15/10/2021 15/10/2021Managed by Triad National Security, LLC., for the U.S. Department of Energy’s NNSA.

Approval of ISO/IEC 17025:2017 Suppliers

Metrology Program & Calibration Lab Kenneth Nadeau, Compliance Officer

Tuesday, April 20, 2021 – 2:30pm EST

LA-UR-21-23763

25/10/2021 25/10/2021

Metrology Program and Calibration Process

General

Process

Technical

Survey

Quality

Requirements

Receipt

inspection

of M&TE

• Accredited vs

Non-

Accredited

• Terminology

• Standards

• Quality vs

Technical

• Purpose

• Scope

• Section 6-7

• Outsourced

items

• Calibration

Certificates

• logo

35/10/2021

Module 1:

General Process for Qualification of Calibration Suppliers

1.Determination of Source

1. Scope of work

2. Type of item/service: Not all are created equal.

2.Categorization of Requirements

1. Accredited

2. Non-Accredited

1. PSL/CSL prior approval

2. Technical Survey – QA program vs Technical Calibration Processes

45/10/2021

Module 1 – General Process

Disclaimer: Understand your requirements established per contract with

customers, regulators, etc.

• Example: Triad LLC is a contractor for DOE/NNSA to operate the LANL site.

− Contract imposes quality requirements: 10 CFR 830.120; DOE O 414.1d; NAP-401.1;

− Contract establishes the requirement for a Contractor Standards Laboratory (& PSL)

NA SD M 452.3-1, Chapter 13.2/PSLM – converting to R028.

− Requires work by metrology organizations (Any organization whose primary function involve performing and/or controlling calibration, sampling, testing) to operate in accordance with ISO/IEC 17025:2017, General requirements for the competence of testing and calibration laboratories

− NQA-1 (versions); NAP-401.1; vs. ISO 9001; ISO 14001; ISO 13485; ISO 16949

55/10/2021

General Process

DOE Acceptable Sources – Chapter 13.2 (5.5.5-.6)/PSLM (5.1.2.7)

• NIST

• Another NNSA CSL or PSL

• An approved CCL or DCS*

− Approved for specific fields, ranges and uncertainty.

− If Accredited by an Accreditation Body (ILAC/NACLA), it MAY by accepted for use without additional oversight based upon AB and Scope.

− *requires oversite by the CSL; is not required for measurements performed by the contractor to substantiate subcontractor measurements.

• DoD PSL

• NIST approved State Weights and Measures Facility

65/10/2021 65/10/2021

Terminology

• Accuracy: The quality of closeness of a measured or specified value to the true value; quantitatively

expressed by uncertainty.

• CSL: The portion of the DOE/NNSA nuclear weapons contractors metrology organization that

coordinates and oversees the implementation of the Standards Calibration Program.

• Traceability: Ability to relate individual measurement results through unbroken series of calibration to

standards.

• Uncertainty: assigned value to measurements standards or M&TE representing an appropriate

combination of all significant sources of uncertainty associated with the calibration process including,

but not limited to standards, environmental factors, and statistical data analysis.

75/10/2021 75/10/2021

Standards

• Weapons: NAP-24/401.1 – Weapons Quality Policy

− CRD – requirements for operation and management of NNSA facilities that are

• Energy Sites: NQA-1, QA Requirements for Nuclear Facility Application

− Affect quality of structures, systems and components of nuclear facilities (power generation, spent fuel storage, waste treatment, waste storage and disposal, fuel processing, plutonium processing, and plutonium fuel fabrication.

• ISO/IEC 17025:2017, General requirements for the competence of testing and

calibration laboratories

− Requirements for laboratories to enable them to demonstrate they operate competently, and are able generate valid results and will facilitate cooperation between laboratories and other bodies and assist in the exchange of information a ndexperience, and the in the harmonization for standards and procedures.

85/10/2021 85/10/2021

General Process

• What is needed?

– What is the level of uncertainty or tolerance associated with the TECHNICAL requirements of the product or service?

