appendix d: noise emission information and data specifications
TRANSCRIPT
37
Appendix D: Noise Emission Information and Data Specifications
D 1: Point of Emission Noise Data
Emission Point Noise
Point #
Point Name
Stack height Above Grade
Stack height Above Roof
dBA Duration Comment Units / comments
Boiler/ Turbine
Plant
29 Bag House Outside N/A Minimal
PELLET PLANT
38
Pellet Plant – Dust Pick-ups and
Screen Fines - Bag House
Vent
46'-0" N/A 85
dBA (Lp) when standing near it.
Loud fan, typically things are kept
under 85 dBA for safety
39
Pellet Plant – Pellet Cooler
- Cyclone Vent
46'-0" N/A 85
dBA (Lp) when standing near it.
Loud fan, typically things are kept
under 85 dBA for safety
40
Pellet Plant – Fine
Hammer Mill - Bag House
Vent
46'-0" N/A 85
dBA (Lp) when standing near it.
Loud fan, typically things are kept
under 85 dBA for safety
42 Pellet Plant –
Building Noise 75
dBA (Lp) outside wall estimate (100 inside -25 dBA for
wall) estimate Only'
OTHER SITE BUILDINGS
53 Pellet
Storage Silo Vent
23'-8" 3'-0" 65
SITE 57 Dry Chip
Storage Silo 78'-2" 3'-0" 65 When filling
dBA (Lp) when standing near it
38
Vent
58 Chip Dryer 23'-0" N/A 85 Continuous
85 from fans, dryer 75. By vendor indication of
typical.
dBA(P) 1 m away
59 Cooling Tower 22'-0" N/A =<85 Continuo
us By sample cut
sheets LdBA(P) 5 ft
away
60 Truck Dumper N/A N/A 95 Intermitte
nt
Mainly loud metal on metal bumping
noise, HPU when in use.
65
Mobile Equipment -
Forklift - Pellet
Shipping Forklift
105 Continuous
66
Mobile Equipment –
Log Carry-Lift
105 Continuous Lw
67
Mobile Equipment –
Front End Loader – Biomass
Receiving
105 Continuous Lw
68
Mobile Equipment –
Front End Loader –
Chip Reclaim
105 Continuous Lw
69
Mobile Equipment –
Front End Loader –
Biomass Fuel Reclaim
105 Continuous Lw
70
Biomass Fuel Screen and
Hog, debarking
ect Building
75 Continuous
71
Imported Biomass Transfer
Conveyor 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dBA (Lp) when
standing near it
39
dryer or in a car on the highway.
72 Log Infeed 95 Intermittent
Dropping logs onto conveyors
73 Raw Fuel Infeed 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
74 Chip Screen Overs 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
75 Fuel Transfer conveyor 1 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
76 Fuel Transfer conveyor to
stacker 60-70 Continuous
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
77 Fuel Stacker N/A N/A 60-70 Continuous
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
78 Fuel Reclaim N/A N/A 60-70 Continuous
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
79 Fuel Re-
claim Transfer 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
40
80 Fuel Transfer 2 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
81 Disc Screen N/A N/A 60-70 Continuous
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
82
12 hr Enclosed
Fuel Storage w/reclaim
N/A N/A 60-70 Continuous
HPU/Squeaky bearing ect. By
experience similar to being besides a cloths dryer or in a car on the highway.
dBA (Lp) when
standing near it
83 Fuel Transfer Conveyor 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
84 Fuel Infeed Conveyor 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
85 Chip
Transfer Conveyor 1 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
86 Chip
Transfer Conveyor 2 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
87 Chip
Transfer Conveyor 3 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on
dBA (Lp) when
standing near it
41
the highway.
88 Chip Stacker Aspen N/A N/A 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
89 Chip Stacker Birch N/A N/A 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
90 Chip Reclaim Aspen N/A N/A 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
91 Chip Reclaim Birch N/A N/A 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
92 Reclaim Conveyor 1 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
93 Reclaim Conveyor 2 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
94 Reclaim Conveyor 3 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
95 Dried Chip
Storage Feed Conveyors 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being
dBA (Lp) when
standing
42
besides a cloths dryer or in a car on
the highway.
near it
96
Dried Chip Storage
Discharge Conveyors
60-70 Continuous
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
97 Baghouse
Fines Conveyors 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
98 Dried Pellet
Storage Feed Conveyors 60-70 Continuo
us
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
99
Dried Pellet Storage
Discharge Conveyors
60-70 Continuous
Squeaky bearing ect. By experience
similar to being besides a cloths
dryer or in a car on the highway.
dBA (Lp) when
standing near it
D 2: Point of Emission Noise Data – Additional Information
Note /
comment Boiler / Turbine
Building
Equipment Manufacturer Model /
Size Noise Level units @ X ft
Turbine Generator Arani 90 dBA 3 Boiler Hurst 90 dBA 3
Induced Draft Fan Twin City Fan & Blower
RBO/R /937 110 dBA 3
Under Fire Air Fan Twin City Fan & Blower RBA / 919 99 dBA 3
Over Fire Air Fan Twin City Fan & Blower RBA / 923 101 dBA 3
43
Flue Gas Recirculation Fan
Twin City Fan & Blower TBD est 95 dBA 3
Stand by Generator Cummins 500 kWe 88 dBA 3 76 dBA is available
Pellet Building
Equipment Manufacturer Model Noise Level units @ X ft
Hammer Mill California Pellet Mills HM-54-48 110 dBA 3
Pellet Mill California Pellet Mills 7932-5 85 dBA 3
Biomass Preparation
Building
Equipment Manufacturer Model Noise Level units @ X ft
Debarker, pocket Rotary type Deal SD
RD2L320 87 dBA 3
Horizontal feed Slant Disc Chipper Acrowood 8425 >110, <90 dBA 3
Biomass Fuel Screen, Heavy-Duty Design Disc
Screen
West Salem Machinery
30-6 Heavy-Duty
90 dBA 3
Biomass Fuel Hog, Swing Hammer type
West Salem Machinery 4032B 105 dBA 3
Garage
Equipment Manufacturer Model Noise Level units @ X ft
Maint Operations, Air Impact Gun >90 dBA 3
Heavy Equipment, running during testing = Machine
noise level dBA 3
Fire Pump Building
Equipment Manufacturer Model Noise Level units @ X ft
Fire Pump (main Pump) Armstrong TBD 85 dBA 3
Fire Pump (Diesel Armstrong / Engine - 97.2 dBA 3 beside
44
standby Pump) Cummins CFP9E-F50 - 1760
rpm, 350 hp.
engine
119.6 dBA 3
at exhaust (lower
dBA may be
available)
45
D 3: Standby Generator Set Manufacturer Specifications
46
D 4: Over Fire Fan Manufacturer Specifications
47
D 5: Induced Draft Fan Manufacturer Specifications
48
D 6: Under Fire Fan Manufacturer Specifications
49
D 7: Fire Pump Diesel Engine Manufacturer Specifications
50
D 8: Transport Truck Noise Measurement Data and Sound Power Calculation
Frequency Lzeq (dB) A-weighting Correction (dBA) LAeq (dBA) Sound Power (dBA)
12.5 Hz 72.6 -63.4 9.2 43.2 16 Hz 73.1 -63.4 9.7 43.7 20 Hz 73.7 -50.5 23.2 57.2 25 Hz 68.9 -44.7 24.2 58.2
31.5 Hz 66.9 -39.4 27.5 61.5 40 Hz 68.3 -34.6 33.7 67.7 50 Hz 67.4 -30.2 37.2 71.2 63 Hz 72.7 -26.2 46.5 80.5 80 Hz 65.7 -22.5 43.2 77.2
100 Hz 63.6 -19.1 44.5 78.5 125 Hz 63.2 -16.1 47.1 81.1 160 Hz 57.2 -13.4 43.8 77.8 200 Hz 57.7 -10.9 46.8 80.8 250 Hz 57.6 -8.6 49 83.0 315 Hz 53.9 -6.6 47.3 81.3 400 Hz 53.7 -4.8 48.9 82.9 500 Hz 57.9 -3.2 54.7 88.7 630 Hz 56.1 -1.9 54.2 88.2 800 Hz 57 -0.8 56.2 90.2 1 kHz 57.8 0 57.8 91.8
1.25 kHz 58.2 0.6 58.8 92.8 1.6 kHz 57.2 1 58.2 92.2 2 kHz 56.3 1.2 57.5 91.5
2.5 kHz 53.2 1.3 54.5 88.5 3.15 kHz 51 1.2 52.2 86.2
4 kHz 47.5 1 48.5 82.5 5 kHz 45.3 0.5 45.8 79.8
6.3 kHz 43.7 -0.1 43.6 77.6 8 kHz 41.8 -1.1 40.7 74.7
10 kHz 38.6 -2.5 36.1 70.1 12.5 kHz 35 -4.3 30.7 64.7 16 kHz 29.9 -6.6 23.3 57.3
51
D 9: List of Insignificant Sources
Emission Point Point # Point Name
BOILER/TURBINE PLANT
1 Boiler Blow Down 2 RO system Blow Down 3 Filter Back Wash 4 Soft Regen 5 Washup and Floor Drains 6 Ash transfer shed washup 7 Boiler Building Washrooms/showers 8 Boiler Flue Gas Stack 9 Boiler Blow Down Vent
10 Gland Steam Vent 11 Boiler De-Aerator Vent 24 Pellet Boiler Flue Gas Outlet 25 Turbine Lube System Vent 26 Turbine Surface Condenser Air Ejector Vent 27 Boiler Bathroom Exhaust Fan Outlet
PELLET PLANT
34 Pellet Plant Washup and Floor Drains 35 Pellet Plant Washroom, Showers and Locker room 36 Office HVAC 37 Pellet Mill Lab Exhaust Fan 41 Pellet Plant – Ripening Bin – Vent 43 Mechanical Shop Exhaust Fan 44 Electrical Shop Exhaust Fan 45 Control Room Exhaust Fan
OTHER SITE BUILDINGS
49 Garage Washup and Floor Drains 50 Garage Bathroom
SITE
56 Biomass Boiler Ash 61 Biomass Pile-Birch 62 Biomass Pile-Aspen 63 Biomass Pile-Fuel 64 Contaminated Biomass
Note 1 Boiler Flue Gas Stack is 46 in diameter tapering to 40" in last 12" Note 2 70** = 70°F min. to Ambient
52
Appendix E: Predictor Input Data
Regular Operations Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Line sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Desc. ISO H ISO Terr. HDef. InputLw Cb(D) Cb(E) Cb(N) 85 Chip Transfer Conveyor 2.00 0.00 Relative False 0.00 0.00 0.00 75 Fuel Transfer Conveyor 1 2.00 0.00 Relative False 0.00 0.00 0.00 79 Fuel Re-claim Transfer 2.00 0.00 Relative False 0.00 0.00 0.00 91 Chip Re-claim-Aspen/Birch 2.00 0.00 Relative False 0.00 0.00 0.00 94 Reclaim Conveyor 3 2.00 0.00 Relative False 0.00 0.00 0.00 73 Raw Fuel Infeed 2.00 0.00 Relative False 0.00 0.00 0.00 78 Fuel Re-claim 2.00 0.00 Relative False 0.00 0.00 0.00 80 Fuel Transfer 2 2.00 0.00 Relative False 0.00 0.00 0.00 83 Fuel Transfer Conveyor 2.00 0.00 Relative False 0.00 0.00 0.00 84 Fuel Infeed Conveyor 2.00 0.00 Relative False 0.00 0.00 0.00 93 Reclaim Conveyor 2 2.00 0.00 Relative False 0.00 0.00 0.00 95 Dried Chip Storage Feed Conveyors 2.00 0.00 Relative False 0.00 0.00 0.00 96 Dried Chip Storage Discharge Conveyors 2.00 0.00 Relative False 0.00 0.00 0.00 97 Baghouse Fines Conveyors 2.00 0.00 Relative False 0.00 0.00 0.00 98 Dried Pellet Storage Feed Conveyors 2.00 0.00 Relative False 0.00 0.00 0.00 99 Dried Pellet Storage Discharge Conveyors 2.00 0.00 Relative False 0.00 0.00 0.00 76 Fuel Transfer Conveyor to Stacker 1.00 0.00 Relative False 0.00 0.00 0.00 77 Fuel Stacker 2.00 0.00 Relative False 0.00 0.00 0.00 87 Chip Transfer Conv3 1.00 0.00 Relative False 0.00 0.00 0.00 89 Chip Stacker-Aspen/Birch 2.00 0.00 Relative False 0.00 0.00 0.00 92 Reclaim Conveyor 1 2.00 0.00 Relative False 0.00 0.00 0.00 86 Chip Transfer Conveyor 2 2.00 0.00 Relative False 0.00 0.00 0.00 71 Imported Biomass Transfer Conveyor 2.00 0.00 Relative False 0.00 0.00 0.00 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Line sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Max.dist. No refl. No building No ind.site LwM 1 LwM 2 LwM 3 LwM 4 LwM 5 LwM 6 LwM 7 LwM 8 LwM 9 85 25.00 No No No -- -- -- -- -- -- -- -- -- 75 25.00 No No No -- -- -- -- -- -- -- -- -- 79 100.00 No No No -- -- -- -- -- -- -- -- -- 91 100.00 No No No -- -- -- -- -- -- -- -- -- 94 25.00 No No No -- -- -- -- -- -- -- -- -- 73 25.00 No No No -- -- -- -- -- -- -- -- -- 78 100.00 No No No -- -- -- -- -- -- -- -- -- 80 100.00 No No No -- -- -- -- -- -- -- -- -- 83 25.00 No No No -- -- -- -- -- -- -- -- -- 84 25.00 No No No -- -- -- -- -- -- -- -- -- 93 25.00 No No No -- -- -- -- -- -- -- -- -- 95 25.00 No No No -- -- -- -- -- -- -- -- -- 96 25.00 No No No -- -- -- -- -- -- -- -- -- 97 25.00 No No No -- -- -- -- -- -- -- -- --
53
98 25.00 No No No -- -- -- -- -- -- -- -- -- 99 25.00 No No No -- -- -- -- -- -- -- -- -- 76 100.00 No No No -- -- -- -- -- -- -- -- -- 77 25.00 No No No -- -- -- -- -- -- -- -- -- 87 100.00 No No No -- -- -- -- -- -- -- -- -- 89 25.00 No No No -- -- -- -- -- -- -- -- -- 92 100.00 No No No -- -- -- -- -- -- -- -- -- 86 25.00 No No No -- -- -- -- -- -- -- -- -- 71 25.00 No No No -- -- -- -- -- -- -- -- -- 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Line sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name LwM 10 LwM 11 LwM 12 LwM 13 LwM 14 LwM 15 LwM 16 LwM 17 LwM 18 LwM 19 LwM 20 LwM 21 LwM 22 85 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 75 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 79 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 91 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 94 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 73 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 78 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 80 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 83 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 84 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 93 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 95 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 96 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 97 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 98 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 99 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 76 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 77 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 87 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 89 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 92 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 86 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 71 -- -- -- 70.00 -- -- -- -- -- -- -- -- -- 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Line sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name LwM 23 LwM 24 LwM 25 LwM 26 LwM 27 Lw 1 Lw 2 Lw 3 Lw 4 Lw 5 Lw 6 Lw 7 Lw 8 Lw 9 Lw 10 Lw 11 85 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 75 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 79 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 91 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 94 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 73 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 78 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 80 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 83 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --
54
