atista southeast dunkin’

129
©2017 Chazen Engineering, Land Surveying, & Landscape Architecture Co., D.P.C. Stormwater Pollution Prevention Plan Batista Southeast Dunkin’ 1617 NYS Route 22 Town of Southeast Putnam County, New York February 4, 2019 Prepared for: ECB Realty, LLC 28 Eagle Road Danbury, CT 06810

Upload: others

Post on 19-Dec-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

©2017 Chazen Engineering, Land Surveying, & Landscape Architecture Co., D.P.C.

Stormwater Pollution Prevention Plan

Batista Southeast Dunkin’

1617 NYS Route 22 Town of Southeast

Putnam County, New York

February 4, 2019

Prepared for:

ECB Realty, LLC 28 Eagle Road

Danbury, CT 06810

ALL RIGHTS RESERVED. COPY OR REPRODUCTION OF THIS DRAWING OR DOCUMENT, OR ANY PORTION THEREOF, WITHOUT THE EXPRESS WRITTEN PERMISSION OF CHAZEN ENGINEERING, LAND SURVEYING & LANDSCAPE ARCHITECTURE CO., D.P.C. IS PROHIBITED. THIS DRAWING OR DOCUMENT IS NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR ANY PURPOSE OTHER THAN THE SPECIFIC PROJECT, APPLICATION AND SITUATION FOR WHICH IT WAS INTENDED. ANY MODIFICATION OF THIS DRAWING OR DOCUMENT, OR ANY USE FOR ANY PROJECT, APPLICATION OR SITUATION OTHER THAN THAT FOR WHICH IT WAS INTENDED, WILL BE AT USER’S SOLE RISK AND WITHOUT LIABILITY TO CHAZEN ENGINEERING, LAND SURVEYING & LANDSCAPE ARCHITECTURE CO., D.P.C. IT IS A VIOLATION OF NEW YORK STATE EDUCATION LAW FOR ANY PERSON TO ALTER THIS DRAWING OR DOCUMENT IN ANY WAY, UNLESS HE OR SHE IS ACTING UNDER THE DIRECTION OF A LICENSED DESIGN PROFESSIONAL (PROFESSIONAL ENGINEER, LAND SURVEYOR, ARCHITECT OR LANDSCAPE ARCHITECT). IF THIS DRAWING OR DOCUMENT IS ALTERED, THE ALTERING DESIGN PROFESSIONAL SHALL AFFIX TO THE DRAWING OR DOCUMENT HIS OR HER SEAL, THE NOTATION “ALTERED BY” FOLLOWED BY HIS OR HER SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.

Stormwater Pollution Prevention Plan

Batista Southeast Dunkin’

1617 NYS Route 22 Town of Southeast

Putnam County, New York

February 4, 2019

Prepared by:

Chazen Engineering, Land Surveying & Landscape Architecture Co., D.P.C. 21 Fox Street Suite 201

Poughkeepsie, NY 12601 (845) 454-3980

Dutchess County Capital District North Country Central New York Nashville, TN (845) 454-3980 (518) 273-0055 (518) 812-0513 (315) 251-1013 (615) 380-1359

Stormwater Pollution Prevention Plan Batista Southeast Dunkin’ Page i

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

PREPARER OF THE SWPPP

“I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person(s) who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that false statements made herein are punishable as a Class A misdemeanor pursuant to Section 29.45 of the Penal Law.” Name1: Chris Lapine, PE Title: Director Date: February 4, 2019

1 This is a signature of a New York State licensed Professional Engineer employed by The Chazen Companies that is duly authorized to sign and seal Stormwater Pollution Prevention Plans (SWPPPs), NOIs, and NOTs prepared under their direct supervision. Refer to Appendix H for the Chazen Certifying Professionals Letter.

Stormwater Pollution Prevention Plan Batista Southeast Dunkin’ Page ii

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

TABLE OF CONTENTS

1.0 EXECUTIVE SUMMARY ..................................................................................................................... 1

1.1 Project Description..................................................................................................................... 1

1.2 Stormwater Pollution Controls .................................................................................................. 2

1.3 Conclusion .................................................................................................................................. 2

2.0 SWPPP IMPLEMENTATION RESPONSIBILITIES ................................................................................. 3

2.1 Definitions .................................................................................................................................. 3

2.2 Owner’s/Operator's Responsibilities ......................................................................................... 4

2.3 Owner’s/Operator’s Engineer’s Responsibilities ....................................................................... 6

2.4 Contractor's Responsibilities ...................................................................................................... 7

2.5 Qualified Inspector’s/Qualified Professional’s Responsibilities ................................................ 8

2.6 SWPPP Participants .................................................................................................................... 9

3.0 SITE CHARACTERISTICS .................................................................................................................. 10

3.1 Land Use and Topography ....................................................................................................... 10

3.2 Soils and Groundwater ............................................................................................................ 10

3.3 Watershed Designation ........................................................................................................... 11

3.4 Receiving Water Bodies ........................................................................................................... 11

3.5 Aquifer Designation ................................................................................................................. 11

3.6 Wetlands .................................................................................................................................. 11

3.7 Flood Plains .............................................................................................................................. 12

3.8 Listed, Endangered, or Threatened Species ............................................................................ 12

3.9 Historic Places .......................................................................................................................... 12

4.0 CONSTRUCTION SEQUENCE ........................................................................................................... 13

5.0 CONSTRUCTION-PHASE POLLUTION CONTROL ............................................................................. 14

5.1 Temporary Erosion and Sediment Control Measures .............................................................. 14

5.2 Permanent Erosion and Sediment Control Measures ............................................................. 16

5.3 Other Pollutant Controls .......................................................................................................... 17

5.4 Construction Housekeeping Practices ..................................................................................... 17

6.0 INSPECTIONS, MAINTENANCE, AND REPORTING .......................................................................... 20

6.1 Inspection and Maintenance Requirements ............................................................................ 20

6.2 Reporting Requirements .......................................................................................................... 22

Stormwater Pollution Prevention Plan Batista Southeast Dunkin’ Page iii

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

LIST OF TABLES

Table 1: USDA Soil Data .............................................................................................................................. 10

Stormwater Pollution Prevention Plan Batista Southeast Dunkin’ Page iv

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

APPENDICES

Appendix A: NYSDEC SPDES General Permit GP-0-15-002

Appendix B: NYSDEC Forms

• Notice of Intent (NOI)

• MS4 SWPPP Acceptance Form

• Notice of Termination (NOT)

Appendix C: Contractor and Subcontractor Certification Forms

Appendix D: SWPPP Inspection Report (Sample Form)

Appendix E: NYSDEC “Deep-Ripping and Decompaction,” April 2008

Appendix F: Post-Construction Inspections and Maintenance

Appendix G: Figures

• Figure 1: Site Location Map

• Figure 2: Soils Map

• Figure 3: Historic Places Screening Map

• Figure 4: Environmental Resource Map

• Figure 5: Erosion & Sediment Control Plan Prior to Construction

• Figure 6: Erosion & Sediment Control Plan During Construction

Appendix H: Chazen Certifying Professionals Letter

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 1

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

1.0 EXECUTIVE SUMMARY

This Stormwater Pollution Prevention Plan (SWPPP) has been prepared for major activities associated with construction of Batista Southeast Dunkin’. This SWPPP includes the elements necessary to comply with the national baseline general permit for construction activities enacted by the U.S. Environmental Protection Agency (EPA) under the National Pollutant Discharge Elimination System (NPDES) program and all local governing agency requirements. This SWPPP must be implemented at the start of construction.

This SWPPP has been developed in accordance with the “New York State Department of Environmental Conservation (NYSDEC) State Pollution Discharge Elimination System (SPDES) General Permit for Stormwater Discharges from Construction Activity” General Permit Number GP-0-15-002, effective January 29, 2015 through January 28, 2020. The SWPPP and accompanying plans identify and detail stormwater management, pollution prevention, and erosion and sediment control measures necessary during and following completion of construction.

This SWPPP and the accompanying plans entitled “Engineering Plan Set” have been submitted as a set. These engineering drawings are considered an integral part of this SWPPP. Therefore, this SWPPP is not considered complete without them. References made herein to “the plans” or to a specific “sheet” refer to these drawings.

This report considers the impacts associated with the intended development with the purpose of:

1. Maintaining existing drainage patterns as much as possible while continuing the conveyance of upland watershed runoff;

2. Controlling increases in the rate of stormwater runoff resulting from the proposed development so as not to adversely alter downstream conditions; and

3. Mitigating potential stormwater quality impacts and preventing soil erosion and sedimentation resulting from stormwater runoff generated both during and after construction.

The analysis and design completed and documented in this report is intended to be part of the application made for a commercial, redevelopment project completed on behalf of the Owner.

1.1 Project Description

The Applicant, ECB Realty, LLC (Steven Batista), is proposing amendments to an approved site plan for a 0.92-acre parcel located at 1617 NYS Route 22 in the Town of Southeast, at the intersection of NYS Route 22 and NYS Route 312. The current applicant is proposing to construct a 2,400 square foot (SF) Dunkin’ (formerly known as Dunkin’ Donuts) with drive-thru on the site.

The 0.92-acre site is currently vacant, since a former gas station on the site has been removed by the previous applicant, and the site has been remediated to the satisfaction of NYSDEC. The 0.92-acre parcel is identified on the Town of Southeast tax map as Section 46 Block 1 Lot 21. A location map of the site has been provided in Appendix G, as Figure 1.

The project site is located within the New York City Watershed located east of the Hudson River, and construction activities will involve soil disturbance between 5,000 square feet and one acre of land. This type of project is included in Table 1 of Appendix B of GP-0-15-002. Therefore, this SWPPP only includes erosion and sediment controls.

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 2

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

.

This project is located within the Town of Southeast regulated, traditional land use control Municipal Separate Stormwater Sewer System (MS4). Therefore, an MS4 SWPPP Acceptance Form is required to accompany NOIs submitted to the NYSDEC.

Runoff from the project site will discharge to an unnamed class C water course which is not included in the list of Section 303(d) water bodies included in Appendix E of GP-0-15-002.

Project construction activities will consist primarily of site grading, paving, building construction, water supply, and sewage collection necessary to support the proposed redevelopment. Construction phase pollutant sources anticipated at the site are disturbed (exposed) soil, vehicle fuels and lubricants, chemicals associated with building construction, and building materials. Without adequate control there is the potential for each type of pollutant to be transported by stormwater.

1.2 Stormwater Pollution Controls

The stormwater pollution controls outlined herein have been designed and evaluated in accordance with the following standards and guidelines:

• New York State Stormwater Management Design Manual, dated January 2015 (Design Manual).

• New York State Standards and Specifications for Erosion and Sediment Control, dated November 2016 (SSESC).

• New York City Department of Environmental Protection Final Regulations (effective May 1, 1997, as amended April 4, 2010)

Stormwater quality will be enhanced through the implementation of temporary and permanent erosion and sediment control measures, and other construction-phase pollution controls outlined herein.

1.3 Conclusion

This project is subject to the requirements of the Town of Southeast regulated MS4, and this SWPPP has been prepared in conformance with the current Design Manual and SSESC. As such, GP-0-15-002 coverage will be effective five (5) business days from the date the NYSDEC receives the electronically submitted eNOI and signed “MS4 SWPPP Acceptance” form, or ten (10) business days from the date the NYSDEC receives the complete paper NOI and signed “MS4 SWPPP Acceptance” form.

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 3

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

2.0 SWPPP IMPLEMENTATION RESPONSIBILITIES

A summary of the responsibilities and obligations of all parties involved with compliance with the NYSDEC SPDES General Permit GP-0-15-002 conditions is outlined in the subsequent sections. For a complete listing of the definitions, responsibilities, and obligations, refer to the SPDES General Permit GP-0-15-002 presented in Appendix A.

2.1 Definitions

1. “General SPDES Permit” means a SPDES permit issued pursuant to 6 NYCRR Part 750-1.21 authorizing a category of discharges.

2. “Owner” or “Operator” means the person, persons, or legal entity which owns or leases the property on which the construction activity is occurring; and/or an entity that has operational control over the construction plans and specifications, including the ability to make modifications to the plans and specifications. There may be occasions during the course of a project in which there are multiple Owners/Operators, all of which will need to file and maintain the appropriate SWPPP documents and plans, including without limitation, the Notice of Intent (NOI) and Notice of Termination (NOT).

3. “Owner’s/Operator’s Engineer” means the person or entity retained by an Owner/Operator to design and oversee the implementation of the SWPPP.

4. “Contractor” means the person or entity identified as such in the construction contract with the Owner/Operator. The term “Contractor” shall also include the Contractor’s authorized representative, as well as any and all subcontractors retained by the Contractor.

5. “Qualified Inspector” means a person that is knowledgeable in the principles and practices of erosion and sediment control, such as licensed Professional Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered Landscape Architect, or other Department endorsed individual(s).

It can also mean someone working under the direct supervision of, and at the same company as, the licensed Professional Engineer or Registered Landscape Architect, provided that person has training in the principles and practices of erosion and sediment control. Training in the principles and practices of erosion and sediment control means that an individual working under the direct supervision of the licensed Professional Engineer or Registered Landscape Architect has received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a Soil and Water Conservation District, or other Department endorsed entity. After receiving the initial training, the individual working under the direct supervision of the licensed Professional Engineer or Registered Landscape Architect shall receive four (4) hours of training every three (3) years.

It can also mean a person that meets the Qualified Professional qualifications in addition to the Qualified Inspector qualifications.

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 4

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

Note: Inspections of any post-construction stormwater management practices that include structural components, such as a dam for an impoundment, shall be performed by a licensed Professional Engineer.

6. “Qualified Professional” means a person that is knowledgeable in the principles and practices of stormwater management and treatment, such as a licensed Professional Engineer, Registered Landscape Architect, or other Department endorsed individual(s). Individuals preparing SWPPPs that require the post-construction stormwater management practice component must have an understanding of the principles of hydrology, water quality management practice design, water quantity control design, and, in many cases, the principles of hydraulics. All components of the SWPPP that involve the practice of engineering, as defined by the NYS Education Law (see Article 145), shall be prepared by, or under the direct supervision of, a professional engineer licensed to practice in the State of New York.

7. “Trained Contractor” means an employee from a contracting (construction) company, identified in Part III.A.6., that has received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a Soil and Water Conservation District, or other Department endorsed entity. After receiving the initial training, the Trained Contractor shall receive four (4) hours of training every three (3) years.

It can also mean an employee from a contracting (construction) company, identified in Part III.A.6.,that meets the Qualified Inspector qualifications (e.g. licensed Professional Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered Landscape Architect, or someone working under the direct supervision of, and at the same company as, the licensed Professional Engineer or Registered Landscape Architect, provided they have received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a Soil and Water Conservation District, or other Department endorsed entity.

The “Trained Contractor(s)” will be responsible for the day to day implementation of the SWPPP.

2.2 Owner’s/Operator's Responsibilities

1. Ensure that control measures are selected, designed, installed, implemented and maintained to minimize the discharge of pollutants and prevent a violation of the water quality standards, meeting the non-numeric effluent limitations in Part I.B.1.(a)-(f) of the SPDES General Permit and in accordance with the New York State Standards and Specifications for Erosion and Sediment Control, dated November 2016.

2. Retain the services of a “Qualified Inspector” or “Qualified Professional” as defined under Section 2.1, to provide the services outlined in Section 2.5 “Qualified Inspector’s/Qualified Professional’s Responsibilities.”

3. Retain the services of a “Qualified Professional,” as defined under Section 2.1, to provide the services outlined in Section 2.3 “Owner’s/Operator’s Engineers Responsibilities.”

4. Have an authorized corporate officer sign the completed NOI. A copy of the completed NOI is included in Appendix B.

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 5

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

5. Submit the electronic version of the NOI (eNOI) along with the MS4 SWPPP acceptance form using the NYSDEC’s website (http://www.dec.ny.gov/chemical/43133.html) or submit the signed NOI along with the MS4 SWPPP acceptance form to the following:

NOTICE OF INTENT NYS DEC, Bureau of Water Permits 625 Broadway, 4th Floor Albany, New York 12233-3505 Town of Southeast 1360 Route 22 Brewster, NY 10509

6. Pay the required initial and annual fees upon receipt of invoices from NYSDEC. These invoices are generally issued in the fall of each year. The initial fee is calculated as $110.00 per acre disturbed plus $675.00 per acre of net increase in impervious cover, and the annual fee is $110.00.

7. Prior to the commencement of construction activity, identify the contractor(s) and subcontractor(s) that will be responsible for implementing the erosion and sediment control measures and stormwater management practices described in this SWPPP. Have each of these contractors and subcontractors identify at least one “Trained Contractor”, as defined under Section 2.1 that will be responsible for the implementation of the SWPPP. Ensure that the Contractor has at least one “Trained Contractor” on site on a daily basis when soil disturbance activities are being performed.

8. Schedule a pre-construction meeting which shall include the Town of Southeast MS4 representative, Owner’s/Operator’s Engineer, Contractor, and their sub-contractors to discuss responsibilities as they relate to the implementation of this SWPPP.

9. Require the Contractor to fully implement the SWPPP prepared for the site by the Owner/Operator’s Engineer to ensure that the provisions of the SWPPP are implemented from the commencement of construction activity until all areas of disturbance have achieved final stabilization and the Notice of Termination (NOT) has been submitted to the NYSDEC.

10. Forward a copy of the NOI Acknowledgement Letter received from the regulatory agency to the Owner’s/Operator’s Engineer for project records, and to the Contractor for display at the construction site.

11. Maintain a copy of the General Permit (GP-0-15-002), NOI, NOI Acknowledgement Letter, SWPPP, MS4 SWPPP Acceptance Form, inspection reports, Spill Prevention, Countermeasures, Cleanup (“SPCC”) Plan, and all documentation in accordance with Part I.F.8.a.-d of GP-0-15-002 necessary to demonstrate eligibility with the permit at the construction site, until all disturbed areas have achieved final stabilization and the NOT has been submitted to the NYSDEC. Place documents in a secure location that must be accessible during normal business hours to an individual performing a compliance inspection.

12. Submit a Notice of Termination (NOT) form (see Appendix B) within 48 hours of receipt of the Owner’s/Operator’s Engineer’s certification of final site stabilization to the following:

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 6

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

NOTICE OF TERMINATION NYS DEC, Bureau of Water Permits 625 Broadway, 4th Floor Albany, New York 12233-3505 Town of Southeast 1360 Route 22 Brewster, NY 10509

13. Request and receive all SWPPP records from the Owner’s/Operator’s Engineer and archive those records for a minimum of five (5) years after the NOT is filed.

14. Implement the Post-Construction Inspections and Maintenance procedures outlined in Appendix F.

15. The NOI, SWPPP, and inspection reports required by GP-0-15-002 are public documents that the Owner/Operator must make available for review and copying by any person within five (5) business days of the Owner/Operator receiving a written request by any such person to review the NOI, SWPPP, or inspection reports. Copying of documents will be done at the requester’s expense.

16. The Owner/Operator must keep the SWPPP current at all times. At a minimum, the Owner/Operator shall amend the SWPPP:

a) Whenever the current provisions prove to be ineffective in minimizing pollutants in stormwater discharges from the project site;

b) Whenever there is a change in design, construction, or operation at the construction site that has or could have an effect on the discharge of pollutants; and

c) To address issues or deficiencies identified during an inspection by the “Qualified Inspector,” the Department, or other Regulatory Authority.

2.3 Owner’s/Operator’s Engineer’s Responsibilities

1. Prepare the SWPPP using good engineering practices, best management practices, and in compliance with all federal, state, and local regulatory requirements.

2. Prepare the Notice of Intent (NOI) form (see Appendix B), sign the “SWPPP Preparer Certification” section of the NOI, and forward to Owner/Operator for signature.

3. Provide copies of the SWPPP to the Town of Southeast once all signatures and attachments are complete.

4. Enter Contractor’s information in Section 2.5 “SWPPP Participants” once a Contractor is selected by the Owner/Operator.

5. Update the SWPPP each time there is a significant modification to the pollution prevention measures or a change of the principal Contractor working on the project who may disturb site soil.

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 7

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

2.4 Contractor's Responsibilities

1. Sign the SWPPP Contractor's Certification Form contained within Appendix C and forward to the Owner’s/Operator’s Engineer for inclusion in the Site Log Book.

2. Identify at least one Trained Contractor that will be responsible for implementation of this SWPPP. Ensure that at least one Trained Contractor is on site on a daily basis when soil disturbance activities are being performed. The Trained Contractor shall inspect the erosion and sediment control practices and pollution prevention measures being implemented within the active work area daily to ensure that they are being maintained in effective operating conditions at all times. If deficiencies are identified, the contractor shall begin implementing corrective actions within one business day and shall complete the corrective actions in a reasonable time frame.

3. Provide the names and addresses of all subcontractors working on the project site. Require all subcontractors who will be involved with construction activities that will result in soil disturbance to identify at least one Trained Contractor that will be on site on a daily basis when soil disturbance activities are being performed; and to sign a copy of the Subcontractor’s Certification Form contained within Appendix C, then forward to the Owner’s/Operator’s Engineer for inclusion into the Site Log Book. This information must be retained as part of the Site Log Book.

4. Maintain a Spill Prevention and Response Plan in accordance with requirements outlined in Section 5.4 of this SWPPP. This plan shall be provided to the Owner’s/Operator’s Engineer for inclusion in the Site Log Book, prior to mobilization on-site.

5. Participate in a pre-construction meeting which shall include the Town of Southeast MS4 representative, Owner/Operator, Owner’s/Operator’s Engineer, and all subcontractors to discuss responsibilities as they relate to the implementation of this SWPPP.

6. If Contractor plans on utilizing adjacent properties for material, waste, borrow, or equipment storage areas, or if Contractor plans to engage in industrial activity other than construction (such as operating asphalt and/or concrete plants) at the site, Contractor shall submit appropriate documentation to the Owner’s/Operator’s Engineer so that the SWPPP can be modified accordingly.

7. Implement site stabilization, erosion and sediment control measures, and other requirements of the SWPPP.

8. In accordance with the requirements in the most current version of the NYS Standards and Specifications for Erosion and Sediment Control, conduct inspections of erosion and sediment control measures installed at the site to ensure that they remain in effective operating condition at all times. Prepare and retain written documentation of inspections as well as of all repairs/maintenance activities performed. This information must be retained as part of the Site Log Book.

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 8

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

9. Begin implementing corrective actions within one (1) business day of receipt of notification by the Qualified Inspector/Qualified Professional that deficiencies exist with the erosion and sediment control measures employed at the site. Corrective actions shall be completed within a reasonable time frame.

10. Maintain a record of the date(s) and location(s) that soil restoration is performed in accordance with the accompanying plans and NYSDEC Division of Water’s publication “Deep-Ripping and Decompaction,” dated April 2008. A copy of this is publication is provided in Appendix E. The record that is to be maintained shall be a copy of the overall site grading plan delineating the area(s) and date(s) that the soil was restored.

11. Upon completion of all construction at the site, the contractor responsible for overall SWPPP Compliance shall sign the certification on their Contractor Certification Form indicating that: a.) all temporary erosion and sediment control measures have been removed from the site, b.) the on-site soils disturbed by construction activity have been restored in accordance with the SWPPP and the NYSDEC Division of Water’s publication “Deep-Ripping and Decompaction,”

2.5 Qualified Inspector’s/Qualified Professional’s Responsibilities

1. Participate in a pre-construction meeting with the Town of Southeast MS4 representative, Owner/Operator, Contractor, and their subcontractors to discuss responsibilities as they relate to the implementation of this SWPPP.

2. Conduct an initial assessment of the site prior to the commencement of construction and certify in an inspection report that the appropriate erosion and sediment control measures described within this SWPPP have been adequately installed and implemented to ensure overall preparedness of the site.

3. Provide on-site inspections to determine compliance with the SWPPP. Because this project site is located in one of the watersheds listed in Appendix D of GP-0-15-002, and proposes soil disturbances between five thousand (5,000) square feet and one (1) acre of land, site inspections are not required to be performed by a qualified inspector.

4. Notify the owner/operator and appropriate contractor or subcontractor of any corrective actions that need to be taken.

5. Prepare a construction Site Log Book to be used as a record of all inspection reports generated throughout the duration of construction. Ensure that the construction Site Log Book is maintained and kept up-to-date throughout the duration of construction.

6. Review the Contractor’s SWPPP records on a periodic basis to ensure compliance with the requirements for daily reports, soil restoration, inspections, and maintenance logs.

7. Prepare the Notice of Termination (NOT). Sign the NOT Certifications VI (Final Stabilization) and forward the NOT to the Owner/Operator for signature on Certification VIII (Owner/Operator Certification).

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 9

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

8. Transfer the SWPPP documents, along with all NOI's, permit certificates, NOT's, construction Site Log Book, and written records required by the General Permit to the Owner/Operator for archiving.

2.6 SWPPP Participants

1. Owner’s/Operator’s Engineer: Christopher Lapine, P.E. The Chazen Companies 21 Fox Street Poughkeepsie, New York 12601 Phone: (845) 454-3980 Fax: (845) 454-4026 2. Owner/Operator: Steven Batista ECB Realty, LLC 28 Eagle Road Danbury, CT 06810 Phone: (203)798-1887 3. Contractor2: Name and Title: Company Name: Mailing Address: Phone: Fax:

2 Contractor’s information to be entered once the Contractor has been selected.

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 10

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

3.0 SITE CHARACTERISTICS

3.1 Land Use and Topography

The project site is an abandoned gas station and based on correspondence with the NYSDEC it has been inactive for approximately six to eight years. The parcel is zoned for HC-1 (Highway Commercial) use.

The overall site is slightly to moderately sloping, with slopes ranging from 0 to 25 percent. Site elevations range from approximately 98 feet above mean sea level (MSL) to 120 feet above MSL. The western and southern portions of the site are higher in elevation than the northern and eastern portions of the site.

Runoff from the site currently enters a closed drainage network within the NYSDOT right-of-ways along NYS Routes 22 and 312 where it is conveyed to a stream located at the North West Corners of the NYSD Route 22 and 312.

3.2 Soils and Groundwater

The United States Department of Agriculture (USDA) Soil Conservation Service (SCS) Soil Survey for Putnam and Westchester Counties was reviewed and provided surficial soil conditions for the study area. The SCS identified the presence of Ridgebury and Paxton soil series soil types. Soil data as provided by the SCS is presented in Table 1.

Table 1: USDA Soil Data

Map Symbol & Description Hydrologic Soil

Group Permeability (inches/hour)

Erosion Factor K

Depth to Water Table

(feet)

Depth to Bedrock (inches)

RdB – Ridgebury loam, 3 to 8 percent slopes

C 0.6-6.0 0.24 0-0.5 >60

PnC – Paxton fine sandy loam, 8 to 15 percent slopes

C 0.6-2.0 0.24 1.5-2.5 >60

Upon review of the soil data presented in Table 1, the project site does not contain soils with a soil slope phase of E or F.

The Soil Conservation Service defines the hydrologic soil groups as follows:

• Type A Soils: Soils having a high infiltration rate and low runoff potential when thoroughly wet. These soils consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a moderate rate of water transmission.

• Type B Soils: Soils having a moderate infiltration rate when thoroughly wet and consisting mainly of moderately deep to deep, moderately well to well drained soils with moderately fine to moderately course textures. These soils have a moderate rate of water transmission.

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 11

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

• Type C Soils: Soils having a low infiltration rate when thoroughly wet and consisting chiefly of soils with a layer that impedes downward movement of water and soils with moderately fine-to-fine texture. These soils have a low rate of water transmission.

• Type D Soils: Soils having a very low infiltration rate and high runoff potential when thoroughly wet. These soils consist chiefly of clays that have high shrink-swell potential, soils that have a permanent high water table, soils that have a clay pan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very low rate of water transmission.

The soils map for the study area is presented in Appendix G, as Figure 2.

3.3 Watershed Designation

The project site is located in the New York City Watershed East of the Hudson, which is listed in both Appendix C and Appendix D of GP-0-15-002. Within this watershed, all projects that involve soil disturbances between 5000 square feet and one acre of land must obtain coverage under the general permit, and are required to prepare a SWPPP that only includes erosion and sediment controls

3.4 Receiving Water Bodies

The nearest natural classified water course into which runoff from the project site will discharge is an unnamed, 864-304 regulated water course tributary to the Bog Brook Reservoir.

This water course is classified by NYSDEC as a Class C water course and is not included in the Section 303(d) list of impaired waters found in Appendix E of GP-0-15-002.

3.5 Aquifer Designation

The project site is not located over a US EPA designated Sole Source aquifer; nor is it located over a Primary or Principal aquifer listed in the NYSDEC Technical and Operational Guidance Series (TOGS) 2.1.3 (1980).

3.6 Wetlands

On January 30, 2013, the project site was evaluated by Chazen employees for the presence of regulated wetlands and it was determined that the project site does not contain NYSDEC or Federally Regulated Wetlands.

The New York State Department of Environmental Conservation (NYSDEC) Environmental Resources Mapper, on May 28, 2013, indicated that, although State regulated wetlands are not located on-site, the NYSDEC wetland bearing the designation BR-40 is located to the southeast of the project site approximately 650 feet from the property boundary and the NYSDEC wetland bearing the designation BR-9 is located to the northwest of the project site approximately 750 feet from the property boundary.

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 12

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

3.7 Flood Plains

According to the National Flood Insurance Program Flood Insurance Rate Map (FIRM), Town of Southeast, New York, Community Panel Number 361041 0162 E, the project site lies within Flood Zone X, an area of outside the 0.2% annual chance floodplain. Therefore, there is no 100-year flood plain boundary to be shown on the project plans.

3.8 Listed, Endangered, or Threatened Species

Chazen has completed a preliminary Endangered and Threatened Species investigation report for the Batista Dunkin’ site in the Town of Southeast, Putnam County, NY. The investigation found that the US Fish and Wildlife Service identified Indiana Bat, Bog Turtle, New England Cottontail and Bald Eagle as occurring in Putnam County. The NY Natural Heritage Program identified that Bald Eagles and Bog Turtles were identified as occurring within one mile of the site. On January 22, 2013, biologists from the Chazen Companies made an inspection of the site and surrounding areas. The biologists found that the site is completely lacking in suitable habitat for threatened and endangered species. This is due in large part to the existing development of the site (vacant gas station), and the urbanized and degraded condition of the immediate landscape. The trees on the site are identified as an early successional variant of the Northern Hardwood Forest community. The trees are overwhelmingly dominated by sugar maple. The Site’s trees were generally found to be devoid of certain micro-habitat features, such as exfoliating/loose bark, cavities, crevices or snags. This is likely due to the relatively young age of the forest community. As such, the community does not represent habitat for Indiana bat. No wetland or water surface features were identified within or directly adjacent to the Site’s forested habitat, or elsewhere on site. Therefore the site does not represent bog turtle habitat. The site does not have thickets or other habitat associated with New England Cottontail. The site does not have open water areas that would be suitable for Bald Eagle foraging or nesting.

Suitable bog turtle habitat is found less than half a mile from the site (the southern portion of NYSDEC wetland BR-9), and radio-telemetry studies find that bog turtles can travel more than half a mile to reach other suitable habitats. However, at this site, any turtle would need to cross NYS Route 312 or Route 22 before reaching the site. Both roadways have very high traffic counts (10,493 and 24,000 per day respectively in 2010). Both of these roads are significant barriers for animal (especially turtle) migration. Such “barriers” diminish the likelihood of turtles successfully entering the Site, thereby alleviating the need for additional mitigation measures beyond the silt fencing already planned as part of the project’s erosion control plan.

3.9 Historic Places

A State Preservation Historical Information Network Exchange search on the New York State Historic Preservation Office website, performed on November 30, 2012, revealed the property is not listed or eligible for listing on the State or National Register of Historic Places. A printout of the historic places screening map is presented in Appendix G, as Figure 3.

In addition, the stormwater discharges from the project site will not adversely impact downstream properties so long as the stormwater management practices have been constructed in accordance with

this SWPPP.

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 13

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

4.0 CONSTRUCTION SEQUENCE

This project has not received written approval from Town of Southeast allowing the disturbance of more than five acres of land at any one time. Therefore, if the Contractor’s construction sequence requires the disturbance of more than five acres at any one time, written approval must be obtained from NYSDEC prior to disturbing more than five acres at once.

The “Erosion and Sediment Control Plan” and the “Erosion and Sediment Control Plan Prior to Construction” in the accompanying drawings identifies the major construction activities that are the subject of this SWPPP. The order (or sequence) in which the major activities are expected to begin is presented on the accompanying drawings, though each activity will not necessarily be completed before the next begins. In addition, these activities could occur in a different order if necessary to maintain adequate erosion and sediment control. If this is the case, the contractor shall notify the Owner’s/Operator’s Engineer overseeing the implementation of the SWPPP.

The Contractor will be responsible for implementing the erosion and sediment control measures identified on the plans. The Contractor may designate these tasks to certain subcontractors as they see fit, but the ultimate responsibility for implementing these controls and ensuring their proper function remains with the Contractor.

Refer to the accompanying plans for details and specifications regarding the construction sequencing schedule.

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 14

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

5.0 CONSTRUCTION-PHASE POLLUTION CONTROL

The SWPPP and accompanying plans identify the temporary and permanent erosion and sediment control measures that have been incorporated into the design of this project. These measures will be implemented during construction, to minimize soil erosion and control sediment transport off-site, and after construction, to control the quality and quantity of stormwater runoff from the developed site.

Erosion control measures, designed to minimize soil loss, and sediment control measures, intended to retain eroded soil and prevent it from reaching water bodies or adjoining properties, have been developed in accordance with the following documents:

• NYSDEC SPDES General Permit for Stormwater Discharges From Construction Activity, Permit No. GP-0-15-002 (effective January 29, 2015 through January 28, 2020)

• New York State Standards and Specifications for Erosion and Sediment Control, NYSDEC (November 2016)

The SWPPP and accompanying plans outline the construction scheduling for implementing the erosion and sediment control measures. These documents include limitations on the duration of soil exposure, criteria and specifications for placement and installation of the erosion and sediment control measures, a maintenance schedule, and specifications for the implementation of erosion and sediment control practices and procedures.

Temporary and permanent erosion and sediment control measures that shall be applied during construction generally include:

1. Minimizing soil erosion and sedimentation by stabilization of disturbed areas and by removing sediment from construction site discharges.

2. Preservation of existing vegetation to the greatest extent practical. Following the completion of construction activities in any portion of the site, permanent vegetation shall be established on all exposed soils.

3. Site preparation activities to minimize the area and duration of soil disruption.

4. Establishment of permanent traffic corridors to ensure that “routes of convenience” are avoided.

5.1 Temporary Erosion and Sediment Control Measures

The temporary erosion and sediment control measures described in the following sections are included as part of the construction documents.

5.1.1 Stabilized Construction Entrance

Prior to construction, stabilized construction entrance(s) will be installed, per accompanying plans, to reduce the tracking of sediment onto public roadways.

Construction traffic must enter and exit the site at the stabilized construction entrance(s). The intent is to trap dust and mud that would otherwise be carried off-site by construction traffic.

The entrance(s) shall be maintained in a condition, which will control tracking of sediment onto public rights-of-way or streets. When necessary, additional aggregate will be placed atop the filter fabric to

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 15

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

assure the minimum thickness is maintained. All sediment and/or soil spilled, dropped, or washed onto public rights-of-way must be removed immediately. Periodic inspection and needed maintenance shall be provided after each substantial rainfall event.

5.1.2 Dust Control

Water trucks shall be used as needed during construction to reduce dust generated on-site. Dust control must be provided by the Contractor(s) to a degree that is acceptable to the Owner, and in compliance with the applicable local and state dust control requirements.

5.1.3 Temporary Soil Stockpile

Materials, such as topsoil, will be temporarily stockpiled (if necessary) on the site during the construction process. Stockpiles shall be located in an area away from storm drainage, water bodies and/or courses, and will be properly protected from erosion by a surrounding silt fence barrier.

5.1.4 Silt Fencing

Prior to the initiation of and during construction activities, a geotextile filter fabric (or silt fence) will be established downgradient of all disturbed areas. These barriers may extend into non-impact areas to provide adequate protection of adjacent lands.

Clearing and grubbing will be performed only as necessary for the installation of the sediment control barrier. To facilitate effectiveness of the silt fencing, daily inspections and inspections immediately after significant storm events will be performed by the Contractor(s). Maintenance of the fence will be performed as needed.

5.1.5 Temporary Seeding

Because this site directly discharges to one of the 303(d) segments listed in Appendix E or is located in one of the watersheds listed in Appendix C of GP-0-15-002, temporary soil stabilization measures must be initiated by the end of the next business day and completed within seven (7) days from the date the soil disturbance activity has temporarily ceased.

5.1.6 Stone and Block Drop Inlet Protection

Concrete blocks surrounded by wire mesh and crushed stone will be placed around both existing catch basins, and proposed catch basins once they have been installed, to prevent sediment from entering the catch basins and storm sewer system. During construction, crushed stone shall be replaced as necessary to ensure proper function.

5.1.7 Filter Fabric Drop Inlet Protection

Install filter fabric or silt fence with wooden stakes at the perimeter of existing or proposed catch basins located in lawn areas, to prevent sediment from entering the catch basins and storm sewer system. Remove sediment accumulation and repair or replace fabric as necessary to ensure proper function.

5.1.8 Erosion Control Blanket

Erosion control blankets shall be installed in accordance with manufacturer’s requirements on all slopes exceeding 3:1. Erosion control blankets provide temporary erosion protection, rapid vegetative establishment, and long-term erosion resistance to shear stresses generated by high runoff flow velocities associated with steep slopes.

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 16

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

5.1.9 Temporary Sediment Trap

Temporary sediment traps shall be constructed to intercept sediment-laden runoff, reduce the amount of sediment leaving the disturbed areas, and protect drainage ways, properties, and rights-of-way.

Accumulated sediment shall be removed from the trap when it reaches no greater than 50 percent of the design capacity. Sediment shall not be placed downstream from the embankment, adjacent to a stream, or floodplain.

Temporary sediment traps depicted on the accompanying plans have been designed to provide 3,600 CF of storage per acre of tributary watershed.

5.1.10 Temporary Diversion Swales

Temporary diversion swales shall be used to divert off-site runoff around the construction site and divert runoff from stabilized areas around disturbed areas. Temporary diversion swales can be used to direct runoff from disturbed areas into sediment traps.

5.1.11 Dewatering Operations

Dewatering will be used to intercept sediment-laden stormwater or pumped groundwater and allow it to settle out of the pumped discharge prior to being discharged from the site. Water from dewatering operations shall be treated to eliminate the discharge of sediment and other pollutants. Water resulting from dewatering operations shall be directed to temporary sediment traps or dewatering devices. Temporary sediment traps and dewatering bags will be provided, installed, and maintained at downgradient locations to control sediment deposits to downstream surfaces. Clearing and grubbing will be performed only as necessary for the installation of the sediment control filter; and unlike sediment control barriers, trenching is not required. The ends of the filter sock should be directed upslope, to prevent stormwater from running around the end of the sock. The preferred anchoring method is to drive stakes through the center of the sock at regular intervals; alternatively, stakes can be placed on the downstream side of the sock. To facilitate effectiveness of the compost filter sock, daily inspections and inspections immediately after significant storm events will be performed by the Contractor(s) to ensure that they are intact and the area behind the sock is not filled with sediment. Maintenance of the sock will be performed as needed.

5.2 Permanent Erosion and Sediment Control Measures

The permanent erosion and sediment control measures described in the following sections are included as part of the construction documents.

5.2.1 Establishment of Permanent Vegetation

Disturbed areas that will be vegetated must be seeded in accordance with the contract documents. The type of seed, mulch, and maintenance measures as described in the contract documents shall also be followed.

Because this site directly discharges to one of the 303(d) segments listed in Appendix E or is located in one of the watersheds listed in Appendix C of GP-0-15-002, permanent soil stabilization measures must

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 17

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

be initiated by the end of the next business day and completed within seven (7) days from the date the soil disturbance activity has permanently ceased.

Final site stabilization is achieved when all soil-disturbing activities at the site have been completed and a uniform, perennial vegetative cover with a density of 80 percent has been established or equivalent stabilization measures (such as the use of mulches or geotextiles) have been employed on all unpaved areas and areas not covered by permanent structures.

5.3 Other Pollutant Controls

Other necessary pollutant controls are listed below:

5.3.1 Solid and Liquid Waste Disposal

No solid or liquid waste materials, including building materials, shall be discharged from the site with stormwater. All solid waste, including disposable materials incidental to any construction activities, must be collected and placed in containers. The containers shall be emptied periodically by a licensed trash disposal service and hauled away from the site.

Substances that have the potential for polluting surface and/or groundwater must be controlled by whatever means necessary in order to ensure that they do not discharge from the site. As an example, special care must be exercised during equipment fueling and servicing operations. If a spill occurs, it must be contained and disposed of so that it will not flow from the site or enter groundwater, even if this requires removal, treatment, and disposal of soil. In this regard, potentially polluting substances should be handled in a manner consistent with the impact they represent.

5.3.2 Sanitary Facilities

Temporary sanitary facilities will be provided by the Contractor throughout the construction phase. They must be utilized by all construction personnel and will be serviced by a licensed commercial Contractor. These facilities must comply with state and local sanitary or septic system regulations.

5.3.3 Water Source

Non-stormwater components of site discharge must be clean water. Water used for construction, which discharges from the site, must originate from a public water supply or private well approved by the Health Department. Water used for construction that does not originate from an approved public supply must not discharge from the site; such water can be retained in temporary ponds/sediment traps until it infiltrates and/or evaporates.

5.4 Construction Housekeeping Practices

During the construction phase, the Contractor(s) will implement the following measures:

5.4.1 Material Stockpiles

Material resulting from clearing and grubbing operations that will be stockpiled on-site, must be adequately protected with downgradient erosion and sediment controls.

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 18

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

5.4.2 Equipment Cleaning and Maintenance

The Contractor(s) will designate areas for equipment cleaning, maintenance, and repair. The Contractor(s) and subcontractor(s) will utilize those areas. The areas will be protected by a temporary perimeter berm.

5.4.3 Detergents

The use of detergents for large-scale washing is prohibited (i.e., vehicles, buildings, pavement surfaces, etc.)

5.4.4 Spill Prevention and Response

A Spill Prevention and Response Plan shall be developed for the site by the Contractor(s). The plan shall detail the steps required in the event of an accidental spill and shall identify contact names and phone numbers of people and agencies that must be notified.

The plan shall include Material Safety Data Sheets (MSDS) for all materials to be stored on-site. All workers on-site will be required to be trained on safe handling and spill prevention procedures for all materials used during construction. Regular tailgate safety meetings shall be held and all workers that are expected on the site during the week shall be required to attend.

5.4.5 Concrete Wash Areas

Concrete trucks will be allowed to wash out or discharge surplus concrete or drum wash water on the site, but only in specifically designated diked and impervious washout areas, which have been prepared to prevent contact between the concrete wash and stormwater. Waste generated from concrete wash water shall not be allowed to flow into drainage ways, inlets, receiving waters, or highway right of ways, or any location other than the designated concrete wash areas. Proper signage designating the “Concrete Wash Areas” shall be placed near the facility. Concrete wash areas shall be located at minimum 100 linear feet from drainage ways, inlets, and surface waters.

The hardened residue from the concrete wash areas will be disposed of in the same manner as other non-hazardous construction waste materials. Maintenance of the wash area is to include removal of hardened concrete. Facility shall have sufficient volume to contain all the concrete waste resulting from washout and a minimum freeboard of 12 inches. Facility shall not be filled beyond 95% capacity and shall be cleaned out once 75% full unless a new facility is constructed. The Contractor will be responsible for seeing that these procedures are followed.

