

02.09.02

1807 66kv Ambheta-Bilimora Navsari S/C 66 KV 10.0014.02.66

27.03.01

1808 66kv Ambheta-Chikhli Navsari S/C 66 KV 2.5019.02.66

27.03.99

1809 66kv Gandevi - Amalsad Navsari S/C 66 KV 8.70 02.09.02

1810 66kv Bilimora-Gundlav Navsari S/C 66 KV 18.00 06.08.87

1811 66kv Bilimora-Dungri Navsari D/C 66 KV 10.00 26.05.00

1812 66kv Chikhli-fadwel Navsari S/C 66 KV 17.3814.03.94

22.02.08

1813 66kv Fadwel-Khergam Navsari S/C 66 KV 28.2114.03.94

22.02.08

1814 66kv Rnkuva-Anaval Navsari S/C 66 KV 10.00

19.02.66

06.08.87

20.08.06

28.07.141815 Rankuva - Chikhli S/C 66 kV 10.00 28.07.14

1816 66kv Tankal-Vansda Navsari S/C 66 KV 35.30 27.11.10

1817 66kv Ambheta-Tankal Navsari S/C 66 KV 14.20 27.11.10

1818 66kv Anaval- Dolvan Navsari S/C 66 KV 12.60 16.01.90

1819 66kv Anaval-Vansda Navsari S/C 66 KV 20.4019.02.66

02.03.90

Page 74

Page 42: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

1820 66kv Vansda-Waghai Navsari S/C 66 KV 21.20 19.02.66

1821 66kv Waghai-Ahwa Navsari S/C 66 KV 26.60 27.02.99

1822 66kv Dolvan - Virpur Navsari S/C 66 KV 10.00 17.05.11

182366kv Tap line from Navsaro-Godadra to

Maroli lineNavsari S/C 66 KV 2.10 31.03.90

1824 66Kv Chhapra-Navsari City Navsari S/C 66 KV 2.30 09.08.08

1825 66kv Mahuva-Singod line Navsari S/C 66 KV 14.58 23.09.09

1826 66kv Dolvan-Mangalia line Navsari S/C 66 KV 14.82 22.06.11

1827 Dharampur- Khergam Navsari S/C 66 KV 14.29 13.05.11

1828 66kv Ahwa- Saputara line Navsari S/C 66 KV 24.86 1.03.12

1829 66kv Ambheta- Balwada Navsari S/C 66 KV 9.50 21.06.12

1830 66kv Amalsad - Sultanpur Navsari S/C 66 KV 11.86 28.07.12

1831 66kv Erthan- GETP line Navsari S/C 66 KV 2.94 24.11.12

183266kv GETP - Gokulanand line (U/G

cable)Navsari UG 66 KV 1.67 25.01.14

1833 66kv GETP - GPPL line (U/G cable) Navsari UG 66 KV 1.318 5.03.14

1834 66kv Vansda- Mahuvas Navsari S/C 66 KV 9.37 19.05.14

1835 Vapi-Atul 1 Navsari S/C 66 KV 22.00 1.05.80

1836 Khadki-Atul Navsari S/C 66 KV 12.00 23.07.00

1837 Vapi-GIDC-1 Navsari D/C 66 KV 3.50 13.05.80

1838 Vapi-GIDC-2 Navsari 66 KV 3.50 13.05.80

1839 Vapi-3RD Ph. Navsari S/C 66 KV 8.20 10.03.84

1840 Vapi-Damanganga 1 Navsari S/C 66 KV 6.00 23.01.93

1841 Vapi-Damanganga 2 Navsari S/C 66 KV 6.00 16.09.13

1842 Vapi-IVTH Pahse Navsari S/C 66 KV 8.80 28.03.00

1843 Atul-Atak Pardi 1 Navsari D/C 66 KV 9.00 21/05/1905

1844 Atul-Atak Pardi 2 Navsari D/C 66 KV 9.00 21/05/1905

1845 Atul- Valsad Navsari S/C 66 KV 14.50 4.06.97

1846 Atul - Atul Product 1 Navsari D/C 66 KV 1.8426.03.73

19.12.89

1847 Atul - Atul Product 2 Navsari 66 KV 1.8426.03.73

19.12.89

1848 Atakpardi-Dharampur Navsari S/C 66 KV 22.00 15.03.93

1849 Vapi - Paria Navsari S/C 66 KV 8.45 7.05.11

185066kV Paria-Kocharwa line (LILO from

Paria-K'kopar line)Navsari 66 KV 5.65 16.04.13

1851 Kocharwa- Kakadkoper (Mota ponda) Navsari S/C 66 KV 11.65 7.05.11

1852 Kakadkoper-Kaprada Navsari S/C 66 KV 15.00 10.06.05

1853 Damanganga-Sarigam Navsari S/C 66 KV 16.00 25.01.93

1854 66kV Bhilad-Sarigam 2 Navsari D/C 66 KV 11.00 1.09.94

1855 66kV Bhilad-Sarigam-sanjan Navsari D/C 66 KV 17.74 1.05.02

1856 Srigam-Umargam Navsari S/C 66 KV 30.00 23.04.96

1857 3 RD Phase - 4Th Phase Navsari S/C 66 KV 0.79 6.08.83

1858 Khadki-Raymond Navsari S/C 66 KV 3.75 27.06.08

1859 Damanganga- UPL Navsari S/C 66 KV 1.20 15.11.06

1860 66KV Atakpardi-Dungri Navsari D/C 66 KV 16.00 26.05.02

1861 66KV Gundlav- Atakpardi Navsari D/C 66 KV 8.00 14.12.11

1862 66KV Vapi-Morai line Navsari S/C 66 KV 4.00 02.12.10

1863 66KV Morai-Kolak line Navsari S/C 66 KV 8.00 02.12.10 16.09.14

1864 66KV Kolak-Khadki line Navsari S/C 66 KV 14.00 02.12.10 16.09.14

1865 66kV 3rD Phase Micro ink Navsari S/C 66 KV 0.75 29.07.09

1866 66kV Vapi -GIDC II Navsari S/C 66 KV 4.9118.11.97

27.12.12

1867 66kV GIDC II-DGPM line Navsari S/C 66 KV 14.0818.11.97

27.12.12

1868 66kv U'gam-U'gam phase-II line No-1 Navsari S/C 66 KV 1.232 30.04.12

1869 66kv U'gam-U'gam phase-II line No-2 Navsari S/C 66 KV 1.232 30.04.12

1870 66kV Sanjan-Umargam LILO at Palgam s/s Navsari S/C 66 KV 1 5.07.12

1871 66kV Morai-Velspun line Navsari S/C 66 KV 0.15 3.03.12

1872 66kV Morai-Alok line Navsari S/C 66 KV 2.1 4.08.12

1873 66kV Umargam-Chandan steel line Navsari S/C 66 KV 1.6 18.09.12

1874 66kV Umargam-Ph-II to Sunpet line Navsari S/C 66 KV 1.12 22.10.12

1875 66kV Vapi-GIDC ph II to M/s Bilag ind. Line Navsari S/C 66 KV 0.145 30.01.13

1876 66kV Sarigam-JBF LINE Navsari S/C 66 KV 1.20 8.10.13

1877 66kv Balwada- Dungri line Navsari S/C 66 KV 20.00 21.06.12

1878 66kV Dharampur-Piprol line Navsari S/C 66 KV 18.5 1.11.13

1879 66kV Bhilad-Sarigam-3 Navsari S/C 66 KV 8.2 10.04.13

1880 66kV Sarigam-Madurai LINE Navsari S/C 66 KV 0.55 17.07.14

1881 66kV Kaprada-Sahuda Navsari S/C 66 KV 19.07 5.08.14

Page 75

Page 43: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

1882 66kV Palgam-Mehta tube.(U/G cable) Navsari S/C 66 KV 1.8 13.02.14

1883 66kV Dungri-Bhagdawada Navsari S/C 66 KV 9.069 25.09.14

1884 66kV Dungri-Untadi Navsari S/C 66 KV 6.71 25.09.14

1885 66kV Untadi-Bhagdawada Navsari S/C 66 KV 10.925km 25.09.14

1886 66kV Umargam-Ph-II to Chandansteel lineNavsari UG 66 KV 430m 21.05.15

1887 66kV Morai-Rubymecon line Navsari UG 66 KV 2.1km 22.09.15

1888 Vav- jolwa -Palsana Navsari S/C 66 KV 14.50 19.01.80

1889 Vav-Niyol Navsari S/C 66 KV 16.00 16.07.09

1890 Niyol-BRC Navsari S/C 66 KV 13.500 16.07.09

1891 Vav-S.E.CO.-ESTN. 1 Navsari D/C 66 KV 17.00 30.09.93

1892 Vav-S.E.CO.-ESTN. 2 Navsari 66 KV 17.00 30.09.93

1893 Vav - Kamrej Navsari S/C 66 KV 5.50 4.07.89

1894 Vav - Kosmada Navsari S/C 66 KV 4.00 14.05.12

1895 Kosmada- Godadara Navsari S/C 66 KV 12.424 14.05.12

1896 Vav - Godadara Navsari S/C 66 KV 16.42 22.04.12

1897 Vav - Kadodara No. 3 Navsari S/C 66 KV 9.00 27.03.85

1898 Kadodara- Sachin A Navsari S/C 66 KV 11.00 27.03.85

1899 On D/c Tower Vav-Puna Navsari S/C 66 KV 15.470 29.04.04

1900 Puna-Vanz Navsari S/C 66 KV 31.180 29.04.04

1901 Vanz-Sachin B Navsari S/C 66 KV 7.250 29.04.04

1902 Vav - Sarthana Navsari D/C 66 KV 8.77 11.10.02

1903 Vav- Tapi 1 Navsari D/C 66 KV 11.50 3.7.91

1904 Vav- Tapi 2 Navsari 66 KV 11.50 4.10.91

1905 Vav- Tapi 3 Navsari D/C 66 KV 13.50 1.10.91

1906 Vav- Tapi 4 Navsari 66 KV 13.50 1.10.91

1907 Mahuwa-Sarbhon Navsari 66 KV 15.50 17.05.85

1908 Mota-Bardoli Navsari S/C 66 KV 9.00 9.08.03

1909 Mota-Sarbhon Navsari S/C 66 KV 19.00 24.06.11

1910 Mota-Kejriwal Navsari S/C 66 KV 6.25 18.04.12

1911 Ukai(HY)Songadh-Uchhal Navsari S/C 66 KV 25.80 5.01.72

1912 Ukai(HY)-Ukai Songadh-1 Navsari S/C 66 KV 5.65 1.01.04

1913 Ukai(HY)- Songadh-2 Navsari S/C 66 KV 5.65 1.01.04

1914 Uchhal-Naranpur Navsari S/C 66 KV 18.00 5.01.72

1915 Naranpur-Rumkitalav Navsari S/C 66 KV 22.00 5.01.72

1916 Rumkitalav- Kukarmunda Navsari S/C 66 KV 25.00 5.01.72

1917 Kukarmunda-Nizar Navsari S/C 66 KV 10.00 5.01.72 3.07.10

1918 Songadh-Vyara Navsari S/C 66 KV 30.80 1.05.65

1919 Songadh-CPM Navsari S/C 66 KV 0.70 2.06.94

1920 Songadh-Jamkhadi Navsari S/C 66 KV 20.25 30.04.11

1921 Kadodra-Palsana Navsari S/C 66 KV 10.00 15.12.95

1922 Vav-Laskana-Utran-Kosad Navsari S/C 66 KV 18.75 14.04.84

1923 Vav-Laskana-Utran- Mora Navsari S/C 66 KV 44.62 14.04.84

1924 Vav-Kadodra 1 Navsari D/C 66 KV 9.00 27.03.85

1925 Vav-Kadodra 2 Navsari 66 KV 9.00 27.03.85

1926 Kadodra-Jolva Navsari S/C 66 KV 5.00 15.12.95

1927 Kadodra-Garden Vareli 1 Navsari D/C 66 KV 3.00 1.09.75

1928 Kadodra-Garden Vareli 2 Navsari 66 KV 3.00 1.09.75

1929 Mahuwa-Valod Navsari S/C 66 KV 18.00 5.11.92

1930 66Kv Mahuva-Bamniya Navsari S/C 66 KV 15.40 13.07.07

1931 Vav-Velanja-Kim Navsari S/C 66 KV 12.00 11.10.02

1932 Vav-Velanja-Variav Navsari S/C 66 KV 26.00 3.07.91

1933 Variav-Olpad-Shivan Navsari S/C 66 KV 36.00 1.10.91

1934 Vyara-Kapp Navsari S/C 66 KV 18.00 31.03.84

1935 Vyara-Borakhdi Navsari D/C+S/C 66 KV 20.27 5.11.92 03.07.15

1936 Valod-Borakhdi Navsari D/C+S/C 66 KV 9.66 5.11.92 03.07.15

1937 Valod-Kalakva Navsari D/C+S/C 66 KV 15.96 4.07.11 20.05.15

1938 Kalakva - Virpore Navsari D/C+S/C 66 KV 11.60 4.07.11 20.05.15

1939 Bardoli- Afwa Navsari S/C 66 KV 16.00 27.08.98

1940 Afwa- Valod Navsari S/C 66 KV 14.00 8.12.81

1941 Vav-Sampura Navsari S/C 66 KV 15.55 14.04.84

1942 Sampura-Kadod Navsari S/C 66 KV 16.94 25.09.08

1943 Kadod-Madhi Navsari S/C 66 KV 8.70 15.06.06

1944 Jolwa-Shri Durga(HT Cons) Navsari S/C 66KV 0.9 3.5.13

1945 Jolwa-Mota-Bardoli Navsari S/C 66KV 14.25 12.8.13

1946 Ichhapore-Pal Navsari S/C 66 KV 11.500 31.05.03

1947 Pal-Bhatha Navsari S/C 66 KV 1.600 31.05.03 19.03.14

1948 Bhatha - Variav Navsari S/C 66 KV 16.300 31.05.03 19.03.14

Page 76

Page 44: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

1949 Ichhapore-Variav-Rama Navsari S/C 66 KV 23.700 31.05.03

1950 Ichhapore-HWP 1 Navsari D/C 66 KV 6.000 20.4.90

1951 Ichhapore-HWP 2 Navsari D/C 66 KV 6.000 20.4.90

1952 Ichhapore-ONGC 1 Navsari D/C 66 KV 4.000 23.11.89

1953 Ichhapore-ONGC 2 Navsari D/C 66 KV 4.000 23.11.89

1954 Talangpur-Vesu-NCF 1 Navsari S/C 66 KV 17.600 3.12.04

1955 Talangpur-Vesu-NCF 2 Navsari S/C 66 KV 17.600 3.12.04

1956 Bhestan-NFI Navsari S/C 66 KV 1.200 8.12.81

1957 Bhestan-Govalak Navsari S/C 66 KV 2.500 27.8.98

1958 Udhana-Govalak Navsari S/C 66 KV 3.500 24.1.74

1959 Sachin- A to Sachin- B Navsari D/C 66 KV 3.000 14.01.96

1960 Mota-Madhi(Rly.)-1 Navsari S/C 66 KV 20.25 15.07.03

1961 Songdh-Navapur Rly. Navsari S/C 66 KV 23.03 21.01.04

1962 Utran-Tapi-B1-STN. Navsari D/C 66 KV 7.700 1.2.76

1963 Utran-Tapi-B2-STN. Navsari D/C 66 KV 7.700 1.2.76

1964 Tapi-Udhna-1 Navsari D/C 66 KV 6.200 15.5.81

1965 Tapi-Udhna-2 Navsari D/C 66 KV 6.200 15.5.81

1966 Tapi-S.E.CO.-A STN. Navsari S/C 66 KV 4.300 12.08.99

1967 Utran- Tapi No. 3 Navsari D/C 66 KV 5.500 20.11.09

1968 Utran- Tapi No. 4 Navsari D/C 66 KV 5.500 20.11.09

1969 Ichhapore -Pala line no. 1 Navsari M/C 66 KV 18.000 25.12.09

1970 Ichhapore -F stn. Pala line no. 2 Navsari M/C 66 KV 18.000 25.12.09

1971 Talangpur-Sachin B -1 Navsari D/C 66 KV 3.500 21.3.00

1972 Talangpur-Sachin B -2 Navsari D/C 66 KV 3.500 21.3.00

1973 Talangpur - Pandesara B1 Navsari S/C 66 KV 12.400 9.4.02

1974 Talangpur - Pandesara B2 Navsari S/C 66 KV 12.400 9.4.02

1975 Pandesara-B- Pandesara A1 Navsari S/C 66 KV 1.000 1.3.02

1976 Pandesara B- Pandesara A2 Navsari S/C 66 KV 1.000 1.3.02

1977 66Kv Talangpur-Vesu-2 Line 1 Navsari D/C 66 KV 12.000 19.04.00 28.04.14

1978 66Kv Talangpur-Vesu-2 Line 2 Navsari D/C 66 KV 12.000 19.04.00 28.04.14

1979 Talangpur - S.E.CO. D.STN 1 Navsari D/C 66 KV 12.000 19.04.00

1980 Talangpur - S.E.CO. D.STN 2 Navsari D/C 66 KV 12.000 19.04.00

1981 Utran-S.E.CO. K.STN-1 Navsari D/C 66 KV 5.500 6.10.05

1982 Utran-S.E.CO. K.STN-2 Navsari D/C 66 KV 5.500 6.10.05

1983 66kv Vav- Arthan Navsari D/C 66 KV 14.92 2.12.11

1984 66kv Arthan - Vanz Navsari D/C 66 KV 11.000 2.12.11

1985 66Kv Sachin B-Puna Navsari D/C 66 KV 36.500 19.11.06

1986 66kv Sachin B-Maroli Navsari S/C 66 KV 6.940 2.06.95

1987 66Kv Ukai(Hy)-Mini HY No. 1 Navsari D/C 66 KV 1.00 8.12.87

1988 66Kv Ukai(Hy)-Mini HY No. 2 Navsari 66 KV 1.00 8.12.87

1989 Mota-Madhi(Rly.)-2 Navsari D/C 66 KV 20.25 30.08.14

1990 Songadh-Navapur Rly.-1 Navsari D/C 66 KV 23.25 21.01.04

1991 Songadh-Navapur Rly.-2 Navsari D/C 66 KV 23.25 02.06.14

1992 66 Kv Kukarmunda - Nimbhora Navsari S/C 66 Kv 18.16 10.06.14

1993 Songadh-Kavla Navsari S/C on D/C 66 Kv 6.90 13.04.15

1994 Ukai (Hy) - Vadibhesrot Navsari S/C on D/C 66 Kv 4.88 17.04.15

1995 Vadibhesrot-Sisor Navsari S/C on D/C 66 Kv 15.47 05.06.15

1996 Sisor-Chikhalibhenrot Navsari S/C on D/C 66 Kv 6.01 27.06.15

1997 66 Kv Mota - Parab Navsari D/C 66 Kv 7.70 22.07.14

1998 Talangpur-Ambuja Cement Navsari S/C 66 KV 19.000 17.12.07

1999 66Kv Sachin-Khajod-Tap at GUJAMB Navsari S/C 66 KV 0.600 8.06.10

2000 66kv Talangpur Jiav Navsari S/C 66 KV 7.670 8.06.10

2001 66kv Jiav - Khajod Navsari S/C 66 KV 7.205 8.06.10

2002 66kv Talangpur Sachin C Line 1 Navsari D/C 66 KV 3.153 16.09.10

2003 66kv Talangpur Sachin C Line 2 Navsari D/C 66 KV 3.153 16.09.10

2004 Ichhapore-Kribhco-1 line Navsari D/C 66 KV 4.650 30.09.11

2005 Ichhapore-Kribhco-2 line Navsari D/C 66 KV 4.650 30.09.11

2006 66 KV Bhestan - Bhagavati line Navsari S/C 66 KV 1.766 19.11.11

2007 66kv Ichchhapore-Kosad line Navsari S/C 66 KV 35.140 24.12.11

2008 66kv Ichchhapore-Mora line Navsari S/C 66 KV 18.890 28.12.11

2009 66kv Ichchhapore-ABG-1 line Navsari D/C 66 KV 4.653 30.03.12

2010 66kv Ichchhapore-ABG-2 line Navsari D/C 66 KV 4.653 30.03.12

2011 66kv Sachin-C -Colour tex line Navsari S/C 66 KV 1.658 23.04.12

2012 66Kv Vanz- Sachin B Navsari S/C 66 KV 7.250 29.04.04

2013 66Kv Sachin B-SUSM no.2 Navsari S/C 66 KV 31.043 9.07.2013

2014 66Kv SUSM-Bhatiya line NavsariD/C &U/G

Cable66KV 4.023

09.07.2016

30.03.2015

Page 77

Page 45: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

2015 66Kv Bhatiya-Puna line NavsariD/C &U/G

Cable66KV 24.057

09.07.2016

30.03.2015

2016 66kv Mora-Adani Navsari S/C 66 KV 12.11 04.10.12

2017 66kv Mora-Hazira LNG Navsari S/C 66 KV 11.22 13.12.12

2018 66kv Vanz-Gokulanand line Navsari S/C 66 KV 4.98 23.04.12

2019 66kv Pandesara-B -Colour tex line Navsari S/C 66 KV 0.589 15.10.12

2020 66kV D/C Mora - SVGDPL line No. 1 Navsari D/C 66 KV 8.673 23.02.13

2021 66kV D/C Mora - SVGDPL line No. 2 Navsari D/C 66 KV 8.673 23.02.13

2022 66Kv Vesu-2 SVNIT Line 1 Navsari D/C 66 KV 4.07 29.04.14

2023 66Kv Vesu-2 SVNIT Line 2 Navsari D/C 66 KV 4.07 29.04.14

2024 66Kv Sachin B-220Kv Popda Navsari S/C 66 KV 30.145 28.06.14

2025 66Kv SUSM- 220Kv Popda Navsari S/C 66 KV 1.15 28.06.14

2026 66KV Ichchhapore-GHB line No.1 Navsari S/C 66KV 1.57 07.09.2015

2027 66KV Ichchhapore-GHB line No.2 Navsari S/C 66KV 1.57 07.09.2015

2028 66Kv Sachin-B to Sachin-A line No.2 Navsari D/C 66KV 2.37 26.08.2015

2029 66Kv Sachin-C to Sachin-A line No.1 Navsari U/G Cable 66KV 0.7 07.03.2015

2030 66Kv Sachin-C to Sachin-A line No.2 Navsari U/G Cable 66KV 0.7 07.03.2015

2031 66Kv Popda-Vanz line Navsari D/C & Cable 66KV 8.62 23.01.2015

2032 66Kv Popda-Erthan line Navsari D/C & Cable 66KV 3 23.01.2015

2033 66kV Amalsad - Chhapar Navsari S/C 66KV 3.56 07.08.2014

2034 66KV Talangpur - Mangrol Navsari S/C 66KV 10.31 16.10.2014

2035 66kv Vansda- Anklach Navsari D/C 66kV 25.32 09.02.2015

2036 66kV Gandevi - Sultanpur Navsari D/C 66kV 20.977 13.04.2015

2037 Koyali-ND-II-Mogar no-2 Jambuva S/C + D/C 66 KV 12.00 10.08.66

2038 Gotri-Koyali-Anand no-1 Jambuva S/C + D/C 66 KV 12.00 10.08.66

2039 ND-II-Ranoli Jambuva S/C 66 KV 6.88 25.10.93

2040 ND-II-Poicha Jambuva S/C 66 KV 9.2521.01.81

(01.11.93)