84 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 93 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 95 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 96 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 97 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 98 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 99 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 76 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 77 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 87 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 89 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 92 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 86 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 71 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Line sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Lw 12 Lw 13 Lw 14 Lw 15 Lw 16 Lw 17 Lw 18 Lw 19 Lw 20 Lw 21 Lw 22 Lw 23 Lw 24 Lw 25 Lw 26 85 -- 78.38 -- -- -- -- -- -- -- -- -- -- -- -- -- 75 -- 77.64 -- -- -- -- -- -- -- -- -- -- -- -- -- 79 -- 85.43 -- -- -- -- -- -- -- -- -- -- -- -- -- 91 -- 82.57 -- -- -- -- -- -- -- -- -- -- -- -- -- 94 -- 85.00 -- -- -- -- -- -- -- -- -- -- -- -- -- 73 -- 79.54 -- -- -- -- -- -- -- -- -- -- -- -- -- 78 -- 83.36 -- -- -- -- -- -- -- -- -- -- -- -- -- 80 -- 81.50 -- -- -- -- -- -- -- -- -- -- -- -- -- 83 -- 77.27 -- -- -- -- -- -- -- -- -- -- -- -- -- 84 -- 81.29 -- -- -- -- -- -- -- -- -- -- -- -- -- 93 -- 89.15 -- -- -- -- -- -- -- -- -- -- -- -- -- 95 -- 83.36 -- -- -- -- -- -- -- -- -- -- -- -- -- 96 -- 74.88 -- -- -- -- -- -- -- -- -- -- -- -- -- 97 -- 80.27 -- -- -- -- -- -- -- -- -- -- -- -- -- 98 -- 72.27 -- -- -- -- -- -- -- -- -- -- -- -- -- 99 -- 70.82 -- -- -- -- -- -- -- -- -- -- -- -- -- 76 -- 86.86 -- -- -- -- -- -- -- -- -- -- -- -- -- 77 -- 83.19 -- -- -- -- -- -- -- -- -- -- -- -- -- 87 -- 87.47 -- -- -- -- -- -- -- -- -- -- -- -- -- 89 -- 83.19 -- -- -- -- -- -- -- -- -- -- -- -- -- 92 -- 79.61 -- -- -- -- -- -- -- -- -- -- -- -- -- 86 -- 79.62 -- -- -- -- -- -- -- -- -- -- -- -- -- 71 -- 79.54 -- -- -- -- -- -- -- -- -- -- -- -- -- 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Line sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Lw 27 Red 1 Red 2 Red 3 Red 4 Red 5 Red 6 Red 7 Red 8 Red 9 Red 10 Red 11 85 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 75 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 79 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 94 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
55
73 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 78 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 80 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 83 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 84 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 93 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 95 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 96 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 97 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 98 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 99 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 76 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 87 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 89 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 92 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 86 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 71 -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Line sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Red 12 Red 13 Red 14 Red 15 Red 16 Red 17 Red 18 Red 19 Red 20 Red 21 Red 22 Red 23 85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Line sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Red 24 Red 25 Red 26 Red 27 85 0.00 0.00 0.00 0.00 75 0.00 0.00 0.00 0.00
56
79 0.00 0.00 0.00 0.00 91 0.00 0.00 0.00 0.00 94 0.00 0.00 0.00 0.00 73 0.00 0.00 0.00 0.00 78 0.00 0.00 0.00 0.00 80 0.00 0.00 0.00 0.00 83 0.00 0.00 0.00 0.00 84 0.00 0.00 0.00 0.00 93 0.00 0.00 0.00 0.00 95 0.00 0.00 0.00 0.00 96 0.00 0.00 0.00 0.00 97 0.00 0.00 0.00 0.00 98 0.00 0.00 0.00 0.00 99 0.00 0.00 0.00 0.00 76 0.00 0.00 0.00 0.00 77 0.00 0.00 0.00 0.00 87 0.00 0.00 0.00 0.00 89 0.00 0.00 0.00 0.00 92 0.00 0.00 0.00 0.00 86 0.00 0.00 0.00 0.00 71 0.00 0.00 0.00 0.00 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Moving source, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Desc. ISO H ISO Terr. HDef. Flow(D) Flow(E) Flow(N) TR2 Chipped Biomass Delivery - Transport Truck 1.50 0.00 Relative 11 -- -- TR4 Ash Waste Truck - Transport Truck 1.50 0.00 Relative 1 -- -- TR3 Wood Pellet Shipment - Transport Truck 1.50 0.00 Relative 9 -- -- TR1 Biomass Delivery - Transport Truck 1.50 0.00 Relative 11 -- -- LoaderChip ME - Front End Loader - Chip Reclaim 2.00 0.00 Relative 96 24 48 Forklift ME - Forklift - Pellet Shipping Forklift 0.75 0.00 Relative 96 24 48 LoaderBio ME - Front End Loader - Biomass Receiving 2.00 0.00 Relative 96 24 48 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Moving source, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Cb(D) Cb(E) Cb(N) Avg.speed Max.dist. Lw 1 Lw 2 Lw 3 Lw 4 Lw 5 Lw 6 Lw 7 Lw 8 TR2 26.46 -- -- 40 100.00 -- -- -- 80.52 -- -- 81.12 -- TR4 37.70 -- -- 40 100.00 -- -- -- 80.52 -- -- 81.12 -- TR3 27.90 -- -- 40 100.00 -- -- -- 80.52 -- -- 81.12 -- TR1 26.67 -- -- 40 100.00 -- -- -- 80.52 -- -- 81.12 -- LoaderChip 19.69 20.94 20.94 25 100.00 -- -- -- -- -- -- -- -- Forklift 13.68 14.93 14.93 15 100.00 -- -- -- -- -- -- -- -- LoaderBio 15.84 17.09 17.09 25 100.00 -- -- -- -- -- -- -- -- 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Moving source, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Lw 9 Lw 10 Lw 11 Lw 12 Lw 13 Lw 14 Lw 15 Lw 16 Lw 17 Lw 18 Lw 19 Lw 20 Lw 21
57
TR2 -- 83.02 -- -- 88.72 -- -- 91.82 -- -- 91.52 -- -- TR4 -- 83.02 -- -- 88.72 -- -- 91.82 -- -- 91.52 -- -- TR3 -- 83.02 -- -- 88.72 -- -- 91.82 -- -- 91.52 -- -- TR1 -- 83.02 -- -- 88.72 -- -- 91.82 -- -- 91.52 -- -- LoaderChip -- -- -- -- 105.00 -- -- -- -- -- -- -- -- Forklift -- -- -- -- 105.00 -- -- -- -- -- -- -- -- LoaderBio -- -- -- -- 105.00 -- -- -- -- -- -- -- -- 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Moving source, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Lw 22 Lw 23 Lw 24 Lw 25 Lw 26 Lw 27 Red 1 Red 2 Red 3 Red 4 Red 5 Red 6 TR2 82.52 -- -- 74.72 -- -- 0.00 0.00 0.00 0.00 0.00 0.00 TR4 82.52 -- -- 74.72 -- -- 0.00 0.00 0.00 0.00 0.00 0.00 TR3 82.52 -- -- 74.72 -- -- 0.00 0.00 0.00 0.00 0.00 0.00 TR1 82.52 -- -- 74.72 -- -- 0.00 0.00 0.00 0.00 0.00 0.00 LoaderChip -- -- -- -- -- -- 0.00 0.00 0.00 0.00 0.00 0.00 Forklift -- -- -- -- -- -- 0.00 0.00 0.00 0.00 0.00 0.00 LoaderBio -- -- -- -- -- -- 0.00 0.00 0.00 0.00 0.00 0.00 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Moving source, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Red 7 Red 8 Red 9 Red 10 Red 11 Red 12 Red 13 Red 14 Red 15 Red 16 Red 17 TR2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TR4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TR3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TR1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LoaderChip 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Forklift 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LoaderBio 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Moving source, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Red 18 Red 19 Red 20 Red 21 Red 22 Red 23 Red 24 Red 25 Red 26 Red 27 TR2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TR4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TR3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TR1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LoaderChip 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Forklift 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LoaderBio 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Point sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Desc. Height Terrain L HDef.
58
51 Re-sizer Equipment Enclosure 9.76 0.00 Relative to Objects 70 Biomass Fuel Screen & Hog 2.00 0.00 Relative 29 Bag House 3.00 0.00 Relative to Objects 74 Chip Screen Overs 9.76 0.00 Relative to Objects VENTCB Wastewater System Vent - Cogeneration Bldg 7.62 0.00 Relative VENTPB Wastewater System Vent - Pellet Bldg 9.14 0.00 Relative VENTBD Wastewater System Vent - Bed Dosing 2.50 0.00 Relative LR Line Reactor 4.00 0.00 Relative LB Load Bank 4.00 0.00 Relative 38 Dust Pick-ups and Acreen Fines-Bag House Vent 14.02 0.00 Relative to Objects 39 Pellet Cooler-Cyclone Vent 14.02 0.00 Relative to Objects 42 Building Noise 0.50 7.01 Relative to Objects 53 Pellet Storage Silo Vent 0.90 16.99 Relative to Objects 57 Dry Chip Storage Silo Vent 18.00 0.00 Relative to Objects 58E Chip Dryer - Exhaust 2.50 0.00 Relative to Objects 58E Chip Dryer - Exhaust 2.50 0.00 Relative to Objects 58E Chip Dryer - Exhaust 2.50 0.00 Relative to Objects 58E Chip Dryer - Exhaust 2.50 0.00 Relative to Objects 59 Cooling Tower 6.71 0.00 Relative to Objects 59 Cooling Tower 6.71 0.00 Relative to Objects 60 Truck Dumper 1.00 0.00 Relative 81 Disk Screen 2.00 0.00 Relative 82 12 hr Enclosed Storage w/ Re-claim 2.00 0.00 Relative Turbine Turbine Generator 2.00 0.00 Relative to Objects Boiler Boiler 2.00 18.14 Relative to Objects IDF Induced Draft Fan 1.00 18.14 Relative to Objects UFAF Under Fire Air Fan 1.00 18.14 Relative to Objects OFAF Over Fire Air Fan 1.00 8.13 Relative to Objects FGRF Flue Gas Recirculation Fan 1.00 8.13 Relative to Objects HM Hammer Mill 0.00 0.00 Relative to Objects PM Pellet Mill 0.00 0.00 Relative to Objects BFHSWT Biomass Fuel Hog Swing Hammer Type 2.00 0.00 Relative to Objects 52 Garage Vehicle Exhaust System 2.50 0.00 Relative to Objects 48 Garage HVAC 2.50 0.00 Relative to Objects 58 Chip Dryer 2.50 0.00 Relative to Objects 58 Chip Dryer 2.50 0.00 Relative to Objects 58 Chip Dryer 2.50 0.00 Relative to Objects 58 Chip Dryer 2.50 0.00 Relative to Objects 40 Fine Hammer Mill-Bag House Vent 14.02 0.00 Relative to Objects ST Secondary Transformer (750 kVA) 6.00 0.00 Relative to Objects MT Main Transformer (1500 kVA) 6.00 0.00 Relative to Objects 60 Truck Dumper 1.00 0.00 Relative 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Point sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Type Dir. Angle Ca(D) Ca(E) Ca(N) No refl. No building No ind.site Lw 1 51 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 70 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 29 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 74 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- VENTCB Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- VENTPB Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- VENTBD Normal point source 0.00 360.00 0.00 0.00 0.00 No No No --
59
LR Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- LB Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 38 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 39 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 42 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 53 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 57 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 58E Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 58E Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 58E Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 58E Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 59 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 59 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 60 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 81 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 82 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- Turbine Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- Boiler Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- IDF Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- UFAF Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- OFAF Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- FGRF Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- HM Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- PM Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- BFHSWT Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 52 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 48 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 58 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 58 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 58 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 58 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 40 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- ST Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- MT Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 60 Normal point source 0.00 360.00 0.00 0.00 0.00 No No No -- 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Point sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Lw 2 Lw 3 Lw 4 Lw 5 Lw 6 Lw 7 Lw 8 Lw 9 Lw 10 Lw 11 Lw 12 Lw 13 Lw 14 Lw 15 Lw 16 Lw 17 51 -- -- -- -- -- -- -- -- -- -- -- 20.00 -- -- -- -- 70 -- -- -- -- -- -- -- -- -- -- -- 105.00 -- -- -- -- 29 -- -- -- -- -- -- -- -- -- -- -- 60.00 -- -- -- -- 74 -- -- -- -- -- -- -- -- -- -- -- 70.00 -- -- -- -- VENTCB -- -- -- -- -- -- -- -- -- -- -- 75.00 -- -- -- -- VENTPB -- -- -- -- -- -- -- -- -- -- -- 75.00 -- -- -- -- VENTBD -- -- -- -- -- -- -- -- -- -- -- 75.00 -- -- -- -- LR -- -- -- -- -- -- -- -- -- -- -- 68.00 -- -- -- -- LB -- -- -- -- -- -- -- -- -- -- -- 68.00 -- -- -- -- 38 -- -- -- -- -- -- -- -- -- -- -- 85.00 -- -- -- -- 39 -- -- -- -- -- -- -- -- -- -- -- 85.00 -- -- -- -- 42 -- -- -- -- -- -- -- -- -- -- -- 75.00 -- -- -- -- 53 -- -- -- -- -- -- -- -- -- -- -- 65.00 -- -- -- -- 57 -- -- -- -- -- -- -- -- -- -- -- 65.00 -- -- -- --
60
58E -- -- -- -- -- -- -- -- -- -- -- 93.00 -- -- -- -- 58E -- -- -- -- -- -- -- -- -- -- -- 93.00 -- -- -- -- 58E -- -- -- -- -- -- -- -- -- -- -- 93.00 -- -- -- -- 58E -- -- -- -- -- -- -- -- -- -- -- 93.00 -- -- -- -- 59 -- -- -- -- -- -- -- -- -- -- -- 85.00 -- -- -- -- 59 -- -- -- -- -- -- -- -- -- -- -- 85.00 -- -- -- -- 60 -- -- -- -- -- -- -- -- -- -- -- 95.00 -- -- -- -- 81 -- -- -- -- -- -- -- -- -- -- -- 70.00 -- -- -- -- 82 -- -- -- -- -- -- -- -- -- -- -- 70.00 -- -- -- -- Turbine -- -- -- -- -- -- -- -- -- -- -- 76.02 -- -- -- -- Boiler -- -- -- -- -- -- -- -- -- -- -- 76.02 -- -- -- -- IDF -- -- -- -- -- -- -- -- -- -- -- 120.00 -- -- -- -- UFAF -- -- -- -- -- -- -- -- -- -- -- 109.00 -- -- -- -- OFAF -- -- -- -- -- -- -- -- -- -- -- 111.00 -- -- -- -- FGRF -- -- -- -- -- -- -- -- -- -- -- 103.00 -- -- -- -- HM -- -- -- -- -- -- -- -- -- -- -- 118.00 -- -- -- -- PM -- -- -- -- -- -- -- -- -- -- -- 93.00 -- -- -- -- BFHSWT -- -- -- -- -- -- -- -- -- -- -- 105.00 -- -- -- -- 52 -- -- -- -- -- -- -- -- -- -- -- 100.00 -- -- -- -- 48 -- -- -- -- -- -- -- -- -- -- -- 100.00 -- -- -- -- 58 -- -- -- -- -- -- -- -- -- -- -- 83.00 -- -- -- -- 58 -- -- -- -- -- -- -- -- -- -- -- 83.00 -- -- -- -- 58 -- -- -- -- -- -- -- -- -- -- -- 83.00 -- -- -- -- 58 -- -- -- -- -- -- -- -- -- -- -- 83.00 -- -- -- -- 40 -- -- -- -- -- -- -- -- -- -- -- 85.00 -- -- -- -- ST -- -- -- -- -- -- -- -- -- -- -- 58.00 -- -- -- -- MT -- -- -- -- -- -- -- -- -- -- -- 68.00 -- -- -- -- 60 -- -- -- -- -- -- -- -- -- -- -- 95.00 -- -- -- -- 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Point sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Lw 18 Lw 19 Lw 20 Lw 21 Lw 22 Lw 23 Lw 24 Lw 25 Lw 26 Lw 27 Red 1 Red 2 Red 3 Red 4 51 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 70 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 29 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 74 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 VENTCB -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 VENTPB -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 VENTBD -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 LR -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 LB -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 38 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 39 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 42 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 53 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 57 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 58E -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 58E -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 58E -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 58E -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 59 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 59 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 60 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00