Sawcut Portland Cement Concrete (PCC) slurry shall not be allowed to enter drainage ways, inlets, and/or surface waters. Sawcut residue should not be left on the surface of pavement or be allowed to flow over and off pavement.

The Project may require the use of multiple concrete wash areas. All concrete wash areas will be located in an area where the likelihood of the area contributing to stormwater discharges is negligible. If required, additional BMPs must be implemented to prevent concrete wastes from contributing to stormwater discharges.

5.4.6 Material Storage

Construction materials shall be stored in a dedicated staging area. The staging area shall be located in an area that prevents negative impacts of construction materials on stormwater quality.

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 19

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

Chemicals, paints, solvents, fertilizers, and other toxic material must be stored in waterproof containers. Except during application, the contents must be kept in trucks or within storage facilities. Runoff containing such material must be collected, removed from the site, treated, and disposed of at an approved solid waste or chemical disposal facility.

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 20

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

6.0 INSPECTIONS, MAINTENANCE, AND REPORTING

6.1 Inspection and Maintenance Requirements

6.1.1 Pre-Construction Inspection and Certification

Prior to the commencement of construction, the Qualified Inspector/Qualified Professional shall conduct an assessment of the site and certify that the appropriate erosion and sediment control measures have been adequately installed and implemented. The Contractor shall contact the Qualified Inspector/Qualified Professional once the erosion and sediment control measures have been installed.

6.1.2 Construction Phase Inspections and Maintenance

Because this project site is located in one of the watersheds listed in Appendix D of GP-0-15-002, and is between 5,000 square feet and acre in proposed soil disturbance, site inspections are not required by a qualified professional however are required by the trained professional.

The purpose of site inspections is to assess performance of pollutant controls. Based on these inspections, the Qualified Inspector/Qualified Professional will decide whether it is necessary to modify this SWPPP, add or relocate sediment barriers, or whatever else may be needed in order to prevent pollutants from leaving the site via stormwater runoff. The general contractor has the duty to cause pollutant control measures to be repaired, modified, maintained, supplemented, or whatever else is necessary in order to achieve effective pollutant control.

Examples of particular items to evaluate during site inspections are listed below. This list is not intended to be comprehensive. During each inspection the inspector must evaluate overall pollutant control system performance as well as particular details of individual system components. Additional factors should be considered as appropriate to the circumstances.

1. Locations where vehicles enter and exit the site must be inspected for evidence of off-site sediment tracking. A stabilized construction entrance will be constructed where vehicles enter and exit. This entrance will be maintained or supplemented as necessary to prevent sediment from leaving the site on vehicles.

2. Sediment barriers must be inspected and, if necessary, they must be enlarged or cleaned in order to provide additional capacity. All material from behind sediment barriers will be stockpiled on the up slope side. Additional sediment barriers must be constructed as needed.

3. Inspections will evaluate disturbed areas and areas used for storing materials that are exposed to rainfall for evidence of, or the potential for, pollutants entering the drainage system. If necessary, the materials must be covered or original covers must be repaired or supplemented. Also, protective berms must be constructed, if needed, in order to contain runoff from material storage areas.

4. Grassed areas will be inspected to confirm that a healthy stand of grass is maintained. The site has achieved final stabilization once all areas are covered with building foundation or pavement, or have a stand of grass with at least 80 percent density. The density of 80 percent or greater must be maintained to be considered as stabilized. Areas must be watered, fertilized, and reseeded as needed to achieve this goal.

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 21

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

5. All discharge points must be inspected to determine whether erosion control measures are effective in preventing significant impacts to receiving waters.

The inspection reports must be completed entirely and additional remarks should be included if needed to fully describe a situation. An important aspect of the inspection report is the description of additional measures that need to be taken to enhance plan effectiveness. The inspection report must identify whether the site was in compliance with the SWPPP at the time of inspection and specifically identify all incidents of non-compliance.

Within one (1) business day of the completion of an inspection, the Qualified Inspector/Qualified Professional shall notify the Owner/Operator and appropriate contractor or subcontractor of any corrective actions that need to be taken. The contractor or subcontractor shall begin implementing the corrective actions within one (1) business day of the notification and shall complete the corrective actions in a reasonable time frame.

In addition to the inspections performed by the Qualified Inspector/Qualified Professional, the Contractor shall perform routine inspections that include a visual check of all erosion and sediment control measures. All inspections and maintenance shall be performed in accordance with the inspection and maintenance schedule provided on the accompanying plans. Sediment removed from erosion and sediment control measures will be exported from the site, stockpiled for later use, or used immediately for general non-structural fill.

It is the responsibility of the general contractor to assure the adequacy of site pollutant discharge controls. Actual physical site conditions or contractor practices could make it necessary to install more structural controls than are shown on the accompanying plans. (For example, localized concentrations of runoff could make it necessary to install additional sediment barriers, sediment traps, etc.) Assessing the need for additional controls and implementing them or adjusting existing controls will be a continuing aspect of this SWPPP until the site achieves final stabilization.

6.1.3 Temporary Suspension of Construction Activities

For construction sites where soil disturbance activities have been temporarily suspended (e.g. Winter shutdown) and temporary stabilization measures have been applied to all disturbed areas, the frequency of Trained Contractor inspections can be reduced to once every 30 calendar days. Prior to reducing the frequency of inspections, the Owner/Operator shall notify the NYSDEC Region 3 stormwater contact person Town of Southeast in writing.

6.1.4 Partial Project Completion

For construction sites where soil disturbance activities have been shut down with partial project completion, all areas disturbed as of the project shutdown date have achieved final stabilization and the inspections by the Trained Contractor can stop. Prior to the shutdown, the Owner/Operator shall notify the NYSDEC Region 3 stormwater contact person and the Town of Southeast in writing.

If soil disturbance activities have not resumed within two years from the date of shutdown, a Notice of Termination (NOT) shall be properly completed and submitted to the NYSDEC.

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 22

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

6.1.5 Post-Construction Inspections and Maintenance

Inspections and maintenance of final stabilization measures be performed in accordance with Appendix F, once all disturbed areas are stabilized.

6.2 Reporting Requirements

6.2.1 Inspection and Maintenance Reports

Inspection/maintenance reports shall be prepared prior to and during construction in accordance with the schedule outlined herein and in the SPDES General Permit GP-0-15-002 Part IV.C. The reports shall be prepared to identify and document the maintenance of the erosion and sediment control measures. A sample inspection form is provided in Appendix D.

Specifically, each inspection shall record the following information:

1. Date and time of inspection.

2. Name and title of person(s) performing inspection.

3. A description of the weather and soil conditions (e.g. dry, wet, saturated) at the time of the inspection.

4. A description of the condition of the runoff at all points of discharge from the construction site. This shall include identification of any discharges of sediment from the construction site. Include discharges from conveyance systems (i.e. pipes, culverts, ditches, etc.) and overland flow.

5. A description of the condition of all natural surface waterbodies located within, or immediately adjacent to, the property boundaries of the construction site which receive runoff from disturbed areas. This shall include identification of any discharges of sediment to the surface water body.

6. Identification of all erosion and sediment control practices and pollution prevention measures that need repair or maintenance.

7. Identification of all erosion and sediment control practices and pollution prevention measures that were not installed properly or are not functioning as designed and need to be reinstalled or replaced.

8. Description and sketch of areas with active soil disturbance activity, areas that have been disturbed but are inactive at the time of the inspection, and areas that have been stabilized (temporary and/or final) since the last inspection.

9. Corrective action(s) that must be taken to install, repair, replace or maintain erosion and sediment control practices and pollution prevention measures

10. Identification and status of all corrective actions that were required by previous inspection.

11. Color photographs, with date stamp, that clearly show the condition of all practices that have been identified as needing corrective actions. The Qualified Inspector/Qualified Professional shall

Stormwater Pollution Prevention Plan Batista Dunkin’ Page 23

The Chazen Companies Chazen Job Number: 81625.00 February 4, 2019

attach paper color copies of the digital photographs to the inspection report being maintained onsite within seven (7) calendar days of the date of the inspection. The Qualified Inspector/Qualified Professional shall also take digital photographs, with date stamp, that clearly show the condition of the practice(s) after the corrective action has been completed. The Qualified Inspector/Qualified Professional shall attach the paper color copies of the digital photographs to the inspection report that documents the completion of the corrective action work within seven (7) calendar days of that inspection.

All inspection reports shall be signed by the Qualified Inspector/Qualified Professional. Pursuant to Part II.C.2 of GP-0-15-002, the inspection reports shall be maintained on site with the SWPPP.

6.2.2 Site Log Book

The Owner/Operator shall retain a copy of the SWPPP required by GP-0-15-002 at the construction site from the date of initiation of construction activities to the date of final stabilization.

During construction, the Owner’s/Operator’s Engineer shall maintain a record of all SWPPP inspection reports at the site in the Site Log Book. The Site Log Book shall be maintained on-site and made available to the permitting authority, if necessary.

6.2.3 Post Construction Records and Archiving

Following construction, the Owner/Operator shall retain copies of the SWPPP, the complete construction Site Log Book, and records of all data used to complete the NOI to be covered by this permit, for a period of at least five years from the date that the site is finally stabilized. This period may be extended by the NYSDEC, at its sole discretion, at any time upon written notification.

Records shall be maintained of all post construction inspections and maintenance work performed in accordance with the requirements outlined in Appendix F.

   

     

  

Appendix A: NYSDEC SPDES General Permit GP‐0‐15‐002 

   

     

NEW

YO

RK

STAT

ED

EP

AR

TME

NT

OF

EN

VIR

ON

ME

NTA

L C

ON

SE

RV

ATIO

NS

PD

ES

GE

NE

RA

L P

ERM

ITFO

R S

TOR

MW

ATE

R D

ISC

HA

RG

ES

From

CO

NST

RU

CTI

ON

AC

TIVI

TY

Per

mit

No.

GP

-0-1

5-00

2

Issu

ed P

ursu

ant t

o A

rticl

e 17

, Titl

es 7

, 8 a

nd A

rticl

e 70

of

the

Envi

ronm

enta

l Con

serv

atio

n La

w

Effe

ctiv

e D

ate:

Jan

uary

29,

201

5E

xpira

tion

Dat

e: J

anua

ry 2

8, 2

020

John

J. F

ergu

son

Chi

ef P

erm

it Ad

min

istra

tor

Aut

horiz

ed S

igna

ture

Dat

e

Add

ress

:N

YS D

EC

Div

isio

n of

Env

ironm

enta

l Per

mits

625

Bro

adw

ay, 4

th F

loor

Alb

any,

N.Y

. 12

233-

1750

PREF

AC

E

Pur

suan

t to

Sec

tion

402

of th

e C

lean

Wat

er A

ct (“

CW

A”),

sto

rmw

ater

dis

char

ges

from

cer

tain

con

stru

ctio

n ac

tiviti

esar

e un

law

ful u

nles

s th

ey a

re a

utho

rized

by

a N

atio

nal

Pol

luta

nt D

isch

arge

Elim

inat

ion

Sys

tem

(“N

PD

ES

”) pe

rmit

or b

y a

stat

e pe

rmit

prog

ram

. N

ew Y

ork’

sS

tate

Pol

luta

nt D

isch

arge

Elim

inat

ion

Sys

tem

(“S

PD

ES

”) is

a N

PD

ES

-ap

prov

edpr

ogra

m w

ith p

erm

its is

sued

in a

ccor

danc

e w

ith th

e E

nviro

nmen

tal

Con

serv

atio

n La

w (“

EC

L”).

This

gen

eral

per

mit

(“per

mit”

) is

issu

ed p

ursu

ant t

o A

rticl

e 17

, Titl

es 7

, 8 a

nd

Arti

cle

70of

the

EC

L. A

n ow

ner o

r ope

rato

rmay

obt

ain

cove

rage

und

er th

is p

erm

it by

su

bmitt

ing

a N

otic

e of

Inte

nt ("

NO

I") to

the

Dep

artm

ent.

Cop

ies

of th

is p

erm

it an

d th

e N

OI

for N

ew Y

ork

are

avai

labl

e by

cal

ling

(518

) 402

-810

9 or

at a

ny N

ew Y

ork

Sta

teD

epar

tmen

t of E

nviro

nmen

tal C

onse

rvat

ion

(“the

Dep

artm

ent”)

regi

onal

offi

ce (s

ee

App

endi

x G

).The

y ar

e al

so a

vaila

ble

on th

e D

epar

tmen

t’s w

ebsi

te a

t:ht

tp://

ww

w.d

ec.n

y.go

v/

An

owne

r or o

pera

tor o

f a c

onst

ruct

ion

activ

ity th

at is

elig

ible

for c

over

age

unde

r th

ispe

rmit

mus

t obt

ain

cove

rage

prio

r to

the

com

men

cem

ent o

f con

stru

ctio

n ac

tivity

.A

ctiv

ities

that

fit t

he d

efin

ition

of “

cons

truct

ion

activ

ity”,

as d

efin

ed u

nder

40

CFR

12

2.26

(b)(1

4)(x

), (1

5)(i)

,and

(15)

(ii),

cons

titut

e co

nstru

ctio

n of

a p

oint

sou

rce

and

ther

efor

e, p

ursu

ant t

o A

rticl

e 17

-050

5 of

the

EC

L, th

e ow

ner o

r ope

rato

r mus

t hav

e co

vera

ge u

nder

a S

PD

ES

per

mit

prio

r to

com

men

cing

con

stru

ctio

n ac

tivity

. The

y ca

nnot

w

ait u

ntil

ther

e is

an

actu

al d

isch

arge

from

the

cons

truct

ion

site

to o

btai

n pe

rmit

cove

rage

.

*Not

e: T

he it

alic

ized

wor

ds/p

hras

es w

ithin

this

per

mit

are

defin

ed in

App

endi

x A

.

I

NEW

YO

RK

STA

TE D

EPA

RTM

ENT

OF

ENVI

RO

NM

ENTA

L C

ON

SER

VATI

ON

SPD

ES G

ENER

AL

PER

MIT

FO

R S

TOR

MW

ATE

R D

ISC

HA

RG

ESFR

OM

CO

NST

RU

CTI

ON

AC

TIVI

TIES

Par

t I.P

ER

MIT

CO

VE

RA

GE

AN

D L

IMIT

ATI

ON

S...

......

......

......

......

......

......

......

......

......

.....1

A

. P

erm

it A

pplic

atio

n...

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

.... 1

B

. E

fflue

nt L

imita

tions

App

licab

le to

Dis

char

ges

from

Con

stru

ctio

n A

ctiv

ities

......

.....1

C

. P

ost-c

onst

ruct

ion

Sto

rmw

ater

Man

agem

entP

ract

ice

Req

uire

men

ts...

......

......

.....4

D

. M

aint

aini

ng W

ater

Qua

lity.

......

......

......

......

......

......

......

......

......

......

......

......

......

......

8 E

. El

igib

ility

Und

er T

his

Gen

eral

Perm

it....

......

......

......

......

......

......

......

......

......

......

.....9

F.

A

ctiv

ities

Whi

ch A

re In

elig

ible

for C

over

age

Und

erTh

isG

ener

al P

erm

it...

......

.....9

P

art I

I. O

BTA

ININ

G P

ER

MIT

CO

VE

RA

GE

......

......

......

......

......

......

......

......

......

......

......

...12

A

. N

otic

e of

Inte

nt (N

OI)

Sub

mitt

al...

......

......

......

......

......

......

......

......

......

......

......

.....1

2 B

. P

erm

it A

utho

rizat

ion.

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

.13

C.

Gen

eral

Req

uire

men

ts F

or O

wne

rs o

r Ope

rato

rsW

ithP

erm

it C

over

age

......

.....1

5 D

. P

erm

it C

over

age

for D

isch

arge

s A

utho

rized

Und

er G

P-0

-10-

001.

......

......

......

....1

7 E

. C

hang

e of

Ow

ner o

rOpe

rato

r.....

......

......

......

......

......

......

......

......

......

......

......

......

17

Par

t III.

STO

RM

WA

TER

PO

LLU

TIO

NP

RE

VE

NTI

ON

PLA

N (S

WP

PP

)....

......

......

......

.....1

8 A

. G

ener

al S

WP

PP

Req

uire

men

ts...

......

......

......

......

......

......

......

......

......

......

......

.....1

8 B

. R

equi

red

SW

PP

P C

onte

nts

......

......

......

......

......

......

......

......

......

......

......

......

......

..20

C.

Req

uire

d S

WP

PP

Com

pone

nts

by P

roje

ct T

ype.

......

......

......

......

......

......

......

......

23

Part

IV. I

NSP

ECTI

ON

AND

MAI

NTE

NAN

CE

REQ

UIR

EM

EN

TS...

......

......

......

......

......

....2

4 A

. G

ener

al C

onst

ruct

ion

Site

Insp

ectio

nan

d M

aint

enan

ce R

equi

rem

ents

......

......

..24

B.

Con

tract

or M

aint

enan

ce In

spec

tion

Req

uire

men

ts...

......

......

......

......

......

......

......

24

C.

Qua

lifie

d In

spec

torI

nspe

ctio

n R

equi

rem

ents

......

......

......

......

......

......

......

......

......

24

Par

t V. T

ER

MIN

ATI

ON

OF

PE

RM

IT C

OV

ER

AG

E...

......

......

......

......

......

......

......

......

......

..28

A.

Term

inat

ion

ofP

erm

it C

over

age

......

......

......

......

......

......

......

......

......

......

......

......

.28

Part

VI.R

EPO

RTI

NG

AN

DR

ETEN

TIO

N O

F R

ECO

RD

S...

......

......

......

......

......

......

......

...30

A

. R

ecor

d R

eten

tion

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

30

B.

Add

ress

es...

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

..30

Part

VII.

STA

ND

ARD

PER

MIT

CO

ND

ITIO

NS

......

......

......

......

......

......

......

......

......

......

.....3

1 A

. D

uty

to C

ompl

y....

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

31

B.

Con

tinua

tion

of th

e E

xpire

d G

ener

alP

erm

it....

......

......

......

......

......

......

......

......

....3

1 C

. En

forc

emen

t.....

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

...31

D

. N

eed

to H

alto

r Red

uce

Act

ivity

Not

a D

efen

se...

......

......

......

......

......

......

......

......

31

E.

Dut

y to

Miti

gate

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

...32

F.

D

uty

to P

rovi

de In

form

atio

n....

......

......

......

......

......

......

......

......

......

......

......

......

.....3

2 G

. O

ther

Info

rmat

ion

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

32

H.

Sig

nato

ry R

equi

rem

ents

......

......

......

......

......

......

......

......

......

......

......

......

......

......

..32

I. P

rope

rty R

ight

s....

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

...34

J.

S

ever

abili

ty...

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

....3

4 K

. R

equi

rem

ent t

oO

btai

n C

over

age

Und

er a

n A

ltern

ativ

e P

erm

it....

......

......

......

.....3

4 L.

P

rope

r Ope

ratio

n an

dM

aint

enan

ce...

......

......

......

......

......

......

......

......

......

......

.....3

5 M

. In

spec

tion

and

Ent

ry...

......

......

......

......

......

......

......

......

......

......

......

......

......

......

....3

5 N

. P

erm

it A

ctio

ns...

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

..36

O.

Def

initi

ons

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

.....3

6 P

. R

e-O

pene

r Cla

use

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

....3

6

II

Q.

Pen

altie

sfo

r Fal

sific

atio

n of

For

ms

and

Rep

orts

......

......

......

......

......

......

......

......

.36

R.

Oth

er P

erm

its...

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

...36

A

PP

EN

DIX

A...

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

.....3

7 A

PP

EN

DIX

B...

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

.....4

4 A

PP

EN

DIX

C...

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

....4

6 A

PP

EN

DIX

D...

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

....5

2 A

PP

EN

DIX

E...

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

.....5

3 A

PP

EN

DIX

F...

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

.....5

5

III

(Par

t I)

Part

I. P

ERM

IT C

OVE

RA

GE

AN

D L

IMIT

ATI

ON

S

A.P

erm

it Ap

plic

atio

nTh

is p

erm

it au

thor

izes

sto

rmw

ater

dis

char

ges

tosu

rface

wat

ers

of th

e S

tate

from

th

e fo

llow

ing

cons

truct

ion

activ

ities

iden

tifie

d w

ithin

40

CFR

Par

ts 1

22.2

6(b)

(14)

(x),

122.

26(b

)(15

)(i)

and

122.

26(b

)(15

)(ii)

, pro

vide

d al

l of t

he e

ligib

ility

pro

visi

ons

of th

is

perm

it ar

e m

et:

Con

stru

ctio

n ac

tiviti

esin

volv

ing

soil

dist

urba

nces

of o

ne (1

) or m

ore

acre

s;

incl

udin

g di

stur

banc

es o

f le

ss t

han

one

acre

tha

t ar

e pa

rt of

a l

arge

r co

mm

on p

lan

of d

evel

opm

ent o

r sal

eth

at w

ill ul

timat

ely

dist

urb

one

or m

ore

acre

s of

land

; exc

ludi

ng r

outin

e m

aint

enan

ce a

ctiv

ityth

at is

per

form

ed to

m

aint

ain

the

orig

inal

line

and

gra

de, h

ydra

ulic

cap

acity

or o

rigin

al p

urpo

se

of a

faci

lity;

Con

stru

ctio

n ac

tiviti

es in

volv

ing

soil

dist

urba

nces

of l

ess

than

one

(1) a

cre

whe

re th

e D

epar

tmen

t has

det

erm

ined

that

a S

PD

ES

per

mit

is re

quire

d fo

r st

orm

wat

er d

isch

arge

sba

sed

on th

e po

tent

ial f

or c

ontri

butio

n to

a v

iola

tion

of a

wat

er q

ualit

y st

anda

rd o

r fo

r si

gnifi

cant

con

tribu

tion

of p

ollu

tant

sto

su

rface

wat

ers

of th

e St

ate.

Con

stru

ctio

n ac

tiviti

es lo

cate

d in

the

wat

ersh

ed(s

) ide

ntifi

ed in

App

endi

x D

th

at in

volv

e so

il di

stur

banc

es b

etw

een

five

thou

sand

(5,

000)

squ

are

feet

an

d on

e (1

) acr

e of

land

.

B.E

fflue

nt L

imita

tions

App

licab

le to

Dis

char

ges

from

Con

stru

ctio

n A

ctiv

ities

Dis

char

ges

auth

oriz

ed b

y th

ispe

rmit

mus

t ac

hiev

e, a

t a

min

imum

, th

e ef

fluen

t lim

itatio

ns in

Par

t I.B

.1.(

a) –

(f)of

this

per

mit.

Thes

e lim

itatio

ns re

pres

ent t

he d

egre

e of

effl

uent

red

uctio

n at

tain

able

by

the

appl

icat

ion

of b

est

prac

ticab

le t

echn

olog

y cu

rrent

ly a

vaila

ble.

Ero

sion

and

Sed

imen

t Con

trolR

equi

rem

ents

-The

ow

ner o

r ope

rato

rmus

t se

lect

, de

sign

, in

stal

l, im

plem

ent

and

mai

ntai

n co

ntro

l m

easu

res

to

min

imiz

eth

e di

scha

rge

of p

ollu

tant

san

dpr

even

t a

viol

atio

n of

the

wat

er

qual

ity s

tand

ards

. The

sel

ectio

n, d

esig

n, in

stal

latio

n, im

plem

enta

tion,

and

m

aint

enan

ceof

thes

e co

ntro

l mea

sure

sm

ust m

eet t

he n

on-n

umer

ic e

fflue

nt

limita

tions

in P

art I

.B.1

.(a) –

(f) o

f thi

s pe

rmit

and

be in

acc

orda

nce

with

the

New

Yor

k S

tate

Sta

ndar

ds a

nd S

peci

ficat

ions

for

Ero

sion

and

Sed

imen

t C

ontro

l, da

ted

Aug

ust

2005

,us

ing

soun

d en

gine

erin

g ju

dgm

ent.

Whe

re

cont

rol m

easu

res

are

not d

esig

ned

in c

onfo

rman

ce w

ith th

e de

sign

crit

eria

in

clud

ed in

the

tech

nica

l sta

ndar

d, th

e ow

ner

or o

pera

tor

mus

t inc

lude

in

the

Sto

rmw

ater

Pol

lutio

n P

reve

ntio

n P

lan

(“SW

PPP

”)th

e re

ason

(s) f

or th

e de

viat

ion

or a

ltern

ativ

e de

sign

and

pro

vide

info

rmat

ion

1

(Par

t I.B

.1)

whi

ch d

emon

stra

tes

that

the

devi

atio

n or

alte

rnat

ive

desi

gn is

equ

ival

entt

o th

e te

chni

cal s

tand

ard.

a.Er

osio

n an

d Se

dim

ent C

ontr

ols.

Des

ign,

inst

all a

nd m

aint

ain

effe

ctiv

e er

osio

nan

d se

dim

ent c

ontro

ls to

min

imiz

eth

e di

scha

rge

of p

ollu

tant

san

d pr

even

t a

viol

atio

n of

the

wat

er q

ualit

y st

anda

rds.

At

a m

inim

um,

such

co

ntro

ls m

ust b

e de

sign

ed, i

nsta

lled

and

mai

ntai

ned

to:

(i)M

inim

ize

soil

eros

ion

thro

ugh

appl

icat

ion

of ru

noff

cont

rol a

nd s

oil

stab

ilizat

ion

cont

rol m

easu

reto

min

imiz

epo

lluta

ntdi

scha

rges

;

(ii)

Con

trol

stor

mw

ater

di

scha

rges

to

m

inim

ize

chan

nel

and

stre

amba

nk e

rosi

onan

d sc

our

in t

he i

mm

edia

te v

icin

ity o

f th

e di

scha

rge

poin

ts;

(iii)

Min

imiz

eth

e am

ount

of s

oil e

xpos

ed d

urin

g co

nstru

ctio

n ac

tivity

;

(iv)

Min

imiz

eth

e di

stur

banc

e of

ste

ep s

lope

s;

(v)

Min

imiz

ese

dim

ent d

isch

arge

s fro

m th

e si

te;

(vi)

Pro

vide

and

mai

ntai

n na

tura

l buf

fers

aro

und

surfa

ce w

ater

s, d

irect

st

orm

wat

er

to

vege

tate

d ar

eas

and

max

imiz

est

orm

wat

er

infil

tratio

nto

redu

ce p

ollu

tant

disc

harg

es, u

nles

s in

feas

ible

;

(vii)

Min

imiz

eso

il co

mpa

ctio

n. M

inim

izin

g so

il co

mpa

ctio

n is

not

re

quire

d w

here

the

inte

nded

func

tion

of a

spe

cific

are

a of

the

site

di

ctat

es th

at it

be

com

pact

ed; a

nd

(viii)

Unl

ess

infe

asib

le,

pres

erve

a s

uffic

ient

am

ount

of

tops

oil

to

com

plet

e so

il re

stor

atio

nan

d es

tabl

ish

a un

iform

, de

nse

vege

tativ

e co

ver.

b.So

il St

abili

zatio

n.In

are

as w

here

soi

l dis

turb

ance

act

ivity

has

tem

pora

rily

or p

erm

anen

tly c

ease

d, th

e ap

plic

atio

n of

soi

l sta

biliz

atio

n m

easu

res

mus

t be

initi

ated

by

the

end

of t

he n

ext

busi

ness

day

and

com

plet

ed w

ithin

fo

urte

en (

14)

days

fro

m t

he d

ate

the

curre

nt s

oil

dist

urba

nce

activ

ity

ceas

ed.F

or c

onst

ruct

ion

site

s th

at d

irect

ly d

isch

arge

to o

ne o

f the

303

(d)

segm

ents

list

ed in

App

endi

x E

or i

s lo

cate

d in

one

of t

he w

ater

shed

s lis

ted

in A

ppen

dix

C,

the

appl

icat

ion

of s

oil

stab

ilizat

ion

mea

sure

s m

ust

be

initi

ated

by

the

end

of th

e ne

xt b

usin

ess

day

and

com

plet

ed w

ithin

sev

en

(7)

days

from

the

date

the

curre

nt s

oil d

istu

rban

ce a

ctiv

ity c

ease

d. S

ee

App

endi

x A

for d

efin

ition

of T

empo

raril

y C

ease

d.

c.D

ewat

erin

g.D

isch

arge

s fro

m d

ewat

erin

g ac

tiviti

es, i

nclu

ding

dis

char

ges

2

(Par

t I.B

.1.c

)fro

m d

ewat

erin

g of

tre

nche

s an

d ex

cava

tions

, m

ust

bem

anag

ed b

y ap

prop

riate

con

trolm

easu

res.

d.Po

llutio

n Pr

even

tion

Mea

sure

s.

Des

ign,

in

stal

l, im

plem

ent,

and

mai

ntai

n ef

fect

ive

pollu

tion

prev

entio

n m

easu

res

to

min

imiz

eth

e di

scha

rge

of p

ollu

tant

san

d pr

even

t a

viol

atio

n of

the

wat

er q

ualit

y st

anda

rds.

At

a m

inim

um,

such

mea

sure

s m

ust

be d

esig

ned,

inst

alle

d,

impl

emen

ted

and

mai

ntai

ned

to:

(i)M

inim

ize

the

disc

harg

eof

pol

luta

nts

from

equ

ipm

ent

and

vehi

cle

was

hing

, whe

el w

ash

wat

er, a

nd o

ther

was

h w

ater

s. T

his

appl

ies

to

was

hing

ope

ratio

ns th

at

use

clea

n w

ater

onl

y. S

oaps

, det

erge

nts

and

solv

ents

cann

otbe

use

d;

(ii)

Min

imiz

eth

e ex

posu

re o

f bu

ildin

g m

ater

ials

, bu

ildin

g pr

oduc

ts,

cons

truct

ion

was

tes,

tra

sh,

land

scap

e m

ater

ials

, fe

rtiliz

ers,

pe

stic

ides

, he

rbic

ides

, de

terg

ents

, sa

nita

ry

was

te

and

othe

r m

ater

ials

pre

sent

on

the

site

to p

reci

pita

tion

and

to s

torm

wat

er.

Min

imiz

atio

n of

exp

osur

e is

not

req

uire

d in

cas

es w

here

the

ex

posu

re t

o pr

ecip

itatio

n an

d to

sto

rmw

ater

will

not

res

ult

in a

di

scha

rge

of p

ollu

tant

s, o

r w

here

exp

osur

e of

a s

peci

fic m

ater

ial

or p

rodu

ct p

oses

littl

e ris

k of

sto

rmw

ater

con

tam

inat

ion

(suc

h as

fin

al p

rodu

cts

and

mat

eria

ls in

tend

ed fo

r out

door

use

) ; a

nd

(iii)

Pre

vent

the

disc

harg

eof

pol

luta

nts

from

spi

lls a

nd l

eaks

and

im

plem

ent

chem

ical

spi

ll an

d le

ak p

reve

ntio

n an

d re

spon

se

proc

edur

es.

e.Pr

ohib

ited

Dis

char

ges.

The

follo

win

g di

scha

rges

are

pro

hibi

ted:

(i)W

aste

wat

er fr

om w

asho

ut o

f con

cret

e;

(ii)

Was

tew

ater

fro

m w

asho

ut a

nd c

lean

out

of s

tucc

o, p

aint

, fo

rm

rele

ase

oils

, cur

ing

com

poun

ds a

nd o

ther

con

stru

ctio

n m

ater

ials

;

(iii)

Fuel

s, o

ils,

or o

ther

pol

luta

nts

used

in

vehi

cle

and

equi

pmen

t op

erat

ion

and

mai

nten

ance

;

(iv)

Soa

ps o

r sol

vent

s us

ed in

veh

icle

and

equ

ipm

ent w

ashi

ng; a

nd

(v)

Toxi

c or

haz

ardo

us s

ubst

ance

s fro

m a

spi

ll or

oth

er re

leas

e.

f.S

urfa

ce O

utle

ts. W

hen

disc

harg

ing

from

bas

ins

and

impo

undm

ents

, the

ou

tlets

sha

ll be

des

igne

d, c

onst

ruct

ed a

nd m

aint

aine

d in

suc

h a

man

ner

that

sed

imen

t doe

s no

t lea

ve th

e ba

sin

or im

poun

dmen

t and

that

ero

sion

3

(Par

t I.B

.1.f)

at o

r bel

ow th

e ou

tlet d

oes

not o

ccur

.

C.P

ost-c

onst

ruct

ion

Stor

mw

ater

Man

agem

ent P

ract

ice

Req

uire

men

ts

The

owne

r or

ope

rato

rof

a c

onst

ruct

ion

activ

ityth

atre

quire

spo

st-

cons

truct

ion

stor

mw

ater

man

agem

ent

prac

tices

purs

uant

to

Par

t III

.C.

of

this

per

mit

mus

t sel

ect,

desi

gn, i

nsta

ll, a

nd m

aint

ain

the

prac

tices

to m

eet

the

perfo

rman

ce c

riter

iain

the

New

Yor

k S

tate

Sto

rmw

ater

Man

agem

ent

Des

ign

Man

ual

(“Des

ign

Man

ual”)

, da

ted

Janu

ary

2015

, us

ing

soun

d en

gine

erin

g ju

dgm

ent.

Whe

re p

ost-c

onst

ruct

ion

stor

mw

ater

man

agem

ent

prac

tices

(“S

MP

s”) a

re n

ot d

esig

ned

in c

onfo

rman

ce w

ith th

e pe

rform

ance

cr

iteria

in t

he D

esig

n M

anua

l, th

e ow

ner

or o

pera

tor

mus

t in

clud

e in

the

SW

PPP

the

reas

on(s

) fo

r th

e de

viat

ion

or a

ltern

ativ

e de

sign

and

pro

vide

in

form

atio

n w

hich

dem

onst

rate

s th

at th

e de

viat

ion

or a

ltern

ativ

e de

sign

is

equi

vale

ntto

the

tech

nica

l sta

ndar

d.

The

owne

r or

ope

rato

r of

a c

onst

ruct

ion

activ

ityth

at r

equi

res

post

-co

nstru

ctio

n st

orm

wat

er m

anag

emen

t pr

actic

es p

ursu

ant

to P

art

III.C

. of

th

is p

erm

it m

ust d

esig

nth

e pr

actic

esto

mee

t the

app

licab

le s

izin

g cr

iteria

in P

art I

.C.2

.a.,

b., c

. or d

.of t

his

perm

it.

a.Si

zing

Crit

eria

for N

ew D

evel

opm

ent

(i)R

unof

f Red

uctio

n Vo

lum

e (“R

Rv”

):R

educ

e th

e to

talW

ater

Qua

lity

Vol

ume

(“WQ

v”)

by a

pplic

atio

n of

RR

tec

hniq

ues

and

stan

dard

S

MP

s w

ith R

Rv

capa

city

. Th

e to

tal

WQ

v sh

all

be c

alcu

late

d in

ac

cord

ance

with

the

crite

ria in

Sec

tion

4.2

of th

e D

esig

n M

anua

l.

(ii)

Min

imum

R

Rv

and

Trea

tmen

t of

R

emai

ning

Tota

lW

Qv:

Con

stru

ctio

n ac

tiviti

esth

at

cann

ot

mee

t th

e cr

iteria

in

P

art

I.C.2

.a.(i

) of

thi

s pe

rmit

due

to s

ite li

mita

tions

shal

l dire

ct r

unof

f fro

m a

ll ne

wly

con

stru

cted

impe

rvio

us a

reas

to a

RR

tech

niqu

e or

stan

dard

SM

P w

ith R

Rv

capa

city

unle

ss in

feas

ible

.The

spe

cific

si

te li

mita

tions

that

pre

vent

the

redu

ctio

n of

100

% o

f the

WQ

v sh

all

be d

ocum

ente

d in

the

SWPP

P. F

or e

ach

impe

rvio

us a

rea

that

is

not

dire

cted

to

a R

R t

echn

ique

or

stan

dard

SM

P w

ith R

Rv

capa

city

, th

e SW

PPP

mus

t in

clud

e do

cum

enta

tion

whi

ch

dem

onst

rate

sth

at a

ll op

tions

wer

e co

nsid

ered

and

for e

ach

optio

n ex

plai

nsw

hy it

is c

onsi

dere

d in

feas

ible

.

In n

o ca

se s

hall

the

runo

ff re

duct

ion

achi

eved

from

the

new

ly

cons

truc

ted

impe

rvio

us a

reas

be le

ss th

an th

e M

inim

um R

Rv

asca

lcul

ated

usi

ng t

hecr

iteria

in S

ectio

n 4.

3 of

the

Des

ign

Man

ual.

The

rem

aini

ng p

ortio

n of

the

tota

l WQ

v 4

(Par

t I.C

.2.a

.ii)

that

can

not b

e re

duce

d sh

all b

e tre

ated

by

appl

icat

ion

of s

tand

ard

SM

Ps.

(iii)

Cha

nnel

Pro

tect

ion

Volu

me

(“C

pv”):

Pro

vide

24

hour

ext

ende

d de

tent

ion

of t

he p

ost-d

evel

oped

1-y

ear,

24-h

our

stor

m e

vent

; re

mai

ning

afte

r ru

noff

redu

ctio

n. T

he C

pv r

equi

rem

ent d

oes

not

appl

y w

hen:

(1)R

educ

tion

of t

he e

ntire

Cpv

is a

chie

ved

by a

pplic

atio

n of

ru

noff

redu

ctio

n te

chni

ques

or i

nfilt

ratio

n sy

stem

s, o

r

(2)T

hesi

te d

isch

arge

s di

rect

ly to

tida

l wat

ers,

or

fifth

ord

er o

r la

rger

stre

ams.

(iv)

Ove

rban

k Fl

ood

Con

trol

Crit

eria

(“Q

p”):

Req

uire

s st

orag

e to

at

tenu

ate

the

post

-dev

elop

men

t 10-

year

, 24-

hour

pea

k di

scha

rge

rate

(Qp)

to p

rede

velo

pmen

t rat

es. T

he Q

p re

quire

men

t doe

s no

t ap

ply

whe

n:(1

)the

site

dis

char

ges

dire

ctly

to

tidal

wat

ers

or f

ifth

orde

r or

la

rger

stre

ams,

or

(2)A

dow

nstre

am a

naly

sis

reve

als

that

ove

rban

k co

ntro

l is

not

requ

ired.

(v)

Ext

rem

e Fl

ood

Con

trol

Crit

eria

(“Q

f”):

Req

uire

s st

orag

e to

at

tenu

ate

the

post

-dev

elop

men

t 10

0-ye

ar,

24-h

our

peak

di

scha

rge

rate

(Qf)

to p

rede

velo

pmen

t rat

es. T

he Q

f req

uire

men

t do

es n

ot a

pply

whe

n:(1

)the

site

dis

char

ges

dire

ctly

to

tidal

wat

ers

or f

ifth

orde

r or

la

rger

stre

ams,

or

(2)A

dow

nstre

am a

naly

sis

reve

als

that

ove

rban

k co

ntro

l is

not

requ

ired.

b.Si

zing

Crit

eria

for

New

Dev

elop

men

tin

Enh

ance

d Ph

osph

orus

R

emov

al W

ater

shed

(i)R

unof

f Red

uctio

n Vo

lum

e (R

Rv)

: R

educ

e th

e to

tal W

ater

Qua

lity

Vol

ume

(WQ

v) b

y ap

plic

atio

n of

RR

tec

hniq

ues

and

stan

dard

S

MP

s w

ith R

Rv

capa

city

.The

tota

l WQ

v is

the

runo

ff vo

lum

e fro

m

the

1-ye

ar,

24

hour

de

sign

st

orm

ov

er

the

post

-dev

elop

ed

wat

ersh

edan

d sh

all b

e ca

lcul

ated

in a

ccor

danc

e w

ith th

e cr

iteria

in

Sec

tion

10.3

of t

he D

esig

n M

anua

l.

(ii)

Min

imum

R

Rv

and

Trea

tmen

t of

R

emai

ning

To

tal

WQ

v:C

onst

ruct

ion

activ

ities

that

ca

nnot

m

eet

the

crite

ria

in

Par

t I.C

.2.b

.(i)

of t

his

perm

itdu

e to

site

lim

itatio

nssh

alld

irect

run

off

from

all

new

ly c

onst

ruct

ed im

perv

ious

are

asto

a R

R te

chni

que

or

5

(Par

t I.C

.2.b

.ii)

stan

dard

SM

P w

ith R

Rv

capa

city

unl

ess

infe

asib

le.T

he s

peci

fic

site

lim

itatio

nsth

at p

reve

nt th

e re

duct

ion

of 1

00%

of t

he W

Qv

shal

l be

doc

umen

ted

in th

e SW

PPP

. For

eac

h im

perv

ious

are

ath

at is

no

t di

rect

ed t

o a

RR

tec

hniq

ue o

r st

anda

rd S

MP

with

RR

v ca

paci

ty,

the

SWPP

P

mus

t in

clud

e do

cum

enta

tion

whi

chde

mon

stra

tes

that

all o

ptio

ns w

ere

cons

ider

ed a

nd fo

r eac

h op

tion

expl

ains

why

itis

cons

ider

edin

feas

ible

.

In n

o ca

se s

hall

the

runo

ff re

duct

ion

achi

eved

from

the

new

ly

cons

truc

ted

impe

rvio

us a

reas

be le

ss th

an th

e M

inim

um R

Rv

as c

alcu

late

d us

ing

the

crite

ria in

Sec

tion

10.3

of t

he D

esig

n M

anua

l.Th

ere

mai

ning

porti

on o

f th

e to

tal W

Qv

that

can

not b

e re

duce

d sh

all b

e tre

ated

by

appl

icat

ion

of s

tand

ard

SM

Ps.

(iii)

Cha

nnel

Pro

tect

ion

Volu

me

(Cpv

): P

rovi

de 2

4 ho

ur e

xten

ded

dete

ntio

n of

the

pos

t-dev

elop

ed 1

-yea

r, 24

-hou

r st

orm

eve

nt;

rem

aini

ng a

fter

runo

ff re

duct

ion.

The

Cpv

req

uire

men

t doe

s no

t ap

ply

whe

n: (1)R

educ

tion

of

the

entir

e C

pv

is

achi

eved

by

ap

plic

atio

n of

ru

noff

redu

ctio

n te

chni

ques

or

in

filtra

tion

syst

ems,

or

(2)T

hesi

te d

isch

arge

s di

rect

ly t

o tid

al w

ater

s,or

fift

h or

der o

r lar

ger s

tream

s.

(iv)

Ove

rban

k Fl

ood

Con

trol

Crit

eria

(Q

p):

Req

uire

s st

orag

e to

at

tenu

ate

the

post

-dev

elop

men

t 10-

year

, 24-

hour

pea

k di

scha

rge

rate

(Qp)

to p

rede

velo

pmen

t rat

es. T

he Q

p re

quire

men

t doe

s no

t ap

ply

whe

n: (1)t

he s

ite d

isch

arge

s di

rect

ly t

o tid

al w

ater

s or

fift

h or

der o

r lar

ger s

tream

s, o

r(2

)A d

owns

tream

ana

lysi

s re

veal

s th

at o

verb

ank

cont

rol

is n

ot re

quire

d.

(v)

Ext

rem

e Fl

ood

Con

trol C

riter

ia (Q

f): R

equi

res

stor

age

to a

ttenu

ate

the

post

-dev

elop

men

t 100

-yea

r, 24

-hou

r pea

k di

scha

rge

rate

(Qf)

to p

rede

velo

pmen

t ra

tes.

