ApplicationApplication
Design sludge storage siloDesign sludge storage silo
Dr. Hasan HamoudaDr. Hasan Hamouda
Design sludge storage siloDesign sludge storage silo
Design a sludge storage silo for one Year capacity
Given are with following WWTP Data:
QIn = 50000 m3, C = 200 mg BOD5/l, QR/Q0 = 0.58
= 0.9 kg TS / kg BOD5
SS removal in PS = 60%
BOD5 removal in PS = 30%
TS Effluence = 10 mg/l
TS Biology = 4 g/l
TS max from Thickening tank = 4%
TS max from Pressing machine = 18%
TS of final dewatering process = 36%
Sludge treatmentSludge treatment
Dewatering
Anaerobic
Stabilization
Landfill
agricultural recycling
thermal recycling
Sludge
Thickening
Tank
Pressing LimingTS~18%TS~4%
Silo
TS~36%
Polymer Dosage
Coagulation
Flocculation
Dewaterd
Sludge
36%
Excessive
Sludge
4%Lime
18%
H2O
64%
Pressed
Sludge
18%
Sludge
4%
H2O
96%
wastewater treatment plants-treated sludgewastewater treatment plants-treated sludge
Solution
Load in Influence = 50000 m3/d X 200 mg/l = 10000 kg BOD5 ,
From BOD5 removal in PS = 30%, Load after PS 10000 kg BOD5 X 0.7 = 7000 kg BOD5
From s = 0.9 kg TS / kg BOD5, calculate the m Excess = 7000 X 0.9 = 6300 kg TS/d
From SS removal in PS = 60%, calculate the m Primary sludge = 10000 X 0.6 = 6000 kg TS/d
From TS Eff = 10 mg/l, calculate the m Excess, Eff = 50000 X 10 mg/l = 500 kg TS/d (flow in the per flooder)
S M total = S m Excess + m Primary sludge + m Excess, Eff = (6300 + 6000 + 500) kg TS/d = 12800 kg TS/d
s total = 12800 kg TS/d /10000 kg BOD5/d = 1.28 kg TS / kg BOD5,elimenated
S m total, to Dewatering = S m Excess + m Primary sludge = (6300 + 6000 ) kg TS/d = 12300 kg TS/d
Assumption: TS primary = 20 g/l and from the QR/Q0 Ratio calculate TSR = 10 g/l (for example)
So TS to the thickening tank = (20+10)/2 = 15 g/l,
Q sludge from the thickening tank = (12300 kg TS/d) / (15 kg/m3) = 820 m3/d
Q sludge to the Dewatering machine = (12300 kg TS/d) / (40 kg/m3) = 307.5 m3/d
Q sludge to the liming machine = (12300 kg TS/d) / (180 kg/m3) = 68.3 m3/d
Q sludge to the sludge Silo = (12300 kg TS/d + 12300 kg TS( lime)/d ) / (360 kg/m3) = 68.3 m3/d
V silo (for one year) = 68.3 m3/d X365 d = 25000 m3