61
81 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 82 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 Turbine -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 Boiler -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 IDF -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 UFAF -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 OFAF -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 FGRF -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 HM -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 PM -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 BFHSWT -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 52 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 48 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 58 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 58 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 58 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 58 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 40 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 ST -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 MT -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 60 -- -- -- -- -- -- -- -- -- -- 0.00 0.00 0.00 0.00 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Point sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Red 5 Red 6 Red 7 Red 8 Red 9 Red 10 Red 11 Red 12 Red 13 Red 14 Red 15 51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VENTCB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VENTPB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VENTBD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58E 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58E 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58E 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58E 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Turbine 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Boiler 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 IDF 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 UFAF 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 OFAF 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
62
FGRF 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 HM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 BFHSWT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ST 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Point sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Red 16 Red 17 Red 18 Red 19 Red 20 Red 21 Red 22 Red 23 Red 24 Red 25 Red 26 51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VENTCB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VENTPB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VENTBD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58E 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58E 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58E 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58E 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Turbine 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Boiler 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 IDF 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 UFAF 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 OFAF 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 FGRF 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 HM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 BFHSWT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
63
58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ST 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Point sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Red 27 51 0.00 70 0.00 29 0.00 74 0.00 VENTCB 0.00 VENTPB 0.00 VENTBD 0.00 LR 0.00 LB 0.00 38 0.00 39 0.00 42 0.00 53 0.00 57 0.00 58E 0.00 58E 0.00 58E 0.00 58E 0.00 59 0.00 59 0.00 60 0.00 81 0.00 82 0.00 Turbine 0.00 Boiler 0.00 IDF 0.00 UFAF 0.00 OFAF 0.00 FGRF 0.00 HM 0.00 PM 0.00 BFHSWT 0.00 52 0.00 48 0.00 58 0.00 58 0.00 58 0.00 58 0.00 40 0.00 ST 0.00 MT 0.00 60 0.00
64
2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Grids, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Desc. Height Terrain L DeltaX DeltaY Grid Grid 1.50 0.00 20 20 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Receivers, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Desc. Terrain L HDef. Height A Height B Height C Height D Height E Height F POR 1 Armstrong Public School 0.00 Relative 1.50 4.50 -- -- -- -- POR 2 McKenzie Inn/Cottages 0.00 Relative 1.50 4.50 -- -- -- -- POR 3 Residence 0.00 Relative 1.50 4.50 -- -- -- -- 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Receivers, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Façade POR 1 Yes POR 2 Yes POR 3 Yes 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Buildings, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Desc. Height Terrain L HDef. Cp Refl. 1 Refl. 2 Refl. 3 Bio Buid. Biomass Processing Building 13.82 0.00 Relative 0 dB 0.80 0.80 0.80 Garage Garage 8.36 0.00 Relative 0 dB 0.80 0.80 0.80 B/T Boiler/Turbine Plant SE Section 18.14 0.00 Relative 0 dB 0.80 0.80 0.80 B/T Boiler/Turbine Plant NW Section 8.13 0.00 Relative 0 dB 0.80 0.80 0.80 Fire Fire Pump Building 8.36 0.00 Relative 0 dB 0.80 0.80 0.80 Wood Plant Wood Pellet Plant NE Section 22.91 0.00 Relative 0 dB 0.80 0.80 0.80 Wood Plant Wood Pellet Plant SW Section 7.01 0.00 Relative 0 dB 0.80 0.80 0.80 57 Dry Chip Storage Silo Vent 22.91 0.00 Relative 0 dB 0.80 0.80 0.80 53 Pellet Storage Silo Vent 16.99 0.00 Relative 0 dB 0.80 0.80 0.80 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Buildings, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Refl. 4 Refl. 5 Refl. 6 Refl. 7 Refl. 8 Refl. 9 Refl. 10 Refl. 11 Refl. 12 Refl. 13 Refl. 14 Bio Buid. 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Garage 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 B/T 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 B/T 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Fire 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
65
Wood Plant 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Wood Plant 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 57 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 53 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Buildings, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Refl. 15 Refl. 16 Refl. 17 Refl. 18 Refl. 19 Refl. 20 Refl. 21 Refl. 22 Refl. 23 Refl. 24 Bio Buid. 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Garage 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 B/T 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 B/T 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Fire 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Wood Plant 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Wood Plant 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 57 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 53 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Buildings, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Refl. 25 Refl. 26 Refl. 27 Bio Buid. 0.80 0.80 0.80 Garage 0.80 0.80 0.80 B/T 0.80 0.80 0.80 B/T 0.80 0.80 0.80 Fire 0.80 0.80 0.80 Wood Plant 0.80 0.80 0.80 Wood Plant 0.80 0.80 0.80 57 0.80 0.80 0.80 53 0.80 0.80 0.80 2014-Predictor V9.11 10-06 11:59:51 AM Model: Regular Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Foliage regions, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Desc. Height Terrain L HDef. Forest Forested Area 1 10.00 0.00 Relative Forest Forested Area 2 10.00 0.00 Relative 2014-Predictor V9.11 10-06 11:59:51 AM
66
E 1: Plot of Source Attributes – Regular Operations – Full View
67
E 2: Plot of Source Attributes – Regular Operations – Boiler/Turbine Building
68
E 3: Plot of Source Attributes – Regular Operations – Fuel Storage Area
69
E 4: Plot of Source Attributes – Regular Operations – Chip Storage Area
70
E 5: Plot of Source Attributes – Regular Operations – Pellet Mill
71
E 6: Plot of Source Attributes – Regular Operations – Electrical Transformers
72
Emergency Equipment Operations Model: Emergency Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Point sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Desc. Height Terrain L HDef. Type Dir. 31 Fire Pump Diesel Engine 8.23 0.00 Relative to Objects Normal point source 0.00 30 Stand by Generator (500kW) 8.23 0.00 Relative to Objects Normal point source 0.00 31E Fire Pump Diesel Engine - Exhaust 1.00 8.36 Relative to Objects Normal point source 0.00 Main FP Fire Pump Main 1.00 0.00 Relative to Objects Normal point source 0.00 2014-Predictor V9.11 08-19 3:25:45 PM Model: Emergency Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Point sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Angle Ca(D) Ca(E) Ca(N) No refl. No building No ind.site Lw 1 Lw 2 Lw 3 Lw 4 Lw 5 Lw 6 31 360.00 0.00 0.00 0.00 No No No -- -- -- -- -- -- 30 360.00 0.00 0.00 0.00 No No No -- -- -- -- -- -- 31E 360.00 0.00 0.00 0.00 No No No -- -- -- -- -- -- Main FP 360.00 0.00 0.00 0.00 No No No -- -- -- -- -- -- 2014-Predictor V9.11 08-19 3:25:45 PM Model: Emergency Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Point sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Lw 7 Lw 8 Lw 9 Lw 10 Lw 11 Lw 12 Lw 13 Lw 14 Lw 15 Lw 16 Lw 17 Lw 18 Lw 19 Lw 20 Lw 21 31 -- -- -- -- -- -- 105.20 -- -- -- -- -- -- -- -- 30 -- -- -- -- -- -- 112.90 -- -- -- -- -- -- -- -- 31E -- -- -- -- -- -- 127.00 -- -- -- -- -- -- -- -- Main FP -- -- -- -- -- -- 93.00 -- -- -- -- -- -- -- -- 2014-Predictor V9.11 08-19 3:25:45 PM Model: Emergency Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Point sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Lw 22 Lw 23 Lw 24 Lw 25 Lw 26 Lw 27 Red 1 Red 2 Red 3 Red 4 Red 5 Red 6 Red 7 31 -- -- -- -- -- -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30 -- -- -- -- -- -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31E -- -- -- -- -- -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Main FP -- -- -- -- -- -- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2014-Predictor V9.11 08-19 3:25:45 PM Model: Emergency Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Point sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Red 8 Red 9 Red 10 Red 11 Red 12 Red 13 Red 14 Red 15 Red 16 Red 17 Red 18 31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31E 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Main FP 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
73
2014-Predictor V9.11 08-19 3:25:45 PM Model: Emergency Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Point sources, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Red 19 Red 20 Red 21 Red 22 Red 23 Red 24 Red 25 Red 26 Red 27 31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31E 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Main FP 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2014-Predictor V9.11 08-19 3:25:45 PM Model: Emergency Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Grids, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Desc. Height Terrain L DeltaX DeltaY Grid Grid 4.50 0.00 20 20 2014-Predictor V9.11 08-19 3:25:45 PM Model: Emergency Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Receivers, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Desc. Terrain L HDef. Height A Height B Height C Height D Height E Height F POR 1 Armstrong Public School 0.00 Relative 1.50 4.50 -- -- -- -- POR 2 McKenzie Inn/Cottages 0.00 Relative 1.50 4.50 -- -- -- -- POR 3 Residence 0.00 Relative 1.50 4.50 -- -- -- -- 2014-Predictor V9.11 08-19 3:25:45 PM Model: Emergency Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Receivers, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Façade POR 1 Yes POR 2 Yes POR 3 Yes 2014-Predictor V9.11 08-19 3:25:45 PM Model: Emergency Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Buildings, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Desc. Height Terrain L HDef. Cp Refl. 1 Refl. 2 Refl. 3 Garage Garage 8.36 0.00 Relative 0 dB 0.80 0.80 0.80 B/T Boiler/Turbine Plant SE Section 18.14 0.00 Relative 0 dB 0.80 0.80 0.80 B/T Boiler/Turbine Plant NW Section 8.13 0.00 Relative 0 dB 0.80 0.80 0.80 Fire Fire Pump Building 8.36 0.00 Relative 0 dB 0.80 0.80 0.80 Wood Plant Wood Pellet Plant NE Section 22.91 0.00 Relative 0 dB 0.80 0.80 0.80 Wood Plant Wood Pellet Plant SW Section 7.01 0.00 Relative 0 dB 0.80 0.80 0.80 57 Dry Chip Storage Silo Vent 22.91 0.00 Relative 0 dB 0.80 0.80 0.80 53 Pellet Storage Silo Vent 16.99 0.00 Relative 0 dB 0.80 0.80 0.80 2014-Predictor V9.11 08-19 3:25:45 PM
74