The

Qf

requ

irem

ent

does

not

app

ly

whe

n:(1

)the

site

dis

char

ges

dire

ctly

to

tidal

wat

ers

or f

ifth

orde

r or l

arge

r stre

ams,

or

(2)A

dow

nstre

am a

naly

sis

reve

als

that

ove

rban

k co

ntro

l is

not

requ

ired.

c.Si

zing

Crit

eria

for R

edev

elop

men

t Act

ivity

6

(Par

t I.C

.2.c

.i)(i)

Wat

er Q

ualit

y V

olum

e (W

Qv)

: Th

e W

Qv

treat

men

t ob

ject

ive

for

rede

velo

pmen

t act

ivity

shal

l be

addr

esse

d by

one

of t

he fo

llow

ing

optio

ns.

Red

evel

opm

ent

activ

ities

loca

ted

in

anE

nhan

ced

Pho

spho

rus

Rem

oval

Wat

ersh

ed (s

ee P

art I

II.B

.3.a

nd A

ppen

dix

Cof

this

per

mit)

shal

l cal

cula

te th

e W

Qv

in a

ccor

danc

e w

ith S

ectio

n 10

.3 o

f the

Des

ign

Man

ual.

All

othe

r red

evel

opm

ent a

ctiv

ities

shal

l ca

lcul

ate

the

WQ

v in

acc

orda

nce

with

Sec

tion

4.2

of t

he D

esig

n M

anua

l.

(1)R

educ

e th

e ex

istin

g im

perv

ious

cov

erby

a m

inim

um

of 2

5% o

f th

e to

tal d

istu

rbed

, im

perv

ious

are

a.Th

e S

oil R

esto

ratio

n cr

iteria

in S

ectio

n 5.

1.6

of th

e D

esig

n M

anua

l mus

t be

appl

ied

to a

ll ne

wly

cre

ated

per

viou

s ar

eas,

or

(2)C

aptu

re a

nd tr

eat a

min

imum

of 2

5% o

f the

WQ

v fro

m

the

dist

urbe

d, im

perv

ious

are

aby

the

appl

icat

ion

of

stan

dard

SM

Ps;

or r

educ

e 25

% o

f the

WQ

v fro

m th

e di

stur

bed,

impe

rvio

us a

rea

by th

e ap

plic

atio

n of

RR

te

chni

ques

or s

tand

ard

SM

Ps

with

RR

v ca

paci

ty.,

or(3

)Cap

ture

and

treat

a m

inim

um o

f 75%

of t

he W

Qv

from

th

e di

stur

bed,

im

perv

ious

ar

eaas

w

ell

as

any

addi

tiona

l run

off f

rom

trib

utar

y ar

eas

by a

pplic

atio

n of

th

e al

tern

ativ

e pr

actic

es d

iscu

ssed

in

Sec

tions

9.3

and

9.4

of th

e D

esig

n M

anua

l., o

r(4

)App

licat

ion

of a

com

bina

tion

of 1

,2 a

nd 3

abo

ve th

at

prov

ide

a w

eigh

ted

aver

age

of a

t le

ast

two

of t

he

abov

e m

etho

ds. A

pplic

atio

n of

this

met

hod

shal

l be

in a

ccor

danc

e w

ith th

e cr

iteria

in S

ectio

n 9.

2.1(

B) (

IV)

of th

e D

esig

n M

anua

l.

If th

ere

is a

n ex

istin

g po

st-c

onst

ruct

ion

stor

mw

ater

man

agem

ent

prac

tice

loca

ted

on th

e si

te th

at c

aptu

res

and

treat

s ru

noff

from

the

impe

rvio

us a

rea

that

is b

eing

dis

turb

ed, t

he W

Qv

treat

men

t opt

ion

sele

cted

mus

t, at

a m

inim

um,

prov

ide

treat

men

t eq

ual

to t

he

treat

men

t tha

t was

bei

ng p

rovi

ded

by th

e ex

istin

g pr

actic

e(s)

if th

at

treat

men

t is

gre

ater

tha

n th

e tre

atm

ent

requ

ired

by o

ptio

ns 1

–4

abov

e.

(ii)

Cha

nnel

Pro

tect

ion

Volu

me

(Cpv

): N

ot r

equi

red

if th

ere

are

noch

ange

s to

hyd

rolo

gy t

hat

incr

ease

the

dis

char

gera

tefro

m t

he

proj

ect s

ite.

(iii)

Ove

rban

k Fl

ood

Con

trol C

riter

ia (Q

p): N

ot re

quire

d if

ther

e ar

eno

chan

ges

to h

ydro

logy

tha

t in

crea

se t

he d

isch

arge

rate

from

the

proj

ect s

ite.

7

(Par

t I.C

.2.c

.iv)

(iv)

Ext

rem

e Fl

ood

Con

trol C

riter

ia (

Qf):

Not

req

uire

d if

ther

e ar

eno

chan

ges

to h

ydro

logy

tha

t in

crea

se t

he d

isch

arge

rate

from

the

pr

ojec

t site

.

d.Si

zing

Crit

eria

for

Com

bina

tion

of R

edev

elop

men

t Act

ivity

and

New

D

evel

opm

ent

Con

stru

ctio

n pr

ojec

ts th

at in

clud

e bo

th N

ew D

evel

opm

enta

nd

Red

evel

opm

ent

Act

ivity

shal

l pr

ovid

e po

st-c

onst

ruct

ion

stor

mw

ater

man

agem

ent c

ontro

ls th

at m

eet t

he s

izin

g cr

iteria

calc

ulat

ed a

s an

agg

rega

te o

f the

Siz

ing

Crit

eria

in P

art I

.C.2

.a.

or b

. of

thi

s pe

rmit

for

the

New

Dev

elop

men

tpo

rtion

of

the

proj

ect

and

Par

t I.C

.2.c

of

this

per

mit

for

Red

evel

opm

ent

Act

ivity

porti

on o

f the

pro

ject

.

D.M

aint

aini

ng W

ater

Qua

lity

The

Dep

artm

ent

expe

cts

that

com

plia

nce

with

the

con

ditio

ns o

f th

is p

erm

it w

ill

cont

rol d

isch

arge

s ne

cess

ary

to m

eet a

pplic

able

wat

er q

ualit

y st

anda

rds.

It sh

all b

e a

viol

atio

n of

the

EC

L fo

r any

dis

char

ge to

eith

er c

ause

or c

ontri

bute

to a

vio

latio

n of

wat

er q

ualit

y st

anda

rds

as c

onta

ined

in P

arts

700

thro

ugh

705

of T

itle

6 of

the

Offi

cial

Com

pila

tion

of C

odes

, Rul

es a

nd R

egul

atio

ns o

f the

Sta

te o

f New

Yor

k, s

uch

as:

Ther

e sh

all b

e no

incr

ease

in tu

rbid

ity th

at w

ill ca

use

a su

bsta

ntia

l vis

ible

cont

rast

to n

atur

al c

ondi

tions

;

Ther

e sh

all b

e no

incr

ease

in s

uspe

nded

, col

loid

al o

rset

tleab

le s

olid

s th

at

will

cau

se d

epos

ition

or i

mpa

ir th

e w

ater

s fo

r the

ir be

st u

sage

s; a

nd

Ther

e sh

allb

e no

res

idue

from

oil

and

float

ing

subs

tanc

es, n

or v

isib

le o

il fil

m, n

orgl

obul

es o

f gre

ase.

If th

ere

is e

vide

nce

indi

catin

g th

at t

he s

torm

wat

er d

isch

arge

s au

thor

ized

by

this

pe

rmit

are

caus

ing,

hav

e th

e re

ason

able

pot

entia

l to

caus

e, o

r are

con

tribu

ting

to a

viol

atio

n of

the

wat

er q

ualit

y st

anda

rds;

the

owne

r or o

pera

torm

ust t

ake

appr

opria

te

corre

ctiv

e ac

tion

in a

ccor

danc

e w

ith P

art I

V.C

.5. o

f thi

s ge

nera

l per

mit

and

docu

men

t in

acc

orda

nce

with

Par

t IV

.C.4

. of t

his

gene

ral p

erm

it.To

add

ress

the

wat

er q

ualit

y st

anda

rdvi

olat

ion

the

owne

r or o

pera

tor m

ay n

eed

to p

rovi

de a

dditi

onal

info

rmat

ion,

in

clud

e an

d im

plem

ent a

ppro

pria

te c

ontro

ls in

the

SWPP

P to

cor

rect

the

prob

lem

, or

obt

ain

an in

divi

dual

SP

DE

S p

erm

it.

If th

ere

is e

vide

nce

indi

catin

g th

at d

espi

te c

ompl

ianc

e w

ith th

e te

rms

and

cond

ition

s of

this

gen

eral

per

mit

it is

dem

onst

rate

d th

at th

e st

orm

wat

er d

isch

arge

s au

thor

ized

by

this

per

mit

are

caus

ing

or c

ontri

butin

g to

a v

iola

tion

of w

ater

qual

ity s

tand

ards

, or

8

(Par

t I.D

)if

the

Dep

artm

ent

dete

rmin

es t

hat

a m

odifi

catio

n of

the

per

mit

is n

eces

sary

to

prev

ent

a vi

olat

ion

of w

ater

qua

lity

stan

dard

s, t

he a

utho

rized

dis

char

ges

will

no

long

er b

e el

igib

le fo

r cov

erag

e un

der t

his

perm

it. T

he D

epar

tmen

t may

requ

ire th

e ow

ner o

r ope

rato

rto

obta

in a

nin

divi

dual

SPD

ES

per

mit

to c

ontin

ue d

isch

argi

ng.

E.El

igib

ility

Und

er T

his

Gen

eral

Per

mit

This

per

mit

may

aut

horiz

e al

l dis

char

ges

of s

torm

wat

er fr

om c

onst

ruct

ion

activ

ity to

sur

face

wat

ers

of th

e S

tate

and

grou

ndw

ater

sex

cept

for i

nelig

ible

di

scha

rges

iden

tifie

d un

der s

ubpa

ragr

aph

F. o

f thi

s P

art.

Exc

ept f

or n

on-s

torm

wat

er d

isch

arge

sex

plic

itly

liste

d in

the

next

par

agra

ph,

this

pe

rmit

only

au

thor

izes

st

orm

wat

er

disc

harg

es

from

co

nstru

ctio

n ac

tiviti

es.

Not

with

stan

ding

pa

ragr

aphs

E

.1

and

E.2

abov

e,

the

follo

win

g no

n-st

orm

wat

er d

isch

arge

sm

ay b

e au

thor

ized

by

this

per

mit:

dis

char

ges

from

fir

efig

htin

g ac

tiviti

es;

fire

hydr

ant

flush

ings

; w

ater

s to

whi

ch c

lean

sers

or

othe

r com

pone

nts

have

not

bee

n ad

ded

that

are

use

d to

was

h ve

hicl

es o

r co

ntro

l du

st i

n ac

cord

ance

with

the

SW

PPP

, ro

utin

e ex

tern

al b

uild

ing

was

hdow

n w

hich

doe

s no

t us

e de

terg

ents

; pav

emen

t w

ashw

ater

s w

here

sp

ills

or le

aks

of to

xic

or h

azar

dous

mat

eria

ls h

ave

not o

ccur

red

(unl

ess

all

spille

d m

ater

ial h

as b

een

rem

oved

) and

whe

re d

eter

gent

s ar

e no

t use

d; a

ir co

nditi

onin

g co

nden

sate

; un

cont

amin

ated

gro

undw

ater

or s

prin

g w

ater

; un

cont

amin

ated

dis

char

ges

from

con

stru

ctio

n si

te d

e-w

ater

ing

oper

atio

ns;

and

foun

datio

n or

foo

ting

drai

ns w

here

flo

ws

are

not

cont

amin

ated

with

pr

oces

s m

ater

ials

suc

h as

sol

vent

s. F

or t

hose

ent

ities

req

uire

d to

obt

ain

cove

rage

und

er th

is p

erm

it, a

nd w

ho d

isch

arge

as n

oted

in th

is p

arag

raph

, an

d w

ith th

e ex

cept

ion

of fl

ows

from

fire

fight

ing

activ

ities

, the

se d

isch

arge

sm

ust b

e id

entif

ied

in th

e SW

PPP

. Und

er a

ll ci

rcum

stan

ces,

the

owne

r or

op

erat

or m

ust

still

com

ply

with

wat

er q

ualit

y st

anda

rds

in P

art

I.Dof

this

pe

rmit.

The

owne

r or

ope

rato

rm

ust m

aint

ain

perm

it el

igib

ility

to d

isch

arge

unde

r th

is p

erm

it.

Any

dis

char

ges

that

are

not

com

plia

nt w

ith t

he e

ligib

ility

co

nditi

ons

of th

is p

erm

it ar

e no

t aut

horiz

ed b

y th

e pe

rmit

and

the

owne

r or

oper

ator

mus

t eith

er a

pply

for

a s

epar

ate

perm

it to

cov

er th

ose

inel

igib

le

disc

harg

esor

tak

e st

eps

nece

ssar

y to

mak

e th

e di

scha

rge

elig

ible

for

co

vera

ge.

F.A

ctiv

ities

Whi

ch A

re In

elig

ible

for C

over

age

Und

er T

his

Gen

eral

Per

mit

All

of th

e fo

llow

ing

are

nota

utho

rized

by

this

per

mit:

9

(Par

t I.F

)

Dis

char

ges

afte

r co

nstru

ctio

n ac

tiviti

esha

ve b

een

com

plet

ed a

nd th

e si

te

has

unde

rgon

e fin

al s

tabi

lizat

ion;

Dis

char

ges

that

are

mix

ed w

ith s

ourc

es o

f non

-sto

rmw

ater

oth

er th

an th

ose

expr

essl

y au

thor

ized

und

er s

ubse

ctio

n E.

3. o

f thi

s P

art a

nd id

entif

ied

in th

e SW

PPP

requ

ired

by th

is p

erm

it;

Dis

char

ges

that

are

req

uire

d to

obt

ain

an i

ndiv

idua

l S

PD

ES

per

mit

or

anot

her S

PD

ES

gene

ral p

erm

it pu

rsua

nt to

Par

t VII.

K.o

f thi

s pe

rmit;

Con

stru

ctio

n ac

tiviti

esor

dis

char

ges

from

con

stru

ctio

n ac

tiviti

es th

at m

ayad

vers

ely

affe

ct a

nen

dang

ered

or t

hrea

tene

d sp

ecie

sun

less

the

owne

r or

oper

ator

has

obta

ined

ape

rmit

issu

edpu

rsua

nt to

6 N

YCR

R P

art 1

82fo

r th

e pr

ojec

t or t

he D

epar

tmen

t has

issu

ed a

lette

r of n

on-ju

risdi

ctio

n fo

r the

pr

ojec

t.A

ll do

cum

enta

tion

nece

ssar

y to

dem

onst

rate

elig

ibilit

y sh

all

be

mai

ntai

ned

on s

ite in

acc

orda

nce

with

Par

tII.C

.2 o

f thi

s pe

rmit.

Dis

char

ges

whi

chei

ther

cau

se o

r co

ntrib

ute

to a

vio

latio

n of

wat

er q

ualit

y st

anda

rds

adop

ted

purs

uant

to th

e E

CL

and

its a

ccom

pany

ing

regu

latio

ns;

Con

stru

ctio

n ac

tiviti

esfo

r res

iden

tial,

com

mer

cial

and

inst

itutio

nal p

roje

cts:

a.W

here

the

disc

harg

es f

rom

the

con

stru

ctio

n ac

tiviti

esar

e tri

buta

ry t

o w

ater

s of

the

stat

e cl

assi

fied

as A

A o

r AA

-s; a

nd

b.W

hich

dist

urb

one

or m

ore

acre

s of

land

with

no

exis

ting

impe

rvio

us c

over

;an

d

c.W

hich

are

unde

rtake

n on

land

with

a S

oil S

lope

Pha

se th

at is

iden

tifie

d as

an

E o

r F, o

r the

map

uni

t nam

e is

incl

usiv

e of

25%

or g

reat

er s

lope

, on

the

Uni

ted

Sta

tes

Dep

artm

ent o

f Agr

icul

ture

(“U

SD

A”)

Soi

l Sur

vey

for t

he

Cou

nty

whe

re th

e di

stur

banc

e w

ill oc

cur.

Con

stru

ctio

n ac

tiviti

esfo

r lin

ear

trans

porta

tion

proj

ects

and

lin

ear

utilit

y pr

ojec

ts:

a.W

here

the

disc

harg

es f

rom

the

con

stru

ctio

n ac

tiviti

esar

e tri

buta

ry t

o w

ater

s of

the

stat

e cl

assi

fied

as A

A o

r AA

-s; a

nd

b.W

hich

dist

urb

two

or m

ore

acre

s of

land

with

no

exis

ting

impe

rvio

us c

over

;an

d

c.W

hich

are

unde

rtake

n on

land

with

a S

oil S

lope

Pha

se th

at is

iden

tifie

d as

an

E o

r F, o

r the

map

uni

t nam

e is

incl

usiv

e of

25%

or g

reat

er s

lope

,on

the

US

DA

Soi

l Sur

vey

for t

he C

ount

y w

here

the

dist

urba

nce

will

occu

r.10

(Par

t I.F

.8)

Con

stru

ctio

n ac

tiviti

esth

at h

ave

the

pote

ntia

l to

affe

ct a

nhi

stor

icpr

oper

ty,

unle

ssth

ere

is d

ocum

enta

tion

that

suc

him

pact

s ha

ve b

een

reso

lved

.The

fo

llow

ing

docu

men

tatio

nne

cess

ary

to d

emon

stra

te e

ligib

ility

with

thi

s re

quire

men

tsha

ll be

mai

ntai

ned

on s

ite in

acc

orda

nce

with

Par

t II.C

.2 o

f th

is p

erm

itan

d m

ade

avai

labl

e to

the

Dep

artm

ent i

n ac

cord

ance

with

Par

t V

II.F

of th

is p

erm

it:

a.D

ocum

enta

tion

that

th

e co

nstru

ctio

n ac

tivity

is

not

with

in

an

arch

eolo

gica

lly s

ensi

tive

area

indi

cate

d on

the

sens

itivi

ty m

ap, a

nd th

at

the

cons

truct

ion

activ

ityis

not

loca

ted

on o

r im

med

iate

ly a

djac

ent

to a

pr

oper

ty li

sted

or

dete

rmin

ed to

be

elig

ible

for

listin

g on

the

Nat

iona

l or

Sta

te R

egis

ters

of

His

toric

Pla

ces,

and

that

ther

e is

no

new

per

man

ent

build

ing

on t

he c

onst

ruct

ion

site

with

in t

he f

ollo

win

g di

stan

ces

from

a

build

ing,

stru

ctur

e, o

r obj

ect t

hat i

s m

ore

than

50

year

s ol

d, o

r if t

here

is

such

a n

ew p

erm

anen

t bu

ildin

g on

the

con

stru

ctio

n si

te w

ithin

tho

se

para

met

ers

that

N

YS

Offi

ce

of

Park

s,

Rec

reat

ion

and

His

toric

P

rese

rvat

ion

(OP

RH

P),

a H

isto

ric P

rese

rvat

ion

Com

mis

sion

of a

Cer

tifie

d Lo

cal

Gov

ernm

ent,

or

a qu

alifi

ed

pres

erva

tion

prof

essi

onal

ha

s de

term

ined

that

the

build

ing,

stru

ctur

e, o

r obj

ect m

ore

than

50

year

s ol

d is

not

his

toric

ally

/arc

heol

ogic

ally

sig

nific

ant.

1-5

acre

s of

dis

turb

ance

-20

feet

5-20

acr

es o

f dis

turb

ance

-50

feet

20+

acre

s of

dis

turb

ance

-10

0 fe

et, o

r

b.D

EC

con

sulta

tion

form

sen

t to

OP

RH

P,

and

copi

ed t

o th

e N

YS D

EC

A

genc

y H

isto

ric P

rese

rvat

ion

Offi

cer (

APO

), an

d (i)

the

Sta

te E

nviro

nmen

tal Q

ualit

y R

evie

w (

SE

QR

) E

nviro

nmen

tal

Ass

essm

ent

Form

(EA

F) w

ith a

neg

ativ

e de

clar

atio

n or

the

Fi

ndin

gs S

tate

men

t, w

ith d

ocum

enta

tion

of O

PR

HP

’s a

gree

men

t w

ith th

e re

solu

tion;

or

(ii)

docu

men

tatio

n fro

m O

PR

HP

tha

t th

e co

nstru

ctio

n ac

tivity

will

resu

lt in

No

Impa

ct; o

r(ii

i)do

cum

enta

tion

from

OP

RH

P p

rovi

ding

a d

eter

min

atio

n of

No

Adv

erse

Impa

ct; o

r(iv

)a

Lette

r of R

esol

utio

n si

gned

by

the

owne

r/ope

rato

r, O

PR

HP

and

the

DE

C A

PO

whi

ch a

llow

s fo

r th

is c

onst

ruct

ion

activ

ityto

be

elig

ible

for c

over

age

unde

r the

gen

eral

per

mit

in te

rms

of th

e St

ate

His

toric

Pre

serv

atio

n Ac

t (S

HP

A);

or

c.D

ocum

enta

tion

of

satis

fact

ory

com

plia

nce

with

S

ectio

n 10

6 of

th

e N

atio

nal H

isto

ric P

rese

rvat

ion

Act

for a

cot

erm

inou

s pr

ojec

t are

a:(i)

No

Affe

ct(ii

)N

o A

dver

se A

ffect

11

(Par

t I.F

.8.c

.iii)

(iii)

Exe

cute

d M

emor

andu

m o

f Agr

eem

ent,

or

d.D

ocum

enta

tion

that

:(i)

SH

PA

Sec

tion

14.0

9 ha

s be

en c

ompl

eted

by

NYS

DE

C o

r ano

ther

st

ate

agen

cy.

Dis

char

ges

from

con

stru

ctio

n ac

tiviti

esth

at a

re s

ubje

ct t

o an

exi

stin

g S

PD

ES

indi

vidu

al o

r gen

eral

per

mit

whe

re a

SP

DE

S p

erm

it fo

r con

stru

ctio

n ac

tivity

has

been

term

inat

ed o

r den

ied;

or w

here

the

owne

r or o

pera

torh

as

faile

d to

rene

w a

n ex

pire

d in

divi

dual

per

mit.

Part

II.

OB

TAIN

ING

PER

MIT

CO

VER

AG

E

A.N

otic

e of

Inte

nt (N

OI)

Subm

ittal

An

owne

r or

ope

rato

rof

a c

onst

ruct

ion

activ

ity t

hat

is n

otsu

bjec

t to

the

re

quire

men

ts o

f a

regu

late

d, t

radi

tiona

l la

nd u

se c

ontro

l M

S4

mus

t fir

st

prep

are

a SW

PPP

in a

ccor

danc

e w

ith a

ll ap

plic

able

req

uire

men

ts o

f th

is

perm

it an

d th

en s

ubm

it a

com

plet

ed N

OI f

orm

to th

eD

epar

tmen

tin

orde

r to

be a

utho

rized

to

disc

harg

e un

der

this

per

mit.

An

owne

r or

ope

rato

rsh

all

use

eith

er t

he e

lect

roni

c (e

NO

I) or

pap

er v

ersi

on o

f th

e N

OI

that

the

D

epar

tmen

t pr

epar

ed.

Bot

h ve

rsio

ns o

f th

e N

OI

are

loca

ted

on t

he

Dep

artm

ent’s

web

site

(http

://w

ww

.dec

.ny.

gov/

).Th

e pa

per

vers

ion

of th

e N

OI

shal

l be

sig

ned

in a

ccor

danc

e w

ith P

art

VII.

H.

of t

his

perm

itan

d su

bmitt

ed to

the

follo

win

g ad

dres

s.

NO

TIC

E O

F IN

TEN

TN

YS D

EC, B

urea

u of

Wat

er P

erm

its62

5 B

road

way

, 4th

Floo

rA

lban

y, N

ew Y

ork

1223

3-35

05

An

owne

r or

ope

rato

rof

a c

onst

ruct

ion

activ

ity t

hat

is s

ubje

ct t

o th

e re

quire

men

ts o

f a

regu

late

d, t

radi

tiona

l la

nd u

se c

ontro

l M

S4

mus

t fir

st

prep

are

a SW

PPP

in a

ccor

danc

e w

ith a

ll ap

plic

able

req

uire

men

ts o

f th

is

perm

it an

d th

en h

ave

its S

WPP

P re

view

ed a

nd a

ccep

ted

by th

e re

gula

ted,

tra

ditio

nal

land

use

con

trol

MS

4pr

ior

to s

ubm

ittin

g th

e N

OI

to t

he

Dep

artm

ent.

The

owne

r or

op

erat

orsh

all

have

th

e “M

S4

SWPP

P A

ccep

tanc

e” fo

rm s

igne

din

acc

orda

nce

with

Par

t VII.

H.,

and

then

sub

mit

that

for

m a

long

with

a c

ompl

eted

NO

I to

the

Dep

artm

ent.

An

owne

r or

op

erat

orsh

all u

se e

ither

the

elec

troni

c (e

NO

I) or

pap

er v

ersi

on o

f the

NO

I.

The

pape

r ver

sion

of t

he N

OI s

hall

be s

igne

d in

acc

orda

nce

with

Par

t VII.

H.

of th

is p

erm

it an

d su

bmitt

ed to

the

addr

ess

in P

art I

I.A.1

.

12

(Par

t II.A

.2)

The

requ

irem

ent f

or a

n ow

ner o

r ope

rato

rto

have

its

SWPP

P re

view

ed a

nd

acce

pted

by

the

MS

4pr

ior

to s

ubm

ittin

g th

e N

OI t

o th

e D

epar

tmen

t doe

s no

t ap

ply

to a

n ow

ner

or o

pera

tor

that

is

obta

inin

g pe

rmit

cove

rage

in

acco

rdan

ce w

ith t

he r

equi

rem

ents

in

Par

t II.

E.

(Cha

nge

of O

wne

r or

O

pera

tor)

or w

here

the

owne

r or o

pera

toro

f the

con

stru

ctio

n ac

tivity

is th

e re

gula

ted,

trad

ition

al la

nd u

se c

ontro

l MS

4.

The

owne

r or

ope

rato

r sha

ll ha

ve th

e SW

PPP

pre

pare

r si

gn th

e “S

WPP

P P

repa

rer C

ertif

icat

ion”

sta

tem

ent o

n th

e N

OI p

rior t

o su

bmitt

ing

the

form

to

the

Dep

artm

ent.

As

of th

e da

te th

e N

OI i

s su

bmitt

ed to

the

Dep

artm

ent,

the

owne

r or o

pera

tor

shal

l m

ake

the

NO

I an

d SW

PPP

avai

labl

e fo

rre

view

and

cop

ying

in

acco

rdan

ce w

ith th

e re

quire

men

ts in

Par

t VII.

F. o

f thi

s pe

rmit.

B.P

erm

it Au

thor

izat

ion

An

owne

r or

ope

rato

rsh

all n

ot c

omm

ence

con

stru

ctio

n ac

tivity

unt

il th

eir

auth

oriz

atio

n to

dis

char

geun

der t

his

perm

it go

es in

to e

ffect

.

Aut

horiz

atio

n to

dis

char

geun

der t

his

perm

it w

ill be

effe

ctiv

e w

hen

the

owne

r or

ope

rato

r has

sat

isfie

d al

lof t

he fo

llow

ing

crite

ria:

a.pr

ojec

t re

view

pur

suan

t to

the

Sta

te E

nviro

nmen

tal Q

ualit

y R

evie

w A

ct

(“SE

QR

A”)

have

bee

n sa

tisfie

d, w

hen

SEQ

RA

is

appl

icab

le.

See

the

D

epar

tmen

t’s w

ebsi

te (h

ttp://

ww

w.d

ec.n

y.go

v/)f

or m

ore

info

rmat

ion,

b.w

here

requ

ired,

all

nece

ssar

y D

epar

tmen

t per

mits

sub

ject

to th

e U

nifo

rm

Pro

cedu

res

Act

(“U

PA

”)(s

ee 6

NYC

RR

Par

t 62

1) h

ave

been

obt

aine

d,

unle

ss o

ther

wis

e no

tifie

d by

the

Dep

artm

ent

purs

uant

to

6 N

YCR

R

621.

3(a)

(4).

Ow

ners

or

oper

ator

sof

con

stru

ctio

n ac

tiviti

es t

hat

are

requ

ired

to o

btai

n U

PA

perm

itsm

ust s

ubm

it a

prel

imin

ary

SWPP

P to

the

appr

opria

te D

EC

Per

mit

Adm

inis

trato

r at

the

Reg

iona

l O

ffice

lis

ted

in

App

endi

x F

at th

e tim

e al

l oth

er n

eces

sary

UP

Ape

rmit

appl

icat

ions

are

su

bmitt

ed. T

he p

relim

inar

y SW

PPP

mus

t inc

lude

suf

ficie

nt in

form

atio

n to

de

mon

stra

te th

at th

e co

nstru

ctio

n ac

tivity

qua

lifie

s fo

r aut

horiz

atio

n un

der

this

per

mit,

c.th

e fin

al S

WPP

P h

as b

een

prep

ared

, and

d.a

com

plet

eN

OI h

as b

een

subm

itted

to th

e D

epar

tmen

t in

acco

rdan

ce w

ith

the

requ

irem

ents

of t

his

perm

it.

An

owne

r or o

pera

tor t

hat h

as s

atis

fied

the

requ

irem

ents

of P

art I

I.B.2

abo

ve

13

(Par

t II.B

.3)

will

be

auth

oriz

ed to

dis

char

gest

orm

wat

er fr

om th

eir c

onst

ruct

ion

activ

ity in

acco

rdan

ce w

ith th

e fo

llow

ing

sche

dule

:

a.Fo

r co

nstru

ctio

n ac

tiviti

esth

at a

re n

otsu

bjec

t to

the

req

uire

men

ts o

f a

regu

late

d, tr

aditi

onal

land

use

con

trol M

S4:

(i)Fi

ve (

5) b

usin

ess

days

fro

m t

he d

ate

the

Dep

artm

ent

rece

ives

a

com

plet

e el

ectro

nic

vers

ion

of t

he N

OI

(eN

OI)

for

cons

truct

ion

activ

ities

with

a S

WPP

P t

hat

has

been

pre

pare

d in

con

form

ance

w

ith th

e de

sign

crit

eria

in th

e te

chni

cal s

tand

ard

refe

renc

ed in

Par

t III

.B.1

and

the

perfo

rman

ce

crite

riain

th

e te

chni

cal

stan

dard

re

fere

nced

in

Par

ts I

II.B

., 2

or 3

, fo

r co

nstru

ctio

n ac

tiviti

esth

at

requ

ire

post

-con

stru

ctio

n st

orm

wat

er

man

agem

ent

prac

tices

purs

uant

to P

art I

II.C

.; or

(ii)

Six

ty (6

0) b

usin

ess

days

from

the

date

the

Dep

artm

ent r

ecei

ves

aco

mpl

ete

NO

I (e

lect

roni

c or

pa

per

vers

ion)

for

cons

truct

ion

activ

ities

with

a

SW

PPP

th

at

has

not

been

pr

epar

ed

in

conf

orm

ance

w

ith

the

desi

gn

crite

ria

in

tech

nica

l st

anda

rd

refe

renc

ed in

Par

t III.

B.1

. or,

for c

onst

ruct

ion

activ

ities

that

requ

ire

post

-con

stru

ctio

n st

orm

wat

er m

anag

emen

t pra

ctic

es p

ursu

ant t

o P

art

III.C

.,th

epe

rform

ance

crit

eria

inth

ete

chni

cal

stan

dard

refe

renc

ed in

Par

ts II

I.B.,

2 or

3,o

r;

(iii)

Ten

(10)

bus

ines

s da

ys fr

om th

e da

te th

e D

epar

tmen

t rec

eive

s a

com

plet

e pa

per v

ersi

on o

f the

NO

I for

con

stru

ctio

n ac

tiviti

esw

ith

a SW

PPP

that

has

bee

n pr

epar

ed in

con

form

ance

with

the

desi

gn

crite

ria in

the

tech

nica

l sta

ndar

d re

fere

nced

in P

art I

II.B

.1 a

nd th

epe

rform

ance

crit

eria

in th

e te

chni

cal s

tand

ard

refe

renc

ed in

Par

ts

III.B

., 2

or

3,

for

cons

truct

ion

activ

ities

that

re

quire

po

st-

cons

truct

ion

stor

mw

ater

man

agem

ent p

ract

ices

pur

suan

t to

Par

t III

.C.

b.Fo

r co

nstru

ctio

n ac

tiviti

esth

at a

re s

ubje

ct t

o th

e re

quire

men

ts o

f a

regu

late

d, tr

aditi

onal

land

use

con

trol M

S4:

(i)Fi

ve (5

) bus

ines

s da

ys fr

om th

e da

te th

e D

epar

tmen

t rec

eive

s bo

th

a co

mpl

ete

elec

troni

c ve

rsio

n of

the

NO

I (eN

OI)

and

sign

ed “

MS4

SWPP

P A

ccep

tanc

e” fo

rm, o

r

(ii)

Ten

(10)

bus

ines

s da

ys f

rom

the

dat

e th

e D

epar

tmen

t re

ceiv

es

both

a c

ompl

ete

pape

r ve

rsio

n of

the

NO

I an

d si

gned

“M

S4

SWPP

P A

ccep

tanc

e” fo

rm.

The

Dep

artm

ent m

ay s

uspe

nd o

r den

y an

ow

ner’s

or o

pera

tor’s

cove

rage

14

(Par

t II.B

.4)

unde

r th

is p

erm

it if

the

Dep

artm

ent d

eter

min

es th

atth

e SW

PPP

does

not

m

eet t

he p

erm

it re

quire

men

ts.I

n ac

cord

ance

with

sta

tute

, reg

ulat

ion,

and

th

e te

rms

and

cond

ition

s of

this

perm

it, th

e D

epar

tmen

t may

den

y co

vera

ge

unde

r th

is p

erm

it an

d re

quire

sub

mitt

al o

f an

appl

icat

ion

for

an in

divi

dual

S

PD

ES

per

mit

base

d on

a re

view

of t

he N

OI o

r oth

er in

form

atio

n pu

rsua

nt

to P

art I

I.

Cov

erag

e un

der

this

per

mit

auth

oriz

es s

torm

wat

er d

isch

arge

sfro

m o

nly

thos

e ar

eas

of d

istu

rban

ce t

hat

are

iden

tifie

d in

the

NO

I. If

an o

wne

r or

op

erat

orw

ishe

s to

hav

e st

orm

wat

er d

isch

arge

s fro

m f

utur

e or

add

ition

al

area

s of

di

stur

banc

e au

thor

ized

, th

ey

mus

t su

bmit

a ne

w

NO

I th

at

addr

esse

s th

at p

hase

of t

he d

evel

opm

ent,

unle

ss o

ther

wis

e no

tifie

d by

the

Dep

artm

ent.

The

owne

r or

ope

rato

rsh

all

not

com

men

ce c

onst

ruct

ion

activ

ity o

n th

e fu

ture

or a

dditi

onal

are

as u

ntil

thei

r aut

horiz

atio

n to

dis

char

geun

der t

his

perm

it go

es in

to e

ffect

in a

ccor

danc

e w

ith P

art I

I.B.o

f thi

s pe

rmit.

C.G

ener

al R

equi

rem

ents

For

Ow

ners

orO

pera

tors

With

Per

mit

Cov

erag

e

The

owne

r or o

pera

tor s

hall

ensu

re th

at th

e pr

ovis

ions

of t

he S

WPP

P a

re

impl

emen

ted

from

the

com

men

cem

ent o

f con

stru

ctio

n ac

tivity

until

all

area

s of

di

stur

banc

e ha

ve

achi

eved

fin

al

stab

iliza

tion

and

the

Not

ice

of

Term

inat

ion

(“NO

T”) h

as b

een

subm

itted

to th

e D

epar

tmen

t in

acco

rdan

ce

with

Par

t V. o

f thi

s pe

rmit.

Thi

s in

clud

es a

ny c

hang

es m

ade

to th

e SW

PPP

purs

uant

to P

art I

II.A

.4. o

f thi

s pe

rmit.

The

owne

r or o

pera

tors

hall

mai

ntai

n a

copy

of t

he G

ener

al P

erm

it (G

P-0

-15

-002

), N

OI,

NO

I A

ckno

wle

dgm

ent

Lette

r, SW

PPP

, M

S4

SWPP

P A

ccep

tanc

e fo

rm, i

nspe

ctio

nre

ports

,and

all d

ocum

enta

tion

nece

ssar

y to

de

mon

stra

teel

igib

ility

with

thi

s pe

rmit

at t

he c

onst

ruct

ion

site

unt

il al

l di

stur

bed

area

s ha

ve a

chie

ved

final

sta

biliz

atio

n an

d th

e N

OT

has

been

su

bmitt

ed t

o th

e D

epar

tmen

t. Th

e do

cum

ents

mus

t be

mai

ntai

ned

in a

se

cure

loca

tion,

suc

h as

a jo

b tra

iler,

on-s

ite c

onst

ruct

ion

offic

e, o

r mai

lbox

w

ith lo

ck. T

he s

ecur

e lo

catio

n m

ust b

e ac

cess

ible

dur

ing

norm

al b

usin

ess

hour

s to

an

indi

vidu

al p

erfo

rmin

g a

com

plia

nce

insp

ectio

n.

The

owne

r or

ope

rato

r of

a c

onst

ruct

ion

activ

itysh

all n

ot d

istu

rb g

reat

er

than

five

(5) a

cres

of s

oil a

t any

one

tim

e w

ithou

t prio

r writ

ten

auth

oriz

atio

n fro

m t

he D

epar

tmen

t or

, in

are

as u

nder

the

jur

isdi

ctio

n of

a r

egul

ated

, tra

ditio

nal l

and

use

cont

rol M

S4,

the

regu

late

d, tr

aditi

onal

land

use

con

trol

MS

4(p

rovi

ded

the

regu

late

d, t

radi

tiona

l lan

d us

e co

ntro

l MS

4is

not

the

ow

ner o

r ope

rato

r of t

he c

onst

ruct

ion

activ

ity).

At a

min

imum

, the

ow

ner o

r op

erat

or m

ust

com

ply

with

the

fol

low

ing

requ

irem

ents

in

orde

r to

be

auth

oriz

ed to

dis

turb

gre

ater

than

five

(5) a

cres

of s

oil a

t any

one

tim

e:a.

The

owne

r or o

pera

tors

hall 15

(Par

t II.C

.3.a

)ha

ve a

qua

lifie

d in

spec

tor c

ondu

ct a

t lea

st tw

o (2

) site

insp

ectio

ns in

ac

cord

ance

with

Par

t IV

.C. o

f thi

s pe

rmit

ever

y se

ven

(7) c

alen

dar d

ays,

fo

r as

long

as

grea

ter t

han

five

(5) a

cres

of s

oil r

emai

ndi

stur

bed.

The

tw

o (2

) ins

pect

ions

sha

ll be

sep

arat

ed b

y a

min

imum

of t

wo

(2) f

ull

cale

ndar

day

s.

b.In

are

as w

here

soi

l dis

turb

ance

act

ivity

has

tem

pora

rily

or p

erm

anen

tly

ceas

ed, t

he a

pplic

atio

n of

soil

stab

ilizat

ion

mea

sure

s m

ustb

ein

itiat

ed b

y th

e en

d of

the

nex

t bu

sine

ss d

ayan

d co

mpl

eted

with

in s

even

(7)

day

s fro

m t

he d

ate

the

curr

ent

soil

dist

urba

nce

activ

ity c

ease

d. T

he s

oil

stab

ilizat

ion

mea

sure

s se

lect

ed s

hall

be in

con

form

ance

with

the

tech

nica

l st

anda

rd, N

ew Y

ork

Sta

te S

tand

ards

and

Spe

cific

atio

ns fo

r E

rosi

on a

nd

Sed

imen

t Con

trol,

date

d A

ugus

t 200

5.

c.Th

e ow

ner o

r ope

rato

rsha

ll pr

epar

ea

phas

ing

plan

that

def

ines

max

imum

di

stur

bed

area

per

pha

se a

nd s

how

s re

quire

d cu

ts a

nd fi

lls.

d.Th

e ow

ner

or o

pera

tor

shal

l ins

tall

any

addi

tiona

l site

spe

cific

pra

ctic

es

need

ed to

pro

tect

wat

er q

ualit

y.

e.Th

e ow

ner

or o

pera

tor

shal

l in

clud

e th

e re

quire

men

ts a

bove

in

thei

r SW

PPP

.

In a

ccor

danc

e w

ith s

tatu

te, r

egul

atio

ns, a

nd th

e te

rms

and

cond

ition

s of

this

pe

rmit,

the

Dep

artm

ent

may

sus

pend

or

revo

ke a

n ow

ner’s

or

oper

ator

’sco

vera

ge u

nder

this

per

mit

at a

ny ti

me

if th

e D

epar

tmen

t det

erm

ines

that

th

e SW

PPP

doe

s no

t m

eet

the

perm

it re

quire

men

ts.

Upo

n a

findi

ng o

f si

gnifi

cant

non

-com

plia

nce

with

the

prac

tices

des

crib

ed in

the

SWP

PP

or

viol

atio

nof

this

per

mit,

the

Dep

artm

ent m

ay o

rder

an

imm

edia

te s

top

to a

ll ac

tivity

at t

he s

ite u

ntil t

he n

on-c

ompl

ianc

e is

rem

edie

d. T

he s

top

wor

k or

der

shal

l be

in w

ritin

g, d

escr

ibe

the

non-

com

plia

nce

in d

etai

l, an

d be

sen

t to

the

owne

r or o

pera

tor.

For

cons

truct

ion

activ

ities

that

are

sub

ject

to

the

requ

irem

ents

of

a re

gula

ted,

tra

ditio

nal

land

use

con

trol

MS

4, t

he o

wne

r or

oper

ator

shal

l no

tify

the

regu

late

d, t

radi

tiona

l la

nd u

se c

ontro

l M

S4

in w

ritin

g of

any

pl

anne

d am

endm

ents

or m

odifi

catio

ns to

the

post

-con

stru

ctio

n st

orm

wat

er

man

agem

ent p

ract

ice

com

pone

nt o

f the

SW

PP

P r

equi

red

by P

art I

II.A

. 4.

and

5. o

f thi

s pe

rmit.

Unl

ess

othe

rwis

e no

tifie

d by

the

regu

late

d, tr

aditi

onal

la

nd u

se c

ontro

l M

S4,

the

owne

r or

ope

rato

rsh

all

have

the

SW

PPP

amen

dmen

ts o

r m

odifi

catio

ns r

evie

wed

and

acc

epte

d by

the

reg

ulat

ed,

tradi

tiona

l lan

d us

e co

ntro

l MS

4pr

ior

to c

omm

enci

ng c

onst

ruct

ion

of t

he

post

-con

stru

ctio

n st

orm

wat

er m

anag

emen

t pra

ctic

e

16

(Par

t II.D

)D

.Per

mit

Cov

erag

e fo

r Dis

char

ges

Auth

oriz

ed U

nder

GP-

0-10

-001

Upo

n re

new

al o

f SP

DE

S G

ener

al P

erm

it fo

r S

torm

wat

er D

isch

arge

s fro

m

Con

stru

ctio

n A

ctiv

ity(P

erm

it N

o. G

P-0

-10-

001)

, an

owne

r or o

pera

toro

f aco

nstru

ctio

nac

tivity

with

cov

erag

e un

der

GP-

0-10

-001

, as

of th

e ef

fect

ive

date

of G

P-0

-15-

002,

sha

ll be

aut

horiz

edto

dis

char

gein

acc

orda

nce

with

G

P-0

-15-

002,

unle

ss o

ther

wis

e no

tifie

d by

the

Dep

artm

ent.