2041 Rania-Savli Jambuva S/C 66 KV 10.50 21.01.81

2042 Savli-Desar Jambuva S/C 66 KV 21.43 10.08.91

2043 Desar-Timba Jambuva S/C 66 KV 20.40 21.11.94

2044 Jarod-Tundav Jambuva S/C 66 KV 14.63 29.06.95

2045 Jarod-Royal Vinyle(EHT Consumer) Jambuva S/C 66 KV 2.40 12.05.95

2046 Baska-Neomer Jambuva S/C 66 KV 4.80 05.10.99

2047 ND-I-Deepak nitrete Jambuva S/C 66 KV 0.20 30.03.91

2048 Koyali -GRP No-1 Jambuva D/C 66 KV 2.10 14.09.67

2049 Koyali -GRP No-2 Jambuva D/C 66 KV 2.10 05.02.67

2050 F'nagar-GSFC No-1 Jambuva S/C 66 KV 0.23 10.12.68

2051 F'nagar-GSFC No-2 Jambuva S/C 66 KV 0.05 10.12.68

2052 F'nagar-GSFC No-3 Jambuva S/C 66 KV 0.11 19.06.69

2053 F'nagar-GSFC No-4 Jambuva S/C 66 KV 0.06 20.09.72

2054 F'nagar-GSFC No-5 Jambuva S/C 66 KV 0.07 01.04.95

2055 F'nagar- HWP Jambuva S/C 66 KV 0.12 02.04.73

2056 Manjusar- BTIL Jambuva S/C 66 KV 2.17 14.02.09

2057 Manjusar- Alindra Jambuva D/C 66 KV 3.83 07.07.11

2058 Alindra-Tundav Jambuva D/C 66 KV 5.13 07.07.11

2059 Poicha-Rania Jambuva S/C 66 KV 12.00 21.01.81

2060 Manjusar- Tundav Jambuva D/C 66 KV 8.62 07.07.11

2061 Jarod-Kemrock Jambuva S/C 66 KV 8.03 16.04.10

2062 Manjusar-Xylem Jambuva S/C 66 KV 2.95 29.09.12

2063 Tundav-Savli Jambuva S/C 66 KV 9.27 02.02.13

2064 Gotri-Karjan 1 (Atladra) Jambuva D/C 66 KV 30.00 07/11/1974

2065 Gotri-Karjan 2 (Makarpura) Jambuva D/C 66 KV 30.00 07/11/1974

2066Gotri-Atladara tap 1

(Tap from Gotri- Karjan line 1)Jambuva D/C 66 KV 5.75 13/06/1905

2067Gotri-Atladara tap 2

(Tap from Gotri- Karjan line 2)Jambuva D/C 66 KV 5.75 13/06/1905

2068 Karjan-Palej Jambuva S/C 66 KV 13.80 07/11/1974

2069 Karjan-PCBL Jambuva S/C 66 KV 13.80 07/11/1974

2070 Gotri-Vidyutnagar 1 Jambuva D/C 66 KV 3.90 24.08.72

2071 Gotri-Vidyutnagar 2 Jambuva D/C 66 KV 3.90 24.08.72

2072 Gotri-Shubhanpura 1 Jambuva D/C 66 KV 4.50 07/11/1964

2073 Gotri-Shubhanpura 2 Jambuva D/C 66 KV 4.50 07/11/1964

2074 Subhanpura-Alembic Pharma Jambuva S/C 66 KV 0.30 14.07.95

2075 Tap to Padra from Gtr.-Jmb line -1 Jambuva S/C 66 KV 13.40 04/01/1992

2076Tap to Samiyala from Gtr.-Jmb line -2

(LILO at Samiyala)Jambuva S/C 66 KV 3.50 23.02.06

2077 Samiyala-Padra(Tap Line) Jambuva S/C 66 KV 8.30 23.02.06

2078 Gotri-Godhra(Khakhriya) Jambuva D/C 66 KV 52.80 19.02.65

Page 78

Page 46: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

2079 Gotri-Jarod (Kalol) Jambuva D/C 66 KV 31.80 19.02.65

2080 Gavasad-Mobha 1 Jambuva S/C 66 KV 1.47 02/01/2002

2081 Gavasad-Mobha 2 Jambuva S/C 66 KV 2.00 22/04/2000

2082 Gavasad-Masar road Jambuva S/C 66 KV 12.00 22/04/2000

2083 Mobha-Karakhadi Jambuva S/C 66 KV 5.33 22.02.99

2084 Chhani'A'-Chhani B 1 Jambuva D/C 66 KV 1.89 29.11.86

2085 Chhani'A'-Chhani B 2 Jambuva D/C 66 KV 1.89 29.11.86

2086 Karjan-Torrent 1 Jambuva D/C 66 KV 30.50 29.03.94

2087 Karjan-Torrent 2 Jambuva D/C 66 KV 30.50 29.03.94

2088 Karjan-Kashipura Jambuva S/C 66 KV 14.82 19.05.73

2089 Karjan-Sadhali Jambuva S/C 66 KV 22.20 18/10/1976

2090 Karjan-Handod Jambuva S/C 66 KV 20.50 23.04.69

2091 Handod-Sarbhan Jambuva S/C 66 KV 9.50 03/10/2006

2092 Gotri-Koyali 1 Jambuva D/C 66 KV 7.30 25/05/2005

2093 Gotri-Koyali 2 Jambuva D/C 66 KV 7.30 25/05/2005

2094 Gavasad-Mahuvad Jambuva S/C 66 KV 10.00 1.1.2002

2095 Mahuvad -Padra Jambuva S/C 66 KV 11.00 1.1.2002

2096 Gavasad-Philips Jambuva S/C 66 KV 4.47 16/11/2009

2097 Chandrapura -HNG-1 Jambuva D/C 66 KV 1.00 11/08/2009

2098 Chandrapura -HNG-2 Jambuva D/C 66 KV 1.00 11/08/2009

2099 Godhra- Tuva Jambuva S/C 66 KV 20.00 20/06/1991

2100 Tuva- Timba Jambuva S/C 66 KV 10.00 20/06/1991

2101 Godhra- Kothi steel Jambuva S/C 66 KV 3.00 29/04/2008

2102 Godhra- Vejalpur Jambuva S/C 66 KV 14.00 05/06/2000

2103 Vejalpur- Kalol Jambuva S/C 66 KV 14.00 30/11/1999

2104 Godhra- Jafarabad Jambuva S/C 66 KV 10.00 12/09/2003

2105 Jafarabad- Santrod Jambuva S/C 66 KV 20.00 12/09/2003

2106 santrod - Piplod Jambuva S/C 66KV 14.00 16.12.86 09.02.14

2107 piplod- Limkheda Jambuva S/C 66KV 10.00 16.12.86 09.02.14

2108 Limkheda -Pipero Jambuva S/C 66 KV 27.00 22.02.2014

2109 D'Baria- Tap line Jambuva S/C 66 KV 10.75 08/03/1993

2110 Santrod Rajayata Jambuva S/C 66 KV 28.12 02/07/2011

2111 Timba- Kothamba Jambuva S/C 66 KV 27.50 15/10/2003

2112 Chandrapura- Madhwas 1 Jambuva D/C 66 KV 3.10 08/10/2011

2113 Chandrapura- Madhwas 2 Jambuva D/C 66 KV 3.10 08/10/2011

2114 Dahod- Karath Jambuva S/C 66 KV 16.00 31/10/2002

2115 Karath- Zalod Jambuva S/C 66 KV 14.00 31/10/2002

2116 Zalod- Sarasava (P) Jambuva S/C 66 KV 21.00 31/10/2002

2117 Sarasava (P)- Santrampur Jambuva S/C 66 KV 17.00 19/05/2004

2118 Dahod- Nalvai Jambuva S/C 66 KV 22.00 07/03/2009

2119 Dahod- Kharedi Jambuva S/C 66 KV 9.20 15/02/2005

2120 Godhra-Lunawada Jambuva S/C 66 KV 40.00 10/07/1979

2121 Tap to Shahera (Godhra-Lunawada) Jambuva S/C 66 KV 0.80 17/08/1991

2122 Tap to Jafrabad (Godhra-Lunawada) Jambuva S/C 66 KV 0.80 1999

2123 Lunawada- M'Khanpur Jambuva S/C 66 KV 26.00 19/04/1987

2124 Lunawada- Kothamba Jambuva S/C 66 KV 15.38 15/10/2003

2125 Lunawada- Movasa Jambuva S/C 66 KV 24.00 15/02/2010

2126 Movasa- Santrampur Jambuva S/C 66 KV 25.00 15/02/2010

2127 Chandrapura- Khakhariya Jambuva S/C 66 KV 3.43 19/02/1990

2128 Khakhariya- Baska Jambuva S/C 66 KV 15.00 28/07/1979

2129 Khakhariya- Jarod Jambuva S/C 66 KV 25.00 28/01/1979

2130 Chandrapura -TOTO Jambuva S/C 66 KV 1.50 27/01/2014

2131 Chandrapura-G.I.D.C -B U/G cable Jambuva S/C 66 KV 2.80 25/03/2014

2132 Chandrapura - sunfarma Jambuva S/C 66 KV 9.00 31/07/2013

2133 Chandrapura- Baska Jambuva S/C 66 KV 9.00 12/07/2013

2134 Chandrapura- GIDC Halol Jambuva S/C 66 KV 2.80 26/01/1989

2135 GIDC Halol- Shivrajpur Jambuva S/C 66 KV 19.47 22/11/1987

2136 Chandrapura- Gen Motor Jambuva S/C 66 KV 1.00 19/03/1996

2137 Chandrapura- Kalol Exp Jambuva S/C 66 KV 14.10 19/02/1989

2138 Chandrapura- Kalol Local Jambuva S/C 66 KV 18.37 19/02/1990

2139 Chandrapura- Ceat tyre Jambuva S/C 66 KV 1.00 31/05/2010

2140 Chandrapura- Gamesha Jambuva S/C 66 KV 1.00 19/11/2011

2141 Kalol- PM Steel Jambuva S/C 66 KV 1.44 03/11/1973

2142 Santrod- Mota Amlia Jambuva S/C 66 KV 30.00 29/04/2012

2143 Kharedi- Kathala Jambuva S/C 66 KV 17.00 02/11/2012

2144 Savdas na Muvada - Movasa-1 Jambuva D/C 66 KV 7.00 11/12/2012

2145 Savdas na Muvada - Movasa-2 Jambuva D/C 66 KV 7.00 11/12/2012

Page 79

Page 47: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

2146 Jambuva-Dabhoi Jambuva S/C 66 KV 25.00 11/02/1972

2147 Jambuva-Waghodia Road Jambuva S/C 66 KV 12.22 25/12/1989

2148 Waghodia Road-Indrapuri Jambuva S/C 66 KV 1.00 25/12/1989

2149 Jambuva-Tarsali-1 Jambuva D/C 66 KV 6.00 01/06/1969

2150 Jambuva-Tarsali-2 Jambuva D/C 66 KV 6.00 01/06/1969

2151 Jambuva -Makarpura Jambuva S/C 66 KV 4.05 02/04/2009

2152 Jambuva-Gajrawadi Jambuva S/C 66 KV 14.20 02/07/1985

2153 Waghodia-Gajrawadi Jambuva S/C 66 KV 21.70 07/12/1985

2154 Waghodia-Khatamba Jambuva S/C 66 KV 14.76 15/08/1994

2155 Waghodia-Appolo Jambuva S/C 66 KV 4.00 08/09/1993

2156 Waghodia-Areva Jambuva S/C 66 KV 20.00 06/12/2008

2157 Waghodia - Suzlon Jambuva S/C 66 KV 10.00 01/07/2008

2158 Waghodia - Sanghvi forging & engg Jambuva S/C 66 KV 1.73 29/09/2012

2159 Gajrawadi- Motibaug U/G-1 Jambuva D/C 66 KV 3.20 29/12/1997

2160 Gajrawadi- Motibaug U/G-2 Jambuva D/C 66 KV 3.20 29/12/1997

2161 Dabhoi - Sankheda Jambuva S/C 66 KV 23.65 02/02/1984

2162 Khatamba- GAIL Jambuva S/C 66 KV 10.34 16/05/1992

2163 Khatamba - Indrapuri - Harni Jambuva S/C 66 KV 10.00 20/03/1986

2164 Indrapuri - Harni Jambuva S/C 66 KV 5.00 27/03/1993

2165 Harni-Sama Jambuva S/C 66 KV 6.40 29/03/2008

2166 Gotri-Godhra LILO to Sama Jambuva D/C 66KV 2.00 24/04/2013

2167Makarpura TAP Line 1 from Gotri-Karjan

D/CJambuva D/C 66 KV 0.50 07/11/1974

2168Makarpura TAP Line 2 from Gotri-Karjan

D/CJambuva D/C 66 KV 0.50 07/11/1974

2169 Makarpura-Alstom Jambuva S/C 66 KV 0.85 07/10/2010

2170 Makarpura- ABB Jambuva S/C 66 KV 0.85 04/04/2009

2171 Makarpura-FAG Jambuva S/C 66 KV 3.10 12/12/2010

2172 Makarpura- Siemens Jambuva S/C 66 KV 1.60 18/03/2011

2173 Makarpura- ERDA Jambuva S/C 66 KV 0.91 01/08/1998

2174 Makarpura-A - Makarpura-B Jambuva S/C 66 KV 3.10 18/06/2013

2175 Tarsali -Makarpura-B-1 Jambuva D/C 66 KV 2.80 18/11/2012

2176 Tarsali -Makarpura-B-2 Jambuva D/C 66 KV 2.80 18/11/2012

2177 Vasedi-Pavi Jambuva S/C 66 KV 18.00 12.11.97

2178 Vasedi-Vanar Jambuva D/C 66 KV 8.00 14.12.97

2179 Vanar-Panvad Jambuva D/C 66 KV 16.00 14.12.97

2180 Karvan-Sadhli Jambuva S/C 66 KV 14.00 10/12/1986

2181 GIDC -Shivarajpur Jambuva S/C 66 KV 9.00 25/09/1987

2182 GIDC-Ghoghamba Tap Jambuva S/C 66 KV 12.00 01.06.94

2183 Tilakwada -chandod line-1 Jambuva D/C 66 KV 18.40 11.09.74

2184 Tilakwada -chandod line-2 Jambuva D/C 66 KV 18.40 11.09.74

2185 Tilakwada-Amadla Jambuva D/C 66 KV 20.26 08.08.90

2186 Amadla-Navagam Jambuva D/C 66 KV 17.51 08.08.90

2187 Tilakwada-Naswadi Jambuva S/C 66 KV 15.80 02.11.89

2188 Tilakwada-Dabhoi Jambuva S/C 66 KV 25.50 14.10.85

2189 Naswadi-Kosindra Jambuva S/C 66 KV 14.00 01.04.05

2190 Naswadi-Kawant Jambuva S/C 66 KV 40.00 15.03.86

2191 Garudeswar-Navagam Jambuva D/C 66 KV 12.66 08/08/1990

2192 Tilakwada-Garudeswar Jambuva D/C 66 KV 13.35 08.08.90

2193 Sadhali-Sinor Jambuva S/C 66 KV 14.00 16.09.74

2194 Sadhali-Karjan Jambuva S/C 66 KV 14.00 18.10.76

2195 Bodeli-Pavi Jambuva S/C 66 KV 15.00 02.02.84

2196 Sankheda-Bodeli Jambuva S/C 66 KV 25.50 02.02.84

2197 Chandod-Rajpipla Jambuva S/C 66 KV 20.50 21.11.85

2198 Koshindra-Chalamali Jambuva S/C 66 KV 7.96 08.07.08

2199 Panavad-Kawant Jambuva S/C 66 KV 14.50 14.12.97

2200 Sadhli-Pisai Jambuva S/C 66 KV 14.00 10.04.76

2201 Chandod-Pisai Jambuva S/C 66 KV 12.00 10.04.76

2202 Ghogmba-Simaliya Jambuva S/C 66KV 24.00 09/05/2013

2203 Gorwa - Subhanpura U/G Cable. Jambuva S/C 66 KV 1.81 12/03/2009

2204 Gotri-Vidyutnagar 3 U/G Jambuva S/C 66 KV 3.90 20/07/2011

2205 Gotri-Jambuva-Padra-Gavasad-1 Jambuva D/C 66 KV 32.72 19/06/1964

2206 MasarRoad-GujaratGlass Jambuva S/C 66 KV 3.80 22/04/2000

2207 Tap to Shahera (Godhra-Lunawada) Jambuva S/C 66 KV 0.80 17/08/1991

2208 Vidyutnagar-Vasna U/G Cable Line Jambuva S/C 66 KV 1.52 06/12/2012

2209 Gotri-Gorwa Jambuva D/C 66 KV 2.00 19/02/1965

2210 Karjan-Cosmo Jambuva S/C 66 KV 2.15 18/08/2012

2211 Masar Road-Amod Jambuva S/C 66 KV 10.00 26/02/2009

Page 80

Page 48: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

2212 Masar Road-Jambusar Jambuva S/C 66 KV 10.00 26/02/2009

2213 Karjan-TTK Jambuva S/C 66 KV 1.91 09/07/2013

2214 Karjan-TBEA Jambuva S/C 66 KV 3.36 29/08/2013

2215 Vasna - Atladara U/G Jambuva S/C 66 KV 3.9 06.12.2012

2216 Gavasad-Sterling SEZ Line Jambuva S/C 66 KV 19.48 31.03.14

2217 Gotri-Jambuva Line-1 tap to Bhyali Jambuva S/C 66 KV 6.30 16.07.2014

2218Gotri-Karjan D/C Line LILO at 66 kV Gotri-

B S/s.Jambuva D/C 66 KV 0.15 15.07.2014

2219 66kv Pavi-Rangalichokadi line Jambuva S/C 66KV 15 14/08/2014

2220 66KV Pavi-Vadoth line Jambuva D/C 66KV 26.5 11/06/2014

2221 66KV Bodeli-Vadoth Line Jambuva D/C 66KV 27.5 11/06/2014

222266KV LILO to Nandarwa from Godhra-

LunawadaJambuva D/C 66KV 7 14/03/2015

2223 66KV LILO to Lakodara Jambuva D/C 66 0.125 27/06/2015

222466KV LILO to Uchapan from exist Pavi-

VadothJambuva D/C 66KV 0.5 29/06/2015

2225 66KV Limbadiya-Virpur Jambuva S/C 66KV 11 30/06/2015

222666KV LILO to Navagam from Kharedi-

KathlaJambuva D/C 66KV 1.522 06/06/2015

2227 66KV Fangia-Devgadhbaria Jambuva S/C 66KV 24.607 14/07/2015

2228 66KV Surya from rustampura bodeli D/C 66KV 1.07 27/05/2015

2229 66KV Vyankatpura-Rustampura Jambuva D/C 66KV 46.606 15/09/2015

223066KV UG Cable tap to 66KV Jambuva-B

from Jambuva-DabhoiJambuva UG 66KV 0.653 04/04/2015

223166KV UG Cable tap to 66KV Jambuva-B

from Jambuva-GajarawadiJambuva UG 66KV 0.624 14/04/2015

2232 66KV Madhwas to M/S Lavacat Jambuva UG 66KV 2.4 16/06/2015

2233 Achhalia - P'nagar Bharuch S/C 66 KV 12.40 1.3.96

2234 Achhalia - Panetha Bharuch S/C 66 KV 13.00 19.4.06

2235 P'nagar - Rajpipla Bharuch S/C 66 KV 23.00 1.5.98

2236 Achhalia - Rajpardi Bharuch S/C 66 KV 7.00 22.5.77

2237 Rajpipla - Bhacharwada Bharuch S/C 66 KV 8.66 16.11.07

2238 Ankleshwar - Zagadia Bharuch S/C 66 KV 17.00 22.5.77

2239 Ankleshwar – Ank GIDC A Bharuch S/C 66 KV 7.00 22.1.82

2240 Ankleshwar- UPL Bharuch S/C 66 KV 0.70 11.09.1993

2241 Ankleshwar-Kosamba –1 Bharuch D/C 66 KV 15.00 17.01.65

2242 Ankleshwar-Kosamba –2 Bharuch D/C 66 KV 15.00 17.01.65

2243 Bharuch B – Vagra - Vilayat Bharuch S/C 66 KV 37.5020.03.2009

(24.12.1998)

2244 Chhidra TAP line. Bharuch S/C 66 KV 28.05 16.07.2001

2245 Chhidra-Devla line Bharuch S/C 66 KV 12.02 08.08.13

2246 Dahej - BASF Bharuch S/C 66 KV 4.00 20.05.1999

2247 Dahej - GCPTCL Bharuch S/C 66 KV 6.41 21.10.00

2248 Dahej - GFL line-1 Bharuch D/C 66 KV 2.25 21.03.08

2249 Dahej - GFL 2 Bharuch D/C 66 KV 2.25 16.08.2010

2250 Hald – Palej – 1 Bharuch D/C 66 KV 19.0028.09.92

(1965)

2251 Rarod Tapping line Bharuch S/C 66 KV 18.00 28.09.92

2252 Haldarwa – VNEL – 1 Bharuch D/C 66 KV 9.08 07.08.1993

2253 Haldarwa – VNEL – 2 Bharuch D/C 66 KV 9.08 07.08.1993

2254 Haldarwa – Zanor Bharuch S/C 66 KV 20.00 28.09.1992

2255 Haldarwa – Palej – 2 Bharuch D/C 66 KV 19.00 18/05/1905

2256 Haldarwa – Bharuch 1 Bharuch D/C 66 KV 7.053.03.2003

(1965)

2257 Haldarwa – Bharuch 2 Bharuch D/C 66 KV 7.053.03.2003

(1965)

2258 Haldarwa – Bharuch B Bharuch D/C 66 KV 13.11 13.03.1993

2259 Haldarwa – Bori Bharuch D/C 66 KV 8.50 19.10.2012

2260 Bori- Bharuch B Bharuch D/C 66 KV 10.71 19.10.2012

2261 Haldarwa – Kadod Bharuch D/C 66 KV 9.11 01.01.08

2262 Hansot – Ank (Urban) Bharuch S/C 66 KV 20.50 26.03.2000

2263 Kharach – Guj.Glass Bharuch S/C 66 KV 1.50 27.09.1994

2264 Kim – Kamrej Bharuch S/C 66 KV 23.50 18.12.1993

2265 Kim - Karanj Bharuch S/C 66 KV 4.00 14.02.1997

2266 Kim – Mosali Bharuch S/C 66 KV 25.70 12.07.1995

2267 Kim - Palod - 1 Bharuch D/C 66 KV 2.00 07.12.1993

2268 Kim - Pipodara Bharuch S/C 66 KV 4.00 03.08.1993

2269 Kim – Velanja - Vav Bharuch S/C 66 KV 28.50 18.12.1993

2270 Kosamba - Kharach Bharuch S/C 66 KV 13.50 05.03.1994

Page 81

Page 49: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

2271 Kosamba - Palod-2 Bharuch S/C 66 KV 22.7030.08.07

(1965)

2272 Netrang –Sadrapani Bharuch S/C 66 KV 26.58 06.06.07

2273 Sadrapani – Dediapada Bharuch S/C 66 KV 31.08 06.06.07

2274 Palej - PCBL Bharuch S/C on D/C 66 KV 2.00 07.02.2005

2275 Palej -Steelco Bharuch S/C 66 KV 0.50 03.11.1992

2276 Palod – Kosamba-Borsara Bharuch S/C 66 KV 25.60 7.12.1993

2277 Panoli tap line-1 Bharuch S/C 66 KV 2.62 27.02.1986

2278 Panoli tap line-2 Bharuch S/C 66 KV 2.62 27.02.1986

2279 Panoli -Hansot Bharuch S/C 66 KV 19.84 31.05.1986

2280 Pipodara - Borsara Bharuch S/C 66 KV 7.00 12.07.1995

2281 Randeri – MTZ Bharuch S/C 66 KV 2.80 30.12.96

2282 Sarbhan – Amod Bharuch S/C 66 KV 12.0017.01.05

(24.04.1969)

2283 Amod - Jambusar Bharuch S/C 66 KV 11.5017.01.05

(24.04.1969)

2284 Ukai – Borda-Sagbara Bharuch S/C 66 KV 55.00 20.8.76

2285 Vagra – Bhensali Bharuch S/C 66 KV 26.1008.06.2007

(14.9.81)

2286 Dahej - Bhesali Bharuch S/C 66 KV 26.1008.06.2007

(14.9.81)

2287 Bhensali-Subhlaxmi Bharuch S/C 66 KV 1.68 18.01.13

2288 Vagra – GAIL 1 Bharuch D/C 66 KV 9.40 22.12.2000

2289 Vagra – GAIL 2 Bharuch D/C 66 KV 9.40 22.12.2000

2290 Vagra – ONGC-1 Bharuch D/C 66 KV 13.00 09.11.1990

2291 Vagra – ONGC-2 Bharuch D/C 66 KV 13.00 09.11.1990

2292 Valia – Ankleshwar GIDC 'A' Bharuch S/C 66 KV 25.00 28.1.82

2293 Valia – Godrej Bharuch S/C 66 KV 5.30 12.3.91

2294 Valia-Daheli Bharuch S/C 66 KV 7.88 16.06.07

2295 Zagadia – Borosil Bharuch S/C 66 KV 6.00 24.12.97

2296 Zagadia – Bhalod Bharuch S/C 66 KV 23.1618.05.2011

(22.05.77)

2297 Bhalod-Rajpardi Bharuch S/C 66 KV 12.1618.05.2011

(22.05.77)

2298 Zagadia – Randeri-1 Bharuch S/C 66 KV 5.30 3.5.97

2299 Zagadia – Search Chem(UPL-5) Bharuch S/C 66 KV 3.75 11.12.95

2300 Zagadia- Randeri-2 Bharuch S/C 66 KV 5.3007.10.2009

(3.5.1997)

2301 Randeri-Ankleshwar-B Bharuch S/C 66 KV 10.7007.10.2009

(3.5.1997)

2302 Zagadia– Rajeshwaranand Bharuch S/C 66 KV 8.00 3.5.97

2303 Zagadia– Zagadia Bharuch S/C 66 KV 6.00 12.5.05

2304 Zagadia -SWILL Bharuch S/C 66 KV 1.00 8.12.01

2305 Saddapani-Chikda Bharuch S/C 66 KV 21.60 30.5.08

2306 Karanj-Areth Bharuch S/C 66 KV 22.81 08.02.07

2307 66kV Zankhavav Vankal Bharuch S/C 66 KV 7.008 25.08.09 24.07.14

2308 66kV Mosali Vankal Bharuch S/C 66 KV 7.008 25.08.09 24.07.14

2309 Vilayat-Jubilliant Bharuch S/C 66 KV 1.17 26.04.2011

2310 Vilayat-Grasim U/G line Bharuch S/C 66 KV 1.70 06.02.2013

2311 Zagadia-Kohler Bharuch S/C 66 KV 5.03 07.04.2009

2312 Zagadia-Lanxess Bharuch S/C 66 KV 2.82 26.02.2010

2313 Randeri-Sejal Glass Bharuch S/C 66 KV 0.70 05.11.2009

2314 Randeri-Air Liquid Bharuch S/C 66 KV 0.89 20.08.2009

2315 Karjan Dam-Rajpipla-1 Bharuch D/C 66 KV 6.71 12.02.2011

2316 Karjan Dam-Rajpipla-2 Bharuch D/C 66 KV 6.71 27.03.2011

2317 Dahej - Dahej (220KV) Bharuch S/C 66 KV 2.98 07.05.2010

2318 Dahej-ABG Bharuch S/C 66 KV 7.60 12.08.2010

2319 Dahej-Torrent Bharuch S/C 66 KV 0.70 01.04.2010

2320 Dahej-Adani Bharuch S/C 66 KV 5.93 18.02.2011

2321 Dahej-BASF U/G line Bharuch S/C 66 KV 2.60 16.08.13

2322 66kV Vagra-Vilayat-1 Bharuch D/C 66 KV 4.30 11.2.12

2323 66kV Vagra-Vilayat-2 Bharuch D/C 66 KV 4.30 11.2.12

2324 66kV Zagadia-Dadheda Bharuch S/C 66 KV 4.65 18.2.12

2325 66kV Zagadia-Flow Metallic Bharuch S/C 66 KV 3.69 25.2.12

2326 Valia-Duttnagar Bharuch S/C 66 KV 20.30 05.11.11

2327 Duttnagar-Netrang Bharuch S/C 66 KV 5.10 05.11.11

2328 66KV Zagadia- DSCL Bharuch S/C 66 KV 1.03 08.06.12

2329 Bharuch 'B'-Panchbatti Bharuch S/C 66 KV 4.20 05.10.11

2330 Mandvi - Umarkhadi Bharuch S/C 66 KV 9.56 07.10.11

2331 Umarkhadi - Zankhvav Bharuch S/C 66 KV 18.36 07.10.11

2332 Mosali-GIPCL Bharuch S/C 66 KV 5.34 21.01.12

Page 82

Page 50: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

2333 Kim - Palod 2 Bharuch S/C 66 KV 2.00 7.12.93

2334 Palod-GNL 2 Bharuch S/C 66 KV 18.80 28.03.1996

2335 Vadoli Kharach Bharuch S/C 66 KV 14.32 21.09.15

2336 Palod- Vadoli Bharuch S/C 66 KV 29.76 21.09.15

2337 Vadoli-GNL Bharuch S/C 66 KV

2338 66kV Kurchan Palej Bharuch S/C 66 KV 18 28.08.86 31.01.14

2339 66kV Kurchan Wagra Bharuch D/C 66 KV 20 28.08.86 31.01.14

2340 Muler tap Bharuch S/C 66 KV 16.89 10.01.06

2341 Zagadia- Birla Century Bharuch S/C 66 KV 0.31 02.01.12

2342Tap to FTP s/s from Kosamba-Kharach

line under stop gapBharuch S/C 66 KV 1.5 16.07.13

2343 Luna Vadadla Bharuch D/C 66 KV 2.76 11.06.15

2344 Bhensali Vadadla Bharuch D/C 66 KV 24.76 11.06.15

2345 Luna-Dahej Bharuch S/C 66 KV 8.4 14.05.13

2346 Karanj-Sumeet Industries U/G line Bharuch S/C 66 KV 0.95 26.04.13

2347 66kV Luna Filatex Bharuch S/C 66 KV 4.2 27.01.14

2348 66kV Panoli Overseas Bharuch S/C 66 KV 4.5 25.03.14

2349 66kV Achhalia Rajuvadia Bharuch S/C 66 KV 11.89 23.05.14

2350 66kV kim FTP line Bharuch S/C 66 KV 12.5 07.01.14

2351 66kV Dadheda Abbott Health care Bharuch S/C 66 KV 2.1 13.06.14

2352 66kV Saring Rarod Bharuch D/C 66 KV 12 19.07.14

2353 Suva(220kV) Galenda 2 Bharuch D/C 66 KV 5 21.07.15

2354 Duttnagar-Mouza Bharuch S/C 66 KV 10.05 02.06.15

2355 Kosamba(400kV) Panoli II Bharuch D/C 66 KV 16.17 03.06.15

2356 Kosamba(400kV) Kosamba Bharuch S/C 66 KV 15 27.07.15

2357 Kosamba(400kV) Kharach Bharuch S/C 66 KV 17 27.07.15

2358 Haldarwa(220kV) Haldarwa Bharuch S/C 66 KV 0.506 23.06.15

2359 Vav(220kV) Delad Bharuch S/C 66 KV 0.91 03.06.15

2360 Delad Sivan Bharuch S/C 66 KV 0.91 03.06.15

2361 Vadadala-M/s Lubrizol Bharuch S/C 66 KV 1.575 17.07.15

2362 Suva(220kV) ATC Tire Bharuch S/C 66 KV 5.91 07.04.15

2363 Luna-M/s LINDE Bharuch S/C 66 KV 1.298 13.01.15

2364 66 KV Panoli-1 to Panoli-2 Bharuch S/C 66 KV 18.09.15

236566 KV Zaghadia(220 KV)-M/s

GulbrandsonBharuch S/C 66 KV 2.596 09.06.15

2366 Palod-Borasara UG cable line Bharuch S/C 66 KV 3.728 28.11.14

1 Nandesari-II-GACL -1&2 Jambuva D/C 33KV 1.90 15.12.83

2 Nandesari-II- Polymer -1 Jambuva S/C 33KV 0.55 14.08.84

3 Nandesari-II- Polymer -2 Jambuva S/C 33KV 0.70 03.12.83

4 J'nagar-GACL -1&2 Jambuva D/C 33KV 2.60 26.05.76

5 J'nagar-IPCL NO-1 Jambuva UGC 33KV 1.56 27.01.73

6 J'nagar-IPCL NO-2 Jambuva UGC 33KV 1.56 27.05.76

7 J'nagar-IPCL NO-3 Jambuva UGC 33KV 1.56 25.01.73

8 Lunawda Kadana Jambuva S/C 33KV 52.00 20.7.1975

9 Dahod W'Rly Jambuva S/C 33KV 3.00 28.6.1967

33 KV Transmission Line

Page 83

Page 51: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of Transmission Line Name of Circle SC/DCVoltage

Level (KV)

Line Length

(Ckt. Km)

Date of Commercial

Operation

Page 84

Page 52: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

1 Amreli Dhasa 220KV Dhasa 220220/66

66/11

2x100=200

1X15+1X15=3022 11.07.1995 GETCO

2 Amreli Dhasa 220KV Botad 220

220/132

220/66

66/11

1x100=100

1x100=100

1x5=5

20 10.06.2010 O/S

3 Amreli Dhasa 132 KV Paliyad 132132/66

66/11

2x50=100

1x10+1x20=3016 07.05.1965 GETCO

4 Amreli Dhasa 132 KV Barwala 132132/66

132/11

1x50=50

1x12.5+1x25=37.59 07.05.1965 GETCO

5 Amreli Dhasa 66 KV Sanosara 66 66/11 1x10+1x15=25 7 10.10.1998 GETCO

6 Amreli Dhasa 66KV N'vadar 66 66/11 2x10=20 7 24.12.2001 GETCO

7 Amreli Dhasa 66KV Dharwala 66 66/11 2x10=20 4 04.07.2009 O/S

8 Amreli Dhasa 66KV Malapara 66 66/11 2x10=20 6 16.07.2009 O/S

9 Amreli Dhasa 66 KV Chavand 66 66/11 1x10=10 4 11.06.2011 O/S

10 Amreli Dhasa 66KV Mandavi 66 66/11 1x10=10 3 05.06.2012 O/S

11 Amreli Dhasa 66 KV Bajud 66 66/11 1x15=15 4 06.07.2012 O/S

12 Amreli Dhasa 66 KV Jambervala 66 66/11 1x10=10 4 21.07.2012 O/S

13 Amreli Dhasa 66 KV Botad 66 66/11 1X15+2X10=35 11 29.03.1991 GETCO

14 Amreli Dhasa 66 KV Gadhada 66 66/11 2X15+1X10=40 13 25.01.1990 GETCO

15 Amreli Dhasa 66 KV Salangpur 66 66/11 2x10=20 6 05.12.1991 GETCO

16 Amreli Dhasa 66 KV Vinchhiya 66 66/11 1X15+2X10=35 8 19.10.1993 GETCO

17 Amreli Dhasa 66 KV Lakheni 66 66/11 1X15+1X10=25 6 10.04.1993 GETCO

18 Amreli Dhasa 66KV Turkha 66 66/11 2x10=20 7 28.02.2000 GETCO

19 Amreli Dhasa 66 KV Lathidad 66 66/11 2x10=20 6 21.06.2005 GETCO

20 Amreli Dhasa 66KV Kalatalav 66 66/11 2x10=20 6 08.05.2006 GETCO

21 Amreli Dhasa 66KV Haddad 66 66/11 2x10=20 6 29.01.2007 O/S

22 Amreli Dhasa 66KV Tatam 66 66/11 1X15+1X10=25 6 09.04.2007 O/S

23 Amreli Dhasa 66KV Bandhani 66 66/11 1X15+1X10=25 6 12.07.2007 O/S

24 Amreli Dhasa 66KV Ratanpar 66 66/11 2x10=20 6 23.05.2008 O/S

25 Amreli Dhasa 66KV Sanali 66 66/11 2x10=20 5 22.10.2011 O/S

26 Amreli Dhasa 66KV Ambardi 66 66/11 2x10=20 4 19.11.2011 O/S

27 Amreli Dhasa 66KV Keriya 66 66/11 1x15=15 4 15.09.2012 O/S

28 Amreli Dhasa 66kv Botad 2 66 66/11 1x10=10 4 14.08.2013 O/S

29 Amreli Dhasa 66kv Rojmal 66 66/11 1x15=15 6 05.03.2013 O/S

30 Amreli Dhasa 66kv Ujalvav 66 66/11 1x15=15 3 23.02.2013 O/S

31 Amreli Dhasa 66kv Bhimdad 66 66/11 2x15=30 5 11.01.2014 O/S

32 Amreli Dhasa 66kv Gadhali 66 66/11 2x15=30 5 01.08.2014 O/S

Amreli Mahuva 220 kv Otha 220220/66

66/1111X2=200 8 31.03.2000 GETCO

Amreli Mahuva 220 kv Otha 220 66/11 10X2=20 13 20.08.2000 GETCO

34 Amreli Mahuva 66KV Bagdana 66 66/11 10X1+15X1=25 6 23.12.1996 GETCO

35 Amreli Mahuva 66KV Kadamgiri 66 66/11 10X2=20 6 30.11.2009 O/S

36 Amreli Mahuva 66KV Datha 66 66/11 10X2=20 5 30.09.2008 O/S

37 Amreli Mahuva 66KV Belampar 66 66/11 10X1=10 3 31.03.2013 O/S

38 Amreli Mahuva 66KV Kalsar 66 66/11 10X1=10 4 05.07.2013 O/S

39 Amreli Mahuva 66KV Bhaguda 66 66/11 10X1+15X1=25 5 21.07.2014 O/S

40 Amreli Mahuva 66KV Mahuva 66 66/11 15X3=45 7 07.02.1979 GETCO

41 Amreli Mahuva 66KV Dungar 66 66/11 10X2=20 5 10.01.1996 GETCO

42 Amreli Mahuva 66KV Vadli 66 66/11 10X2=20 5 24.12.1996 GETCO

43 Amreli Mahuva 66KV Mota Khutavada 66 66/11 10X2=20 7 22.06.2004 GETCO

44 Amreli Mahuva 66KV Vangar 66 66/11 10X1=10 4 12.01.2009 O/S

45 Amreli Mahuva 66KV Kadiyali 66 66/11 10X2=20 5 21.07.2010 O/S

46 Amreli Mahuva 66KV Babariyadhar 66 66/11 10X1=10 4 30.09.2008 O/S

47 Amreli Mahuva 66KV Dudhala-2 66 66/11 15X1=15 4 22.12.2012 O/S

48 Amreli Mahuva 66KV Billa 66 66/11 15X1=15 3 14.03.2013 O/S

49 Amreli Mahuva 66KV Talaja 66 66/11 10X2+15X1=35 7 04.12.1981 GETCO

50 Amreli Mahuva 66KV Manar 66 66/11 10X1+15X1=25 5 28.02.1999 GETCO

51 Amreli Mahuva 66KV Pithalpur 66 66/11 10X2=20 5 15.06.2004 GETCO

52 Amreli Mahuva 66KV Dihor 66 66/11 10X2=20 7 19.12.2008 O/S

53 Amreli Mahuva 66KV Pasvi 66 66/11 10X2=20 5 01.05.2009 O/S

54 Amreli Mahuva 66KV Thadach 66 66/11 10X2=20 7 24.08.2006 O/S

55 Amreli Mahuva 66KV Trapaj 66 66/11 10X2=20 4 14.12.2011 O/S

56 Amreli Mahuva 66KV Devaliya 66 66/11 15X2=30 5 10.06.2013 O/S

57 Amreli Mahuva 66KV Kukad 66 66/11 15X2=30 4 10.07.2014 O/S

58 Amreli Amreli 66KV Amreli A 66 66/11.55 10×2+15×1=35 6 23.07.1967 GETCO

59 Amreli Amreli 66KV Amreli B 66 66/11.55 10×3=30 7 11.09.2001 GETCO

60 Amreli Amreli 66KV Babara 66 66/11.55 15×3=45 7 08.08.1994 GETCO

61 Amreli Amreli 66KV Bagasara 66 66/11.55 10×1+15×2=40 6 11.01.1990 GETCO

62 Amreli Amreli 66KV Chalala 66 66/11.55 10×3=30 7 05.07.1988 GETCO

63 Amreli Amreli 66KV Chital 66 66/11.55 15×2=30 5 14.07.1993 GETCO

64 Amreli Amreli 66KV Damnagar 66 66/11.55 10×1+15×1=25 5 27.06.1976 GETCO

65 Amreli Amreli 66KV Gavadka 66 66/11.55 10×2=20 5 18.11.2008 OS

66 Amreli Amreli 66KV Gariyadhar 66 66/11.55 10×3=30 6 27.06.1976 GETCO

67 Amreli Amreli 66KV Gundaran 66 66/11.55 10×1=10 3 09.09.2008 OS

68 Amreli Amreli 66KV Kukavav 66 66/11.55 10×1+15×1=25 5 31.03.1991 GETCO

69 Amreli Amreli 66KV Kotadapitha 66 66/11.55 10×1+15×1=25 8 24.08.2005 GETCO

70 Amreli Amreli 66KV Khambhala 66 66/11.55 10×2=20 5 01.02.2010 OS

71 Amreli Amreli 66KV Lathi 66 66/11.55 10×2+15×1=35 6 29.11.1991 GETCO

33

Form 2

Details of Substations

Name of the Transmission Licensee: Gujarat Energy Transmission Corporation Limited