Model: Emergency Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Buildings, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Refl. 4 Refl. 5 Refl. 6 Refl. 7 Refl. 8 Refl. 9 Refl. 10 Refl. 11 Refl. 12 Refl. 13 Refl. 14 Garage 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 B/T 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 B/T 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Fire 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Wood Plant 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Wood Plant 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 57 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 53 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 2014-Predictor V9.11 08-19 3:25:45 PM Model: Emergency Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Buildings, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Refl. 15 Refl. 16 Refl. 17 Refl. 18 Refl. 19 Refl. 20 Refl. 21 Refl. 22 Refl. 23 Refl. 24 Garage 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 B/T 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 B/T 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Fire 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Wood Plant 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Wood Plant 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 57 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 53 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 2014-Predictor V9.11 08-19 3:25:45 PM Model: Emergency Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Buildings, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Refl. 25 Refl. 26 Refl. 27 Garage 0.80 0.80 0.80 B/T 0.80 0.80 0.80 B/T 0.80 0.80 0.80 Fire 0.80 0.80 0.80 Wood Plant 0.80 0.80 0.80 Wood Plant 0.80 0.80 0.80 57 0.80 0.80 0.80 53 0.80 0.80 0.80 2014-Predictor V9.11 08-19 3:25:45 PM Model: Emergency Operations - 2014 August Updated Model version of Area - Area Group: (main group) Listing of: Foliage regions, for method Industrial noise - ISO 9613.1/2 (1/3 Octave) Name Desc. Height Terrain L HDef. Forest Forested Area 1 10.00 0.00 Relative Forest Forested Area 2 10.00 0.00 Relative 2014-Predictor V9.11 08-19 3:25:45 PM
75
E 7: Plot of Source Attributes – Emergency Equipment Operations – Full View
76
Appendix F: Predictor Output Results
Regular Operations
Report: Table of Results Model: Regular Operations - 2014 August Updated Model LAeq: by Source for receiver POR 1_A - Armstrong Public School Group: (main group) Group Reduction: No Name Source Description Height Day Evening Night POR 1_A Armstrong Public School 1.50 37.5 37.5 37.5 29 Bag House 3.00 -30.3 -30.3 -30.3 38 Dust Pick-ups and Acreen Fines-Bag House Vent 14.02 -2.4 -2.4 -2.4 39 Pellet Cooler-Cyclone Vent 14.02 7.5 7.5 7.5 40 Fine Hammer Mill-Bag House Vent 14.02 -2.9 -2.9 -2.9 42 Building Noise 0.50 -20.3 -20.3 -20.3 48 Garage HVAC 2.50 25.2 25.2 25.2 51 Re-sizer Equipment Enclosure 9.76 -64.5 -64.5 -64.5 52 Garage Vehicle Exhaust System 2.50 8.8 8.8 8.8 53 Pellet Storage Silo Vent 0.90 -23.5 -23.5 -23.5 57 Dry Chip Storage Silo Vent 18.00 -17.2 -17.2 -17.2 58 Chip Dryer 2.50 4.9 4.9 4.9 58 Chip Dryer 2.50 -3.4 -3.4 -3.4 58 Chip Dryer 2.50 0.0 0.0 0.0 58 Chip Dryer 2.50 -6.5 -6.5 -6.5 58E Chip Dryer - Exhaust 2.50 14.9 14.9 14.9 58E Chip Dryer - Exhaust 2.50 6.9 6.9 6.9 58E Chip Dryer - Exhaust 2.50 10.4 10.4 10.4 58E Chip Dryer - Exhaust 2.50 4.5 4.5 4.5 59 Cooling Tower 6.71 7.8 7.8 7.8 59 Cooling Tower 6.71 7.1 7.1 7.1 60 Truck Dumper 1.00 10.3 10.3 10.3 60 Truck Dumper 1.00 10.0 10.0 10.0 70 Biomass Fuel Screen & Hog 2.00 12.1 12.1 12.1 71 Imported Biomass Transfer Conveyor 2.00 -0.9 -0.9 -0.9 73 Raw Fuel Infeed 2.00 -15.6 -15.6 -15.6 74 Chip Screen Overs 9.76 -6.4 -6.4 -6.4 75 Fuel Transfer Conveyor 1 2.00 -2.8 -2.8 -2.8 76 Fuel Transfer Conveyor to Stacker 1.00 1.9 1.9 1.9 77 Fuel Stacker 2.00 3.0 3.0 3.0 78 Fuel Re-claim 2.00 2.7 2.7 2.7 79 Fuel Re-claim Transfer 2.00 5.7 5.7 5.7 80 Fuel Transfer 2 2.00 -0.8 -0.8 -0.8 81 Disk Screen 2.00 -15.2 -15.2 -15.2 82 12 hr Enclosed Storage w/ Re-claim 2.00 -13.0 -13.0 -13.0 83 Fuel Transfer Conveyor 2.00 -6.4 -6.4 -6.4 84 Fuel Infeed Conveyor 2.00 -11.1 -11.1 -11.1 85 Chip Transfer Conveyor 2.00 -1.7 -1.7 -1.7 86 Chip Transfer Conveyor 2 2.00 -0.4 -0.4 -0.4 87 Chip Transfer Conv3 1.00 3.1 3.1 3.1 89 Chip Stacker-Aspen/Birch 2.00 3.5 3.5 3.5 91 Chip Re-claim-Aspen/Birch 2.00 3.1 3.1 3.1 92 Reclaim Conveyor 1 2.00 0.1 0.1 0.1 93 Reclaim Conveyor 2 2.00 10.9 10.9 10.9
77
94 Reclaim Conveyor 3 2.00 3.7 3.7 3.7 95 Dried Chip Storage Feed Conveyors 2.00 -2.4 -2.4 -2.4 96 Dried Chip Storage Discharge Conveyors 2.00 -1.5 -1.5 -1.5 97 Baghouse Fines Conveyors 2.00 3.9 3.9 3.9 98 Dried Pellet Storage Feed Conveyors 2.00 -19.2 -19.2 -19.2 99 Dried Pellet Storage Discharge Conveyors 2.00 -23.8 -23.8 -23.8 BFHSWT Biomass Fuel Hog Swing Hammer Type 2.00 15.1 15.1 15.1 All shown dB values are A-weighted 2014-Predictor V9.11 10-06 12:24:48 PM Report: Table of Results Model: Regular Operations - 2014 August Updated Model LAeq: by Source for receiver POR 1_A - Armstrong Public School Group: (main group) Group Reduction: No Name Source Description Height Day Evening Night Boiler Boiler 2.00 -3.6 -3.6 -3.6 FGRF Flue Gas Recirculation Fan 1.00 18.9 18.9 18.9 Forklift ME - Forklift - Pellet Shipping Forklift 0.75 5.7 4.5 4.5 HM Hammer Mill 0.00 16.2 16.2 16.2 IDF Induced Draft Fan 1.00 35.7 35.7 35.7 LB Load Bank 4.00 -9.8 -9.8 -9.8 LoaderBio ME - Front End Loader - Biomass Receiving 2.00 12.2 10.9 10.9 LoaderChip ME - Front End Loader - Chip Reclaim 2.00 5.1 3.9 3.9 LR Line Reactor 4.00 -9.8 -9.8 -9.8 MT Main Transformer (1500 kVA) 6.00 -9.8 -9.8 -9.8 OFAF Over Fire Air Fan 1.00 29.4 29.4 29.4 PM Pellet Mill 0.00 -4.2 -4.2 -4.2 ST Secondary Transformer (750 kVA) 6.00 -19.8 -19.8 -19.8 TR1 Biomass Delivery - Transport Truck 1.50 1.5 -- -- TR2 Chipped Biomass Delivery - Transport Truck 1.50 1.4 -- -- TR3 Wood Pellet Shipment - Transport Truck 1.50 -3.7 -- -- TR4 Ash Waste Truck - Transport Truck 1.50 -12.3 -- -- Turbine Turbine Generator 2.00 -3.9 -3.9 -3.9 UFAF Under Fire Air Fan 1.00 24.8 24.8 24.8 VENTBD Wastewater System Vent - Bed Dosing 2.50 -2.8 -2.8 -2.8 VENTCB Wastewater System Vent - Cogeneration Bldg 7.62 -2.7 -2.7 -2.7 VENTPB Wastewater System Vent - Pellet Bldg 9.14 0.1 0.1 0.1 All shown dB values are A-weighted 2014-Predictor V9.11 10-06 12:24:48 PM Report: Table of Results Model: Regular Operations - 2014 August Updated Model LAeq: by Source for receiver POR 1_B - Armstrong Public School Group: (main group) Group Reduction: No Name Source Description Height Day Evening Night POR 1_B Armstrong Public School 4.50 40.7 40.7 40.7 29 Bag House 3.00 -29.8 -29.8 -29.8 38 Dust Pick-ups and Acreen Fines-Bag House Vent 14.02 0.5 0.5 0.5 39 Pellet Cooler-Cyclone Vent 14.02 10.9 10.9 10.9 40 Fine Hammer Mill-Bag House Vent 14.02 0.1 0.1 0.1 42 Building Noise 0.50 -17.9 -17.9 -17.9 48 Garage HVAC 2.50 28.6 28.6 28.6 51 Re-sizer Equipment Enclosure 9.76 -61.3 -61.3 -61.3
78
52 Garage Vehicle Exhaust System 2.50 11.6 11.6 11.6 53 Pellet Storage Silo Vent 0.90 -23.0 -23.0 -23.0 57 Dry Chip Storage Silo Vent 18.00 -14.0 -14.0 -14.0 58 Chip Dryer 2.50 8.3 8.3 8.3 58 Chip Dryer 2.50 -0.2 -0.2 -0.2 58 Chip Dryer 2.50 3.3 3.3 3.3 58 Chip Dryer 2.50 -3.4 -3.4 -3.4 58E Chip Dryer - Exhaust 2.50 18.3 18.3 18.3 58E Chip Dryer - Exhaust 2.50 10.2 10.2 10.2 58E Chip Dryer - Exhaust 2.50 13.7 13.7 13.7 58E Chip Dryer - Exhaust 2.50 7.6 7.6 7.6 59 Cooling Tower 6.71 9.0 9.0 9.0 59 Cooling Tower 6.71 7.7 7.7 7.7 60 Truck Dumper 1.00 13.8 13.8 13.8 60 Truck Dumper 1.00 13.5 13.5 13.5 70 Biomass Fuel Screen & Hog 2.00 15.2 15.2 15.2 71 Imported Biomass Transfer Conveyor 2.00 2.6 2.6 2.6 73 Raw Fuel Infeed 2.00 -13.8 -13.8 -13.8 74 Chip Screen Overs 9.76 -3.0 -3.0 -3.0 75 Fuel Transfer Conveyor 1 2.00 0.6 0.6 0.6 76 Fuel Transfer Conveyor to Stacker 1.00 5.3 5.3 5.3 77 Fuel Stacker 2.00 4.5 4.5 4.5 78 Fuel Re-claim 2.00 3.5 3.5 3.5 79 Fuel Re-claim Transfer 2.00 9.1 9.1 9.1 80 Fuel Transfer 2 2.00 1.5 1.5 1.5 81 Disk Screen 2.00 -13.3 -13.3 -13.3 82 12 hr Enclosed Storage w/ Re-claim 2.00 -11.1 -11.1 -11.1 83 Fuel Transfer Conveyor 2.00 -4.3 -4.3 -4.3 84 Fuel Infeed Conveyor 2.00 -8.1 -8.1 -8.1 85 Chip Transfer Conveyor 2.00 1.8 1.8 1.8 86 Chip Transfer Conveyor 2 2.00 3.1 3.1 3.1 87 Chip Transfer Conv3 1.00 6.5 6.5 6.5 89 Chip Stacker-Aspen/Birch 2.00 7.0 7.0 7.0 91 Chip Re-claim-Aspen/Birch 2.00 6.5 6.5 6.5 92 Reclaim Conveyor 1 2.00 3.5 3.5 3.5 93 Reclaim Conveyor 2 2.00 13.2 13.2 13.2 94 Reclaim Conveyor 3 2.00 7.0 7.0 7.0 95 Dried Chip Storage Feed Conveyors 2.00 1.0 1.0 1.0 96 Dried Chip Storage Discharge Conveyors 2.00 1.9 1.9 1.9 97 Baghouse Fines Conveyors 2.00 7.3 7.3 7.3 98 Dried Pellet Storage Feed Conveyors 2.00 -16.1 -16.1 -16.1 99 Dried Pellet Storage Discharge Conveyors 2.00 -20.7 -20.7 -20.7 BFHSWT Biomass Fuel Hog Swing Hammer Type 2.00 18.2 18.2 18.2 All shown dB values are A-weighted 2014-Predictor V9.11 10-06 12:24:48 PM Report: Table of Results Model: Regular Operations - 2014 August Updated Model LAeq: by Source for receiver POR 1_B - Armstrong Public School Group: (main group) Group Reduction: No Name Source Description Height Day Evening Night Boiler Boiler 2.00 -0.6 -0.6 -0.6 FGRF Flue Gas Recirculation Fan 1.00 22.3 22.3 22.3 Forklift ME - Forklift - Pellet Shipping Forklift 0.75 6.4 5.1 5.1
79
HM Hammer Mill 0.00 17.8 17.8 17.8 IDF Induced Draft Fan 1.00 38.9 38.9 38.9 LB Load Bank 4.00 -6.4 -6.4 -6.4 LoaderBio ME - Front End Loader - Biomass Receiving 2.00 15.6 14.4 14.4 LoaderChip ME - Front End Loader - Chip Reclaim 2.00 8.6 7.3 7.3 LR Line Reactor 4.00 -6.4 -6.4 -6.4 MT Main Transformer (1500 kVA) 6.00 -6.3 -6.3 -6.3 OFAF Over Fire Air Fan 1.00 32.8 32.8 32.8 PM Pellet Mill 0.00 -1.7 -1.7 -1.7 ST Secondary Transformer (750 kVA) 6.00 -16.4 -16.4 -16.4 TR1 Biomass Delivery - Transport Truck 1.50 2.1 -- -- TR2 Chipped Biomass Delivery - Transport Truck 1.50 2.0 -- -- TR3 Wood Pellet Shipment - Transport Truck 1.50 -3.1 -- -- TR4 Ash Waste Truck - Transport Truck 1.50 -11.7 -- -- Turbine Turbine Generator 2.00 -3.3 -3.3 -3.3 UFAF Under Fire Air Fan 1.00 28.2 28.2 28.2 VENTBD Wastewater System Vent - Bed Dosing 2.50 0.6 0.6 0.6 VENTCB Wastewater System Vent - Cogeneration Bldg 7.62 -2.2 -2.2 -2.2 VENTPB Wastewater System Vent - Pellet Bldg 9.14 3.5 3.5 3.5 All shown dB values are A-weighted 2014-Predictor V9.11 10-06 12:24:48 PM Report: Table of Results Model: Regular Operations - 2014 August Updated Model LAeq: by Source for receiver POR 2_A - McKenzie Inn/Cottages Group: (main group) Group Reduction: No Name Source Description Height Day Evening Night POR 2_A McKenzie Inn/Cottages 1.50 34.7 34.7 34.7 29 Bag House 3.00 -19.0 -19.0 -19.0 38 Dust Pick-ups and Acreen Fines-Bag House Vent 14.02 -4.9 -4.9 -4.9 39 Pellet Cooler-Cyclone Vent 14.02 -9.6 -9.6 -9.6 40 Fine Hammer Mill-Bag House Vent 14.02 3.0 3.0 3.0 42 Building Noise 0.50 -13.0 -13.0 -13.0 48 Garage HVAC 2.50 6.0 6.0 6.0 51 Re-sizer Equipment Enclosure 9.76 -58.6 -58.6 -58.6 52 Garage Vehicle Exhaust System 2.50 20.1 20.1 20.1 53 Pellet Storage Silo Vent 0.90 -23.5 -23.5 -23.5 57 Dry Chip Storage Silo Vent 18.00 -19.6 -19.6 -19.6 58 Chip Dryer 2.50 1.7 1.7 1.7 58 Chip Dryer 2.50 1.1 1.1 1.1 58 Chip Dryer 2.50 -5.4 -5.4 -5.4 58 Chip Dryer 2.50 -7.2 -7.2 -7.2 58E Chip Dryer - Exhaust 2.50 11.9 11.9 11.9 58E Chip Dryer - Exhaust 2.50 11.2 11.2 11.2 58E Chip Dryer - Exhaust 2.50 4.7 4.7 4.7 58E Chip Dryer - Exhaust 2.50 2.8 2.8 2.8 59 Cooling Tower 6.71 6.1 6.1 6.1 59 Cooling Tower 6.71 6.1 6.1 6.1 60 Truck Dumper 1.00 7.2 7.2 7.2 60 Truck Dumper 1.00 7.7 7.7 7.7 70 Biomass Fuel Screen & Hog 2.00 25.0 25.0 25.0 71 Imported Biomass Transfer Conveyor 2.00 -7.9 -7.9 -7.9 73 Raw Fuel Infeed 2.00 -18.2 -18.2 -18.2 74 Chip Screen Overs 9.76 -24.1 -24.1 -24.1
80
75 Fuel Transfer Conveyor 1 2.00 -2.4 -2.4 -2.4 76 Fuel Transfer Conveyor to Stacker 1.00 -0.4 -0.4 -0.4 77 Fuel Stacker 2.00 0.6 0.6 0.6 78 Fuel Re-claim 2.00 0.5 0.5 0.5 79 Fuel Re-claim Transfer 2.00 2.5 2.5 2.5 80 Fuel Transfer 2 2.00 1.1 1.1 1.1 81 Disk Screen 2.00 -10.4 -10.4 -10.4 82 12 hr Enclosed Storage w/ Re-claim 2.00 -12.9 -12.9 -12.9 83 Fuel Transfer Conveyor 2.00 -5.6 -5.6 -5.6 84 Fuel Infeed Conveyor 2.00 -1.6 -1.6 -1.6 85 Chip Transfer Conveyor 2.00 -4.8 -4.8 -4.8 86 Chip Transfer Conveyor 2 2.00 -3.6 -3.6 -3.6 87 Chip Transfer Conv3 1.00 -0.5 -0.5 -0.5 89 Chip Stacker-Aspen/Birch 2.00 -0.2 -0.2 -0.2 91 Chip Re-claim-Aspen/Birch 2.00 -0.8 -0.8 -0.8 92 Reclaim Conveyor 1 2.00 -3.7 -3.7 -3.7 93 Reclaim Conveyor 2 2.00 6.0 6.0 6.0 94 Reclaim Conveyor 3 2.00 0.6 0.6 0.6 95 Dried Chip Storage Feed Conveyors 2.00 -2.2 -2.2 -2.2 96 Dried Chip Storage Discharge Conveyors 2.00 -24.1 -24.1 -24.1 97 Baghouse Fines Conveyors 2.00 -20.0 -20.0 -20.0 98 Dried Pellet Storage Feed Conveyors 2.00 -12.0 -12.0 -12.0 99 Dried Pellet Storage Discharge Conveyors 2.00 -15.5 -15.5 -15.5 BFHSWT Biomass Fuel Hog Swing Hammer Type 2.00 25.0 25.0 25.0 All shown dB values are A-weighted 2014-Predictor V9.11 10-06 12:24:48 PM Report: Table of Results Model: Regular Operations - 2014 August Updated Model LAeq: by Source for receiver POR 2_A - McKenzie Inn/Cottages Group: (main group) Group Reduction: No Name Source Description Height Day Evening Night Boiler Boiler 2.00 -6.9 -6.9 -6.9 FGRF Flue Gas Recirculation Fan 1.00 15.4 15.4 15.4 Forklift ME - Forklift - Pellet Shipping Forklift 0.75 4.9 3.7 3.7 HM Hammer Mill 0.00 21.9 21.9 21.9 IDF Induced Draft Fan 1.00 32.5 32.5 32.5 LB Load Bank 4.00 -13.6 -13.6 -13.6 LoaderBio ME - Front End Loader - Biomass Receiving 2.00 9.2 8.0 8.0 LoaderChip ME - Front End Loader - Chip Reclaim 2.00 2.2 1.0 1.0 LR Line Reactor 4.00 -13.5 -13.5 -13.5 MT Main Transformer (1500 kVA) 6.00 -12.3 -12.3 -12.3 OFAF Over Fire Air Fan 1.00 15.1 15.1 15.1 PM Pellet Mill 0.00 -4.6 -4.6 -4.6 ST Secondary Transformer (750 kVA) 6.00 -22.3 -22.3 -22.3 TR1 Biomass Delivery - Transport Truck 1.50 -3.5 -- -- TR2 Chipped Biomass Delivery - Transport Truck 1.50 -3.2 -- -- TR3 Wood Pellet Shipment - Transport Truck 1.50 -11.6 -- -- TR4 Ash Waste Truck - Transport Truck 1.50 -19.6 -- -- Turbine Turbine Generator 2.00 -25.6 -25.6 -25.6 UFAF Under Fire Air Fan 1.00 21.4 21.4 21.4 VENTBD Wastewater System Vent - Bed Dosing 2.50 -9.4 -9.4 -9.4 VENTCB Wastewater System Vent - Cogeneration Bldg 7.62 -16.4 -16.4 -16.4 VENTPB Wastewater System Vent - Pellet Bldg 9.14 -21.1 -21.1 -21.1
81
All shown dB values are A-weighted 2014-Predictor V9.11 10-06 12:24:48 PM Report: Table of Results Model: Regular Operations - 2014 August Updated Model LAeq: by Source for receiver POR 2_B - McKenzie Inn/Cottages Group: (main group) Group Reduction: No Name Source Description Height Day Evening Night POR 2_B McKenzie Inn/Cottages 4.50 38.1 38.1 38.1 29 Bag House 3.00 -15.5 -15.5 -15.5 38 Dust Pick-ups and Acreen Fines-Bag House Vent 14.02 -2.6 -2.6 -2.6 39 Pellet Cooler-Cyclone Vent 14.02 -7.0 -7.0 -7.0 40 Fine Hammer Mill-Bag House Vent 14.02 3.4 3.4 3.4 42 Building Noise 0.50 -9.6 -9.6 -9.6 48 Garage HVAC 2.50 8.9 8.9 8.9 51 Re-sizer Equipment Enclosure 9.76 -55.2 -55.2 -55.2 52 Garage Vehicle Exhaust System 2.50 23.5 23.5 23.5 53 Pellet Storage Silo Vent 0.90 -20.1 -20.1 -20.1 57 Dry Chip Storage Silo Vent 18.00 -19.1 -19.1 -19.1 58 Chip Dryer 2.50 4.4 4.4 4.4 58 Chip Dryer 2.50 3.9 3.9 3.9 58 Chip Dryer 2.50 -4.6 -4.6 -4.6 58 Chip Dryer 2.50 -6.4 -6.4 -6.4 58E Chip Dryer - Exhaust 2.50 14.6 14.6 14.6 58E Chip Dryer - Exhaust 2.50 14.0 14.0 14.0 58E Chip Dryer - Exhaust 2.50 5.6 5.6 5.6 58E Chip Dryer - Exhaust 2.50 3.7 3.7 3.7 59 Cooling Tower 6.71 9.5 9.5 9.5 59 Cooling Tower 6.71 9.5 9.5 9.5 60 Truck Dumper 1.00 10.6 10.6 10.6 60 Truck Dumper 1.00 11.1 11.1 11.1 70 Biomass Fuel Screen & Hog 2.00 28.4 28.4 28.4 71 Imported Biomass Transfer Conveyor 2.00 -4.6 -4.6 -4.6 73 Raw Fuel Infeed 2.00 -16.9 -16.9 -16.9 74 Chip Screen Overs 9.76 -21.4 -21.4 -21.4 75 Fuel Transfer Conveyor 1 2.00 1.1 1.1 1.1 76 Fuel Transfer Conveyor to Stacker 1.00 3.1 3.1 3.1 77 Fuel Stacker 2.00 4.0 4.0 4.0 78 Fuel Re-claim 2.00 4.0 4.0 4.0 79 Fuel Re-claim Transfer 2.00 5.9 5.9 5.9 80 Fuel Transfer 2 2.00 4.5 4.5 4.5 81 Disk Screen 2.00 -6.9 -6.9 -6.9 82 12 hr Enclosed Storage w/ Re-claim 2.00 -9.4 -9.4 -9.4 83 Fuel Transfer Conveyor 2.00 -2.2 -2.2 -2.2 84 Fuel Infeed Conveyor 2.00 1.9 1.9 1.9 85 Chip Transfer Conveyor 2.00 -3.5 -3.5 -3.5 86 Chip Transfer Conveyor 2 2.00 -2.1 -2.1 -2.1 87 Chip Transfer Conv3 1.00 2.9 2.9 2.9 89 Chip Stacker-Aspen/Birch 2.00 3.3 3.3 3.3 91 Chip Re-claim-Aspen/Birch 2.00 2.7 2.7 2.7 92 Reclaim Conveyor 1 2.00 -0.3 -0.3 -0.3 93 Reclaim Conveyor 2 2.00 9.4 9.4 9.4 94 Reclaim Conveyor 3 2.00 3.7 3.7 3.7 95 Dried Chip Storage Feed Conveyors 2.00 -1.5 -1.5 -1.5