An

owne

r or

ope

rato

rm

ay c

ontin

ue t

o im

plem

ent

the

tech

nica

l/des

ign

com

pone

nts

of t

he p

ost-c

onst

ruct

ion

stor

mw

ater

man

agem

ent

cont

rols

prov

ided

tha

t su

chde

sign

was

don

e in

con

form

ance

with

the

tec

hnic

al

stan

dard

s in

pla

ce a

t the

tim

eof

initi

al p

roje

ct a

utho

rizat

ion.

How

ever

, the

y m

ust c

ompl

y w

ith th

e ot

her,

non-

desi

gn p

rovi

sion

s of

GP

-0-1

5-00

2.

E.C

hang

e of

Ow

ner o

r Ope

rato

r

Whe

n pr

oper

ty o

wne

rshi

p ch

ange

s or

whe

n th

ere

is a

cha

nge

in o

pera

tiona

l co

ntro

l ove

r the

con

stru

ctio

n pl

ans

and

spec

ifica

tions

, the

orig

inal

ow

ner o

r op

erat

orm

ust

notif

y th

e ne

w

owne

r or

op

erat

or,

in

writ

ing,

of

the

requ

irem

ent

to o

btai

n pe

rmit

cove

rage

by

subm

ittin

g a

NO

I w

ith t

he

Dep

artm

ent.

Onc

e th

e ne

w o

wne

r or o

pera

toro

btai

ns p

erm

it co

vera

ge, t

he

orig

inal

ow

ner o

r ope

rato

rsha

ll the

n su

bmit

a co

mpl

eted

NO

T w

ith th

e na

me

and

perm

it id

entif

icat

ion

num

ber

of t

he n

ew o

wne

r or

ope

rato

rto

the

D

epar

tmen

t at t

he a

ddre

ss in

Par

t II.A

.1.o

f thi

s pe

rmit.

If th

e or

igin

al o

wne

r or

ope

rato

r mai

ntai

ns o

wne

rshi

p of

a p

ortio

n of

the

cons

truct

ion

activ

ity a

nd

will

dis

turb

soi

l, th

ey m

ust m

aint

ain

thei

r cov

erag

e un

der t

he p

erm

it.

Per

mit

cove

rage

for t

he n

ewow

ner o

r ope

rato

rwill

be e

ffect

ive

as o

f the

dat

e th

e D

epar

tmen

t re

ceiv

es a

com

plet

e N

OI,

prov

ided

the

orig

inal

ow

ner

or

oper

ator

was

not

sub

ject

to a

six

ty (6

0) b

usin

ess

day

auth

oriz

atio

n pe

riod

that

ha

s no

t exp

ired

as o

f the

dat

e th

e D

epar

tmen

t rec

eive

s th

e N

OI f

rom

the

new

ow

ner o

r ope

rato

r.

17

(Par

t III)

Part

III.

STO

RM

WAT

ER P

OLL

UTI

ON

PR

EVEN

TIO

N P

LAN

(SW

PPP)

A.G

ener

al S

WPP

P R

equi

rem

ents

ASW

PPP

sha

ll be

pre

pare

d an

d im

plem

ente

d by

the

owne

r or o

pera

toro

f ea

ch c

onst

ruct

ion

activ

ityco

vere

d by

thi

s pe

rmit.

The

SW

PPP

mus

t do

cum

ent

the

sele

ctio

n,

desi

gn,

inst

alla

tion,

im

plem

enta

tion

and

mai

nten

ance

of t

he c

ontro

l mea

sure

s an

d pr

actic

es th

at w

ill be

use

d to

mee

t th

e ef

fluen

t lim

itatio

ns in

Par

t I.B

. of t

his

perm

it an

d w

here

app

licab

le, t

he

post

-con

stru

ctio

n st

orm

wat

er m

anag

emen

t pr

actic

ere

quire

men

tsin

Par

t I.C

.of t

his

perm

it.Th

e SW

PPP

sha

ll be

pre

pare

d pr

ior

to th

e su

bmitt

al o

f th

e N

OI.

The

NO

I sh

all

be s

ubm

itted

to

the

Dep

artm

ent

prio

r to

the

co

mm

ence

men

t of c

onst

ruct

ion

activ

ity.A

cop

y of

the

com

plet

ed, f

inal

NO

I sh

all b

e in

clud

ed in

the

SWPP

P.

The

SWPP

P sh

all d

escr

ibe

the

eros

ion

and

sedi

men

t con

trol p

ract

ices

and

w

here

req

uire

d, p

ost-c

onst

ruct

ion

stor

mw

ater

man

agem

ent p

ract

ices

that

w

ill b

e us

edan

d/or

con

stru

cted

to

redu

ce t

he p

ollu

tant

sin

sto

rmw

ater

di

scha

rges

and

to a

ssur

e co

mpl

ianc

e w

ith th

e te

rms

and

cond

ition

s of

this

pe

rmit.

In a

dditi

on, t

he S

WPP

P sh

all i

dent

ify p

oten

tial s

ourc

es o

f pol

lutio

n w

hich

may

rea

sona

bly

be e

xpec

ted

toaf

fect

the

qua

lity

of s

torm

wat

er

disc

harg

es.

All

SWPP

Ps

that

req

uire

the

pos

t-con

stru

ctio

n st

orm

wat

er m

anag

emen

t pr

actic

e co

mpo

nent

sha

ll be

pre

pare

d by

a q

ualif

ied

prof

essi

onal

tha

t is

kn

owle

dgea

ble

in th

e pr

inci

ples

and

pra

ctic

es o

f sto

rmw

ater

man

agem

ent

and

treat

men

t.

The

owne

r or o

pera

torm

ust k

eep

the

SWPP

P cu

rrent

so

that

it a

t all

times

ac

cura

tely

doc

umen

ts th

e er

osio

n an

d se

dim

ent c

ontro

ls p

ract

ices

that

are

be

ing

used

or

will

be u

sed

durin

g co

nstru

ctio

n, a

nd a

ll po

st-c

onst

ruct

ion

stor

mw

ater

man

agem

ent p

ract

ices

that

will

be c

onst

ruct

ed o

n th

e si

te. A

t a

min

imum

, the

ow

ner o

r ope

rato

r sha

ll am

end

the

SWPP

P:

a.w

hene

ver

the

curre

nt p

rovi

sion

s pr

ove

to b

e in

effe

ctiv

e in

min

imiz

ing

pollu

tant

sin

sto

rmw

ater

dis

char

ges

from

the

site

;

b.w

hene

ver

ther

e is

a c

hang

e in

des

ign,

con

stru

ctio

n, o

r op

erat

ion

at th

e co

nstru

ctio

n si

te t

hat

has

or c

ould

hav

e an

effe

ct o

n th

e di

scha

rge

of

pollu

tant

s; a

nd

c.to

add

ress

issu

es o

r de

ficie

ncie

s id

entif

ied

durin

g an

insp

ectio

n by

the

qu

alifi

ed in

spec

tor,

the

Dep

artm

ent o

r oth

er re

gula

tory

aut

horit

y.

The

Dep

artm

ent m

ay n

otify

the

owne

r or o

pera

tora

t any

tim

e th

at th

e

18

(Par

t III.

A.5

)SW

PPP

doe

s no

t mee

t one

or

mor

e of

the

min

imum

req

uire

men

ts o

f thi

s pe

rmit.

The

not

ifica

tion

shal

l be

in w

ritin

g an

d id

entif

y th

e pr

ovis

ions

of t

he

SWPP

P t

hat

requ

ire m

odifi

catio

n. W

ithin

fou

rteen

(14

) ca

lend

ar d

ays

of

such

not

ifica

tion,

or

as o

ther

wis

e in

dica

ted

by th

e D

epar

tmen

t, th

e ow

ner

or o

pera

tor

shal

l mak

e th

e re

quire

d ch

ange

s to

the

SW

PPP

and

sub

mit

writ

ten

notif

icat

ion

to th

e D

epar

tmen

t tha

t the

cha

nges

hav

e be

en m

ade.

If

the

owne

r or o

pera

tord

oes

not r

espo

nd to

the

Dep

artm

ent’s

com

men

ts in

th

e sp

ecifi

ed t

ime

fram

e, t

he D

epar

tmen

t m

ay s

uspe

nd t

he o

wne

r’s o

r op

erat

or’s

cove

rage

und

er th

is p

erm

itor

req

uire

the

owne

r or

ope

rato

rto

ob

tain

cov

erag

e un

der a

n in

divi

dual

SP

DE

S pe

rmit

in a

ccor

danc

e w

ith P

art

II.C

.4. o

f thi

s pe

rmit.

Prio

r to

the

com

men

cem

ento

f con

stru

ctio

n ac

tivity

, the

ow

ner o

r ope

rato

rm

ust i

dent

ify th

e co

ntra

ctor

(s) a

nd s

ubco

ntra

ctor

(s) t

hat w

ill be

resp

onsi

ble

for i

nsta

lling,

con

stru

ctin

g, re

pairi

ng, r

epla

cing

, ins

pect

ing

and

mai

ntai

ning

th

e er

osio

n an

d se

dim

ent c

ontro

l pra

ctic

es in

clud

ed in

the

SWPP

P; a

nd th

e co

ntra

ctor

(s) a

nd s

ubco

ntra

ctor

(s)t

hat w

ill be

resp

onsi

ble

for c

onst

ruct

ing

the

post

-con

stru

ctio

n st

orm

wat

er m

anag

emen

t pr

actic

es i

nclu

ded

in t

he

SWPP

P.

The

owne

r or

ope

rato

r sh

all h

ave

each

of

the

cont

ract

ors

and

subc

ontra

ctor

s id

entif

y at

leas

t one

per

son

from

thei

r com

pany

that

will

be

resp

onsi

ble

for i

mpl

emen

tatio

n of

the

SWPP

P. T

his

pers

on s

hall

be k

now

n as

the

train

ed c

ontra

ctor

. The

ow

ner o

r ope

rato

r sha

ll en

sure

that

at l

east

on

etra

ined

con

tract

oris

on

site

on

a da

ily b

asis

whe

n so

il di

stur

banc

e ac

tiviti

es a

re b

eing

per

form

ed.

The

owne

r or

op

erat

or

shal

l ha

ve

each

of

th

e co

ntra

ctor

s an

d su

bcon

tract

ors

iden

tifie

d ab

ove

sign

a c

opy

of t

he f

ollo

win

g ce

rtific

atio

n st

atem

ent b

elow

bef

ore

they

com

men

ce a

ny c

onst

ruct

ion

activ

ity:

"I he

reby

cer

tify

unde

r pe

nalty

of l

aw th

at I

unde

rsta

nd a

nd a

gree

to

com

ply

with

the

ter

ms

and

cond

ition

s of

the

SW

PPP

and

agr

ee t

o im

plem

ent a

ny c

orre

ctiv

e ac

tions

iden

tifie

d by

the

qual

ified

insp

ecto

r du

ring

a si

te in

spec

tion.

I a

lso

unde

rsta

nd th

at th

e ow

ner o

r ope

rato

rm

ust c

ompl

y w

ith th

e te

rms

and

cond

ition

s of

the

mos

t cur

rent

ver

sion

of

th

e N

ew

York

S

tate

P

ollu

tant

D

isch

arge

E

limin

atio

n S

yste

m

("S

PD

ES"

) gen

eral

per

mit

for s

torm

wat

er d

isch

arge

s fro

m c

onst

ruct

ion

activ

ities

and

that

it is

unl

awfu

l for

any

per

son

to c

ause

or

cont

ribut

e to

a v

iola

tion

of w

ater

qua

lity

stan

dard

s. F

urth

erm

ore,

I am

aw

are

that

th

ere

are

sign

ifica

nt p

enal

ties

for s

ubm

ittin

g fa

lse

info

rmat

ion,

that

I do

no

t bel

ieve

to b

e tru

e, in

clud

ing

the

poss

ibilit

y of

fine

and

impr

ison

men

t fo

r kno

win

g vi

olat

ions

"

In a

dditi

on t

o pr

ovid

ing

the

certi

ficat

ion

stat

emen

t abo

ve,

the

certi

ficat

ion

page

mus

t al

so i

dent

ify t

he s

peci

fic e

lem

ents

of

the

SWPP

P t

hat

each

co

ntra

ctor

and

sub

cont

ract

or w

ill be

resp

onsi

ble

for a

nd in

clud

e th

e na

me

and

title

of t

he p

erso

n pr

ovid

ing

the

sign

atur

e; th

e na

me

and

title

of t

he

19

(Par

t III.

A.6

)tra

ined

con

tract

orre

spon

sibl

e fo

r SW

PPP

impl

emen

tatio

n; t

he n

ame,

ad

dres

s an

d te

leph

one

num

ber o

f the

con

tract

ing

firm

; the

add

ress

(or o

ther

id

entif

ying

des

crip

tion)

of t

he s

ite; a

nd th

e da

te th

e ce

rtific

atio

n st

atem

ent

is s

igne

d. T

he o

wne

r or o

pera

tors

hall

atta

ch th

e ce

rtific

atio

n st

atem

ent(s

) to

the

copy

of t

he S

WPP

P th

at is

mai

ntai

ned

at th

e co

nstru

ctio

n si

te. I

f new

or

add

ition

al c

ontra

ctor

s ar

e hi

red

to im

plem

ent m

easu

res

iden

tifie

d in

the

SWPP

P a

fter

cons

truct

ion

has

com

men

ced,

the

y m

ust

also

sig

n th

e ce

rtific

atio

n st

atem

ent a

nd p

rovi

de th

e in

form

atio

n lis

ted

abov

e.

For

proj

ects

whe

re t

he D

epar

tmen

t re

ques

ts a

cop

y of

the

SW

PPP

or

insp

ectio

nre

ports

, the

ow

ner o

r ope

rato

rsha

ll sub

mit

the

docu

men

ts in

bot

h el

ectro

nic

(PD

Fon

ly) a

nd p

aper

form

at w

ithin

five

(5) b

usin

ess

days

, unl

ess

othe

rwis

e no

tifie

d by

the

Dep

artm

ent.

B.R

equi

red

SWPP

P C

onte

nts

Ero

sion

and

sed

imen

tcon

trol c

ompo

nent

-A

ll SW

PPP

s pr

epar

ed p

ursu

ant

to th

is p

erm

it sh

all i

nclu

de e

rosi

on a

nd s

edim

ent c

ontro

l pra

ctic

es d

esig

ned

in c

onfo

rman

ce w

ith th

e te

chni

cal s

tand

ard,

New

Yor

k S

tate

Sta

ndar

ds a

nd

Spe

cific

atio

ns f

or E

rosi

on a

nd S

edim

ent

Con

trol,

date

dA

ugus

t 20

05.

Whe

re

eros

ion

and

sedi

men

t co

ntro

l pr

actic

es

are

not

desi

gned

in

co

nfor

man

ce w

ith th

e de

sign

crit

eria

incl

uded

in th

ete

chni

cal s

tand

ard,

the

owne

r or o

pera

tor m

ust d

emon

stra

te e

quiv

alen

ceto

the

tech

nica

l sta

ndar

d.

At a

min

imum

, the

ero

sion

and

sed

imen

t con

trol c

ompo

nent

of t

he S

WPP

P sh

all i

nclu

de th

e fo

llow

ing:

a.B

ackg

roun

d in

form

atio

n ab

out

the

scop

eof

the

proj

ect,

incl

udin

g th

e lo

catio

n, ty

pe a

nd s

ize

of p

roje

ct;

b.A

site

map

/con

stru

ctio

n dr

awin

g(s)

for

the

pro

ject

, in

clud

ing

a ge

nera

l lo

catio

n m

ap. A

t a m

inim

um, t

he s

ite m

ap s

hall

show

the

tota

l site

are

a;

all i

mpr

ovem

ents

; are

as o

f dis

turb

ance

; are

as th

at w

ill no

t be

dist

urbe

d;

exis

ting

vege

tatio

n;

on-s

ite

and

adja

cent

of

f-site

su

rface

w

ater

(s);

flood

plai

n/flo

odw

ay b

ound

arie

s; w

etla

nds

and

drai

nage

pat

tern

s th

at

coul

d be

affe

cted

by

the

cons

truct

ion

activ

ity; e

xist

ing

and

final

con

tour

s ;

loca

tions

of d

iffer

ent s

oil t

ypes

with

bou

ndar

ies;

mat

eria

l, w

aste

, bor

row

or

eq

uipm

ent

stor

age

area

s lo

cate

d on

ad

jace

nt

prop

ertie

s;

and

loca

tion(

s) o

f the

sto

rmw

ater

dis

char

ge(s

);

c.A

des

crip

tion

of th

e so

il(s)

pre

sent

at t

he s

ite, i

nclu

ding

an

iden

tific

atio

n of

th

e H

ydro

logi

c S

oil G

roup

(HS

G);

d.A

cons

truct

ion

phas

ing

plan

and

seq

uenc

e of

ope

ratio

ns d

escr

ibin

g th

e in

tend

ed o

rder

of c

onst

ruct

ion

activ

ities

, inc

ludi

ng c

lear

ing

and

grub

bing

, ex

cava

tion

and

grad

ing,

util

ity a

nd in

frast

ruct

ure

inst

alla

tion

and

any

othe

r20

(Par

t III.

B.1

.d)

activ

ity a

t the

site

that

resu

lts in

soi

l dis

turb

ance

;

e.A

des

crip

tion

of th

e m

inim

um e

rosi

on a

nd s

edim

ent c

ontro

l pra

ctic

es to

be

inst

alle

d or

impl

emen

ted

for e

ach

cons

truct

ion

activ

ityth

at w

ill re

sult

in

soil

dist

urba

nce.

Inc

lude

a s

ched

ule

that

ide

ntifi

es t

hetim

ing

of i

nitia

l pl

acem

ent

or i

mpl

emen

tatio

n of

eac

h er

osio

n an

d se

dim

ent

cont

rol

prac

tice

and

the

min

imum

tim

e fra

mes

that

eac

h pr

actic

e sh

ould

rem

ain

in p

lace

or b

e im

plem

ente

d;

f.A

te

mpo

rary

an

d pe

rman

ent

soil

stab

ilizat

ion

plan

th

at

mee

ts

the

requ

irem

ents

of t

his

gene

ral p

erm

it an

d th

e te

chni

cal s

tand

ard,

New

Yor

k S

tate

Sta

ndar

ds a

nd S

peci

ficat

ions

for

Ero

sion

and

Sed

imen

t C

ontro

l, da

ted

Augu

st 2

005,

for

each

sta

ge o

f th

e pr

ojec

t, in

clud

ing

initi

al la

nd

clea

ring

and

grub

bing

to

proj

ect

com

plet

ion

and

achi

evem

ent

of f

inal

st

abili

zatio

n;

g.A

site

map

/con

stru

ctio

n dr

awin

g(s)

sho

win

g th

e sp

ecifi

c lo

catio

n(s)

, si

ze(s

), an

d le

ngth

(s) o

f eac

h er

osio

n an

d se

dim

ent c

ontro

l pra

ctic

e;

h.Th

e di

men

sion

s, m

ater

ial s

peci

ficat

ions

, ins

talla

tion

deta

ils, a

nd o

pera

tion

and

mai

nten

ance

req

uire

men

ts f

or a

ll er

osio

n an

d se

dim

ent

cont

rol

prac

tices

. In

clud

e th

e lo

catio

n an

d si

zing

of

any

tem

pora

ry s

edim

ent

basi

ns a

nd s

truct

ural

prac

tices

tha

t w

ill be

use

d to

div

ert

flow

s fro

m

expo

sed

soils

;

i.A

mai

nten

ance

insp

ectio

n sc

hedu

le fo

r the

con

tract

or(s

)ide

ntifi

ed in

Par

t III

.A.6

.of t

his

perm

it, to

ens

ure

cont

inuo

us a

nd e

ffect

ive

oper

atio

n of

the

eros

ion

and

sedi

men

t co

ntro

l pr

actic

es.

The

mai

nten

ance

ins

pect

ion

sche

dule

sha

ll be

in a

ccor

danc

e w

ith t

he r

equi

rem

ents

in t

he t

echn

ical

st

anda

rd, N

ew Y

ork

Sta

te S

tand

ards

and

Spe

cific

atio

ns fo

r E

rosi

on a

nd

Sed

imen

t Con

trol,

date

dA

ugus

t 200

5;

j.A

des

crip

tion

of t

hepo

llutio

n pr

even

tion

mea

sure

sth

at w

ill b

e us

ed t

o co

ntro

l lit

ter,

cons

truct

ion

chem

ical

s an

d co

nstru

ctio

n de

bris

fro

m

beco

min

g a

pollu

tant

sour

ce in

the

stor

mw

ater

dis

char

ges;

k.A

des

crip

tion

and

loca

tion

of a

ny s

torm

wat

er d

isch

arge

sas

soci

ated

with

in

dust

rial

activ

ity o

ther

tha

n co

nstru

ctio

n at

the

site

, in

clud

ing,

but

not

lim

ited

to, s

torm

wat

er d

isch

arge

sfro

m a

spha

lt pl

ants

and

con

cret

e pl

ants

lo

cate

d on

the

cons

truct

ion

site

; and

l.Id

entif

icat

ion

of a

ny e

lem

ents

of t

he d

esig

n th

at a

re n

ot in

con

form

ance

w

ith t

he d

esig

ncr

iteria

in t

he t

echn

ical

sta

ndar

d, N

ew Y

ork

Sta

te

Sta

ndar

ds a

nd S

peci

ficat

ions

for

Ero

sion

and

Sed

imen

t C

ontro

l, da

ted

Aug

ust 2

005.

Incl

ude

the

reas

on fo

r the

dev

iatio

n or

alte

rnat

ive

desi

gn

21

(Par

t III.

B.1

.l)an

d pr

ovid

e in

form

atio

n w

hich

de

mon

stra

tes

that

th

e de

viat

ion

or

alte

rnat

ive

desi

gn is

equ

ival

entt

o th

e te

chni

cal s

tand

ard.

Pos

t-con

stru

ctio

n st

orm

wat

er m

anag

emen

t pr

actic

e co

mpo

nent

–Th

e ow

ner

or o

pera

tor

of a

nyco

nstru

ctio

n pr

ojec

t id

entif

ied

in T

able

2 o

f A

ppen

dix

B as

ne

edin

g po

st-c

onst

ruct

ion

stor

mw

ater

m

anag

emen

t pr

actic

es s

hall

prep

are

a SW

PPP

tha

t in

clud

es p

ract

ices

des

igne

d in

co

nfor

man

ce w

ith th

e ap

plic

able

siz

ing

crite

riain

Par

t I.C

.2.a

., c.

or

d. o

f th

ispe

rmit

and

the

perfo

rman

ce c

riter

ia in

the

tech

nica

l sta

ndar

d, N

ew Y

ork

Sta

te S

torm

wat

er M

anag

emen

t Des

ign

Man

ual d

ated

Janu

ary

2015

Whe

re

post

-con

stru

ctio

n st

orm

wat

er

man

agem

ent

prac

tices

ar

e no

t de

sign

ed i

n co

nfor

man

ce w

ith t

hepe

rform

ance

crit

eria

in t

hete

chni

cal

stan

dard

, the

ow

ner o

r ope

rato

r mus

t inc

lude

in th

e SW

PPP

the

reas

on(s

) fo

r th

e de

viat

ion

or a

ltern

ativ

e de

sign

and

pro

vide

inf

orm

atio

n w

hich

de

mon

stra

tes

that

the

devi

atio

n or

alte

rnat

ive

desi

gn is

equ

ival

entt

o th

e te

chni

cal s

tand

ard.

The

post

-con

stru

ctio

n st

orm

wat

er m

anag

emen

t pra

ctic

e co

mpo

nent

of t

he

SWPP

P s

hall

incl

ude

the

follo

win

g:a.

Iden

tific

atio

n of

all

post

-con

stru

ctio

n st

orm

wat

er m

anag

emen

t pra

ctic

es to

be

con

stru

cted

as

part

of t

he p

roje

ct.

Incl

ude

the

dim

ensi

ons,

mat

eria

l sp

ecifi

catio

ns

and

inst

alla

tion

deta

ils

for

each

po

st-c

onst

ruct

ion

stor

mw

ater

man

agem

ent p

ract

ice;

b.A

site

map

/con

stru

ctio

n dr

awin

g(s)

sho

win

g th

e sp

ecifi

c lo

catio

n an

d si

ze

of e

ach

post

-con

stru

ctio

n st

orm

wat

er m

anag

emen

t pra

ctic

e;

c.A

Sto

rmw

ater

Mod

elin

g an

d An

alys

is R

epor

t tha

t inc

lude

s:

(i)M

ap(s

) sh

owin

g pr

e-de

velo

pmen

t co

nditi

ons,

in

clud

ing

wat

ersh

ed/s

ubca

tchm

ents

bo

unda

ries,

flo

w

path

s/ro

utin

g,

and

desi

gn p

oint

s;

(ii)

Map

(s)

show

ing

post

-dev

elop

men

t co

nditi

ons,

in

clud

ing

wat

ersh

ed/s

ubca

tchm

ents

bou

ndar

ies,

flo

w p

aths

/rout

ing,

des

ign

poin

ts a

nd p

ost-c

onst

ruct

ion

stor

mw

ater

man

agem

ent p

ract

ices

;

(iii)

Res

ults

of

stor

mw

ater

mod

elin

g (i.

e. h

ydro

logy

and

hyd

raul

ic

anal

ysis

) fo

r th

e re

quire

d st

orm

ev

ents

. In

clud

e su

ppor

ting

calc

ulat

ions

(mod

el ru

ns),

met

hodo

logy

, and

a s

umm

ary

tabl

e th

at

com

pare

s pr

e an

d po

st-d

evel

opm

ent r

unof

f rat

es a

nd v

olum

es fo

r th

e di

ffere

nt s

torm

eve

nts;

(iv)

Sum

mar

y ta

ble,

with

sup

porti

ng c

alcu

latio

ns, w

hich

dem

onst

rate

s 22

(Par

t III.

B.2

.c.iv

)th

at e

ach

post

-con

stru

ctio

n st

orm

wat

er m

anag

emen

t pra

ctic

e ha

s be

en d

esig

ned

in c

onfo

rman

ce w

ith th

e si

zing

crit

eria

incl

uded

in

the

Des

ign

Man

ual;

(v)

Iden

tific

atio

n of

any

siz

ing

crite

riath

at is

not

requ

ired

base

d on

the

requ

irem

ents

incl

uded

in P

art I

.C.o

f thi

s pe

rmit;

and

(vi)

Iden

tific

atio

n of

any

ele

men

ts o

f th

e de

sign

tha

t ar

e no

t in

co

nfor

man

ce w

ith th

e pe

rform

ance

crit

eria

in th

e D

esig

n M

anua

l. In

clud

e th

e re

ason

(s)

for

the

devi

atio

n or

alte

rnat

ive

desi

gn a

ndpr

ovid

e in

form

atio

n w

hich

dem

onst

rate

s th

at t

he d

evia

tion

or

alte

rnat

ive

desi

gn is

equ

ival

ent t

o th

e D

esig

n M

anua

l;d.

Soi

l tes

ting

resu

lts a

nd lo

catio

ns (t

est p

its, b

orin

gs);

e.In

filtra

tion

test

resu

lts, w

hen

requ

ired;

and

f.A

n op

erat

ions

an

d m

aint

enan

ce

plan

th

at

incl

udes

in

spec

tion

and

mai

nten

ance

sch

edul

es a

nd a

ctio

ns to

ens

ure

cont

inuo

us a

nd e

ffect

ive

oper

atio

n of

eac

h po

st-c

onst

ruct

ion

stor

mw

ater

man

agem

ent

prac

tice.

Th

e pl

an s

hall

iden

tify

the

entit

y th

at w

ill be

resp

onsi

ble

for t

he lo

ng te

rm

oper

atio

n an

d m

aint

enan

ce o

f eac

h pr

actic

e.

Enh

ance

d P

hosp

horu

s R

emov

al S

tand

ards

-A

ll co

nstru

ctio

n pr

ojec

ts

iden

tifie

d in

Tab

le 2

of

Appe

ndix

B t

hat

are

loca

ted

in t

he w

ater

shed

s id

entif

ied

in A

ppen

dix

C s

hall

prep

are

a SW

PPP

tha

t in

clud

es p

ost-

cons

truct

ion

stor

mw

ater

man

agem

ent p

ract

ices

des

igne

d in

con

form

ance

w

ith th

e ap

plic

able

siz

ing

crite

ria in

Par

t I.C

.2. b

., c.

or d

. of t

his

perm

it an

dth

e pe

rform

ance

cr

iteria

,En

hanc

ed

Pho

spho

rus

Rem

oval

S

tand

ards

in

clud

ed i

n th

e D

esig

n M

anua

l. A

t a

min

imum

, th

e po

st-c

onst

ruct

ion

stor

mw

ater

man

agem

ent p

ract

ice

com

pone

nt o

f the

SW

PPP

shal

l inc

lude

ite

ms

2.a

-2.f.

abo

ve.

C.R

equi

red

SWPP

P C

ompo

nent

s by

Pro

ject

Typ

e

Unl

ess

othe

rwis

e no

tifie

d by

the

Dep

artm

ent,

owne

rs o

r op

erat

ors

of c

onst

ruct

ion

activ

ities

iden

tifie

d in

Tab

le 1

of A

ppen

dix

B a

re re

quire

d to

pre

pare

a S

WPP

P th

at

only

incl

udes

ero

sion

and

sed

imen

t con

trol p

ract

ices

des

igne

d in

con

form

ance

with

P

art I

II.B

.1of

this

per

mit.

Ow

ners

or o

pera

tors

of th

e co

nstru

ctio

n ac

tiviti

es id

entif

ied

in T

able

2 o

f App

endi

x B

sha

ll pre

pare

a S

WPP

P th

at a

lso

incl

udes

pos

t-con

stru

ctio

n st

orm

wat

er m

anag

emen

t pra

ctic

es d

esig

ned

in c

onfo

rman

ce w

ith P

art I

II.B.

2 or

3of

th

is p

erm

it.

23

(Par

t IV

)Pa

rt IV

. IN

SPEC

TIO

N A

ND

MA

INTE

NA

NC

E R

EQU

IREM

ENTS

A.G

ener

al C

onst

ruct

ion

Site

Insp

ectio

n an

d M

aint

enan

ce R

equi

rem

ents

The

owne

r or

ope

rato

rm

ust e

nsur

e th

at a

ll er

osio

n an

d se

dim

ent c

ontro

l pr

actic

es

(incl

udin

g po

llutio

n pr

even

tion

mea

sure

s)

and

all

post

-co

nstru

ctio

n st

orm

wat

er m

anag

emen

t pr

actic

es id

entif

ied

in t

he S

WPP

P ar

e in

spec

ted

and

mai

ntai

ned

in a

ccor

danc

e w

ith P

art I

V.B

. and

C. o

f thi

s pe

rmit.

The

term

s of

this

per

mit

shal

l not

be

cons

trued

to p

rohi

bit t

he S

tate

of N

ew

York

fro

m e

xerc

isin

g an

y au

thor

ity p

ursu

ant

to t

he E

CL,

com

mon

law

or

fede

ral l

aw, o

r pro

hibi

t New

Yor

k S

tate

from

taki

ng a

ny m

easu

res,

whe

ther

ci

vil o

r crim

inal

, to

prev

ent v

iola

tions

of t

he la

ws

of th

e S

tate

of N

ew Y

ork,

or

pro

tect

the

publ

ic h

ealth

and

saf

ety

and/

or th

e en

viro

nmen

t.

B.C

ontr

acto

rMai

nten

ance

Insp

ectio

n R

equi

rem

ents

The

owne

r or

ope

rato

rof

eac

h co

nstru

ctio

n ac

tivity

iden

tifie

d in

Tab

les

1 an

d 2

of A

ppen

dix

B s

hall

have

a tr

aine

d co

ntra

ctor

insp

ect t

he e

rosi

on a

nd

sedi

men

t co

ntro

lpr

actic

esan

dpo

llutio

n pr

even

tion

mea

sure

s be

ing

impl

emen

ted

with

in th

e ac

tive

wor

k ar

ea d

aily

to e

nsur

e th

at th

ey a

re b

eing

m

aint

aine

d in

effe

ctiv

e op

erat

ing

cond

ition

at a

ll tim

es. I

f def

icie

ncie

s ar

e id

entif

ied,

the

cont

ract

or s

hall

begi

n im

plem

entin

gco

rrect

ive

actio

ns w

ithin

on

e bu

sine

ss d

ay a

nd s

hall

com

plet

e th

e co

rrec

tive

actio

ns in

a re

ason

able

tim

e fra

me.

For

cons

truct

ion

site

s w

here

so

il di

stur

banc

e ac

tiviti

es

have

be

en

tem

pora

rily

susp

ende

d (e

.g. w

inte

r sh

utdo

wn)

and

tem

pora

ry s

tabi

lizat

ion

mea

sure

s ha

ve b

een

appl

ied

to a

ll di

stur

bed

area

s, th

etra

ined

con

tract

orca

n st

op c

ondu

ctin

g th

e m

aint

enan

ce in

spec

tions

. The

train

ed c

ontra

ctor

shal

l beg

in c

ondu

ctin

g th

e m

aint

enan

ce in

spec

tions

in a

ccor

danc

e w

ith P

art

IV.B

.1. o

f thi

s pe

rmit

as s

oon

as s

oil d

istu

rban

ce a

ctiv

ities

resu

me.

For c

onst

ruct

ion

site

s w

here

soi

l dis

turb

ance

act

iviti

es h

ave

been

shu

t dow

n w

ith p

artia

l pro

ject

com

plet

ion,

the

train

ed c

ontra

ctor

can

stop

con

duct

ing

the

mai

nten

ance

ins

pect

ions

if

all

area

s di

stur

bed

as o

f th

e pr

ojec

t sh

utdo

wn

date

hav

e ac

hiev

ed f

inal

sta

biliz

atio

n an

dal

l pos

t-con

stru

ctio

n st

orm

wat

er m

anag

emen

t pra

ctic

es re

quire

d fo

r the

com

plet

ed p

ortio

n of

the

proj

ect

have

bee

n co

nstru

cted

in c

onfo

rman

ce w

ith t

he S

WPP

P a

nd a

re

oper

atio

nal.

C.Q

ualif

ied

Insp

ecto

r Ins

pect

ion

Req

uire

men

ts

24

(Par

t IV

.C) Th

eow

ner o

r ope

rato

rsha

ll ha

ve a

qua

lifie

d in

spec

tor c

ondu

ct s

ite in

spec

tions

in

conf

orm

ance

with

the

follo

win

g re

quire

men

ts:

[Not

e: T

he t

rain

ed c

ontra

ctor

iden

tifie

d in

Par

t III

.A.6

. an

d IV

.B.

of t

his

perm

itca

nnot

cond

uct

the

qual

ified

ins

pect

or s

ite i

nspe

ctio

ns u

nles

s th

ey m

eet

the

qual

ified

insp

ecto

rqua

lific

atio

ns in

clud

ed in

App

endi

x A

. In

orde

r to

perfo

rm th

ese

insp

ectio

ns, t

he tr

aine

d co

ntra

ctor

wou

ld h

ave

to b

e a:

-lic

ense

d P

rofe

ssio

nal E

ngin

eer,

-Cer

tifie

d P

rofe

ssio

nal i

n E

rosi

on a

nd S

edim

ent C

ontro

l (C

PE

SC

), -R

egis

tere

d La

ndsc

ape

Arc

hite

ct, o

r -s

omeo

ne w

orki

ng u

nder

the

dire

ct s

uper

visi

on o

f, an

d at

the

sam

e co

mpa

ny

as, t

he li

cens

ed P

rofe

ssio

nal E

ngin

eer

or R

egis

tere

d La

ndsc

ape

Arc

hite

ct,

prov

ided

they

hav

e re

ceiv

ed fo

ur (4

) hou

rs o

f Dep

artm

ent e

ndor

sed

train

ing

in p

rope

r er

osio

n an

d se

dim

ent

cont

rol

prin

cipl

es f

rom

a S

oil

and

Wat

er

Con

serv

atio

n D

istri

ct, o

r oth

er D

epar

tmen

t end

orse

d en

tity]

.

Aqu

alifi

ed i

nspe

ctor

sha

ll co

nduc

t si

te i

nspe

ctio

ns f

or a

ll co

nstru

ctio

n ac

tiviti

es id

entif

ied

in T

able

s 1

and

2 of

App

endi

x B

, with

the

exce

ptio

n of

:

a.th

e co

nstru

ctio

n of

a s

ingl

e fa

mily

resi

dent

ial s

ubdi

visi

on w

ith 2

5% o

r les

s im

perv

ious

cov

erat

tota

l site

bui

ld-o

ut th

at in

volv

es a

soi

l dis

turb

ance

of

one

(1) o

r mor

e ac

res

of la

nd b

ut le

ss th

an fi

ve (5

) acr

es a

nd is

notl

ocat

ed

in o

ne o

f the

wat

ersh

eds

liste

d in

App

endi

x C

and

not

dire

ctly

dis

char

ging

to

one

of t

he 3

03(d

) seg

men

ts li

sted

in A

ppen

dix

E;

b.th

e co

nstru

ctio

n of

a s

ingl

e fa

mily

hom

e th

at in

volv

es a

soi

l dis

turb

ance

of

one

(1) o

r mor

e ac

res

of la

nd b

ut le

ss th

an fi

ve (5

) acr

es a

nd is

not

loca

ted

in o

ne o

f the

wat

ersh

eds

liste

d in

App

endi

x C

and

not

dire

ctly

dis

char

ging

to

one

of t

he 3

03(d

) seg

men

ts li

sted

in A

ppen

dix

E;

c.co

nstru

ctio

n on

agr

icul

tura

l pro

perty

that

invo

lves

a s

oil d

istu

rban

ce o

f one

(1

) or m

ore

acre

s of

land

but

less

than

five

(5) a

cres

; and

d.co

nstru

ctio

n ac

tiviti

eslo

cate

d in

the

wat

ersh

eds

iden

tifie

d in

App

endi

x D

th

at in

volv

e so

il di

stur

banc

es b

etw

een

five

thou

sand

(5,0

00) s

quar

e fe

et

and

one

(1) a

cre

of la

nd.

Unl

ess

othe

rwis

e no

tifie

d by

the

Dep

artm

ent,

the

qual

ified

insp

ecto

r sh

all

cond

uct s

ite in

spec

tions

in a

ccor

danc

e w

ith th

e fo

llow

ing

timet

able

:

a.Fo

r co

nstru

ctio

n si

tes

whe

re s

oil d

istu

rban

ce a

ctiv

ities

are

on-

goin

g, th

e qu

alifi

ed i

nspe

ctor

sha

ll co

nduc

t a

site

ins

pect

ion

at l

east

onc

e ev

ery

seve

n (7

) cal

enda

r day

s.

b.Fo

r con

stru

ctio

n si

tes

whe

re s

oil d

istu

rban

ce a

ctiv

ities

are

on-

goin

g an

d 25

(Par

t IV

.C.2

.b)

the

owne

r or o

pera

torh

as re

ceiv

ed a

utho

rizat

ion

in a

ccor

danc

e w

ith P

art

II.C

.3 to

dis

turb

gre

ater

than

five

(5) a

cres

of s

oil a

t any

one

tim

e, th

e qu

alifi

ed in

spec

tor s

hall

cond

uct a

t lea

st tw

o (2

) site

insp

ectio

ns e

very

se

ven

(7) c

alen

dar d

ays.

The

two

(2) i

nspe

ctio

ns s

hall

be s

epar

ated

by

a m

inim

um o

f tw

o (2

) ful

l cal

enda

r day

s.

c.Fo

r co

nstru

ctio

n si

tes

whe

re

soil

dist

urba

nce

activ

ities

ha

ve

been

te

mpo

raril

y su

spen

ded

(e.g

. win

ter s

hutd

own)

and

tem

pora

ry s

tabi

lizat

ion

mea

sure

s ha

ve b

een

appl

ied

to a

ll di

stur

bed

area

s, th

e qu

alifi

ed in

spec

tor

shal

l con

duct

a s

ite in

spec

tion

at le

ast

once

eve

ry t

hirty

(30

) ca

lend

ar

days

. Th

e ow

ner

or o

pera

tor

shal

l no

tify

the

DO

W W

ater

(S

PDE

S)

Pro

gram

con

tact

at

the

Reg

iona

l O

ffice

(se

e co

ntac

t in

form

atio

n in

A

ppen

dix

F)or

, in

area

s un

der

the

juris

dict

ion

of a

reg

ulat

ed, t

radi

tiona

l la

nd u

se c

ontro

l M

S4,

the

reg

ulat

ed,

tradi

tiona

l la

nd u

se c

ontro

l M

S4

(pro

vide

d th

e re

gula

ted,

trad

ition

al la

nd u

se c

ontro

l MS

4is

not

the

owne

r or

ope

rato

r of

the

con

stru

ctio

n ac

tivity

)in

writ

ing

prio

r to

red

ucin

g th

e fre

quen

cy o

f ins

pect

ions

.

d.Fo

r co

nstru

ctio

n si

tes

whe

re s

oil d

istu

rban

ce a

ctiv

ities

hav

e be

en s

hut

dow

n w

ith p

artia

l pr

ojec

t co

mpl

etio

n, t

hequ

alifi

ed i

nspe

ctor

can

stop

co

nduc

ting

insp

ectio

ns if

all

area

s di

stur

bed

as o

f the

pro

ject

shu

tdow

n da

te h

ave

achi

eved

fina

l sta

biliz

atio

n an

dal

l pos

t-con

stru

ctio

n st

orm

wat

er

man

agem

ent p

ract

ices

req

uire

d fo

r th

e co

mpl

eted

por

tion

of th

e pr

ojec

t ha

ve

been

co

nstru

cted

in

co

nfor

man

ce

with

th

e SW

PPP

an

d ar

e op

erat

iona

l. Th

e ow

ner o

r ope

rato

rsha

ll no

tify

the

DO

W W

ater

(SPD

ES

) P

rogr

am c

onta

ct a

t th

e R

egio

nal

Offi

ce (

see

cont

act

info

rmat

ion

in

App

endi

x F)

or,

in a

reas

und

er th

e ju

risdi

ctio

n of

a r

egul

ated

, tra

ditio

nal

land

use

con

trol

MS

4, t

he r

egul

ated

, tra

ditio

nal

land

use

con

trol

MS

4(p

rovi

ded

the

regu

late

d, tr

aditi

onal

land

use

con

trol M

S4

is n

ot th

e ow

ner

or o

pera

tor o

f the

con

stru

ctio

n ac

tivity

)in

writ

ing

prio

r to

the

shut

dow

n. If

so

il di

stur

banc

e ac

tiviti

es a

re n

ot re

sum

ed w

ithin

2 y

ears

from

the

date

of

shut

dow

n, th

e ow

ner o

r ope

rato

rsha

ll hav

e th

e qu

alifi

ed in

spec

torp

erfo

rm

a fin

al in

spec

tion

and

certi

fy th

at a

lldi

stur

bed

area

sha

ve a

chie

ved

final

st

abili

zatio

n, a

ndal

l tem

pora

ry,

stru

ctur

al e

rosi

on a

ndse

dim

ent

cont

rol

mea

sure

s ha

ve b

een

rem

oved

;and

that

all

post

-con

stru

ctio

n st

orm

wat

er

man

agem

ent p

ract

ices

hav

e be

en c

onst

ruct

ed in

conf

orm

ance

with

the

SW

PPP

by

sign

ing

the

“Fin

al

Sta

biliz

atio

n”

and

“Pos

t-Con

stru

ctio

n S

torm

wat

er M

anag

emen

t Pra

ctic

e” c

ertif

icat

ion

stat

emen

ts o

n th

e N

OT.