– What is the degree of difficulty, importance, and/or risk (safety, environment, health, reliability, scheduling,..) associated with performing measurements or calibrations supporting the technical requirements of the product or service?

– How measurements performed in support of the program may be impacted by the CCL/DCS calibration program?

• Who are the available sources?

– Accredited? – if in scope, AB is ILAC/NACLA, and risk is low-moderate – approve*

– Non-Accredited? Perform technical survey of calibration program on the basis of ISO/IEC 17025

– Who is performing the calibration?

95/10/2021

Accredited Calibration Providers

• For the item or services needed; is the potential source Accredited?⁃ If not – then technical survey.

• Is the source of the Accreditation an ILAC/NACLA member?⁃ If not – then technical survey.

• Does the scope of the accreditation for the potential source cover the requested item or service? ⁃ If not – then technical survey.

If yes to all three.. Then approve! … and monitor performance.

Chapter 13.2, 5.6: “NNSA recognizes the value of laboratory accreditation performed by and accreditation body that is recognized by the National Cooperation for Laboratory Accreditation (NACLA). A metrology organization that is so accredited could reduce the need for technical survey… depending on the Scope of Accreditation.”

105/10/2021

Module 2:

Technical Survey• Quality Assessment v Technical Survey

– Quality Assessment: planned and documented activity, performed in accordance with procedures, intended to communicate and effect improvements where needed and maintain cognizance subcontractor performance; provides basis of acceptance of material and/or verifies performance.

– Technical Survey: evaluation of a metrology organization by qualified metrology personnel to determine the organization ability to perform required operations; evaluation also confirms adequate technical and administrative requirements have been implemented.

• Review elements 4.0 General Requirements, 5.0 Structural Requirements, and

8.0 Management system as the ‘Quality Assessment’ + 7.1 Contracts

• Review elements 6.0 Resource Requirements and 7.0 Process Requirements

as the “Technical Survey” for in-house calibration or 6.6/7.1 for outsourced.

115/10/2021

Method Assessment - In-house or Outsourced

Technical Survey

• Sample: *O = Observed Test; P = Procedure Reviewed; I = Interviewed Personnel; E = Equipment Inspected; F = Field

(On-Site); NR = Not Running17025 ASSESSOR REPORT

METHOD REVIEW MATRIX

LAB NAME: ASSESSMENT DATE(S): Page ___ of ___

ISO/IEC 17025 Section→

6.2, Personnel

6.3 Fac./Envir.;

6.4 Equip.;

6.6 Externally prov.

7.2.1.1-.7 7.6 6.5 Traceability7.3/7.

47.7 7.5/7.11

7.8.1-.2, .4 Cal; 7.8.3

(Test); 7.8.5 (Sample)

Parameter/ Test Name or

Technology

(7.2.1)

Method(s)

(From Scope)

(7.8.2)

Depth of

Assessment

*see codes

Name(s) of

Personnel

interviewed

Accom &

Environment;

Equipment &

Ref. Mat’ls.

Procedure/

Operating

Instructions

Measurement

Uncertainty

Verification

Traceability;

Verification/

Calibration

Samp

ling;

Handl

ing/

Prep.

Quality

Checks

Records Report/

Certificate

Mass

Calibration

Test

Sample

___ Dir/X Ind

NIST

Handbook 44

O,I,P,E, F John Doe

OK-temp/ humidity

charts reviewed

OK-laboratory

SOP #6

Reviewed/

Acceptable

OK-calibration certificates

reviewed

N/A OK OK-reviewed

records

OK-reviewed calibration

Certificate/report

125/10/2021

Good practice – Purpose and Scope

Evaluation Criteria

• Calibration affects M&TE; M&TE affects determination; Determination affects

use

• For assessments other than 17025, Supplement Calibration sections with

appropriate criteria:

− EG: NQA-1 Requirement 12 (v.2000/2008-09 addend): “tools, gages instruments and other measuring and test equipment used for activities affecting quality shall be controlled, calibrated at specified periods, adjusted and maintained to required accuracy limits.”