Name of Transmission System

Name of Region: Gujarat

Page 85

Page 53: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

72 Amreli Amreli 66KV Liliya 66 66/11.55 10×2=20 5 30.05.1992 GETCO

73 Amreli Amreli 66KV Malaviya

Piparia 66 66/11.55 10×2+15×1=35 6 01.05.2009 OS

74 Amreli Amreli 66KV Sarambhada 66 66/11.55 10×2=20 5 07.09.1999 GETCO

75 Amreli Amreli 66KV Simaran 66 66/11.55 10×2=20 6 14.10.2008 OS

76 Amreli Amreli 66KV Tori 66 66/11.55 10×1=10 4 09.08.2011 OS

77 Amreli Amreli 66KV Lunidhar 66 66/11.55 15×1=15 4 12.03.2014 OS

78 Amreli Amreli 66KV

Virdi(Gariyadhar-B)66 66/11.55 15×2=30 5 22.07.2014 OS

79 Amreli Amreli 66KV Mota Ankadiya 66 66/11.55 10×1=10 3 10.10.2014 OS

80 Amreli Amreli 66KV kuvargadh 66 66/11.55 15×1=15 4 22.11.2014 OS

81 Amreli Vartej Sihor 66 66/11 3 x 15 12 24.09.87 GETCO

82 Amreli Vartej Songadh 66 66/11 3 x 10 11 11.01.77 GETCO

83 Amreli Vartej Ghanghli 66 66/11 4 x 15 9 21.02.99 GETCO

84 Amreli Vartej Navagam 66 66/11 2 x 15 7 03.10.91 GETCO

85 Amreli Vartej Sar 66 66/11 2 x 10 6 07.03.2010 O/S

86 Amreli Vartej Ghodidhal 66 66/11 2 x 10 6 20.05.2009 O/S

87 Amreli Vartej Vartej 220220/66 &

66/11

3 X 100

3 X 1530 02.06.66 GETCO

88 Amreli Vartej Chitra 66 66/112 X 10

1 X 156 28.12.99 GETCO

89 Amreli Vartej Sagapara 220 220/66 3 X 100 25 13.09.99 GETCO

90 Amreli Vartej Palitana 66 66/11 3 x 10 8 08.09.77 GETCO

91 Amreli Vartej Tana 66 66/11 1 x 10 + 1 X 15 6 31.07.97 GETCO

92 Amreli Vartej Palitana- B 66 66/11 1 x 10 + 1 X 15 5 01.06.12 O/S

93 Amreli Vartej Gheti 66 66/11 1 x 10 4 12.12.11 O/S

94 Amreli Vartej Bhandariya 66 66/11 1 x 10 3 21.10.11 O/S

95 Amreli Vartej Parvadi 66 66/11 2 X 10 5 21.10.11 O/S

96 Amreli Vartej Vallabhipur 220

220/132,

220/66,132/6

6, 132/11

2 X 100, 2 X 20, 2

X 12.521 05.12.94 GETCO

97 Amreli Vartej Dhola 66 66/11 2 X 10 6 21.08.89 GETCO

98 Amreli Vartej Panvi 66 66/11 1 x 10 4 26.05.10 O/S

99 Amreli Vartej Motidharai 66 66/11 1 x 10 5 21.07.09 O/S

100 Amreli Vartej Bhavnagar City 66 66/11 3 x 15 8 26.06.78 GETCO

101 Amreli Vartej Bunder 66 66/11 2 x 15 9 21.07.71 GETCO

102 Amreli Vartej Sidsar 66 66/11 3 X 10 13 14.09.92 GETCO

103 Amreli Vartej Nari 66 66/11 3 X 10 9 13.06.75 GETCO

104 Amreli Vartej Mamsa 66 66/11 3 X 15 8 27.10.97 GETCO

105 Amreli Vartej Tansa 66 66/11 1 X 15 1 X 10 8 10.07.93 GETCO

106 Amreli Vartej Bhumbhli 66 66/11 2 X 10 5 21.02.99 GETCO

107 Amreli Vartej Sardarnagar 66 66/11 2 x 10 6 20.06.09 O/S

108 Amreli Vartej Nathugadh 66 66/11 1 x 10 4 03.12.11 O/S

109 Amreli Vartej Valkat Gate 66 66/11 2 x 10 5 08.06.12 O/S

110 Amreli Vartej Nesda 66 66/11 3 x 20 8 02.01.13 O/S

111 Amreli Vartej Desainagar 66 66/11 2 X 15 4 23.01.13 O/S

112 Amreli Vartej Mamsa-2 66 66/11 2 X 15 5 19.03.2014 O/S

113 Amreli Vartej Kharakdi 66 66/11 1 X 10 4 13.03.2014 O/S

114 Amreli Vartej Ghanghali - 3 66 66/11 2 X 20 4 21.02.14 O/S

115 Amreli Vartej Shihor-2 66 66/11 2 X 20 4 24.04.14 O/S

116 Amreli Vartej Shetrunji dam 66 66/11 1 X 15 3 04.04.14 O/S

117 Amreli Vartej Maglana 66 66/11 2 X 15 4 11.05.15 O/S

220 220/66 16

66 66/11 18

119 Amreli Savarkundla 66KV Bhader 66 66/11 1x10 + 1x15 6 06.11.1999 GETCO

120 Amreli Savarkundla 66KV Dhari 66 66/11 2x10 + 1x15 7 30.05.1990 GETCO

121 Amreli Savarkundla 66KV Dudhala 66 66/11 1x15 + 1x10 4 23.11.1997 GETCO

122 Amreli Savarkundla 66KV Jafrabad 66 66/11 2x10 7 30.10.1991 GETCO

123 Amreli Savarkundla 66KV Jesar 66 66/11 2x10 5 29.03.1986 GETCO

124 Amreli Savarkundla 66KV Khambha 66 66/11 1x15 + 1x10 6 04.07.1986 GETCO

125 Amreli Savarkundla 66KV M'-Barman 66 66/11 2x10 7 16/06/1905 GETCO

126 Amreli Savarkundla 66KV Rajula 66 66/11 1x15 + 1x10 6 18/05/1905 GETCO

127 Amreli Savarkundla 66KV Savarkundla 66 66/11 2x15 4 14/06/1905 GETCO

128 Amreli Savarkundla 66KV Vanda 66 66/11 2x10 5 07.06.2000 GETCO

129 Amreli Savarkundla 66KV Vijapadi 66 66/11 2x10 5 10.09.1994 GETCO

130 Amreli Savarkundla 66KV Ambardi 66 66/11 2x10 5 08.02.2005 GETCO

131 Amreli Savarkundla 66KV Dalkhaniya 66 66/11 2x10 5 13.06.2005 GETCO

132 Amreli Savarkundla66KV Mota

Samadhiyala66 66/11 2x10 6 22.10.2005 GETCO

133 Amreli Savarkundla 66KV Gadhakada 66 66/11 2x10 5 07.11.2008 O/S

134 Amreli Savarkundla 66KV Devala 66 66/11 1x10 3+1=4 20.11.2009 O/S

135 Amreli Savarkundla 66KV Rabarika 66 66/11 1x10 4 11.03.2010 O/S

136 Amreli Savarkundla 66KV Kubda 66 66/11 2x10 4 12.11.2011 O/S

19/05/1905 GETCO118 Amreli Savarkundla 220KV Savarkundla 3x100

Page 86

Page 54: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

137 Amreli Savarkundla 66KV Dedan 66 66/11 1x15 4 19.01.2013 O/S

138 Amreli Savarkundla 66KV Timbi 66 66/11 1x10 3 15.03.2014 O/S

139 Amreli Savarkundla 66KV Badhada 66 66/11 1x15 5 19.04.2014 O/S

140 Amreli Savarkundla 66KV Kagdadi 66 66/11 2x15 5 09.09.2014 O/S

141 Amreli Savarkundla 66KV Barpatodi 66 66/11 1x10 5 25.05.2015 O/S

142 Amreli Savarkundla 66KV Mota Agariya 66 66/11 1x15 5 06.07.2015 O/S

400/220 315 X 3 400KV-16

220/66 100 X 1,50 X 2 220KV-13

66/11 5 x 1 66KV-10

400KV

Recator50 x 1,125 x1

144 AnjarSamakhiyal

i220 kV Shivlakha 220KV

220/66KV

66/11KV

100 X 3

5 X 1 46 08.05.2004 GETCO

145 AnjarSamakhiyal

i220kV Vondh 220KV

220/66KV

66/11KV

100 X 2

5 X 1 18 31.07.2013

Maintenance by O/S

Opearated by

GETCO

146 AnjarSamakhiyal

i132 kV Samkhiyali 132KV

132/66KV

132/66KV

66/11KV

50 X 2

20 X 1

10 X 229 30.01.1995 GETCO

147 AnjarSamakhiyal

i66 kV Adhoi 66KV 66/11KV 10 X1 + 15 X 1 6 30.03.1995 GETCO

148 AnjarSamakhiyal

i66 kV Rapar 66KV 66/11KV 15 X 2 6 01.01.1970 GETCO

149 AnjarSamakhiyal

i66 kV Pragpar 66KV 66/11KV 10 X 3 7 13.03.2003 GETCO

150 AnjarSamakhiyal

i66 kV Bhimasar 66KV 66/11KV 10 X2 + 15 X 1 5 02.05.1994 GETCO

151 AnjarSamakhiyal

i66 kV Balasar 66KV 66/11KV 10 X 2 5 26.11.1999 GETCO

152 AnjarSamakhiyal

i66 kV Vajepar 66KV 66/11KV 10 X 3 8 31.10.1995 GETCO

153 AnjarSamakhiyal

i66 kV Chirai 66KV 66/11KV 10 X 2 8 31.12.2002 GETCO

154 AnjarSamakhiyal

i66 kV Amardi 66KV 66/11KV 10 X1 + 15 X 2 8 25.02.2000 GETCO

155 AnjarSamakhiyal

i66 kV Bhachau 66KV 66/11KV 10 X1 + 15 X 1 5 01.08.1970 GETCO

156 AnjarSamakhiyal

i66 kV Chobari 66KV 66/11KV 10 X1 + 15 X 2 5 16.01.1996 GETCO

157 AnjarSamakhiyal

i66kV Shikra 66KV 66/11KV 10 X 3 8 02.06.2007 Out source

158 AnjarSamakhiyal

i66kV Amrapar 66KV 66/11KV 10 X 1 3 21.03.2011 Out source

159 AnjarSamakhiyal

i66kV Chitrod 66KV 66/11KV 15 X 1 10 19.10.2012 Out source

160 AnjarSamakhiyal

i66kV Khirai 66KV 66/11KV 15 X 1 4 07.08.2013 Out source

161 AnjarSamakhiyal

i66kV Sukhpar 66KV 66/11KV 15 X 2 6 08.10.2013 Out source

162 Anjar Bhuj 220 kV Nanikhakhar 220KV 220/66KV

66/11KV

100 X 2

5 X 1

25 X 1 MVAR

27 31.12.1997 GETCO

163 Anjar Bhuj 220 kV Kukma 220KV 220/66KV

66/11KV

100 X 2

5 X 1 24 30.06.2008

Maintenance by O/S

Opearated by

GETCO

164 Anjar Bhuj 66 kV Bhuj - A 66KV 66/11KV 10 X2 + 15 X 1 11 05.06.1971 GETCO

165 Anjar Bhuj 66 kV Madhapar 66KV 66/11KV 10 X2 + 15 X 1 9 11.04.2004 GETCO

166 Anjar Bhuj 66 kV Lakhond 66KV 66/11KV 15 X 3 9 31.03.1990 GETCO

167 Anjar Bhuj 66 kV Kotada (C) 66KV 66/11KV 10 X2 + 15 X 1 9 28.03.1994 GETCO

168 Anjar Bhuj 66kv Chapredi 66KV 66/11KV 15 X 2 4 27.07.2012 Out source

169 Anjar Bhuj 66kV Bhuj - B 66KV 66/11KV 10 X 3 7 15.12.1994 GETCO

170 Anjar Bhuj 66 kV Loria 66KV 66/11KV 10 X 2 8 28.04.1987 GETCO

171 Anjar Bhuj 66 kV Khavada 66KV 66/11KV 5 X 2 7 28.12.1999 GETCO

172 Anjar Bhuj 66 kV Bhediyabet 66KV 66/11KV 5 X 2 4 25.08.2007 GETCO

173 Anjar Bhuj 66 kV Vighakot 66KV 66/11KV 5 X 2 4 02.08.2007 GETCO

174 Anjar Bhuj 66 Kv Sukhpar 66KV 66/11KV 10 X 2 5 12.08.2009 Out source

175 Anjar Bhuj 66 kV Dahinsara 66KV 66/11KV 15 X 2 7 25.05.1976 GETCO

176 Anjar Bhuj 66 kV Baladia 66KV 66/11KV 10 X 2 7 31.03.2000 GETCO

177 Anjar Bhuj 66 kV Mankuva 66KV 66/11KV 10 X1 + 15 X 1 5 26.01.1994 GETCO

178 Anjar Bhuj 66kV Nanikhakhar 66KV 66/11KV 10 X2 + 15 X 1 5 23.01.1991 GETCO

179 Anjar Bhuj 66 kV Talwana 66KV 66/11KV 10 X 2 5 03.05.2010 Out source

180 Anjar Bhuj 66 kV Mandvi 66KV 66/11KV 10 X2 + 15 X 1 6 06.01.1976 GETCO

181 Anjar Bhuj 66 kV Koday 66KV 66/11KV 10 X1 + 15 X 1 8 01.01.2000 GETCO

182 Anjar Bhuj 66kv Dhordo 66KV 66/11KV 10 X1 + 15 X 1 5 13.12.2012 Out source

183 Anjar Bhuj 66kv Reldi 66KV 66/11KV 10 X1 + 15 X 1 5 23.05.2013 Out source

143 Amreli400KV

Amreli400KV Amreli 400KV 2.8.2000 GETCO

Page 87

Page 55: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

184 Anjar Bhuj 66kv KERA 66KV 66/11KV 15 X 2 5 21.09.2013 Out source

185 Anjar Bhuj 66kv Bhujodi 66KV 66/11KV 15 X 2 5 29.01.2014 Out source

186 Anjar Bhuj 66kv Paddhar 66KV 66/11KV 15 X 2 5 07.04.2014 Out source

187 Anjar Bhuj 66kv Sanosara 66KV 66/11KV 15 X 2 5 21.08.2014 Out source

188 Anjar Bhuj 66KV Asambiya 66KV 66/11KV 15 X 2 28.02.2015 Out source

189 Anjar Bhuj 66KV Gundiyali 66KV 66/11KV 15 X 2 28.02.2015 Out source

190 Anjar Anjar 400KV Varsana 400KV 400/220KV

315 x 2

1 x 50 MVAR

1 x 125 MVAR

15 12.01.2011

Maintenance by O/S

Opearated by

GETCO

191 Anjar Anjar 220 kV Anjar 220KV 220/66KV

66/11KV

100 X 3

15 X 3

1 x 25 MVAR

31 15.07.1978 GETCO

192 Anjar Anjar 220kV Tappar 220KV 220/66KV

66/11KV

100 X 2

5 X 125 28.01.2008

Maintenance by O/S

Opearated by

GETCO

193 Anjar Anjar 220kV Welspun 220KV NA NA 6 06.01.2013

Maintenance by

Welspun

Opearated by

GETCO

194 Anjar Anjar 220 KV Mokha SS 220KV 220/66KV

66/11KV

100 X 2

5 X 114 12.9.2014

Maintenance by O/S

Opearated by

GETCO

195 Anjar Anjar 66 kV Kanaiyabe 66KV 66/11KV 10 X2 + 15 X 1 8 27.06.2008 Out source

196 Anjar Anjar 66 kV Khambhara 66KV 66/11KV 10 X 2 4 25.06.2008 Out source

197 Anjar Anjar 66 kV Dudhai 66KV 66/11KV 15 X 3 9 01.05.1989 GETCO

198 Anjar Anjar 66 kV Dhaneti 66KV 66/11KV 15 X 2 9 07.03.1997 GETCO

199 Anjar Anjar 66 kV Ratnal 66KV 66/11KV10 x1 + 15x1

+20x1 6 10.10.2002 GETCO

200 Anjar Anjar 66 kV Khedoi 66KV 66/11KV 10 x3 9 01.08.1983 GETCO

201 Anjar Anjar 66 KV Vidi SS 66KV 66/11KV 15 X 2 5 31.05.2013 Out source

202 Anjar Anjar 66 kV FTZ 66KV 66/11KV 2x20+2x15 12 01.05.1980 GETCO

203 Anjar Anjar66 kV Gandhidham '

B66KV 66/11KV 15 x 3 8 30.03.1998 GETCO

204 Anjar Anjar 66 kV Mithirohar 66KV 66/11KV 3X10 8 11.02.2005 GETCO

205 Anjar Anjar 66 kV Kidana 66KV 66/11KV 10 X1 + 15 X 1 7 16.07.2008 Out source

206 Anjar Anjar 66 kV Kandla 66KV 66/11KV 10 x2 6 01.01.1971 GETCO

207 Anjar Anjar 66 kV Varsana 66KV 66/11KV 15 x 3 12 21.08.2004 GETCO

208 Anjar Anjar 66 kV Mokha 66KV 66/11KV 10 x2 9 30.03.2006 GETCO

209 Anjar Anjar 66 kV Mundra 66KV 66/11KV 15 x 3 8 06.01.1980 GETCO

210 Anjar Anjar 66 kV Mundra Ind. 66KV 66/11KV 10 x2 9 20.02.2006 GETCO

211 Anjar Anjar 66 kV Tharavada 66KV 66/11KV 10 x2 5 02.02.2005 GETCO

212 Anjar Anjar 66 kV Bhujpur 66KV 66/11KV 10 x3 8 31.03.2001 GETCO

213 Anjar Anjar 66 kv Siracha 66KV 66/11KV 10 x2 7 01.09.2009 Out source

214 Anjar Anjar66 KV Varsamedi

SS66KV 66/11KV 15 x 2 5 01.09.2014 Out source

215 Anjar Anjar 66KV Khokhara 66KV 66/11KV 15 x 2 5 16.02.2015 Out source

216 Anjar Anjar 66 KV Patri 66KV 66/11KV 15 x 2 5 28.02.2015 Out source

217 Anjar Anjar 66 KV Baraya 66KV 66/11KV 15 x 2 5 15.06.2015 Out source

218 Anjar Nakhatrana 220kV Nakhatrana 220KV 220/66KV

66/11KV

100X2

5X126 25.09.1995 GETCO

219 Anjar Nakhatrana 66kV Kothara 66KV 66/11KV 15X2 8 30.09.1992 GETCO

220 Anjar Nakhatrana 66kV Mothala 66KV 66/11KV 10X2 7 03.04.2006 GETCO

221 Anjar Nakhatrana 66kV Naliya 66KV 66/11KV 10X3 8 30.09.1992 GETCO

222 Anjar Nakhatrana 66kV Bayath 66KV 66/11KV 10X1+15X1 6 10.10.2000 GETCO

223 Anjar Nakhatrana 66kV Khirasara 66KV 66/11KV 10X1+15X1 6 05.06.1997 GETCO

224 Anjar Nakhatrana66 kV Dumra

66KV 66/11KV 10X2 4 19.08.2009 Out source

225 Anjar Nakhatrana 66 kV Nakhatrana 66KV 66/11KV 15X3 7 12.10.1982 GETCO

226 Anjar Nakhatrana 66kV Kotda(J) 66KV 66/11KV 10X2+15X1 7 09.03.1996 GETCO

227 Anjar Nakhatrana 66kV Ravapar 66KV 66/11KV 10X3 7 09.03.1996 GETCO

228 Anjar Nakhatrana 66kV Netra 66KV 66/11KV 10X3 8 28.09.1995 GETCO

229 Anjar Nakhatrana 66kV Dayapar 66KV 66/11KV 10X2 6 06.10.1997 GETCO

230 Anjar Nakhatrana66 kV Nanimau

66KV 66/11KV 10X1+15X1 6 15.04.2010 Out source

231 Anjar Nakhatrana 66kV Gadhsisa 66KV 66/11KV 15X2 7 15.07.1986 GETCO

232 Anjar Nakhatrana 66kV Don 66KV 66/11KV 10X2 9 02.12.2004 GETCO

Page 88

Page 56: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

233 Anjar Nakhatrana 66 kV Darasadi 66KV 66/11KV 10X2 5 20.11.2005 GETCO

234 Anjar Nakhatrana 66kV Deshalpar 66KV 66/11KV 10X1+15X1 8 20.04.1982 GETCO

235 Anjar Nakhatrana 66kV Vithon 66KV 66/11KV 10X2+15X1 6 31.10.2001 GETCO

236 Anjar Nakhatrana 66 kV Nirona 66KV 66/11KV 10X1 4 01.05.2010 Out source

237 Anjar Nakhatrana66 kV Vagoth

66KV 66/11KV 10X2 5 27.07.2011 Out source

238 Anjar Nakhatrana66 kV Parjau (Wanku)

66KV 66/11KV 15X1 3 26.07.2012 Out source

239 Anjar Nakhatrana66 kV Hajapar

66KV 66/11KV 15X2 5 06.08.2013 Out source

240 Anjar Nakhatrana

66kV

Deshalpar(Guthali) 66KV 66/11KV 15X2 5 07.08.2014 Out source

241 Anjar Nakhatrana66kV Jamathada

66KV 66/11KV 15X2 5 21.08.2014 Out source

242 Anjar Nakhatrana 66KV Nananakhatrana 66KV 66/11KV 15X2 5 25.05.2015 Out source

243 Anjar Nakhatrana 66KV Nani-Chher 66KV 66/11KV 15X2 5 26.05.2015 Out source

244 Anjar Nakhatrana 66KV Rava 66KV 66/11KV 15X2 5 29.05.2015 Out source

245 Anjar Nakhatrana 66KV Baranda 66KV 66/11KV 15X2 4 11.06.2015 Out source

246 Bharuch Bharuch 220KV Dahej 220 220/66 3x100=300

17

12 11.06.1998 GETCO

247 Bharuch Bharuch 220kV Suva 220 220/66 2x100=20011

631.03.2015 O/S

248 Bharuch Bharuch 132KV Bharuch 132132/66

66/22

3x20=60

2x10+1x15=35

9

9

18

19.05.1973 GETCO

249 Bharuch Bharuch 132KV Ankleshwar 132132/66

66/22

3x50+1x100=250

2x20+3x15=85

9

15

21

12.10.1977 GETCO

250 Bharuch Bharuch 66KV Dahej 'A' 66 66/11 2x15=302

903.11.2012 GETCO

251 Bharuch Bharuch 66KV Dahej 66 66/11 3x10=307

1814.09.1981 O/S

252 Bharuch Bharuch 66KV Luna 66 66/11 2x15=306

1120.05.2013 O/S

253 Bharuch Bharuch 66KV Bhensali 66 66/11 1x15+1x5=206

908.06.2007 O/S

254 Bharuch Bharuch 66KV Bharuch 'B' 66 66/22 2x10+1x15=358

823.08.1994 GETCO

255 Bharuch Bharuch 66KV Panoli 66 66/22 4x20=809

1827.02.1986 GETCO

256 Bharuch Bharuch 66KV Hansot 66 66/11 2x10=205

1131.05.1987 GETCO

257 Bharuch Bharuch 66KV Panchbatti 66 66/11 1x10+1x15=254

1011.10.2011 O/S

258 Bharuch Bharuch 66KV Ankleshwar 'A' 66 66/22 4x15=609

1818.08.1994 GETCO

259 Bharuch Bharuch 66KV Ankleshwar 'B' 66 66/22 3x15+1x10=555

1613.02.2000 GETCO

260 Bharuch Bharuch 66KV Ankleshwar 'U' 66 66/22 3x10=305

1226.03.2000 GETCO

261 Bharuch Bharuch 66kV Galenda 66 66/11 2x20=404

423.07.2015 O/S

262 Bharuch Bharuch 66kV Vadadla 66 66/11 2x20=405

511.06.2015 O/S

263 Bharuch Bharuch 66kV Panoli II 66 66/11 2x20=407

503.06.2015 O/S

264 Bharuch Haldarwa 220KV Haldarwa 220220/132

220/66

2x100+1x50=250

1X100+1X50=15

0

7

14

1610.10.1992 GETCO

265 Bharuch Haldarwa 220KV Wagra 220 220/661X100+1X50=15

0

7

628.01.2009 O/S

266 Bharuch Haldarwa 66KV Palej 66 66/11 2x15+1x10=4010

2113.03.1976 GETCO

267 Bharuch Haldarwa 66KV Zanor 66 66/11 2x10=204

1227.02.1992 GETCO

268 Bharuch Haldarwa 66KV Rarod 66 66/11 1x10+1x5=154

1016.05.1992 GETCO

269 Bharuch Haldarwa 66KV Sarbhan 66 66/11 2x15 =305

1319.10.1982 GETCO

270 Bharuch Haldarwa 66KV Bori 66 66/11 2x15 =305

819.10.2012 O/S

Page 89

Page 57: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

271 Bharuch Haldarwa 66KV Saring 66 66/11 1x15=155

719.07.2014 O/S

272 Bharuch Haldarwa 66KV Jambusar 66 66/11 1x15+1x10=254

1324.07.1979 GETCO

273 Bharuch Haldarwa 66KV Amod 66 66/11 2x10=206

817.01.2005 GETCO

274 Bharuch Haldarwa 66KV Chhidra 66 66/11 1x10+1x5=155

1111.08.2001 GETCO

275 Bharuch Haldarwa 66KV Vagra 66 66/11 2x10=2010

1028.08.1986 GETCO

276 Bharuch Haldarwa 66KV Muller 66 66/11 2x10=204

724.01.2006 GETCO

277 Bharuch Haldarwa 66KV Kadod 66 66/11 2x10=204

601.01.2008 GETCO

278 Bharuch Haldarwa 66KV Vilayat 66 66/11 1X15+5X1=206

520.03.2009 O/S

279 Bharuch Haldarwa 66KV Devla 66 66/11 1x15=153

616.08.2013 O/S

280 Bharuch Haldarwa 66kV Haldarwa 66 66/11 2x15=304

316.07.2015 O/S

281 Bharuch Haldarwa 66KV Kurchan 66 66/11 2x15=305

730.01.2014 O/S

282 Bharuch Achhalia 220KV Achhalia 220220/132

220/66

2X100+1X50+1X

150=400

1x100=10

17

14

7

17.03.1979 GETCO

283 Bharuch Achhalia 220KV Zagadia 220 220/66 3x50=15015

1406.06.1995 GETCO

284 Bharuch Achhalia 132KV Valia 132132/66

66/11

2x50+1x100=200

2x15=30

8

12

21

22.05.1972 GETCO

285 Bharuch Achhalia 66KV Zagadia 66 66/11 2x10=207

1528.03.1995 GETCO

286 Bharuch Achhalia 66KV Rajpardi 66 66/11 2x10=205

1823.10.1996 GETCO

287 Bharuch Achhalia 66KV Pratapnagar 66 66/11 2x10=205

1816.01.1996 GETCO

288 Bharuch Achhalia 66KV Rajpipla 66 66/11 2x10+1x15=356

1715.12.1969 GETCO

289 Bharuch Achhalia 66KV Randeri 66 66/11 2x10=2010

1113.12.1996 GETCO

290 Bharuch Achhalia 66KV Netrang 66 66/11 1x10+1x15=256

1528.11.1985 GETCO

291 Bharuch Achhalia 66KV Dediapada 66 66/11 2x5=104

1028.02.1989 GETCO

292 Bharuch Achhalia 66KV Sagbara 66 66/11 2x10=204

1220.08.1976 GETCO

293 Bharuch Achhalia 66KV Panetha 66 66/11 2x10=205

920.04.2006 GETCO

294 Bharuch Achhalia 66KV Sadadapani 66 66/11 2x5=106

706.06.2007 O/S

295 Bharuch Achhalia 66KV Daheli 66 66/11 2x10=204

916.06.2007 O/S

296 Bharuch Achhalia 66KV Bhacharwada 66 66/11 2x10=204

916.11.2007 O/S

297 Bharuch Achhalia 66KV Chikda 66 66/11 2x5=104

630.05.2008 O/S

298 Bharuch Achhalia 66KV Borda 66 66/11 1x10+1x5=155

501.05.2010 O/S

299 Bharuch Achhalia 66KV Bhalod 66 66/11 2x5=105

617.05.2011 O/S

300 Bharuch Achhalia 66KV Dadheda 66 66/11 3x10=304

908.11.2011 O/S

301 Bharuch Achhalia 66KV Duttnagar 66 66/11 1x10=104

602.12.2011 O/S

302 Bharuch Achhalia 66KV Anijara 66 66/11 2x15=305

623.03.2014 O/S

303 Bharuch Achhalia 66KV Rajuvadia 66 66/11 2x15=305

626.05.2014 O/S

304 Bharuch Achhalia 66KV Mouza 66 66/11 2x15=304

602.06.2015 O/S

305 Bharuch Kim 400KV Kosamba 400400/220

220/66

3x315=945

2x100=200

10

17

11

29.03.2011 O/S

306 Bharuch Kim 220KV Kim 220 220/66 3x100=30016

1619.08.1993 GETCO

307 Bharuch Kim 66KV Kosamba 66 66/22 3x10=3010

1517.01.1965 GETCO

308 Bharuch Kim 66KV Mota Borasra 66 66/11 15x3+20x1=658

2120.03.1993 GETCO

309 Bharuch Kim 66KV Kharach 66 66/2210x1 + 15x1 +

20x1=45

7

705.03.1994 GETCO

Page 90

Page 58: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

310 Bharuch Kim 66KV Palod 66 66/11 15x 2 + 20x1=5011

1406.09.1989 GETCO

311 Bharuch Kim 66KV Karanj 66 66/11 10x1 +15x2=407

1314.02.1997 GETCO

312 Bharuch Kim 66KV Velanja 66 66/22 15x2+10x1=407

1225.10.1996 GETCO

313 Bharuch Kim 66KV Pipodra 66 66/11 15X4=607

1611.03.1993 GETCO

314 Bharuch Kim 66KV Mandvi 66 66/11 15x2+10x1=406

1731.03.1984 GETCO

315 Bharuch Kim 66KV Mosali 66 66/11 2x10=207

1412.07.1995 GETCO

316 Bharuch Kim 66KV Zankhvav 66 66/11 1x10+1x5=155

1217.09.1990 GETCO

317 Bharuch Kim 66KV Areth 66 66/11 2x10=204

908.02.2007 GETCO

318 Bharuch Kim 66KV Sivan 66 66/11 15x3=456

902.11.2009 O/S

319 Bharuch Kim 66KV Umarkhadi 66 66/11 2x5=105

807.07.2011 O/S

320 Bharuch Kim 66KV Karjan 66 66/11 2x5=104

522.11.2012 O/S

321 Bharuch Kim 66KV FTP 66 66/11 2x15=304

720.07.2013 O/S

322 Bharuch Kim 66KV Dinod 66 66/11 2x15=302

507.11.2013 O/S

323 Bharuch Kim 66KV Vankal 66 66/11 2x15=305

924.07.2014 O/S

324 Bharuch Kim 66kV Delad 66 66/11 2x15=305

303.06.2015 O/S

325 Bharuch Kim 66kV Palod II 66 66/11 2x15=302

314.07.2015 O/S

326 Gondal Gondal 220 KV Gondal 220 220/132 3X100=300 15.04.1965 GETCO

327 Gondal Gondal 220 KV Gondal 220 132/66 3X50=150 31

328 Gondal Gondal 132 KV Jasdan 132 132/66 3x50=150 14.04.1999 GETCO

329 Gondal Gondal 132 KV Jasdan 132 66/11 1x20+1x15=35

330 Gondal Gondal66 KV

Kashivishvanath66 66/11 2x15+1x10=40 5 22.04.1977 GETCO

331 Gondal Gondal 66 KV Virpur 66 66/11 1x10+1x15=25 5 13.02.1989 GETCO

332 Gondal Gondal 66 KV Lodhika 66 66/11 2X15=30 3 30.12.1989 GETCO

333 Gondal Gondal 66 KV Vasavad 66 66/11 2X15=30 4 30.07.1990 GETCO

334 Gondal Gondal 66 KV Sardhar 66 66/11 2X15=30 5 18.06.1991 GETCO

335 Gondal Gondal66 KV Kotda

Sangani66 66/11 1X15+1X10=25 4 08.06.1991 GETCO

336 Gondal Gondal 66 KV Moviya 66 66/11 2X15=30 4 24.06.1993 GETCO

337 Gondal Gondal 66 KV Kolithad 66 66/11 1x10+1x15=25 5 07.05.1994 GETCO

338 Gondal Gondal 66 KV Lilakha 66 66/11 1x10+1x15=25 5 26.09.1994 GETCO

339 Gondal Gondal 66 KV Derdi 66 66/11 2x10+1x15=25 5 20.03.1996 GETCO

340 Gondal Gondal 66 KV Kamlapur 66 66/11 2X10=20 4 31.03.2001 GETCO

341 Gondal Gondal 66 KV Tramba 66 66/11 10+15=25 6 01.09.2003 GETCO

342 Gondal Gondal 66 KV Motadadva 66 66/11 1X10+1X15=25 6 27.06.2007 O/s

343 Gondal Gondal 66 KV Hadamtala 66 66/11 1X10+1X15=25 5 07.07.2007 O/s

344 Gondal Gondal 66 KV Mevasa 66 66/11 1X10+1X10=20 4 26.07.2007 O/s

345 Gondal Gondal66 KV Jasdan-

II(Gadhadiya)66 66/11 2X10=20 6 19.12.2007 O/s

346 Gondal Gondal 66 KV Sultanpur 66 66/11 2X10=20 4 31.03.2008 O/s

347 Gondal Gondal 66 KV Ramod 66 66/11 2X10=20 3 26.08.2009 O/s

348 Gondal Gondal66 KV Mota

Devaliya66 66/11 2X15=30 4 29.08.2009 O/s

349 Gondal Gondal 66 KV Umrali 66 66/11 2X10=20 5 24.02.2010 O/s

350 Gondal Gondal 66 KV Jamwadi 66 66/11 2X10=20 5 08.03.2010 O/s

351 Gondal Gondal 66 KV Faldang 66 66/11 2X10=20 4 29.03.2010 O/s

352 Gondal Gondal 66 KV Virnagar 66 66/11 2X10=20 4 14.07.2011 O/s

353 Gondal Gondal 66 KV Bhadala 66 66/11 2X10=20 4 30.07.2011 O/s

354 Gondal Gondal 66 KV Jivapar 66 66/11 2X10=20 4 14.11.2011 O/s

355 Gondal Gondal 66 KV Gondal-2 66 66/11 2X10=20 3 19.10.2011 O/s

356 Gondal Gondal66 KV

Shreenathgadh66 66/11 2X10=20 4 04.12.2011 O/s

357 Gondal Gondal 66kV Gomta 66 66/11 2X15=30 4 11.03.2013 O/s

358 Gondal Gondal 66KV Amarnagar 66 66/11 2X15=30 4 18.07.2013 O/s

359 Gondal Gondal66kV Shivrajpur

S/S66 66/11 2X15=30 4 14.08.2013 O/s

360 Gondal Gondal66kv

Anida(vachhra)66 66/11 2X15=30 4 29.03.2014 O/s

361 Gondal Gondal 66kV Road pipalia 66 66/11 2X15=30 5 29.05.2014 O/s

362 Gondal Gondal66KV

Rajsamdhiyala66 66/11 2X15=30 3 04.08.2015 O/s

17

Page 91

Page 59: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

363 Gondal Gondal 66KV Nadala 66 66/11 2X15=30 4 23.07.2015 O/s

364 Gondal Morbi 220 KV Morbi 220 220/66 3X100=300 28 30.05.1997 GETCO

365 Gondal Morbi 220 KV Lalpar 220 220/661X100+

1X160=26021.09.1995 O/s

366 Gondal Morbi 220 KV Lalpar 220 220/132 1X100=100

367 Gondal Morbi 220 KV Lalpar 66 66/11 4X15=60

368 Gondal Morbi 66 KV Morbi ‘A’ 66 66/11 1X15+1X20=35 4 18.09.1996 GETCO

369 Gondal Morbi 66 KV Pipaliya 66 66/11 2X10 =20 3 14.10.1996 GETCO