Th

e ow

ner o

r ope

rato

rsha

ll th

en s

ubm

it th

eco

mpl

eted

NO

T fo

rm to

the

addr

ess

in P

art I

I.A.1

of th

is p

erm

it.

e.Fo

r co

nstru

ctio

n si

tes

that

dire

ctly

dis

char

geto

one

of

the

303(

d)

segm

ents

list

ed in

App

endi

x E

or i

s lo

cate

d in

one

of t

he w

ater

shed

s lis

ted

in A

ppen

dix

C, t

he q

ualif

ied

insp

ecto

r sh

all c

ondu

ct a

t lea

st tw

o (2

) si

te

insp

ectio

ns e

very

seve

n (7

) cal

enda

r day

s. T

he tw

o (2

) ins

pect

ions

sha

ll 26

(Par

t IV

.C.2

.e)

be s

epar

ated

by

a m

inim

um o

f tw

o (2

) ful

l cal

enda

r day

s.

At a

min

imum

, the

qua

lifie

d in

spec

tor s

hall

insp

ect a

ll er

osio

n an

d se

dim

ent

cont

rol p

ract

ices

and

pollu

tion

prev

entio

n m

easu

res

to e

nsur

e in

tegr

ity a

nd

effe

ctiv

enes

s,

all

post

-con

stru

ctio

n st

orm

wat

er

man

agem

ent

prac

tices

un

der c

onst

ruct

ion

to e

nsur

e th

at th

ey a

re c

onst

ruct

ed in

con

form

ance

with

th

e SW

PPP

, al

l ar

eas

of

dist

urba

nce

that

ha

ve

not

achi

eved

fin

al

stab

iliza

tion,

all p

oint

s of

dis

char

geto

nat

ural

sur

face

wat

erbo

dies

loca

ted

with

in,

or

imm

edia

tely

ad

jace

nt

to,

the

prop

erty

bo

unda

ries

of

th

e co

nstru

ctio

n si

te, a

nd a

ll po

ints

of d

isch

arge

from

the

cons

truct

ion

site

.

The

qual

ified

insp

ecto

r sh

all p

repa

re a

n in

spec

tion

repo

rt su

bseq

uent

to

each

and

eve

ry in

spec

tion.

At a

min

imum

, the

insp

ectio

n re

port

shal

l incl

ude

and/

or a

ddre

ss th

e fo

llow

ing:

a.D

ate

and

time

of in

spec

tion;

b.N

ame

and

title

of p

erso

n(s)

per

form

ing

insp

ectio

n;

c.A

des

crip

tion

of th

e w

eath

er a

nd s

oil c

ondi

tions

(e.g

. dry

, wet

, sat

urat

ed)

at th

e tim

e of

the

insp

ectio

n;

d.A

des

crip

tion

of th

e co

nditi

on o

f the

runo

ff at

all

poin

ts o

f dis

char

gefro

m

the

cons

truct

ion

site

. Thi

s sh

all i

nclu

de id

entif

icat

ion

of a

ny d

isch

arge

sof

se

dim

ent f

rom

the

cons

truct

ion

site

. Inc

lude

dis

char

ges

from

con

veya

nce

syst

ems

(i.e.

pip

es, c

ulve

rts, d

itche

s, e

tc.)

and

over

land

flow

;

e.A

des

crip

tion

of th

e co

nditi

on o

f all

natu

ral s

urfa

ce w

ater

bodi

es lo

cate

d w

ithin

, or

im

med

iate

ly

adja

cent

to

, th

e pr

oper

ty

boun

darie

s of

th

e co

nstru

ctio

n si

te w

hich

rec

eive

run

off

from

dis

turb

ed a

reas

. Th

is s

hall

incl

ude

iden

tific

atio

n of

any

dis

char

ges

ofse

dim

ent

to t

he s

urfa

ce

wat

erbo

dy;

f.Id

entif

icat

ion

of a

ll er

osio

n an

d se

dim

ent c

ontro

l pra

ctic

es a

ndpo

llutio

n pr

even

tion

mea

sure

s th

at n

eed

repa

ir or

mai

nten

ance

;

g.Id

entif

icat

ion

of a

ll er

osio

n an

d se

dim

ent c

ontro

l pra

ctic

esan

dpo

llutio

n pr

even

tion

mea

sure

sth

at w

ere

not i

nsta

lled

prop

erly

or a

re n

ot fu

nctio

ning

as

des

igne

d an

d ne

ed to

be

rein

stal

led

or re

plac

ed;

h.D

escr

iptio

n an

d sk

etch

of a

reas

with

act

ive

soil

dist

urba

nce

activ

ity, a

reas

th

at h

ave

been

dis

turb

ed b

ut a

re in

activ

e at

the

time

of th

e in

spec

tion,

and

area

s th

at h

ave

been

sta

biliz

ed (

tem

pora

ry a

nd/o

r fin

al)

sinc

e th

e la

st

insp

ectio

n;27

(Par

t IV

.C.4

.i)i.

Cur

rent

ph

ase

of

cons

truct

ion

of

all

post

-con

stru

ctio

n st

orm

wat

er

man

agem

ent p

ract

ices

and

iden

tific

atio

n of

all

cons

truct

ion

that

is n

ot in

co

nfor

man

ce w

ith th

e SW

PPP

and

tech

nica

l sta

ndar

ds;

j.C

orre

ctiv

e ac

tion(

s) t

hat

mus

t be

tak

en t

o in

stal

l, re

pair,

rep

lace

or

mai

ntai

n er

osio

n an

d se

dim

ent c

ontro

l pra

ctic

esan

d po

llutio

n pr

even

tion

mea

sure

s; a

nd to

cor

rect

def

icie

ncie

s id

entif

ied

with

the

cons

truct

ion

of

the

post

-con

stru

ctio

n st

orm

wat

er m

anag

emen

t pra

ctic

e(s)

;

k.Id

entif

icat

ion

and

stat

us o

f al

lcor

rect

ive

actio

ns t

hat

wer

e re

quire

d by

pr

evio

us in

spec

tion;

and

l.D

igita

l pho

togr

aphs

, with

dat

e st

amp,

that

clea

rly s

how

the

cond

ition

of a

ll pr

actic

es t

hat

have

bee

n id

entif

ied

as n

eedi

ng c

orre

ctiv

e ac

tions

. Th

e qu

alifi

ed

insp

ecto

r sh

all

atta

ch

pape

r co

lor

copi

es

of

the

digi

tal

phot

ogra

phs

to th

e in

spec

tion

repo

rt be

ing

mai

ntai

ned

onsi

te w

ithin

sev

en

(7)

cale

ndar

day

s of

the

dat

e of

the

insp

ectio

n. T

he q

ualif

ied

insp

ecto

rsh

all a

lso

take

dig

ital p

hoto

grap

hs, w

ith d

ate

stam

p, th

atcl

early

sho

w th

e co

nditi

on o

f the

pra

ctic

e(s)

afte

r the

cor

rect

ive

actio

n ha

s be

en c

ompl

eted

. Th

e qu

alifi

ed i

nspe

ctor

sha

ll at

tach

pap

er c

olor

cop

ies

of t

he d

igita

l ph

otog

raph

s to

the

insp

ectio

n re

port

that

doc

umen

ts th

e co

mpl

etio

n of

the

corre

ctiv

e ac

tion

wor

k w

ithin

sev

en (7

) cal

enda

r day

s of

that

insp

ectio

n.

With

in o

ne b

usin

ess

day

of th

e co

mpl

etio

n of

an

insp

ectio

n, th

e qu

alifi

ed

insp

ecto

r sh

all n

otify

the

owne

r or

ope

rato

ran

d ap

prop

riate

con

tract

or o

r su

bcon

tract

orid

entif

ied

in P

art

III.A

.6.

of t

his

perm

it of

any

cor

rect

ive

actio

ns th

at n

eed

to b

e ta

ken.

The

con

tract

or o

r sub

cont

ract

or s

hall

begi

n im

plem

entin

g th

e co

rrect

ive

actio

ns w

ithin

one

bus

ines

s da

y of

thi

s no

tific

atio

n an

d sh

all c

ompl

ete

the

corre

ctiv

e ac

tions

in a

rea

sona

ble

time

fram

e.

All

insp

ectio

n re

ports

sha

ll be

sig

ned

by th

e qu

alifi

ed in

spec

tor.

Purs

uant

to

Par

t II.C

.2.o

f thi

s pe

rmit,

the

insp

ectio

n re

ports

sha

ll be

mai

ntai

ned

on s

ite

with

the

SWPP

P.

Part

V. T

ERM

INA

TIO

N O

F PE

RM

IT C

OVE

RA

GE

A.

Term

inat

ion

of P

erm

it C

over

age

An

owne

r or o

pera

tort

hat i

s el

igib

le to

term

inat

e co

vera

geun

der t

his

perm

it m

ust

subm

it a

com

plet

ed N

OT

form

to

the

addr

ess

in P

art

II.A

.1of

thi

s pe

rmit.

The

NO

T fo

rm s

hall

be o

ne w

hich

is a

ssoc

iate

d w

ith t

his

perm

it,

sign

ed in

acc

orda

nce

with

Par

t VII.

Hof

this

per

mit.

28

(Par

t V.A

.2)

An

owne

r or

ope

rato

rm

ay t

erm

inat

e co

vera

ge w

hen

one

or m

ore

the

follo

win

g co

nditi

ons

have

bee

n m

et:

a.To

tal p

roje

ct c

ompl

etio

n -A

ll co

nstru

ctio

n ac

tivity

iden

tifie

d in

the

SWPP

P ha

s be

en c

ompl

eted

; an

dal

l are

as o

f di

stur

banc

e ha

ve a

chie

ved

final

st

abili

zatio

n;an

dal

l tem

pora

ry,

stru

ctur

al e

rosi

on a

nd s

edim

ent

cont

rol

mea

sure

s ha

ve b

een

rem

oved

; an

dal

l po

st-c

onst

ruct

ion

stor

mw

ater

m

anag

emen

t pra

ctic

es h

ave

been

con

stru

cted

in c

onfo

rman

ce w

ith t

he

SWPP

P a

nd a

re o

pera

tiona

l;

b.P

lann

ed s

hutd

own

with

par

tial p

roje

ct c

ompl

etio

n -

All

soil

dist

urba

nce

activ

ities

hav

e ce

ased

; and

all a

reas

dis

turb

ed a

s of

the

proj

ect s

hutd

own

date

hav

e ac

hiev

ed fi

nal s

tabi

lizat

ion;

and

all t

empo

rary

, stru

ctur

al e

rosi

on

and

sedi

men

t co

ntro

l m

easu

res

have

bee

n re

mov

ed;

and

all

post

-co

nstru

ctio

n st

orm

wat

er

man

agem

ent

prac

tices

re

quire

d fo

r th

e co

mpl

eted

por

tion

of th

e pr

ojec

t hav

e be

en c

onst

ruct

ed in

con

form

ance

w

ith th

e SW

PPP

and

are

oper

atio

nal;

c.A

new

ow

ner

or o

pera

tor

has

obta

ined

cov

erag

e un

der

this

per

mit

in

acco

rdan

ce w

ith P

art I

I.E.o

f thi

s pe

rmit.

d.Th

e ow

ner

or o

pera

tor

obta

ins

cove

rage

und

er a

n al

tern

ativ

e S

PDE

S ge

nera

l per

mit

or a

n in

divi

dual

SP

DE

S p

erm

it.

For

cons

truct

ion

activ

ities

mee

ting

subd

ivis

ion

2a. o

r 2b

. of

this

Par

t, th

e ow

ner

or o

pera

tor

shal

l hav

e th

e qu

alifi

ed in

spec

tor

perfo

rm a

fin

al s

ite

insp

ectio

n pr

ior

to s

ubm

ittin

g th

e N

OT.

The

qua

lifie

d in

spec

tor

shal

l, by

si

gnin

g th

e “F

inal

S

tabi

lizat

ion”

an

d “P

ost-C

onst

ruct

ion

Sto

rmw

ater

M

anag

emen

t Pra

ctic

ece

rtific

atio

n st

atem

ents

on

the

NO

T, c

ertif

y th

at a

ll th

e re

quire

men

ts in

Par

t V.A

.2.a

. or b

. of t

his

perm

it ha

ve b

een

achi

eved

.

For

cons

truct

ion

activ

ities

that

are

sub

ject

to

the

requ

irem

ents

of

a re

gula

ted,

trad

ition

al la

nd u

se c

ontro

l MS

4an

d m

eet s

ubdi

visi

on 2

a. o

r 2b.

of

this

Par

t, th

e ow

ner o

r ope

rato

rsha

ll ha

ve th

ere

gula

ted,

trad

ition

al la

nd

use

cont

rol

MS4

sign

the

“M

S4

Acc

epta

nce”

sta

tem

ent

on t

he N

OT

in

acco

rdan

ce w

ith t

he r

equi

rem

ents

in

Part

VII.

H.

of t

his

perm

it.Th

e re

gula

ted,

tra

ditio

nal

land

us

e co

ntro

l M

S4

offic

ial,

by

sign

ing

this

st

atem

ent,

has

dete

rmin

ed th

at it

is a

ccep

tabl

e fo

r the

ow

ner o

r ope

rato

rto

subm

it th

e N

OT

in a

ccor

danc

e w

ith t

here

quire

men

ts o

f th

is P

art.

The

regu

late

d, tr

aditi

onal

land

use

con

trol M

S4

can

mak

e th

is d

eter

min

atio

n by

pe

rform

ing

afin

al s

ite in

spec

tion

them

selv

esor

by a

ccep

ting

the

qual

ified

in

spec

tor’s

fina

l site

insp

ectio

nce

rtific

atio

n(s)

requ

ired

in P

art V

.A.3

.of t

his

perm

it.

29

(Par

t V.A

.5)

For

cons

truct

ion

activ

ities

th

at

requ

ire

post

-con

stru

ctio

n st

orm

wat

er

man

agem

ent p

ract

ices

and

mee

t sub

divi

sion

2a.

of t

his

Par

t, th

e ow

ner o

r op

erat

orm

ust,

prio

r to

subm

ittin

g th

e N

OT,

ens

ure

one

of th

e fo

llow

ing:

a.th

e po

st-c

onst

ruct

ion

stor

mw

ater

man

agem

ent p

ract

ice(

s) a

nd a

ny ri

ght-

of-w

ay(s

) ne

eded

to m

aint

ain

such

pra

ctic

e(s)

hav

e be

en d

eede

d to

the

mun

icip

ality

in w

hich

the

prac

tice(

s) is

loca

ted,

b.an

exe

cute

d m

aint

enan

ce a

gree

men

t is

in p

lace

with

the

mun

icip

ality

that

w

ill m

aint

ain

the

post

-con

stru

ctio

n st

orm

wat

er m

anag

emen

t pra

ctic

e(s)

,

c.fo

r pos

t-con

stru

ctio

n st

orm

wat

er m

anag

emen

t pra

ctic

es th

at a

re p

rivat

ely

owne

d, t

he o

wne

r or

ope

rato

r ha

s a

mec

hani

sm in

pla

ce t

hat

requ

ires

oper

atio

n an

d m

aint

enan

ce o

f th

e pr

actic

e(s)

in

acco

rdan

ce w

ith t

heop

erat

ion

and

mai

nten

ance

pla

n,su

ch a

s a

deed

cov

enan

t in

the

owne

r or

ope

rato

r’sde

ed o

f rec

ord,

d.fo

r po

st-c

onst

ruct

ion

stor

mw

ater

man

agem

ent p

ract

ices

that

are

ow

ned

bya

publ

ic

or

priv

ate

inst

itutio

n (e

.g.

scho

ol,

univ

ersi

ty,

hosp

ital),

go

vern

men

t ag

ency

or

auth

ority

, or

pub

lic u

tility

;th

eow

ner

or o

pera

tor

has

polic

y an

d pr

oced

ures

in

pl

ace

that

en

sure

s op

erat

ion

and

mai

nten

ance

of

the

prac

tices

in a

ccor

danc

e w

ith t

he o

pera

tion

and

mai

nten

ance

pla

n.

Part

VI.

REP

OR

TIN

G A

ND

RET

ENTI

ON

OF

REC

OR

DS

A.R

ecor

d R

eten

tion

The

owne

r or o

pera

tors

hall

reta

in a

cop

y of

the

NO

I, N

OI

Ack

now

ledg

men

t Le

tter,

SWPP

P,

MS

4 SW

PPP

A

ccep

tanc

e fo

rm

and

any

insp

ectio

n re

ports

that

wer

e pr

epar

ed in

con

junc

tion

with

this

per

mit

for a

per

iod

of

at le

ast f

ive

(5) y

ears

from

the

date

that

the

Dep

artm

ent r

ecei

ves

a co

mpl

ete

NO

T su

bmitt

ed in

acc

orda

nce

with

Par

t V. o

f thi

s ge

nera

l per

mit.

B.A

ddre

sses

With

the

exce

ptio

n of

the

NO

I, N

OT,

and

MS4

SW

PPP

Acc

epta

nce

form

(w

hich

m

ust b

e su

bmitt

ed to

the

addr

ess

refe

renc

ed in

Par

t II.A

.1of

this

per

mit)

, all

writ

ten

corre

spon

denc

e re

ques

ted

by

the

Dep

artm

ent,

incl

udin

g in

divi

dual

pe

rmit

appl

icat

ions

, sha

ll be

sen

t to

the

addr

ess

of th

e ap

prop

riate

DO

W W

ater

(SP

DE

S)

Pro

gram

con

tact

at t

he R

egio

nal O

ffice

list

ed in

App

endi

x F.

30

(Par

t VII)

Part

VII.

STA

ND

AR

D P

ERM

IT C

ON

DIT

ION

S

A.D

uty

to C

ompl

y

The

owne

r or o

pera

torm

ust c

ompl

y w

ith a

ll co

nditi

ons

of th

is p

erm

it. A

ll co

ntra

ctor

s an

d su

bcon

tract

ors

asso

ciat

ed w

ith th

e pr

ojec

t mus

t com

ply

with

the

term

s of

the

SWPP

P. A

ny n

on-c

ompl

ianc

e w

ith th

is p

erm

it co

nstit

utes

a v

iola

tion

of th

e C

lean

W

ater

Act

(CW

A) a

nd th

e E

CL

and

is g

roun

ds fo

r an

enfo

rcem

ent a

ctio

n ag

ains

t the

ow

ner

or

oper

ator

and/

or

the

cont

ract

or/s

ubco

ntra

ctor

; pe

rmit

revo

catio

n,

susp

ensi

on o

r mod

ifica

tion;

or d

enia

l of a

per

mit

rene

wal

app

licat

ion.

Upo

n a

findi

ng

of s

igni

fican

t no

n-co

mpl

ianc

e w

ith t

his

perm

it or

the

app

licab

le S

WPP

P,

the

Dep

artm

ent m

ay o

rder

an

imm

edia

te s

top

to a

ll co

nstru

ctio

n ac

tivity

at t

he s

ite u

ntil

the

non-

com

plia

nce

is r

emed

ied.

The

sto

p w

ork

orde

r sh

all

be i

n w

ritin

g, s

hall

desc

ribe

the

non-

com

plia

nce

in d

etai

l,an

d sh

all b

e se

nt to

the

owne

r or o

pera

tor.

If an

y hu

man

rem

ains

or a

rcha

eolo

gica

l rem

ains

are

enc

ount

ered

dur

ing

exca

vatio

n,

the

owne

ror o

pera

torm

ust i

mm

edia

tely

cea

se, o

r cau

se to

cea

se, a

ll co

nstru

ctio

n ac

tivity

in t

he a

rea

of t

he r

emai

ns a

nd n

otify

the

app

ropr

iate

Reg

iona

l W

ater

E

ngin

eer (

RW

E).

Con

stru

ctio

n ac

tivity

shal

l not

resu

me

until

writ

ten

perm

issi

on to

do

so

has

been

rece

ived

from

the

RW

E.

B.C

ontin

uatio

n of

the

Expi

red

Gen

eral

Per

mit

This

per

mit

expi

res

five

(5)y

ears

from

the

effe

ctiv

e da

te. I

f a n

ew g

ener

al p

erm

it is

no

t iss

ued

prio

r to

the

expi

ratio

n of

this

gen

eral

per

mit,

an

owne

r or

ope

rato

rw

ith

cove

rage

und

er th

is p

erm

itm

ay c

ontin

ue to

ope

rate

and

dis

char

gein

acc

orda

nce

with

the

term

s an

d co

nditi

ons

of th

is g

ener

al p

erm

it, if

it is

ext

ende

d pu

rsua

nt to

the

Sta

te A

dmin

istra

tive

Proc

edur

e A

ct a

nd 6

NYC

RR

Par

t 62

1,un

tila

new

gen

eral

pe

rmit

is is

sued

.

C.E

nfor

cem

ent

Failu

re o

f th

e ow

ner

or o

pera

tor,

its c

ontra

ctor

s, s

ubco

ntra

ctor

s, a

gent

s an

d/or

as

sign

s to

stri

ctly

adh

ere

to a

ny o

f the

per

mit

requ

irem

ents

con

tain

ed h

erei

n sh

all

cons

titut

e a

viol

atio

n of

thi

s pe

rmit.

The

re a

re s

ubst

antia

l cr

imin

al,

civi

l, an

d ad

min

istra

tive

pena

lties

ass

ocia

ted

with

vio

latin

g th

e pr

ovis

ions

of t

his

perm

it. F

ines

of

up

to $

37,5

00 p

er d

ay fo

r eac

h vi

olat

ion

and

impr

ison

men

t for

up

to fi

fteen

(15)

ye

ars

may

be

asse

ssed

dep

endi

ng u

pon

the

natu

re a

nd d

egre

e of

the

offe

nse.

D.N

eed

to H

alt o

r Red

uce

Activ

ity N

ot a

Def

ense

It sh

all n

ot b

e a

defe

nse

for

an o

wne

r or

ope

rato

rin

an

enfo

rcem

ent a

ctio

n th

at it

w

ould

hav

e be

en n

eces

sary

to

halt

or r

educ

e th

e co

nstru

ctio

n ac

tivity

in o

rder

to

mai

ntai

n co

mpl

ianc

e w

ith th

e co

nditi

ons

of th

is p

erm

it.

31

(Par

t VII.

E)

E.D

uty

to M

itiga

te

The

owne

r or

ope

rato

r an

d its

con

tract

ors

and

subc

ontra

ctor

s sh

all

take

all

reas

onab

le s

teps

to

min

imiz

eor

pre

vent

any

dis

char

gein

vio

latio

n of

thi

s pe

rmit

whi

ch h

as a

rea

sona

ble

likel

ihoo

d of

adv

erse

ly a

ffect

ing

hum

an h

ealth

or

the

envi

ronm

ent.

F.D

uty

to P

rovi

de In

form

atio

n

The

owne

r or o

pera

tors

hall

furn

ish

to th

e D

epar

tmen

t,w

ithin

are

ason

able

spe

cifie

d tim

e pe

riod

of a

writ

ten

requ

est,

all

docu

men

tatio

n ne

cess

ary

tode

mon

stra

teel

igib

ility

and

any

info

rmat

ion

tode

term

ine

com

plia

nce

with

thi

s pe

rmit

or t

o de

term

ine

whe

ther

cau

se e

xist

s fo

r mod

ifyin

g or

revo

king

this

per

mit,

or s

uspe

ndin

g or

den

ying

cov

erag

e un

der t

his

perm

it, in

acc

orda

nce

with

the

term

s an

d co

nditi

ons

of th

is p

erm

it.Th

e N

OI,

SWPP

Pan

din

spec

tion

repo

rts re

quire

d by

this

per

mit

are

publ

ic d

ocum

ents

that

the

owne

r or

ope

rato

r m

ust m

ake

avai

labl

e fo

r re

view

and

co

pyin

g by

any

per

son

with

in f

ive

(5)

busi

ness

day

s of

the

ow

ner

or o

pera

tor

rece

ivin

g a

writ

ten

requ

est b

y an

y su

ch p

erso

n to

revi

ew th

ese

docu

men

ts. C

opyi

ng

of d

ocum

ents

will

be d

one

at th

e re

ques

ter’s

exp

ense

.

G.O

ther

Info

rmat

ion

Whe

n th

e ow

ner o

r ope

rato

rbec

omes

aw

are

that

they

faile

d to

sub

mit

any

rele

vant

fa

cts,

or

subm

itted

inc

orre

ct i

nfor

mat

ion

in t

he N

OI

or i

n an

y of

the

doc

umen

ts

requ

ired

by th

is p

erm

it , o

r hav

e m

ade

subs

tant

ive

revi

sion

s to

the

SWPP

P (e

.g. t

he

scop

e of

the

proj

ect c

hang

es s

igni

fican

tly, t

he ty

pe o

f pos

t-con

stru

ctio

n st

orm

wat

er

man

agem

ent

prac

tice(

s) c

hang

es,

ther

e is

a r

educ

tion

in t

he s

izin

g of

the

pos

t-co

nstru

ctio

n st

orm

wat

er m

anag

emen

t pr

actic

e, o

rth

ere

is a

n in

crea

se i

n th

e di

stur

banc

e ar

ea o

r im

perv

ious

are

a), w

hich

wer

e no

t ref

lect

ed in

the

orig

inal

NO

I su

bmitt

ed to

the

Dep

artm

ent,

they

sha

ll pr

ompt

ly s

ubm

it su

ch fa

cts

or in

form

atio

n to

th

e D

epar

tmen

tusi

ng th

e co

ntac

t inf

orm

atio

n in

Par

t II.A

.of t

his

perm

it. F

ailu

re o

f th

e ow

ner

or o

pera

tor

to c

orre

ct o

r su

pple

men

t an

y re

leva

nt f

acts

with

in f

ive

(5)

busi

ness

day

s of

bec

omin

g aw

are

of th

e de

ficie

ncy

shal

l con

stitu

te a

vio

latio

n of

this

pe

rmit.

H.S

igna

tory

Req

uire

men

ts

All

NO

Is a

nd N

OTs

sha

ll be

sig

ned

as fo

llow

s:

a.Fo

r a c

orpo

ratio

n th

ese

form

s sh

all b

e si

gned

by

a re

spon

sibl

e co

rpor

ate

offic

er.

For

the

purp

ose

of t

his

sect

ion,

a r

espo

nsib

le c

orpo

rate

offi

cer

mea

ns:

(i)a

pres

iden

t, se

cret

ary,

trea

sure

r, or

vic

e-pr

esid

ent o

f the

32

(Par

t VII.

H.1

.a.i)

corp

orat

ion

in c

harg

e of

a p

rinci

pal b

usin

ess

func

tion,

or a

ny o

ther

pe

rson

who

per

form

s si

mila

r po

licy

or d

ecis

ion-

mak

ing

func

tions

fo

r the

cor

pora

tion;

or

(ii)

the

man

ager

of

on

e or

m

ore

man

ufac

turin

g,

prod

uctio

n or

op

erat

ing

faci

litie

s, p

rovi

ded

the

man

ager

is a

utho

rized

to m

ake

man

agem

ent

deci

sion

s w

hich

go

vern

th

e op

erat

ion

of

the

regu

late

d fa

cilit

y in

clud

ing

havi

ng t

he e

xplic

it or

impl

icit

duty

of

mak

ing

maj

or c

apita

l inv

estm

ent r

ecom

men

datio

ns, a

nd in

itiat

ing

and

dire

ctin

g ot

her c

ompr

ehen

sive

mea

sure

s to

ass

ure

long

term

en

viro

nmen

tal

com

plia

nce

with

en

viro

nmen

tal

law

s an

d re

gula

tions

; the

man

ager

can

ens

ure

that

the

nece

ssar

y sy

stem

s ar

e es

tabl

ishe

d or

act

ions

take

n to

gat

her c

ompl

ete

and

accu

rate

in

form

atio

n fo

r pe

rmit

appl

icat

ion

requ

irem

ents

; an

d w

here

au

thor

ity t

o si

gn d

ocum

ents

has

bee

n as

sign

ed o

r de

lega

ted

to

the

man

ager

in a

ccor

danc

e w

ith c

orpo

rate

pro

cedu

res;

b.Fo

r a p

artn

ersh

ip o

r sol

e pr

oprie

tors

hip

thes

e fo

rms

shal

l be

sign

ed b

y a

gene

ral p

artn

er o

r the

pro

prie

tor,

resp

ectiv

ely;

or

c.Fo

r a m

unic

ipal

ity, S

tate

, Fed

eral

, or o

ther

pub

lic a

genc

y th

ese

form

s sh

all

be s

igne

d by

eith

er a

prin

cipa

l exe

cutiv

e of

ficer

or r

anki

ng e

lect

ed o

ffici

al.

For

purp

oses

of

this

sec

tion,

a p

rinci

pal e

xecu

tive

offic

er o

f a

Fede

ral

agen

cy in

clud

es:

(i)th

e ch

ief e

xecu

tive

offic

er o

f the

age

ncy,

or

(ii)

a se

nior

exe

cutiv

e of

ficer

hav

ing

resp

onsi

bilit

y fo

r th

e ov

eral

l op

erat

ions

of

a pr

inci

pal

geog

raph

ic u

nit

of t

he a

genc

y (e

.g.,

Reg

iona

l Adm

inis

trato

rs o

f EP

A).

The

SWPP

P a

nd o

ther

info

rmat

ion

requ

este

d by

the

Dep

artm

ent s

hall

be

sign

ed b

y a

pers

on d

escr

ibed

in P

art

VII.

H.1

.of

thi

s pe

rmit

or b

y a

duly

au

thor

ized

rep

rese

ntat

ive

of t

hat

pers

on.

A p

erso

n is

a d

uly

auth

oriz

ed

repr

esen

tativ

e on

ly if

:

a.Th

e au

thor

izat

ion

is m

ade

in w

ritin

g by

a p

erso

n de

scrib

ed in

Par

t VII.

H.1

.of

this

per

mit;

b.Th

e au

thor

izat

ion

spec

ifies

eith

er a

n in

divi

dual

or

a po

sitio

n ha

ving

re

spon

sibi

lity

for

the

over

all o

pera

tion

of th

e re

gula

ted

faci

lity

or a

ctiv

ity,

such

as

the

posi

tion

of p

lant

man

ager

, ope

rato

r of

a w

ell o

r a

wel

l fie

ld,

supe

rinte

nden

t, po

sitio

n of

equ

ival

ent

resp

onsi

bilit

y, o

r an

indi

vidu

al o

r po

sitio

n ha

ving

ove

rall

resp

onsi

bilit

y fo

r en

viro

nmen

tal

mat

ters

for

the

co

mpa

ny. (

A d

uly

auth

oriz

ed re

pres

enta

tive

may

thus

be

eith

er a

nam

ed

33

(Par

t VII.

H.2

.b)

indi

vidu

al o

r any

indi

vidu

al o

ccup

ying

a n

amed

pos

ition

) and

,

c.Th

e w

ritte

n au

thor

izat

ion

shal

l inc

lude

the

nam

e, ti

tle a

nd s

igna

ture

of t

he

auth

oriz

ed re

pres

enta

tive

and

be a

ttach

ed to

the

SWPP

P.

All

insp

ectio

n re

ports

sha

ll be

sig

ned

by t

hequ

alifi

ed i

nspe

ctor

tha

t pe

rform

s th

e in

spec

tion.

The

MS

4 SW

PPP

Acc

epta

nce

form

sha

ll be

sig

ned

by

the

prin

cipa

l ex

ecut

ive

offic

er o

r ra

nkin

g el

ecte

d of

ficia

l fro

m t

he r

egul

ated

, tra

ditio

nal

land

use

con

trol M

S4,

or b

y a

duly

aut

horiz

ed re

pres

enta

tive

of th

at p

erso

n.

It sh

all c

onst

itute

a p

erm

it vi

olat

ion

if an

inco

rrect

and

/or i

mpr

oper

si

gnat

ory

auth

oriz

es a

ny re

quire

d fo

rms,

SW

PP

P a

nd/o

r ins

pect

ion

repo

rts.

I.Pr

oper

ty R

ight

s

The

issu

ance

of t

his

perm

it do

es n

ot c

onve

y an

y pr

oper

ty ri

ghts

of a

ny s

ort,

nor

any

excl

usiv

e pr

ivile

ges,

nor

doe

s it

auth

oriz

e an

y in

jury

to p

rivat

e pr

oper

ty n

or

any

inva

sion

of p

erso

nal r

ight

s, n

or a

ny in

fring

emen

t of F

eder

al, S

tate

or

loca

l la

ws

or

regu

latio

ns.

Ow

ners

or

op

erat

ors

mus

t ob

tain

an

y ap

plic

able

co

nvey

ance

s, e

asem

ents

, lic

ense

s an

d/or

acc

ess

to r

eal

prop

erty

prio

r to

co

mm

enci

ng c

onst

ruct

ion

activ

ity.

J.Se

vera

bilit

y

The

prov

isio

ns o

f thi

s pe

rmit

are

seve

rabl

e, a

nd if

any

pro

visi

on o

f thi

s pe

rmit,

or

the

appl

icat

ion

of a

ny p

rovi

sion

of t

his

perm

it to

any

circ

umst

ance

, is

held

inva

lid,

the

appl

icat

ion

of s

uch

prov

isio

n to

oth

er c

ircum

stan

ces,

and

the

rem

aind

er o

f th

is p

erm

it sh

all n

ot b

e af

fect

ed th

ereb

y.

K.R

equi

rem

ent t

o O

btai

nC

over

age

Und

er a

n A

ltern

ativ

ePe

rmit

The

Dep

artm

ent

may

req

uire

any

ow

ner

or o

pera

tor

auth

oriz

ed b

y th

is

perm

it to

app

ly f

or a

nd/o

r ob

tain

eith

er a

n in

divi

dual

SP

DE

S p

erm

it or

an

othe

r SP

DE

S

gene

ral

perm

it. W

hen

the

Dep

artm

ent

requ

ires

any

disc

harg

er a

utho

rized

by

a ge

nera

l per

mit

to a

pply

for a

n in

divi

dual

SP

DE

S pe

rmit,

it s

hall

notif

y th

edi

scha

rger

in w

ritin

g th

at a

per

mit

appl

icat

ion

is

requ

ired.

Thi

s no

tice

shal

l inc

lude

a b

rief s

tate

men

t of t

he re

ason

s fo

r thi

s de

cisi

on, a

n ap

plic

atio

n fo

rm, a

sta

tem

ent s

ettin

g a

time

fram

e fo

r the

ow

ner

or o

pera

tor

to f

ile t

he a

pplic

atio

n fo

r an

indi

vidu

al S

PD

ES

per

mit,

and

a

dead

line,

not

soo

ner

than

180

day

s fro

m o

wne

r or

ope

rato

rre

ceip

t of t

he

notif

icat

ion

lette

r, w

here

by th

e au

thor

izat

ion

to

34

(Par

t VII.

K.1

)di

scha

rge

unde

r thi

s ge

nera

l per

mit

shal

l be

term

inat

ed. A

pplic

atio

ns m

ust

be s

ubm

itted

to th

e ap

prop

riate

Per

mit

Adm

inis

trato

r at t

he R

egio

nal O

ffice

. Th

e D

epar

tmen

t m

ay g

rant

add

ition

al t

ime

upon

dem

onst

ratio

n, t

o th

e sa

tisfa

ctio

n of

th

e D

epar

tmen

t, th

at

addi

tiona

l tim

e to

ap

ply

for

an

alte

rnat

ive

auth

oriz

atio

n is

nec

essa

ry o

r w

here

the

Dep

artm

ent

has

not

prov

ided

a p

erm

it de

term

inat

ion

in a

ccor

danc

e w

ith P

art 6

21 o

f thi

s Ti

tle.

Whe

n an

indi

vidu

al S

PD

ES

per

mit

is is

sued

to a

dis

char

ger

auth

oriz

ed to

di

scha

rge

unde

r a

gene

ral S

PD

ES

perm

it fo

r th

e sa

me

disc

harg

e(s)

, th

e ge

nera

l pe

rmit

auth

oriz

atio

n fo

r ou

tfalls

aut

horiz

ed u

nder

the

ind

ivid

ual

SP

DE

S p

erm

it is

aut

omat

ical

ly t

erm

inat

ed o

n th

e ef

fect

ive

date

of

the

indi

vidu

al p

erm

it un

less

term

inat

ion

is e

arlie

r in

acco

rdan

ce w

ith 6

NYC

RR

P

art 7

50.

L.Pr

oper

Ope

ratio

n an

d M

aint

enan

ce

The

owne

r or

ope

rato

rsha

ll at

all

times

pro

perly

ope

rate

and

mai

ntai

n al

l fac

ilitie

s an

d sy

stem

s of

tre

atm

ent

and

cont

rol

(and

rel

ated

app

urte

nanc

es)

whi

ch a

re

inst

alle

d or

use

d by

the

owne

r or o

pera

tort

o ac

hiev

e co

mpl

ianc

e w

ith th

e co

nditi

ons

of th

is p

erm

it an

d w

ith th

e re

quire

men

ts o

fthe

SW

PPP.

M.I

nspe

ctio

n an

d En

try

The

owne

r or o

pera

tors

hall

allo

w a

n au

thor

ized

repr

esen

tativ

e of

the

Dep

artm

ent,

EP

A,

app

licab

le c

ount

y he

alth

dep

artm

ent,

or,

in t

he c

ase

of a

con

stru

ctio

n si

te

whi

ch d

isch

arge

sth

roug

h an

MS

4, a

n au

thor

ized

rep

rese

ntat

ive

of t

he M

S4

rece

ivin

g th

e di

scha

rge,

upo

n th

e pr

esen

tatio

n of

cre

dent

ials

and

oth

er d

ocum

ents

as

may

be

requ

ired

by la

w, t

o:

Ent

er u

pon

the

owne

r’s o

r ope

rato

r'spr

emis

es w

here

a re

gula

ted

faci

lity

or

activ

ity is

loca

ted

or c

ondu

cted

or

whe

re r

ecor

ds m

ust b

e ke

pt u

nder

the

cond

ition

s of

this

per

mit;

Hav

e ac

cess

to a

nd c

opy

at r

easo

nabl

e tim

es, a

ny r

ecor

ds th

at m

ust b

e ke

pt u

nder

the

cond

ition

s of

this

per

mit;

and

Insp

ect a

t rea

sona

ble

times

any

faci

litie

s or

equ

ipm

ent (

incl

udin

g m

onito

ring

and

cont

rol e

quip

men

t), p

ract

ices

or

oper

atio

ns r

egul

ated

or

requ

ired

by

this

per

mit.

Sam

ple

or m

onito

r at

rea

sona

ble

times

, fo

r pu

rpos

es o

f as

surin

g pe

rmit

com

plia

nce

or a

s ot

herw

ise

auth

oriz

ed b

y th

e A

ct o

r EC

L, a

ny s

ubst

ance

s or

par

amet

ers

at a

ny lo

catio

n.

35

(Par

t VII.

N)

N.P

erm

it Ac

tions

This

per

mit

may

, at a

ny ti

me,

be

mod

ified

, sus

pend

ed, r

evok

ed, o

rren

ewed

by th

e D

epar

tmen

t in

acco

rdan

ce w

ith 6

NYC

RR

Par

t 621

. The

filin

g of

a r

eque

st b

y th

e ow

ner o

r ope

rato

rfor

a p

erm

it m

odifi

catio

n, re

voca

tion

and

reis

suan

ce, t

erm

inat

ion,

a

notif

icat

ion

of p

lann

ed c

hang

es o

r an

ticip

ated

non

com

plia

nce

does

not

lim

it,

dim

inis

h an

d/or

sta

y co

mpl

ianc

e w

ith a

ny te

rms

of th

is p

erm

it.

O.D

efin

ition

s

Def

initi

ons

of k

ey te

rms

are

incl

uded

in A

ppen

dix

A o

f thi

s pe

rmit.

P.R

e-O

pene

r Cla

use

If th

ere

is e

vide

nce

indi

catin

g po

tent

ial o

r rea

lized

impa

cts

on w

ater

qua

lity

due

to a

ny s

torm

wat

er d

isch

arge

ass

ocia

ted

with

con

stru

ctio

n ac

tivity

co

vere

d by

thi

s pe

rmit,

the

ow

ner

or o

pera

tor

of s

uch

disc

harg

e m

ay b

e re

quire

d to

obt

ain

an i

ndiv

idua

l pe

rmit

or a

ltern

ativ

e ge

nera

l pe

rmit

in

acco

rdan

ce w

ith P

art V

II.K

. of t

his

perm

it or

the

perm

it m

ay b

e m

odifi

ed to

in

clud

e di

ffere

nt li

mita

tions

and

/or r

equi

rem

ents

.

Any

Dep

artm

ent i

nitia

ted

perm

it m

odifi

catio

n, s

uspe

nsio

n or

revo

catio

n w

ill

be c

ondu

cted

in a

ccor

danc

e w

ith 6

NYC

RR

Par

t 621

, 6 N

YCR

R 7

50-1

.18,

an

d 6

NYC

RR

750

-1.2

0.

Q.P

enal

ties

for F

alsi

ficat

ion

of F

orm

s an

d R

epor

ts

In a

ccor

danc

e w

ith 6

NYC

RR

Par

t 750

-2.4

and

750-

2.5,

any

per

son

who

kno

win

gly

mak

es

any

fals

e m

ater

ial

stat

emen

t, re

pres

enta

tion,

or

ce

rtific

atio

n in

an

y ap

plic

atio

n, re

cord

, rep

ort o

r oth

er d

ocum

ent f

iled

or re

quire

d to

be

mai

ntai

ned

unde

r th

is p

erm

it, in

clud

ing

repo

rts o

f com

plia

nce

or n

onco

mpl

ianc

e sh

all,

upon

con

vict

ion,

be

pun

ishe

d in

acc

orda

nce

with

EC

L §7

1-19

33 a

ndor

Arti

cles

175

and

210

of t

he

New

Yor

k S

tate

Pen

al L

aw.

R.O

ther

Per

mits

Not

hing

in th

is p

erm

it re

lieve

s th

e ow

ner

or o

pera

tor

from

a r

equi

rem

ent t

o ob

tain

an

y ot

her p

erm

its re

quire

d by

law

.

36

APP

END

IX A

Def

initi

ons

Alte

r Hyd

rolo

gy fr

om P

re to

Pos

t-Dev

elop

men

t Con

ditio

ns -

mea

ns th

e po

st-

deve

lopm

ent p

eak

flow

rate

(s) h

as in

crea

sed

by m

ore

than

5%

of t

he p

re-d

evel

oped

co

nditi

on fo

r the

des

ign

stor

m o

f int

eres

t (e.

g. 1

0 yr

and

100

yr).

Com

bine

d Se

wer

-m

eans

a s

ewer

that

is d

esig

ned

to c

olle

ct a

nd c

onve

y bo

th “s

ewag

e”

and

“sto

rmw

ater

”.

Com

men

ce (C

omm

ence

men

t of)

Con

stru

ctio

n A

ctiv

ities

-m

eans

the

initi

al

dist

urba

nce

of s

oils

ass

ocia

ted

with

cle

arin

g, g

radi

ng o

r exc

avat

ion

activ

ities

; or o

ther

co

nstru

ctio

n re

late

d ac

tiviti

es th

at d

istu

rb o

r exp

ose

soils

suc

h as

dem

oliti

on, s

tock

pilin

g of

fill

mat

eria

l, an

d th

e in

itial

inst

alla

tion

of e

rosi

on a

nd s

edim

ent c

ontro

l pra

ctic

es

requ

ired

in th

e SW

PPP

. See

def

initi

on fo

r “C

onst

ruct

ion

Act

ivity

(ies)

” als

o.