82
96 Dried Chip Storage Discharge Conveyors 2.00 -21.0 -21.0 -21.0 97 Baghouse Fines Conveyors 2.00 -17.1 -17.1 -17.1 98 Dried Pellet Storage Feed Conveyors 2.00 -8.6 -8.6 -8.6 99 Dried Pellet Storage Discharge Conveyors 2.00 -14.5 -14.5 -14.5 BFHSWT Biomass Fuel Hog Swing Hammer Type 2.00 28.4 28.4 28.4 All shown dB values are A-weighted 2014-Predictor V9.11 10-06 12:24:48 PM Report: Table of Results Model: Regular Operations - 2014 August Updated Model LAeq: by Source for receiver POR 2_B - McKenzie Inn/Cottages Group: (main group) Group Reduction: No Name Source Description Height Day Evening Night Boiler Boiler 2.00 -3.4 -3.4 -3.4 FGRF Flue Gas Recirculation Fan 1.00 18.8 18.8 18.8 Forklift ME - Forklift - Pellet Shipping Forklift 0.75 8.4 7.1 7.1 HM Hammer Mill 0.00 25.0 25.0 25.0 IDF Induced Draft Fan 1.00 35.9 35.9 35.9 LB Load Bank 4.00 -10.1 -10.1 -10.1 LoaderBio ME - Front End Loader - Biomass Receiving 2.00 12.7 11.4 11.4 LoaderChip ME - Front End Loader - Chip Reclaim 2.00 4.1 2.8 2.8 LR Line Reactor 4.00 -10.1 -10.1 -10.1 MT Main Transformer (1500 kVA) 6.00 -9.5 -9.5 -9.5 OFAF Over Fire Air Fan 1.00 17.5 17.5 17.5 PM Pellet Mill 0.00 -3.2 -3.2 -3.2 ST Secondary Transformer (750 kVA) 6.00 -19.5 -19.5 -19.5 TR1 Biomass Delivery - Transport Truck 1.50 -2.8 -- -- TR2 Chipped Biomass Delivery - Transport Truck 1.50 -2.5 -- -- TR3 Wood Pellet Shipment - Transport Truck 1.50 -11.0 -- -- TR4 Ash Waste Truck - Transport Truck 1.50 -19.0 -- -- Turbine Turbine Generator 2.00 -24.4 -24.4 -24.4 UFAF Under Fire Air Fan 1.00 24.9 24.9 24.9 VENTBD Wastewater System Vent - Bed Dosing 2.50 -8.4 -8.4 -8.4 VENTCB Wastewater System Vent - Cogeneration Bldg 7.62 -16.2 -16.2 -16.2 VENTPB Wastewater System Vent - Pellet Bldg 9.14 -17.9 -17.9 -17.9 All shown dB values are A-weighted 2014-Predictor V9.11 10-06 12:24:48 PM Report: Table of Results Model: Regular Operations - 2014 August Updated Model LAeq: by Source for receiver POR 3_A - Residence Group: (main group) Group Reduction: No Name Source Description Height Day Evening Night POR 3_A Residence 1.50 35.3 35.3 35.3 29 Bag House 3.00 -38.0 -38.0 -38.0 38 Dust Pick-ups and Acreen Fines-Bag House Vent 14.02 0.1 0.1 0.1 39 Pellet Cooler-Cyclone Vent 14.02 5.2 5.2 5.2 40 Fine Hammer Mill-Bag House Vent 14.02 -2.2 -2.2 -2.2 42 Building Noise 0.50 -24.6 -24.6 -24.6 48 Garage HVAC 2.50 23.0 23.0 23.0 51 Re-sizer Equipment Enclosure 9.76 -67.0 -67.0 -67.0 52 Garage Vehicle Exhaust System 2.50 8.2 8.2 8.2
83
53 Pellet Storage Silo Vent 0.90 -22.3 -22.3 -22.3 57 Dry Chip Storage Silo Vent 18.00 -18.8 -18.8 -18.8 58 Chip Dryer 2.50 2.7 2.7 2.7 58 Chip Dryer 2.50 -1.6 -1.6 -1.6 58 Chip Dryer 2.50 -4.8 -4.8 -4.8 58 Chip Dryer 2.50 -3.9 -3.9 -3.9 58E Chip Dryer - Exhaust 2.50 12.7 12.7 12.7 58E Chip Dryer - Exhaust 2.50 12.6 12.6 12.6 58E Chip Dryer - Exhaust 2.50 5.8 5.8 5.8 58E Chip Dryer - Exhaust 2.50 7.3 7.3 7.3 59 Cooling Tower 6.71 2.8 2.8 2.8 59 Cooling Tower 6.71 2.2 2.2 2.2 60 Truck Dumper 1.00 8.5 8.5 8.5 60 Truck Dumper 1.00 8.1 8.1 8.1 70 Biomass Fuel Screen & Hog 2.00 9.6 9.6 9.6 71 Imported Biomass Transfer Conveyor 2.00 -2.8 -2.8 -2.8 73 Raw Fuel Infeed 2.00 -16.8 -16.8 -16.8 74 Chip Screen Overs 9.76 -8.3 -8.3 -8.3 75 Fuel Transfer Conveyor 1 2.00 -9.1 -9.1 -9.1 76 Fuel Transfer Conveyor to Stacker 1.00 -0.1 -0.1 -0.1 77 Fuel Stacker 2.00 1.0 1.0 1.0 78 Fuel Re-claim 2.00 1.4 1.4 1.4 79 Fuel Re-claim Transfer 2.00 2.7 2.7 2.7 80 Fuel Transfer 2 2.00 -0.3 -0.3 -0.3 81 Disk Screen 2.00 -12.4 -12.4 -12.4 82 12 hr Enclosed Storage w/ Re-claim 2.00 -11.9 -11.9 -11.9 83 Fuel Transfer Conveyor 2.00 -4.6 -4.6 -4.6 84 Fuel Infeed Conveyor 2.00 -9.2 -9.2 -9.2 85 Chip Transfer Conveyor 2.00 -3.5 -3.5 -3.5 86 Chip Transfer Conveyor 2 2.00 -2.2 -2.2 -2.2 87 Chip Transfer Conv3 1.00 1.2 1.2 1.2 89 Chip Stacker-Aspen/Birch 2.00 1.6 1.6 1.6 91 Chip Re-claim-Aspen/Birch 2.00 3.0 3.0 3.0 92 Reclaim Conveyor 1 2.00 0.1 0.1 0.1 93 Reclaim Conveyor 2 2.00 9.5 9.5 9.5 94 Reclaim Conveyor 3 2.00 4.2 4.2 4.2 95 Dried Chip Storage Feed Conveyors 2.00 2.1 2.1 2.1 96 Dried Chip Storage Discharge Conveyors 2.00 -3.8 -3.8 -3.8 97 Baghouse Fines Conveyors 2.00 1.6 1.6 1.6 98 Dried Pellet Storage Feed Conveyors 2.00 -22.1 -22.1 -22.1 99 Dried Pellet Storage Discharge Conveyors 2.00 -25.5 -25.5 -25.5 BFHSWT Biomass Fuel Hog Swing Hammer Type 2.00 12.1 12.1 12.1 All shown dB values are A-weighted 2014-Predictor V9.11 10-06 12:24:48 PM Report: Table of Results Model: Regular Operations - 2014 August Updated Model LAeq: by Source for receiver POR 3_A - Residence Group: (main group) Group Reduction: No Name Source Description Height Day Evening Night Boiler Boiler 2.00 -7.3 -7.3 -7.3 FGRF Flue Gas Recirculation Fan 1.00 16.7 16.7 16.7 Forklift ME - Forklift - Pellet Shipping Forklift 0.75 2.9 1.6 1.6 HM Hammer Mill 0.00 15.8 15.8 15.8
84
IDF Induced Draft Fan 1.00 33.6 33.6 33.6 LB Load Bank 4.00 -12.1 -12.1 -12.1 LoaderBio ME - Front End Loader - Biomass Receiving 2.00 10.2 9.0 9.0 LoaderChip ME - Front End Loader - Chip Reclaim 2.00 3.3 2.0 2.0 LR Line Reactor 4.00 -12.1 -12.1 -12.1 MT Main Transformer (1500 kVA) 6.00 -12.0 -12.0 -12.0 OFAF Over Fire Air Fan 1.00 27.2 27.2 27.2 PM Pellet Mill 0.00 -8.4 -8.4 -8.4 ST Secondary Transformer (750 kVA) 6.00 -22.1 -22.1 -22.1 TR1 Biomass Delivery - Transport Truck 1.50 -0.8 -- -- TR2 Chipped Biomass Delivery - Transport Truck 1.50 -0.9 -- -- TR3 Wood Pellet Shipment - Transport Truck 1.50 -6.7 -- -- TR4 Ash Waste Truck - Transport Truck 1.50 -14.5 -- -- Turbine Turbine Generator 2.00 -6.3 -6.3 -6.3 UFAF Under Fire Air Fan 1.00 22.6 22.6 22.6 VENTBD Wastewater System Vent - Bed Dosing 2.50 -5.0 -5.0 -5.0 VENTCB Wastewater System Vent - Cogeneration Bldg 7.62 -5.2 -5.2 -5.2 VENTPB Wastewater System Vent - Pellet Bldg 9.14 -2.2 -2.2 -2.2 All shown dB values are A-weighted 2014-Predictor V9.11 10-06 12:24:48 PM Report: Table of Results Model: Regular Operations - 2014 August Updated Model LAeq: by Source for receiver POR 3_B - Residence Group: (main group) Group Reduction: No Name Source Description Height Day Evening Night POR 3_B Residence 4.50 38.7 38.7 38.7 29 Bag House 3.00 -37.0 -37.0 -37.0 38 Dust Pick-ups and Acreen Fines-Bag House Vent 14.02 3.6 3.6 3.6 39 Pellet Cooler-Cyclone Vent 14.02 8.7 8.7 8.7 40 Fine Hammer Mill-Bag House Vent 14.02 0.9 0.9 0.9 42 Building Noise 0.50 -22.5 -22.5 -22.5 48 Garage HVAC 2.50 26.4 26.4 26.4 51 Re-sizer Equipment Enclosure 9.76 -63.8 -63.8 -63.8 52 Garage Vehicle Exhaust System 2.50 11.1 11.1 11.1 53 Pellet Storage Silo Vent 0.90 -21.8 -21.8 -21.8 57 Dry Chip Storage Silo Vent 18.00 -15.6 -15.6 -15.6 58 Chip Dryer 2.50 6.1 6.1 6.1 58 Chip Dryer 2.50 1.7 1.7 1.7 58 Chip Dryer 2.50 -1.6 -1.6 -1.6 58 Chip Dryer 2.50 -0.6 -0.6 -0.6 58E Chip Dryer - Exhaust 2.50 16.1 16.1 16.1 58E Chip Dryer - Exhaust 2.50 16.1 16.1 16.1 58E Chip Dryer - Exhaust 2.50 9.0 9.0 9.0 58E Chip Dryer - Exhaust 2.50 10.4 10.4 10.4 59 Cooling Tower 6.71 3.8 3.8 3.8 59 Cooling Tower 6.71 2.6 2.6 2.6 60 Truck Dumper 1.00 11.9 11.9 11.9 60 Truck Dumper 1.00 11.5 11.5 11.5 70 Biomass Fuel Screen & Hog 2.00 12.7 12.7 12.7 71 Imported Biomass Transfer Conveyor 2.00 0.7 0.7 0.7 73 Raw Fuel Infeed 2.00 -15.0 -15.0 -15.0 74 Chip Screen Overs 9.76 -4.9 -4.9 -4.9 75 Fuel Transfer Conveyor 1 2.00 -5.9 -5.9 -5.9
85
76 Fuel Transfer Conveyor to Stacker 1.00 3.4 3.4 3.4 77 Fuel Stacker 2.00 4.4 4.4 4.4 78 Fuel Re-claim 2.00 4.8 4.8 4.8 79 Fuel Re-claim Transfer 2.00 3.4 3.4 3.4 80 Fuel Transfer 2 2.00 3.1 3.1 3.1 81 Disk Screen 2.00 -10.5 -10.5 -10.5 82 12 hr Enclosed Storage w/ Re-claim 2.00 -8.5 -8.5 -8.5 83 Fuel Transfer Conveyor 2.00 -1.2 -1.2 -1.2 84 Fuel Infeed Conveyor 2.00 -6.1 -6.1 -6.1 85 Chip Transfer Conveyor 2.00 -0.1 -0.1 -0.1 86 Chip Transfer Conveyor 2 2.00 1.2 1.2 1.2 87 Chip Transfer Conv3 1.00 4.6 4.6 4.6 89 Chip Stacker-Aspen/Birch 2.00 5.0 5.0 5.0 91 Chip Re-claim-Aspen/Birch 2.00 5.8 5.8 5.8 92 Reclaim Conveyor 1 2.00 2.8 2.8 2.8 93 Reclaim Conveyor 2 2.00 11.9 11.9 11.9 94 Reclaim Conveyor 3 2.00 6.4 6.4 6.4 95 Dried Chip Storage Feed Conveyors 2.00 5.6 5.6 5.6 96 Dried Chip Storage Discharge Conveyors 2.00 -0.4 -0.4 -0.4 97 Baghouse Fines Conveyors 2.00 5.1 5.1 5.1 98 Dried Pellet Storage Feed Conveyors 2.00 -18.9 -18.9 -18.9 99 Dried Pellet Storage Discharge Conveyors 2.00 -22.5 -22.5 -22.5 BFHSWT Biomass Fuel Hog Swing Hammer Type 2.00 15.2 15.2 15.2 All shown dB values are A-weighted 2014-Predictor V9.11 10-06 12:24:48 PM Report: Table of Results Model: Regular Operations - 2014 August Updated Model LAeq: by Source for receiver POR 3_B - Residence Group: (main group) Group Reduction: No Name Source Description Height Day Evening Night Boiler Boiler 2.00 -7.3 -7.3 -7.3 FGRF Flue Gas Recirculation Fan 1.00 20.1 20.1 20.1 Forklift ME - Forklift - Pellet Shipping Forklift 0.75 3.1 1.8 1.8 HM Hammer Mill 0.00 17.6 17.6 17.6 IDF Induced Draft Fan 1.00 37.0 37.0 37.0 LB Load Bank 4.00 -8.6 -8.6 -8.6 LoaderBio ME - Front End Loader - Biomass Receiving 2.00 13.7 12.4 12.4 LoaderChip ME - Front End Loader - Chip Reclaim 2.00 6.7 5.5 5.5 LR Line Reactor 4.00 -8.7 -8.7 -8.7 MT Main Transformer (1500 kVA) 6.00 -8.6 -8.6 -8.6 OFAF Over Fire Air Fan 1.00 30.7 30.7 30.7 PM Pellet Mill 0.00 -6.5 -6.5 -6.5 ST Secondary Transformer (750 kVA) 6.00 -18.6 -18.6 -18.6 TR1 Biomass Delivery - Transport Truck 1.50 -0.1 -- -- TR2 Chipped Biomass Delivery - Transport Truck 1.50 -0.2 -- -- TR3 Wood Pellet Shipment - Transport Truck 1.50 -6.1 -- -- TR4 Ash Waste Truck - Transport Truck 1.50 -13.9 -- -- Turbine Turbine Generator 2.00 -6.1 -6.1 -6.1 UFAF Under Fire Air Fan 1.00 25.8 25.8 25.8 VENTBD Wastewater System Vent - Bed Dosing 2.50 -1.6 -1.6 -1.6 VENTCB Wastewater System Vent - Cogeneration Bldg 7.62 -5.0 -5.0 -5.0 VENTPB Wastewater System Vent - Pellet Bldg 9.14 1.3 1.3 1.3 All shown dB values are A-weighted
86
F 8: Predictor Daytime Contour Plot – Regular Operations – 1.5 m Impact Height – Full View
87
F 9: Predictor Daytime Contour Plot – Regular Operations – 1.5 m Impact Height – Isolated View
88
F 10: Predictor Daytime Contour Plot – Regular Operations – 4.5 m Impact Height – Full View
89
F 11: Predictor Daytime Contour Plot – Regular Operations – 4.5 m Impact Height – Isolated View
90
Emergency Equipment Operations
Report: Table of Results Model: Emergency Operations - 2014 August Updated Model LAeq: by Source for receiver POR 1_A - Armstrong Public School Group: (main group) Group Reduction: No Name Source Description Height Day POR 1_A Armstrong Public School 1.50 42.1 30 Stand by Generator (500kW) 8.23 32.5 31 Fire Pump Diesel Engine 8.23 28.2 31E Fire Pump Diesel Engine - Exhaust 1.00 41.4 Main FP Fire Pump Main 1.00 10.0 All shown dB values are A-weighted 2014-Predictor V9.11 08-19 3:25:28 PM Report: Table of Results Model: Emergency Operations - 2014 August Updated Model LAeq: by Source for receiver POR 1_B - Armstrong Public School Group: (main group) Group Reduction: No Name Source Description Height Day POR 1_B Armstrong Public School 4.50 45.2 30 Stand by Generator (500kW) 8.23 32.8 31 Fire Pump Diesel Engine 8.23 31.6 31E Fire Pump Diesel Engine - Exhaust 1.00 44.8 Main FP Fire Pump Main 1.00 13.4 All shown dB values are A-weighted 2014-Predictor V9.11 08-19 3:25:28 PM Report: Table of Results Model: Emergency Operations - 2014 August Updated Model LAeq: by Source for receiver POR 2_A - McKenzie Inn/Cottages Group: (main group) Group Reduction: No Name Source Description Height Day POR 2_A McKenzie Inn/Cottages 1.50 40.4 30 Stand by Generator (500kW) 8.23 24.4 31 Fire Pump Diesel Engine 8.23 23.6 31E Fire Pump Diesel Engine - Exhaust 1.00 40.2 Main FP Fire Pump Main 1.00 -2.5 All shown dB values are A-weighted 2014-Predictor V9.11 08-19 3:25:28 PM Report: Table of Results Model: Emergency Operations - 2014 August Updated Model LAeq: by Source for receiver POR 2_B - McKenzie Inn/Cottages Group: (main group) Group Reduction: No Name Source Description Height Day POR 2_B McKenzie Inn/Cottages 4.50 43.8
91
30 Stand by Generator (500kW) 8.23 27.1 31 Fire Pump Diesel Engine 8.23 25.2 31E Fire Pump Diesel Engine - Exhaust 1.00 43.6 Main FP Fire Pump Main 1.00 0.1 All shown dB values are A-weighted 2014-Predictor V9.11 08-19 3:25:28 PM Report: Table of Results Model: Emergency Operations - 2014 August Updated Model LAeq: by Source for receiver POR 3_A - Residence Group: (main group) Group Reduction: No Name Source Description Height Day POR 3_A Residence 1.50 40.2 30 Stand by Generator (500kW) 8.23 30.2 31 Fire Pump Diesel Engine 8.23 26.4 31E Fire Pump Diesel Engine - Exhaust 1.00 39.5 Main FP Fire Pump Main 1.00 8.1 All shown dB values are A-weighted 2014-Predictor V9.11 08-19 3:25:28 PM Report: Table of Results Model: Emergency Operations - 2014 August Updated Model LAeq: by Source for receiver POR 3_B - Residence Group: (main group) Group Reduction: No Name Source Description Height Day POR 3_B Residence 4.50 43.4 30 Stand by Generator (500kW) 8.23 30.4 31 Fire Pump Diesel Engine 8.23 29.8 31E Fire Pump Diesel Engine - Exhaust 1.00 43.0 Main FP Fire Pump Main 1.00 11.6 All shown dB values are A-weighted 2014-Predictor V9.11 08-19 3:25:28 PM
92
F 12: Predictor Daytime Contour Plot – Emergency Equipment Operations – 1.5 m Impact Height – Full View
93
F 13: Predictor Daytime Contour Plot – Emergency Equipment Operations – 1.5 m Impact Height – Isolated View
94
F 14: Predictor Daytime Contour Plot – Emergency Equipment Operations – 4.5 m Impact Height – Full View
95
F 15: Predictor Daytime Contour Plot – Emergency Equipment Operations – 4.5 m Impact Height – Isolated View
96
Appendix G: NPC-300 Reference Pages
G 1: Exclusion Limit Values for Stationary Sources
97
G 2: Sound Level Limits for Emergency Equipment
98
G 3: Determination of Area Class
##P.O. Box 988
FABSCO LLC. 2410 Industrial Rd.