370 Gondal Morbi 66 KV Khareda 66 66/11 2X10 =20 3 3.07.2006 GETCO

371 Gondal Morbi66 KV Morbi-C-

Lilapar66 66/11 3X10 =30 7 9.09.2002 GETCO

372 Gondal Morbi 66 KV Tankara 66 66/11 2X15=30 6 15.06.1976 GETCO

373 Gondal Morbi 66 KV Dungarpur 66 66/11 2X15=30 4 11.10.2004 GETCO

374 Gondal Morbi 66 KV Morbi’B’ 66 66/11 3X10=30 6 15.07.1988 GETCO

375 Gondal Morbi66 KV

Mahendranagar66 66/11 3X15=30 6 07.07.2006 GETCO

376 Gondal Morbi 66 KV Jetpar 66 66/11 1X10+1X15=25 4 21.05.1996 GETCO

377 Gondal Morbi 66 KV Vajepar 66 66/11 2X10=20 4 20.12.2007 O/s

378 Gondal Morbi66 KV

Lakhdhirpur66 66/11 3X15=45 8 7.02.2008 O/s

379 Gondal Morbi66 KV

Rafadeshwar66 66/11 1X10+2X15=40 7 31.07.2008 O/s

380 Gondal Morbi 66 KV Lajai 66 66/11 2X10=20 5 01.04.2009 O/s

381 Gondal Morbi66 KV

Bharatnagar66 66/11 3X10=30 5 26.08.2009 O/s

382 Gondal Morbi 66KV Chanchapar 66 66/11 2X10=20 3 06.05.2010 O/s

383 Gondal Morbi 66KV Vejalpar 66 66/11 2X10=20 4 25.06.2010 O/s

384 Gondal Morbi 66KV GHUTU 66 66/11 2X10=20 6 3.01.2011 O/s

385 Gondal Morbi66KV

KALIKANAGAR66 66/11 2X10=20 4 5.03.2011 O/s

386 Gondal Morbi 66KV JODHPAR 66 66/11 2X15=30 4 16.03.2011 O/s

387 Gondal Morbi 66 KV Ravapar 66 66/11 2X10=20 3 06.06.2011 O/s

388 Gondal Morbi 66 KV Virpar 66 66/11 1X15=15 3 03.08.2012 O/s

389 Gondal Morbi 66 KV Jambudiya 66 66/11 2X15=30 4 24.08.2012 O/s

390 Gondal Morbi 66kV Bela 66 66/11 2X15=30 4 24.12.2012 O/s

391 Gondal Morbi66kV

Unchimandal66 66/11 2X15=30 4 11.01.2013 O/s

392 Gondal Morbi 66kV Mitana 66 66/11 2X15=30 4 19.08.2013 O/s

393 Gondal Morbi 66kV Trajpar 66 66/11 2x15=30 5 17.12.2013 O/s

394 Gondal Morbi 66 kv Rangpar s/s 66 66/11 2x15=30 4 8.04.2015 O/s

395 Gondal Morbi 66 kv Mansar s/s 66 66/11 2x15=30 4 16.04.2015 O/s

396 Gondal Morbi 66 kv Amreli s/s 66 66/11 2x15=30 4 12.08.2015 O/s

397 Gondal Rajkot 220 KV Rajkot

(Nyara)220 220/132

1X100+1X150=

25024.11.1996 GETCO

398 Gondal Rajkot 220 KV Rajkot

(Nyara)220 220/66

1X100+1X160=

260

399 Gondal Rajkot 220 KV Kangsiyali 220 220/66 3X100=300 24 29.06.2011 O/s

400 Gondal Rajkot 132 KV Rajkot -

Vikram132 132/66 4X50=200 14 14.06.1988 GETCO

401 Gondal Rajkot 132 KV Vajadi 132 132/112X12.5+

1X25=505 13.04.1993 GETCO

402 Gondal Rajkot 66 KV Punitnagar 66 66/11 4x15=60 12 01.02.1978 GETCO

403 Gondal Rajkot 66 KV Liara 66 66/11 2x10=20 4 07.06.1968 GETCO

404 Gondal Rajkot 66 KV Padadhari 66 66/11 2X15=30 4 14.04.1986 GETCO

405 Gondal Rajkot 66 KV Dudhsagar 66 66/11 4x15=60 10 19.05.1963 GETCO

406 Gondal Rajkot 66 KV Shapar 66 66/11 1x15+2X20 =55 7 01.02.1992 GETCO

407 Gondal Rajkot 66 KV Aji Gidc 66 66/11 2x15+2X20 =70 6 21.05.1992 GETCO

408 Gondal Rajkot 66 KV

Ghanteshwar66 66/11 1X15+1X10=25 6 19.12.1986 GETCO

409 Gondal Rajkot 66 KV Navagam 66 66/11 3 X 15=45 9 25.10.1996 GETCO

410 Gondal Rajkot 66 KV Laxminagar 66 66/11 4x15=60 7 10.11.1998 GETCO

411 Gondal Rajkot 66 KV Siddheswar 66 66/11 2X15+1x20=50 8 29.09.1999 GETCO

412 Gondal Rajkot 66 KV Kotharia 66 66/11 3x15=45 6 21.09.2002 GETCO

413 Gondal Rajkot 66 KV Taraghadi 66 66/11 1X10+1X15=25 4 07.10.2002 GETCO

414 Gondal Rajkot 66 KV Popatpara 66 66/11 1X10+1X15=25 4 20.07.2004 GETCO

415 Gondal Rajkot 66 KV Nikawa 66 66/11 2X10=20 4 09.06.2005 GETCO

416 Gondal Rajkot 66 KV Kagdadi 66 66/11 1X10+1X15=25 4 08.06.2006 GETCO

18

27

Page 92

Page 60: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

417 Gondal Rajkot 66 KV Metoda 66 66/11 3x15=45 6 28.07.2006 GETCO

418 Gondal Rajkot 66 KV Raiyadhar 66 66/11 2X15=30 5 12.10.2006 GETCO

419 Gondal Rajkot 66 KV Kuvadava 66 66/11 1X10+1x15=25 4 04.09.2008 O/s

420 Gondal Rajkot 66 KV Veraval 66 66/11 2X15=30 8 26.05.2009 O/s

421 Gondal Rajkot 66 KV Rotary 66 66/11 1X10+1x15=25 4 06.08.2009 O/s

422 Gondal Rajkot 66 KV Mavadi 66 66/11 2X15=30 3 03.10.2009 O/s

423 Gondal Rajkot 66 KV Neknam 66 66/11 2X10=20 4 23.11.2011 O/s

424 Gondal Rajkot 66 KV Nagar

Pipaliya66 66/11 2X10=20 4 29.04.2011 O/s

425 Gondal Rajkot 66 KV

Shashtrimedan66 66/11 2X20=40 3 28.03.2012 O/s

426 Gondal Rajkot 66 KV Vavadi 66 66/11 3x15=45 5 22.05.2012 O/s

427 Gondal Rajkot 66K

POLYTECHNIC66 66/11 2x15=30 6 12.09.2012 O/s

428 Gondal Rajkot 66kV University

Road66 66/11 2x15=30 3 01.12.2012 O/s

429 Gondal Rajkot 66kV Sarvoday 66 66/11 2X15=30 4 19.12.2012 O/s

430 Gondal Rajkot 66kV Central 66 66/11 2X15=30 3 19.11.2012 O/s

431 Gondal Rajkot 66kV Lalpark

(Neelkanth)66 66/11 2x20=40 3 09.07.2013 O/s

432 Gondal Rajkot 66KV

Motakhijadia66 66/11 2X15=30 3 18.01.2014 O/s

433 Gondal Rajkot 66kV KHERDI 66 66/11 2X15=30 3 12.05.2014 O/s

434 Gondal Rajkot 66kV Stadium 66 66/11 2X15=30 4 23.03.2015 O/s

435 Gondal Rajkot 66kV

KHIRASHARA66 66/11 2X15=30 3 20.04.2015 O/s

436 Gondal Rajkot 66kV GAURIDAD 66 66/11 2x20=40 4 12.08.2015 O/s

437 Gondal Rajkot 66kV PIPALANA 66 66/11 2X15=30 4 26.08.2015 O/s

438 Gondal Wankaner 220kv Sartanpar 220 220/66 2x160=320 06.06.2014 O/s

439 Gondal Wankaner 220kv Sartanpar 220 220/132 1x100=100 17

440 Gondal Wankaner 132 KV Wankaner 132 132/662X50+1x100=2

001.02.1965 GETCO

441 Gondal Wankaner 132 KV Wankaner 132 66/11 1X20+2X15=50

442 Gondal Wankaner 132 KV Dhrol 132 132/66 3X50=150 17 31.03.2002 GETCO

443 Gondal Wankaner 66 KV Jadeshwar 66 66/11 2X15=30 6 24.01.1998 GETCO

444 Gondal Wankaner 66 KV Chotila 66 66/11 2X15=30 3 28.08.1984 GETCO

445 Gondal Wankaner 66 KV Than 66 66/11 2X15=30 3 21.11.1976 GETCO

446 Gondal Wankaner 66 KV Bamanbore 66 66/11 1X10+1X15=25 3 07.09.1983 GETCO

447 Gondal Wankaner 66 KV Lunsar 66 66/11 2X15=30 4 10.08.2000 GETCO

448 Gondal Wankaner 66KV Dhuva 66 66/11 3X15=45 7 25.03.2004 GETCO

449 Gondal Wankaner 66 KV Mahika 66 66/11 1X10+1X15=25 7 30.03.2004 GETCO

450 Gondal Wankaner 66 KV Bangawadi 66 66/11 2X10=20 4 28.06.2007 O/s

451 Gondal Wankaner 66 KV Limbada 66 66/11 2X10=20 4 27.08.2009 O/s

452 Gondal Wankaner66 KV

Sindhavadar66 66/11 2X10=20 4 06.05.2010 O/s

453 Gondal Wankaner 66 KV Thikariyali 66 66/11 2X10=20 7 27.05.2010 O/s

454 Gondal Wankaner 66 KV Sartanpar 66 66/11 3X15=45 6 2.10.2010 O/s

455 Gondal Wankaner 66 KV Dhrol 66 66/11 2X15=30 17 3.07.1971 GETCO

456 Gondal Wankaner 66 KV JamDudhai 66 66/11 1X10+1X15=25 3 7.05.1993 GETCO

457 Gondal Wankaner 66 KV Keshiya 66 66/11 2X10=20 3 1.05.2000 GETCO

458 Gondal Wankaner 66 KV Latipar 66 66/11 1X10+1X15=25 6 31.05.2004 GETCO

459 Gondal Wankaner 66 KV Khengarka 66 66/11 2X10=20 3 12.07.2010 O/s

460 Gondal Wankaner 66KV Bhojpara 66 66/11 2X10=20 4 24.03.2011 O/s

461 Gondal Wankaner 66KV Daldi 66 66/11 2X10=20 4 22.07.2011 O/s

462 Gondal Wankaner 66KV Lakaddhar 66 66/11 3X15=45 6 04.07.2011 O/s

463 Gondal Wankaner 66kV Matel 66 66/11 2X15=30 5 28.09.2012 O/s

464 Gondal Wankaner 66kV Dhrangda 66 66/11 1X15=15 3 11.12.2012 O/s

465 Gondal Wankaner 66kV Rajgadh 66 66/11 2X15=30 7 16.05.2013 O/s

466 Gondal Wankaner 66kV Padana 66 66/11 2X15=30 3 31.12.2013 O/s

467 Gondal Wankaner 66kV Pipaliyaraj 66 66/11 2X15=30 4 10.01.2014 O/s

468 Gondal Wankaner 66 KV Satapar 66 66/11 2X15=30 4 03.05.2014 O/s

469 Gondal Wankaner 66 KV Mandalasar 66 66/11 2X15=30 3 01.08.2015 O/s

470 Gondal Jetpur 400KV Jetpur 400 400/2203X315

+1X500=144541 03.09.1984 GETCO

471 Gondal Jetpur 400KV Jetpur 400 220/66 2X100=200

472 Gondal Hadala 400 KV Hadala 400 400/220 3X315=945 42 27.05.2007 GETCO

473 Gondal Hadala 400 KV Hadala 400 220/661X100+

1X50=150

25

Page 93

Page 61: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

474 Himatnagar Soja 400 KV Soja 400KV 400/220/33 500 11 16/01/1987 Getco

475 Himatnagar Soja 220KV 400/220/33 500 14

476 Himatnagar Soja 66KV 66/11 5 1

477 Himatnagar Agiyol 220 KV Agiyol 220KV 220/66 50 14 26/11/1990 Getco

478 Himatnagar Agiyol 220/66 100

479 Himatnagar Agiyol 220/66 50

480 Himatnagar Agiyol 132KV 220/132 100 6

481 Himatnagar Agiyol 220/132 100

482 Himatnagar Agiyol 220/132 50

483 Himatnagar Agiyol 66KV 14

484 Himatnagar Agiyol 66 KV HMT-II 66KV 66/11 10 5 26/02/2000 Getco

485 Himatnagar Agiyol 66/11 10

486 Himatnagar Agiyol 66 KV Nikoda 66KV 66/11 10 5 28/02/2005 Outsource

487 Himatnagar Agiyol 66/11 10

488 Himatnagar Agiyol 66 KV Dalpur 66KV 66/11 10 4 17/05/2008 Out source

489 Himatnagar Agiyol 66/11 15

490 Himatnagar Agiyol 66 KV Chandarani 66KV 66/11 10 03/08/2009 Out source

491 Himatnagar 66/11 10

492 Himatnagar Agiyol 66 KV HMT-I 66KV 66/11 15 7 19/10/1969 Getco

493 Himatnagar Agiyol 66/11 15

494 Himatnagar Agiyol 66/11 10

495 Himatnagar Agiyol 66 KV Hajipur 66KV 66/11 10 5 13/03/2002 Getco

496 Himatnagar Agiyol 66/11 15

497 Himatnagar Agiyol 66/11 15

498 Himatnagar Agiyol 66 KV Dedhrota 66KV 66/11 10 4 05/02/1990 Getco

499 Himatnagar Agiyol 66/11 15

500 Himatnagar Agiyol 66 KV Hansalpur 66KV 66/11 10 6 28/10/2004 Getco

501 Himatnagar Agiyol 66/11 10

502 Himatnagar Agiyol 66 kv Munpur 66KV 66/11 10 4 29/01/2010 Out source

503 Himatnagar Agiyol 66/11 10

504 Himatnagar Agiyol 66 KV Kaniyol 66KV 66/11 10 6 28/10/1995 Getco

505 Himatnagar Agiyol 66/11 5

506 Himatnagar Agiyol 66 KV Kalidungri 66KV 66/11 10 24/03/2009 Out source

507 Himatnagar 66/11 10

508 Himatnagar Agiyol 66 KV Prantij 66KV 66/11 15 6 09/12/1972 Getco

509 Himatnagar Agiyol 66/11 15

510 Himatnagar Agiyol 66 KV Amodara 66KV 66/11 15 4 15/02/1991 Getco

511 Himatnagar Agiyol 66/11 10

512 Himatnagar Agiyol 66 KV Tajpur 66KV 66/11 15 5 29/03/1990 Getco

513 Himatnagar Agiyol 66/11 15

514 Himatnagar Agiyol 66 KV Gambhoi 66KV 66/11 10 5 07/09/1981 Getco

515 Himatnagar Agiyol 66/11 10

516 Himatnagar Agiyol 66 KV Ranasan 66KV 66/11 10 6 01/09/1979 Getco

517 Himatnagar Agiyol 66/11 10

518 Himatnagar Agiyol 66/11 10

519 Himatnagar Agiyol 66 KV Medhasan 66KV 66/11 10 5 01/06/1993 Getco

520 Himatnagar Agiyol 66/11 10

521 Himatnagar Agiyol 66 KV Gadhi 66KV 66/11 10 3 06/02/2010 Out source

522 Himatnagar 66/11 10

523 Himatnagar Agiyol 66 KV Rupal 66KV 66/11 10 4 17/01/2012 Out source

524 Himatnagar Agiyol 66KV 66/11 15 Out source

525 Himatnagar Agiyol 66/11 10

526 Himatnagar Agiyol 66KV 66/11 15 Out source

527 Himatnagar Agiyol 66/11 15

528 Himatnagar Dhansura 220 KV Dhansura 220KV 220/66 100 12 24/04/1984 Getco

529 Himatnagar Dhansura 100

530 Himatnagar Dhansura 50

531 Himatnagar Dhansura 66KV 66/11 15 16

532 Himatnagar Dhansura 10

533 Himatnagar Dhansura 66 kv Akrund 66KV 66/11 10 4 30/11/2011 Out source

534 Himatnagar Dhansura 132 KV Talod 132KV 132/66 50 7 03/01/1974 Getco

535 Himatnagar Dhansura 50

536 Himatnagar Dhansura 40

537 Himatnagar Dhansura 66KV 66/11 15 11

538 Himatnagar Dhansura 15

539 Himatnagar Dhansura 66 KV D' Muuvadi 66KV 66/11 10 6 19/04/1994 Getco

540 Himatnagar Dhansura 10

541 Himatnagar Dhansura 66 KV Rozad 66KV 66/11 10 6 26/03/1991 Getco

542 Himatnagar Dhansura 10

543 Himatnagar Dhansura 66 KV Bayal(D) 66KV 66/11 10 4 27/03/2001 Getco

544 Himatnagar Dhansura 10

545 Himatnagar Dhansura 66 KV Bayad 66KV 66/11 15 5 29/03/1977 Getco

546 Himatnagar Dhansura 15

547 Himatnagar Dhansura 66 KV Sathamba 66KV 66/11 10 7 19/07/1983 Getco

548 Himatnagar Dhansura 10

549 Himatnagar Dhansura 66 KV Ambliyara 66KV 66/11 15 5 20/03/1990 Getco

550 Himatnagar Dhansura 10

551 Himatnagar Dhansura 66 KV Virpur 66KV 66/11 10 4 26/03/2000 Getco

552 Himatnagar 10

553 Himatnagar Dhansura 66 KV Gabat 66KV 66/11 10 4 08/03/1993 Getco

554 Himatnagar Dhansura 10

555 Himatnagar Dhansura 66 KV Modasa 66KV 66/11 15 9 19/07/1977 Getco

556 Himatnagar Dhansura 15

66 KV Gadhoda 5 20/07/2012

66 KV Sonasan 5 15/04/2015

5

4

Page 94

Page 62: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

557 Himatnagar Dhansura 66 KV Malpur 66KV 66/11 15 4 26/03/1985 Getco

558 Himatnagar Dhansura 10

559 Himatnagar Dhansura 66 KV Megharaj 66KV 66/11 10 5 06/07/1979 Getco

560 Himatnagar Dhansura 7.5

561 Himatnagar Dhansura 66 KV Tintoi 66KV 66/11 15 5 14/06/1984 Getco

562 Himatnagar Dhansura 10

563 Himatnagar Dhansura 66 KV Shinawad 66KV 66/11 10 4 23/05/2005 Outsource

564 Himatnagar 10

565 Himatnagar Dhansura 66 KV Rellawada 66KV 66/11 10 5 31/03/2000 Getco

566 Himatnagar Dhansura 10

567 Himatnagar Dhansura 66 kv Kasana 66KV 66/11 10 3 18/03/2008 Out source

568 Himatnagar Dhansura 66 kv Ramgadhi 66KV 66/11 10 3 28/02/2011 Out source

569 Himatnagar 10

570 Himatnagar Dhansura 66 kv Harsol 66KV 66/11 10 29/06/2011 Out source

571 Himatnagar 66/11 10

572 Himatnagar Dhansura 66 kv Punsari 66KV 66/11 10 4 25/07/2011 Out source

573 Himatnagar Dhansura 66 kv Debhari 66KV 66/11 10 3 08/09/2011 Out source

574 Himatnagar 10

575 Himatnagar Dhansura 66 kv Aniyor 66KV 66/11 15 3 25/07/2012 Out source

576 Himatnagar Dhansura 66kv Untarda 66KV 66/11 15 16/05/14 Getco

577 Himatnagar 15

578 Himatnagar Dhansura 66kv Nani Isrol 66KV 66/11 15 25/07/14 Getco

579 Himatnagar 15

580 Himatnagar Dhansura 66kv Dugarvada 66KV 66/11 15 25/07/14 Getco

581 Himatnagar 15

582 Himatnagar Dhansura 66kv Vadagam 66KV 66/11 15 25/09/14 Getco

583 Himatnagar 15

584 Himatnagar Dhansura 66 KV Taalod 66KV 66/11 15 30/04/2015 Out source

585 Himatnagar 15

586 Himatnagar Dhansura 66 KV Indran S/S 66KV 66/11 15 01/06/2015 Out source

587 Himatnagar 15

588 Himatnagar Dhansura 66 KV Vasnirel S/S 66KV 66/11 15 05/06/2015 Out source

589 Himatnagar 15

590 Himatnagar Dhansura 66 KV Khadol S/S 66KV 66/11 15 08/05/2015 Out source

591 Himatnagar 15

592 Himatnagar Dhansura 66 KV Salaiya 66KV 66/11 15 10/08/2015 Out source

593 Himatnagar 15

594 Himatnagar Dhansura 66 KV Navagam 66KV 66/11 15 30/05/2015 Out source

595 Himatnagar 15

596 Himatnagar Idar 220 KV Bhutiya 220KV 220/66 100 10 28/01/2006 Out source

597 Himatnagar Idar 220/66 100

598 Himatnagar Idar 66KV 66/11 5 15

599 Himatnagar Idar 132 KV IDAR 132KV 132/66 100 5 04/04/1978 Getco

600 Himatnagar Idar 132/66 50

601 Himatnagar Idar 66KV 66/11 10 12

602 Himatnagar Idar 66/11 10

603 Himatnagar Idar 66/11 10

604 Himatnagar Idar 66 KV Choriwad 66KV 66/11 10 7 05/07/1974 Getco

605 Himatnagar 66/11 10

606 Himatnagar Idar 66/11 10

607 Himatnagar Idar 66 KV Kundala 66KV 66/11 10 4 04/10/1999 Getco

608 Himatnagar Idar 66/11 10

609 Himatnagar Idar 66 KV Badoli 66KV 66/11 15 7 28/05/1989 Getco

610 Himatnagar Idar 66/11 10

611 Himatnagar Idar 66/11 10

612 Himatnagar Idar 66 KV Chitroda 66KV 66/11 15 5 09/10/2013 Out source

613 Himatnagar 66/11 15

614 Himatnagar Idar 66 KV Lai-Ranasan 66KV 66/11 15 6 06/10/1989 Getco

615 Himatnagar Idar 66/11 15

616 Himatnagar Idar 66 KV Sundarpur 66KV 66/11 10 4 17/05/2001 Getco

617 Himatnagar Idar 66/11 15

618 Himatnagar Idar 66 KV Panol 66KV 66/11 10 6 29/01/2005 Getco

619 Himatnagar Idar 66/11 10

620 Himatnagar Idar 66 KV Jadar 66KV 66/11 10 5 22/02/1982 Getco

621 Himatnagar Idar 66/11 10

622 Himatnagar Idar 66 KV Netramali 66KV 66/11 15 22/05/2013 Out source

623 Himatnagar 66/11 15

624 Himatnagar Idar 66 KV Bhiloda 66KV 66/11 10 6 13/10/1978 Getco

625 Himatnagar Idar 66/11 10

626 Himatnagar Idar 66 KV Dantod 66KV 66/11 10 5 31/03/2003 Getco

627 Himatnagar Idar 66/11 10

628 Himatnagar Idar 66 KV Vijaynagar 66KV 66/11 10 4 31/03/2005 Getco

629 Himatnagar Idar 66/11 5

630 Himatnagar Idar 66 KV Vasai 66KV 66/11 15 5 31/03/1995 Getco

631 Himatnagar Idar 66/11 10

632 Himatnagar Idar 66 KV Palla 66KV 66/11 10 5 26/07/2006 Out source

633 Himatnagar Idar 66/11 10

634 Himatnagar Idar 66 KV Khedbrahma 66KV 66/11 10 7 22/04/1980 Getco

635 Himatnagar Idar 66/11 10

636 Himatnagar Idar 66/11 10

637 Himatnagar Idar 66 KV Vadali 66KV 66/11 10 7 18/01/1989 Getco

5

5

5

5

5

5

5

4

4

4

4

5

Page 95

Page 63: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

638 Himatnagar Idar 66/11 10

639 Himatnagar Idar 66/11 10

640 Himatnagar Idar 66 KV M'Champa 66KV 66/11 10 6 22/05/1993 Getco

641 Himatnagar Idar 66/11 10

642 Himatnagar Idar 66 KV Hingatiya 66KV 66/11 10 4 25/03/2009 Out source

643 Himatnagar Idar 66 KV Torda 66KV 66/11 10 4 15/07/2010 Out source

644 Himatnagar Idar 66 KV Golwada 66KV 66/11 5 5 11/03/2011 Out source

645 Himatnagar 66/11 5

646 Himatnagar Idar 66 KV Poshina 66KV 66/11 5 4 20/04/2011 Out source

647 Himatnagar Idar 66/11 5

648 Himatnagar Idar 66 KV Babsar 66KV 66/11 5 4 23/02/2012 Out source

649 Himatnagar Idar 66/11 10

650 Himatnagar Idar 66 KV Tandaliya 66KV 66/11 15 4 04/09/2013 Out source

651 Himatnagar 66/11 15

652 Himatnagar Idar 66 KV Mau 66KV 66/11 15 04/09/2013 Out source

653 Himatnagar 66/11 15

654 Himatnagar Idar 66 KV Surpur 66KV 66/11 15 20/04/2015 Out source

655 Himatnagar Idar 66/11 15

656 Himatnagar Idar 66 KV Ubsal 66KV 66/11 15 28/05/2015 Out source

657 Himatnagar Idar 66/11 15

658 Himatnagar Idar 66 KV kheradi 66KV 66/11 15 20/06/2015 Out source

659 Himatnagar 66/11 15

660 Himatnagar Jamla 220 KV Jamla 220KV 220/66 100 12 30/03/1995 Getco

661 Himatnagar 220KV 220/66 100

662 Himatnagar 220KV 220/66 50

663 Himatnagar 66KV 66/11 4 18

664 Himatnagar Jamla 66 KV Soja 66KV 66/11 10 5 29/11/1991 Getco

665 Himatnagar 66/11 10

666 Himatnagar Jamla 66 KV Veda 66KV 66/11 10 4 22/02/2005 Getco

667 Himatnagar 66/11 10

668 Himatnagar Jamla 66 KV Itala 66KV 66/11 10 4 27/06/2008 Out source

669 Himatnagar 10

670 Himatnagar Jamla 66 KV Mansa 66KV 66/11 20 8 26/02/1969 Getco

671 Himatnagar 66/11 15

672 Himatnagar 66/11 15

673 Himatnagar Jamla 66 KV Manekpur 66KV 66/11 10 6 22/01/1999 Getco

674 Himatnagar 66/11 10

675 Himatnagar 66/11 10

676 Himatnagar Jamla 66 KV Lodra 66KV 66/11 10 7 05/07/1973 Getco

677 Himatnagar 66/11 10

678 Himatnagar 66/11 10

679 Himatnagar Jamla 66 KV Unava 66KV 66/11 10 3 04/08/2009 Out source

680 Himatnagar Jamla 66 KV Nardipur 66KV 66/11 15 8 27/09/1973 Getco

681 Himatnagar 66/11 10

682 Himatnagar 66/11 10

683 Himatnagar Jamla 66 KV Pansar 66KV 66/11 10 4 06/01/1995 Getco

684 Himatnagar 66/11 10

685 Himatnagar Jamla 66 KV Randheja 66KV 66/11 10 8 21/08/1984 Getco

686 Himatnagar 66/11 10

687 Himatnagar 66/11 10

688 Himatnagar Jamla 66 KV Motiadraj 66KV 66/11 10 4 31/01/2005 Getco

689 Himatnagar 66/11 10

690 Himatnagar Jamla 66 KV Langhanaj 66KV 66/11 10 7 04/05/1991 Getco

691 Himatnagar 66/11 10

692 Himatnagar 66/11 10

693 Himatnagar Jamla 66 KV Aakhaj 66KV 66/11 10 4 05/01/2010 Out source

694 Himatnagar 66/11 10

695 Himatnagar Jamla 66 KV Boru 66KV 66/11 15 5 21/01/2014 Out source

696 Himatnagar 66/11 15

697 Himatnagar Vijapur 220 KV Vijapur 220/66 100 23/03/1987 Getco

698 Himatnagar Vijapur 220/66 100

699 Himatnagar Vijapur 66/11 15

700 Himatnagar Vijapur 66/11 15

701 Himatnagar Vijapur 66/11 15

702 Himatnagar Vijapur 132 KV Visnagar 132/66 50 15/06/1992 Getco

703 Himatnagar Vijapur 132/66 50

704 Himatnagar Vijapur 66/11 15

705 Himatnagar Vijapur 66/11 10

706 Himatnagar Vijapur 66/11 10

707 Himatnagar Vijapur 66 KV Ranasan 66/11 15 23/04/2003 Getco

708 Himatnagar Vijapur 66/11 10

709 Himatnagar Vijapur 66 KV Bhalak 66KV 66/11 10 18/03/2005 Outsource

710 Himatnagar 66/11 10

711 Himatnagar Vijapur 66 KV Vasai 66/11 10 30/09/1980 Getco

712 Himatnagar Vijapur 66/11 10

713 Himatnagar Vijapur 66/11 10

714 Himatnagar Vijapur 66 KV Kada 66/11 15 28/09/1999 Getco

715 Himatnagar Vijapur 66/11 10

716 Himatnagar Vijapur 66 KV Jantral 66/11 10 25/06/1992 Getco

717 Himatnagar Vijapur 66/11 10

718 Himatnagar Vijapur 66 KV Tatosan 66/11 10 22/01/1977 Getco

719 Himatnagar Vijapur 66/11 10

720 Himatnagar Vijapur 66/11 10

66KV 5

66KV 8

66KV 6

4

66KV 8

66KV 4

66KV 11

132KV 5

66KV 9

5

5

5

5

220KV 8

Page 96

Page 64: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

721 Himatnagar Vijapur 66 KV Sundarpur 66/11 10 14/02/1980 Getco

722 Himatnagar Vijapur 66/11 10

723 Himatnagar Vijapur 66/11 10

724 Himatnagar Vijapur 66 KV Ladol 66/11 10 04/08/2003 Getco

725 Himatnagar 66/11 10

726 Himatnagar Vijapur 66 KV Hirpura 66/11 10 19/07/2007 Out source

727 Himatnagar 66/11 10

728 Himatnagar Vijapur 66 KV Gojariya 66/11 10 05/07/1973 Getco

729 Himatnagar Vijapur 66/11 15

730 Himatnagar Vijapur 66/11 10

731 Himatnagar Vijapur 66 KV Charada 66/11 10 20/12/2004 Getco

732 Himatnagar 66/11 10

733 Himatnagar Vijapur 66 KV Vihar 66/11 10 23/03/1993 Getco

734 Himatnagar Vijapur 66/11 10

735 Himatnagar Vijapur 66 KV Valam 66/11 10 08/07/2004 Getco

736 Himatnagar Vijapur 66/11 5

737 Himatnagar Vijapur 66 KV Vadasan 66KV 66/11 10 02/07/2011 Out source

738 Himatnagar 66/11 10

739 Himatnagar Vijapur 66 KV Pilvai 66/11 15 21/03/2014 Out source

740 Himatnagar 66/11 15

741 Himatnagar Vijapur 66 KV Techava 66KV 66/11 15 3 20/07/2012 Out source

742 Himatnagar Vijapur 66 KV Kamana 66KV 66/11 15 17/10/2012 Out source

743 Himatnagar 66/11 15

744 Himatnagar Vijapur 66 KV Malosan 66KV 66/11 15 27/06/2014 Out source

745 Himatnagar 66/11 15

746 Himatnagar Vijapur 66 KV GIDC (Goz) 66KV 66/11 15 21/11/2014 Out source

747 Himatnagar 66/11 15

748

749

750

751

752

753

754

755

756

757

758

759 132 132/33 1X20 GETCO

760

761

762

763

764

765 GETCO

766

767

768

769

770

771

772

773

774

775

776

777

778

779

780

781

782

783

784

785

786

787

788

789

790

791

792

793 23.05.2013

794 11.05.1979

795 20.07.2010

796

797

798

799

800

801

Tr. Bay=3

line

Bay=6

15/01/1979 GETCOJambuwa Godhra 66 KV KHAKHARIA 66 KV 66/11 15+15+10

Jambuwa Godhra66 KVHALOL GIDC-

A66 KV 66/11 15+15+15

Tr. Bay=3

line

Bay=2

16/03/1989 GETCO

Tr. Bay=2

line Bay=225/03/2000 GETCO

Jambuwa Godhra 66 KV KALOL(PMS) 66 KV 66/11 15+10+10

Tr. Bay=3

line

Bay=3

Jambuwa Godhra 66 KV VEJALPUR 66 KV 66/11 10+10

GETCO

Jambuwa Godhra 66 KV JAFRABAD 66 KV 66/11 15+15Tr. Bay=2

line Bay=326/03/1999 GETCO

Jambuwa Godhra 66 KV TIMBA 66 KV 66/11 15+15Tr. Bay=2

line Bay=321/03/1991 GETCO

Tr. Bay=2

line Bay=218/05/2002 GETCO

Jambuwa Godhra 66 KV SHEHRA 66 KV 66/11 10+10Tr. Bay=2

line Bay=1

Jambuwa Godhra 66 KV ZALOD 66 KV 66/11 10+10

09/08/1990 GETCO

Jambuwa Godhra 33 KV KADANA 33 KV 33/11 5+3Tr. Bay=2

line 20/04/1975 GETCO

Jambuwa Godhra66

KVDEVGADHBARIA66 KV 66/11 10+15

Tr. Bay=2

line 03/08/1993 GETCO

Tr. Bay=2

line 23/04/1987 GETCO

Jambuwa Godhra66

KVSANTRAMPUR66 KV 66/11 10+10+10

Tr. Bay=3

line

Jambuwa Godhra66 KV

MOTAKHANPUR66 KV 66/11 10+15

12.09.2004 GETCO

Tr. Bay=6

line

Bay=6

29.03.2013

GETCO

Jambuwa Godhra 132 KV LIMKHEDA 132 KV 66/11 10+10 GETCO

Jambuwa Godhra 132 KV LIMKHEDA 132 KV 132/66 50+50

GETCO

Jambuwa Godhra 66 KV LUNAWADA 66 KV 66/11 15+10 GETCO

Tr. Bay=2

line 01/01/1966

Jambuwa Godhra 66 KV LUNAWADA 66 KV 66/33 10+5 Tr. Bay=4

line

Bay=5

18/12/1976

Jambuwa Godhra 66 KV SANTROAD 66 KV 66/11 10+10

GETCO

66 66/11 10+10+10 GETCO

50+50+100+50

Tr. Bay=4

line

Bay=15