Con

stru

ctio

n A

ctiv

ity(ie

s) -

mea

ns a

ny c

lear

ing,

gra

ding

, exc

avat

ion,

fillin

g, d

emol

ition

or

sto

ckpi

ling

activ

ities

that

resu

lt in

soi

l dis

turb

ance

. Cle

arin

g ac

tiviti

es c

an in

clud

e, b

ut

are

not l

imite

d to

, log

ging

equ

ipm

ent o

pera

tion,

the

cutti

ng a

nd s

kidd

ing

of tr

ees,

stu

mp

rem

oval

and

/or b

rush

root

rem

oval

.Con

stru

ctio

n ac

tivity

doe

s no

t inc

lude

rout

ine

mai

nten

ance

that

is p

erfo

rmed

to m

aint

ain

the

orig

inal

line

and

gra

de, h

ydra

ulic

cap

acity

, or

orig

inal

pur

pose

of a

faci

lity.

Dire

ct D

isch

arge

(to

a sp

ecifi

c su

rfac

e w

ater

body

) -m

eans

that

runo

ff flo

ws

from

aco

nstru

ctio

n si

te b

y ov

erla

nd fl

ow a

nd th

e fir

st p

oint

of d

isch

arge

is th

e sp

ecifi

c su

rface

w

ater

body

, or r

unof

f flo

ws

from

a c

onst

ruct

ion

site

to a

sep

arat

e st

orm

sew

er s

yste

m a

nd

the

first

poi

nt o

f dis

char

ge fr

om th

e se

para

te s

torm

sew

er s

yste

m is

the

spec

ific

surfa

ce

wat

erbo

dy.

Dis

char

ge(s

) -m

eans

any

add

ition

of a

ny p

ollu

tant

to w

ater

s of

the

Sta

te th

roug

h an

ou

tlet o

r poi

nt s

ourc

e.

Envi

ronm

enta

l Con

serv

atio

n La

w (E

CL)

-m

eans

cha

pter

43-

B of

the

Con

solid

ated

La

ws

of th

e S

tate

of N

ew Y

ork,

ent

itled

the

Envi

ronm

enta

l Con

serv

atio

n La

w.

Equi

vale

nt (E

quiv

alen

ce) –

mea

nsth

at th

e pr

actic

e or

mea

sure

mee

ts a

ll th

e pe

rform

ance

, lon

gevi

ty, m

aint

enan

ce, a

nd s

afet

y ob

ject

ives

of t

he te

chni

cal s

tand

ard

and

will

prov

ide

an e

qual

or g

reat

er d

egre

eof

wat

er q

ualit

y pr

otec

tion.

Fina

l Sta

biliz

atio

n -m

eans

that

all

soil

dist

urba

nce

activ

ities

hav

e ce

ased

and

a u

nifo

rm,

pere

nnia

l veg

etat

ive

cove

r with

a d

ensi

ty o

f eig

hty

(80)

per

cent

ove

r the

ent

ire p

ervi

ous

surfa

ce h

as b

een

esta

blis

hed;

or o

ther

equ

ival

ent s

tabi

lizat

ion

mea

sure

s, s

uch

as

perm

anen

t lan

dsca

pe m

ulch

es, r

ock

rip-ra

p or

was

hed/

crus

hed

ston

e ha

ve b

een

appl

ied

37

on a

ll di

stur

bed

area

s th

at a

re n

ot c

over

ed b

y pe

rman

ent s

truct

ures

, con

cret

e or

pa

vem

ent.

Gen

eral

SPD

ES p

erm

it -m

eans

a S

PD

ES p

erm

it is

sued

pur

suan

t to

6 N

YCR

R P

art 7

50-

1.21

and

Sec

tion

70-0

117

of th

e E

CL

auth

oriz

ing

a ca

tego

ry o

f dis

char

ges.

Gro

undw

ater

(s)-

mea

ns w

ater

s in

the

satu

rate

d zo

ne. T

he s

atur

ated

zon

e is

a

subs

urfa

ce z

one

in w

hich

all

the

inte

rstic

es a

re fi

lled

with

wat

er u

nder

pre

ssur

e gr

eate

r th

an th

at o

f the

atm

osph

ere.

Alth

ough

the

zone

may

con

tain

gas

-fille

d in

ters

tices

or

inte

rstic

es fi

lled

with

flui

ds o

ther

than

wat

er, i

t is

still

cons

ider

ed s

atur

ated

.

His

toric

Pro

pert

y–

mea

ns a

ny b

uild

ing,

stru

ctur

e, s

ite, o

bjec

t or d

istri

ct th

at is

list

ed o

n th

e St

ate

or N

atio

nal R

egis

ters

of H

isto

ric P

lace

s or

is d

eter

min

ed to

be

elig

ible

for l

istin

g on

the

Stat

e or

Nat

iona

l Reg

iste

rs o

f His

toric

Pla

ces.

Impe

rvio

us A

rea

(Cov

er) -

mea

ns a

ll im

perm

eabl

e su

rface

s th

at c

anno

teffe

ctiv

ely

infil

trate

rain

fall.

Thi

s in

clud

es p

aved

, con

cret

e an

d gr

avel

sur

face

s (i.

e. p

arki

ng lo

ts,

driv

eway

s, ro

ads,

runw

ays

and

side

wal

ks);

build

ing

roof

tops

and

mis

cella

neou

s im

perm

eabl

e st

ruct

ures

suc

h as

pat

ios,

poo

ls, a

nd s

heds

.

Infe

asib

le–

mea

ns n

ot te

chno

logi

cally

pos

sibl

e, o

r not

eco

nom

ical

ly p

ract

icab

le a

nd

achi

evab

le in

ligh

t of b

est i

ndus

try p

ract

ices

.

Larg

er C

omm

on P

lan

of D

evel

opm

ent o

r Sal

e -m

eans

a c

ontig

uous

are

a w

here

m

ultip

le s

epar

ate

and

dist

inct

con

stru

ctio

n ac

tiviti

esar

e oc

curri

ng, o

r will

occu

r, un

der

one

plan

. The

term

“pla

n” in

“lar

ger c

omm

on p

lan

of d

evel

opm

ent o

r sal

e” is

bro

adly

de

fined

as

any

anno

unce

men

t or p

iece

of d

ocum

enta

tion

(incl

udin

g a

sign

, pub

lic n

otic

e or

hea

ring,

mar

ketin

g pl

an, a

dver

tisem

ent,

draw

ing,

per

mit

appl

icat

ion,

Sta

te

Env

ironm

enta

l Qua

lity

Rev

iew

Act

(SE

QR

A) e

nviro

nmen

tal a

sses

smen

t for

m o

r oth

er

docu

men

ts, z

onin

g re

ques

t, co

mpu

ter d

esig

n, e

tc.)

or p

hysi

cal d

emar

catio

n (in

clud

ing

boun

dary

sig

ns, l

ot s

take

s, s

urve

yor m

arki

ngs,

etc

.) in

dica

ting

that

con

stru

ctio

n ac

tiviti

esm

ay o

ccur

on

a sp

ecifi

c pl

ot.

For d

iscr

ete

cons

truct

ion

proj

ects

that

are

loca

ted

with

in a

larg

er c

omm

on p

lan

of

deve

lopm

ent o

r sal

e th

at a

re a

t lea

st 1

/4 m

ile a

part,

eac

h pr

ojec

t can

be

treat

ed a

s a

sepa

rate

pla

n of

dev

elop

men

t or s

ale

prov

ided

any

inte

rcon

nect

ing

road

, pip

elin

e or

util

ity

proj

ect t

hat i

s pa

rt of

the

sam

e “c

omm

on p

lan”

is n

ot c

oncu

rrent

ly b

eing

dis

turb

ed.

Min

imiz

e–

mea

ns re

duce

and

/or e

limin

ate

to th

e ex

tent

ach

ieva

ble

usin

g co

ntro

lm

easu

res

(incl

udin

g be

st m

anag

emen

t pra

ctic

es) t

hat a

re te

chno

logi

cally

ava

ilabl

e an

d ec

onom

ical

ly p

ract

icab

le a

nd a

chie

vabl

e in

ligh

t of b

est i

ndus

try p

ract

ices

.

Mun

icip

al S

epar

ate

Stor

m S

ewer

(MS4

) -a

conv

eyan

ce o

r sys

tem

of c

onve

yanc

es

(incl

udin

g ro

ads

with

dra

inag

e sy

stem

s, m

unic

ipal

stre

ets,

cat

ch b

asin

s, c

urbs

, gut

ters

,

38

ditc

hes,

man

-mad

ech

anne

ls, o

r sto

rm d

rain

s):

(i)O

wne

d or

ope

rate

d by

a S

tate

, city

, tow

n, b

orou

gh, c

ount

y, p

aris

h, d

istri

ct,

asso

ciat

ion,

or o

ther

pub

lic b

ody

(cre

ated

by

or p

ursu

ant t

o St

ate

law

) hav

ing

juris

dict

ion

over

dis

posa

l of s

ewag

e, in

dust

rial w

aste

s, s

torm

wat

er, o

r oth

er

was

tes,

incl

udin

g sp

ecia

l dis

trict

s un

der S

tate

law

suc

h as

a s

ewer

dis

trict

, flo

od

cont

rol d

istri

ct o

r dra

inag

e di

stric

t, or

sim

ilar e

ntity

, or a

n In

dian

trib

e or

an

auth

oriz

ed In

dian

trib

al o

rgan

izat

ion,

or a

des

igna

ted

and

appr

oved

man

agem

ent

agen

cy u

nder

sec

tion

208

of th

e C

WA

that

dis

char

ges

to s

urfa

ce w

ater

s of

the

S

tate

;(ii

) D

esig

ned

or u

sed

for c

olle

ctin

g or

con

veyi

ng s

torm

wat

er;

(iii)

Whi

ch is

not

a c

ombi

ned

sew

er; a

nd(iv

) W

hich

is n

ot p

art o

f a P

ublic

ly O

wne

d Tr

eatm

ent W

orks

(PO

TW) a

s de

fined

at 4

0 C

FR 1

22.2

.

Nat

iona

l Pol

luta

nt D

isch

arge

Elim

inat

ion

Syst

em (N

PDES

)-m

eans

the

natio

nal

syst

em fo

r the

issu

ance

of w

aste

wat

er a

nd s

torm

wat

er p

erm

its u

nder

the

Fede

ral W

ater

P

ollu

tion

Con

trol A

ct (C

lean

Wat

er A

ct).

New

Dev

elop

men

t–m

eans

any

land

dis

turb

ance

that

doe

s m

eet t

he d

efin

ition

of

Red

evel

opm

ent A

ctiv

ity in

clud

ed in

this

app

endi

x.

NO

I Ack

now

ledg

men

t Let

ter-

mea

ns th

e le

tter t

hat t

he D

epar

tmen

t sen

ds to

an

owne

r or

ope

rato

r to

ackn

owle

dge

the

Dep

artm

ent’s

rece

ipt a

nd a

ccep

tanc

e of

a c

ompl

ete

Not

ice

of In

tent

. Thi

s le

tter d

ocum

ents

the

owne

r’s o

r ope

rato

r’s a

utho

rizat

ion

to

disc

harg

e in

acc

orda

nce

with

the

gene

ral p

erm

it fo

r sto

rmw

ater

dis

char

ges

from

co

nstru

ctio

n ac

tivity

.

Ow

ner o

r Ope

rato

r -m

eans

the

pers

on, p

erso

ns o

r leg

al e

ntity

whi

ch o

wns

or l

ease

s th

e pr

oper

ty o

n w

hich

the

cons

truct

ion

activ

ityis

occ

urrin

g; a

nd/o

r an

entit

y th

at h

as

oper

atio

nal c

ontro

l ove

r the

con

stru

ctio

n pl

ans

and

spec

ifica

tions

, inc

ludi

ng th

e ab

ility

to

mak

e m

odifi

catio

ns to

the

plan

s an

d sp

ecifi

catio

ns.

Perf

orm

ance

Crit

eria

–m

eans

the

desi

gn c

riter

ia li

sted

und

er th

e “R

equi

red

Ele

men

ts”

sect

ions

in C

hapt

ers

5, 6

and

10

of th

e te

chni

cal s

tand

ard,

New

Yor

k S

tate

Sto

rmw

ater

M

anag

emen

t Des

ign

Man

ual,

date

d Ja

nuar

y 20

15.I

tdoe

s no

t inc

lude

the

Siz

ing

Crit

eria

(i.

e. W

Qv,

RR

v, C

pv, Q

p an

d Q

f ) in

Par

t I.C

.2.o

f the

per

mit.

Pollu

tant

-mea

ns d

redg

ed s

poil,

filte

r bac

kwas

h, s

olid

was

te, i

ncin

erat

or re

sidu

e,

sew

age,

gar

bage

, sew

age

slud

ge, m

uniti

ons,

che

mic

al w

aste

s, b

iolo

gica

l mat

eria

ls,

radi

oact

ive

mat

eria

ls, h

eat,

wre

cked

or d

isca

rded

equ

ipm

ent,

rock

, san

d an

d in

dust

rial,

mun

icip

al, a

gric

ultu

ral w

aste

and

bal

last

dis

char

ged

into

wat

er; w

hich

may

cau

se o

r mig

ht

reas

onab

ly b

e ex

pect

ed to

cau

se p

ollu

tion

of th

e w

ater

s of

the

stat

e in

con

trave

ntio

n of

th

e st

anda

rds

or g

uida

nce

valu

es a

dopt

ed a

s pr

ovid

ed in

6 N

YCR

RP

arts

700

et s

eq .

39

Qua

lifie

d In

spec

tor -

mea

ns a

per

son

that

is k

now

ledg

eabl

e in

the

prin

cipl

es a

nd

prac

tices

of e

rosi

on a

nd s

edim

ent c

ontro

l, su

ch a

s a

licen

sed

Pro

fess

iona

l Eng

inee

r, C

ertif

ied

Pro

fess

iona

l in

Ero

sion

and

Sed

imen

t Con

trol (

CP

ES

C),

Reg

iste

red

Land

scap

e A

rchi

tect

, or o

ther

Dep

artm

ent e

ndor

sed

indi

vidu

al(s

).

It ca

n al

so m

ean

som

eone

wor

king

und

er th

e di

rect

sup

ervi

sion

of,

and

at th

e sa

me

com

pany

as,

the

licen

sed

Pro

fess

iona

l Eng

inee

r or R

egis

tere

d La

ndsc

ape

Arc

hite

ct,

prov

ided

that

per

son

has

train

ing

in th

e pr

inci

ples

and

pra

ctic

es o

f ero

sion

and

sed

imen

t co

ntro

l. Tr

aini

ng in

the

prin

cipl

es a

nd p

ract

ices

of e

rosi

on a

nd s

edim

ent c

ontro

l mea

ns

that

the

indi

vidu

al w

orki

ng u

nder

the

dire

ct s

uper

visi

on o

f the

lice

nsed

Pro

fess

iona

l E

ngin

eer o

r Reg

iste

red

Land

scap

e A

rchi

tect

has

rece

ived

fou

r (4)

hou

rs o

f Dep

artm

ent

endo

rsed

trai

ning

in p

rope

r ero

sion

and

sed

imen

t con

trol p

rinci

ples

from

a S

oil a

nd W

ater

C

onse

rvat

ion

Dis

trict

, or o

ther

Dep

artm

ent e

ndor

sed

entit

y. A

fter r

ecei

ving

the

initi

al

train

ing,

the

indi

vidu

al w

orki

ng u

nder

the

dire

ct s

uper

visi

on o

f the

lice

nsed

Pro

fess

iona

l E

ngin

eer o

r Reg

iste

red

Land

scap

e A

rchi

tect

sha

ll re

ceiv

e fo

ur (4

) hou

rs o

f tra

inin

g ev

ery

thre

e (3

) yea

rs.

It ca

n al

so m

ean

a pe

rson

that

mee

ts th

e Q

ualif

ied

Pro

fess

iona

l qua

lific

atio

ns in

add

ition

to

the

Qua

lifie

d In

spec

tor q

ualif

icat

ions

.

Not

e: In

spec

tions

of a

ny p

ost-c

onst

ruct

ion

stor

mw

ater

man

agem

ent p

ract

ices

that

incl

ude

stru

ctur

al c

ompo

nent

s, s

uch

as a

dam

for a

n im

poun

dmen

t, sh

all b

e pe

rform

ed b

y a

licen

sed

Pro

fess

iona

l Eng

inee

r.

Qua

lifie

dPr

ofes

sion

al -

mea

ns a

per

son

that

is k

now

ledg

eabl

e in

the

prin

cipl

es a

nd

prac

tices

of s

torm

wat

er m

anag

emen

t and

trea

tmen

t, su

ch a

s a

licen

sed

Pro

fess

iona

l E

ngin

eer,

Reg

iste

red

Land

scap

e A

rchi

tect

or o

ther

Dep

artm

ent e

ndor

sed

indi

vidu

al(s

). In

divi

dual

s pr

epar

ing

SWPP

Ps

that

requ

ire th

e po

st-c

onst

ruct

ion

stor

mw

ater

m

anag

emen

t pra

ctic

e co

mpo

nent

mus

t hav

e an

und

erst

andi

ng o

f the

prin

cipl

es o

f hy

drol

ogy,

wat

er q

ualit

y m

anag

emen

t pra

ctic

e de

sign

, wat

er q

uant

ity c

ontro

l des

ign,

and

, in

man

y ca

ses,

the

prin

cipl

es o

f hyd

raul

ics.

All

com

pone

nts

of th

e SW

PPP

that

invo

lve

the

prac

tice

of e

ngin

eerin

g, a

s de

fined

by

the

NYS

Edu

catio

n La

w (s

ee A

rticl

e 14

5), s

hall

be p

repa

red

by, o

r und

er th

e di

rect

sup

ervi

sion

of,

a pr

ofes

sion

al e

ngin

eerl

icen

sed

to

prac

tice

in th

e S

tate

of N

ew Y

ork.

.

Red

evel

opm

ent

Activ

ity(ie

s)–

mea

ns t

he d

istu

rban

ce a

nd r

econ

stru

ctio

n of

exi

stin

g im

perv

ious

are

a, in

clud

ing

impe

rvio

us a

reas

that

wer

e re

mov

ed fr

om a

pro

ject

site

with

in

five

(5) y

ears

of p

relim

inar

y pr

ojec

t pla

n su

bmis

sion

toth

e lo

cal g

over

nmen

t(i.e

. site

pla

n,

subd

ivis

ion,

etc

.).

Reg

ulat

ed, T

radi

tiona

l Lan

d U

se C

ontr

ol M

S4 -

mea

ns a

city

, tow

n or

vill

age

with

land

us

e co

ntro

l aut

horit

y th

at is

requ

ired

to g

ain

cove

rage

und

er N

ew Y

ork

Sta

te D

EC

’s

SP

DE

S G

ener

al P

erm

it Fo

r Sto

rmw

ater

Dis

char

ges

from

Mun

icip

al S

epar

ate

Stor

mw

ater

S

ewer

Sys

tem

s (M

S4s

).

40

Rou

tine

Mai

nten

ance

Act

ivity

-m

eans

con

stru

ctio

n ac

tivity

that

is p

erfo

rmed

to

mai

ntai

n th

e or

igin

al li

ne a

nd g

rade

, hyd

raul

ic c

apac

ity, o

r orig

inal

pur

pose

of a

faci

lity,

in

clud

ing,

but

not

lim

ited

to:

-Re-

grad

ing

of g

rave

l roa

ds o

r par

king

lots

, -S

tream

ban

k re

stor

atio

n pr

ojec

ts (d

oes

not i

nclu

de th

e pl

acem

ent o

f spo

il m

ater

ial),

-Cle

anin

g an

d sh

apin

g of

exi

stin

g ro

adsi

de d

itche

s an

d cu

lver

ts th

at m

aint

ains

the

appr

oxim

ate

orig

inal

line

and

gra

de, a

nd h

ydra

ulic

cap

acity

of t

he d

itch,

-Cle

anin

g an

d sh

apin

g of

exi

stin

g ro

adsi

de d

itche

s th

at d

oes

not m

aint

ain

the

appr

oxim

ate

orig

inal

gra

de, h

ydra

ulic

cap

acity

and

pur

pose

of t

he d

itch

if th

e ch

ange

s to

the

line

and

grad

e, h

ydra

ulic

cap

acity

or p

urpo

se o

f the

ditc

h ar

e in

stal

led

to im

prov

e w

ater

qua

lity

and

quan

tity

cont

rols

(e.g

.ins

talli

ng g

rass

line

d di

tch)

,-P

lace

men

t of a

ggre

gate

sho

ulde

r bac

king

that

mak

es th

e tra

nsiti

on b

etw

een

the

road

sho

ulde

r and

the

ditc

h or

em

bank

men

t,-F

ull d

epth

milli

ng a

nd fi

lling

of e

xist

ing

asph

alt p

avem

ents

, rep

lace

men

t of

conc

rete

pav

emen

t sla

bs, a

nd s

imila

r wor

k th

at d

oes

not e

xpos

e so

il or

dis

turb

the

botto

m s

ix (6

) inc

hes

of s

ubba

se m

ater

ial,

-Lon

g-te

rm u

se o

f equ

ipm

ent s

tora

ge a

reas

at o

r nea

r hig

hway

mai

nten

ance

fa

cilit

ies,

-Rem

oval

of s

edim

ent f

rom

the

edge

of t

he h

ighw

ay to

rest

ore

a pr

evio

usly

ex

istin

g sh

eet-f

low

dra

inag

e co

nnec

tion

from

the

high

way

sur

face

to th

e hi

ghw

ay

ditc

h or

em

bank

men

t,-E

xist

ing

use

of C

anal

Cor

p ow

ned

upla

nd d

ispo

sal s

ites

for t

he c

anal

, and

-Rep

lace

men

t of c

urbs

, gut

ters

, sid

ewal

ks a

nd g

uide

rail

post

s.

Site

lim

itatio

ns –

mea

ns s

ite c

ondi

tions

that

pre

vent

the

use

of a

n in

filtra

tion

tech

niqu

ean

d or

infil

tratio

n of

the

tota

l WQ

v. T

ypic

al s

ite li

mita

tions

incl

ude:

seas

onal

hig

h gr

ound

wat

er, s

hallo

w d

epth

to b

edro

ck, a

nd s

oils

with

an

infil

tratio

n ra

te le

ss th

an 0

.5

inch

es/h

our.

The

exis

tenc

e of

site

lim

itatio

ns s

hall

be c

onfir

med

and

doc

umen

ted

usin

gac

tual

fiel

d te

stin

g (i.

e. te

st p

its, s

oil b

orin

gs, a

nd in

filtra

tion

test

)or u

sing

info

rmat

ion

from

th

e m

ost c

urre

nt U

nite

d S

tate

s D

epar

tmen

t of A

gric

ultu

re (U

SD

A) S

oil S

urve

y fo

r the

C

ount

y w

here

the

proj

ect i

s lo

cate

d.

Sizi

ng C

riter

ia –

mea

ns th

e cr

iteria

incl

uded

in P

art I

.C.2

of th

e pe

rmit

that

are

use

d to

si

ze p

ost-c

onst

ruct

ion

stor

mw

ater

man

agem

ent c

ontro

l pra

ctic

es. T

he c

riter

ia in

clud

e;

Wat

er Q

ualit

y V

olum

e (W

Qv)

, Run

off R

educ

tion

Volu

me

(RR

v), C

hann

el P

rote

ctio

n V

olum

e (C

pv),

Ove

rban

k Fl

ood

(Qp)

, and

Ext

rem

e Fl

ood

(Qf).

Stat

e Po

lluta

nt D

isch

arge

Elim

inat

ion

Syst

em (S

PDES

) -m

eans

the

syst

em

esta

blis

hed

purs

uant

to A

rticl

e 17

of t

he E

CL

and

6 N

YCR

R P

art 7

50 fo

r iss

uanc

e of

pe

rmits

aut

horiz

ing

disc

harg

es to

the

wat

ers

of th

e st

ate.

Stee

p Sl

ope

–m

eans

land

are

a w

ith a

Soi

l Slo

pe P

hase

that

is id

entif

ied

as a

n E

or F

, or

41

the

map

uni

t nam

e is

incl

usiv

e of

25%

or g

reat

er s

lope

, on

the

Uni

ted

Sta

tes

Dep

artm

ent

of A

gric

ultu

re (“

US

DA

”) S

oil S

urve

y fo

r the

Cou

nty

whe

re th

e di

stur

banc

e w

ill oc

cur.

Surf

ace

Wat

ers

of th

e St

ate

-sha

ll be

con

stru

ed to

incl

ude

lake

s, b

ays,

sou

nds,

pon

ds,

impo

undi

ng re

serv

oirs

, spr

ings

, riv

ers,

stre

ams,

cre

eks,

est

uarie

s, m

arsh

es, i

nlet

s,

cana

ls, t

he A

tlant

ic o

cean

with

in th

e te

rrito

rial s

eas

of th

e st

ate

of N

ew Y

ork

and

all o

ther

bo

dies

of s

urfa

ce w

ater

, nat

ural

or a

rtific

ial,

inla

nd o

r coa

stal

, fre

sh o

r sal

t, pu

blic

or

priv

ate

(exc

ept t

hose

priv

ate

wat

ers

that

do

not c

ombi

ne o

reffe

ct a

junc

tion

with

nat

ural

su

rface

wat

ers)

, whi

ch a

re w

holly

or p

artia

lly w

ithin

or b

orde

ring

the

stat

e or

with

in it

s ju

risdi

ctio

n. W

ater

s of

the

stat

e ar

e fu

rther

def

ined

in 6

NY

CR

R P

arts

800

to 9

41.

Tem

pora

rily

Cea

sed

–m

eans

that

an

exis

ting

dist

urbe

d ar

ea w

ill n

ot b

e di

stur

bed

agai

n w

ithin

14

cale

ndar

day

s of

the

prev

ious

soi

l dis

turb

ance

.

Tem

pora

ry S

tabi

lizat

ion

-mea

ns th

at e

xpos

ed s

oil h

as b

een

cove

red

with

mat

eria

l(s) a

s se

t for

th in

the

tech

nica

l sta

ndar

d, N

ew Y

ork

Sta

ndar

ds a

nd S

peci

ficat

ions

for E

rosi

on

and

Sed

imen

t Con

trol,

to p

reve

nt th

e ex

pose

d so

il fro

m e

rodi

ng. T

he m

ater

ials

can

in

clud

e, b

ut a

re n

ot li

mite

d to

, mul

ch, s

eed

and

mul

ch, a

nd e

rosi

on c

ontro

l mat

s (e

.g. j

ute

twis

ted

yarn

, exc

elsi

or w

ood

fiber

mat

s).

Tota

l Max

imum

Dai

ly L

oads

(TM

DLs

) -A

TM

DL

is th

e su

m o

f the

allo

wab

le lo

ads

of a

si

ngle

pol

luta

nt fr

om a

ll co

ntrib

utin

g po

int a

nd n

onpo

int s

ourc

es. I

t is

a ca

lcul

atio

n of

the

max

imum

am

ount

of a

pol

luta

nt th

at a

wat

erbo

dy c

an re

ceiv

e on

a d

aily

bas

is a

nd s

till

mee

t wat

er q

ualit

y st

anda

rds,

and

an

allo

catio

n of

that

am

ount

to th

e po

lluta

nt's

sou

rces

. A

TM

DL

stip

ulat

es w

aste

load

allo

catio

ns (W

LAs)

for p

oint

sou

rce

disc

harg

es, l

oad

allo

catio

ns (L

As)

for n

onpo

int s

ourc

es, a

nd a

mar

gin

of s

afet

y (M

OS

).

Trai

ned

Con

trac

tor -

mea

ns a

n em

ploy

ee fr

om th

e co

ntra

ctin

g (c

onst

ruct

ion)

com

pany

, id

entif

ied

in P

art I

II.A

.6.,

that

has

rece

ived

four

(4) h

ours

of D

epar

tmen

t end

orse

d tra

inin

g in

pro

per e

rosi

on a

nd s

edim

ent c

ontro

l prin

cipl

es fr

om a

Soi

l and

Wat

er C

onse

rvat

ion

Dis

trict

, or o

ther

Dep

artm

ent e

ndor

sed

entit

y. A

fter r

ecei

ving

the

initi

al tr

aini

ng, t

hetra

ined

co

ntra

ctor

shal

l rec

eive

four

(4) h

ours

of t

rain

ing

ever

y th

ree

(3) y

ears

.

It ca

n al

so m

ean

an e

mpl

oyee

from

the

cont

ract

ing

(con

stru

ctio

n) c

ompa

ny, i

dent

ified

in

Par

t III.

A.6

., th

at m

eets

the

qual

ified

insp

ecto

r qua

lific

atio

ns (e

.g. l

icen

sed

Pro

fess

iona

l E

ngin

eer,

Cer

tifie

d P

rofe

ssio

nal i

n E

rosi

on a

nd S

edim

ent C

ontro

l (C

PE

SC

), R

egis

tere

d La

ndsc

ape

Arc

hite

ct, o

r som

eone

wor

king

und

er th

e di

rect

sup

ervi

sion

of,

and

at th

e sa

me

com

pany

as, t

he li

cens

ed P

rofe

ssio

nal E

ngin

eer o

r Reg

iste

red

Land

scap

e A

rchi

tect

, pro

vide

d th

ey h

ave

rece

ived

four

(4) h

ours

of D

epar

tmen

t end

orse

d tra

inin

g in

pr

oper

ero

sion

and

sed

imen

t con

trol p

rinci

ples

from

a S

oil a

nd W

ater

Con

serv

atio

n D

istri

ct, o

r oth

er D

epar

tmen

t end

orse

d en

tity)

.

The

train

ed c

ontra

ctor

is

resp

onsi

ble

for t

he d

ay to

day

impl

emen

tatio

n of

the

SWPP

P.

Uni

form

Pro

cedu

res

Act

(UPA

) Per

mit

-mea

ns a

per

mit

requ

ired

unde

r 6 N

YCR

R P

art

42

621

of th

e E

nviro

nmen

tal C

onse

rvat

ion

Law

(EC

L), A

rticl

e 70

.

Wat

er Q

ualit

y St

anda

rd -

mea

ns s

uch

mea

sure

s of

pur

ity o

r qua

lity

for a

ny w

ater

s in

re

latio

n to

thei

r rea

sona

ble

and

nece

ssar

y us

e as

pro

mul

gate

d in

6 N

YCR

R P

art 7

00 e

t se

q.

43

APP

END

IX B

Req

uire

d SW

PPP

Com

pone

nts

by P

roje

ct T

ype

Tabl

e 1

CO

NST

RU

CTI

ON

AC

TIVI

TIES

TH

AT R

EQU

IRE

THE

PREP

ARA

TIO

N O

F A

SW

PPP

THAT

ON

LY IN

CLU

DES

ER

OSI

ON

AN

D S

EDIM

ENT

CO

NTR

OLS

The

follo

win

g co

nstr

uctio

n ac

tiviti

es th

at in

volv

e so

il di

stur

banc

es o

f one

(1) o

r mor

e ac

res

of

land

, but

less

than

five

(5) a

cres

:

•Si

ngle

fam

ily h

ome

notl

ocat

ed in

one

of t

he w

ater

shed

s lis

ted

in A

ppen

dix

C o

rnot

dire

ctly

di

scha

rgin

g to

one

of t

he 3

03(d

) seg

men

ts li

sted

in A

ppen

dix

E•

Sing

le fa

mily

resi

dent

ial s

ubdi

visi

ons

with

25%

or l

ess

impe

rvio

us c

over

at t

otal

site

bui

ld-o

ut

and

not l

ocat

ed in

one

of t

he w

ater

shed

s lis

ted

in A

ppen

dix

C a

nd n

otdi

rect

ly d

isch

argi

ng to

on

e of

the

303(

d) s

egm

ents

list

ed in

App

endi

x E

•C

onst

ruct

ion

of a

bar

n or

oth

er a

gric

ultu

ral b

uild

ing,

silo

, sto

ck y

ard

or p

en.

The

follo

win

g co

nstr

uctio

n ac

tiviti

es th

at in

volv

e so

il di

stur

banc

es o

f one

(1) o

r mor

e ac

res

of

land

:

•In

stal

latio

n of

und

ergr

ound

, lin

ear

utilit

ies;

suc

h as

gas

lin

es,

fiber

-opt

ic c

able

, ca

ble

TV,

elec

tric,

tele

phon

e, s

ewer

mai

ns, a

nd w

ater

mai

ns•

Envi

ronm

enta

l enh

ance

men

t pro

ject

s, s

uch

as w

etla

nd m

itiga

tion

proj

ects

, sto

rmw

ater

re

trofit

s an

d st

ream

rest

orat

ion

proj

ects

•Bi

ke p

aths

and

trai

ls•

Side

wal

k co

nstru

ctio

n pr

ojec

ts th

at a

re n

ot p

art o

f a ro

ad/ h

ighw

ay c

onst

ruct

ion

or

reco

nstru

ctio

n pr

ojec

t•

Slop

e st

abili

zatio

n pr

ojec

ts•

Slop

e fla

tteni

ng th

at c

hang

es th

e gr

ade

of th

e si

te, b

ut d

oes

not s

igni

fican

tly c

hang

e th

e ru

noff

char

acte

ristic

s •

Spoi

l are

as th

at w

ill be

cov

ered

with

veg

etat

ion

•La

nd c

lear

ing

and

grad

ing

for t

he p

urpo

ses

of c

reat

ing

vege

tate

d op

en s

pace

(i.e

. re

crea

tiona

l par

ks, l

awns

, mea

dow

s, fi

elds

), ex

clud

ing

proj

ects

that

alte

r hyd

rolo

gy fr

om p

re

to p

ost d

evel

opm

ent c

ondi

tions

•At

hlet

ic fi

elds

(nat

ural

gra

ss) t

hat d

o no

t inc

lude

the

cons

truct

ion

or re

cons

truct

ion

of

impe

rvio

us a

rea

and

do n

ot a

lter h

ydro

logy

from

pre

to p

ost d

evel

opm

ent c

ondi

tions

•D

emol

ition

pro

ject

whe

re v

eget

atio

n w

ill be

est

ablis

hed

and

no re

deve

lopm

ent i

s pl

anne

d•

Ove

rhea

d el

ectri

c tra

nsm

issi

on li

ne p

roje

ct th

at d

oes

not i

nclu

de th

e co

nstru

ctio

n of

pe

rman

ent a

cces

s ro

ads

or p

arki

ng a

reas

sur

face

d w

ith im

perv

ious

cov

er

•St

ruct

ural

pra

ctic

es a

s id

entif

ied

in T

able

II in

the

“Agr

icul

tura

l Man

agem

ent P

ract

ices

C

atal

og fo

r Non

poin

t Sou

rce

Pollu

tion

in N

ew Y

ork

Stat

e”, e

xclu

ding

pro

ject

s th

at in

volv

e so

il di

stur

banc

es o

f les

s th

an fi

ve a

cres

and

con

stru

ctio

n ac

tiviti

es th

at in

clud

e th

e co

nstru

ctio

n or

reco

nstru

ctio

n of

impe

rvio

us a

rea

The

follo

win

g co

nstr

uctio

n ac

tiviti

es th

at in

volv

e so

il di

stur

banc

es b

etw

een

five

thou

sand

(500

0)

squa

re fe

et a

nd o

ne (1

) acr

e of

land

:

•Al

l con

stru

ctio

n ac

tiviti

es lo

cate

d in

the

wat

ersh

eds

iden

tifie

d in

App

endi

x D

that

in

volv

e so

il di

stur

banc

es b

etw

een

five

thou

sand

(5,0

00) s

quar

e fe

et a

nd o

ne (1

) acr

e of

la

nd.

44

Tabl

e 2

CO

NST

RU

CTI

ON

AC

TIVI

TIES

TH

AT R

EQU

IRE

THE

PREP

ARA

TIO

N O

F A

SW

PPP

THAT

INC

LUD

ES

POST

-CO

NST

RU

CTI

ON

STO

RM

WAT

ER M

AN

AG

EMEN

T PR

AC

TIC

ES

The

follo

win

g co

nstr

uctio

n ac

tiviti

es th

at in

volv

e so

il di

stur

banc

es o

f one

(1) o

r mor

e ac

res

of

land

:•

Sing

le fa

mily

hom

e lo

cate

d in

one

of t

he w

ater

shed

s lis

ted

in A

ppen

dix

C o

r dire

ctly

di

scha

rgin

g to

one

of t

he 3

03(d

) seg

men

ts li

sted

in A

ppen

dix

E•

Sing

le fa

mily

resi

dent

ial s

ubdi

visi

ons

loca

ted

in o

ne o

f the

wat

ersh

eds

liste

d in

App

endi

x C

or

dire

ctly

dis

char

ging

to o

ne o

f the

303

(d) s

egm

ents

list

ed in

App

endi

x E

•Si

ngle

fam

ily re

side

ntia

l sub

divi

sion

s th

at in

volv

e so

il di

stur

banc

es o

f bet

wee

n on

e (1

) and

fiv

e (5

) ac

res

of la

nd w

ith g

reat

er th

an 2

5% im

perv

ious

cov

er a

t tot

al s

ite b

uild

-out

Sing

le fa

mily

resi

dent

ial s

ubdi

visi

ons

that

invo

lve

soil

dist

urba

nces

of f

ive

(5) o

r mor

e ac

res

of la

nd, a

nd s

ingl

e fa

mily

resi

dent

ial s

ubdi

visi

ons

that

invo

lve

soil

dist

urba

nces

of l

ess

than

fiv

e (5

) acr

es th

at a

re p

art o

f a la

rger

com

mon

pla

n of

dev

elop

men

t or s

ale

that

will

ulti

mat

ely

dist

urb

five

or m

ore

acre

s of

land

•M

ulti-

fam

ily re

side

ntia

l dev

elop

men

ts; i

nclu

des

tow

nhom

es, c

ondo

min

ium

s, s

enio

r hou

sing

co

mpl

exes

, ap

artm

ent c

ompl

exes

, and

mob

ile h

ome

park

s•

Airp

orts

•Am

usem

ent p

arks

•C

ampg

roun

ds•

Cem

eter

ies

that

incl

ude

the

cons

truct

ion

or re

cons

truct

ion

of im

perv

ious

are

a (>

5% o

f di

stur

bed

area

) or a

lter t

he h

ydro

logy

from

pre

to p

ost d

evel

opm

ent c

ondi

tions

•C

omm

erci

al d

evel

opm

ents

Chu

rche

s an

d ot

her p

lace

s of

wor

ship

•C

onst

ruct

ion

of a

bar

n or

oth

er a

gric

ultu

ral b

uild

ing(

e.g.

silo

) and

stru

ctur

al p

ract

ices

as

iden

tifie

d in

Tab

le II

in th

e “A

gric

ultu

ral M

anag

emen

t Pra

ctic

es C

atal

og fo

r Non

poin

t Sou

rce

Pollu

tion

in N

ew Y

ork

Stat

e” th

at in

clud

e th

e co

nstru

ctio

n or

reco

nstru

ctio

n of

impe

rvio

us

area

, exc

ludi

ng p

roje

cts

that

invo

lve

soil

dist

urba

nces

of l

ess

than

five

acr

es.

•G

olf c

ours

es•

Inst

itutio

nal,

incl

udes

hos

pita

ls, p

rison

s, s

choo

ls a

nd c

olle

ges

•In

dust

rial f

acili

ties,

incl

udes

indu

stria

l par

ks•

Land

fills

•M

unic

ipal

faci

litie

s; in

clud

es h

ighw

ay g

arag

es, t

rans

fer s

tatio

ns, o

ffice

bui

ldin

gs, P

OTW

’s

and

wat

er tr

eatm

ent p

lant

s •

Offi

ce c

ompl

exes

•Sp

orts

com

plex

es•

Rac

etra

cks,

incl

udes

race

track

s w

ith e

arth

en (d

irt) s

urfa

ce•

Roa

d co

nstru

ctio

n or

reco

nstru

ctio

n •

Park

ing

lot c

onst

ruct

ion

or re

cons

truct

ion

•At

hlet

ic fi

elds

(nat

ural

gra

ss) t

hat i

nclu

de th

e co

nstru

ctio

n or

reco

nstru

ctio

n of

impe

rvio

us

area

(>5%

of d

istu

rbed

are

a) o

r alte

r the

hyd

rolo

gy fr

om p

re to

pos

t dev

elop

men

t con

ditio

ns•

Athl

etic

fiel

ds w

ith a

rtific

ial t

urf

•Pe

rman

ent a

cces

s ro

ads,

par

king

are

as,s

ubst

atio

ns, c

ompr

esso

r sta

tions

and

wel

l dril

ling

pads

, sur

face

d w

ith im

perv

ious

cov

er, a

nd c

onst

ruct

ed a

s pa

rt of

an

over

-hea

d el

ectri

c tra

nsm

issi

on li

ne p

roje

ct ,

win

d-po

wer

pro

ject

, cel

l tow

er p

roje

ct, o

il or

gas

wel

l dril

ling

proj

ect,

sew

er o

r wat

er m

ain

proj

ecto

r oth

er li

near

util

ity p

roje

ct•

All o

ther

con

stru

ctio

n ac

tiviti

es th

at in

clud

e th

e co

nstru

ctio

n or

reco

nstru

ctio

n of

impe

rvio

us

area

ora

lter t

he h

ydro

logy

from

pre

to p

ost d

evel

opm

ent c

ondi

tions

, and

are

not l

iste

d in

Ta

ble

1

45

APP

END

IX C

Wat

ersh

eds

Whe

re E

nhan

ced

Phos

phor

us R

emov

al S

tand

ards

Are

Req

uire

d

Wat

ersh

eds

whe

re o

wne

rs o

r ope

rato

rs o

f con

stru

ctio

n ac

tiviti

es id

entif

ied

in T

able

2

of A

ppen

dix

B m

ust p

repa

re a

SW

PPP

that

incl

udes

pos

t-con

stru

ctio

nst

orm

wat

er m

anag

emen

t pra

ctic

es d

esig

ned

in c

onfo

rman

ce w

ith th

e En

hanc

ed

Phos

phor

us R

emov

al S

tand

ards

incl

uded

in th

e te

chni

cal s

tand

ard,

New

Yor

k St

ate

Stor

mw

ater

Man

agem

ent D

esig

n M

anua

l (“D

esig

n M

anua

l”).

•E

ntire

New

Yor

k C

ity W

ater

shed

loca

ted

east

of t

he H

udso

n R

iver

-Fig

ure

1•

Ono

ndag

a La

ke W

ater

shed

-Fig

ure

2•

Gre

enw

ood

Lake

Wat

ersh

ed-F

igur

e 3

•O

scaw

ana

Lake

Wat

ersh

ed –

Figu

re 4

•K

inde

rhoo

k La

ke W

ater

shed

–Fi

gure

5

46

Figu

re 1

-N

ew Y

ork

City

Wat

ersh

ed E

ast o

f the

Hud

son

47

Figu

re 2

-O

nond

aga

Lake

Wat

ersh

ed

48

Figu

re 3

-G

reen

woo

d La

ke W

ater

shed

49

Figu

re 4

-O

scaw

ana

Lake

Wat

ersh

ed

50

51

APP

END

IX D

Wat

ersh

eds

whe

re o

wne

rs o

r ope

rato

rs o

f con

stru

ctio

n ac

tiviti

es th

at in

volv

e so

il di

stur

banc

es b

etw

een

five

thou

sand

(500

0) s

quar

e fe

et a

nd o

ne (1

) acr

e of

land

m

ust o

btai

n co

vera

ge u

nder

this

per

mit.