Sapulpa, OK 74066
AIR COOLED EXCHANGER SPECIFICATION SHEET (918) 224-7550 Fax (918) 224-3564
1 Date: 3/16/2018 Rev. 0
2 Customer BAY INDUSTRIAL 90 MM BTU/HR HEAT DUMP Item No.
3 Plant Location ONTARIO Job No.: A15- Ref. No.
4 Service 50/50 Ethylene Glycol P.O. No.
5 Size and Type 14.297 x 48.000 FORCED No. Bays 3
6 Surface/Unit - Finned Tube 362485 ft2 ;Bare Tube 18520 ft2
7 Heat Exchanged 9.00e+7 Btu/h MTD, Eff. 41.7 ºF
8 Transfer Rate-Finned Tube 6.582 ;Bare Tube, Service 128.82 Clean 138.89 Btu/h.ft2.F
PERFORMANCE DATA - TUBE SIDE
10 Fluid Name Vapor Ref. Temp. ºF 194.00 140.00
11 Total Fluid In lb/h 7103533 Specific Heat Btu/lb.F 0 0
12 Vapor lb/h 0.0 0.0 Viscosity cP 0 0
13 Liquid lb/h 7103533 7103533 Conductivity Btu/h.ft.F 0 0
14 Noncond lb/h 0.0 0.0 Density lb/ft3 0 0
15 Steam lb/h 0.0 0.0 Liquid Ref. Temp. ºF 194.00 140.00
16 Water lb/h 0.0 0.0 Specific Heat Btu/lb.F 0.2380 0.2313
17 Viscosity cP 0.8486 0.8208
18 Temperature In/Out ºF 194.00 140.00 Conductivity Btu/h.ft.F 0.9340 1.6900
19 Pressure In / Out psia 100.00 88.75 Density lb/ft3 64.355 65.588
20 Velocity ft/s 7.40
21 Press. Drop Allow/Calc psi 15.000 11.250 Fouling resistance h.ft2.F/Btu 0.00050
PERFORMANCE DATA - AIR SIDE (Air)
23 Air flow rate/item (SCFM) 1018875 Altitude above Sea Level ft 1063.0
24 Air Quantity/Fan (ACFM) 180071 Temperature In (Dry Bulb) ºF 80.00
25 Actual Static Press in H2O 0.731 Temperature Out ºF 161.59
26 Face Velocity (SFPM) 500.00 Min. Design Ambient ºF -20
27 Max Mass Velocity lb/h.ft2 Fan Air Temperature ºF 80.00
DESIGN - MATERIALS - CONSTRUCTION29 Design Pressure psig 150.00 Test Pressure psig 225 Design Temperature 300.00 -20 ºF
30 TUBE BUNDLE HEADER, Type BOX TUBE, Material SA 214
31 Size 14.151 X 48.000 Material SA 516-70N WELDED
32 No./Bay 1 No. Rows 6 No. Passes 2 OD 1.2500 Thickness 0.0600 in
33 Arrangement Bundles in Series Slope 0 in/ft LAST PASS No./Bundle 393
34 Bundles 3 Bundles in parallel Plug Material SA 105 Length 48.000 ft
35 Bays 3 Bays in parallel Gasket Material SOFT IRON Pitch 2.5625 in
36 Bundle Frame Finish Galvanized Corr Allow 0.125 in Fin, Type L TENSION
37 Header Finish Zinc Metalize In qty/in. 3 12 Material ALUMINUM
38 Structure Finish Galvanized Out qty/in. 3 12 OD 2.5000 Thk. 0.016 in
39 Mounting/C TO C GRADE Special Nozzles 1" 6000# V&D No./in 10.0 Fin Design Temp 300.00
40 Surf Prep SSPC SP 6 Rating/Facing 300# RFWN Code - ASME
41 Louvres / Guards Coil Guard TI PI Stamp YES
42 Vibration Switches MURPHY VS2 EX Chem. Cleaning SPECS.
MECHANICAL EQUIPMENT
44 Fan Mfg MOORE Driver Speed Reducer
45 Model VE 42 10000 Type MOTOR Type HTD
46 No./Bay 2 Rev./ Min 242 Mfg. SIEMENS Mfg. GATES OR EQ
47 Fan Diam. Ft 13 No. Blades 6 No/Bay 2 Model
48 Adj X Auto Pitch 7.3 hp /Driver 40 No/Bay 2
49 Mat'l:Blade Hub ALUM Rev/Min 1750 AGMA Rating, hp 72
50 hp/Fan, Design 31.26 Enclosure TEFC Ratio 7.231405
51 hp/Fan, Min Amb 38.36 Volt;Phase;Cycle 460/3/60 Support STRUCTURE
52 Plot Area 14.297 x 48.000 ft2 Bundle WT Dry lb 50095 Full H20 60231 API Noz Mult. 2
53 Weight per bay lbs. 62073 Motors VFD Compatible Steam Coil No Heat Treat NO
54 Weight per unit. 186220 Recirc No NDE ASME
55 dBA @ 3' 84.6 Ladder No Bugscreen No
56 Fan Wt Lbs 144 End Walk Opt
57 Side Walk No
58 Drive Walk No
3161802
ALUMINUM
AC-1
Output Summary Page 1
Released to the following HTRI Member Company:
FABSCO
Karl Myers
Xace 7.3.1 3/16/2018 8:35 SN: 13528-1080408626 US Units
Rating-Horizontal air-cooled heat exchanger forced draft countercurrent to crossflow
No Data Check Messages.
No Runtime Messages.
Process Conditions Outside Tubeside
Fluid name 50/50 Ethylene Glycol
Fluid condition Sens. Gas Sens. Liquid
Total flow rate (1000-lb/hr) 4584.938 7103.533
Weight fraction vapor, In/Out 1.0000 1.0000 0.0000 0.0000
Temperature, In/Out (Deg F) 80.00 161.59 194.00 140.00
Skin temperature, Min/Max (Deg F) 126.60 186.36 130.92 189.49
Pressure, Inlet/Outlet (psia) 14.141 14.115 100.00 88.750
Pressure drop, Total/Allow (inH2O) (psi) 0.731 0.000 11.250 15.000
Midpoint velocity (ft/sec) 22.32 7.39
- In/Out (ft/sec) 7.45 7.35
Heat transfer safety factor (--) 1.0000 1.0000Fouling (ft2-hr-F/Btu) 0.00000 0.00050
Exchanger Performance
Outside film coef (Btu/ft2-hr-F) 8.02 Actual U (Btu/ft2-hr-F) 6.582
Tubeside film coef (Btu/ft2-hr-F) 1674.4 Required U (Btu/ft2-hr-F) 5.960
Clean coef (Btu/ft2-hr-F) 7.096 Area (ft2) 362485Hot regime Sens. Liquid Overdesign (%) 10.43
Cold regime Sens. Gas Tube Geometry
EMTD (Deg F) 41.7 Tube type High-finnedDuty (MM Btu/hr) 90.000 Tube OD (inch) 1.2500
Unit Geometry Tube ID (inch) 1.1300
Bays in parallel per unit 3 Length (ft) 48.000
Bundles parallel per bay 1 Area ratio(out/in) (--) 22.024
Extended area (ft2) 362485 Layout Staggered
Bare area (ft2) 18206 Trans pitch (inch) 2.5625
Bundle width (ft) 14.151 Long pitch (inch) 2.2191
Nozzle Inlet Outlet Number of passes (--) 2
Number (--) 3 3 Number of rows (--) 6
Diameter (inch) 9.0620 9.0620 Tubecount (--) 393
Velocity (ft/sec) 7.61 7.46 Tubecount Odd/Even (--) 66 / 65 R-V-SQ (lb/ft-sec2) 3723.3 3653.3 Material Carbon steel
Pressure drop (psi) 0.442 0.276 Fin Geometry
Fan Geometry Type Circular
No/bay (--) 2 Fins/length (fin/inch) 10.0
Fan ring type Flanged Fin root (inch) 1.2500
Diameter (ft) 13.171 Height (inch) 0.6250
Ratio, Fan/bundle face area (--) 0.4012 Base thickness (inch) 0.0160
Driver power (hp) 36.33 Over fin (inch) 2.5000
Tip clearance (inch) 0.7500 Efficiency (%) 84.1Efficiency (%) 65.000 Area ratio (fin/bare) (--) 19.910
Airside Velocities Actual Standard Material Aluminum 1100-annealed
Face (ft/min) 530.20 500.00 Thermal Resistance, %
Maximum (ft/sec) 20.79 19.60 Air 82.04
Flow (1000 ft3/min) 1080.4 1018.9 Tube 8.66
Velocity pressure (inH2O) 0.103 Fouling 7.25
Bundle pressure drop (inH2O) 0.679 Metal 2.05Bundle flow fraction (--) 1.000 Bond 0.00
Bundle 92.98 Airside Pressure Drop, % Louvers 0.00Ground clearance 0.00 Fan guard 0.00 Hail screen 0.00Fan ring 7.02 Fan area blockage 0.00 Steam coil 0.00
F:\AirCool Jobs\Users\Karl\18\03\03161802 Dickie 1806-2 heat dump\03161802.htri
Moore Fans LLCPhone: (660) 376-3575 www.moorefans.com Fax: (660) 376-2909
Reference No. Item No.
7.3
9.311.6
Design Conditions
Class: 10000 Blade Type: EC Temperature: 80 Deg. F Static Pr.: 0.731 in H2O
Series: 42 Blade Tip: VE Elevation: 1063 feet Power Req'd: 31.26 bhp
Diameter: 13.00 feet Adjustment: MAN Density Ratio: 0.944 Design Angle: 7.3 deg
RPM: 242 Blades: 6 Air Volume: 180071.00 ACFM Weight: 144 lbs
(BH
P)
(in
H2
O)
(AC
FM
)
Est. API Angle=Maximum Angle=
Design Angle=
4.7
4.7
0
10
20
30
40
50
60
0
50000
100000
150000
200000
250000
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0
Po
we
r
Air
Vo
lum
e
Blade Angle (Degrees)
Class 10000 Performance Curve
(Maximum recommended angle is 30 degrees)
Air Volume
Power
3.2
4.7
6.5
8.8
11.6
3.2
4.7
6.5
8.8
11.6
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
0
10
20
30
40
50
60
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0
Eff
icie
nc
y
Po
we
r
System Performance Curve
Power
Efficiency %
0.2
0.5
1.2
2.0
3.2
4.7
6.5
8.8
11.6
0.2
0.5
1.2
2.0
3.2
4.7
6.5
8.8
11.6
0.00
0.20
0.40
0.60
0.80
1.00
1.20
0
50000
100000
150000
200000
250000
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0
Sta
tic
Pre
ss
ure
Air
Vo
lum
e
Blade Angle (Degrees)
Air Volume
Static Pressure
Ref No.: Item No:
Class: 10000 10K Hub Type: HD Blade Type: EC
Blade Tip: VE Adjustment: MAN MAN Rotation: RH
Series: 42 Diameter: 13 feet Blades: 6
Temperature: 80 Deg. F Elevation: 1063 feet Density Ratio: 0.944
Volume: 180071 ACFM Air Vel.: 1429.38 fpm Speed: 242.0 RPM
Static Pressure: 0.731 in H2O Pv: 0.120 in H2O Pt: 0.851 in H2O
Power Reqd.: 31.26 bhp Motor: 40 bhp Total Eff: 77.3%
Power @ -20 deg. 38.36 bhp Bld Natural Freq.: 6.8 Hz Static Eff: 66.4%
Blades Required: 4.69 API Blades Req.: 6 Blade Load: 0.781
Tip Speed: 9883.5 fpm Deflection Angle: 59.2 deg. Pitch Number: 1.69
Entry Correction: 1 Tip Clearance: 0.75 inches Design Angle: 7.3 deg
Exit Correction: 1.00 Draft: Orientation:
Torque Factor: 2 Motor Torque: 1736 ft. lbs Torq/Bld: 289 ft. lbs
Appr fan weight: 144 lbs 65 kg Bore Size: 0.1 inches
WR2 1496 lb-ft2 63.2 kg m2 Bushing Type: U
Thrust Load: 587 lbs 267 kg Qty required: 1
Noise Levels Per Fan ( Forced Draft) (Horizontal Orientation) See Note 2
dBA HZ 63 125 250 500 1000 2000 4000 8000
96.0 102.0 101.0 98.0 93.0 91.0 85.0 79.0 73.0
81.4 87.4 86.4 83.4 78.4 76.4 70.4 64.4 58.4
76.6 82.6 81.6 78.6 73.6 71.6 65.6 59.6 53.6
0.0 6.0 5.0 2.0 (3.0) (5.0) (11.0) (17.0) (23.0)
0.0 6.0 5.0 2.0 (3.0) (5.0) (11.0) (17.0) (23.0)
Phone: (660) 376-3575
Class 10000, Series 42, 13 feet Diameter, 6 Blades
3/16/2018 8:46
Fax:(660) 376-2909
0
With VE Blade Tips,
Version 2.27
Forced
Note 2: Noise levels are the best estimate of the fan noise with 0 dBA additional noise
included due to drive components, flow obstructions or structure reflection and reverberation.
Available motor power may limit maximum angle to a lower value.
Manual Adjustment, Heavy Duty, Extended Chord, Right Hand Rotation
Fan Model No. 1042/073-U0-A/42R-VE-4-13.00-6
Note 1: Maximum blade angle to prevent fan stall is 11.6 degrees.
http://moorefans.com/pdfs/TMC_840_C.pdfFan Drawing:
Sound Pressure Level 1 meter below fan
http://www.moorefans.com
Horizontal
Moore Fans LLC Rating
Sound Power Level
0
Sound Pressure Level 1 meter radially from blade tip
SECTION PRESSURE PRESSURE TEMP IN CONN OUT CONN CONN ASME VOLUME LVR/GUARD COIL WT MOORE FAN 10000 MOTOR SIEMENS
MAWP(PSIG) TEST(PSIG) DEG F NPS NPS RATING FT3 LBS SERIES 42 HP 40
1 150 195 300 12 12 150 YES 162.43 OPTION 50095 DIAM. FT. 13 RPM 1800
2 BLADES RH VAC/PH/HZ 460/3/60
3 PITCH 7.3 TYPE TEFC
4 RPM 242 FRAME "T" 324
5 ACFM 180071 MTR SHAFT IN. 2.125
6 FT/MIN 9883 FAN SHFT IN 2.9375
587 BAYS PER UNIT 3
CL TO CL HEADERS
7.00
.75" Diam
24.00 1.375
66.00
176.00 6 3
148.00
84.00 6
GRADE MOUNT BASE PLATE
281.25 281.25 168
ROW 3 ROW 2 ROW 1 COL A COL B NOTE: THIS DRAWING IS PROPRIETARY TO FABSCO LLC, AND NOT
TO BE RELEASED WITHOUT PRIOR WRITTEN CONSENT
STUB COLUMNS REMOVED FOR SHIPMENT
ANGLE BRACES NOT SHOWN FOR CLARITY
SUBJECT TO MODIFICATION
ALL DIMENSIONS PROVIDED IN INCHES
Loads KIPS
ROW/COL DEAD HYDRO NOZ VERT WIND VERT WIND HORZ SEISMIC Y SEISMIC XZ Y MAX
1A 7.8 1.3 4.5 1.73910238 3.6 1.6 0.3 18.9 FABSCO LLC.1B 7.8 1.3 4.5 1.73910238 3.6 1.6 0.3 18.9
2A 15.6 2.6 0 1.73910238 3.6 3.1 0.6 23.5
2B 15.6 2.6 0 1.73910238 3.6 3.1 0.6 23.5
3A 7.8 1.3 0 1.73910238 3.6 1.6 0.3 14.4 PROPOSAL ARRANGEMENT3B 7.8 1.3 0 1.73910238 3.6 1.6 0.3 14.4 MODEL 3 F 2 48.000 14
DRAWING # P 3161802 REV 0
PREPARED BY: KM DATE: 3/16/2018
Page 1 of 1
PO Box 988 2410 Industrial Road Sapulpa, OK 74066 (918) 224-7550 Fax (918) 224-3564 [email protected]
Customer PO No: RE: Payment and Cancellation Schedules
Fabsco Quote/Job No:
Payment Schedule:
All payments are due Net 30 days from documented completion of the milestone.
10% Initial submittal of General Arrangement and Bundle prints
40% Upon receipt of tube
40% Hydrotest
10% Final documentation
Note: All shipments overseas must be paid in full prior to shipping the equipment from Fabsco, Sapulpa, which may mean accellerating the payment terms accordingly.
FABSCO
Cancellation Schedule:
WEEKS % of PO ARO Value
2 10
4 40
6 75
Start of Fabrication 100
All shipments overseas must be paid in full prior to shipping the equipment from Fabsco, Sapulpa, which may mean accellerating the payment terms accordingly.
Essential Terms
1. Liquidated, consequential, and indirect damages are spcifically excluded2. Warranty per API 661 is the lesser of 12 months from start up or 18 months from shipment. 3. Fabsco maximum exposure is limited the value of the purchase order.4. Bonds are specifically excluded from Fabsco's scope of supply. 5. Quotes exclude all taxes and duties on the equipment offered unless specifically stated otherwise.
FABSCO ‐ STANDARD TERMS AND CONDITIONS OF SALE
Fabsco Shell and Tube, LLC and Fabsco Fin‐Air, LLC, hereafter jointly referred to as Fabsco, includes our Standard Terms and Conditions of Sale for Fabsco to our customers hereafter referred to as Purchaser and these condition are to be made part of our sales proposal and quotation and we shall only accept purchase contracts or sales orders with these standard terms and conditions, unless these terms and conditions are modified specifically different in Fabsco’s related sales proposal and Fabsco written acceptance of Purchaser‘s sales order or contract which include different terms. All purchase orders or contracts related to Fabsco’s sales proposals are subject to written acceptance by Fabsco by authorized employee at our offices in Sapulpa, Oklahoma at the time of placement of purchase order by Purchaser.
1. PRICES Fabsco’s quoted prices are F.O.B. (ex‐works, loaded on truck(s), per INCOTERMS 2000) at Fabsco’s facility in Sapulpa, Oklahoma. Our prices are subject to the timely receipt of all required information and material from the Purchaser and the timely review and approval of related engineering prints and drawing of equipment being manufactured for Purchaser.
2. TAXES Prices do not include any Federal, State or Local sales, use, excise or similar taxes. Consequently, in addition to the price, the amount of any
present or future tax applicable to the sale or use of the Fabsco’s product or equipment shall be paid by the Purchaser unless the Purchaser shall have provided the Seller with a tax exemption certificate acceptable to Fabsco’s related taxing authorities.
3. ACCEPTANCE Acceptance of all purchase orders or contracts shall be by Fabsco’s authorized personnel at our general offices, in Sapulpa, Oklahoma,
subject to review of purchase order documents and credit approval. Fabsco’s sales proposal must be accepted by Purchaser within 30 days from date tendered and in the interim; Fabsco reserves the right to modify the price and any other terms of proposal until written authorized acceptance by Fabsco.
4. DELIVERY All delivery terms and dates are subject to: (i) the prior sale of the product or equipment or any part thereof; (ii) causes beyond Fabsco’s
reasonable control; (iii) acts of God, fires, floods, epidemics, riots, wars, priorities and acts of civil or military authority; (iv) strikes, labor difficulties and shortages of labor; (v) delays in transportation, trucking shortages and shortages in fuel, power, materials and supplies; and (vi) acts of the Purchaser including the timely receipt of all required information and materials from Purchaser.