15/01/1989 GETCO

Jambuwa Godhra 132 KV DAHOD

Tr. Bay=7

line

Bay=8

17/12/1983

132

Godhra 220 KV GODHRA 66 KV 66/11 15+15

Jambuwa Godhra220 KV

CHANDRAPURA220 KV 220/66

Tr. Bay=8

line

Bay=15

15/01/1979

132/66 40+50

GETCO

Jambuwa Godhra 220 KV GODHRA 220 KV 220/66 100+100

Jambuwa

Jambuwa Godhra 220 KV GODHRA 220 KV 220/132 50+50+100+100

4

66KV 6

5

5

5

66KV 5

66KV 5

66KV 5

66KV 5

66KV 4

66KV 8

66KV 8

Page 97

Page 65: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

802

803

804

805

806

807

808

809

810

811

812

813

814

815

816

817

818 O/S

819

820

821

822

823

824

825

826 Jambuwa Godhra220 kvSavdasna

Muvada66 KV 66/11 1x5 GETCO

827

828

829

830

831

832

833

834

835

836

837

838

839

840

841 Tr. Bay=2

842 line Bay=3

843

844

845

846

847

848

849

850

851

852

853

854

855

856

857 Jambuva Jambuva 220KV Jambuva 220 220/132 15.06.2010 GETCO

858 Jambuva Jambuva 220 220/132 19.05.2008 GETCO

859 Jambuva Jambuva 220 220/132 02.03.2004 GETCO

860 Jambuva Jambuva 132 132/66 23.09.2015 GETCO

861 Jambuva Jambuva 132 132/66 13.06.2008 GETCO

862 Jambuva Jambuva 132 132/66 02.02.2011 GETCO

863 Jambuva Jambuva 66 66/11 11.06.2004 GETCO

864 Jambuva Jambuva 66 66/11 14.07.2013 GETCO

865 Jambuva Jambuva 220 220/66 1x100=100 04.04.2015 GETCO

866 Jambuva Jambuva 220KV Waghodia 220 220/66 GETCO

867 Jambuva Jambuva 220 220/66 GETCO

868 Jambuva Jambuva 220 220/66 GETCO

869 Jambuva Jambuva 66 66/11 GETCO

870 Jambuva Jambuva 66 66/11 GETCO

871 Jambuva Jambuva 66 66/11 GETCO

872 Jambuva Jambuva 66 66/11 GETCO

873 Jambuva Jambuva 66 66/11 GETCO

874 Jambuva Jambuva 66 66/11 GETCO

875 Jambuva Jambuva 66 66/11 GETCO

876 Jambuva Jambuva 66 66/11 GETCO

877 Jambuva Jambuva 66 66/11 GETCO

878 Jambuva Jambuva 66 66/11 GETCO

879 Jambuva Jambuva 66 66/11 GETCO

880 Jambuva Jambuva 66 66/11 GETCO

881 Jambuva Jambuva 66 66/11 GETCO

882 Jambuva Jambuva 66 66/11 O/S

883 Jambuva Jambuva 66 66/11 O/S

884 Jambuva Jambuva 66 66/11 O/S

66kv Dabhoi 2x10=20Tr. Bay=2

line 02/11/1972

66kv Sama 2x10+1x15=35

Tr. Bay=3

line

Bay=4

29.03.2008

66kv Indrapuri 2x15+1x20=50

Tr. Bay=3

line

Bay=3

25/12/1989

66kv Harni 2x15+1x20=50

Tr. Bay=3

line

Bay=3

22/04/1993

2x100+1x50=250Tr. Bay=6

line

Bay=6

03/02/1985

2x20+1x15=55

66KV Khatamba 2x10=20Tr. Bay=2

line 23/02/1986

Tr. Bay=2

line Bay=111.07.2015 O/S

3x100=300

Tr. Bay=9

line

Bay=28

1x100 +

2x50=200

1x5 +1x10=15

Jambuwa Godhra 66 KVLIMADIA 66 KV 66/11 15+15

Jambuwa Godhra 66 KV FANGIYA 66 KV 66/11 2x15Tr. Bay=2

line Bay=114.07.2015 O/S

Jambuwa Godhra 66 KVNavagam 66 KV 66/11 2x15Tr. Bay=2

line Bay=206/06/2015 O/S

Tr. Bay=2

line Bay=205.03.2015 O/S

Jambuwa Godhra 66 KV DITWAS 66 KV 66/11 2x5Tr. Bay=2

line Bay=2

Jambuwa Godhra 66 KV BAKOR 66 KV 66/11 1x15 +1x10

26/03/2015 O/S

Jambuwa Godhra 66 KV NANDARAVA 66 KV 66/11 2x15Tr. Bay=2

line Bay=214.03.2015 O/S

10.09.2014 O/S

Jambuwa Godhra 66 KV Kharod 66 KV 66/11 2x15Tr. Bay=2

line Bay=218.11.2015

Jambuwa Godhra66 KVHALOL GIDC

B66 KV 66/11 2x15

O/S

Jambuwa Godhra 66 KV piplod 66 KV 66/11 2x15Tr. Bay=2

line Bay=202.09.2014 O/S

Jambuwa Godhra 66 KV pipero 66 KV 66/11 1x5 +1x10Tr. Bay=2

line Bay=102.03.2014 O/S

Tr. Bay=2

line Bay=231.12.2013 O/S

Jambuwa Godhra 66 KVLileshara 66 KV 66/11 2x15Tr. Bay=2

Jambuwa Godhra 66 KV Gokalpura 66 KV 66/11 2x15

18.12.2013 O/S

Jambuwa Godhra 66 KVSimaliya 66 KV 66/11 2x15Tr. Bay=2

line Bay=116.05.2013 O/S

Jambuwa Godhra 66 KV Vardhari 66 KV 66/11 1x15 +1x10Tr. Bay=2

line Bay=118.11.2012 O/S

Tr. Bay=3

line Bay=504.12.2014

GETCO

Jambuwa Godhra 66 KVBhudhaji na

Chhapora66 KV 66/11 2x15

Tr. Bay=2

Jambuwa Godhra220 kvSavdasna

Muvada220 KV 220/66 2x100

21.01.2014 O/S

Jambuwa Godhra 66 KV Kathala 66 KV 66/11 5+5Tr. Bay=2

line Bay=102/11/2012 GETCO

Jambuwa Godhra 66 KV TUVA 66 KV 66/11 15+10Tr. Bay=2

line Bay=231.07.2012 O/S

Tr. Bay=2

line Bay=202.07.2011 O/S

Jambuwa Godhra66 KV MOTA

AMBLIYA 66 KV 66/11 10+10

Tr. Bay=2

line Bay=1

Jambuwa Godhra 66 KV RAJAYATA 66 KV 66/11 2x10

29.04.2012

Jambuwa Godhra 66 KV MADHVAS 66 KV 66/11 10+10Tr. Bay=2

line Bay=422.12.2010 O/S

Jambuwa Godhra 66 KV MOVASA 66 KV 66/11 10+10Tr. Bay=2

line Bay=415.02.2010 O/S

Tr. Bay=2

line Bay=226.06.2008 O/S

Jambuwa Godhra66 KV NALWAI

(Garbada)66 KV 66/11 10+10

Tr. Bay=2

line Bay=1

Jambuwa Godhra66 KV KARATH

(LIMDI)66 KV 66/11 2X10

15.10.2009 O/S

Jambuwa Godhra66 KV

SARASAVA(PURVA)66 KV 66/11 10+10

Tr. Bay=2

line Bay=227.05.2008 O/S

Jambuwa Godhra 66 KV KHAREDI 66 KV 66/11 10+15Tr. Bay=2

line Bay=210.05.2005 GETCO

Jambuwa Godhra 66 KV KOTHAMBA 66 KV 66/11 15+10Tr. Bay=2

line Bay=302/01/2004 GETCO

Page 98

Page 66: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

885 Jambuva Jambuva 66kv W'dia Road 66 66/11 O/S

886 Jambuva Jambuva 66 66/11 O/S

887 Jambuva Jambuva 66kV Motibaug 66 66/11 GETCO

888 Jambuva Jambuva 66 66/11 GETCO

889 Jambuva Jambuva 66kV Gajrawadi 66 66/11 GETCO

890 Jambuva Jambuva 66 66/11 GETCO

891 Jambuva Jambuva 66 66/11 GETCO

892 Jambuva Jambuva 66KV Makarpura 66 66/11 29.07.1993 GETCO

893 Jambuva Jambuva 66 66/11 05.04.1997 GETCO

894 Jambuva Jambuva 66 66/11 22.08.2008 GETCO

895 Jambuva Jambuva 66 66/11 24.11.2014 GETCO

896 Jambuva Jambuva 66KV Tarsali 66 66/11 GETCO

897 Jambuva Jambuva 66 66/11 GETCO

898 Jambuva Jambuva 66 66/11 GETCO

899 Jambuva Jambuva66KV Makarpura-

B66 66/11 O/S

900 Jambuva Jambuva 66 66/11 O/S

901 Jambuva Jambuva 66KV Karvan 66 66/11 GETCO

902 Jambuva Jambuva 66 66/11 GETCO

903 Jambuva Jambuva 66KV Rustampura 66 66/11 O/S

904 Jambuva Jambuva 66 66/11 O/S

905 Jambuva Jambuva 66KV Jambuva-B 66 66/11 04.04.2015 O/S

906 Jambuva Jambuva 04.04.2015 O/S

907 Jambuva Gotri 220kv Gavasad 220 220/66 3x50=150 25 03/09/2000 GETCO

908 Jambuva Gotri 132kv Gotri 132 132/66 3x50=150 28

909 1x40=40

910 1x100=100

911 132/11 2x25=50

912 Jambuva Gotri 220kv Karjan s/s 220 220/66 2x100=200 33

913 132/66 3x50=150

914 66/11 2x15=30

915 66/11 1x10=10

916 Jambuva Gotri 66KV Vidhyutnagar 66 66/11 3x15=45 9

917 2x20=40

918 Jambuva Gotri 66kv Subhanpura s/s 66 66/113x20=60

1x15=158 10/06/1998 GETCO

919 Jambuva Gotri 66KV Chani A 66 66/11 1x15+1x10=25 8 19/01/1974 GETCO

920 Jambuva Gotri 66KV Chani B 66 66/11 2x10+1X20=40 5 29/11/1966 GETCO

921 Jambuva Gotri 66KV Padra s/s 66 66/11 3x15=45 5 10/09/1972 GETCO

922 Jambuva Gotri 66kv Mobha s/s 66 66/11 2x10+1x15=35 6 03/01/1982 GETCO

923 Jambuva Gotri 66KV Kashipura s/s 66 66/11 2x15+1x10=40 4 24/09/1997 GETCO

924 Jambuva Gotri66KV Masar road

s/s66 66/11 2x10=20 6 28/03/1994 GETCO

925 Jambuva Gotri 66KV Atladra s/s 66 66/11 2x20=40 5 05/04/1991 GETCO

926 Jambuva Gotri 66KV Karakhadi 66 66/11 1x20+1x15=35 4 22/03/1993 GETCO

927 Jambuva Gotri 66KV Gorwa 66 66/11 2x15=30 5 21/03/2003 GETCO

928 Jambuva Gotri 66KV Samiyala 66 66/11 2x10=20 4 23/02/2006 GETCO

929 Jambuva Gotri 66KV Handod s/s 66 66/11 1x15+1x10=25 4 03/10/2006 GETCO

930 Jambuva Gotri 66KV Mahuvad 66 66/11 1x20+1x15=35 5 28/05/2008 O/S

931 Jambuva Gotri 66KV Vasna 66 66/11 1x20+1x15=35 4 06/06/2012 O/S

932 Jambuva Gotri 66KV Bhayali 66 66/11 2x20=40 3 16/07/2014 O/S

933 Jambuva Gotri 66KV Gotri B 66 66/11 2x20=40 6 15/07/2014 O/S

934 Jambuva Gotri 66KV Lakodara 66 66/11 2x15=30 4 27/06/2015 O/S

935 Jambuva Gotri 66KV Gavasad B 66 66/11 2x15=30 2 01/09/2014 O/S

936 Jambuva Bodeli 132 Kv Vasedi 132 132 70(50+20)

937 Jambuva Bodeli 66 66 30(15+15)

938 Jambuva Bodeli 132KV Tilakwada 132 132 90(50+40)

939 Jambuva Bodeli 66 60 10(5+5)

940 Jambuva Bodeli 66KV Naswadi 66 66 20(10+10) 8 27.03.1986 GETCO

941 Jambuva Bodeli 66KV Navagam 66 66 30(10+10+10) 6 24.04.1978 GETCO

942 Jambuva Bodeli 66KV Garudeshwar 66 66 10(5+5) 5 15.02.2011 O/S

943 Jambuva Bodeli 66KV Amadala 66 66 15(5+10) 5 23.03.2011 O/S

944 Jambuva Bodeli 66KV Bodeli 66 66 20(10+10) 5 01.04.1970 GETCO

945 Jambuva Bodeli 66KV Pavi-Jetpur 66 66 20(10+10) 6 21.03.1991 GETCO

946 Jambuva Bodeli 66KV Vanar 66 66 10(5+5) 5 09.06.2011 O/S

947 Jambuva Bodeli 66KV Lehwant 66 66 30(15+15) 4 18.08.2014 O/S

948 Jambuva Bodeli 66KV Panvad 66 66 20(10+10) 5 22.01.2010 O/S

949 Jambuva Bodeli 66KV Kawant 66 66 30(15+15) 5 08.04.1992 GETCO

950 Jambuva Bodeli 66KV Shivrajpur 66 66 10(5+5) 4 25.09.1987 GETCO

951 Jambuva Bodeli 66KV Ghoghamba 66 66 20(10+10) 5 28.03.1992 GETCO

952 Jambuva Bodeli 66KV Vadoth 66 66 10(5+5) 5 11.06.2014 O/S

953 Jambuva Bodeli 66KV Rangli 66 66 30(15+15) 4 14.08.2014 O/S

954 Jambuva Bodeli 66KV Sankheda 66 66 25(15+10) 5 12.04.1984 GETCO

955 Jambuva Bodeli 66KV Kosindra 66 66 20(10+10) 5 01.04.2005 GETCO

956 Jambuva Bodeli 66KV Chalamli 66 66 20(10+10) 4 08.07.2008 O/S

957 Jambuva Bodeli 66KV Uchpan 66 66 30(15+15) 5 29.06.2015 O/S

958 Jambuva Bodeli 66KV Surya 66 66 30(15+15) 5 26.05.2015 O/S

959 Jambuva Bodeli 66KV Sadhli 66 66 30(10+10+10) 9 10.04.1976 GETCO

960 Jambuva Bodeli 66KV Sinor 66 66 20(10+10) 4 09.04.1993 GETCO

961 Jambuva Bodeli 66KV Chandod 66 66 20(10+10) 8 17.05.2005 GETCO

962 Jambuva Bodeli 66KV Pisai 66 66 25(15+10) 5 30.03.2011 O/S

16 09.04.1973 GETCO

GETCO

15/06/1989 O/S

22/03/1964 GETCO

10 27.03.1998 GETCO

2x15=30Tr. Bay=2

line 14.04.2015

2x15=30Tr. Bay=2

line

19/06/1964

1x15+1x20=35

Tr. Bay=2

line

Bay=3

19.11.2012

2x10=20Tr. Bay=2

line 03.11.2004

2x10+1x15=35

Tr. Bay=3

line

Bay=4

15.12.1997

4x15=60

Tr. Bay=4

line

Bay=9

3x15=45

Tr. Bay=3

line

Bay=4

14/06/1989

1x15+1x20=35

Tr. Bay=2

line

Bay=2

03/01/2013

2x20=40Tr. Bay=2

line 25.02.2014

Page 99

Page 67: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

963 Jambuva Bodeli 66KV Simali 66 66 30(15+15) 5 20.02.2014 O/S

965 220/132 2x100

966 220/66 1x100+1x160

967 Jamnagar Jamnagar 66 Kalavad 66 66/11 2x15+1x10 7 11.08.72 GETCO

968 Jamnagar Jamnagar 66 Kharedi 66 66/11 3x10 6 26.05.93 GETCO

969 Jamnagar Jamnagar 66 Navagam 66 66/11 2x10 4 17.07.07 OS

970 Jamnagar Jamnagar 66 Morvadi 66 66/11 2x10 4 05.05.08 OS

971 Jamnagar Jamnagar 66 Nagajar 66 66/11 2x10 6 12.08.09 OS

972 Jamnagar Jamnagar 66 Bhadukia 66 66/11 2x10 5 1.5.2010 OS

973 Jamnagar Jamnagar 66 Mota-Vadala 66 66/11 2x10 4 27.07.11 OS

974 Jamnagar Jamnagar 66 Toda 66 66/11 2x15 4 9.10.13 OS

975 Jamnagar Jamnagar 66 Dhulasiya 66 66/11 2x15 5 1.11.13 OS

976 Jamnagar Jamnagar 66 KV Kalavad -B 66 66/11 2x15 5 29.03.14 OS

977 Jamnagar Jamnagar 66 Sikka 66 66/11 10X2 7 17.04.75 GETCO

978 Jamnagar Jamnagar 66 Lalpur 66 66/11 15X2 5 25.06.84 GETCO

979 Jamnagar Jamnagar 66 Pipali 66 66/11 10X2 4 7.06.05 GETCO

980 Jamnagar Jamnagar 66 Shapar(BAID) 66 66/11 10X2 5 1.5.2010 OS

981 Jamnagar Jamnagar 66 TPS Sikka s/s 66 132/66 50X2 7 11/06/1905 OS

982 Jamnagar Jamnagar 66 KV Haripar 66 66/11 15X1 5 31.12.12 OS

983 Jamnagar Jamnagar 66 KV Chandragadh 66 66/11 15X2 5 08.08.2014 OS

984 Jamnagar Jamnagar 132 132/66 2X50 + 1X100

985 Jamnagar Jamnagar 132 132/11 3x12.5

986 Jamnagar Jamnagar 132 66/11 1X10

987 Jamnagar Jamnagar 66KV JAMNAGAR-C 66 66/11 2X15+1X10 6 22.09.02 GETCO

988 Jamnagar Jamnagar 66KV HAPA 66 66/11 3x10 5 24.04.99 GETCO

989 Jamnagar Jamnagar 66KV Morkanda 66 66/11 2 X 10 5 02.08.08 OS

990 Jamnagar Jamnagar 66KV Beraja 66 66/11 2X 10 3 20.05.11 OS

991 Jamnagar Jamnagar 66KV Mota Khadba 66 66/11 2 x 15 4 12.09.14 OS

992 Jamnagar Jamnagar 66KV SUVARDA 66 66/11 2 x 15 4 16.03.2015 OS

993 Jamnagar Jamnagar 66KV SAT RASTA 66 66/11 4X10 7 11.07.80 GETCO

994 Jamnagar Jamnagar 66KV JAMNAGAR-B 66 66/11 4x15 8 19.12.90 GETCO

995 Jamnagar Jamnagar 66KV BEDESHWAR 66 66/11 2X15+1X10 5 24.05.86 GETCO

996 Jamnagar Jamnagar66KV

JAMVANTHALI66 66/11 1x10+1x15 4 21.01.98 GETCO

997 Jamnagar Jamnagar 66KV MODPAR 66 66/11 2X10 9 30.03.00 GETCO

998 Jamnagar Jamnagar 66KV BANUGAR 66 66/11 10x2=20 5 24.02.05 GETCO

999 Jamnagar Jamnagar 66KV PIPARTODA 66 66/11 2X10 4 22.08.06 GETCO

1000 Jamnagar Jamnagar 66KV Aliyabada 66 66/11 1 X 10 3 12.04.12 OS

1001 Jamnagar Jamnagar 66KV GIDC Phase -III 66 66/11 2 X 15 4 30.10.12 OS

1002 Jamnagar Jamnagar 66KV Khiri 66 66/11 1x10+1x15 4 27.05.12 OS

1003 Jamnagar Jamnagar 66KV LAL BANGLA 66 66/11 2 x20 7 23.08.13 OS

1004 Jamnagar Khambhalia 220 220/132 1X100

1005 Jamnagar Khambhalia 220 220/66 1X100

1006 Jamnagar Khambhalia 132 132/66 2X50

1007 Jamnagar Khambhalia 132 66/11 3X15

1008 Jamnagar Khambhalia 132 132/66 3X50

1009 Jamnagar Khambhalia 132 66/11 3X10

1010 Jamnagar Khambhalia 66KV Vadinar 66 66/11 1X10+1X15 5 28.11.78 OS

1011 Jamnagar Khambhalia 66KV Varvala 66 66/11 2X10 8 30.05.81 GETCO

1012 Jamnagar Khambhalia 66KV Arambhada 66 66/11 2X10 5 28.04.94 GETCO

1013 Jamnagar Khambhalia 66KV Kalyanpur 66 66/11 2X15 7 07.05.95 GETCO

1014 Jamnagar Khambhalia 66KV Meghpar 66 66/11 1X15+1x10 8 28.05.99 GETCO

1015 Jamnagar Khambhalia 66KV Vadatara 66 66/11 1X10+1X15 5 19.01.02 GETCO

1016 Jamnagar Khambhalia 66KV Bhadthar 66 66/11 1X10+1x15 7 09.04.05 GETCO

1017 Jamnagar Khambhalia 66KV Lamba 66 66/11 1X10+1X15 5 11.08.07 OS

1018 Jamnagar Khambhalia 66KV Babarzar 66 66/11 2X10 5 05.06.08 OS

1019 Jamnagar Khambhalia 66KV Gorana 66 66/11 2X10 4 26.08.09 OS

1020 Jamnagar Khambhalia 66KV Modpar 66 66/11 2X10 4 10.08.09 GETCO

1021 Jamnagar Khambhalia 66KV Kanchapur 66 66/11 2X10 5 01.05.10 OS

1022 Jamnagar Khambhalia 66KV Korada 66 66/11 2X10 4 03.01.12 OS

132KV Khambhalia 13 11.03.92 GETCO

132KV Bhatia 29 07.04.93 GETCO

132KV NAGHEDI 24 16.6.1964 GETCO

220kv Bhatia 19 31.01.2014 OS

Jamnagar Jamnagar 220 Jamnagar 220 34 29.03.95 GETCO

Page 100

Page 68: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

1023 Jamnagar Khambhalia 66KV Goinj 66 66/11 2X10 6 19.05.12 OS

1024 Jamnagar Khambhalia 66kv Bhankhokhari 66 66/11 1X10+1X15 4 02.07.12 OS

1025 Jamnagar Khambhalia 66kv Sanosari 66 66/11 2X15 5 25.06.13 OS

1026 Jamnagar Khambhalia 66kv Gadhka 66 66/11 1X15 3 12.02.2014 OS

1027 Jamnagar Khambhalia 66kv Ran 66 66/11 2X15 5 4.3.2014 OS

1028 Jamnagar Khambhalia 66kv Motirafudal 66 66/11 2X15 4 10.05.2014 OS

1029 Jamnagar Khambhalia 66kv Morjar 66 66/11 2X15 4 23.09.2014 OS

1030 Jamnagar Ranavav 220 220/132 2X100

1031 Jamnagar Ranavav 220 132/66 3X50

1032 Jamnagar Ranavav 220 66/11 2X10

1033 Jamnagar Ranavav132KV

Bhomiyavadar132 132/66 2X50 9 26.05.12 OS

1034 Jamnagar Ranavav66KV Porbandar

Colony66 66/11 3x10 6 27.04.74 GETCO

1035 Jamnagar Ranavav 66KV Bhanvad 66 66/11 2X15 6 12.09.91 GETCO

1036 Jamnagar Ranavav 66KV Vansjalia 66 66/11 2X15 4 18.10.93 GETCO

1037 Jamnagar Ranavav 66KV Gosa 66 66/11 1X5 3 14.11.96 GETCO

1038 Jamnagar Ranavav66KV Porbandar

(Gidc)66 66/11 2X15 5 25.04.74 GETCO

1039 Jamnagar Ranavav 66KV Bokhira 66 66/11 1X15+1X10 8 16.09.96 GETCO

1040 Jamnagar Ranavav 66KV Bagvadar 66 66/11 2X15 8 08.02.84 GETCO

1041 Jamnagar Ranavav 66KV Visavada 66 66/11 2X10 6 12.06.94 GETCO

1042 Jamnagar Ranavav 66KV Advana 66 66/11 2X10 4 21.12.01 GETCO

1043 Jamnagar Ranavav 66KV Kutiyana 66 66/11 2X10 8 01.03.73 GETCO

1044 Jamnagar Ranavav66KV Rana

Kandorna66 66/11 1X10+1X15 10 28.09.91 GETCO

1045 Jamnagar Ranavav 66KV Sonvadia 66 66/11 2X10 6 07.03.98 GETCO

1046 Jamnagar Ranavav 66KV Gunda 66 66/11 2X10 8 10.12.04 GETCO

1047 Jamnagar Ranavav 66KV Khageshri 66 66/11 2X10 8 01.08.07 OS

1048 Jamnagar Ranavav 66KV Chhaya 66 66/11 2X10 7 10.08.09 OS

1049 Jamnagar Ranavav66KV

Bhomiyavadar66 66/11 1X10+1X15 5 05.10.09 OS

1050 Jamnagar Ranavav 66KV Ramgadh 66 66/11 2X10 5 08.06.10 OS

1051 Jamnagar Ranavav 66KV Vanavad 66 66/11 1X10 5 20.04.11 OS

1052 Jamnagar Ranavav 66KV Ambarama 66 66/11 1X10 4 08.07.11 OS

1053 Jamnagar Ranavav 66KV Modpar 66 66/11 1X10 4 11.07.11 OS

1054 Jamnagar Ranavav 66KV Bakharala 66 66/11 1X10 4 29.06.11 OS

1055 Jamnagar Ranavav 66 KV Vanana 66 66/11 1X15 5 16.04.12 OS

1056 Jamnagar Ranavav 66kv Tumbda 66 66/11 1X15 4 26.07.12 OS

1057 Jamnagar Ranavav 66kv Badej 66 66/11 1X10 3 15.09.12 OS

1058 Jamnagar Ranavav 66kv Bhod 66 66/11 2X15 6 07.05.13 OS

1059 Jamnagar Ranavav 66kv Ranpar 66 66/11 2X15 5 22.06.13 OS

1060 Jamnagar Ranavav 66KV Vadala 66 66/11 2x15 4 30.09.14 OS

1061 Jamnagar Ranavav 66KV Paradava 66 66/11 2x15 4 19.3.2015 OS

1062 Junagadh Junagadh 220 kv Visavadar 220kV 220/66kV 50+50+100 23 03.05.95 GETCO

1063 Junagadh Junagadh 132 kv Junagadh 132kV132/66kV

132/11kV

50+100

12.5+25+2515 17.10.87 GETCO

1064 Junagadh Junagadh 132 kv Bhavnath 132kV 132/11kV 25+25 5 15.09.15 GETCO

1065 Junagadh Junagadh66 kv

Junagadh(GIDC)66kV 66/11kV 15+15+15 8 01.09.75 GETCO

1066 Junagadh Junagadh 66 kv Zanzarda 66kV 66/11kV 10+10+10 8 31.03.97 GETCO

1067 Junagadh Junagadh 66 kv Choki 66kV 66/11kV 15+15 5 20.10.95 GETCO

1068 Junagadh Junagadh 66 kv Vadiya 66kV 66/11kV 10+15 5 26.03.87 GETCO

1069 Junagadh Junagadh 66 kv Devki Galol 66kV 66/11kV 10+15 5 16.10.96 GETCO

1070 Junagadh Junagadh 66 kv Chuda 66kV 66/11kV 15+15 5 15.06.99 GETCO

1071 Junagadh Junagadh 66 kv Bhesan 66kV 66/11kV 15+15 6 10.01.84 GETCO

1072 Junagadh Junagadh 66 kv Mota Kotda 66kV 66/11kV 10+10+10 6 25.06.97 GETCO

1073 Junagadh Junagadh 66 kv Bhalgam 66kV 66/11kV 10+15 5 29.07.04 GETCO

1074 Junagadh Junagadh 66 kv Dhebar 66kV 66/11kV 10+15 6 05.10.95 GETCO

1075 Junagadh Junagadh 66 kv Visavadar 66kV 66/11kV 10+15+15 7 11.09.88 GETCO

1076 Junagadh Junagadh 66 kv Bilkha 66kV 66/11kV 10+10+15 8 20.06.84 GETCO

1077 Junagadh Junagadh 66 kv Prabhatpur 66kV 66/11kV 10+15 4 28.03.98 GETCO

1078 Junagadh Junagadh 66 kv Majevadi 66kV 66/11kV 10+10 5 25.01.00 GETCO

1079 Junagadh Junagadh 66 kv Moti Monpari 66kV 66/11kV 15+15 4 22.03.94 GETCO

1080 Junagadh Junagadh 66 kv Baradiya 66kV 66/11kV 10+10 4 13.09.05 GETCO

1081 Junagadh Junagadh 66 kv Navi Haliyad 66kV 66/11kV 10+10 4 19.02.07 O/S

1082 Junagadh Junagadh 66 kv Khambhaliya 66kV 66/11kV 10+10 5 21.06.07 O/S

1083 Junagadh Junagadh 66kv Mendapara 66kV 66/11kV 10+10 5 27.07.10 O/S

1084 Junagadh Junagadh 66 kv Vekariya 66kV 66/11kV 10+10 5 25.06.09 O/S

1085 Junagadh Junagadh 66 kv Vadla 66kV 66/11kV 10+10 5 14.07.11 O/S

1086 Junagadh Junagadh 66 Kv Amarapar 66kV 66/11kV 15+15 5 15.07.13 O/S

220KV Ranavav 31 05.06.80 GETCO

Page 101

Page 69: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

1087 Junagadh Junagadh66 Kv Juni Dhari

Gundali66kV 66/11kV 15+15 5 07.06.13 O/S

1088 Junagadh Junagadh 66 Kv ArabTimbadi 66kV 66/11kV 15+15 5 28.10.13 O/S

1089 Junagadh Junagadh 66 Kv Chhodavadi 66kV 66/11kV 15+15 5 25.05.15 O/S

1090 Junagadh Dhoraji 220KV Moti-Paneli 220kV 220/66kV 100+100 23 23.01.98 GETCO

1091 Junagadh Dhoraji 132KV Dhoraji 132kV 132/11kV 25+25 5 04.01.71 GETCO

1092 Junagadh Dhoraji 132KV Bhayavadar 132kV132/66kV

66/11kV

20+20+20

10+1514 06.03.97 GETCO

1093 Junagadh Dhoraji 66KV Upleta 66kV 66/11kV 10+15+15 6 07.05.79 GETCO

1094 Junagadh Dhoraji 66KV Kharachia 66kV 66/11kV 15+10 6 11.09.79 GETCO

1095 Junagadh Dhoraji 66KV Tansava 66kV 66/11kV 10+10 5 07.08.95 GETCO

1096 Junagadh Dhoraji 66KV Jetpur – A 66kV 66/11kV 10+15+15 6 06.11.81 GETCO

1097 Junagadh Dhoraji 66KV Jamkandorna 66kV 66/11kV 15+15 6 12.01.84 GETCO

1098 Junagadh Dhoraji 66KV Supedi 66kV 66/11kV 15+10 6 26.06.97 GETCO

1099 Junagadh Dhoraji 66KV Jam-jodhpur 66kV 66/11kV 15+15 5 04.08.80 GETCO

1100 Junagadh Dhoraji 66KV Samana 66kV 66/11kV 10+10 5 23.01.98 GETCO

1101 Junagadh Dhoraji 66KV Chitravad 66kV 66/11kV 15+15 5 24.03.94 GETCO

1102 Junagadh Dhoraji 66KV Jetpur – B 66kV 66/11kV 10+15 5 03.09.98 GETCO

1103 Junagadh Dhoraji 66KV Mandalipur 66kV 66/11kV 10+10 5 23.02.07 O/S

1104 Junagadh Dhoraji 66KV Kolki 66kV 66/11kV 10+10 4 31.05.10 O/S

1105 Junagadh Dhoraji 66KV Shethvadala 66kV 66/11kV 10+10 5 16.06.10 O/S

1106 Junagadh Dhoraji 66KV Raydi 66kV 66/11kV 10+10 5 05.07.10 O/S

1107 Junagadh Dhoraji 66KV Motipaneli 66kV 66/11kV 10+10 4 06.10.10 O/S

1108 Junagadh Dhoraji 66KV Mandasan 66kV 66/11kV 10+10 4 29.11.10 O/S

1109 Junagadh Dhoraji 66KV Satodad 66kV 66/11kV 15+15 5 02.05.13 O/S

1110 Junagadh Dhoraji 66KV Khajurda 66kV 66/11kV 15+15 5 08.07.13 O/S

1111 Junagadh Dhoraji 66KV Vanana 66kV 66/11kV 15+15 5 14.08.13 O/S

1112 Junagadh Dhoraji 66KV Dhoraji 66kV 66/11kV 15+15 5 26.12.14 O/S

1113 Junagadh Dhoraji 66KV Arani 66kV 66/11kV 15+15 4 11.08.14 O/S

1114 Junagadh Dhoraji66KV

Motiparabadi66kV 66/11kV 15+15 5 26.06.15 O/S

1115 Junagadh Dhoraji 66KV Padeshwar 66kV 66/11kV 15+15 4 06.06.15 O/S

1116 Junagadh Keshod 220 KV Keshod 220kV 220/66kV 100+100+100 31 27.12.88 GETCO

1117 Junagadh Keshod 220 Kv Shapur 220kV220/132kV

220/66kV

100

100+10019 16.06.12 O/S

1118 Junagadh Keshod 66 KV Keshod 66kV 66/11kV 10+10+15 8 01.01.70 GETCO

1119 Junagadh Keshod 66 KV Mangrol 66kV 66/11kV 10+10+15 7 01.01.72 GETCO

1120 Junagadh Keshod 66 KV Shil 66kV 66/11kV 10+10 5 21.10.93 GETCO

1121 Junagadh Keshod 66 KV Madhavpur 66kV 66/11kV 10+15 8 05.09.81 GETCO

1122 Junagadh Keshod 66 KV Khirasara 66kV 66/11kV 10+10 5 16.11.94 GETCO

1123 Junagadh Keshod 66 KV Koylana 66kV 66/11kV 10+10+10 7 21.05.04 GETCO

1124 Junagadh Keshod 66 KV Budhecha 66kV 66/11kV 10+10 5 01.08.06 O/S

1125 Junagadh Keshod 66 KV Ajab 66kV 66/11kV 15+15 7 26.09.95 GETCO

1126 Junagadh Keshod 66 KV Malia 66kV 66/11kV 15+15+10 10 29.01.88 GETCO

1127 Junagadh Keshod 66 KV Chorvad 66kV 66/11kV 15+15+10 7 17.12.72 GETCO

1128 Junagadh Keshod 66 KV Chuldi 66kV 66/11kV 15+15 5 11.12.00 GETCO

1129 Junagadh Keshod 66 KV Veraval 66kV 66/11kV 15+15+15+10 12 16.10.70 GETCO

1130 Junagadh Keshod 66 KV P. Patan 66kV 66/11kV 15+10+10 9 23.03.92 GETCO

1131 Junagadh Keshod 66 KV Moraj 66kV 66/11kV 15+15 6 03.07.03 GETCO

1132 Junagadh Keshod 66 KV Sutrapada 66kV 66/11kV 15+10 8 01.04.99 GETCO

1133 Junagadh Keshod 66KV Bhatsimroli 66kV 66/11kV 15+10 6 05.07.07 O/S

1134 Junagadh Keshod 66KV Adri 66kV 66/11kV 10+10 5 27.02.08 O/S

1135 Junagadh Keshod 66KV Amrapur 66kV 66/11kV 10+10+10 6 16.06.08 O/S

1136 Junagadh Keshod 66KV GIDC Veraval 66kV 66/11kV 15+10+10 6 29.09.09 O/S

1137 Junagadh Keshod 66kv Ishara 66kV 66/11kV 10+10 5 24.05.11 O/S

1138 Junagadh Keshod 66kV Raningpara 66kV 66/11kV 15+10 5 21.12.12 O/S

1139 Junagadh Keshod 66kv Kadaya 66kV 66/11kV 15+15 5 16-4-13 O/S

1140 Junagadh Keshod 66Kv Agatrai 66kV 66/11kV 10+10 5 05.08.09 O/S

1141 Junagadh Keshod 66Kv Bhalka GIS 66kV 66/11kV 20+20 4 27.04.15 O/S

1142 Junagadh Manavadar 220Kv Sardargadh 220kV 220/66kV 100+100+50 28 18.12.97 GETCO

1143 Junagadh Manavadar 66Kv Sardargadh 66kV 66/11kV 15+10 7 06.04.90 GETCO

1144 Junagadh Manavadar 66Kv Patanvav 66kV 66/11kV 15+15 5 24.11.96 GETCO

1145 Junagadh Manavadar 66Kv Moti Marad 66kV 66/11kV 15+10 5 30.06.89 GETCO

1146 Junagadh Manavadar 66Kv Manavadar 66kV 66/11kV 15+15 5 19.12.71 GETCO