Ent

ire N

ew Y

ork

City

Wat

ersh

ed th

at is

loca

ted

east

of t

he H

udso

n R

iver

-See

Fig

ure

1 in

App

endi

x C

52

APP

END

IX E

List

of 3

03(d

) seg

men

ts im

paire

d by

pol

luta

nts

rela

ted

to c

onst

ruct

ion

activ

ity(e

.g. s

ilt, s

edim

ent

or n

utrie

nts)

. Ow

ners

or o

pera

tors

of s

ingl

e fa

mily

hom

e an

d si

ngle

fam

ily re

side

ntia

l sub

divi

sion

sw

ith 2

5% o

r les

s to

tal i

mpe

rvio

us c

over

at t

otal

site

bui

ld-o

utth

at in

volv

e so

il di

stur

banc

es o

f one

or

mor

e ac

res

of la

nd, b

ut le

ss th

an 5

acr

es, a

nd d

irect

ly d

isch

arge

to o

ne o

f the

list

ed s

egm

ents

be

low

sha

ll pr

epar

e a

SWPP

P th

at in

clud

es p

ost-c

onst

ruct

ion

stor

mw

ater

man

agem

ent p

ract

ices

de

sign

ed in

con

form

ance

with

the

New

Yor

k St

ate

Stor

mw

ater

Man

agem

ent D

esig

n M

anua

l (“

Des

ign

Man

ual”)

, dat

ed J

anua

ry 2

015.

CO

UN

TYW

ATE

RB

OD

YC

OU

NTY

WAT

ER

BO

DY

Alb

any

Ann

Lee

(Sha

kers

) Pon

d, S

tum

p P

ond

Alb

any

Bas

ic C

reek

Res

ervo

irA

llegh

eny

Am

ity L

ake,

Sau

nder

s Po

ndB

ronx

Van

Cor

tland

t Lak

eB

room

eW

hitn

ey P

oint

Lak

e/R

eser

voir

Bro

ome

Fly

Pon

d, D

eer L

ake

Bro

ome

Min

or T

ribs

to L

ower

Sus

queh

anna

(n

orth

)C

atta

raug

usA

llegh

eny

Riv

er/R

eser

voir

Cat

tara

ugus

Cas

e La

keC

atta

raug

usLi

nlyc

o/C

lub

Pon

dC

ayug

aD

uck

Lake

Cha

utau

qua

Cha

utau

qua

Lake

, Nor

thC

haut

auqu

aC

haut

auqu

a La

ke, S

outh

Cha

utau

qua

Bea

r Lak

eC

haut

auqu

aC

hada

koin

Riv

er a

nd tr

ibs

Cha

utau

qua

Low

er C

assa

daga

Lak

eC

haut

auqu

aM

iddl

e C

assa

daga

Lak

eC

haut

auqu

aFi

ndle

y La

keC

linto

nG

reat

Cha

zy R

iver

, Low

er, M

ain

Ste

mC

olum

bia

Kin

derh

ook

Lake

Col

umbi

aR

obin

son

Pond

Dut

ches

sH

illsi

de L

ake

Dut

ches

sW

appi

nger

Lak

esD

utch

ess

Fall

Kill

and

tribs

Erie

Gre

en L

ake

Erie

Sca

jaqu

ada

Cre

ek, L

ower

, and

trib

sE

rieS

caja

quad

a C

reek

, Mid

dle,

and

trib

sE

rieS

caja

quad

a C

reek

, Upp

er, a

nd tr

ibs

Erie

Rus

h C

reek

and

trib

sE

rieE

llico

tt C

reek

, Low

er, a

nd tr

ibs

Erie

Bee

man

Cre

ek a

nd tr

ibs

Erie

Mur

der C

reek

, Low

er, a

nd tr

ibs

Erie

Sou

th B

ranc

h S

mok

e C

r, Lo

wer

, and

tri

bsE

rieLi

ttle

Sis

ter C

reek

, Low

er, a

nd tr

ibs

Ess

exLa

ke G

eorg

e (p

rimar

y co

unty

: W

arre

n)G

enes

eeB

lack

Cre

ek, U

pper

, and

min

or tr

ibs

Gen

esee

Tona

wan

da C

reek

, Mid

dle,

Mai

n S

tem

Gen

esee

Oak

Orc

hard

Cre

ek, U

pper

, and

trib

sG

enes

eeB

owen

Bro

ok a

nd tr

ibs

Gen

esee

Big

elow

Cre

ek a

nd tr

ibs

Gen

esee

Bla

ck C

reek

, Mid

dle,

and

min

or tr

ibs

Gen

esee

LeR

oy R

eser

voir

Gre

ene

Sch

ohar

ie R

eser

voir

Gre

ene

Sle

epy

Hol

low

Lak

eH

erki

mer

Ste

ele

Cre

ek tr

ibs

Kin

gsH

endr

ix C

reek

Lew

isM

ill C

reek

/Sou

th B

ranc

h an

d tri

bsLi

ving

ston

Con

esus

Lak

eLi

ving

ston

Jayc

ox C

reek

and

trib

sLi

ving

ston

Mill

Cre

ek a

nd m

inor

trib

sLi

ving

ston

Bra

dner

Cre

ek a

nd tr

ibs

Livi

ngst

onC

hris

tie C

reek

and

trib

sM

onro

eLa

ke O

ntar

io S

hore

line,

Wes

tern

Mon

roe

Mill

Cre

ek/B

lue

Pon

d O

utle

t and

trib

sM

onro

eR

oche

ster

Em

baym

ent -

East

Mon

roe

Roc

hest

er E

mba

ymen

t -W

est

Mon

roe

Unn

amed

Trib

to H

oneo

ye C

reek

Mon

roe

Gen

esee

Riv

er, L

ower

, Mai

n S

tem

Mon

roe

Gen

esee

Riv

er, M

iddl

e, M

ain

Ste

mM

onro

eB

lack

Cre

ek, L

ower

, and

min

or tr

ibs

Mon

roe

Buc

k Po

ndM

onro

eLo

ng P

ond

Mon

roe

Cra

nber

ry P

ond

Mon

roe

Mill

Cre

ek a

nd tr

ibs

Mon

roe

Shi

pbui

lder

s C

reek

and

trib

sM

onro

eM

inor

trib

s to

Iron

dequ

oit B

ayM

onro

eTh

omas

Cre

ek/W

hite

Bro

ok a

nd tr

ibs

Nas

sau

Gle

n C

ove

Cre

ek, L

ower

, and

trib

sN

assa

uLI

Trib

s (fr

esh)

to E

ast B

ayN

assa

uE

ast M

eado

w B

rook

, Upp

er, a

nd tr

ibs

Nas

sau

Hem

pste

ad B

ayN

assa

uH

emps

tead

Lak

eN

assa

uG

rant

Par

k P

ond

Nas

sau

Bea

ver L

ake

Nas

sau

Cam

aans

Pon

dN

assa

uH

alls

Pon

dN

assa

uLI

Tid

al T

ribs

to H

emps

tead

Bay

Nas

sau

Mas

sape

qua

Cre

ek a

nd tr

ibs

Nas

sau

Rey

nold

s C

hann

el, e

ast

Nas

sau

Rey

nold

s C

hann

el, w

est

Nas

sau

Silv

er L

ake,

Lof

ts P

ond

Nas

sau

Woo

dmer

e C

hann

elN

iaga

raH

yde

Par

k La

keN

iaga

raLa

ke O

ntar

io S

hore

line,

Wes

tern

Nia

gara

Ber

ghol

tz C

reek

and

trib

sO

neid

aB

allo

u, N

ail C

reek

sO

nond

aga

Ley

Cre

ek a

nd tr

ibs

Ono

ndag

aO

nond

aga

Cre

ek, L

ower

and

trib

s

53

APP

END

IX E

List

of 3

03(d

) seg

men

ts im

paire

d by

pol

luta

nts

rela

ted

to c

onst

ruct

ion

activ

ity, c

ont’d

.

CO

UN

TY

W

ATER

BO

DY

CO

UN

TY

W

ATER

BO

DY

Ono

ndag

aO

nond

aga

Cre

ek, M

iddl

e an

d tri

bsO

nond

aga

Ono

ndag

a C

reek

, Upp

, and

min

or tr

ibs

Ono

ndag

aH

arbo

r Bro

ok, L

ower

, and

trib

sO

nond

aga

Nin

emile

Cre

ek, L

ower

, and

trib

sO

nond

aga

Min

or tr

ibs

to O

nond

aga

Lake

Ono

ndag

aO

nond

aga

Cre

ek, L

ower

, and

trib

sO

ntar

ioH

oneo

ye L

ake

Ont

ario

Hem

lock

Lak

e O

utle

t and

min

or tr

ibs

Ont

ario

Gre

at B

rook

and

min

or tr

ibs

Ora

nge

Mon

hage

n B

rook

and

trib

sO

rang

eO

rang

e La

keO

rlean

sLa

ke O

ntar

io S

hore

line,

Wes

tern

Osw

ego

Ple

asan

t Lak

eO

sweg

oLa

ke N

eata

hwan

taP

utna

mO

scaw

ana

Lake

Put

nam

Pal

mer

Lak

eP

utna

mLa

ke C

arm

elQ

ueen

sJa

mai

ca B

ay, E

aste

rn, a

nd tr

ibs

(Que

ens)

Que

ens

Ber

gen

Basi

nQ

ueen

sS

hellb

ank

Bas

inR

enss

elae

rN

assa

u La

keR

enss

elae

rS

nyde

rs L

ake

Ric

hmon

dG

rasm

ere,

Arb

utus

and

Wol

fes

Lake

sR

ockl

and

Con

gers

Lak

e, S

war

tout

Lak

eR

ockl

and

Roc

klan

d La

keS

arat

oga

Bal

lsto

n La

keS

arat

oga

Rou

nd L

ake

Sar

atog

aD

waa

s K

ill a

nd tr

ibs

Sar

atog

aTr

ibs

to L

ake

Lone

lyS

arat

oga

Lake

Lon

ely

Sch

enec

tady

Col

lins

Lake

Sch

enec

tady

Dua

ne L

ake

Sch

enec

tady

Mar

iavi

lle L

ake

Sch

ohar

ieE

ngle

ville

Pon

dS

choh

arie

Sum

mit

Lake

Sch

uyle

rC

ayut

a La

keS

t.La

wre

nce

Fish

Cre

ek a

nd m

inor

trib

sS

t. La

wre

nce

Bla

ck L

ake

Out

let/B

lack

Lak

eS

teub

enLa

ke S

alub

riaS

teub

enS

mith

Pon

dS

uffo

lkM

iller

s P

ond

Suf

folk

Mat

tituc

k (M

arra

took

a) P

ond

Suf

folk

Tida

l trib

s to

Wes

t Mor

iche

s Ba

yS

uffo

lkC

anaa

n La

ke

Suf

folk

Lake

Ron

konk

oma

Suf

folk

Bea

verd

am C

reek

and

trib

sS

uffo

lkB

ig/L

ittle

Fre

sh P

onds

Suf

folk

Fres

h Po

ndS

uffo

lkG

reat

Sou

th B

ay, E

ast

Suf

folk

Gre

at S

outh

Bay

, Mid

dle

Suf

folk

Gre

at S

outh

Bay

, Wes

tS

uffo

lkM

ill a

nd S

even

Pon

dsS

uffo

lkM

oric

hes

Bay

, Eas

tS

uffo

lkM

oric

hes

Bay

, Wes

tS

uffo

lkQ

uant

uck

Bay

Suf

folk

Shi

nnec

ock

Bay

(and

Inle

t)S

ulliv

anB

odin

e, M

ontg

omer

y La

kes

Sul

livan

Dav

ies

Lake

Sul

livan

Ple

asur

e La

keS

ulliv

anS

wan

Lak

eTo

mpk

ins

Cay

uga

Lake

, Sou

ther

n E

ndTo

mpk

ins

Ow

asco

Inle

t, U

pper

, and

trib

sU

lste

rA

shok

an R

eser

voir

Uls

ter

Eso

pus

Cre

ek, U

pper

, and

min

or

tribs

Uls

ter

Eso

pus

Cre

ek, L

ower

, Mai

n S

tem

Uls

ter

Eso

pus

Cre

ek, M

iddl

e, a

nd m

inor

tri

bsW

arre

nLa

ke G

eorg

eW

arre

nTr

ibs

to L

.Geo

rge,

Villa

ge o

f L

Geo

rge

War

ren

Hud

dle/

Fink

le B

rook

s an

d tri

bsW

arre

nIn

dian

Bro

ok a

nd tr

ibs

War

ren

Hag

ue B

rook

and

trib

sW

ashi

ngto

nTr

ibs

to L

.Geo

rge,

Eas

t Shr

Lk

Geo

rge

Was

hing

ton

Cos

sayu

na L

ake

Was

hing

ton

Woo

d C

r/Cha

mpl

ain

Can

al, m

inor

tri

bsW

ayne

Por

t Bay

Way

neM

arbl

etow

n C

reek

and

trib

sW

estc

hest

erLa

ke K

aton

ahW

estc

hest

erLa

ke M

oheg

anW

estc

hest

erLa

ke S

heno

rock

Wes

tche

ster

Res

ervo

ir N

o.1

(Lak

e Is

le)

Wes

tche

ster

Saw

Mill

Riv

er, M

iddl

e, a

nd tr

ibs

Wes

tche

ster

Silv

er L

ake

Wes

tche

ster

Teat

own

Lake

Wes

tche

ster

True

sdal

e La

keW

estc

hest

erW

alla

ce P

ond

Wes

tche

ster

Pea

ch L

ake

Wes

tche

ster

Mam

aron

eck

Riv

er, L

ower

Wes

tche

ster

Mam

aron

eck

Riv

er, U

pp, a

nd tr

ibs

Wes

tche

ster

She

ldra

ke R

iver

and

trib

sW

estc

hest

erB

lind

Bro

ok, L

ower

Wes

tche

ster

Blin

d B

rook

, Upp

er, a

nd tr

ibs

Wes

tche

ster

Lake

Lin

coln

dale

Wes

tche

ster

Lake

Mea

haug

hW

yom

ing

Java

Lak

eW

yom

ing

Silv

er L

ake

Not

e: T

he li

st a

bove

iden

tifie

s th

ose

wat

ers

from

the

final

New

Yor

k St

ate

“201

4 Se

ctio

n 30

3(d)

Lis

t of

Impa

ired

Wat

ers

Req

uirin

g a

TMD

L/O

ther

Stra

tegy

”, da

ted

Janu

ary

2015

,tha

t are

impa

ired

by s

ilt,

sedi

men

t or n

utrie

nts.

54

APP

END

IX F

L IST

OF

NYS

DEC

REG

ION

AL

OFF

ICES

Reg

ion

CO

VER

ING

TH

E FO

LLO

WIN

GC

OU

NTI

ES:

DIV

ISIO

NO

FEN

VIR

ON

MEN

TAL

PER

MIT

S(D

EP)

PER

MIT

AD

MIN

ISTR

ATO

RS

DIV

ISIO

NO

FW

ATE

R(D

OW

)

WAT

ER (S

PDES

)PR

OG

RAM

1N

ASSA

U A

ND

SU

FFO

LK50

CIR

CLE

RO

AD

S TO

NY

BR

OO

K,N

Y11

790

T EL.

(631

)444

-036

5

50C

IRC

LER

OA

DS T

ON

Y B

RO

OK

,NY

1179

0-34

09T E

L.(6

31)4

44-0

405

2B

RO

NX,

KIN

GS,

NEW

YOR

K,

QU

EEN

S A

ND

RIC

HM

ON

D1

HU

NTE

RS

POIN

T PL

AZA

,47

-40

21ST

ST.

L ON

GIS

LAN

D C

ITY,

NY

1110

1-54

07T E

L.(7

18)4

82-4

997

1H

UN

TER

S PO

INT

PLA

ZA,

47-4

021

ST S

T.L O

NG

ISLA

ND

CIT

Y,N

Y11

101-

5407

T EL.

(718

)482

-493

3

3D

UTC

HES

S,O

RA

NG

E,PU

TNA

M,

RO

CK

LAN

D,S

ULL

IVA

N,U

LSTE

R

AN

D W

ESTC

HES

TER

21SO

UTH

PU

TT C

OR

NER

S R

OA

DN

EWPA

LTZ,

NY

1256

1-16

96T E

L.(8

45)2

56-3

059

100

HIL

LSID

EAV

ENU

E,SU

ITE

1WW

HIT

E PL

AIN

S,N

Y10

603

T EL.

(914

)428

-250

5

4AL

BA

NY,

CO

LUM

BIA

,D

ELA

WA

RE,

GR

EEN

E,M

ON

TGO

MER

Y,O

TSEG

O,

REN

SSEL

AER

,SC

HEN

ECTA

DY

AN

D S

CH

OH

AR

IE

1150

NO

RTH

WES

TCO

TT R

OA

DS C

HEN

ECTA

DY,

NY

1230

6-20

14T E

L.(5

18)3

57-2

069

1130

NO

RTH

WES

TCO

TT R

OA

DS C

HEN

ECTA

DY,

NY

1230

6-20

14T E

L.(5

18)3

57-2

045

5C

LIN

TON

,ESS

EX,F

RAN

KLI

N,

FULT

ON

,HA

MIL

TON

,S A

RA

TOG

A,W

ARR

EN A

ND

W

ASH

ING

TON

1115

STA

TE R

OU

TE 8

6,PO

BO

X29

6R

AY

BR

OO

K,N

Y12

977-

0296

T EL.

(518

)897

-123

4

232

GO

LFC

OU

RSE

RO

AD

W

ARR

ENSB

UR

G,N

Y12

885-

1172

T EL.

(518

)623

-120

0

6H

ERK

IMER

, JEF

FER

SON

, LE

WIS

, ON

EID

A AN

D

ST.L

AWR

ENC

E

STAT

E O

FFIC

E B

UIL

DIN

G31

7 W

ASH

ING

TON

STR

EET

WAT

ERTO

WN

, NY

136

01-3

787

TEL.

(315

) 785

-224

5

STAT

E O

FFIC

E B

UIL

DIN

G20

7 G

ENES

EE S

TREE

TU

TIC

A, N

Y 1

3501

-288

5TE

L. (3

15) 7

93-2

554

7B

RO

OM

E, C

AYU

GA,

C

HEN

ANG

O, C

OR

TLAN

D,

MAD

ISO

N, O

NO

ND

AGA,

O

SWEG

O, T

IOG

A AN

D

TOM

PKIN

S

615

ERIE

BLV

D. W

EST

SYR

ACU

SE, N

Y 1

3204

-240

0TE

L. (3

15) 4

26-7

438

615

ERIE

BLV

D. W

EST

SYR

ACU

SE, N

Y 1

3204

-240

0TE

L. (3

15) 4

26-7

500

8C

HEM

UN

G, G

ENES

EE,

LIVI

NG

STO

N, M

ON

RO

E,

ON

TAR

IO, O

RLE

ANS,

SC

HU

YLER

, SEN

ECA,

ST

EUB

EN, W

AYN

E AN

D

YATE

S

6274

EAS

T AV

ON

-LIM

A R

OAD

AVO

N, N

Y 1

4414

-951

9TE

L. (5

85) 2

26-2

466

6274

EAS

T AV

ON

-LIM

A R

D.

AVO

N, N

Y 14

414-

9519

TEL.

(585

) 226

-246

6

9AL

LEG

ANY,

C

ATTA

RAU

GU

S,

CH

AUTA

UQ

UA,

ER

IE,

NIA

GAR

A AN

D W

YOM

ING

270

MIC

HIG

AN A

VEN

UE

BU

FFAL

O, N

Y 1

4203

-299

9TE

L. (7

16) 8

51-7

165

270

MIC

HIG

AN A

VE.

BU

FFAL

O, N

Y 14

203-

2999

TEL.

(716

) 851

-707

0

55

 

Appendix B: NYSDEC Forms 

 

Fax (Owner/Operator)

- -

Page 1 of 14

New York State Department of Environmental Conservation

Division of Water

625 Broadway, 4th Floor

Albany, New York 12233-3505

NOTICE OF INTENT

All sections must be completed unless otherwise noted. Failure to complete all items mayresult in this form being returned to you, thereby delaying your coverage under thisGeneral Permit. Applicants must read and understand the conditions of the permit andprepare a Stormwater Pollution Prevention Plan prior to submitting this NOI. Applicantsare responsible for identifying and obtaining other DEC permits that may be required.

-IMPORTANT-RETURN THIS FORM TO THE ADDRESS ABOVE

OWNER/OPERATOR MUST SIGN FORM

Stormwater Discharges Associated with Construction Activity Under StatePollutant Discharge Elimination System (SPDES) General Permit # GP-0-15-002

Owner/Operator Information

Owner/Operator Contact Person Last Name (NOT CONSULTANT)

Owner/Operator Contact Person First Name

Owner/Operator Mailing Address

City

State Zip

-

Phone (Owner/Operator)

- -

Email (Owner/Operator)

Owner/Operator (Company Name/Private Owner Name/Municipality Name)

NYR(for DEC use only)

FED TAX ID

- (not required for individuals)

0644089821

E C B R e a l t y , L L C

B a t i s t a

S t e v e n

2 8 E a g l e R o a d

D a n b u r y

C T 0 6 8 1 0

2 0 3 7 9 8 1 8 8 7

s b a t i s t a 2 0 0 0 @y a h o o . c o m

1. Provide the Geographic Coordinates for the project site in NYTM Units. To do this youmust go to the NYSDEC Stormwater Interactive Map on the DEC website at:

www.dec.ny.gov/imsmaps/stormwater/viewer.htm

Zoom into your Project Location such that you can accurately click on the centroid ofyour site. Once you have located your project site, go to the tool boxes on the top andchoose "i"(identify). Then click on the center of your site and a new window containingthe X, Y coordinates in UTM will pop up. Transcribe these coordinates into the boxesbelow. For problems with the interactive map use the help function.

X Coordinates (Easting) Y Coordinates (Northing)

Project Site Information

Project/Site Name

Street Address (NOT P.O. BOX)

City/Town/Village (THAT ISSUES BUILDING PERMIT)

State Zip

-County

Name of Nearest Cross Street

Distance to Nearest Cross Street (Feet) Project In Relation to Cross Street

North South East West

Page 2 of 14

2. What is the nature of this construction project?

New Construction

Redevelopment with increase in impervious area

Redevelopment with no increase in impervious area

Section-Block-ParcelTax Map Numbers

Side of Street

North South East West

DEC Region

Tax Map Numbers

6401089828

B a t i s t a S o u t h e a s t D u n k i n '

1 6 1 7 N Y S R o u t e 2 2

T o w n o f S o u t h e a s t

N Y 1 0 5 0 9 P u t n a m 3

R o u t e 3 1 2

0

4 6 - 1 - 2 1

4 1 4 2 8 3 7 3 5 7 7 6 9

3. Select the predominant land use for both pre and post development conditions.SELECT ONLY ONE CHOICE FOR EACH

Page 3 of 14

Existing Land Use

FOREST

PASTURE/OPEN LAND

CULTIVATED LAND

SINGLE FAMILY HOME

SINGLE FAMILY SUBDIVISION

TOWN HOME RESIDENTIAL

MULTIFAMILY RESIDENTIAL

INSTITUTIONAL/SCHOOL

INDUSTRIAL

COMMERCIAL

ROAD/HIGHWAY

RECREATIONAL/SPORTS FIELD

BIKE PATH/TRAIL

LINEAR UTILITY

PARKING LOT

OTHER

Future Land Use

SINGLE FAMILY HOME

SINGLE FAMILY SUBDIVISION

TOWN HOME RESIDENTIAL

MULTIFAMILY RESIDENTIAL

INSTITUTIONAL/SCHOOL

INDUSTRIAL

COMMERCIAL

MUNICIPAL

ROAD/HIGHWAY

RECREATIONAL/SPORTS FIELD

BIKE PATH/TRAIL

LINEAR UTILITY (water, sewer, gas, etc.)

PARKING LOT

CLEARING/GRADING ONLY

DEMOLITION, NO REDEVELOPMENT

WELL DRILLING ACTIVITY *(Oil, Gas, etc.)

OTHER

Pre-Development Post-Development

4. In accordance with the larger common plan of development or sale,enter the total project site area; the total area to be disturbed;existing impervious area to be disturbed (for redevelopmentactivities); and the future impervious area constructed within thedisturbed area. (Round to the nearest tenth of an acre.)

Number of Lots

*Note: for gas well drilling, non-high volume hydraulic fractured wells only

Total SiteArea

.

Total Area ToBe Disturbed

.

Existing ImperviousArea To Be Disturbed

.

Future ImperviousArea Within

Disturbed Area

.

5. Do you plan to disturb more than 5 acres of soil at any one time? Yes No

6. Indicate the percentage of each Hydrologic Soil Group(HSG) at the site.

A B C D

% % % %

7. Is this a phased project? Yes No

8. Enter the planned start and enddates of the disturbanceactivities.

-Start Date

/ /End Date

/ /

4107089829

1 4 0 8 5 4

0 0 1 0 0 0

0 4 0 1 1 9 0 4 0 1 2 0 2 1

Page 4 of 14

Name

9. Identify the nearest surface waterbody(ies) to which construction site runoff willdischarge.

9a. Type of waterbody identified in Question 9?

Wetland / State Jurisdiction On Site (Answer 9b)

Wetland / State Jurisdiction Off Site

Wetland / Federal Jurisdiction On Site (Answer 9b)

Wetland / Federal Jurisdiction Off Site

Stream / Creek On Site

Stream / Creek Off Site

River On Site

River Off Site

Lake On Site

Lake Off Site

Other Type On Site

Other Type Off Site

9b. How was the wetland identified?

Regulatory Map

Delineated by Consultant

Delineated by Army Corps of Engineers

Other (identify)

10. Has the surface waterbody(ies) in question 9 been identified as a303(d) segment in Appendix E of GP-0-15-002?

11. Is this project located in one of the Watersheds identified inAppendix C of GP-0-15-002?

Yes No

Yes No

12. Is the project located in one of the watershedareas associated with AA and AA-S classifiedwaters?If no, skip question 13.

Yes No

13. Does this construction activity disturb land with noexisting impervious cover and where the Soil Slope Phase isidentified as an E or F on the USDA Soil Survey?If Yes, what is the acreage to be disturbed?

Yes No

.

14. Will the project disturb soils within a Stateregulated wetland or the protected 100 foot adjacentarea?

Yes No

8600089821

O f f s i t e C l a s s C S t r e a m

Stream / Creek Off Site

15. Does the site runoff enter a separate storm sewersystem (including roadside drains, swales, ditches,culverts, etc)?

16. What is the name of the municipality/entity that owns the separate storm sewersystem?

Yes No Unknown

17. Does any runoff from the site enter a sewer classifiedas a Combined Sewer?

Yes No Unknown

21. Has the required Erosion and Sediment Control component of theSWPPP been developed in conformance with the current NYSStandards and Specifications for Erosion and Sediment Control(aka Blue Book)?

22. Does this construction activity require the development of aSWPPP that includes the post-construction stormwater managementpractice component (i.e. Runoff Reduction, Water Quality andQuantity Control practices/techniques)?If No, skip questions 23 and 27-39.

23. Has the post-construction stormwater management practice componentof the SWPPP been developed in conformance with the current NYSStormwater Management Design Manual?

Yes No

Yes No

Yes No

Page 5 of 14

18. Will future use of this site be an agricultural property asdefined by the NYS Agriculture and Markets Law? Yes No

Yes No20. Is this a remediation project being done under a Department

approved work plan? (i.e. CERCLA, RCRA, Voluntary CleanupAgreement, etc.)

Yes No19. Is this property owned by a state authority, state agency,

federal government or local government?

6403089820

N e w Y o r k S t a t e D e p a r t m e n t o f T R a n s p o r t a t

Page 6 of 14

SWPPP Preparer

Contact Name (Last, Space, First)

Mailing Address

City

State Zip

-Phone

- -Fax

- -Email

Signature

Date

/ /

First Name

Last Name

MI

SWPPP Preparer Certification

24. The Stormwater Pollution Prevention Plan (SWPPP) was prepared by:

Professional Engineer (P.E.)

Soil and Water Conservation District (SWCD)

Registered Landscape Architect (R.L.A)

Certified Professional in Erosion and Sediment Control (CPESC)

Owner/Operator

Other

I hereby certify that the Stormwater Pollution Prevention Plan (SWPPP) forthis project has been prepared in accordance with the terms and conditions ofthe GP-0-15-002. Furthermore, I understand that certifying false, incorrector inaccurate information is a violation of this permit and the laws of theState of New York and could subject me to criminal, civil and/oradministrative proceedings.

0251089825

PE

T h e C h a z e n C o m p a n i e s

C h r i s t o p h e r L a p i n e

2 1 F o x S t r e e t S u i t e 2 0 1

C I t y o f P o u g h k e e p s i e

N Y 1 2 6 0 1

8 4 5 4 5 4 3 9 8 0

c l a p i n e @c h a z e n c o m p a n i e s . c o m

C h r i s t o p h e r

L a p i n e

26. Select all of the erosion and sediment control practices that will beemployed on the project site:

Page 7 of 14

Biotechnical

Brush Matting

Wattling

Other

25. Has a construction sequence schedule for the planned managementpractices been prepared? Yes No

Brush Matting

Dune Stabilization

Grassed Waterway

Mulching

Protecting Vegetation

Recreation Area Improvement

Seeding

Sodding

Straw/Hay Bale Dike

Streambank Protection

Temporary Swale

Topsoiling

Vegetating Waterways

Vegetative Measures

Check Dams

Construction Road Stabilization

Dust Control

Earth Dike

Level Spreader

Perimeter Dike/Swale

Pipe Slope Drain

Portable Sediment Tank

Rock Dam

Sediment Basin

Sediment Traps

Silt Fence

Stabilized Construction Entrance

Storm Drain Inlet Protection

Straw/Hay Bale Dike

Temporary Access Waterway Crossing

Temporary Stormdrain Diversion

Temporary Swale

Turbidity Curtain

Water bars

Temporary Structural

Debris Basin

Diversion

Grade Stabilization Structure

Land Grading

Lined Waterway (Rock)

Paved Channel (Concrete)

Paved Flume

Retaining Wall

Riprap Slope Protection

Rock Outlet Protection

Streambank Protection

Permanent Structural

0005089822

CRSDCSTSFSCESDIPSDTSSSDTST

Page 8 of 14

Post-construction Stormwater Management Practice (SMP) Requirements

Important: Completion of Questions 27-39 is not requiredif response to Question 22 is No.

27. Identify all site planning practices that were used to prepare the final siteplan/layout for the project.

Preservation of Undisturbed Areas

Preservation of Buffers

Reduction of Clearing and Grading

Locating Development in Less Sensitive Areas

Roadway Reduction

Sidewalk Reduction

Driveway Reduction

Cul-de-sac Reduction

Building Footprint Reduction

Parking Reduction

28. Provide the total Water Quality Volume (WQv) required for this project (based onfinal site plan/layout).

Total WQv Required

. acre-feet

29. Identify the RR techniques (Area Reduction), RR techniques(Volume Reduction) andStandard SMPs with RRv Capacity in Table 1 (See Page 9) that were used to reducethe Total WQv Required(#28).

Also, provide in Table 1 the total impervious area that contributes runoff to eachtechnique/practice selected. For the Area Reduction Techniques, provide the totalcontributing area (includes pervious area) and, if applicable, the total imperviousarea that contributes runoff to the technique/practice.

Note: Redevelopment projects shall use Tables 1 and 2 to identify the SMPs usedto treat and/or reduce the WQv required. If runoff reduction techniques will notbe used to reduce the required WQv, skip to question 33a after identifying theSMPs.

27a. Indicate which of the following soil restoration criteria was used to address therequirements in Section 5.1.6("Soil Restoration") of the Design Manual(2010 version).

All disturbed areas

Compacted areas

will be restored in accordance with the SoilRestoration requirements in Table 5.3 of the Design Manual (see page 5-22).

were considered as impervious cover when calculating theWQv Required, and the compacted areas were assigned a post-constructionHydrologic Soil Group (HSG) designation that is one level less permeablethan existing conditions for the hydrology analysis.

0182089828

and/or

and/or

and/or

and/or

Conservation of Natural Areas (RR-1)

Sheetflow to Riparian

Tree Planting/Tree Pit (RR-3)

Disconnection of Rooftop Runoff (RR-4)

Vegetated Swale (RR-5)

Rain Garden (RR-6)

Stormwater Planter (RR-7)

Rain Barrel/Cistern (RR-8)

Porous Pavement (RR-9)

Green Roof (RR-10)

Infiltration Trench (I-1)

Infiltration Basin (I-2)

Dry Well (I-3)

Underground Infiltration System (I-4)

Bioretention (F-5)

Dry Swale (O-1)

Micropool Extended Detention (P-1)

Wet Pond (P-2)

Wet Extended Detention (P-3)

Multiple Pond System (P-4)

Pocket Pond (P-5)

Surface Sand Filter (F-1)

Underground Sand Filter (F-2)

Perimeter Sand Filter (F-3)

Organic Filter (F-4)

Shallow Wetland (W-1)

Extended Detention Wetland (W-2)

Pond/Wetland System (W-3)

Pocket Wetland (W-4)

Wet Swale (O-2)

.

.

.

.

.

.

.

.

.

.

.

.

.

.

............................

..................................

....................................

.............................................

.....................................

................................

...................................

.........................................

.........................................

.............................

..................................................

..........................................

...............................................

................................................

RR Techniques (Area Reduction)

Total ContributingImpervious Area(acres)

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

...

..........

..........

..

.........................................

............................................

.....................................

....................................

........................................

.....................................

......................................

................................................

........................

............................................

...............................................

Table 1 - Runoff Reduction (RR) Techniquesand Standard Stormwater ManagementPractices (SMPs)

RR Techniques (Volume Reduction)

Standard SMPs with RRv Capacity

Standard SMPs

Page 9 of 14

Total ContributingArea (acres)

.

.

.

.

Buffers/Filters Strips (RR-2)

.............................................

7738089822

.

31. Is the Total RRv provided (#30) greater than or equal to thetotal WQv required (#28).

If Yes, go to question 36.If No, go to question 32.

Yes No

Total RRv provided

32. Provide the Minimum RRv required based on HSG.[Minimum RRv Required = (P)(0.95)(Ai)/12, Ai=(S)(Aic)]

Minimum RRv Required

. acre-feet

30. Indicate the Total RRv provided by the RR techniques (Area/Volume Reduction) andStandard SMPs with RRv capacity identified in question 29.

acre-feet

32a. Is the Total RRv provided (#30) greater than or equal to theMinimum RRv Required (#32)?

If Yes, go to question 33.Note: Use the space provided in question #39 to summarize thespecific site limitations and justification for not reducing100% of WQv required (#28). A detailed evaluation of thespecific site limitations and justification for not reducing100% of the WQv required (#28) must also be included in theSWPPP.

If No, sizing criteria has not been met, so NOI can not beprocessed. SWPPP preparer must modify design to meet sizingcriteria.

Yes No

Page 10 of 14

Hydrodynamic

Wet Vault

Media Filter

Other

Alternative SMP

.

.

.

.

...............................................

..................................................

...............................................

..................

Table 2 - Alternative SMPs(DO NOT INCLUDE PRACTICES BEINGUSED FOR PRETREATMENT ONLY)

Note: Redevelopment projects which do not use RR techniques, shalluse questions 28, 29, 33 and 33a to provide SMPs used, totalWQv required and total WQv provided for the project.

Total ContributingImpervious Area(acres)

Provide the name and manufacturer of the Alternative SMPs (i.e.proprietary practice(s)) being used for WQv treatment.

Name

Manufacturer

0762089822

. acre-feet

CPv Provided

acre-feet.CPv Required

36. Provide the total Channel Protection Storage Volume (CPv) required andprovided or select waiver (36a), if applicable.

Page 11 of 14

35. Is the sum of the RRv provided (#30) and the WQv provided(#33a) greater than or equal to the total WQv required (#28)?

If Yes, go to question 36.If No, sizing criteria has not been met, so NOI can not beprocessed. SWPPP preparer must modify design to meet sizingcriteria.

.34. Provide the sum of the Total RRv provided (#30) and

the WQv provided (#33a).

Yes No

33a. Indicate the Total WQv provided (i.e. WQv treated) by the SMPsidentified in question #33 and Standard SMPs with RRv Capacity identifiedin question 29.

.WQv Provided

acre-feet

Note: For the standard SMPs with RRv capacity, the WQv provided by each practice= the WQv calculated using the contributing drainage area to the practice- RRv provided by the practice. (See Table 3.5 in Design Manual)

33. Identify the Standard SMPs in Table 1 and, if applicable, the Alternative SMPs inTable 2 that were used to treat the remainingtotal WQv(=Total WQv Required in 28 - Total RRv Provided in 30).

Also, provide in Table 1 and 2 the total impervious area that contributes runoffto each practice selected.

Note: Use Tables 1 and 2 to identify the SMPs used on Redevelopment projects.

Site discharges directly to tidal waters

Reduction of the total CPv is achieved on site

36a. The need to provide channel protection has been waived because:

or a fifth order or larger stream.

through runoff reduction techniques or infiltration systems.

. CFS CFS.Post-developmentPre-Development

Total Extreme Flood Control Criteria (Qf)

. CFS . CFS

Post-developmentPre-Development

Total Overbank Flood Control Criteria (Qp)

37. Provide the Overbank Flood (Qp) and Extreme Flood (Qf) control criteria orselect waiver (37a), if applicable.

1766089827

Page 12 of 14

39. Use this space to summarize the specific site limitations and justificationfor not reducing 100% of WQv required(#28). (See question 32a)This space can also be used for other pertinent project information.

38. Has a long term Operation and Maintenance Plan for thepost-construction stormwater management practice(s) beendeveloped?

If Yes, Identify the entity responsible for the long termOperation and Maintenance

Yes No

37a. The need to meet the Qp and Qf criteria has been waived because:

Site discharges directly to tidal waters

Downstream analysis reveals that the Qp and Qfcontrols are not required

or a fifth order or larger stream.

1310089822

Air Pollution Control

Coastal Erosion

Hazardous Waste

Long Island Wells

Mined Land Reclamation

Solid Waste

Navigable Waters Protection / Article 15

Water Quality Certificate

Dam Safety

Water Supply

Freshwater Wetlands/Article 24

Tidal Wetlands

Wild, Scenic and Recreational Rivers

Stream Bed or Bank Protection / Article 15

Endangered or Threatened Species(Incidental Take Permit)

Individual SPDES

SPDES Multi-Sector GP

Other

None

44. If this NOI is being submitted for the purpose of continuing or transferringcoverage under a general permit for stormwater runoff from constructionactivities, please indicate the former SPDES number assigned.

42. Is this project subject to the requirements of a regulated,traditional land use control MS4?(If No, skip question 43)

Yes No

43. Has the "MS4 SWPPP Acceptance" form been signed by the principalexecutive officer or ranking elected official and submitted alongwith this NOI?

Yes No

41. Does this project require a US Army Corps of EngineersWetland Permit?If Yes, Indicate Size of Impact.

Yes No

.

Page 13 of 14

40. Identify other DEC permits, existing and new, that are required for thisproject/facility.

4285089826

Other

N Y R

S a n i t a r y S e w e r S P D E S

N Y R

Owner/Operator CertificationI have read or been advised of the permit conditions and believe that I understand them. I alsounderstand that, under the terms of the permit, there may be reporting requirements. I hereby certifythat this document and the corresponding documents were prepared under my direction or supervision. I amaware that there are significant penalties for submitting false information, including the possibility offine and imprisonment for knowing violations. I further understand that coverage under the general permitwill be identified in the acknowledgment that I will receive as a result of submitting this NOI and canbe as long as sixty (60) business days as provided for in the general permit. I also understand that, bysubmitting this NOI, I am acknowledging that the SWPPP has been developed and will be implemented as thefirst element of construction, and agreeing to comply with all the terms and conditions of the generalpermit for which this NOI is being submitted.

Owner/Operator Signature

Date

/ /

Print First Name

Print Last Name

MI

Page 14 of 14

3547089826

S t e v e n

B a t i s t a

08982TFRMValueDefTFRMValueDef16808982TFRMAmp & <

NYS Department of Environmental Conservation

Division of Water 625 Broadway, 4th Floor

Albany, New York 12233-3505

MS4 Stormwater Pollution Prevention Plan (SWPPP) Acceptance Form

for Construction Activities Seeking Authorization Under SPDES General Permit

*(NOTE: Attach Completed Form to Notice Of Intent and Submit to Address Above)

I. Project Owner/Operator Information 1. Owner/Operator Name:

2. Contact Person:

3. Street Address:

4. City/State/Zip:

II. Project Site Information

5. Project/Site Name:

6. Street Address:

7. City/State/Zip:

III. Stormwater Pollution Prevention Plan (SWPPP) Review and Acceptance Information

8. SWPPP Reviewed by:

9. Title/Position:

10. Date Final SWPPP Reviewed and Accepted:

IV. Regulated MS4 Information

11. Name of MS4:

12. MS4 SPDES Permit Identification Number: NYR20A

13. Contact Person:

14. Street Address:

15. City/State/Zip:

16. Telephone Number:

Page 1 of 2

ECB Realty

STEVEN BATISTA

28 EAGLE ROAD

DANBURY, CT, 06810

BATISTA SOUTHEAST DUNKIN'

1617 NYS ROUTE 22

SOUTHEAST, NY 10509

CHRISTOPHER LAPINE

DIRECTOR

TOWN OF SOUTHEAST

MS4 SWPPP Acceptance Form - continued

V. Certification Statement - MS4 Official (principal executive officer or ranking elected official) or Duly Authorized Representative I hereby certify that the final Stormwater Pollution Prevention Plan (SWPPP) for the construction project identified in question 5 has been reviewed and meets the substantive requirements in the SPDES General Permit For Stormwater Discharges from Municipal Separate Storm Sewer Systems (MS4s). Note: The MS4, through the acceptance of the SWPPP, assumes no responsibility for the accuracy and adequacy of the design included in the SWPPP. In addition, review and acceptance of the SWPPP by the MS4 does not relieve the owner/operator or their SWPPP preparer of responsibility or liability for errors or omissions in the plan. Printed Name: Title/Position: Signature: Date: VI. Additional Information

(NYS DEC - MS4 SWPPP Acceptance Form - January 2015)

Page 2 of 2

New York State Department of Environmental Conservation Division of Water

625 Broadway, 4th Floor Albany, New York 12233-3505

*(NOTE: Submit completed form to address above)*

NOTICE OF TERMINATION for Storm Water Discharges Authorized under the SPDES General Permit for Construction Activity

Please indicate your permit identification number: NYR ___ ___ ___ ___ ___ ___

I. Owner or Operator Information 1. Owner/Operator Name:

2. Street Address:

3. City/State/Zip:

4. Contact Person: 4a.Telephone:

4b. Contact Person E-Mail:

II. Project Site Information

5. Project/Site Name:

6. Street Address:

7. City/Zip:

8. County:

III. Reason for Termination

9a. □ All disturbed areas have achieved final stabilization in accordance with the general permit and SWPPP. *Date final stabilization completed (month/year):

9b. □ Permit coverage has been transferred to new owner/operator. Indicate new owner/operator’s permit identification number: NYR ___ ___ ___ ___ ___ ___ (Note: Permit coverage can not be terminated by owner identified in I.1. above until new owner/operator obtains coverage under the general permit)

9c. □ Other (Explain on Page 2)

IV. Final Site Information:

10a. Did this construction activity require the development of a SWPPP that includes post-construction stormwater management practices? □ yes □ no ( If no, go to question 10f.)

10b. Have all post-construction stormwater management practices included in the final SWPPP been constructed? □ yes □ no (If no, explain on Page 2)

10c. Identify the entity responsible for long-term operation and maintenance of practice(s)?