5. TERMS OF PAYMENT Fabsco’s terms of payment shall be net 30 days from our invoice date. Invoices shall only be payable in U.S. funds and any delays in
Purchaser’s transportation arrangements of related equipment from Fabsco’s facility shall not extend terms of payment or Fabsco’s invoicing rights related to subject equipment. In case of inability of Purchaser to accept any shipment in accordance with purchase order, the Purchaser shall be liable for freight, express, storage, extra cost of handling and other expenses that may be incurred by Fabsco.
6. TITLE TO GOODS It is understood and agreed that all equipment or materials included in this proposal and related sales order is to remain the property of
Fabsco until shipped from our facility, at which time title shall pass to Purchaser.
7. WARRANTY Fabsco warrants that the equipment covered by this quotation and related purchase order is free of defects in material and workmanship, when operated in accordance with the conditions stated in this proposal and related purchase order for a period of the lesser of 12 months after start‐up of Fabsco’s equipment or a period not to exceed 18 months from shipment from Fabsco’s facility. Such warranty shall not apply to any equipment which has been altered or repaired by other than Fabsco’s personnel. Fabsco’s obligation under this warranty is limited to repairing or if in Fabsco’s judgment it seems more appropriate to furnishing without charge, F.O.B. (ex‐works, loaded on truck(s), per INCOTERMS 2000) Fabsco’s facility, a similar part to replace any part which after examination shall to Fabsco’s satisfaction be determined to have been defective at the time it was shipped. This warranty applies only if Fabsco received an immediate written notice upon discovery of such defect by Purchaser. Fabsco makes no warranties covering deterioration or failure due to corrosion or erosion or warranties due to improper installation, operation or storage of related equipment by Purchaser. Fabsco shall assume no responsibility for excessive fouling of our equipment by material such as coke, silt, scale or any foreign substance that may be deposited. Fabsco’s thermal guarantee shall not be applicable on any manufactured equipment where the thermal performance rating was made by the Purchaser. Finished materials and accessories purchased from other manufacturers, including tubes, are warranted only to the extent of the original manufacturer’s warranty to Fabsco. Replacement and Spare Parts: When replacement or spare tube bundles, shells or other parts are purchased, Fabsco is to guarantee satisfactory fit of such parts only if Fabsco was the original manufacturer. Parts fabricated to drawings furnished by the Purchaser shall only be warranted to meet the dimensions and tolerances specified in related drawings.
Fabsco hereby disclaims any and all warranties, expressed or implied, whether for merchantability or fitness for our manufactured equipment being used for particular purpose or otherwise in Purchaser’s enterprise or operating processes.
8. LIMITATION OF LIABILITY AND WARRANTY Notwithstanding any section of this agreement, neither Fabsco nor Purchaser shall be liable to the other
party for any consequential, incidental, indirect damages or loss of profits arising out of this contract and the performance thereof, whether or not such loss or damage is based on the contract, indemnity, tort, strict liability, or otherwise; provided however that this is not intended to apply to any consequential damage claims asserted by third parties which an indemnity obligation is required. Under no circumstance shall Fabsco be liable for any amounts which exceed the purchase price of the specific individual related equipment.
9. INDEMNITY To the extent allowed by Law, Fabsco agrees to indemnify and hold harmless Purchaser from and against any and all losses, claim, attorney’s
fees and expenses, or any death, injury or damage to property or person, arising from or related to any of the following:
(i) The negligent act, omission or willful misconduct of Fabsco related to this Purchase Order. (ii) The failure of Fabsco to pay when due any subcontractor, supplier, employee or other person for work performed in connection
with this Purchase Order. (iii) The failure of Fabsco to secure the timely release of any lien or encumbrance on any equipment to be supplied under the terms of
this Purchase Order.
If Fabsco and Purchaser are concurrently negligent, each Party’s liability shall be limited to that portion of the negligence attributable to it. Notwithstanding anything to the contrary herein, neither Party shall be liable to indemnify the other for the negligence or willful misconduct of the other.
10. CHANGES The Purchaser may change the specification of their equipment order only upon written notice to Fabsco. Any additional costs as a result of the change to Fabsco, will be adjusted to Purchaser’s price.
11. CANCELLATION Should this purchase order or any specific equipment of this purchase order require suspension of work or cancellation of purchase order by Purchaser, written notice must be immediately forwarded to Fabsco’s office in Sapulpa, Oklahoma. A review of all costs incurred on Purchaser’s behalf, will be made by Fabsco to establish an adjustment in price or cancellation costs and an invoice for these costs will be provide to Purchaser and is due in 30 days from invoice date.
12. WAIVER AND MODIFICATION No waiver or modification of any of Fabsco’s Standard Terms and Conditions of Sale shall be effective unless
acknowledged in writing and signed by an authorized Fabsco employee.
13. PATENTS The Purchaser agrees to hold Fabsco harmless from any infringement of process patents due to the incorporation of Fabsco’s manufactured equipment purchased hereunder into a process by the Purchaser and / or related user of said equipment.
14. ERRORS Stenographic and clerical errors of either party are subject to correction.
15. GOVERNING LAW AND DISPUTE RESOLUTION These Standard Terms and Conditions of Sale and the Purchase Order shall be construed and interpreted
in accordance with the laws of the State of Oklahoma. Any action commenced by either Party shall be brought in the Courts of the State of Oklahoma.
16. SUCCESSORS This agreement shall inure to and be binding upon Fabsco and Purchaser hereto, their heirs, successors and assigns.
17. LEGALITY Any provision herein prohibited by law shall be ineffective to the extent of such prohibition without invalidating the remaining provisions of this agreement.
18. CONFLICTS If there are conflicting terms in any agreements, the Purchase Order accepted pursuant to Paragraph 3 will be the controlling document.
19. FCPA COMPLIANCE Purchaser agrees to comply with all applicable national, federal, state and local laws, ordinances and regulations of the United States
of America and of all other applicable anti‐bribery and anti‐corruption laws of non‐U.S. jurisdictions, including without limitation all provisions of the United States Foreign Corrupt Practices Act and any amendments thereto (the “FCPA”). In furtherance and not in limitation of the foregoing covenants, Purchaser represents and covenants that is has not paid and will not, directly or indirectly, pay, offer, give, promise (or authorize such) anything of value to any official or employee or any national, state, or local government of any country, or any agency or instrumentality thereof, to any candidate for public office, to any political party, or any officer or employee thereof in violation of the FCPA or other applicable anti‐bribery laws. Purchaser acknowledges and agrees that Fabsco has the right to terminate the Agreement and any other agreement between Fabsco and Purchaser in the event that Fabsco determines, in its sole discretion exercised in good faith, that Purchaser has committed a violation of the FCPA or any other applicable anti‐bribery or anti‐corruption law or regulations. Purchaser shall defend, indemnify and hold Fabsco harmless from any claims, suits, investigations, penalties, and fines of any kind resulting from any FCPA or other anti‐bribery or anti‐corruption investigation which may occur as a result of any conduct by Purchaser. These FCPA Compliance provisions shall survive any termination, lapse or expiration of the Agreement for a period of twenty‐four (24) months.
20. INTERNATIONAL TRADE COMPLIANCE Purchaser warrants, guarantees, and represents that any products obtained from Fabsco shall be used for inventory purposes, unless otherwise notified to Fabsco in writing. In addition, Purchaser warrants, guarantees, and represents that it shall not, directly or indirectly, disclose, export, re‐export, or transfer in any manner any goods, software, technology, services and/or technical data in violation of any applicable U.S. or applicable foreign laws or regulations governing international trade, export controls, sanctions or embargoes. Purchaser acknowledges and agrees that Fabsco has the right to terminate the Agreement and any other agreement between Fabsco and Purchaser in the event that Fabsco determines, in its sole discretion exercised in good faith, that Purchaser has committed a violation of any applicable U.S. or applicable foreign laws or regulations governing international trade, export controls, sanctions or embargoes. Purchaser shall defend, indemnify and hold Fabsco harmless from any claims, suits, investigations, penalties, and fines of any kind resulting from any investigation involving an alleged violation of U.S. or applicable foreign laws or regulations governing international trade, export controls, sanctions or embargoes investigation which may occur as a result of any conduct by Purchaser. These International Trade Compliance provisions shall survive any termination, lapse or expiration of the Agreement for a period of sixty (60) months.
Attention : Steven Forrest Reference number : 18-15760-2 rev.ACustomer : Wellons Canada Your contact : Sam Mostofi-Afshar
Location :TAG : Date : 01-03-2018
Item : 1 Duty : 20,000,000 Btu/hr Air cooler Option : 1 Stainless steel Tubes ,
Number of systems : 1 Model : EOLIA type ELECTRA Header and connections
Dimension: (Air opening) Width : 97" Length : 246"
Inner Tube type : SA-249 TP304 Turbulators : No Model : N/A
Connection : 300 # Flgd in S.S. 304 Inner Tube thick. : 0.049" Inner Tube O.D. : 0.625"
Fin : Yes Material : Integral Aluminum Fins / Inch : 11
Tubesheet material : Stainless Steel 304 Coating: N/A
Header Material : Stainless steel 304 Coating : N/A Header Type : Removable
Casing Material Galvanized steel Coating : N/A
Fan Cabinet : Galvanized steel Coating : N/A
Fan guards : Carbon steel Coating : Painted or zinc plated
Others :
Weights Empty/Flooded : TBA Sketch : TBA
Fan quantity / unit : 8 Propeller size : 36" Fan Material : Alluminium
Motors : Protection class : F
Other N/A
20 000 000 Btu/h Coil arrangement : 15 861.40 kW
Air flow style : TBA Air orientation : Horizontal
Sound pressure level : 92 +/-2 dB(A) @ 2m*
Design elevation : Sea level
Fluid name :
Inlet Temperature : 525.0 °F 273.9 °C 70.0 °F 21.1 °C
Outlet Temperature : 375.0 °F 190.6 °C 217.0 °F 102.8 °C
Mean Temperature : 450.0 °F 232.2 °C 143.5 °F 61.9 °C
Flow Rate : 212 005 lb/h 96 164 kg/h
Pressure drop : 3.3 PSI 22.8 kPa
Velocity : 3.5 ft/s 1.1 m/s
75 PSI (g) 600 °F 100 PSI (g)517 kPa (g) 316 °C 689 kPa (g)
Heat dissipation :
Dry Air
Tube side :
Petrotherm
General Information :
Heat Exchanger Description :
Fan & Motor Specification :
Performance Specification :
Finned Side :
5hp, 3ph, 60hz, 575V, 1160 rpm, TEFC
*Estimated sound pressure based on free field. The environment for each fan installation influences its measured sound value, therefore dBA levels are for information only.
Design Pressure : Design Temperature : Test Pressure :
Design Data :
Appendix D
Appendix D
Predictor Model Inputs
Whitesand Appendix D: Predictor Inputs Project No.: 300030895.5
Appendix D: Predictor InputsArea Source Limit of 20
Group Item ID Grp ID Date 1st Kid Kid Cnt Name Desc. Shape X1 Y1 Height Rel.H
Line Source Limit of 20Group Item ID Grp ID Date 1st Kid Kid Cnt Name Desc. Shape X1 Y1 Xn Yn
1 99974 0 ###### -1 10 90 HOGGED BIOMASS CONVEYOR - 400Polyline 354304.3 5572049 354462.7 55722282 99975 0 ###### -11 2 75 MICROCHIPPER TAKEAWAY CONV-140Polyline 354427.6 5572179 354453.3 55721753 99976 0 ###### -13 6 76 MICROCHIP TRANSFER CONV-141Polyline 354427.5 5572180 354338.8 55720814 99977 0 ###### -19 1 77 MICROCHIP PILE CONVEYOR - 142Polyline 354379.7 5572093 354362.7 55721085 99978 0 ###### -20 2 79 MICROCHIP CONVEYOR - 154Polyline 354326.7 5572075 354290.7 55721076 99979 0 ###### -22 3 93 HOGGED BIOMASS SCREEN FEED CONVEYOR -412Polyline 354323.9 5572072 354284.9 55721067 99980 0 ###### -25 1 94 SCREENED BIOMASS CONVEYOR - 440Polyline 354284.2 5572107 354267.4 55721228 99981 0 ###### -26 1 95 SCREENED BIOMASS CONVEYOR - 441Polyline 354253 5572106 354266.8 55721229 99982 0 ###### -28 1 92 HOGGED BIOMASS RECLAIM CONVEYOR - 410Polyline 354324.1 5572068 354318.9 5572062
10 99983 0 ###### -29 2 91 HOGGED BIOMASS PILE CONVEYOR - 402Polyline 354325.3 5572030 354304.2 557204911 99984 0 ###### -31 3 108 SLASHER - REFUSE TRANSFER CONVEYOR - 522Polyline 354522.9 5572198 354476.6 557224012 99985 0 ###### -34 2 109 DEBARKER - REFUSE TRANSFER CONVEYOR - 523Polyline 354504 5572214 354475.8 557218213 99986 0 ###### -36 2 72 DEBARKER REFUSE PILE CONVEYOR - 107Polyline 354467.8 5572173 354450.1 557215414 99987 0 ###### -38 2 80 MICROCHIP CONVEYOR - 156Polyline 354284.9 5572112 354264.3 557213115 99988 0 ###### -40 2 82 MICROCHIP CONVEYOR - 165Polyline 354263.4 5572132 354240.8 557215216 99992 0 ###### -59 1 34 Pellet Plant - Packaging Fire Dump ConveyorPolyline 354256.4 5572210 354249.3 557221617 99993 0 ###### -60 1 35 Pellet Plant - Baghouse Fines ConveyorPolyline 354229.4 5572175 354222.7 557218018 99994 0 ###### -61 1 83 DRY FEEDSTOCK CONVEYOR - 190Polyline 354256.8 5572181 354238.5 557219719 99996 0 ###### -63 1 78 MICROCHIP RECLAIM CONVEYOR - 150Polyline 354332.8 5572074 354338.7 557208120 99997 0 ###### -64 1 81 MICROCHIP SURGE BIN SCREW CONVEYORS - 161Polyline 354264.1 5572132 354261.3 557212821 99998 0 ###### -65 1 107 SLASHER - REFUSE CONVEYOR #2 - 521Polyline 354517 5572208 354514.7 557220622 99999 0 ###### -66 1 112 FUEL HOG - TRANSFER CONVEYOR - 552Polyline 354475.5 5572242 354485.8 557225423 1E+05 0 ###### -67 1 105 SLASHER - TRANSFER CONVEYOR - 514Polyline 354556.1 5572235 354542.1 557222124 1E+05 0 ###### -68 1 106 SLASHER - REFUSE CONVEYOR #1 - 520Polyline 354525.3 5572202 354522.6 557219925 1E+05 0 ###### -69 3 101 SLASHER - TAKE AWAY CONVEYOR - 510Polyline 354525.5 5572201 354491.7 557216426 1E+05 0 ###### -869 9 68 Mobile Equipment ? Front End Loader ? Chip RePolyline 354347.5 5572073 354443.7 557213827 1E+05 0 ###### -878 3 69 Mobile Equipment ? Front End Loader ? BiomassPolyline 354327.1 5572059 354377.4 557202328 1E+05 0 ###### -881 5 67 Mobile Equipment ? Log Handler-WMYPolyline 354578.2 5572274 354506.8 557226929 1E+05 0 ###### -886 1 66 Mobile Equipment - Forklift - Pellet ShippingPolyline 354205.1 5572202 354218.9 5572217
Moving SourceLimit of 20Group Item ID Grp ID Date 1st Kid Kid Cnt Name Desc. Shape X1 Y1 Xn Yn
1 1E+05 0 ###### ##### 9 Pellet TPellet Truck ShipmentPolyline 354460.4 5572604 354628.6 55724782 1E+05 0 ###### -763 1 Pellet TPellet Truck ShipmentPolyline 354235.5 5572265 354242.6 55722583 1E+05 0 ###### -764 5 Pellet TPellet Truck ShipmentPolyline 354242.6 5572258 354257.4 55722454 1E+05 0 ###### -769 1 Pellet TPellet Truck ShipmentPolyline 354242.6 5572258 354257.4 55722455 1E+05 0 ###### -770 30 Pellet TPellet Truck ShipmentPolyline 354257.4 5572245 354490.9 55723236 1E+05 0 ###### ##### 46 Log TrckLog Truck ShipmentPolyline 354460.4 5572604 354628.6 5572478
Point Source Limit of 100Group Item ID Grp ID Date Name Desc. Shape X Y Height Rel.H Terrain L HDef.