1147 Junagadh Manavadar 66Kv Pajod 66kV 66/11kV 10+10 7 08.01.87 GETCO

1148 Junagadh Manavadar 66Kv Mandodara 66kV 66/11kV 10+10 5 20.09.91 GETCO

1149 Junagadh Manavadar 66Kv Bantiya 66kV 66/11kV 10+10 6 16.05.07 O/S

1150 Junagadh Manavadar 66Kv Shapur 66kV 66/11kV 15+15 6 20.03.62 GETCO

Page 102

Page 70: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

1151 Junagadh Manavadar 66Kv Kanza 66kV 66/11kV 10+10 6 16.09.94 GETCO

1152 Junagadh Manavadar 66Kv Mendarda 66kV 66/11kV 15+15+10 6 30.09.89 GETCO

1153 Junagadh Manavadar 66Kv Khodiyar 66kV 66/11kV 10+10 5 06.07.04 GETCO

1154 Junagadh Manavadar 66Kv Patrama 66kV 66/11kV 10+10 4 23.05.11 O/S

1155 Junagadh Manavadar 66Kv Navagam 66kV 66/11kV 10+10 6 14.07.11 O/S

1156 Junagadh Manavadar 66Kv Lath 66kV 66/11kV 10+10 5 16.07.11 O/S

1157 Junagadh Manavadar 66Kv Nanadiya 66kV 66/11kV 10+10 4 03.08.11 O/S

1158 Junagadh Manavadar 66Kv Bhader 66kV 66/11kV 10+10 4 10.08.11 O/S

1159 Junagadh Manavadar 66Kv Araniyala 66kV 66/11kV 10+10 4 24.10.11 O/S

1160 Junagadh Manavadar 66Kv Mahiyari 66kV 66/11kV 15+10 4 18.05.12 O/S

1161 Junagadh Manavadar 66Kv Katakpara 66kV 66/11kV 15+10 4 21.07.14 O/S

1162 Junagadh Manavadar 66Kv Sheradi 66kV 66/11kV 15+15 4 22.07.14 O/S

1163 Junagadh Manavadar 66kV Bamanasa 66kV 66/11kV 15+15 4 20.03.15 O/S

1164 Junagadh Manavadar 66kV Marmath 66kV 66/11kV 15+15 5 10.04.15 O/S

1165 Junagadh Kodinar 220KV Timbadi 220kV220/132kV

220/66kV

100+50+50

100+50+5037 31.12.89 GETCO

1166 Junagadh Kodinar 220KV Kansari 220kV 220/66kV 100+100 17 18.01.97 GETCO

1167 Junagadh Kodinar 132KV Talala 132kV132/66kV

66/11kV

50+50+20+20

15+15+1020 16.03.70 GETCO

1168 Junagadh Kodinar 132KV Haripur 132kV 132/11kV 12.5+12.5 5 26.03.03 GETCO

1169 Junagadh Kodinar 66KV Pranchi 66kV 66/11kV 15+15+15 7 14.12.76 GETCO

1170 Junagadh Kodinar 66KV Kodinar 66kV 66/11kV 15+15+10 6 18/05/1905 GETCO

1171 Junagadh Kodinar 66KV Devali 66kV 66/11kV 10+10 4 17.04.02 GETCO

1172 Junagadh Kodinar 66KV Advi 66kV 66/11kV 10+15+15 5 03.06.90 GETCO

1173 Junagadh Kodinar 66KV Ghantwad 66kV 66/11kV 10+15 5 05.11.99 GETCO

1174 Junagadh Kodinar 66KV Alidar 66kV 66/11kV 10+10 3 04.06.06 GETCO

1175 Junagadh Kodinar 66KV Samter 66kV 66/11kV 10+10 3 26.02.00 GETCO

1176 Junagadh Kodinar 66KV Kesariya 66kV 66/11kV 10+10 4 09.07.05 GETCO

1177 Junagadh Kodinar 66KV Una 66kV 66/11kV 15+15+10 6 23/05/1905 GETCO

1178 Junagadh Kodinar 66KV Dhokadva 66kV 66/11kV 15+15+5 7 25.08.88 GETCO

1179 Junagadh Kodinar 66KV GirGadhda 66kV 66/11kV 10+10 5 27.12.91 GETCO

1180 Junagadh Kodinar 66 KV Bodidar 66kV 66/11kV 15 5 23.07.14 O/S

1181 Junagadh Kodinar 66KV Ankolwadi 66kV 66/11kV 10+15 4 04.12.97 GETCO

1182 Junagadh Kodinar 66KV Bhetali 66kV 66/11kV 10+15 3 17.03.06 GETCO

1183 Junagadh Kodinar 66KV Jashadhar 66kV 66/11kV 10 3 26.02.08 O/S

1184 Junagadh Kodinar 66KV Lodhava 66kV 66/11kV 10+10 4 20.06.09 O/S

1185 Junagadh Kodinar 66KV Sindhaj 66kV 66/11kV 10+10 4 05.08.10 GETCO

1186 Junagadh Kodinar 66 KV Adpokar 66kV 66/11kV 15 3 26.07.14 O/S

1187 Junagadh Kodinar 66KV Ghusiya 66kV 66/11kV 10+10 4 10.05.12 O/S

1188 Junagadh Kodinar 66 KV Jantrakhadi 66kV 66/11kV 15 4 25.04.13 O/S

1189 Junagadh Kodinar66 KV Vadji

(Kansari)66kV 66/11kV 15+15 3 09.07.13 O/S

1190 Junagadh Kodinar 66 KV Gorakhmadhi 66kV 66/11kV 15+15 5 26.11.14 O/S

1191 Junagadh Kodinar 66 KV Kanjotar 66kV 66/11kV 15+15 4 25.04.15 O/S

1192 Junagadh Kodinar 66 KV Moradiya 66kV 66/11kV 15+15 4 29.06.15 O/S

1193 Junagadh Kodinar 66 KV Dandi 66kV 66/11kV 15+15 4 21.03.15 O/S

1194 Mehsana Chhatral 220 KV Chhatral 220KV 220/66 100X3 9 GETCO

1195 Mehsana 66KV 66/11 15X2 23 GETCO

1196 Mehsana Chhatral 66 KV Kadi 66KV 66/11 15X3 7 23/11/1977 GETCO

1197 Mehsana Chhatral 66 KV Karannagar 66KV 66/11 15X2,10X1 6 23/01/1992 GETCO

1198 Mehsana Chhatral 66 KV Medha 66KV 66/11 10X2 4 27/02/1995 GETCO

1199 Mehsana Chhatral 66 KV Rangpurda 66KV 66/11 10X2 7 31/05/2005 GETCO

1200 Mehsana Chhatral 66 KV Katosan 66KV 66/11 15X1,10X1 5 01/07/1980 GETCO

1201 Mehsana Chhatral 66 KV Suraj 66KV 66/11 10X2 7 31/08/1999 GETCO

1202 Mehsana Chhatral 66 KV Nandasan 66KV 66/11 15X2,10X1 8 17/01/1989 GETCO

1203 Mehsana Chhatral 66 KV Rajpur 66KV 66/11 15X2,10X1 6 02/11/1993 GETCO

1204 Mehsana Chhatral 66 KV GIDC-Chh 66KV 66/11 20X2,15X1 8 16/05/1989 GETCO

1205 Mehsana Chhatral 66 KV Kalol 66KV 66/11 15X3 7 01/03/1966 GETCO

1206 Mehsana Chhatral 66 KV Borisana 66KV 66/11 10X2 9 27/04/1989 GETCO

1207 Mehsana Chhatral 66 KV Vadsar 66KV 66/11 20X1,15X1 5 13/10/1977 GETCO

1208 Mehsana Chhatral 66 KV Santej 66KV 66/11 20X2 8 19/01/1995 GETCO

1209 Mehsana Chhatral 66 KV Meda Adraj 66KV 66/11 15X1,10X1 7 05/05/1994 GETCO

1210 Mehsana Chhatral 66 KV Adalaj 66KV 66/11 10X3 7 01/03/1988 GETCO

1211 Mehsana Chhatral 66 KV Moti Bhoyan 66KV 66/11 10X3 7 14/03/2007 O/S

1212 Mehsana Chhatral 66 KV Laxmipura 66KV 66/11 10X2 5 01/07/2008 O/S

1213 Mehsana Chhatral 66 KV Sadra 66KV 66/11 10X2 5 14/04/2010 O/S

1214 Mehsana Chhatral 66 KV Dhanot 66KV 66/11 10X2 5 22/07/2010 O/S

23/05/1977

Page 103

Page 71: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

1215 Mehsana Chhatral 66 KV Khatraj 66KV 66/11 15X1,10X1,20X1 6 23/08/2010 O/S

1216 Mehsana Chhatral 66 KV Shantigram 66KV 66/11 20X2 5 08/02/2014 O/S

1217 100 X1

1218 50X2

1219 5X1

1220 100X1

1221 40X1

1222 50X1

1223 10X4

1224 MEHSANA PATAN 66KV CHANASMA 66 KV 66/11 10X3 9 29.12.1975 GETCO

1225 MEHSANA PATAN 66KV KAMBOI 66 KV 66/11 10X2 4 30.12.1992 GETCO

1226 MEHSANA PATAN 66KV HARIJ 66 KV 66/11 10X2 6 4.5.1981 GETCO

1227 MEHSANA PATAN 66KV ADIYA 66KV 66/11 10X2 7 5.2.1990 GETCO

1228 MEHSANA PATAN 66KV KANSA 66KV 66/11 15X2 5 12.6.1991 GETCO

1229 MEHSANA PATAN 66KV MANUND 66KV 66/11 10X2 6 31.3.1992 GETCO

1230 MEHSANA PATAN 66KV SAMI 66KV 66/11 10X2 7 17.5.1994 GETCO

1231 MEHSANA PATAN 66KV S'WER 66KV 66/11 10X2 7 1.5.1995 GETCO

1232 MEHSANA PATAN 66KV BALISANA 66KV 66/11 10X3 6 1.12.1981 GETCO

1233 MEHSANA PATAN 66KV ANAWADA 66KV 66/11 10X1 5

1234 15X1

1235 MEHSANA PATAN 66KV DUNAWAD 66KV 66/11 10X2 6 31.1.1998 GETCO

1236 MEHSANA PATAN 66KV KIMBUVA 66KV 66/11 15X1 4

1237 10X1

1238 MEHSANA PATAN 66KV BHADRADA 66KV 66/11 10X2 11 12.11.2001 GETCO

1239 MEHSANA PATAN66KV

KAMLIWADA66KV 66/11 10X2 5 18.4.2003 GETCO

1240 MEHSANA PATAN 66KV MUJPUR 66KV 66/11 10X2 4 17.10.2003 GETCO

1241 MEHSANA PATAN 66KV KESHNI 66KV 66/11 10X2 5 18.3.2005 GETCO

1242 MEHSANA PATAN 66KV RAJPUR 66KV 66/11 10X2 4 8.8.2005 GETCO

1243 MEHSANA PATAN 66KV ANAWADA 66KV 66/11 15X1 7 12.4.1997 GETCO

1244 MEHSANA PATAN 66KV KATRA 66KV 66/11 10X1 6 14.7.2011 O/S

1245 MEHSANA PATAN 66KV DEVPURA 66KV 66/11 15X2 4 25.10.2013 O/S

1246 MEHSANA PATAN 66KV NORTA 66KV 66/11 15X2 5 4.7.2014 O/S

1247 MEHSANA PATAN 66KV SAMPRA 66KV 66/11 15X2 4 4.8.2014 O/S

1248 MEHSANA PATAN66KV NANI

CHANDUR66KV 66/11 15X2 4 14.5.2015 O/S

1249 315X3

1250 100X3

1251 5X1

1252 50X1

1253 125X1

1254 50X2(PGCIL)

1255 Mehsana Kheralu 22O KV Kheralu 220 kv 220/66 2 (100+100) 26 24.3.96 GETCO

1256 Mehsana Kheralu 66KV KODRAM 66 kv 66/11 2 (10+10) 7 1.5.1992 GETCO

1257 Mehsana Kheralu 66KV GIDASAN 66 kv 66/11 2 (10+10) 4 13.4.93 GETCO

1258 Mehsana Kheralu 66KV VARETHA 66 kv 66/11 2 (10+10) 6 22.3.04 GETCO

1259 Mehsana Kheralu 66KV VADNAGAR 66 kv 66/11 2 (10+10) 6 15.2.84 GETCO

1260 Mehsana Kheralu 66KV UMTA 66 kv 66/11 2 (10+10) 5 31.7.01 GETCO

1261 Mehsana Kheralu 66KV DASAJ 66 kv 66/11 2 (10+10) 4 26.5.05 GETCO

1262 Mehsana Kheralu 66KV MANDALI 66 kv 66/11 2 (10+10) 5 05.07.2004 GETCO

1263 Mehsana Kheralu 66KV KHANPUR 66 kv 66/11 2 (10+10) 6 09.09.2002 GETCO

1264 Mehsana Kheralu 66KV Kheralu 66 kv 66/11 2 (10+15) 4 31.3.82 GETCO

1265 Mehsana Kheralu 66KV Satlasana 66 kv 66/11 2 (10+15) 8 28.2.87 GETCO

1266 132 kv 132/66 3 (50+50+40)

1267 66kv 66/11 2 (20+20)

1268 Mehsana Kheralu 66KV KAHODA 66 kv 66/11 3 (10+10+10) 6 29.3.90 GETCO

1269 Mehsana Kheralu 66KV KHALI 66 kv 66/11 2 (10+10) 6 10.12.1999 GETCO

1270 Mehsana Kheralu 66KV KAKOSHI 66 kv 66/11 3 (10+10+10) 6 26.2.90 GETCO

1271 Mehsana Kheralu 66KV CHHAPI 66 kv 66/11 2 (15+15) 5 28.7.80 GETCO

1272 Mehsana Kheralu 66KV UNJHA 66 kv 66/11 3 (10+10+10) 6 12.5.1979 GETCO

1273 Mehsana Kheralu 66KV KARLI 66 kv 66/11 2 (10+10) 5 17.1.86 GETCO

1274 Mehsana Kheralu 66KV UNAVA 66 kv 66/11 2 (10+10) 4 24.2.06 GETCO

1275 Mehsana Kheralu 66KV KALYANA 66 kv 66/11 2 (10+10) 4 20.09.07 Out source

1276 Mehsana Kheralu 66KV GORAD 66 kv 66/11 2 (10+10) 5 4.10.07 Out source

1277 Mehsana Kheralu66KV

NAVASUDASANA66 kv 66/11 2 (10+10) 5 25.01.2010 Out source

1278 Mehsana Kheralu 66KV OTALPUR 66 kv 66/11 2 (5+5) 4 28.02.2011 Out source

1279 Mehsana Kheralu 66KV MUDANA 66 kv 66/11 2 (10+10) 4 14.12.11 Out source

1280 Mehsana Kheralu 66Kv Sakri 66 kv 66/11 2 (15+15) 5 25.3.14 Out source

1281 Mehsana Kheralu 66kv Sujanpur 66 kv 66/11 2 (15+15) 5 9.6.14 Out source

1282 Mehsana Kheralu 66kv Dharoi 66 kv 66/11 2 (15+15) 4 4.7.14 Out source

1283 Mehsana Kheralu 66kv Undhai 66 kv 66/11 2 (15+15) 7 25.8.14 Out source

1284 Mehsana Kheralu 66kv Pilucha 66 kv 66/11 2 (15+15) 5 25.11.14 Out source

1285 Mehsana Kheralu 66kv Tundav 66 kv 66/11 2 (15+15) 5 09.06.2015 Out source

1286 220/132 100*3+50*1=350 13

1287 220/66 100*1=100 1

Mehsana Kheralu 132KV SIDHPUR 18 18-1-70 GETCO

Mehsana Mehsana 220 kv Mehsana 220kv 24.11.1974 Getco

1.1.2001 GETCO

Mehsana Chhatral 400KV Vadavi s/s 400KV 400/220 47 24.06.2007 GETCO

MEHSANA PATAN 132 KV PATAN 132 KV 132/66 21 11.8.1985 GETCO

18.10.1997 GETCO

MEHSANA PATAN 220KV SANKHARI 220 KV 220/66 26 14.8.1995 GETCO

Page 104

Page 72: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

1288 132/66 50*1=50 13

1289 66/11 15*3=45 10

1290 220/66 100*2+50*1=250 11

1291 66/11 5*1=5 16

1292 Mehsana Mehsana 66 kv Basna 66 66/11 15*2=30 6 15.1.1979 Getco

1293 Mehsana Mehsana 66 kv Dhinoj 66 66/11 15*1+10*1=25 5 26.5.1982 Getco

1294 Mehsana Mehsana 66 kv Bhandu 66 66/11 10*2=20 6 20.12.1982 Getco

1295 Mehsana Mehsana 66 kv Linch 66 66/11 15*3=45 9 18.10.1987 Getco

1296 Mehsana Mehsana 66 kv Palavasna 66 66/11 10*3=30 6 15.1.90 Getco

1297 Mehsana Mehsana 66 kv Kherva 66 66/11 10*2=20 5 16.6.1992 Getco

1298 Mehsana Mehsana 66 kv Nagalpur 66 66/11 15*1+10*1=25 5 21.12.2000 Getco

1299 Mehsana Mehsana 66 kv Becharaji 66 66/11 10*3=30 7 29.11.1974 Getco

1300 Mehsana Mehsana 66 kv Modhera 66 66/11 10*2=20 9 11.11.1983 Getco

1301 Mehsana Mehsana 66 kv Balol 66 66/11 15*1+10*1=25 5 29.3.1981 Getco

1302 Mehsana Mehsana 66 kv Motap 66 66/11 10*2=20 5 29.12.1992 Getco

1303 Mehsana Mehsana 66 kv Jotana 66 66/11 10*2=20 5 21.4.1994 Getco

1304 Mehsana Mehsana 66 kv Udalpur 66 66/11 10*1+7.5*1=17.5 5 17.12.2003 Getco

1305 Mehsana Mehsana 66 kv Mandali 66 66/11 15*2+10*1=40 6 2.3.1999 Getco

1306 Mehsana Mehsana 66 kv Maniyari 66 66/11 10*2=20 5 5.2.2009 O/S

1307 Mehsana Mehsana 66 kv Asjol 66 66/11 10*2=20 5 22.4.2011 O/S

1308 Mehsana Mehsana 66 kv Mudarada 66 66/11 10*2=20 5 15.6.2011 O/S

1309 Nadiad Karamsad 220 KV Karamsad 220 KV 220/132 300 19 30/7/1970 GETCO

1310 Nadiad Karamsad 220 KV 220/66 150 5 GETCO

1311 Nadiad Karamsad 132 KV 132/66 150 11 GETCO

1312 Nadiad Karamsad 66 KV 1 13 GETCO

1313 Nadiad Karamsad 132 KV Ode 132 KV 132/66 110 9 12/10/1984 GETCO

1314 Nadiad Karamsad 66 KV 132/11 25 7 GETCO

1315 Nadiad Karamsad 132 KV Undel 132 KV 132/66 200 4 26/3/1995 GETCO

1316 Nadiad Karamsad 66 KV 66/11 25 8 GETCO

1317 Nadiad Karamsad 66 KV V.V.Nagar 66 KV 66/11 45 3 19/12/1973 GETCO

1318 Nadiad Karamsad 66 KV V.U.Nagar 66 KV 66/11 45 9 29/3/1996 GETCO

1319 Nadiad Karamsad 66 KV Jol 66 KV 66/11 20 4 21/3/2007 GETCO

1320 Nadiad Karamsad 66 KV Anand 66 KV 66/11 60 6 30/3/1973 GETCO

1321 Nadiad Karamsad 66 KV Gopalpura 66 KV 66/11 30 4 6/11/1998 GETCO

1322 Nadiad Karamsad 220 KV Mogar 220KV 220/66 320 8 8/9/2015 GETCO

1323 66 KV 66/11 40 8 28/1/1972 GETCO

1324 Nadiad Karamsad 66 KV Anklav 66 KV 66/11 25 5 21/11/1973 GETCO

1325 Nadiad Karamsad 66 KV Borsad 66 KV 66/11 30 4 20/12/1973 GETCO

1326 Nadiad Karamsad 66 KV Singlav 66 KV 66/11 20 3 29/9/2008 GETCO

1327 Nadiad Karamsad 66 KV Petlad 66 KV 66/11 40 7 5/4/1970 GETCO

1328 Nadiad Karamsad 66 KV Nar 66 KV 66/11 20 5 19/2/1972 GETCO

1329 Nadiad Karamsad 66 KV Ras 66 KV 66/11 30 5 29/3/1991 GETCO

1330 Nadiad Karamsad 66 KV Virsad 66 KV 66/11 25 5 28/3/1991 GETCO

1331 Nadiad Karamsad 66 KV Cambay 66 KV 66/11 35 9 22/3/1991 GETCO

1332 Nadiad Karamsad 66 KV Neja 66 KV 66/11 20 2 27/5/2005 GETCO

1333 Nadiad Karamsad 66 KV Vasad 66 KV 66/11 20 3 9/9/1985 GETCO

1334 Nadiad Karamsad 66 KV Navakhal 66 KV 66/11 20 3 28/9/2009 GETCO

1335 Nadiad Karamsad 66 KV Khanpur 66 KV 66/11 20 3 12/11/2008 Out Source

1336 Nadiad Karamsad 66 KV Karamsad 66 KV 66/11 20 3 14/6/2011 Out Source

1337 Nadiad Karamsad 66 KV Sarsa 66 KV 66/11 25 3 06/01/2012 Out Source

1338 Nadiad Karamsad 66 KV Mehlav 66 KV 66/11 10 3 06/01/2012 Out Source

1339 Nadiad Karamsad 66 KV Bhalej 66 KV 66/11 15 3 31/3/2013 Out Source

1340 Nadiad Karamsad 400 KV Kasor 400 400/220KV 630 8 31/1/1996 GETCO

1341 Nadiad Karamsad 66 66/11.55 5 1 GETCO

1342 Nadiad Karamsad 66KV Limbali 66 66/11 30 5 06/05/2015 Out Source

1343 Nadiad Karamsad 66KV Vatadara 66 66/11 30 5 20/06/2015 Out Source

1344 Nadiad Karamsad 66KV Haldari 66 66/11 30 5 08/05/2015 Out Source

1345 Nadiad Nadiad 220 KV Kapadwanj 220 KV 220/66 200 8 20/03/1993 GETCO

1346 Nadiad Nadiad 66 KV 66/11 5 9 GETCO

1347 Nadiad Nadiad 132 KV Nadiad 132 KV 132/66 100 5 10/02/1974 GETCO

1348 Nadiad Nadiad 66 KV 66/11 55 6 GETCO

1349 Nadiad Nadiad 132 KV Mahemdabad 132 KV 132/66 200 6 6/6/1969 GETCO

1350 Nadiad Nadiad 66 KV 66 KV 30 10 GETCO

1351 Nadiad Nadiad 66 KV Kapadwanj 66 KV 66/11 35 5 6/8/1969 GETCO

1352 Nadiad Nadiad 66 KV Attarsumba 66 KV 66/11 20 5 12/11/1992 GETCO

1353 Nadiad Nadiad 66 KV Nirmali 66 KV 66/11 25 5 31/12/1991 GETCO

1354 Nadiad Nadiad 66 KV Mahudha 66 KV 66/11 20 5 27/8/1975 GETCO

1355 Nadiad Nadiad 66 KV Kathlal 66 KV 66/11 20 5 8/3/1989 GETCO

1356 Nadiad Nadiad 66 KV Torna 66 KV 66/11 20 3 30/10/1999 GETCO

1357 Nadiad Nadiad 66 KV Kamla 66 KV 66/11 40 6 10/11/1990 GETCO

1358 Nadiad Nadiad 66 KV Chaklashi 66 KV 66/11 30 4 12/4/1976 GETCO

1359 Nadiad Nadiad 66 KV Uttarsanda 66 KV 66/11 20 4 11/9/1993 GETCO

1360 Nadiad Nadiad 66 KV Thasra 66 KV 66/11 20 4 2/1/1990 GETCO

1361 Nadiad Nadiad 66 KV Sevalia 66 KV 66/11 20 5 19/1/1974 GETCO

1362 Nadiad Nadiad 66 KV Balasinor 66 KV 66/11 30 5 2/3/1987 GETCO

1363 Nadiad Nadiad 66 KV Kheda 66 KV 66/11 30 5 16/5/1989 GETCO

1364 Nadiad Nadiad 66 KV Vaso 66 KV 66/11 20 4 24/7/1977 GETCO

1365 Nadiad Nadiad 66 KV Limbasi 66 KV 66/11 30 4 8/2/1973 GETCO

1366 Nadiad Nadiad 66 KV Umreth 66 KV 66/11 40 7 5/8/1967 GETCO

1367 Nadiad Nadiad 66 KV Changa 66 KV 66/11 20 7 25/11/1976 GETCO

1368 Nadiad Nadiad 66 KV Demai 66 KV 66/11 20 5 28/11/2003 GETCO

Mehsana Mehsana 220 kv Mitha 220kv 4.6.2001 Getco

Mehsana Mehsana 220 kv Mehsana 220kv 24.11.1974 Getco

Page 105

Page 73: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

1369 Nadiad Nadiad 66 KV Jorapura 66 KV 66/11 20 3 5/1/2008 Out Source

1370 Nadiad Nadiad 66 KV Palaiya 66 KV 66/11 20 3 30/12/2008 Out Source

1371 Nadiad Nadiad 66 KV Reliya 66 KV 66/11 20 4 1/5/2009 Out Source

1372 Nadiad Nadiad 66 KV Rakhiyal 66 KV 66/11 20 3 13/06/2011 Out Source

1373 Nadiad Nadiad 66 KV Jinger 66 KV 66/11 20 3 10/08/2011 Out Source

1374 Nadiad Nadiad 66 KV Matar 66 KV 66/11 25 3 18/09/2012 Out Source

1375 Nadiad Nadiad 66 KV Malitadi 66 KV 66/11 30 4 21/04/2014 Out Source

1376 Nadiad Nadiad 66 KV Bhailakui 66 KV 66/11 30 4 23/04/2014 Out Source

1377 Nadiad Nadiad 66KV Nenpur 66 KV 66/11 15 4 22/07/2014 Out Source

1378 Nadiad Nadiad 66KV Khalal 66 KV 66/11 15 4 21/10/2014 Out Source

1379 Nadiad Nadiad 66KV Alina 66 KV 66/11 30 4 06/06/2015 Out Source

1380 Nadiad Nadiad 66KV Aklacha 66 KV 66/11 30 4 04/06/2015 Out Source

1381 Nadiad Nadiad 66KV VyasVasna 66 KV 66/11 30 4 01/06/2015 Out Source

1382 Nadiad Nadiad 66KV Apruji 66 KV 66/11 30 4 08/06/2015 Out Source

1383 Nadiad Nadiad 66KV Varsola 66 KV 66/11 30 4 26/06/2015 Out Source

1384 Nadiad Narol 220 KV Salejada 220 KV 220/66 200 11 1/5/1999 GETCO

1385 Nadiad Narol 66 KV - 5 17 GETCO

1386 Nadiad Narol 220 KV Bhat 220 KV 220/66 300 13 06/01/2010 Out Source

1387 Nadiad Narol 66 KV 17 17 Out Source

1388 Nadiad Narol 132 KV Narol 132 KV 132/66 180 10 16/1/1964 GETCO

1389 Nadiad Narol 66 KV - 16 16 GETCO

1390 Nadiad Narol 66 KV Dholka City 66 KV 66/11 30 5 25/8/1980 GETCO

1391 Nadiad Narol 66 KV Dholka GIDC 66 KV 66/11 30 6 27/8/1991 GETCO

1392 Nadiad Narol 66 KV Koth 66 KV 66/11 30 5 12/5/1987 GETCO

1393 Nadiad Narol 66 KV Simej 66 KV 66/11 30 5 28/8/2003 GETCO

1394 Nadiad Narol 66 KV Bavla 66 KV 66/11 35 7 2/12/1983 GETCO

1395 Nadiad Narol 66 KV Juval Rupavati 66 KV 66/11 20 8 8/10/1979 GETCO

1396 Nadiad Narol 66 KV Kerala 66 KV 66/11 60 6 11/10/1987 GETCO

1397 Nadiad Narol 66 KV Zamp 66 KV 66/11 20 6 20/12/2004 GETCO

1398 Nadiad Narol 66 KV Sanand 66 KV 66/11 45 7 29/1/1983 GETCO

1399 Nadiad Narol 66 KV Changodar 66 KV 66/11 60 7 23/7/1993 GETCO

1400 Nadiad Narol 66 KV Moraiya 66 KV 66/11 40 9 13/12/2002 GETCO

1401 Nadiad Narol 66 KV Barejadi 66 KV 66/11 30 10 20/9/1977 GETCO

1402 Nadiad Narol 66 KV Navagam 66 KV 66/11 20 6 31/8/1981 GETCO

1403 Nadiad Narol 66 KV Jetalpur 66 KV 66/11 20 5 6/10/1999 GETCO

1404 Nadiad Narol 66 KV Samadara 66 KV 66/11 30 6 10/12/1992 GETCO

1405 Nadiad Narol 66 KV Haldarwas 66 KV 66/11 30 4 25/4/1995 GETCO

1406 Nadiad Narol 66 KV Hirapur 66 KV 66/11 20 5 2/8/2006 Out Source

1407 Nadiad Narol 66 KV Sanathal 66 KV 66/11 30 8 06/05/2008 Out Source

1408 Nadiad Narol 66 KV Bhat 66 KV 66/11 30 2 08/11/2009 Out Source

1409 Nadiad Narol 66 KV Ingoli Road 66 KV 66/11 20 5 05/08/2010 Out Source

1410 Nadiad Narol 66 KV Rajoda 66 KV 66/11 25 7 19/6/2010 Out Source

1411 Nadiad Narol 66 KV Nani Devti 66 KV 66/11 20 4 07/12/2010 Out Source

1412 Nadiad Narol 66 KV Bidaj 66 KV 66/11 20 6 07/12/2010 Out Source

1413 Nadiad Ranasan 66 KV Shella 66 KV 66/11 45 6 06/12/2012 Out Source

1414 Nadiad Narol 66 KV Valthera 66 KV 66/11 30 5 06/12/2012 Out Source

1415 Nadiad Narol 66 KV Vishalpur 66 KV 66/11 30 5 19/12/2012 Out Source

1416 Nadiad Narol 66 KV Vinzol 66 KV 66/11 35 5 02/08/2013 Out Source

1417 Nadiad Narol 66 KV Shetra 66 KV 66/11 30 4 08/12/2014 Out Source

1418 Nadiad Narol 66 KV Madhavnagar 66 KV 66/11 40 5 29/9/2014 Out Source

1419 Nadiad Narol 66KV Daduka 66 KV 66/11 20 5 24/12/2014 Out Source

1420 Nadiad Narol 66KV Raipur 66 KV 66/11 30 5 27/12/2014 Out Source

1421 Nadiad Narol 66KV Lambha 66 KV 66/11 30 5 05/08/2015 Out Source

1422 Nadiad Ranasan 220 KV Ranasan 220 KV 220/132 500 15 30/10/1969 GETCO

1423 Nadiad Ranasan 132 KV 132/66 100 17 GETCO

1424 Nadiad Ranasan 66 KV 9 GETCO

1425 Nadiad Ranasan 220 KV Khanpur 220 KV 220/66 200 11 16/12/1994 GETCO

1426 Nadiad Ranasan 66 KV 66/11 5 17 GETCO

1427 Nadiad Ranasan 132 KV Sabarmati 132 KV 132/66 100 8 29/12/1969 GETCO

1428 Nadiad Ranasan 66 KV 66/11 10 6 GETCO

1429 Nadiad Ranasan 132 KV Chiloda 66 KV 132/66 100 9 01/02/1989 GETCO

1430 Nadiad Ranasan 132 KV 132/11 37.5 11 GETCO

1431 Nadiad Ranasan 66 KV Rakhial 66 KV 66/11 35 6 21/10/1981 GETCO

1432 Nadiad Ranasan 66 KV Halisa 66 KV 66/11 25 6 28/3/1994 GETCO

1433 Nadiad Ranasan 66 KV Kadjodra 66 KV 66/11 25 4 30/3/2002 GETCO

1434 Nadiad Ranasan 66 KV Bopal 66 KV 66/11 40 6 13/2/1998 GETCO

1435 Nadiad Ranasan 66 KV Bhadaj 66 KV 66/11 40 7 26/6/2004 GETCO

1436 Nadiad Ranasan 66 KV Science City 66 KV 66/11 20 5 10/08/2007 Out Source

1437 Nadiad Ranasan 66 KV Bhat 66 KV 66/11 25 8 10/07/2003 GETCO

1438 Nadiad Ranasan 66 KV Kuha 66 KV 66/11 20 4 16/8/2005 GETCO

1439 Nadiad Ranasan 66 KV Kanbha 66 KV 66/11 45 5 23/11/1990 GETCO

1440 Nadiad Ranasan 66 KV Dehgam 66 KV 66/22 50 8 18/2/1966 GETCO

1441 Nadiad Ranasan 66 KV Bahial 66 KV 66/11 20 5 28/3/1994 GETCO

1442 Nadiad Ranasan 66 KV Solankipura 66 KV 66/11 20 5 05/08/2010 Out Source

1443 Nadiad Ranasan 66 KV Dabhoda 66 KV 66/11 20 5 28/7/2009 Out Source

1444 Nadiad Ranasan 66 KV Chhala 66 KV 66/11 30 6 08/07/1986 GETCO

1445 Nadiad Ranasan 66 KV Sadra 66 KV 66/11 20 4 08/02/1994 GETCO

1446 Nadiad Ranasan 66 KV Vehlal 66 KV 66/11 40 6 26/2/1988 GETCO

1447 Nadiad Ranasan 66 KV Muthiya 66 KV 66/11 35 5 10/02/1999 GETCO

1448 Nadiad Ranasan 66 KV Bilasiya 66 KV 66/11 20 5 01/12/2012 Out Source

1449 Nadiad Ranasan 66 KV Kudasan 66 KV 66/11 30 5 21/07/2012 Out Source

1450 Nadiad Ranasan 66 KV Naroda 66 KV 66/11 45 8 29/7/1966 GETCO

1451 Nadiad Ranasan 66 KV Odhav 66 KV 66/11 30 5 24/6/2008 Out Source

Page 106

Page 74: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

1452 Nadiad Ranasan 66 KV Kathwada 66 KV 66/11 30 5 10/11/2011 Out Source

1453 Nadiad Ranasan 66 kV Godrej City 66 KV 66/11 35 5 03/12/2012 Out Source

1454 Nadiad Ranasan 66 kV Tradad 66 KV 66/11 40 5 23/03/2013 Out Source

1455 Nadiad Ranasan 66 KV Chandkheda 66KV 66/11 40 5 19/4/2014 Out Source

1456 Nadiad Ranasan 66 KV Bhuvaladi 66 KV 66/11 40 5 28/07/2014 Out Source

1457 Nadiad Ranasan 66 KV Sahpur 66 KV 66/11 30 5 29/07/2014 Out Source

1458 Nadiad Ranasan 66 KV Chiskari 66 KV 66/11 15 3 18/10/2014 Out Source

1459 Navsari Ichhapore 66KV SARTANA

SS66 66/11 15X3 17 18.05.1999 GETCO

1460 Navsari Ichhapore 66KV

PANDESARA-B SS66 66/22

20X3 +

15X230 14.06.2004 GETCO

1461 Navsari Ichhapore 66KV OLPAD SS 66 66/11 15X3 27 11.05.1982 GETCO

1462 Navsari Ichhapore 220kv POPDA 220 220/66100X3 +

5X126 28.06.2014 GETCO

1463 Navsari Ichhapore 66kv

Eklera(Bhestan) 66 66/11 10X2 13 29.05.2012 OS

1464 Navsari Ichhapore 66KV Pala S/S 66 66/11 10X3 22 26.12.2009 OS

1465 Navsari Ichhapore 66KV KOSMADA

SS66 66/11 10X2 18 07.07.2008 OS

1466 Navsari Ichhapore 220KV

TALANGPORE SS220 220/66

100X4 +

5X137 22.01.2000 GETCO

1467 Navsari Ichhapore 66kv SUSM 66 66/11 15X2 17 11.07.2013 OS

1468 Navsari Ichhapore 220Kv

MORA(L&T) S/S220 220/66 20X1 15 20.11.2010 GETCO

1469 Navsari Ichhapore 66KV SACHIN-A

SS66 66/11

15X3 +

10X132 31.03.1985 GETCO

1470 Navsari Ichhapore 66KV UDHANA SS 66 66/22 20X4 33 29.07.1981 GETCO

1471 Navsari Ichhapore 66KV VARIAV SS 66 66/11 15X3 30 29.11.1995 GETCO

1472 Navsari Ichhapore 66kv Bhatia 66 66/11 15X2 12 30.03.15 OS

1473 Navsari Ichhapore 66kv UTRAN 66 66/1115X2 +

10X133 22.12.2004 OS

1474 Navsari Ichhapore 66KV Khajod S/S 66 66/11 10X2 17 30.10.2009 OS

1475 Navsari Ichhapore 66KV TAPI SS 66 66/22 20X4 30 11.04.1950 GETCO

1476 Navsari Ichhapore 132KV BHESTAN

SS132

132/66

66/11

(100X1 +

50X3)

(20X5 +

15X1)

