Under floor Air – “Plenum Construction” ASHRAE Summer Meeting - June 2009 James E. Megerson, PE, LEED ® AP Vice President, Larson Binkley, Inc.

Upload: jemegerson

Post on 26-Jun-2015

1.053 views

Category:

Documents


5 download

DESCRIPTION

Presentation regarding variables associated with UFAD supply plenum construction

TRANSCRIPT

Page 1: ASHRAE 2009 UFAD Plenum Construction

Under floor Air – “Plenum Construction”ASHRAE Summer Meeting - June 2009

James E. Megerson, PE, LEED® APVice President, Larson Binkley, Inc.

Page 2: ASHRAE 2009 UFAD Plenum Construction

UFAD Supply Plenum Design & Construction

Basic supply plenum design Construction documents Controlling Leakage Construction administration documentation Real world examples along the way

Objectives

Page 3: ASHRAE 2009 UFAD Plenum Construction

Plenum Construction

Primary Construction Materials Raised Access Flooring (RAF) Concrete Sheetrock Brick, Block

Plenum Materials

Page 4: ASHRAE 2009 UFAD Plenum Construction

MEP Construction Documents

Page 5: ASHRAE 2009 UFAD Plenum Construction

MEP Construction Documents

Page 6: ASHRAE 2009 UFAD Plenum Construction

MEP Construction Documents

Page 7: ASHRAE 2009 UFAD Plenum Construction

Architectural Drawings

Page 8: ASHRAE 2009 UFAD Plenum Construction

Architectural Drawings

Page 9: ASHRAE 2009 UFAD Plenum Construction

Architectural Drawings

Page 10: ASHRAE 2009 UFAD Plenum Construction

Architectural Drawings

Page 11: ASHRAE 2009 UFAD Plenum Construction

Leakage Types

Categories of Leakage

Type I – Leakage to interstitial (un-occupied)

Type II – Leakage to the space (occupied)

Avoid any cracks

Be Proactive

Page 12: ASHRAE 2009 UFAD Plenum Construction

Category I

Page 13: ASHRAE 2009 UFAD Plenum Construction

Category II

Page 14: ASHRAE 2009 UFAD Plenum Construction

Category I

Page 15: ASHRAE 2009 UFAD Plenum Construction

Category I

Page 16: ASHRAE 2009 UFAD Plenum Construction

Category I

Page 17: ASHRAE 2009 UFAD Plenum Construction

Category II

Page 18: ASHRAE 2009 UFAD Plenum Construction

Category II

Page 19: ASHRAE 2009 UFAD Plenum Construction

Category II

Page 20: ASHRAE 2009 UFAD Plenum Construction

Avoiding Leakage

What can we do to make it easier?

Improve RAF specification

Execution section

Specify that RAF installer performs a pre-RAF installation inspection / meeting with General, Architect, Engineer and HVAC Contractor and obtain sign off before any RAF is installed.

Page 21: ASHRAE 2009 UFAD Plenum Construction

Age of air gets hotter 2- 3º F / 50’

50’ to farthest diffuser on perimeter

Air Injection Points

50’

50’

Page 22: ASHRAE 2009 UFAD Plenum Construction

Air Highways

Page 23: ASHRAE 2009 UFAD Plenum Construction

100 ft

Air highway Example

Page 24: ASHRAE 2009 UFAD Plenum Construction

Ductwork Example

Page 25: ASHRAE 2009 UFAD Plenum Construction

Fabric diffusers

Page 26: ASHRAE 2009 UFAD Plenum Construction

Shaft Extension

Page 27: ASHRAE 2009 UFAD Plenum Construction

Shaft Extension

Page 28: ASHRAE 2009 UFAD Plenum Construction

Large vents: dispersion in a direction more parallel with the supply sox

Smaller vents:  Increased static pressure directs airflow more perpendicular to sox

Dispersion Patterns

Page 29: ASHRAE 2009 UFAD Plenum Construction
Page 30: ASHRAE 2009 UFAD Plenum Construction
Page 31: ASHRAE 2009 UFAD Plenum Construction
Page 32: ASHRAE 2009 UFAD Plenum Construction

Installation photos

Page 33: ASHRAE 2009 UFAD Plenum Construction

Shaft Branch Feeders

What’s wrong with this?

Page 34: ASHRAE 2009 UFAD Plenum Construction

Shaft Branch Feeders

Maximum Depth = RAF height – 4 inches

18” floor: 14” high duct

14” floor: 10” high duct

Use Combination FSD / EOD

Mount Heat Detector on side of FSD

Mount Disconnect Switch on side

Create a shaft extension

Page 35: ASHRAE 2009 UFAD Plenum Construction

Remove sheetrock 2” above ceiling due to restricted return air path

Seal around conduit and seal end of conduit after wire is pulled

Site Observation Reports

Page 36: ASHRAE 2009 UFAD Plenum Construction

Questions ?