1 1E+05 0 ###### 40 Pelletlant ? Dustick-ups and Screen Fines - B Point 354231.6 5572225 5.48 5.48 0 Relative2 1E+05 0 ###### 41 Pelletlant ?Pellet Cooler - Cyclone Vent Point 354227.5 5572220 5.48 5.48 0 Relative3 1E+05 0 ###### 42 Pelletlant ? Fine Hammer Mill #1 - Bag House Point 354235.5 5572229 5.48 5.48 0 Relative4 1E+05 0 ###### 43 Pelletlant ? Fine Hammer Mill #2 - Bag House Point 354239.6 5572234 5.48 5.48 0 Relative5 1E+05 0 ###### 61_1 Chip Dryer Point 354236.6 5572161 7.01 7.01 0 Relative6 1E+05 0 ###### 61_2 Chip Dryer Point 354241.7 5572167 7.01 7.01 0 Relative7 1E+05 0 ###### 61_3 Chip Dryer Point 354246.5 5572172 7.01 7.01 0 Relative8 1E+05 0 ###### 61_4 Chip Dryer Point 354251.4 5572178 7.01 7.01 0 Relative9 1E+05 0 ###### 48 Mechanical Shop Exhaust Fan Point 354208.7 5572173 8.5 8.5 0 Relative
10 1E+05 0 ###### 49 Electrical Shop Exhaust Fan Point 354212.2 5572169 8.5 8.5 0 Relative11 1E+05 0 ###### 60 Dry Chip Storage Silo Vent Point 354249.1 5572198 24.74 24.74 0 Relative12 1E+05 0 ###### 8 Boiler Flue Gas Stack Point 354212.2 5572111 20 20 0 Relative13 1E+05 0 ###### 55 Pellet Storage Silo Vent Point 354237.3 5572184 7.21 7.21 0 Relative14 1E+05 0 ###### 50 Control Room Exhaust Fan Point 354241 5572226 9.14 9.14 0 Relative15 1E+05 0 ###### 51 Garage HVAC Point 354279.3 5572269 10.6 10.6 0 Relative16 1E+05 0 ###### 54 Garage Vehicle Exhaust System Point 354272.3 5572264 10.6 10.6 0 Relative17 1E+05 0 ###### 58 Debarker/Microchipper Building Fan Point 354462.7 5572192 9.75 9.75 0 Relative18 1E+05 0 ###### 59 Biomass Screening Buidling Fan Point 354288.2 5572101 7.2 7.2 0 Relative19 1E+05 0 ###### 61_1E Chip Dryer - Exhuast Point 354237.9 5572162 2.5 2.5 0 Relative20 1E+05 0 ###### 61_2E Chip Dryer - Exhuast Point 354242.9 5572168 2.5 2.5 0 Relative21 1E+05 0 ###### 61_3E Chip Dryer - Exhuast Point 354247.8 5572174 2.5 2.5 0 Relative22 1E+05 0 ###### 61_4E Chip Dryer - Exhuast Point 354252.7 5572179 2.5 2.5 0 Relative23 1E+05 0 ###### 71 DEBARKER INFFED LOG DECK - 101 Point 354486 5572163 4.57 4.57 0 Relative24 1E+05 0 ###### 84 DRY FEEDSTOCK BUCKET ELEVATOR - 191 Point 354247.2 5572218 12.19 12.19 0 Relative25 1E+05 0 ###### 86 DRY FEEDSTOCK STORAGE EXHAUST FAN - 193 Point 354248.4 5572218 8.13 8.13 0 Relative26 1E+05 0 ###### 102 SLASHER - KICKER #1 - 511 Point 354538.4 5572210 4.57 4.57 0 Relative27 1E+05 0 ###### 103 SLASHER - KICKER #2 - 512 Point 354539.5 5572211 4.57 4.57 0 Relative28 1E+05 0 ###### 104 SLASHER - KICKER #3 - 513 Point 354540.7 5572212 4.57 4.57 0 Relative29 1E+05 0 ###### 117 Slasher Building Fan Point 354536.2 5572225 7.1 7.1 0 Relative30 1E+05 0 ###### 110 FUEL HOG - LOG DECK - 550 Point 354486.9 5572256 2.44 2.44 0 Relative31 1E+05 0 ###### 111 FUEL HOG - SINGULATOR - 552 Point 354485.9 5572255 4.57 4.57 0 Relative32 1E+05 0 ###### 118 Hog Fuel Building Fan Point 354467 5572239 7.1 7.1 0 Relative33 1E+05 0 ###### 121 Thermal Oil Heat Dump Point 354223.3 5572099 5 5 0 Relative34 1E+05 0 ###### 122_B1_F1Glycol Cooling Heat Dump Bay 1 Fan 1 Point 354217.7 5572143 5 5 0 Relative35 1E+05 0 ###### 122_B1_F2Glycol Cooling Heat Dump Bay 1 Fan 2 Point 354216.5 5572142 5 5 0 Relative36 1E+05 0 ###### 122_B2_F1Glycol Cooling Heat Dump Bay 2 Fan 1 Point 354221.7 5572140 5 5 0 Relative37 1E+05 0 ###### 122_B2_F2Glycol Cooling Heat Dump Bay 2 Fan 2 Point 354220.5 5572138 5 5 0 Relative38 1E+05 0 ###### 122_B3_F1Glycol Cooling Heat Dump Bay 3 Fan 1 Point 354225.6 5572136 5 5 0 Relative39 1E+05 0 ###### 122_B3_F2Glycol Cooling Heat Dump Bay 3 Fan 2 Point 354224.4 5572135 5 5 0 Relative40 1E+05 0 ###### 100 SLASHER - LOG DECK - 501 Point 354518.9 5572224 2.4 2.4 0 Relative41 1E+05 0 ###### IDF Induced Draft Fan Point 354201 5572121 2 2 0 Relative42 1E+05 0 ###### 31 Fire Pump Diesel Engine (150hp) Point 354377.7 5571965 8.23 8.23 0 Relative43 1E+05 0 ###### 30 Diesel Generator (500kW) Casing Point 354218 5572153 8.23 8.23 0 Relative44 1E+05 0 ###### 31E Fire Pump Diesel Engine (150hp) Exhaust Point 354384.8 5571963 1 1 9.6 Relative to Objects45 1E+05 0 ###### MFP Main Fire Pump Point 354381.7 5571970 1 1 0 Relative
Contour Point Limit of 20Group Item ID Grp ID Date Name Desc. Shape X Y Height Rel.H Terrain L HDef.
Grid Limit of 20Group Item ID Grp ID Date 1st Kid Kid Cnt Name Desc. Shape X1 Y1 Height Rel.H
Neegan Burnside Ltd. Model Inputs 1 of 2 30895 Whitesand Biomass REA Noise Tables HW
Appendix E
Predictor Model Outputs
Appendix E
Whitesand Appendix E: Predictor Inputs Project No.: 300030895.5
Day Limit 100 Sources, 88 PORsGroup / source ReductionPOR1_APOR1_A POR1_BPOR1_BPOR1_CPOR1_C POR2_A POR2_A POR2_B POR2_B POR2_O_APOR2_O_A
[dB] result corr. result corr. result corr. result corr. result corr. result corr.100 - SLASHER - LOG ... 0 7.5 7.5 11.6 11.6 11.6 11.6 1 1 5.1 5.1 1.1 1.1101 - SLASHER - TAKE... 0 20 20 23.8 23.8 23.8 23.8 18.4 18.4 22.4 22.4 18.4 18.4102 - SLASHER - KICK... 0 -8.6 -8.6 -5.9 -5.9 -5.8 -5.8 4.9 4.9 8.9 8.9 5 5103 - SLASHER - KICK... 0 -8.1 -8.1 -5.3 -5.3 -5.2 -5.2 4.9 4.9 8.9 8.9 5 5104 - SLASHER - KICK... 0 -7.5 -7.5 -4.5 -4.5 -4.4 -4.4 4.9 4.9 8.9 8.9 5 5105 - SLASHER - TRA... 0 17 17 21.1 21.1 21.2 21.2 10.5 10.5 13.3 13.3 10.6 10.6106 - SLASHER - REF... 0 -13.7 -13.7 -10.9 -10.9 -10.8 -10.8 -1 -1 3 3 -1 -1107 - SLASHER - REF... 0 -4.8 -4.8 -1.1 -1.1 -1.1 -1.1 -1.8 -1.8 2.2 2.2 -1.8 -1.8108 - SLASHER - REF... 0 12.9 12.9 17 17 17 17 8.9 8.9 12.4 12.4 9 9109 - DEBARKER - RE... 0 11.4 11.4 14.6 14.6 14.7 14.7 7.9 7.9 11.5 11.5 8 8110 - FUEL HOG - LOG... 0 5.4 5.4 9.4 9.4 9.5 9.5 -3.3 -3.3 -2.6 -2.6 -3.3 -3.3111 - FUEL HOG - SIN... 0 6.2 6.2 10.2 10.2 10.3 10.3 -0.8 -0.8 0.5 0.5 -0.7 -0.7112 - FUEL HOG - TRA... 0 16.3 16.3 20.4 20.4 20.4 20.4 1.1 1.1 1.7 1.7 1.1 1.1115 - Slasher Building 0 25 25 29.1 29.1 29.2 29.2 21.2 21.2 25.2 25.2 21.2 21.2116 - Hog Fuel 0 21 21 25.1 25.1 25.2 25.2 16.8 16.8 20.1 20.1 16.9 16.9117 - Slasher Building ... 0 18.4 18.4 22.5 22.5 22.5 22.5 -2.4 -2.4 -0.6 -0.6 -2.3 -2.3118 - Hog Fuel Buildin... 0 18.7 18.7 22.7 22.7 22.8 22.8 10.6 10.6 12.3 12.3 10.7 10.7121 - Thermal Oil Heat... 0 3.6 3.6 6.3 6.3 6.3 6.3 21.3 21.3 25.4 25.4 21.4 21.4122_B1_F1 - Glycol C... 0 8.9 8.9 9.7 9.7 9.9 9.9 9 9 11.5 11.5 9.1 9.1122_B1_F2 - Glycol C... 0 8.9 8.9 9.7 9.7 10 10 9 9 11.5 11.5 9.1 9.1122_B2_F1 - Glycol C... 0 9.1 9.1 9.9 9.9 10.1 10.1 9 9 11.5 11.5 9.1 9.1122_B2_F2 - Glycol C... 0 9.1 9.1 9.9 9.9 10.1 10.1 9 9 11.5 11.5 9.1 9.1122_B3_F1 - Glycol C... 0 -1.3 -1.3 -0.5 -0.5 -0.1 -0.1 3.8 3.8 5.9 5.9 3.8 3.8122_B3_F2 - Glycol C... 0 9.1 9.1 9.9 9.9 10.1 10.1 4.7 4.7 6.8 6.8 4.7 4.728 - ORC Building 0 28.3 28.3 32.4 32.4 32.4 32.4 26.1 26.1 30 30 26.1 26.134 - Pellet Plant - Pack... 0 5.1 5.1 5.3 5.3 5.4 5.4 -10 -10 -9.9 -9.9 -9.9 -9.935 - Pellet Plant - Bag... 0 -6.6 -6.6 -6 -6 -5.9 -5.9 12.9 12.9 16.9 16.9 12.9 12.940 - Pelletlant ? Dustic... 0 3.8 3.8 7.8 7.8 7.9 7.9 -11.4 -11.4 -9.8 -9.8 -11.4 -11.441 - Pelletlant ?Pellet ... 0 3.7 3.7 7.8 7.8 7.9 7.9 -11.1 -11.1 -9.6 -9.6 -11.1 -11.142 - Pelletlant ? Fine H... 0 3.8 3.8 7.9 7.9 7.9 7.9 -11.1 -11.1 -9.7 -9.7 -11.1 -11.143 - Pelletlant ? Fine H... 0 3.8 3.8 7.9 7.9 8 8 -11.4 -11.4 -9.9 -9.9 -11.4 -11.447 - Pellet P1 0 25.1 25.1 28.9 28.9 29 29 24.4 24.4 27.9 27.9 24.4 24.447_2 - Pellet P1 0 28.4 28.4 32.5 32.5 32.5 32.5 24.2 24.2 27.3 27.3 24.3 24.348 - Mechanical Shop ... 0 -8.3 -8.3 -7.1 -7.1 -7.1 -7.1 0.9 0.9 5 5 1 149 - Electrical Shop Ex... 0 -6.3 -6.3 -5.2 -5.2 -5.1 -5.1 0.9 0.9 5 5 1 150 - Control Room Ex... 0 4.4 4.4 8.4 8.4 8.5 8.5 -14.2 -14.2 -12.5 -12.5 -14.2 -14.251 - Garage HVAC 0 16.7 16.7 20.8 20.8 20.9 20.9 10.5 10.5 11.7 11.7 10.5 10.554 - Garage Vehicle E... 0 16.7 16.7 20.7 20.7 20.8 20.8 10.3 10.3 11.6 11.6 10.4 10.455 - Pellet Storage Sil... 0 -34.7 -34.7 -33.3 -33.3 -33.2 -33.2 -22.6 -22.6 -20.1 -20.1 -22.5 -22.556 - Debarker 0 22.6 22.6 26.7 26.7 26.7 26.7 18.4 18.4 21.3 21.3 18.5 18.557 - Biomass 0 18.8 18.8 19.9 19.9 19.6 19.6 17.6 17.6 21.7 21.7 17.7 17.758 - Debarker/Microch... 0 -9.6 -9.6 -8.4 -8.4 -8.4 -8.4 -4.6 -4.6 -3.5 -3.5 -4.5 -4.559 - Biomass Screenin... 0 -12.9 -12.9 -11.1 -11.1 -11.1 -11.1 1.2 1.2 5.3 5.3 1.3 1.360 - Dry Chip Storage ... 0 -18.5 -18.5 -14.5 -14.5 -14.4 -14.4 -22 -22 -18 -18 -22 -2261_1 - Chip Dryer 0 -18.9 -18.9 -17.1 -17.1 -17 -17 -10.5 -10.5 -8.1 -8.1 -10.5 -10.561_1E - Chip Dryer - E... 0 -3.3 -3.3 -2.4 -2.4 -2.3 -2.3 -3.9 -3.9 -1.1 -1.1 -3.9 -3.961_2 - Chip Dryer 0 -6.7 -6.7 -5.4 -5.4 -5.2 -5.2 -11.4 -11.4 -9.3 -9.3 -11.4 -11.461_2E - Chip Dryer - E... 0 -3.4 -3.4 -2.5 -2.5 -2.4 -2.4 -4.9 -4.9 -2.6 -2.6 -5 -561_3 - Chip Dryer 0 -6.7 -6.7 -5.4 -5.4 -5.2 -5.2 -11.7 -11.7 -9.8 -9.8 -11.7 -11.761_3E - Chip Dryer - E... 0 -3.4 -3.4 -2.4 -2.4 -2.3 -2.3 -5.5 -5.5 -3.4 -3.4 -5.6 -5.661_4 - Chip Dryer 0 -6.7 -6.7 -5.4 -5.4 -5.2 -5.2 -11.6 -11.6 -9.8 -9.8 -11.5 -11.561_4E - Chip Dryer - E... 0 -3.3 -3.3 -2.4 -2.4 -2.2 -2.2 -5.1 -5.1 -3.3 -3.3 -5.1 -5.166 - Mobile Equipment... 0 19.6 19.6 23.6 23.6 23.7 23.7 12.3 12.3 13.3 13.3 12.3 12.367 - Mobile Equipment... 0 17.1 17.1 21.2 21.2 21.2 21.2 12.5 12.5 15.9 15.9 12.6 12.668 - Mobile Equipment... 0 15.8 15.8 19.8 19.8 19.9 19.9 14.1 14.1 18 18 14.2 14.269 - Mobile Equipment... 0 15.7 15.7 19.7 19.7 19.8 19.8 14.4 14.4 18.4 18.4 14.4 14.471 - DEBARKER INFFE... 0 4 4 5.7 5.7 5.7 5.7 2.3 2.3 6.4 6.4 2.4 2.472 - DEBARKER REFU... 0 5 5 9 9 9.1 9.1 6.2 6.2 8.8 8.8 6.2 6.275 - MICROCHIPPER ... 0 7.9 7.9 12 12 12 12 6.1 6.1 10.1 10.1 6.2 6.276 - MICROCHIP TRA... 0 14.7 14.7 18.8 18.8 18.9 18.9 13.1 13.1 17.1 17.1 13.1 13.177 - MICROCHIP PILE ... 0 6.9 6.9 10.9 10.9 11 11 4.8 4.8 8.8 8.8 4.8 4.878 - MICROCHIP REC... 0 12.5 12.5 16.6 16.6 16.6 16.6 10.8 10.8 14.8 14.8 10.9 10.979 - MICROCHIP CON... 0 10.1 10.1 13.5 13.5 13.5 13.5 8.2 8.2 12.2 12.2 8.3 8.38 - Boiler Flue Gas Stack 0 35.7 35.7 39.7 39.7 39.8 39.8 33.6 33.6 37.6 37.6 33.6 33.680 - MICROCHIP CON... 0 7.7 7.7 9 9 9.1 9.1 5.7 5.7 9.7 9.7 5.8 5.881 - MICROCHIP SUR... 0 4 4 4.3 4.3 4.4 4.4 -2.5 -2.5 1.4 1.4 -2.4 -2.482 - MICROCHIP CON... 0 5.5 5.5 5.8 5.8 6 6 -9.9 -9.9 -7 -7 -9.9 -9.983 - DRY FEEDSTOCK ... 0 -3.4 -3.4 -2.9 -2.9 -2.8 -2.8 4.6 4.6 5.8 5.8 4.5 4.584 - DRY FEEDSTOCK ... 0 -0.5 -0.5 0.6 0.6 0.7 0.7 -4.6 -4.6 -3.4 -3.4 -4.5 -4.586 - DRY FEEDSTOCK ... 0 -25.2 -25.2 -24 -24 -23.9 -23.9 -30.9 -30.9 -29.6 -29.6 -30.9 -30.990 - HOGGED BIOMAS... 0 17.3 17.3 21.4 21.4 21.5 21.5 15.2 15.2 19.3 19.3 15.3 15.391 - HOGGED BIOMAS... 0 -2.6 -2.6 1.4 1.4 1.5 1.5 -3.8 -3.8 0.3 0.3 -3.7 -3.792 - HOGGED BIOMAS... 0 17.1 17.1 21.2 21.2 21.2 21.2 15.6 15.6 19.6 19.6 15.7 15.793 - HOGGED BIOMAS... 0 8.6 8.6 12.7 12.7 12.7 12.7 8.6 8.6 12.6 12.6 8.6 8.694 - SCREENED BIOM... 0 9.4 9.4 9.6 9.6 9.7 9.7 4.9 4.9 8.9 8.9 4.9 4.995 - SCREENED BIOM... 0 5.6 5.6 5.7 5.7 5.8 5.8 4.7 4.7 8.7 8.7 4.7 4.7IDF - Induced Draft Fan 0 33.6 33.6 37.6 37.6 37.7 37.7 31.4 31.4 35.4 35.4 31.5 31.5
Neegan Burnside Ltd. Model Results 1 of 4 30895 Whitesand Biomass REA Noise Tables HW