60 03.01.1966 GETCO

1477 Navsari Ichhapore 220KV

ICHCHHAPORE SS220 220/66

100X2 +

50X135 23.03.1992 GETCO

1478 Navsari Ichhapore 66kv Vesu-II 66 66/11 20 X 2 16 28.04.14 OS

1479 Navsari Ichhapore 66KV Mora s/s 66 66/1115X1 +

10X121 28.12.2011 OS

1480 Navsari Ichhapore 66KV VANZ SS 66 66/11 15X4 30 29.04.2004 GETCO

1481 Navsari Ichhapore 66KV GOVALAK

SS66 66/22 15X4 18 27.07.1998 GETCO

1482 Navsari Ichhapore 66KV PAL SS 66 66/1120X1 +

15X231 31.05.2003 GETCO

1483 Navsari Ichhapore 66kv Hira Bourase

(GHB)66 66/11 15X1 11 07.09.15 OS

1484 Navsari Ichhapore 66kv Jiav 66 66/1120X1 +

15X326 01.05.2010 OS

1485 Navsari Ichhapore 66 kv KOSAD 66 66/1110X1 +

15X219 01.05.2010 OS

1486 Navsari Ichhapore 66KV PUNA SS 66 66/22 15X3 19 01.05.2004 GETCO

1487 Navsari Ichhapore 66KV

PANDESARA-A SS66 66/22

20X1 +

15X427 31.01.1992 GETCO

1488 Navsari Ichhapore 66KV

ICHCHHAPORE SS66 66/11

10X2 +

15X120 23.04.1989 GETCO

1489 Navsari Ichhapore 66kv SVNIT 6666/22

66/1120X3 20 29.04.14 OS

1490 Navsari Ichhapore 66kv BHAGVATI

SS66 66/11

15X1 +

10X117 19.11.2011 OS

1491 Navsari Ichhapore 66KV SACHIN-B

SS66 66/11

20X1 +

15X341 06.02.1995 GETCO

1492 Navsari Ichhapore 66KV

GODADARA SS66 66/22

20X2 +

15X229 30.01.1994 GETCO

1493 Navsari Ichhapore 66KV VESU SS 66 66/2220X3 +

15X123 31.12.1996 GETCO

1494 Navsari Ichhapore 66kv Bhatha 66 66/11 15X2 12 19.03.2014 OS

1495 Navsari Ichhapore 66KV Sachin C S/S 66 66/11 15X3 24 16.09.2010 OS

1496 Navsari Navsari 66KV Ahwa SS 66 66/11 5x2 11 19.02.1966 GETCO

1497 Navsari Navsari 66KV Gandevi SS 66 66/11 10X2 26 28.03.1971 GETCO

1498 Navsari Navsari 66KV Tankal SS 66 66/11 10X2 18 20.08.2006 GETCO

1499 Navsari Navsari 66kv Chhaper 66 66/11 15X2 12 07.08.2014 OS

1500 Navsari Navsari 66kv Erthan 66 66/11 10X2 17 2.12.2011 OS

Page 107

Page 75: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

1501 Navsari Navsari 66KV Anaval SS 66 66/11 10X2 21 06.08.1987 GETCO

1502 Navsari Navsari 66KV Eroo SS 66 66/11 10X3 25 06.08.1987 GETCO

1503 Navsari Navsari 66kv Anklach 66 66/11 5X1 11 09.02.15 OS

1504 Navsari Navsari 66kv G.E.T.P. 66 66/11 152 17 24.11.2012 OS

1505 Navsari Navsari 66KV Waghai SS 66 66/1110X +

5X114 19.02.1966 GETCO

1506 Navsari Navsari 66KV Amalsad SS 66 66/1110X1 +

15X118 02.09.2002 GETCO

1507 Navsari Navsari 66KV Chikhli SS 66 66/1110X1 +

15X224 07.11.1988 GETCO

1508 Navsari Navsari 66kv Mahuvas 66 66/11 15X2 10 29.07.2014 OS

1509 Navsari Navsari 66kv Mangalia 66 66/1110X1 +

5X17 22.06.2011 OS

1510 Navsari Navsari 66KV Dolvan SS 66 66/11 10X2 18 16.01.1990 GETCO

1511 Navsari Navsari 66KV Chhapra SS 66 66/11 10X3 24 12.04.1989 GETCO

1512 Navsari Navsari 66KV Maroli SS 66 66/11 10X2 19 31.03.1990 GETCO

1513 Navsari Navsari 66kv Vesma 66 66/1115X1 +

10X115 08.11.2012 OS

1514 Navsari Navsari 66 Kv Singod S/S 66 66/11 10X2 13 23.09.2009 OS

1515 Navsari Navsari 66KV Bilimora SS 66 66/1110X2 +

15X127 15.08.1954 GETCO

1516 Navsari Navsari 220KV Ambheta SS 66220/66

66/11

(100X2+50X1)

(5X1)29 27.03.1999 GETCO

1517 Navsari Navsari 66kv Mangrol 66 66/115X1 +

10X19 16.10.2014 OS

1518 Navsari Navsari 66kv Sultanpur 66 66/11 5X2 12 28.07.2012 OS

1519 Navsari Navsari 66KV Vansda SS 66 66/115X1 +

10X117 02.03.1990 GETCO

1520 Navsari Navsari 66KV Navsari city 66 66/1115X1 +

10X116 09.08.2008 OS

1521 Navsari Navsari 66KV Khergam SS 66 66/11 10x2 19 14.03.1994 GETCO

1522 Navsari Navsari 66kv Rankuva 66 66/11 15X2 11 28.07.2014 OS

1523 Navsari Navsari 66kv SAPUTARA 66 66/11 10X2 11 20.01.2009 OS

1524 Navsari Navsari 66KV Fadvel SS 66 66/11 10X2 16 02.02.2008 OS

1525 Navsari Navsari 220KV Navsari SS 220

220/132

220/66

66/11

(100X3)

(100X2+50X1)

(15X3)

64 04.04.1967 GETCO

1526 Navsari Navsari 66kv Subir 66 66/11 2 27.07.2014 OS

1527 Navsari Navsari 66kv Balwada 66 66/11 15X1 + 10X1 13 21.06.2012 GETCO

1528 Navsari Vapi 66KV DharamPur 66 66/11 10X3 26 26/3/1983 GETCO

1529 Navsari Vapi 66KV Sarigam SS 66 66/11 15X2 + 20X2 49 23/5/1984 GETCO

1530 Navsari Vapi 220KV Vapi SS 220220/66

66/11

(160X2+100X2)

(15X3)59 29/4/1980 GETCO

1531 Navsari Vapi 66kv Piprol 66 66/11 10X1 10 07.01.2014 OS

1532 Navsari Vapi 66KV Morai ss 66 66/11 15X2 + 10X1 21 02.11.2010 OS

1533 Navsari Vapi 66KV Atakpardi 66 66/11 10X4 38 23/11/1958 GETCO

1534 Navsari Vapi 66KV Umargam SS 66 66/11 15X2 + 20X1 28 23/4/1969 GETCO

1535 Navsari Vapi 66kv Bhgdawada 66 66/11 20X2 12 25.09.2014 OS

1536 Navsari Vapi 66kv Palgam 66 66/11 15X2 14 05.07.2012 OS

1537 Navsari Vapi 66KV Khadki SS 66 66/11 10X2 21 23/7/2000 GETCO

1538 Navsari Vapi 66KV Sanjan SS 66 66/11 10X2 16 15/6/2004 GETCO

1539 Navsari Vapi 220KV Bhilad SS 220220/66

66/11

(100X3) +

(10X2 + 3X1)35 29/2/1994 GETCO

1540 Navsari Vapi 66kv Sahuda 66 66/11 10X2 12 05.08.2014 OS

1541 Navsari Vapi 66kV Paria SS 66 66/11 5X2 14 10.05.2011 OS

1542 Navsari Vapi 66KV Valsad 66 66/11 15X2 + 10X1 21 06/04/1997 GETCO

1543 Navsari Vapi 66KV GIDC Vapi

SS66 66/11 20X3 + 15X1 35 10/2/1076 GETCO

1544 Navsari Vapi 66kv 66kV GIDC Ph-

II 66 66/11 15X2 24 28.12.2012 OS

1545 Navsari Vapi 66KV Kaprada 66 66/11 5X1 + 10X1 16 16/6/2000 GETCO

1546 Navsari Vapi 66KV 4th Phase 66 66/11 15X3 24 28/3/2000 GETCO

1547 Navsari Vapi 66kv Kolak 66 66/11 10X2 12 19.09.2014 OS

1548 Navsari Vapi 66KV Gundlav 66 66/11 15X2 + 10X1 22 14.12.2011 OS

1549 Navsari Vapi 66KV Dungari SS 66 66/11 10X2 23 26/5/2000 GETCO

1550 Navsari Vapi 66KV DamanGanga

SS66 66/11 15X1 + 10X2 26 25/10/1993 GETCO

1551 Navsari Vapi 66kv 66kV

Kocharwa66 66/11 15X1 + 10X1 13 23.03.2013 OS

1552 Navsari Vapi 66 KV

KAKADKOPER S/S66 66/11 10X2 20 28/11/1999 GETCO

1553 Navsari Vapi 132KV Atul SS 132132/66

132/11

(50X2)

(12.5X2)40 20/3/1973 GETCO

1554 Navsari Vapi 66KV 3rd Phase 66 66/11 20X4 37 03/10/1984 GETCO

1555 Navsari Vapi 66kv Untadi 66 66/11 15x2 13 25.09.2014 OS

1556 Navsari Vapi 66kv 66kV

Umargam Ph-II66 66/11 15X1 + 10X1 14 30.04.2012 OS

1557 Navsari Vav 66KV VALOD SS 66 66/11 15X1 + 10X2 24 2.12.1992 GETCO

Page 108

Page 76: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

1558 Navsari Vav 66KV KAMREJ SS 66 66/11 10X3 22 07.04.1992 GETCO

1559 Navsari Vav 66kv Parab 66 66/11 15X2 11 30.07.14 OS

1560 Navsari Vav

66KV

KUKARMUNDA

S/S

66 66/11 5X2 13 03.01.2011 OS

1561 Navsari Vav 66KV UKAI SS 66 66/11 10X2 20 31.03.1964 GETCO

1562 Navsari Vav 66KV MADHI SS 66 66/11 10X2 14 15.06.2006 OS

1563 Navsari Vav 66KV KADODARA

SS66 66/22 15X4 + 20X1 34 01.09.1975 GETCO

1564 Navsari Vav 66kv Sisor 66 66/11 15X2 15 05.06.15 OS

1565 Navsari Vav 66kv Naranpur 66 66/11 5X2 13 21.06.2011 OS

1566 Navsari Vav 66kv Niol 66 66/11 10X2 13 16.07.2009 OS

1567 Navsari Vav 66KV SONGADH

SS66 66/11 15X2 31 31.05.1986 GETCO

1568 Navsari Vav 220KV MOTA SS 220 220/66100x2 + 50X1 +

5X152 03.07.2003 GETCO

1569 Navsari Vav 66kv Vadibhesrot 66 66/11 15X2 16 17.04.15 OS

1570 Navsari Vav 66KV ZAMKHADI

S/S66 66/11 5X2 13 1.5.2011 OS

1571 Navsari Vav 66KV VYARA SS 66 66/11 10X3 31 12.06.1973 GETCO

1572 Navsari Vav 66KV BARDOLI SS 66 66/11 15X2 + 10X1 25 14.02.1965 GETCO

1573 Navsari Vav 66KV SAMPURA

SS66 66/11 10X2 15 05.09.2008 GETCO

1574 Navsari Vav 66kv Chikhlibhesrot 66 66/11 15X2 15 29.06.15 OS

1575 Navsari Vav 66kv Nimbhora 66 66/11 15X2 12 9.06.14 OS

1576 Navsari Vav 66KV

RUMKITALAV S/S66 66/11 10X2 13 03.07.2010 OS

1577 Navsari Vav 66KV UCHHAL SS 66 66/11 5X2 14 30.12.87 GETCO

1578 Navsari Vav 66KV JOLWA SS 66 66/11 15X4 33 20.10.2005 GETCO

1579 Navsari Vav 66kv Kavla 66 66/11 15X2 14 14.04.15 OS

1580 Navsari Vav 66KV SARBHON

S/S66 66/11 10X2 14 24.06.2011 OS

1581 Navsari Vav 66KV LASKANA

SS66 66/11 20X4 33 09.08.2003 GETCO

1582 Navsari Vav 66KV MAHUVA

SS66 66/11 10X2+15X1 24 29.07.2014 GETCO

1583 Navsari Vav 66KV PALSANA

SS66 66/11 15X3 22 27.12.1995 GETCO

1584 Navsari Vav 66kv Borkhadi 66 66/11 15X2 13 03.07.15 OS

1585 Navsari Vav 66kv Mota 66 66/11 20X2 12 20.07.14 OS

1586 Navsari Vav 66KV VIRPUR S/S 66 66/11 10X1 + 5X1 16 17.5.2011 OS

1587 Navsari Vav 66KV NIZAR SS 66 66/11 10X2 + 15X1 21 30.11.1975 GETCO

1588 Navsari Vav 66KV KADOD SS 66 66/11 10X2 17 22.05.2006 OS

1589 Navsari Vav 220KV VAV SS 220220/66

66/11

100X5 + 50X1 +

5X158 15.01.1980 GETCO

1590 Navsari Vav 66kv Kalkwa 66 66/11 15x2 11 25.05.15 OS

1591 Navsari Vav 66KV AFWA 66 66/11 5x2 13 25.7.2011 OS

1592 Navsari Vav 66KV BAMNIYA

SS66 66/11 10X2 16 20.10.2005 OS

1593 Palanpur Palanpur 220 Kv PALANPUR 220 220 360(100x2+160) 10

1594 66 66 100.00

1595 100.00

1596 160.00 18

1597 Palanpur Palanpur 66Kv PALANPUR-1 66 66 30(10x3) 6 10.03.1975

1598 10.00

1599 10.00

1600 10.00

1601 Palanpur Palanpur 66Kv GADH 66 66 45(15x3) 7 23.01.1980

1602 15.00

1603 15.00

1604 15.00

1605 Palanpur Palanpur 66Kv CHANDISAR 66 66 30(15x2) 5 06.02.1991

1606 15.00

1607 15.00

1608 Palanpur Palanpur 66Kv BASU 66 66 30(15x2) 29.03.2003

1609 66 66 15.00 29.03.2003

1610 15.00

1611 Palanpur Palanpur 66Kv KANODAR 66 66 30(10x3) 6 22.12.1994

1612 10.00

1613 10.00

1614 10.00

1615 Palanpur Palanpur 66Kv PALANPUR-2 66 66 20(10x2) 4 27.04.1993

1616 10.00

1617 10.00

1618 Palanpur Palanpur 66Kv MALAN 66 66 20(10+10) 6 04.02.1997

GETCO

GETCO

GETCO

26.12.1988 GETCO

GETCO

GETCO

GETCO

5 GETCO

Page 109

Page 77: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

1619 10.00

1620 10.00

1621 Palanpur Palanpur 66Kv LALAVADA 66 66 20(10x2) 5 14.05.2001

1622 10.00

1623 10.00

1624 Palanpur Palanpur 66Kv VADGAM 66 66 35(10x2+15) 7 14.02.1980

1625 10.00

1626 10.00

1627 15.00

1628 Palanpur Palanpur 66Kv JALOTRA 66 66 30(15+15) 5 06.03.1990

1629 15.00

1630 15.00

1631 Palanpur Palanpur 66Kv DANTA 66 66 20(10x2) 4 12.08.1991

1632 10.00

1633 10.00

1634 Palanpur Palanpur 66Kv AMBAJI 66 66 20(2X10) 5 15.01.1993

1635 10.00

1636 10.00

1637 Palanpur Palanpur 66Kv PANCHADA 66 66 20(2X10) 5 20.08.2004

1638 10.00

1639 10.00

1640 Palanpur Palanpur 66Kv AMIRGADH 66 66 20(10X2) 4 04.12.2004

1641 10.00

1642 10.00

1643 Palanpur Palanpur 66Kv IQBALGADH 66 66 20(10x2) 5 18.08.1988

1644 10.00

1645 10.00

1646 Palanpur Palanpur 66Kv DANTIWADA 66 66 25(15+10) 5 30.09.1987

1647 15.00

1648 10.00

1649 Palanpur Palanpur 66Kv JEGOL 66 66 20(10x2) 4 21.03.2005

1650 10.00

1651 10.00

1652 Palanpur Palanpur 66Kv HEBATPUR 66 66 20(10x2) 5 11.03.1998

1653 10.00

1654 10.00

1655 Palanpur Palanpur 66Kv VIRAMPUR 66 66 10(10X1) 4 11.03.2007

1656 10.00

1657 Palanpur Palanpur 66Kv BHUTEDI 66 66 20(10X2) 4 29.03.2007

1658 10.00

1659 10.00

1660 Palanpur Palanpur 66Kv GANGVA 66 66 10(10X1) 4 11.09.2009

1661 10.00

1662 Palanpur Palanpur 66Kv GADALWADA 66 66 20(10X2) 3 16.06.2011

1663 10.00

1664 10.00

1665 Palanpur Palanpur 66Kv VASAN 66 66 20(10X2) 3 06.11.2011

1666 10.00

1667 10.00

1668 Palanpur Palanpur 66Kv MORIYA 66 66 20(10X2) 4 21.12.2011

1669 10.00

1670 10.00

1671 Palanpur Palanpur 66Kv BHAYLA 66 66 10(5x2) 4 16.05.2012

1672 5.00

1673 5.00

1674 Palanpur Palanpur 66KV BHAKHAR 66 66 30(15X2) 4 15.10.2013

1675 15.00

1676 15.00

1677 Palanpur Thavar 220 kV Thavar 220220/66

2X100=200

1X50=50

Tr. Bay=3

line

Bay=4

16.11.2006 GETCO

1678 Palanpur Thavar 220 kV Thavar 66 66/111X15=15

1X10=10

Tr. Bay=2

line

Bay=7

16.11.2006 GETCO

1679 Palanpur Thavar 66 kV Dhanera 66 66/111X15=15

2X10=20

Tr. Bay=3

line

Bay=3

01.09.1980 GETCO

1680 Palanpur Thavar 66 kV Jadiya 66 66/111X15=15

2X10=20

Tr. Bay=3

line

Bay=2

27.03.1989 GETCO

1681 Palanpur Thavar 66 kV Jadiyali 66 66/111X15=15

1X10=10

Tr. Bay=2

line

Bay=3

31.03.2005 GETCO

1682 Palanpur Thavar 66 kV Dharnodhar 66 66/111X15=15

1X10=10

Tr. Bay=2

line

Bay=2

26.08.2009 O/S

OS

OS

OS

OS

GETCO

GETCO

GETCO

OS

OS

OS

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

Page 110

Page 78: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

1683 Palanpur Thavar 66 kV Lavara 66 66/11 2X15=30

Tr. Bay=2

line

Bay=2

17.04.2001 GETCO

1684 Palanpur Thavar 66 kV Rah 66 66/11 2X15=30

Tr. Bay=2

line

Bay=5

26.02.1992 GETCO

1685 Palanpur Thavar 66 kV Asodar 66 66/11 2X15=30

Tr. Bay=2

line

Bay=3

30.03.1996 GETCO

1686 Palanpur Thavar 66 kV Ktada D 66 66/111X15=15

2X10=20

Tr. Bay=3

line

Bay=2

22.09.2004 GETCO

1687 Palanpur Thavar 66 kV Duva 66 66/11 2X10=20

Tr. Bay=2

line

Bay=2

08.09.2009 O/S

1688 Palanpur Thavar 66 kV Zerda 66 66/11 3X15=45

Tr. Bay=3

line

Bay=3

27.02.1987 GETCO

1689 Palanpur Thavar 66 kV Khimmat 66 66/11 2X15=30

Tr. Bay=2

line

Bay=5

15.01.1991 GETCO

1690 Palanpur Thavar 66 kV Nanameda 66 66/11 2X15=30

Tr. Bay=2

line

Bay=3

27.05.1993 GETCO

1691 Palanpur Thavar 66 kV Panthavada 66 66/11 3X10=30

Tr. Bay=3

line

Bay=2

11.7.1996 GETCO

1692 Palanpur Thavar 66 kV Vaktapura 66 66/11 2X10=20

Tr. Bay=2

line

Bay=1

02.05.2006 GETCO

1693 Palanpur Thavar 66 kV Voda 66 66/11 2X10=20

Tr. Bay=2

line

Bay=2

15.05.2008 O/S

1694 Palanpur Thavar 66 kV Ramun 66 66/111X15=15

1X10=10

Tr. Bay=2

line

Bay=2

29.06.2002 GETCO

1695 Palanpur Thavar 66 kV Serpura 66 66/11 2X10=20

Tr. Bay=2

line

Bay=2

11.06.2010 O/S

1696 Palanpur Thavar 66 kV Taruva 66 66/11 1X10=10

Tr. Bay=1

line

Bay=2

09.07.2010 O/S

1697 Palanpur Thavar 66 kV Malotra 66 66/11 2X10=20

Tr. Bay=2

line

Bay=2

03.05.2010 O/S

1698 Palanpur Thavar 66 kV Chekra 66 66/11 2X10=20

Tr. Bay=2

line

Bay=2

08.11.2011 O/S

1699 Palanpur Thavar 66 kV Luvara 66 66/11 2X10=20

Tr. Bay=2

line

Bay=2

08.11.2011 O/S

1700 Palanpur Thavar 66 kV Nandla 66 66/11 1X15=15

Tr. Bay=1

line

Bay=1

31.10.2012 O/S

1701 Palanpur Thavar 66 kV Nanuda 66 66/11 2X15=30

Tr. Bay=2

line

Bay=2

03.05.2014 O/S

1702 Palanpur Thavar 66 kV Nagfana 66 66/11 2X15=30

Tr. Bay=2

line

Bay=2

02.06.2014 O/S

Page 111

Page 79: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

1703 Palanpur Thavar 66 kV Kuvarla 66 66/11 2X15=30

Tr. Bay=2

line

Bay=2

13.10.2014 O/S

1704 Palanpur Thavar 66 kV Shiya 66 66/11 2X15=30

Tr. Bay=2

line

Bay=2

06.11.2014 O/S

1705 Palanpur Thavar66 Kv Godasar

(Delankot)66 66/11 2X15=30

Tr. Bay=2

line

Bay=2

19.03.2015 O/S

1706220KV =

10

1707 66 KV = 12

1708 132/66 1X50+1X40 = 90 132KV = 4 GETCO

1709 66/11 1X20+1X20 = 40 66 KV = 10 GETCO

1710 Palanpur Deesa Jangral 66 66/11 3x10 =30 4 14.06.1980 GETCO

1711 Palanpur Deesa Samau 66 66/11 2x15+1X10 = 40 7 18.04.1988 GETCO

1712 Palanpur Deesa Motakapra 66 66/11 2x15+1X10 = 40 7 29.10.1992 GETCO

1713 Palanpur Deesa Lorwada 66 66/11 1x15+2X10 = 35 7 06.11.1996 GETCO

1714 Palanpur Deesa Baiwada(Malgadh) 66 66/11 1x15+2X10 = 35 6 09.12.1996 GETCO

1715 Palanpur Deesa Shamsherpura 66 66/11 3X15 = 45 6 18.05.1992 GETCO

1716 Palanpur Deesa Shergadh 66 66/11 2X15 =30 5 20.04.2000 GETCO

1717 Palanpur Deesa Bhildi 66 66/11 2x15+1x10=40 6 27.09.1986 GETCO

1718 Palanpur Deesa Vithodar 66 66/11 2X10 =20 5 29.06.2002 GETCO

1719 Palanpur Deesa Manekpur 66 66/11 3X15 = 45 6 04.03.2004 GETCO

1720 Palanpur Deesa Ranpur 66 66/11 2x15 = 30 5 07.05.2004 GETCO

1721 Palanpur Deesa Devsari 66 66/11 1x15+1x10 = 25 6 11.05.2005 GETCO

1722 Palanpur Deesa Samdhi 66 66/11 1x15+1x10 = 25 4 30.06.2006 GETCO

1723 Palanpur Deesa Bhatsan 66 66/11 2X10 =20 5 03.08.2009 OS

1724 Palanpur Deesa Dama 66 66/11 2X10 =20 4 04.08.2009 OS

1725 Palanpur Deesa Balodhar 66 66/11 2X10 =20 4 26.08.2009 OS

1726 Palanpur Deesa Agthala 66 66/11 3x10 =30 6 30.03.2004 GETCO

1727 Palanpur Deesa Aseda 66 66/11 2X10 =20 5 28.05.2010 OS

1728 Palanpur Deesa Gadha 66 66/11 2X10 =20 5 17.06.2010 OS

1729 Palanpur Deesa Pechhadal 66 66/11 2X10 =20 5 20.07.2010 OS

1730 220KV = 8

1731 66 KV = 13

1732 Palanpur Deesa Rasana 66 66/11 2X10 =20 5 23.06.2011 OS

1733 Palanpur Deesa Soni 66 66/11 1x15 = 15 4 02.09.2011 OS

1734 Palanpur Deesa Sardarpura 66 66/11 2x15 = 30 4 31.10.2013 OS

1735 Palanpur Deesa Juna Deesa 66 66/11 2x15 = 30 5 28.02.2014 OS

1736 220 220/66 200(100x2) 14 02.09.1998

1737 100

1738 100

1739 66 66/11 5 (Aux-x'mer) 12

1740 66 66/11 30(15x2) 7 16.11.1989

1741 15

1742 15

1743 66 66/11 10(5x2) 5 29.03.1994

1744 5

1745 5

1746 66 66/11 30(10X3) 5 16.02.1994

1747 10

1748 10

1749 10

1750 66 66/11 40(15x2+10x1) 5 25.07.1990

1751 10

1752 15

1753 15

1754 66 66/11 20(10X2) 5 30.05.2006

1755 10

1756 10

1757 THARAD 66KV LAKHANI 66 66/11 50(20+15x2) 9 26.11.1989

1758 20

1759 15

1760 15

1761 THARAD 66KV KUVANA 66 66/11 30(2x15) 5 30.01.2000

1762 15

1763 15

1764 THARAD 66KV TITHGAM 66 66/11 20(10x2) 6 19.02.1992

1765 10

1766 10

1767 THARAD 66KV BHABHAR 66 66/11 30(15x2) 5 05.03.1988

1768 15

1769 15

1770 THARAD 66KV JALOYA 66 66/11 10(5+5) 5 31.01.2001

1771 5

1772 5

1773 THARAD 66KV MITHI PALADI 66 66/11 45(15x3) 5 13.12.1991

1774 15

1775 15

Palanpur GETCO

PalanpurGETCO

GETCOPalanpur

GETCO

Palanpur

Palanpur GETCO

Palanpur GETCO

Palanpur GETCO

THARAD 66KV KOTDA (F)GETCO

Palanpur THARAD 66 KV VADIYA GETCO

01.10.2010 GETCO

Palanpur THARAD 220KV THARAD GETCO

GETCO

Palanpur THARAD 66KV THARAD

Palanpur Deesa 220KV Agathala 220 22/66 2x100=200

GETCO

Palanpur THARAD 66KV TADAV

GETCO

Palanpur THARAD 66KV PILUDA

12.11.2003 GETCO

Palanpur Deesa Deesa 132 01.09.1980

Palanpur Deesa 220kv Jangral 220 220/66 1X160+1x160 =320

Page 112

Page 80: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

1776 15

1777 THARAD 66KV MAKHANU 66 66/11 15(2x15) 5 25.08.2004

1778 15

1779 15

1780 THARAD 66KV VATAM 66 66/11 20(10X2) 5 23.05.2008

1781 10

1782 10

1783 THARAD 66KV MERA 66 66/11 30(2X15) 5 17.11.1994

1784 15

1785 15

1786 THARAD 66KV RUNI 66 66/11 20(2x10) 3 22.05.2006

1787 10

1788 10

1789 THARAD 66KV DEDARDA 66 66/11 20(2x10) 4 02.05.2006

1790 10

1791 10

1792 THARAD 66KV PATHAMADA 66 66/11 20(2x10) 4 23.02.2007

1793 10

1794 10

1795 THARAD 66 KV KESARGAM 66 66/11 20(2x10) 3 03.09.2009

1796 10

1797 10

1798 THARAD 66 KV BALODHAN 66 66/11 20(2x10) 4 07.07.2010

1799 10

1800 10

1801 66 66/11 10 5 11.08.2012

1802 10

1803 66 66/11 20(2x10) 4 30.06.2011

1804 10

1805 10

1806 66 66/11 (1x10) 5

1807 (1x10)

