aptage quickstart

7
By: Murray Cantor, Ph.D. CTO, Managed Innovation Systems, Inc. [email protected] © 2016 Managed Innovation Systems The Aptage Release Planner (ARP) Quick Start Guide

Upload: mike-ryan

Post on 21-Jan-2018

55 views

Category:

Software


1 download

TRANSCRIPT

Page 1: Aptage quickstart

By:

MurrayCantor,Ph.D.CTO, Managed Innovation Systems, Inc.

[email protected]

© 2016 Managed Innovation Systems

The Aptage

Release Planner (ARP) Quick Start Guide

Page 2: Aptage quickstart

ARP Quick Start Guide

1

This guide lays out the steps for using Aptage. For a complete products description see the The Aptage Release Planner whitepaper

1. Go to www.aptage.com

2. Log in and get this screen

Page 3: Aptage quickstart

ARP Quick Start Guide

2

3. Download the Excel template.

4. Populate the template.

The first sheet is a list of the backlog items and their size triplets. For convenience, there is also an inclusion flag: A ‘1’ means the item is included in the plan. This makes it easy to develop plan alternatives and to track ongoing plans, moving the flag to ‘0’ when the item is completed or now out of plan.

Figure 1. The ARP backlog sheet

The second sheet (Figure 2), has the project data:

• An estimate of the team’s velocity in story points/per periods., also provided as a triplet {best case, likely case, worse case}. For example, a team expects to deliver

BacklogItem Included(1or0)? Low Medium High1A 0 3 5 81B 0 5 8 131C 0 13 21 302 1 16 30 353 1 20 23 504A 1 21 30 404B 1 16 30 355A 0 20 23 505B 0 21 30 40

Page 4: Aptage quickstart

ARP Quick Start Guide

3

about 40 story points per sprint, but believe that they might be able to do as much as 60, but at a minimum they can be counted on delivering 25. In this case velocity would be entered as the triplet {25, 40, 60}.

• The number of periods in the current plan.

Figure 2 The ARP project data sheet

5. Name and save populated workbook

6. Click the browse button

PeriodTeamVelocityLow PeriodTeamVelocityProbable PeriodTeamVelocityHigh RemainingReleaseDurationinPeriods20 30 40 2

Page 5: Aptage quickstart

ARP Quick Start Guide

4

7. Choose the workbook

8. Click the submit button

Page 6: Aptage quickstart

ARP Quick Start Guide

5

9. Wait a few seconds for the ‘Download Results’ button appears.

10. Open the downloaded file ‘result(n).pdf’

Page 7: Aptage quickstart

ARP Quick Start Guide

6