− 2017 Subpart 2-19; Quality Assurance Requirements for the Use of Supplier Accreditation for Calibration or Testing Services & NQA-1 2015, Requirement 12: Invokes ISO/IEC 17025 (2005/2017).

− No other Quality Standard indicates How calibration is performed competently –17025 does.

135/10/2021

Module 3

Quality RequirementsSection 6.0 / 7.0 Outsourced Calibration - 6.6*

• 6.0 Resource Requirements

− 6.1 General; 6.2 Personnel; 6.3 Facilities/Environment; 6.4 Equipment; 6.5 Traceability; 6.6* Externally provided product/service

• 7.0 Process Requirements

− 7.1(6.6) Contracts/tender; 7.2 Methods; 7.3 Sampling; 7.4 Handling; 7.5 Technical records; 7.6 Evaluation of Uncertainty; 7.7 Ensuring Results; 7.8 Reporting results; 7.9 Complaint; 7.10 NCR; 7.11 Control of Data

• (6.6.1)Suitable product and service are

used when used in their own activities or

provided to a customer directly from the

external source or used in support of

lab operation.

• (6.6.2) Procedures and records:

requirements for suppliers; eval, select,

monitoring; conformity of results;

corrective actions

• (6.6.3) Communication of requirements:

product/service, acceptance,

competence, outsource.

145/10/2021

Module 4Receipt Inspection of Calibrations

• Did it come from an approved source?

• Is the approved source Accredited or non-

Accredited?

• Does the calibration certificate reflect that

it meets requested requirements?

7.8; certificate authorized? Is

it clear, unambiguous,

objective, does it include all

imformation agreed to

purchase request and

necessary for interpretation

of results and required by

methods used? Is unreported

information readily available?

155/10/2021

7.8.2.1

Common requirements• Title

• Name and address of lab

• Location of the calibration

• Pagination / end

• Customer information

• Method used (procedure)

• Item condition as received

• Sampling plan/method

• Results apply only to UUT

• Deviations (additions/exlusions to method)

• Authorization of report

• Externally provided results

In addition to 7.8.2

requirements for reporting,

requirements for specific

activities also apply…

Test reports = 7.8.3

Calibration reports = 7.8.4

Sampling reports = 7.8.5

165/10/2021 165/10/2021

Calibration certificates at receipt inspection:

• Measurement Uncertainty – 7.8.4.1a.– ..certificates shall include.. The measurement uncertainty of the

measureme tresult presented in the same unit (of measure) as that of the measurand or in a term relative to the measurand(e.g. percent)

• No more AB logos (ILAC P14:09/2020)– ILAC Policy for Measurement Uncertainty in

Calibrationhttps://ilac.org/publications-and-resources/ilac-policy-series/

– Based upon GUM (guide to Uncertainty in Measurement)https://ilac.org/about-ilac/partnerships/international-partners/bipm/

– Transcat white paper

175/10/2021

References:

• NAP-401.1, Weapon Quality Policy

• NA SD M 452.3-1, Defense Programs Business Requirements and Process

Manual; Chapter 13.2, Metrolgoy Program; Primary Standards Laboratory

Memorandum (Feb 2006)

• DOE O 414.1d, Quality Assurance

• 10 CFR 830.120, Quality Assurance

• NQA-1-2000 / 2008-’09 Add.; /2017; Quality Assurance Requirements for

Nuclear Facility Applications

• NQA-1-2017, Subpart 2-19, Quality Assurance Requirements for the Use of

Supplier Accrediation for Calibration or Testing Services

• https://prp.sandia.gov/DPManual/d-p_chap13-2.pdf

185/10/2021

Kenneth NadeauLANL Calibration Program Compliance OfficerIQPA-Metrology Program and Calibration Lab Quality Engineer 4PO Box 1663, Bikini Atoll Rd.; MS: D478Los Alamos, NM [email protected]