1808 66 66/11 10(5 X 2) 5

1809 5

1810 5

1811 66 66/11 30(2x15) 5

1812 15

1813 15

1814 THARAD 66KV BHORDU 66 66/11 30(2x15) 5 13.12.2013

1815 15

1816 15

1817 THARAD 66KV MIYAL 66 66/11 1x15=15 5 17.04.2014

1818 1x15=15

1819 THARAD 66 66/11 1x15=15 5 28.07.2014

1820 1x15=15

1821 Palanpur Deodar Deodar 220220/66

66

3X100

1X5

12

1931/1/1989 GETCO

1822 Palanpur Deodar Radhanpur 220220/66

66

1X50,1x100

1X5

8

1208/12/2005 GETCO

1823 Palanpur Deodar Charanka 220 220/66 4x100 9

1628/02/2012 GETCO & O/S

1824 Palanpur Deodar Deodar 66 66/11 2x15,1x10 6 01/01/1969 GETCO

1825 Palanpur Deodar Raiya 66 66/11 2x10,1x15 6 25/06/2005 GETCO

1826 Palanpur Deodar Khoda 66 66/11 2x15,1x10 7 08/03/1990 GETCO

1827 Palanpur Deodar Meetha 66 66/11 2x10 6 16/08/2010 O/S

1828 Palanpur Deodar Chamanpura 66 66/11 2x10 4 18/08/2011 O/S

1829 Palanpur Deodar Shihori 66 66/11 2x15,1x10 8 30/11/1977 GETCO

1830 Palanpur Deodar Padardi 66 66/11 2x15 5 15/10/1994 GETCO

1831 Palanpur Deodar Kamboi(F) 66 66/11 2x15,1x10 7 12/11/1999 GETCO

1832 Palanpur Deodar Arnivada 66 66/11 15X2 5 07/02/2001 GETCO

1833 Palanpur Deodar Khimana 66 66/11 2x10 7 27/12/2007 O/S

1834 Palanpur Deodar Ramvas 66 66/11 2x10 5 11/12/2011 O/S

1835 Palanpur Deodar Thara 66 66/11 15x1,10x2 8 27/09/1986 GETCO

1836 Palanpur Deodar Dungrasan 66 66/11 2x10 6 16/12/1999 GETCO

1837 Palanpur Deodar Tervada 66 66/11 15X2 6 25/02/1995 GETCO

1838 Palanpur Deodar Jakhel 66 66/11 2x10 5 08/01/2009 O/S

1839 Palanpur Deodar Khariya 66 66/11 2x10 5 12/09/2011 O/S

1840 Palanpur Deodar Un 66 66/11 10X1,15X1 5 29/01/2000 GETCO

1841 Palanpur Deodar Radhanpur 66 66/11 10X2 7 03/11/1991 GETCO

1842 Palanpur Deodar Varahi 66 66/11 10x2 5 26/11/1991 GETCO

1843 Palanpur Deodar Santalpur 66 66/11 10X1,5X1 7 31/03/1996 GETCO

1844 Palanpur Deodar Dahisar 66 66/11 2x10 6 11/05/1996 GETCO

1845 Palanpur Deodar Charanka 66 66/11 15X2,5X1 6 01/02/2012 O/S

1846 Palanpur Deodar Vakha 66 66/11 15x2 5 13/05/2013 O/S

1847 Palanpur Deodar Bandhavad 66 66/11 2x15 5 07/03/2014 O/S

1848 Palanpur Deodar Umbari 66 66/11 1X15 4 08/05/2014 O/S

1849 Palanpur Deodar Bamroli 66 66/11 1X15 5 15/11/2014 O/S

1850 Palanpur KANSARI 400 KV KANSARI 11400/220 KV

ICT No.1315 11 08.02.2000 GETCO

1851400/220 KV

ICT No.2315

1852400/220 KV

ICT No.3315

1853 Palanpur KANSARI 400 KV KANSARI 20220 / 66 KV

TR No.1100 20 16.06.1991 GETCO

Palanpur OS

Palanpur OS

Palanpur 66KV JALOTA OS

Palanpur THARAD66 KV

KOTARWADA01.03.2012 OS

Palanpur THARAD 66KV WAV 17.07.2013 OS

Palanpur THARAD 66 KV DEL OS

Palanpur THARAD 66 KV DUDHAVA 30.06.2011 OS

Palanpur OS

Palanpur OS

Palanpur THARAD 66 KV RANTILA OS

Palanpur GETCO

Palanpur GETCO

Palanpur os

Palanpur GETCO

Palanpur OS

Palanpur GETCO

GETCOPalanpur

Page 113

Page 81: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

1854220 / 66 KV

TR No.2100

1855220 / 66 KV

TR No.3100

1856 Palanpur KANSARI 400 KV KANSARI 2166/11 KV

Stn.X'mer5 21 16.06.1991 GETCO

1857 Surendranagar 400 400/2202X315

50 Mvar -1 13 31.12.2014

1858 Surendranagar 220 220/66 2X100 10 29.5.2014

1859 Surendranagar 66 66/11 1X5 10 29.5.2014

1860 Surendranagar 220 220/66 3X100 8

1861 Surendranagar 66 66/22 1X10 15

1862 Surendranagar 220 220/66 2X160 11

1863 Surendranagar 66 66/11 1X5 16

1864 Surendranagar Dhrangadhra 66 KV Bhalgamda 66 66/11 4X15 8 01.03.95 GETCO

1865 Surendranagar Dhrangadhra 66 KV Baisabgadh 66 66/11 2X10 4 21.06.10 O/s

1866 Surendranagar Dhrangadhra 66 KV Bavli 66 66/11 3X10 6 18.08.09 O/s

1867 Surendranagar Dhrangadhra 66 KV Chandragadh 66 66/11 2X10 5 01.10.09 O/s

1868 Surendranagar Dhrangadhra 66 KV Charadva 66 66/11 4X15 10 25.07.87 GETCO

1869 Surendranagar Dhrangadhra 66 KV Chuli 66 66/11 2X15+1X20 6 20.12.95 GETCO

1870 Surendranagar Dhrangadhra 66 KV Chupani 66 66/11 2X15+1X20 6 22.01.93 GETCO

1871 Surendranagar Dhrangadhra 66 KV Devaliya 66 66/11 1X10+2X15 6 23.11.95 GETCO

1872 Surendranagar Dhrangadhra 66 KV Dhavana 66 66/11 1X10+1X15 5 23.07.11 O/s

1873 Surendranagar Dhrangadhra 66 KV Dhrangadhra 66 66/111X20+1X15+1X1

06 30.01.74 GETCO

1874 Surendranagar Dhrangadhra66 KV

Ghanshyamgadh66 66/11 2X15 4 09.03.93 GETCO

1875 Surendranagar Dhrangadhra 66kv Gurukul 66 66/11 2X10 5 04.03.2011 O/s

1876 Surendranagar Dhrangadhra 66 KV Halwad 66 66/11 2X15+1X10 5 09.12.77 GETCO

1877 Surendranagar Dhrangadhra 66 KV Hirapur 66 66/11 2X10 5 9.2.12 O/s

1878 Surendranagar Dhrangadhra 66 KV Ishwarnagar 66 66/11 2X10 4 29.06.06 O/s

1879 Surendranagar Dhrangadhra 66 KV Kankawati 66 66/11 2X15+1X10 6 30.01.90 GETCO

1880 Surendranagar Dhrangadhra 66 KV Kondh 66 66/11 2X15+1X20 7 21.12.89 GETCO

1881 Surendranagar Dhrangadhra 66 KV Malaniyad 66 66/11 2X15 5 28.03.99 GETCO

1882 Surendranagar Dhrangadhra 66 KV Merupar 66 66/11 1X15 4 19.11.12 O/s

1883 Surendranagar Dhrangadhra 66 KV Methan 66 66/11 2X10 4 05.12.03 GETCO

1884 Surendranagar Dhrangadhra 66 KV Narali 66 66/11 2X10 4 08.09.09 O/s

1885 Surendranagar Dhrangadhra 66 KV Ranekpar 66 66/11 3X15 5 24.07.04 GETCO

1886 Surendranagar Dhrangadhra 66 KV Sara 66 66/11 1X15+2X20 8 28.03.88 GETCO

1887 Surendranagar Dhrangadhra 66 KV Sarambhada 66 66/11 1X10+2X15 5 10.07.01 GETCO

1888 Surendranagar Dhrangadhra 66 KV Sundaribhavani 66 66/11 2X10 3 26.09.12 O/s

1889 Surendranagar Dhrangadhra 66 KV Tarnetar 66 66/11 1X15+2X20 5 30.08.05 GETCO

1890 Surendranagar Dhrangadhra66 KV Than2

(Abhepar)66 66/11 1X15+1X10 5 05.01.12 O/s

1891 Surendranagar Dhrangadhra66 KV Virpar

(Dadholiya)66 66/11 1X15+1X10 4 07.07.11 O/s

1892 Surendranagar Dhrangadhra 66 KV Halvad gidc 66 66/11 2X15 4 15.05.13 O/s

1893 Surendranagar Dhrangadhra 66 KV Ranmalpur 66 66/11 1X15 4 18.11.13 O/s

1894 Surendranagar Dhrangadhra 66 KV Ratanpar 66 66/11 1X15 3 02.01.14 O/s

1895 Surendranagar Dhrangadhra 66 KV Dighadiya 66 66/11 1X15 4 04.08.14 O/s

1896 Surendranagar Dhrangadhra 66 KV Narichana 66 66/11 2X15+1X10 7 23.11.99 GETCO

1897 Surendranagar Dhrangadhra 66 KV Raigadh 66 66/11 2X10 5 31.01.06 GETCO

1898 Surendranagar Dhrangadhra 66 KV Vavdi 66 66/11 1X7.5+2X15 6 28.03.95 GETCO

1899 Surendranagar Dhrangadhra 66 KV Ishdra 66 66/11 1X10 3 30.12.13 O/s

1900 Surendranagar Dhrangadhra 66 KV Navalgadh 66 66/11 1X10+1X15 5 5.9.13 O/s

1901 Surendranagar Dhrangadhra 66 KV Mathak 66 66/11 2X15 5 16.6.15 O/s

1902 Surendranagar 400 400/220/33 19 18.10.94 GETCO

1903 Surendranagar 220 400/220/33 16 18.10.94 GETCO

1904 Surendranagar 66 66/11 1X5 1 20.10.94 GETCO

1905 Surendranagar 220 220/132 3X100+1X50 7 GETCO

1906 Surendranagar 132 132/66 1X50+2X100 13 GETCO

1907 Surendranagar 66 66/11 2X10 13 GETCO

Limbdi 220 KV Limbdi 27.10.70

Dhrangadhra 220 KV Halwad 22.05.04 GETCO

Limbdi 400 KV Chorania2X500

Dhrangadhra 400 Kv Mansar S/s

Operation-GETCO

Maintenance-

Siemens

Dhrangadhra 220 KV Dhrangadhra 26.02.91 GETCO

Page 114

Page 82: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

1908 Surendranagar Limbdi 220 KV Rajpar S/S 220 220/11 2X25 8 23.10.09Operation-GETCO

Maintenance-Simms

1909 Surendranagar Limbdi 220 KV Dudhrej S/S 220 220/11 2X25 8 24.10.09Operation-GETCO

Maintenance-Simms

1910 Surendranagar Limbdi 220 KV Sadla S/S 220 220/66 2X100 10 28.03.2014Operation-GETCO

Maintenance-Ascent

1911 Surendranagar 132 132/11 2X12.5 9 16.02.72 GETCO

1912 Surendranagar 132 132/66 1X40 4 28.03.2010 GETCO

1913 Surendranagar Limbdi 132 KV Sitagadh 132 132/11 1X25+1X12.5 5 30.10.92 GETCO

1914 Surendranagar Limbdi 132 KV Vakhatpar 132 132/11 2X25 5 19.11.14Operation-GETCO

Maintenance-Ascent

1915 Surendranagar Limbdi 66 KV Chokadi 66 66/11 1X10 3 07.05.12 GETCO

1916 Surendranagar Limbdi 66 KV Chuda 66 66/11 1X10+1X15 5 22.08.91 GETCO

1917 Surendranagar Limbdi 66 KV Dhandalpur 66 66/11 2X10 4 21.02.12 GETCO

1918 Surendranagar Limbdi 66 KV Dholera 66 66/11 2X10 3 02.11.10 O/S

1919 Surendranagar Limbdi 66 KV Dholiya 66 66/11 3X10 6 29.05.07 O/S

1920 Surendranagar Limbdi 66 KV Digsar 66 66/11 2X10 4 17.01.07 O/S

1921 Surendranagar Limbdi 66 KV Dudhrej 66 66/11 1X10+2X15 6 07.01.93 GETCO

1922 Surendranagar Limbdi 66 KV Khodu 66 66/111X10+1X15+1X2

08 28.06.92 GETCO

1923 Surendranagar Limbdi 66 KV Kuntalpur 66 66/11 3X10 7 30.07.08 O/S

1924 Surendranagar Limbdi 66 KV Lakhanka 66 66/11 1X10+1X15 4 21.08.09 O/S

1925 Surendranagar Limbdi 66 KV Moti Vavdi 66 66/11 2X10 3 03.03.10 O/S

1926 Surendranagar Limbdi 66 KV Muli 66 66/11 1X10+1X15 4 27.05.99 GETCO

1927 Surendranagar Limbdi 66 KV Panshina 66 66/11 1X10 3 31.03.10 O/S

1928 Surendranagar Limbdi 66 KV Rajpara 66 66/11 1X10 6 11.5.12 GETCO

1929 Surendranagar Limbdi 66 KV Rajsitapur 66 66/11 3X10+1X15 9 16.09.87 GETCO

1930 Surendranagar Limbdi 66 KV Ranpur 66 66/11 2X15 4 22.05.91 GETCO

1931 Surendranagar Limbdi 66 KV Sadla 66 66/11 2X10+1X15 10 03.11.94 GETCO

1932 Surendranagar Limbdi 66 KV Sayla 66 66/11 2X15 5 28.11.84 GETCO

1933 Surendranagar Limbdi 66 KV Sudamda 66 66/11 1X10+1X15 5 20.02.02 GETCO

1934 Surendranagar Limbdi 66 KV Surendranagar 66 66/11 2X15+1X10 8 08.10.74 GETCO

1935 Surendranagar Limbdi 66 KV Tuva 66 66/11 1X10 3 03.07.14 O/s

1936 Surendranagar Limbdi 66 KV Umarda (O/S) 66 66/11 2X10 4 24.10.08 O/S

1937 Surendranagar Limbdi 66 KV Vadhadra 66 66/11 1X10+1X15 3 15.12.11 O/s

1938 Surendranagar Limbdi 66 KV Vastadi (O/S) 66 66/11 2X10 4 02.11.10 O/S

1939 Surendranagar Limbdi 66 KV Wadhwan 66 66/11 2X10 5 22.12.05 GETCO

1940 Surendranagar Limbdi 66 KV Chachaka 66 66/11 2X15 4 19.08.14 O/S

1941 Surendranagar Limbdi 66 KV Chandarava 66 66/11 2X15 4 21.10.14 O/S

1942 Surendranagar Limbdi 66 KV Khandiya 66 66/11 1X10 5 21.4.15 O/S

1943 Surendranagar Limbdi 66 KV Devpara 66 66/11 2X15 4 25.5.15 O/s

1944 Surendranagar Viramgam 220 KV Viramgam 220 220/66 2X100 13 01.01.76 GETCO

1945 Surendranagar Viramgam220 KV Adalsar

(GETCO-O/S)220 220/11 2X50 8 27.03.08 GETCO

1946 Surendranagar Viramgam220 KV Bala S/S

(GETCO-O/S)220 220/11 1X50+1X25 12 24.10.09

Operation-GETCO

Maintenance-Simms

1947 Surendranagar Viramgam220 KV Dhanki

(GETCO-O/S)220 220/11 2X50 8 17.01.04 GETCO

1948 Surendranagar Viramgam 66 KV Chharodi 66 66/11 1X10+2X15 8 06.10.94 GETCO

1949 Surendranagar Viramgam 66 KV Dhama 66 66/11 1X15 15 18.09.12 O/S

1950 Surendranagar Viramgam 66 KV Hansalpur 66 66/11 1X10+1X15 2 12.09.07 O/S

1951 Surendranagar Viramgam 66 KV Jakhwada 66 66/11 2X10 4 06.12.04 GETCO

1952 Surendranagar Viramgam 66 KV Kamalpur 66 66/11 2X10 4 31.03.86 GETCO

1953 Surendranagar Viramgam 66 KV Kanz 66 66/11 2X10 5 14.11.92 GETCO

1954 Surendranagar Viramgam 66 KV Khavad 66 66/11 3X10 5 15.12.83 GETCO

1955 Surendranagar Viramgam 66 KV Lakhtar 66 66/11 1X10+1X15 5 25.03.85 GETCO

1956 Surendranagar Viramgam 66 KV Mandal 66 66/11 2X10 5 25.07.83 GETCO

1957 Surendranagar Viramgam 66 KV Patdi 66 66/11 1X10+1X15 4 31.03.86 GETCO

1958 Surendranagar Viramgam 66 KV Vadgam 66 66/11 2X10 5 27.11.00 GETCO

1959 Surendranagar Viramgam 66 KV Vanod 66 66/11 2X10 4 28.07.00 GETCO

1960 Surendranagar Viramgam66 KV Vendar Park

( Neno) 66 66/11 3X15 6 06.07.09 O/S

1961 Surendranagar Viramgam 66 KV Viramgam 66 66/11 3X15 5 25.07.76 GETCO

1962 Surendranagar Viramgam 66KV Bol 66 66/11 2X15 4 20.06.2013 O/S

1963 Surendranagar Viramgam 66KV Sanand - 2 66 66/11 2X15 3 24.06.2013 O/S

1964 Surendranagar Viramgam 66 KV Bol - 2 66 66/11 2X15 4 25.8.15 O/S

1965 Surendranagar Viramgam 66 KV Thori Mubarak 66 66/11 2X15 5 9.5.15 O/S

1966 Surendranagar Viramgam 66 KV Vithalpaur 66 66/11 2X15 5 21.7.15 O/S

1967 Surendranagar Viramgam220 KV

Dhanki(GWIL)220 220/66 2X50 5 1.4.15

Operation-GETCO

Maintenance-Hitech

Limbdi 132 KV Dhandhuka

Page 115

Page 83: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Sr. No. Name of CircleName of

DivisionName of Substation

Volatage

Level (KV)Ratio in KV

Number of

Transformers/Rea

ctors/SVC etc.

with capacity

No. of

BaysCOD

Operated/

Maintained by

GETCO/o/s

1968 400/220 KV2X 500 MVA =

1000 MVA

400KV -

17 bays

(13 Nos -

GETCO

& 4 Nos.

PGCIL )

1969 Bus Reactor

1 X 50MVAR =

50 +

1X125MVAR =

175 MVAR

220KV -

13 bays

1970Line

Reactor

1 X 50 =

50MVAR

66KV - 1

( Stn.

X'mer )

GETCOS. Nagar Limbdi 400KV Chorania 400 18.10.1994

Page 116

Page 84: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Normative Parameters considered for tariff calculations

Name of theTransmission Licensee :

Name of the Transmission System:

Name of Region: Gujarat

Particulars Unit 2014-15

(Actual)

1 2 3

Target Availability %

400Kv 98.98%

220Kv 99.36%

132KV 99.45%

66KV 99.79%

S/S 99.86%

Normative O&M per ckt.km Rs. lacs 6.81

Normative O&M per bay Rs. lacs 0.58

Spares for WC as % of O&M % 1% of cost escalated @

6%

Recievables in Months for WC months 1 Month of total

transmission charges

Rate of Return on Equity (%) % 14%

** actuals are lower than Commission's norms

Petitioner

FORM-3

Gujarat Energy Transmission Corporation Limited

Page 117

Page 85: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Name of the Transmission Licensee Gujarat Energy Transmission Corporation Limited

Name of the Transmission System: ____________________________________

Name of Region Gujarat

Exchange Rate at COD ____________________________________

Exchange Rate as on 31.03.2004 ____________________________________

(Amount in Crs)

Financial Year (Starting from COD)

1 2 3 4 5 6 7 8 9 10 11 12 13

Date Amount

(Foreign

Currency)

Exchange

Rate

Amount

(Rs.)

Date Amount

(Foreign

Currency)

Exchange

Rate

Amount

(Rs.)

Date Amount

(Foreign

Currency)

Exchange

Rate

Amount

(Rs.)

Currency11

At the date of Drawl2

Scheduled repayment date of principal

Scheduled payment date of interest

At the end of Financial year

Currency21

At the date of Drawl2

Scheduled repayment date of principal

Scheduled payment date of interest

At the end of Financial year

Currency31 & so on

At the date of Drawl2

Scheduled repayment date of principal

Scheduled payment date of interest

At the end of Financial year

1 Name of the currency to be mentioned e.g. US $, DM, etc. etc.2 In case of more than one drawl during the year, Exchange rate at the date of each drawl to be given.

* NOTE : GETCO has not taken any foreign currency loans for any of its ongoing projects

Petitioner

Not Applicable*

FORM- 4

Details of Foreign loans

(Details only in respect of loans applicable to the project under petition)

Year 1 Year 2 Year 3 and so on

Page 118

Page 86: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Form 5

Name of the Transmission Licensee :

Name of the Transmission System:

Name of Region: Gujarat

Capital as admitted by GERC

Capital cost admitted as on ___________

(Give reference of the GERC relevant Order with Petition No. & Date)

Foreign Component, if any (In Million US $ or the relevant Currency):

Domestic Component (Rs. Cr.):

Foreign Exchange rate considered for the admitted cost:

Total Project cost admitted (Rs. Cr):

* Note : Details of admitted capital cost for the lines/ substatons are not available.

Petitioner

Abstract of Admitted Capital Cost for the existing Projects

Gujarat Energy Transmission Corporation Limited

Not Applicable*

Page 119

Page 87: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

FORM-5A

Name of the Transmission Licensee : Gujarat Energy Transmission Corporation Limited

Name of the Transmission System:

Name of Region: Gujarat

Capital Cost Estimates

Board of Director/ Agency approving the Capital cost

estimates:

Date of approval of the Capital cost estimates:

Price level of approved estimates

Foreign Exchange rate considered for the Capital cost

estimates

Capital Cost excluding IDC & FC

Foreign Component, if any (In Million US $ or the

relevant Currency)

Domestic Component (Rs. Cr.)

Capital cost excluding IDC & FC (Rs. Cr)

IDC & FC

Foreign Component, if any (In Million US $ or the

relevant Currency)

Domestic Component (Rs. Cr.)

Total IDC & FC (Rs.Cr.)

Rate of taxes & duties considered

Capital cost Including IDC & FC

Foreign Component, if any (In Million US $ or the

relevant Currency)

Domestic Component (Rs. Cr.)

Total Capital cost Including IDC & FC (Rs. Cr)

Schedule of Commissioning

(Scheduled DOCO elementwise)

Note:

1. Copy of approval letter should be enclosed.

2. Details of Capital cost are to be furnished as per FORM-5B or 5C as applicable.

3. Details of IDC & Financing Charges are to be furnished as per FORM-16.

PETITIONER

Not Applicable

Abstract of Capital Cost Estimates and Schedule of Commissioning for the New projects

Present Day Cost Completed Cost

As of End of ______Qtr. Of the year _________ As on Scheduled COD of the System

Page 120

Page 88: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Form 5B

Name of theTransmission Licensee : Gujarat Energy Transmission Corporation Limited

Name of the Transmission System:

Name of Region: Gujarat

As per original

Estimates

As on COD

1 2 3 4 5 6 7

A TRANSMISSION LINE

1.0 Preliminary works

1.1 Design & Engineering

1.2 Priliminary investigation,Right of way, forest clearance,

PTCC , general civil works etc.

1.3 Total Preliminary works

2.0 Transmission Lines material

2.1 Towers Steel

2.2 Conductor

2.3 Earth Wire

2.4 Insulators

2.5 Hardware Fittings

2.6 Conductor & Earthwire accessories

Total Transmission Lines material

2.8 Spares

2.9 Erection, Stringing & Civil works including foundation

3.0 Taxes and Duties

3.1 Custom Duty

3.2 Other Taxes & Duties

Total Taxes & Duties

Total -Transmission lines

B. SUBSTATIONS

4.0 Preliminary works & land

4.1 Design & Engineering

4.2 Land

4.3 Site preparation

Total Preliminary works & land

5.0 Civil Works

5.1 Control Room & Office Building including HVAC

5.2 Township & Colony

5.3 Roads and Drainage

5.4 Foundation for structures

5.5 Misc. civil works

Total Civil Works

6.0 Substation Equipments

6.1 Switchgear (CT,PT, Circuit Breaker, Isolator etc)

6.2 Transformers

6.3 Compensating Equipment( Reactor, SVCs etc)

6.4 Control , Relay & Protection Panel

6.5 PLCC

6.6 HVDC package

6.7 Bus Bars/ conductors/Insulators

6.8 Outdoor lighting

6.9 Emergency D.G. Set

6.10 Grounding System

6.11 Structure for switchyard

Total Substation Equipments

7.00 Spares

8.0 Taxes and Duties

8.1 Custom Duty

8.2 Other Taxes & Duties

8.3 Total Taxes & Duties

Total (Sub-station)

9.0 Construction and pre-commissioning expenses

9.1 Site supervision & site admn.etc.

9.2 Tools and Plants

9.3 construction Insurance

Total Construction and pre commissioning expenses

10.0 Overheads

10.1 Establishment

10.2 Audit & Accounts

10.3 Contingency

Total Overheads

11.0 Project cost without IDC & FC

12.0 IDC & FC

13.0 Project cost including IDC & FC

Petitioner

Not Applicable*

* Note : Details o Project specific breakup of expenses is not available. Company has not availed any foreign currency loans.

Break-up of Project Cost for Transmission System

Sl.No. Break Down Cost in Rs. Crores Variation Reasons for

Variation

Admitted Cost

Page 121

Page 89: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Form 5C

Name of theTransmission Licensee : Gujarat Energy Transmission Corporation Limited

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

S.No. Name/No. of

Construction/supp

ly/service package

Scope of works1

(in line with head

of cost break-ups

as applicable)

Whether awarded

through ICB/DCB/

Depatmentally/

Deposit Work etc

& No. of bids

received

No. of bids

received

Date of Award Date of

Start of

work

Date of

Comple-tion of

Work

Value of Award2

in (Rs. Cr.)

Firm or With

Escalation in

prices

Actual expenditure till the

completion or up to COD

whichever is earlier

* Note - Deails of breakup of constructin /supply / service packages are not available.

Petitioner

Break-up of Construction/Supply/Sevice packages

Not applicable*

1 The scope of work in any package should be indicated in conformity of cost break-up in form-5B to the extent possible. 2 If there is any package, which need to be shown in Indian Rupee and foreign currency(ies), the same should be shown separatly alongwith the currency, the exchange rate and the date

e.g. Rs.80 Cr+US$50m=Rs.280Cr at US$=Rs40 as on say 4.1.1999.

Page 122

Page 90: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Form 5D

Name of theTransmission Licensee : Gujarat Energy Transmission

Corporation Ltd.

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

S.NO. Name of line Apportioned approved Cost (Rs. Crs) Completed Cost (Rs. Crs)

1

2

3

4

-

-

-

Substations

S.NO. Name of Substation Apportioned approved Cost (Rs. Crs) Completed Cost (Rs. Crs)

1

2

3

4

-

-

Petitioner

DETAILS OF ELEMENTWISE COST

Details of the Items have been enclosed in the Petition

Details of the Items have been enclosed in the Petition

Page 123

Page 91: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

FORM- 6

Name of theTransmission Licensee :

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

Project Cost as on COD1_________________________________

Date of Commercial Operation of the Transmission element2_________________________________

(Amount in Crs)

1 2 3 4 5 6 7

Loan-I

Loan-II

Loan-III

and so on

Equity-

Foreign

Domestic

Total Equity

Debt : Equity Ratio

2 Date of Commercial Operation means Commercial Operation of the transmission element3 For example : US $, 200M etc.etc

Petitioner

Not available / applicable*

Not available / applicable.*

1 Say US $ 200m + Rs.400 Cr or Rs.1200 Cr including US $200m at an exchange rate of 1US $=Rs.40/-

* Note: The company is still in proceess of finalising the details of the sources of finance for the cpaital expenditure

Financial Package upto COD

Gujarat Energy Transmission Corporation Limited

Financial Package as Approved Financial Package as on COD As Admitted on COD

Currency and Amount3 Currency and Amount3 Currency and Amount3

Page 124

Page 92: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

FORM- 7

Name of theTransmission Licensee : Gujarat Energy Transmission Corporation Ltd.

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

(Amount in Crs)

Particulars Package1 Package2 Package3 Package4 Package5 Package6

1 2 3 4 5 6 7

Source of Loan1

Currency2

Amount of Loan sanctioned

Amount of Gross Loan drawn upto

31.03.2004/COD 3,4,5,13,15

Interest Type6

Fixed Interest Rate, if applicable

Base Rate, if Floating Interest7

Margin, if Floating Interest8Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No

Are there any Caps/Floor9

If above is yes,specify caps/floor

Moratorium Period10

Moratorium effective from

Repayment Period11

Repayment effective from

Repayment Frequency12

Repayment Instalment13,14

Base Exchange Rate16

* Note : Details of project specific allocation of loans is not available.

Petitioner

16 Base exchange rate means the exchange rate prevailing as on 31.03.2004 for existing assets and as on COD for the remaining assets.

10 Moratorium period refers to the period during which loan servicing liability is not required.11 Repayment period means the repayment of loan such as 7 years, 10 years, 25 years etc.

12 Repayment frequency means the interval at which the debt servicing is to be done such as monthly, quarterly, half yearly, annual, etc.

13 Where there is more than one drawal/repayment for a loan, the date & amount of each drawal/repayement may also be given seperately14 If the repayment instalment amount and repayment date can not be worked out from the data furnished above, the repayment schedule

to be furnished seperately.15 In case of Foreign loan,date of each drawal & repayment alongwith exchange rate at that date may be given.

9 At times caps/floor are put at which the floating rates are frozen. If such a condition exists, specify the limits.

Details of Project Specific Loans

Not Available*

1 Source of loan means the agency from whom the loan has been taken such as WB, ADB, WMB, PNB, SBI, ICICI, IFC, PFC etc.2 Currency refers to currency of loan such as US$, DM, Yen,Indian Rupee etc.3 Details are to be submitted as on 31.03.2004 for existing assets and as on COD for the remaining assets.4 Where the loan has been refinanced, details in the Form is to be given for the loan refinaced. However, the details of the original loan is to

be given seperately in the same form.5 If the Tariff in the petition is claimed seperately for various transmission elements, details in the Form is to be given seperately for all the

transmission elements in the same form.6 Interest type means whether the interest is fixed or floating.

7 Base rate means the base as PLR, LIBOR etc. over which the margin is to be added. Applicable base rate on different dates from the date of

drawl may also be enclosed.8 Margin means the points over and above the floating rate.

Page 125

Page 93: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Name of theTransmission Licensee : Gujarat Energy Transmission Corporation Limited

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

(Amount in Crs)

Particulars Package1 Package2 Package3 Package4 Package5 Remarks

1 2 3 4 5 6 7

Source of Loan1

Currency2

Amount of Loan sanctioned

Amount of Gross Loan drawn upto 31.03.2004/COD 3,4,5,13,15

Interest Type6

Fixed Interest Rate, if applicable

Base Rate, if Floating Interest7

Margin, if Floating Interest8

Are there any Caps/Floor9Yes/No Yes/No Yes/No Yes/No Yes/No

If above is yes,specify caps/floor

Moratorium Period10

Moratorium effective from

Repayment Period11

Repayment effective from

Repayment Frequency12

Repayment Instalment13,14

Base Exchange Rate16

Eastern Region

Transmission element 1

Transmission element 2 and so on

Total

Western Region

Transmission element 1

Transmission element 2 and so on

Total

Northern Region

Transmission element 1

Transmission element 2 and so on

Total

Southern Region

Transmission element 1

Transmission element 2 and so on

Total

North-Eastern Region

Transmission element 1

Transmission element 2 and so on

Total

RLDC

Total

Petitioner

8 Margin means the points over and above the floating rate.

9 At times caps/floor are put at which the floating rates are frozen. If such a condition exists, specify the limits.10

Moratorium period refers to the period during which loan servicing liability is not required.11 Repayment period means the repayment of loan such as 7 years, 10 years, 25 years etc.12 Repayment frequency means the interval at which the debt servicing is to be done such as monthly, quarterly, half yearly, annual, etc.

13 Where there is more than one drawal/repayment for a loan, the date & amount of each drawal/repayement and its allocation may also be given seperately

14 If the repayment instalment amount and repayment date can not be worked out from the data furnished above, the repayment schedule to be furnished seperately.

15 In case of Foreign loan,date of each drawal & repayment alongwith exchange rate at that date may be given.16 Base exchange rate means the exchange rate prevailing as on 31.03.2004 for existing assets and as on COD for the remaining assets.

7 Base rate means the base as PLR, LIBOR etc. over which the margin is to be added. Applicable base rate on different dates from the date of drawl may also be enclosed.

FORM- 8

Details of Allocation of corporate loans to various transmission elements

Note : Details of Project Specific allocation of loans is not available.

Distribution of loan packages to various transmission elements

1 Source of loan means the agency from whom the loan has been taken such as WB, ADB, WMB, PNB, SBI, ICICI, IFC, PFC etc.2 Currency refers to currency of loan such as US$, DM, Yen,Indian Rupee etc.3 Details are to be submitted as on 31.03.2004 for existing assets and as on COD for the remaining assets.

4 Where the loan has been refinanced, details in the Form is to be given for the loan refinaced. However, the details of the original loan is to be given seperately in the same form.

5 If the Tariff in the petition is claimed seperately for various transmission elements, details in the Form is to be given seperately for all the transmission elements in the same form.6 Interest type means whether the interest is fixed or floating.

Page 126

Page 94: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Statement of Additional Capitalisation after COD

Name of theTransmission Licensee : Gujarat Energy Transmission Corporation Ltd.

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

COD _________________________________

Sl.No. Year Work/Equipment added

after COD up to Cut off

Date / Beyond Cut off

Date

Amount Capitalised /

Proposed to be

capitalised

Justification Admitted CostI

(1) (2) (3) (4) (5) (6)

Total

Note:

Petitioner

Note: The detailed list of the expenditure incurred on repair and maintenance and on spares has been enclosed in the

ARR petition.

FORM-9

Not applicable*

1 In case the project has been completed and any tariff notification(s) has already been issued in the past by GOI, fill column

6 giving the cost as admitted for the purpose of tariff notification already issued by (Name of the authority) (Enclose copy of

the tariff Order)

1 Fill the form in chronological order year wise along with detailed justification clearly bring out the necessity and the

2 In case initial spares are purchased alongwith any equipment, then the cost of such spares should be indicated separately.

Page 127

Page 95: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

FORM-10

Name of theTransmission Licensee : Gujarat Energy Transmission Corporation Limited

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

Date of Commercial Operation ____________

(Amount in Crs)

Financial Year (Starting from

COD)

Year1 Year2 Year3 Year4 Year 5 &

So on

Year1 Year2 Year3 Year4 Year 5 &

So on

1 2 3 4 5 6 7 8 9 10 11

Amount capitalised in

Work/Equipment

Financing Details

Loan-1

Loan-2

Loan-3 and so on

Total Loan2

Equity

Internal Resources

Others

Total

1 Year 1 refers to Financial Year of COD and Year 2, Year 3 etc. are the subsequent financial years respectively.

Petitioner

* Note - The company is still in the process of finalising the details of sources of finance for the capital expenditure.

Financing of Additional Capitalisation

Actual Admitted

Not Applicable*

2 Loan details for meeting the additional capitalisation requirement should be given as per FORM-7 or 8 whichever is relevent.

Page 128

Page 96: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

FORM- 11

Name of theTransmission Licensee :

Name of the Transmission System: __________________________________

Name of Region: Gujarat

(Amount in Crs)

Financial Year

2014-15

(Actual)

1 2

Depreciation on Capital Cost (Opening)

Amount of Capital Cost (Opening) 12857.62

Depreciation Amount 3498.80

Depreciation on Additional Capitalisation

Amount of Additional Capitalisation 2662.95

Depreciation Amount 601.09

Detail of FERV

Amount of FERV on which depreciation charged

Depreciation amount

Depreciation recovered during the Year 601.09

Advance against Depreciation recovered during the Year -

Depreciation on the Assets acquired out of Govt. Grants / Consumer

Contributions not claimed

-

Depreciation & Advance against Depreciation recovered during the

year

601.09

Petitioner

Statement of Depreciation

Gujarat Energy Transmission Corporation Ltd.

Not applicalbe as no foreign

currency loans have been

availed

Page 129

Page 97: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

FORM- 12

Name of theTransmission Licensee : Gujarat Energy Transmission Company Limited

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

(Amount in Crs)

Sl.

no.Name of the Assets1

Gross Block as on

31.03.2011

Depreciation Rates as

per CERC's

Depreciation Rate

Schedule

Depreciation Amount

for 2010-11*

12 3 4= Col.2 X Col.3

1 Land and Land Rights

2 Building

3 Hydraulic works

4 Other Civil Work

5 Plant & Machinery

6 Lines & Cable Networks Not Applicable

7 Vehicles

8 Furniture & Fixture

9 Office Equipments

10 Others

TOTAL

Weighted Average Depreciation Rate (%)

*Capital Additions during the year have been considered

Petitioner

Calculation of Depreciation Rate

1 Name of the Assets should conform to the description of the assets mentioned in Depreciation Schedule appended to the Notifcation.

Page 130

Page 98: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

FORM- 13

Name of theTransmission Licensee :

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

(Amount in Crs)

Sl.

no.Particulars

2014-15

(Actual)

1 2 3

Loan-1

Gross loan - Opening

Cumulative repayments of Loans upto previous year

Net loan - Opening 3405.39

Add: Drawal(s) during the Year 1791.89

Less: Repayment (s) of Loans during the year 395.02

Net loan - Closing 4802.26

Average Net Loan 4103.83

Rate of Interest on Loan 10.48%

Interest on loan 430.08

Guarantee and Other Finance Charges 10.23

Total Interest on Loan & Financing charges 440.31

Loan-2 and so on

Gross loan - Opening

Cumulative repayments of Loans upto previous year

Net loan - Opening

Add: Drawal(s) during the Year

Less: Repayment (s) of Loans during the year

Net loan - Closing

Average Net Loan

Rate of Interest on Loan

Interest on loan

Total Loan

Gross loan - Opening

Cumulative repayments of Loans upto previous year

Net loan - Opening

Add: Drawal(s) during the Year

Less: Repayment (s) of Loans during the year

Net loan - Closing

Average Net Loan

Interest on loan

Weighted average Rate of Interest on Loans

Petitioner

Calculation of Weighted Average Rate of Interest on Actual Loans1

Gujarat Energy Transmission Corporation Limited

1 In case of Foreign Loans, the calculations in Indian Rupees is to be furnished. However,

the calculations in Orginal currency is also to be furnished seperately in the same form.

Page 131

Page 99: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

Calculation of Advance Against Depreciation (AAD)

Name of theTransmission Licensee :

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

(Amount in Crs)

Particulars2014-15

(Actual)

1 2

1/10th of the Loan(s)

Repayment of the Loan(s) as considered for working out Interest on Loan

Minimum of the Above

Less:Depreciation during the year

(A1)

Cumulative Repayment of the Loan(s) as considered for working out

Interest on Loan Not available

Less: Cumulative Depreciation

(B1)

Advance Against Depreciation (Minimum of A & B) 0

1 If the amount is negative, it will be shown as zero.

Petitioner

FORM- 14

Gujarat Energy Transmission Corporation Limited

Page 132

Page 100: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

FORM- 15

Name of theTransmission Licensee :

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

(Amount in Crs)

Sl.

No.Particulars

2014-15

(Actual)

1 2 3

1 O & M expenses 84.84

2 Maintenance Spares 196.46

3 Recievables 196.73

Total Working Capital 478.03

Rate of Interest 14.75%

Interest on Working Capital 70.51

Petitioner

Calculation of Interest on Working Capital

Gujarat Energy Transmission Corporation Ltd.

Page 133

Page 101: Appendix-C TARIFF FILING FORMS (TRANSMISSION) · 2019. 10. 10. · 59 220 kv Sankhari-Jangaral line no.1 Mehsana D/C 220 KV 32.29 08/09/2012 60 220 kv Sankhari-Jangaral line no.2

FORM-16

Name of theTransmission Licensee : Gujarat Energy Transmission Corporation Ltd.

Name of the Transmission System: ____________________________________

Name of Region: Gujarat

(Amount in Lacs)

Draw Down

Particulars Quantum in

Foreign

currency

Exchange Rate

on draw down

date

Amount in

Indian Rupee

Quantum in

Foreign

currency

Exchange Rate on

draw down date

Amount in

Indian

Rupee

Quantum in

Foreign

currency

Exchange Rate

on draw down

date

Amount in

Indian Rupee

1 Loans

1.1 Foreign Loans

1.1.1 Foreign Loan 1

Draw down Amount

IDC

Financing charges

1.1.2 Foreign Loan 2

Draw down Amount

IDC

Financing charges

1.1.3 Foreign Loan 3

Draw down Amount

IDC

Financing charges

1.1.4 - -

- -

- -

1.1 Total Foreign Loans

Draw down Amount

IDC

Financing charges

1.2 Indian Loans

1.2.1 Indian Loan 1

Draw down Amount -- -- -- -- -- --

IDC -- -- -- -- -- --

Financing charges -- -- -- -- -- --

1.2.2 Indian Loan 2

Draw down Amount -- -- -- -- -- --

IDC -- -- -- -- -- --

Financing charges -- -- -- -- -- --

1.2.3 - - -- -- -- -- -- --

- - -- -- -- -- -- --

- - -- -- -- -- -- --

1.2 Total Indian Loans

Draw down Amount -- -- -- -- -- --

IDC -- -- -- -- -- --

Financing charges -- -- -- -- -- --

1 Total of Loans drawn

IDC

Financing charges

2 Equity

2.1 Foreign equity drawn

2.2 Indian equity drawn -- -- -- -- -- --

Total equity deployed

Petitioner

Not Applicable

Note: Drawal of debt and equity shall be on paripassu basis to meet the commissioning schedule. Drawal of higher equity in the beginning is permissible.

Draw Down Schedule for Calculation of IDC & Financing Charges

Sl.

No.

Quarter 1 Quarter 2 Quarter n (COD)

Page 134