Page 1 of 3

ECB Realty

STEVEN BATISTA

28 EAGLE ROAD

DANBURY, CT, 06810

BATISTA SOUTHEAST DUNKIN'

1617 NYS ROUTE 22

SOUTHEAST, NY 10509

PUTNAM

NOTICE OF TERMINATION for Storm Water Discharges Authorized under the SPDES General Permit for Construction Activity - continued

10d. Has the entity responsible for long-term operation and maintenance been given a copy of the operation and maintenance plan required by the general permit? □ yes □ no

10e. Indicate the method used to ensure long-term operation and maintenance of the post-construction stormwater management practice(s): □ Post-construction stormwater management practice(s) and any right-of-way(s) needed to maintain practice(s) have been deeded to the municipality. □ Executed maintenance agreement is in place with the municipality that will maintain the post-construction stormwater management practice(s). □ For post-construction stormwater management practices that are privately owned, a mechanism is in place that requires operation and maintenance of the practice(s) in accordance with the operation and maintenance plan, such as a deed covenant in the owner or operator’s deed of record. □ For post-construction stormwater management practices that are owned by a public or private institution (e.g. school, university or hospital), government agency or authority, or public utility; policy and procedures are in place that ensures operation and maintenance of the practice(s) in accordance with the operation and maintenance plan.

10f. Provide the total area of impervious surface (i.e. roof, pavement, concrete, gravel, etc.) constructed within the disturbance area? (acres)

11. Is this project subject to the requirements of a regulated, traditional land use control MS4? □ yes □ no (If Yes, complete section VI - “MS4 Acceptance” statement

V. Additional Information/Explanation: (Use this section to answer questions 9c. and 10b., if applicable)

VI. MS4 Acceptance - MS4 Official (principal executive officer or ranking elected official) or Duly Authorized Representative (Note: Not required when 9b. is checked -transfer of coverage)

I have determined that it is acceptable for the owner or operator of the construction project identified in question 5 to submit the Notice of Termination at this time.

Printed Name:

Title/Position:

Signature: Date:

Page 2 of 3

NOTICE OF TERMINATION for Storm Water Discharges Authorized under the SPDES General Permit for Construction Activity - continued

VII. Qualified Inspector Certification - Final Stabilization:

I hereby certify that all disturbed areas have achieved final stabilization as defined in the current version of the general permit, and that all temporary, structural erosion and sediment control measures have been removed. Furthermore, I understand that certifying false, incorrect or inaccurate information is a violation of the referenced permit and the laws of the State of New York and could subject me to criminal, civil and/or administrative proceedings.

Printed Name:

Title/Position:

Signature: Date:

VIII. Qualified Inspector Certification - Post-construction Stormwater Management Practice(s):

I hereby certify that all post-construction stormwater management practices have been constructed in conformance with the SWPPP. Furthermore, I understand that certifying false, incorrect or inaccurate information is a violation of the referenced permit and the laws of the State of New York and could subject me to criminal, civil and/or administrative proceedings.

Printed Name:

Title/Position:

Signature: Date:

IX. Owner or Operator Certification

I hereby certify that this document was prepared by me or under my direction or supervision. My determination, based upon my inquiry of the person(s) who managed the construction activity, or those persons directly responsible for gathering the information, is that the information provided in this document is true, accurate and complete. Furthermore, I understand that certifying false, incorrect or inaccurate information is a violation of the referenced permit and the laws of the State of New York and could subject me to criminal, civil and/or administrative proceedings.

Printed Name:

Title/Position:

Signature:

Date:

(NYS DEC Notice of Termination - January 2015)

Page 3 of 3

Appendix C: Contractor’s Certification Form

Subcontractor’s Certification Form

Chazen Job Number: 81625.00 The Chazen Companies

Stormwater Pollution Prevention Plan Contractor Certification Statement

(Responsible for overall SWPPP Compliance)

Batista Southeast Dunkin’ 1617 NYS Route 22, Town of Southeast, Putnam County, New York

This is to certify that the following contracting firm will be responsible for installing, constructing, repairing, inspecting and/or maintaining the erosion and sediment control practices and post-construction stormwater management control practices required by the SWPPP.

Contracting Firm Information

Name:

Address:

Telephone & Fax: Trained Contractor(s) 1 Responsible for SWPPP Implementation (Provide name, title, and date of last training)

_________________________________________________________________________________________________________

_________________________________________________________________________________________________________ Prior to commencement of construction activity, the following certification shall be issued:

I hereby certify under penalty of law that I understand and agree to comply with the terms and conditions of the SWPPP and agree to implement any corrective actions identified by the qualified inspector during a site inspection. I also understand that the owner or operator must comply with the terms and conditions of the most current version of the New York State Pollutant Discharge Elimination System (“SPDES”) general permit for stormwater discharges from construction activities and that it is unlawful for any person to cause or contribute to a violation of water quality standards. Furthermore, I am aware that there are significant penalties for submitting false information, that I do not believe to be true, including the possibility of fine and imprisonment for knowing violations.

Printed Name:

Title/Position:

Signature: Date:

Upon completion of construction activities, the following certification shall be issued, prior to issuance of the NOT:

I hereby certify that that all permanent stormwater management practices required by the SWPPP have been installed in accordance with the contract documents. I further certify that all temporary erosion and sediment control measures have been removed from the site, and that the on-site soils disturbed by construction activity have been restored in accordance with the SWPPP and the NYSDEC Division of Water’s publication “Deep-Ripping and Decompaction”.

Printed Name:

Title/Position:

Signature: Date:

1 “Trained Contractor” means an employee from a contracting (construction) company that has received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a Soil and Water Conservation District, or other Department endorsed entity. After receiving the initial training, the “trained contractor” shall receive four (4) hours of training every three (3) years. It can also mean an employee from the contracting (construction) company that meets the “qualified inspector” qualifications (e.g. licensed Professional Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered Landscape Architect, or someone working under the direct supervision of, and at the same company as, the licensed Professional Engineer or Registered Landscape Architect, provided they have received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a Soil and Water Conservation District, or other Department endorsed entity). The “Trained Contractor” will be responsible for the day to day implementation of the SWPPP. 2 Signatory Requirements:

a. For a corporation, this form shall be signed by (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principle business function, or any other person who performs similar policy or decision-making functions for the corporation; or (ii) the manager of one or more manufacturing, production or operating facilities, provided the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.

b. For a partnership or sole proprietorship, this form shall be signed by a general partner or the proprietor, respectively. c. For a municipality, State, Federal, or other public agency, this form shall be signed by either a principal executive officer or ranking elected official. For purposes of this section, a

principal executive officer of a Federal agency includes (i) the chief executive officer of the agency, or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g. Regional Administrators of EPA).

Chazen Job Number: 81625.00 The Chazen Companies

Stormwater Pollution Prevention Plan Subcontractor Certification Statement (whose work involves soil disturbance)

Batista Southeast Dunkin’ 1617 NYS Route 22, Town of Southeast, Putnam County, New York

Each Subcontractor whose work will involve soil disturbance of any kind is required to complete and sign this Certification Statement before commencing any construction activity at the site. This completed Certification Statement(s) shall be maintained at the construction site in the Site Log Book.

Subcontracting Firm Information

Name:

Address:

Telephone & Fax: Trained Contractor(s) 2 Responsible for SWPPP Implementation (Provide name, title, and date of last training)

Prior to commencement of construction activities, the following certification shall be issued:

I hereby certify under penalty of law that I understand and agree to comply with the terms and conditions of the SWPPP and agree to implement any corrective actions identified by the qualified inspector during a site inspection. I also understand that the owner or operator must comply with the terms and conditions of the most current version of the New York State Pollutant Discharge Elimination System (“SPDES”) general permit for stormwater discharges from construction activities and that it is unlawful for any person to cause or contribute to a violation of water quality standards. Furthermore, I am aware that there are significant penalties for submitting false information, that I do not believe to be true, including the possibility of fine and imprisonment for knowing violations.

Printed Name:

Title/Position:

Signature: Date:

2 “Trained Contractor” means an employee from a contracting (construction) company that has received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a Soil and Water Conservation District, or other Department endorsed entity. After receiving the initial training, the “trained contractor” shall receive four (4) hours of training every three (3) years. It can also mean an employee from the contracting (construction) company that meets the “qualified inspector” qualifications (e.g. licensed Professional Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered Landscape Architect, or someone working under the direct supervision of, and at the same company as, the licensed Professional Engineer or Registered Landscape Architect, provided they have received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a Soil and Water Conservation District, or other Department endorsed entity). The “Trained Contractor” will be responsible for the day to day implementation of the SWPPP. 2 Signatory Requirements:

a. For a corporation, this form shall be signed by (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principle business function, or any other person who performs similar policy or decision-making functions for the corporation; or (ii) the manager of one or more manufacturing, production or operating facilities, provided the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.

b. For a partnership or sole proprietorship, this form shall be signed by a general partner or the proprietor, respectively. c. For a municipality, State, Federal, or other public agency, this form shall be signed by either a principal executive officer or ranking elected official. For purposes of this section, a

principal executive officer of a Federal agency includes (i) the chief executive officer of the agency, or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g. Regional Administrators of EPA).

Appendix D: SWPPP Inspection Report

(Sample Form)

Page 1 of 6

Chazen Job Number: 81625.00 The Chazen Companies

Stormwater Pollution Prevention Plan Inspection Report

Batista Southeast Dunkin’ 1617 NYS Route 22

Town of Southeast, Putnam County, New York

A Qualified Inspector1 shall prepare an inspection report subsequent to each and every inspection, as required in Part IV.C of the SPDES General Permit GP-0-15-002. All sections of this report are to be completed.

1. Inspection Information

Inspection number: ___________________________________________

Date and Time of Inspection: ___________________________________________

Weather Conditions: ___________________________________________

Soil Conditions (e.g. dry, wet, saturated): ___________________________________________

2. Inspector Information

Qualified Inspector1

Printed Name: Date:

Signature:

Qualified Professional1

Printed Name Date:

Signature:

3. On the included site plan, provide a sketch of areas that are disturbed at the time of the inspection and areas that have been stabilized (temporary and/or final) since the last inspection. Provide additional descriptions below if necessary.

1 A Qualified Inspector means a person that is knowledgeable in the principles and practices of erosion and sediment control, such as licensed Professional Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered Landscape Architect, or other Department endorsed individual(s). It can also mean someone working under the direct supervision of, and at the same company as, the licensed Professional Engineer or Registered Landscape Architect, provided that person has training in the principles and practices of erosion and sediment control. Training in the principles and practices of erosion and sediment control means that the individual working under the direct supervision of the licensed Professional Engineer or Registered Landscape Architect has received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a Soil and Water Conservation District, or other Department endorsed entity. After receiving the initial training, the individual working under the direct supervision of the licensed Professional Engineer or Registered Landscape Architect shall receive four (4) hours of training every three (3) years. It can also mean a person that meets the Qualified Professional qualifications in addition to the Qualified Inspector qualifications. Note: Inspections of any post-construction stormwater management practices that include structural components, such as a dam for an impoundment, shall be performed by a licensed Professional Engineer.

Page 2 of 6

Chazen Job Number: 81625.00 The Chazen Companies

4. In the following table, provide a description of the condition of the runoff at all points of discharge from the construction site, including conveyance systems (pipes, culverts, ditches, etc.) and overland flow. Identify any discharges of sediment from the construction site. Use additional sheets if necessary.

Description of Discharge Point Condition of Runoff Sediment Discharge Noted

yes / no

Estimated Quantity:

yes / no

Estimated Quantity:

yes / no

Estimated Quantity:

yes / no

Estimated Quantity:

5. For all discharge points where sediment discharge has been noted in the above table, provide detailed corrective actions that are required. Use additional sheets if necessary.

Page 3 of 6

Chazen Job Number: 81625.00 The Chazen Companies

6. In the following table, provide checkmarks in the appropriate columns to indicate the condition of all erosion and sediment control practices at the site.

Erosion & Sediment Control Practice

Not Applicable

Functioning as

Designed

Needs Repair or

Maintenance

Not Installed Properly

Date Deficiency

First Reported (If Applicable)

Deficiency Corrected?

Y/N (If Applicable)

Stabilized construction entrance

Temporary parking areas

Construction vehicle wash areas

Silt fence

Temporary swales and berms

Stone check dams

Slope protection measures

Dewatering operations

Sediment traps

Inlet protection measures

Soil stockpiles

Dust control measures

Pavement sweeping

Other:

Other:

7. For all erosion and sediment control practices identified in the above table as “needs repair or

maintenance” or “not installed properly”, provide detailed corrective actions that are required. Use additional sheets if necessary.

Page 4 of 6

Chazen Job Number: 81625.00 The Chazen Companies

8. In the following table, indicate the current phase of construction of all post-construction stormwater management practices and identify all construction that is not in conformance with the SWPPP and technical standards.

SWM Practice Current Phase of Construction

Items not in conformance with the SWPPP

9. For all post-construction stormwater management practices which are identified in the above table as

including “items not in conformance with the SWPPP”, provide detailed corrective action(s) that are required to correct the deficiencies. Use additional sheets if necessary.

Page 5 of 6

Chazen Job Number: 81625.00 The Chazen Companies

Photo Log

Date – Item in need of repair or maintenance:

Date – Corrected Action:

Date – Item in need of repair or maintenance:

Date – Corrected Action:

Page 6 of 6

Chazen Job Number: 81625.00 The Chazen Companies

Photo Log

Date – Item in need of repair or maintenance:

Date – Corrected Action:

Date – Item in need of repair or maintenance:

Date – Corrected Action:

Appendix E: NYSDEC “Deep‐Ripping and  Decompaction,” April 2008

   

DEPA

RTM

ENT

OF E

NVIR

ONM

ENTA

L CO

NSER

VATI

ONN

ew

York

Sta

te

Dee

p-R

ippi

ngan

dD

ecom

pact

ion

New

Yor

k S

tate

D

epar

tmen

t of

En

viro

nm

enta

l C

onse

rvat

ion

Div

isio

nof

Wat

er

Apr

il20

08

Doc

umen

t Pre

pare

d by

:

John

E. L

acey

, La

nd R

esou

rce

Con

sulta

nt a

nd E

nviro

nmen

tal C

ompl

ianc

e M

onito

r (F

orm

erly

with

the

Div

isio

n of

Agr

icul

tura

l Pro

tect

ion

and

Dev

elop

men

t Ser

vice

s, N

YS

Dep

t. of

Agr

icul

ture

& M

arke

ts)

1

Alte

rnativeStormwater

Man

agem

ent

DeepRipp

ingan

dDecom

paction

Des

crip

tion

The

two-

phas

e pr

actic

e of

1) “

Dee

p R

ippi

ng;”

and

2) “

Dec

ompa

ctio

n” (d

eep

subs

oilin

g), o

f the

so

il m

ater

ial

as a

ste

p in

the

cle

anup

and

res

tora

tion/

land

scap

ing

of a

con

stru

ctio

n si

te, h

elps

m

itiga

te t

he p

hysi

cally

ind

uced

im

pact

s of

soi

l co

mpr

essi

on;

i.e.:

soil

com

pact

ion

or t

he

subs

tant

ial i

ncre

ase

in th

e bu

lk d

ensi

ty o

f the

soil

mat

eria

l.

Dee

p R

ippi

ng a

nd D

ecom

pact

ion

are

key

fact

ors

whi

ch h

elp

in r

esto

ring

soil

pore

spa

ce a

nd

perm

eabi

lity

for

wat

er in

filtra

tion.

Con

vers

ely,

the

phys

ical

ac

tions

of

cut-a

nd-f

ill w

ork,

land

gr

adin

g, t

he o

ngoi

ng m

ovem

ent

of c

onst

ruct

ion

equi

pmen

t an

d th

e tra

nspo

rt of

bui

ldin

g m

ater

ials

thro

ugho

ut a

site

alte

r the

arc

hite

ctur

e an

d st

ruct

ure

of th

e so

il, re

sulti

ng in

: the

mix

ing

of l

ayer

s (h

oriz

ons)

of

soil

mat

eria

ls,

com

pres

sion

of

thos

e m

ater

ials

and

dim

inis

hed

soil

poro

sity

whi

ch, i

f lef

t unc

heck

ed, s

ever

ely

impa

irs th

e so

il’s

wat

er h

oldi

ng c

apac

ity a

nd v

ertic

al

drai

nage

(rai

nfal

l inf

iltra

tion)

, fro

m th

e su

rfac

e do

wnw

ard.

In a

hum

id c

limat

e re

gion

, com

pact

ion

dam

age

on a

site

is v

irtua

lly g

uara

ntee

d ov

er th

e du

ratio

n of

a p

roje

ct.

Soil

in v

ery

moi

st to

wet

con

ditio

n w

hen

com

pact

ed, w

ill h

ave

seve

rely

red

uced

pe

rmea

bilit

y.

Figu

re 1

dis

play

s th

e ea

rly s

tage

of

the

deep

-rip

ping

pha

se (

Not

e th

at a

ll to

psoi

l w

as s

tripp

ed p

rior

to c

onst

ruct

ion

acce

ss,

and

it re

mai

ns s

tock

pile

d un

til t

he n

ext

phas

e –

deco

mpa

ctio

n –

is c

ompl

ete)

. A h

eavy

-dut

y tra

ctor

is p

ullin

g a

thre

e-sh

ank

rippe

r on

the

first

of

seve

ral

serie

s of

inc

rem

enta

lly d

eepe

ning

pas

ses

thro

ugh

the

cons

truct

ion

acce

ss c

orrid

or's

dens

ely

com

pres

sed

subs

oil

mat

eria

l.

Figu

re

2 ill

ustra

tes

the

appr

oxim

ate

volu

met

ric

com

posi

tion

of a

loa

m s

urfa

ce s

oil

whe

n co

nditi

ons

are

good

for

pla

nt g

row

th, w

ith a

dequ

ate

natu

ral p

ore

spac

e fo

r flu

ctua

ting

moi

stur

e co

nditi

ons.

Fig.

1. A

typi

cal d

eep

rippi

ng p

hase

of t

his

prac

tice,

dur

ing

the

first

in a

serie

s of

prog

ress

ivel

y de

eper

“rip

s” th

roug

h se

vere

ly

com

pres

sed

subs

oil.

Fig.

2. A

bout

50%

of t

he v

olum

e of

und

istu

rbed

lo

am su

rfac

e so

il is

por

e sp

ace,

whe

n so

il is

in

good

con

ditio

n fo

r pla

nt g

row

th. B

rady

, 200

2.

2

Rec

omm

end

ed A

pp

licat

ion

of

Pra

ctic

e

The

obje

ctiv

e of

Dee

p R

ippi

ng a

nd

Dec

ompa

ctio

n is

to e

ffec

tivel

y fr

actu

re

(ver

tical

ly a

nd la

tera

llly)

thro

ugh

the

thic

knes

s of

the

phys

ical

ly c

ompr

esse

d su

bsoi

l mat

eria

l (s

ee F

igur

e 3)

, re

stor

ing

soil

poro

sity

and

pe

rmea

bilit

yan

d ai

ding

infil

tratio

n to

hel

p re

duce

runo

ff.

Toge

ther

with

tops

oil s

tripp

ing,

th

e “t

wo-

phas

e” p

ract

ice

of D

eep

Rip

ping

and

D

ecom

pact

ion

first

bec

ame

esta

blis

hed

as a

“be

st

man

agem

ent p

ract

ice”

thro

ugh

ongo

ing

succ

ess

on c

omm

erci

al fa

rmla

nds a

ffec

ted

by h

eavy

ut

ility

con

stru

ctio

n rig

ht-o

f-w

ay p

roje

cts

(tran

smis

sion

pip

elin

es a

nd la

rge

pow

er li

nes)

.

Soil

perm

eabi

lity,

soil

drai

nage

and

cro

plan

d pr

oduc

tivity

wer

e re

stor

ed. F

or b

road

er

cons

truct

ion

appl

icat

ion,

the

two-

phas

e pr

actic

e of

Dee

p R

ippi

ng a

nd D

ecom

pact

ion

is b

est

adap

ted

to a

reas

impa

cted

with

sign

ifica

nt so

il co

mpa

ctio

n, o

n co

ntig

uous

ope

n po

rtion

s of l

arge

co

nstru

ctio

n si

tes a

nd in

side

long

, ope

n co

nstru

ctio

n co

rrid

ors u

sed

as te

mpo

rary

acc

ess o

ver t

he

dura

tion

of c

onst

ruct

ion.

Eac

h m

itiga

tion

area

shou

ld h

ave

min

imal

abo

ve-a

nd-b

elow

-gro

und

obst

ruct

ions

for t

he e

asy

avoi

danc

e an

d m

aneu

verin

g of

a la

rge

tract

or a

nd ri

ppin

g/de

com

pact

ing

impl

emen

ts. C

onve

rsel

y, th

e co

mpl

ete

two-

phas

e pr

actic

e is

not

reco

mm

ende

d in

cong

este

d or

ob

stru

cted

are

as d

ue to

the

limita

tions

on

tract

or a

nd im

plem

ent m

ovem

ent.

Ben

efit

s

Agg

ress

ive

“dee

p rip

ping

” th

roug

h th

e co

mpr

esse

d th

ickn

ess

of e

xpos

ed s

ubso

il be

fore

the

re

plac

emen

t/res

prea

ding

of

the

tops

oil l

ayer

, fol

low

ed b

y “d

ecom

pact

ion,

” i.e

.: “s

ub-s

oilin

g,”

thro

ugh

the

rest

ored

tops

oil l

ayer

dow

n in

to th

e su

bsoi

l, of

fers

the

follo

win

g be

nefit

s:

Incr

ease

s th

e pr

ojec

t (la

rger

siz

e) a

rea’

s di

rect

sur

face

inf

iltra

tion

of r

ainf

all

by

pr

ovid

ing

the

open

si

te’s

m

itiga

ted

soil

cond

ition

an

d lo

wer

s th

e de

man

d on

conc

entra

ted

runo

ff c

ontro

l stru

ctur

es

Enha

nces

dire

ct g

roun

dwat

er r

echa

rge

thro

ugh

grea

ter

disp

ersi

on a

cros

s an

d th

roug

h a

br

oade

r sur

face

than

aff

orde

d by

som

e ru

noff

-con

trol s

truct

ural

mea

sure

s

Dec

reas

es ru

noff

vol

ume

gene

rate

d an

d pr

ovid

es h

ydro

logi

c so

urce

con

trol

May

be

pl

anne

d fo

r ap

plic

atio

n in

fe

asib

le

open

lo

catio

ns

eith

er

alon

e or

in

Fig.

3. C

onst

ruct

ion

site

with

sign

ifica

nt

com

pact

ion

of th

e de

ep b

asal

till

subs

oil

exte

nds 2

4 in

ches

bel

ow th

is e

xpos

ed c

ut-

and-

fill w

ork

surf

ace.

3

conj

unct

ion

with

plan

s fo

r st

ruct

ural

pr

actic

es

(e.g

., su

bsur

face

dr

ain

line

or

in

filtra

tion

basi

n) s

ervi

ng th

e sa

me

or c

ontig

uous

are

as

Prom

otes

suc

cess

ful

long

-term

rev

eget

atio

n by

res

torin

g so

il pe

rmea

bilit

y, d

rain

age

and

wat

er h

oldi

ng c

apac

ity f

or h

ealth

y (r

athe

r th

an r

estri

cted

) ro

ot-s

yste

m d

evel

opm

ent

of

trees

, sh

rubs

and

dee

p ro

oted

gro

und

cove

r, m

inim

izin

g pl

ant

drow

ning

dur

ing

wet

pe

riods

and

bur

nout

dur

ing

dry

per

iods

.

Feas

ibili

ty/

Lim

itat

ion

s

The

effe

ctiv

enes

s of D

eep

Rip

ping

and

Dec

ompa

ctio

n is

gov

erne

d m

ostly

by

site

fact

ors s

uch

as:

the

orig

inal

(und

istu

rbed

) soi

l’s h

ydro

logi

c ch

arac

teris

tics;

the

gene

ral s

lope

; loc

al w

eath

er/ti

min

g (s

oil m

oist

ure)

for i

mpl

emen

tatio

n; th

e sp

ace-

rela

ted

free

dom

of e

quip

men

t/im

plem

ent

man

euve

rabi

lity

(not

ed a

bove

in R

ecom

men

ded

App

licat

ion

of P

ract

ice)

, and

by

the

prop

er

sele

ctio

n an

d op

erat

ion

of tr

acto

r and

impl

emen

ts (e

xpla

ined

bel

ow in

Des

ign

Gui

danc

e). T

he

mor

e no

tabl

e si

te-r

elat

ed fa

ctor

s inc

lude

:

Soil

In th

e un

dist

urbe

d co

nditi

on, e

ach

iden

tifie

d so

il ty

pe c

ompr

isin

g a

site

is g

roup

ed in

to o

ne o

f fo

ur c

ateg

orie

s of s

oil h

ydro

logy

, Hyd

rolo

gic

Soil

Gro

up A

, B, C

or D

, det

erm

ined

prim

arily

by

a ra

nge

of c

hara

cter

istic

s inc

ludi

ng so

il te

xtur

e, d

rain

age

capa

bilit

y w

hen

thor

ough

ly w

et, a

nd d

epth

to

wat

er t

able

. Th

e na

tura

l ra

tes

of i

nfilt

ratio

n an

d tra

nsm

issi

on o

f so

il-w

ater

thr

ough

the

un

dist

urbe

d so

il la

yers

for G

roup

A is

“hi

gh”

with

a lo

w ru

noff

pot

entia

l whi

le s

oils

in G

roup

B

are

mod

erat

e in

infil

tratio

n an

d th

e tra

nsm

issi

on o

f so

il-w

ater

with

a m

oder

ate

runo

ff p

oten

tial,

depe

ndin

g so

mew

hat o

n sl

ope.

Soi

ls in

Gro

up C

hav

e sl

ow ra

tes

of in

filtra

tion

and

trans

mis

sion

of

soi

l-wat

er a

nd a

mod

erat

ely

high

run

off

pote

ntia

l inf

luen

ced

by s

oil t

extu

re a

nd s

lope

; whi

le

soils

in

Gro

up D

hav

e ex

cept

iona

lly s

low

ra

tes

of in

filtra

tion

and

trans

mis

sion

of

soil-

wat

er, a

nd h

igh

runo

ff p

oten

tial.

In F

igur

e 4,

the

prof

ile d

ispl

ays t

he

undi

stur

bed

horiz

ons o

f a so

il in

Hyd

rolo

gic

Soil

Gro

up C

and

the

natu

rally

slow

rate

of

infil

tratio

n th

roug

h th

e su

bsoi

l. Th

e sl

ow ra

te

of in

filtra

tion

begi

ns im

med

iate

ly b

elow

the

tops

oil h

oriz

on (3

0 cm

), du

e to

the

limite

d am

ount

of m

acro

por

es, e

.g.:

nat

ural

subs

oil

frac

ture

s, w

orm

hol

es a

nd ro

ot c

hann

els.

Infil

tratio

n af

ter t

he c

onst

ruct

ion-

indu

ced

mix

ing

and

com

pres

sion

of s

uch

subs

oil

mat

eria

l is v

irtua

lly a

bsen

t; bu

t can

be

rest

ored

bac

k to

this

nat

ural

leve

l with

the

two-

phas

e pr

actic

e of

dee

p rip

ping

and

de

com

pact

ion,

follo

wed

by

the

perm

anen

t es

tabl

ishm

ent o

f an

appr

opria

te, d

eep

tapr

oot

Fig.

4. P

rofil

e (in

cen

timet

ers)

dis

play

ing

the

infil

tratio

n te

st re

sult

of th

e na

tura

l u

ndis

turb

ed

horiz

ons o

f a so

il in

Hyd

rolo

gic

Soil

Gro

up C

.

4

law

n/gr

ound

cov

er to

hel

p m

aint

ain

the

rest

ored

subs

oil s

truct

ure.

Inf

iltra

tion

afte

r con

stru

ctio

n-in

duce

d m

ixin

g an

d co

mpr

essi

on o

f suc

h su

bsoi

l mat

eria

l can

be

nota

bly

reha

bilit

ated

with

the

Dee

p R

ippi

ng a

nd D

ecom

pact

ion

prac

tice,

whi

ch p

repa

res t

he si

te fo

r the

app

ropr

iate

long

-term

la

wn/

grou

nd c

over

mix

incl

udin

g de

ep ta

proo

t pla

nts s

uch

as c

love

r, fe

scue

or t

refo

il, e

tc.n

eede

dfo

r all

reha

bilit

ated

soils

.

Gen

eral

ly, s

oils

in H

ydro

logi

c So

il G

roup

s A a

nd B

, whi

ch re

spec

tivel

y m

ay in

clud

e de

ep, w

ell-

drai

ned,

sand

y-gr

avel

ly m

ater

ials

or d

eep,

mod

erat

ely

wel

l-dra

ined

bas

al ti

ll m

ater

ials

, are

am

ong

the

easi

er o

nes t

o re

stor

e pe

rmea

bilit

y an

d in

filtra

tion,

by

deep

ripp

ing

and

deco

mpa

ctio

n. A

mon

g th

e m

any

diff

eren

t soi

ls in

Hyd

rolo

gic

Soil

Gro

up C

are

thos

e un

ique

gla

cial

tills

hav

ing

a na

tura

l fr

agip

an z

one,

beg

inni

ng a

bout

12

to 1

8 in

ches

(30

– 45

cm),

belo

w su

rfac

e. A

lthou

gh so

ils in

H

ydro

logi

c So

il G

roup

C d

o re

quire

a so

mew

hat m

ore

care

fully

app

lied

leve

l of t

he D

eep

Rip

ping

an

d D

ecom

pact

ion

prac

tice,

it c

an g

reat

ly b

enef

it su

ch a

ffec

ted

area

s by

redu

cing

the

runo

ff a

nd

fost

erin

g in

filtra

tion

to a

leve

l equ

al to

that

of p

re-d

istu

rban

ce.

Soils

in H

ydro

logi

c So

il G

roup

D ty

pica

lly h

ave

a pe

rman

ent h

igh

wat

er ta

ble

clos

e to

the

surf

ace,

in

fluen

ced

by a

cla

y or

oth

er h

ighl

y im

perv

ious

laye

r of m

ater

ial.

In m

any

loca

tions

with

cla

y su

bsoi

l mat

eria

l, th

e bu

lk d

ensi

ty is

so n

atur

ally

hig

h th

at h

eavy

traf

ficki

ng h

as li

ttle

or n

o ad

ded

impa

ct o

n in

filtra

tion;

and

stru

ctur

al ru

noff

con

trol p

ract

ices

rath

er th

an D

eep

Rip

ping

and

D

ecom

pact

ion

shou

ld b

e co

nsid

ered

.

The

info

rmat

ion

abou

t Hyd

rolo

gic

Soil

Gro

ups

is m

erel

y a

gene

ral g

uide

line.

Si

te-s

peci

fic d

ata

such

as l

imite

d de

pths

of c

ut-a

nd-f

ill g

radi

ng w

ith m

inim

al re

mov

al o

r tra

nslo

catio

n of

the

inhe

rent

su

bsoi

l m

ater

ials

(as

ana

lyze

d in

the

cou

nty

soil

surv

ey)

or,

conv

erse

ly,

the

exca

vatio

n an

d tra

nslo

catio

n of

dee

per,

unco

nsol

idat

ed s

ubst

ratu

m o

r co

nsol

idat

ed b

edro

ck m

ater

ials

(un

like

the

anal

yzed

sub

soil

horiz

ons’

mat

eria

ls re

ferr

ed to

in th

e co

unty

soi

l sur

vey)

sho

uld

alw

ays

be ta

ken

into

acc

ount

.

Site

s mad

e up

with

sign

ifica

nt q

uant

ities

of l

arge

rock

s, or

hav

ing

a ve

ry sh

allo

w d

epth

to b

edro

ck,

are

not c

ondu

cive

to d

eep

rippi

ng a

nd d

ecom

patio

n (s

ubso

iling

); an

d ot

her m

easu

res

may

be

mor

e pr

actic

al.

Slop

eTh

e tw

o-ph

ase

appl

icat

ion

of 1

) de

ep r

ippi

ng a

nd 2

) de

com

pact

ion

(dee

p su

bsoi

ling)

, is

mos

t pr

actic

al o

n fla

t, ge

ntle

and

mod

erat

e sl

opes

. In

som

e si

tuat

ions

, su

ch a

s b

ut n

ot l

imite

d t

o te

mpo

rary

con

stru

ctio

n ac

cess

cor

ridor

s, in

clus

ion

area

s tha

t are

mod

erat

ely

stee

p al

ong

a pr

ojec

t’s

othe

rwis

e ge

ntle

or

mod

erat

e sl

ope

may

als

o be

dee

p rip

ped

and

deco

mpa

cted

. Fo

r lim

ited

inst

ance

s of

mod

erat

e st

eepn

ess

on o

ther

pro

ject

s, ho

wev

er, t

he p

ost-c

onst

ruct

ion

land

use

and

the

rela

tive

alig

nmen

t of

the

pot

entia

l rip

ping

and

dec

ompa

ctio

n w

ork

in r

elat

ion

to t

he l

ay o

f th

e sl

ope

shou

ld b

e re

view

ed fo

r saf

ety

and

prac

tical

ity. I

n br

oad

cons

truct

ion

area

s pr

edom

inat

ed b

y m

oder

atel

y st

eep

or st

eep

slop

es, t

he p

ract

ice

is g

ener

ally

not

use

d.

Loc

al W

eath

er/T

imin

g/So

il M

oist

ure

Ef

fect

ive

frac

turin

g of

com

pres

sed

subs

oil m

ater

ial f

rom

the

expo

sed

wor

k su

rfac

e, la

tera

lly a

nd

verti

cally

dow

n th

roug

h th

e af

fect

ed z

one

is a

chie

ved

only

whe

n th

e so

il m

ater

ial i

s m

oder

atel

y dr

y to

mod

erat

ely

moi

st.

Nei

ther

one

of

the

two-

phas

es,

deep

rip

ping

nor

dec

ompa

ctio

n (d

eep

5

Fig.

5. A

uger

ed fr

om a

dep

th o

f 19

inch

es

belo

w th

e su

rfac

e of

the

repl

aced

tops

oil,

this

subs

oil s

ampl

e w

as h

and

rolle

d to

a

1/8-

inch

dia

met

er. T

he te

st sh

ows t

he so

il at

th

is si

te st

retc

hes o

ut to

o fa

r with

out

crum

blin

g; it

indi

cate

s the

mat

eria

l is i

n a

plas

tic st

ate

of c

onsi

sten

ce, t

oo w

et fo

r fin

al

deco

mpa

ctio

n(d

eep

subs

oilin

g) a

t thi

s tim

e.

subs

oilin

g), c

an b

e ef

fect

ivel

y co

nduc

ted

whe

n th

e so

il m

ater

ial (

subs

oil o

r rep

lace

d to

psoi

l) is

in

eith

er a

“pl

astic

” or

“liq

uid”

sta

te o

f so

il co

nsis

tenc

y. P

ullin

g th

e re

spec

tive

impl

emen

ts l

egs

thro

ugh

the

soil

whe

n it

is o

verly

moi

st o

nly

resu

lts in

the

“slic

ing

and

smea

ring”

of t

he m

ater

ial o

r ad

ded

“squ

eezi

ng a

nd c

ompr

essi

on”

inst

ead

of

the

nece

ssar

y fr

actu

ring.

Am

ple

dryi

ng t

ime

is

need

ed f

or a

“rip

pabl

e” s

oil

cond

ition

not

mer

ely

in t

he m

ater

ial

clos

e to

the

sur

face

, bu

t th

roug

hout

the

mat

eria

l lo

cate

d do

wn

to t

he b

otto

m o

f th

e ph

ysic

ally

com

pres

sed

zone

of

the

subs

oil.

The

“poo

r m

an’s

Atte

rber

g fie

ld t

est”

for

soi

l pl

astic

ity i

s a

sim

ple

“han

d-ro

ll” m

etho

d us

ed

for

quic

k, o

n-si

te d

eter

min

atio

n of

whe

ther

or

not

the

moi

stur

e le

vel

of

the

affe

cted

so

il m

ater

ial

is l

ow e

noug

h fo

r: e

ffec

tive

deep

rip

ping

of

subs

oil;

resp

read

ing

of t

opso

il i

n a

fria

ble

stat

e;

and

final

de

com

pact

ion

(dee

p su

bsoi

ling)

. U

sing

a s

ampl

e of

soi

l m

ater

ial

obta

ined

fr

om

the

plan

ned

botto

m

dept

h of

rip

ping

, e.

g.:

20 -

24

inch

es b

elow

exp

osed

su

bsoi

l su

rfac

e,

the

sam

ple

is

hand

ro

lled

betw

een

the

palm

s do

wn

to a

1/8

-inch

dia

met

er

thre

ad.

(Use

the

sam

e te

st f

or s

tore

d to

psoi

l m

ater

ial

befo

re r

espr

eadi

ng o

n th

e si

te.)

If t

he

resp

ectiv

e so

il sa

mpl

e cr

umbl

es

apar

t in

se

gmen

ts n

o gr

eate

r tha

n 3/

8 of

an

inch

long

, by

the

time

it is

rolle

d do

wn

to 1

/8 in

ch d

iam

eter

, it

is l

ow e

noug

h in

moi

stur

e fo

r de

ep r

ippi

ng (

or

tops

oil

repl

acem

ent),

an

d de

com

pact

ion.

C

onve

rsel

y, a

s sh

own

in F

igur

e 5,

if

the

rolle

d sa

mpl

e st

retc

hes

out

in i

ncre

men

ts g

reat

er t

han

3/8

of a

n in

ch lo

ng b

efor

e cr

umbl

ing,

it is

in a

“pl

astic

” st

ate

of so

il co

nsis

tenc

y an

d is

too

wet

for

subs

oil r

ippi

ng (a

s wel

l as t

opso

il re

plac

emen

t) an

d fin

al d

ecom

pact

ion.

Des

ign

Gu

idan

ce

Bey

ond

the

abov

e-no

ted

site

fac

tors

, a

vita

l re

quire

men

t fo

r th

e ef

fect

ive

Dee

p R

ippi

ng a

nd

Dec

ompa

ctio

n (d

eep

subs

oilin

g),

is im

plem

entin

g th

e pr

actic

e in

its d

istin

ct, t

wo-

phas

e pr

oces

s:

1) D

eep

rip th

e af

fect

ed th

ickn

ess

of e

xpos

ed s

ubso

il m

ater

ial (

see

Figu

re 1

0 an

d 11

), ag

gres

sive

ly

frac

turin

g it

befo

re th

e pr

otec

ted

tops

oil i

s rea

pplie

d on

the

site

(see

Fig

ure

12);

and

2) D

ecom

pact

(dee

p su

bsoi

l), s

imul

tane

ousl

y th

roug

h th

e re

stor

ed to

psoi

l lay

er a

nd th

e up

per h

alf

of t

he a

ffec

ted

subs

oil

(Fig

ure

13).

The

seco

nd p

hase

, “d

ecom

pact

ion,

” m

itiga

tes

the

parti

al

reco

mpa

ctio

n w

hich

occ

urs

durin

g th

e he

avy

proc

ess

of to

psoi

l spr

eadi

ng/g

radi

ng. P

rior

to d

eep

rippi

ng a

nd d

ecom

pact

ing

the

site

, all

cons

truct

ion

activ

ity, i

nclu

ding

con

stru

ctio

n eq

uipm

ent a

nd

mat

eria

l sto

rage

, site

cle

anup

and

traf

ficki

ng (F

igur

e 14

), sh

ould

be

finis

hed;

and

the

site

clo

sed

off

to fu

rther

dis

turb

ance

. Lik

ewis

e, o

nce

the

prac

tice

is u

nder

way

and

the

area

’s so

il pe

rmea

bilit

y an

d

6

Fig.

6.

A li

ght d

uty

chis

el im

plem

ent,

not

adeq

uate

for e

ither

the

dee

p rip

ping

or

deco

mpa

ctio

n (d

eep

subs

oilin

g) p

hase

.

rain

fall

infil

tratio

n ar

e be

ing

rest

ored

, a p

olic

y lim

iting

all

furth

er tr

affic

to p

erm

anen

t tra

vel l

anes

is

mai

ntai

ned.

The

othe

r cr

itica

l ele

men

ts, o

utlin

ed b

elow

, are

: usi

ng th

e pr

oper

impl

emen

ts (

deep

, hea

vy-d

uty

rippe

rs a

nd s

ubso

ilers

), an

d am

ple

pulli

ng-p

ower

equ

ipm

ent (

tract

ors)

; and

con

duct

ing

the

prac

tice

at th

e ap

prop

riate

spee

d, d

epth

and

pat

tern

(s) o

f mov

emen

t.

Not

e th

at a

n ap

prop

riate

pla

n fo

r th

e se

para

te p

ract

ice

of e

stab

lishi

ng a

hea

lthy

pere

nnia

l gro

und

cove

r, w

ith d

eep

root

ing

to h

elp

mai

ntai

n th

e re

stor

ed s

oil

stru

ctur

e, s

houl

d be

dev

elop

ed i

n ad

vanc

e. T

his m

ay re

quire

the

assi

stan

ce o

f an

agro

nom

ist o

r lan

dsca

pe h

ortic

ultu

rist.

Impl

emen

tsA

void

the

use

of a

ll un

ders

ize

impl

emen

ts. T

he s

mal

l-to-

med

ium

, lig

ht-d

uty

tool

will

, at b

est,

only

“s

carif

y” t

he u

pper

mos

t su

rfac

e po

rtion

of

the

mas

s of

com

pact

ed s

ubso

il m

ater

ial.

The

term

“c

hise

l plo

w”

is c

omm

only

but

inco

rrec

tly a

pplie

d to

a b

road

ran

ge o

f im

plem

ents

. W

hile

a f

ew

may

be

adap

ted

for

the

mod

erat

e su

bsoi

ling

of n

on-im

pact

ed s

oils

, the

maj

ority

are

less

dur

able

an

d us

ed f

or o

nly

light

er la

nd-f

ittin

g (s

ee F

igur

e 6)

.

Use

a “

heav

y du

ty”

agric

ultu

ral-g

rade

, dee

p rip

per (

see

Figu

res

7,9,

10 a

nd 1

1) fo

r the

firs

t pha

se:

the

late

ral

and

verti

cal

frac

turin

g of

the

mas

s of

exp

osed

and

com

pres

sed

subs

oil,

dow

n an

d th

roug

h, to

the

botto

m o

f im

pact

, prio

r to

the

repl

acem

ent o

f the

tops

oil l

ayer

. (A

ny o

vers

ize

rock

s w

hich

are

upl

ifted

to th

e su

bsoi

l sur

face

dur

ing

the

deep

rip

ping

pha

se a

re p

icke

d an

d re

mov

ed.)

Li

ke th

e he

avy-

duty

cla

ss o

f im

plem

ent f

or th

e fir

st p

hase

, the

dec

ompa

ctio

n (d

eep

subs

oilin

g) o

f Ph

ase

2 is

con

duct

ed w

ith t

he h

eavy

-dut

y ve

rsio

n of

the

dee

p su

bsoi

ler.

Mor

e pr

efer

able

is

the

angl

ed-le

g va

riety

of d

eep

subs

oile

r (sh

own

in F

igur

es 8

and

13)

. It

min

imiz

es th

e in

vers

ion

of th

e su

bsoi

l and

tops

oil l

ayer

s w

hile

late

rally

and

ver

tical

ly fr

actu

ring

the

uppe

r hal

f of t

he p

revi

ousl

y rip

ped

subs

oil l

ayer

and

all

of th

e to

psoi

l lay

er b

y de

liver

ing

a m

omen

tary

, wav

e-lik

e “l

iftin

g an

d sh

atte

ring”

act

ion

up

thro

ugh

the

soil

laye

rs a

s it

is p

ulle

d.

Fig.

7.

One

of s

ever

al v

aria

tions

of a

n ag

ricul

tura

l rip

per.

This

uni

t has

long

, rug

ged

shan

ks m

ount

ed o

n a

stee

l V-f

ram

e fo

r dee

p,

aggr

essi

ve fr

actu

ring

thro

ugh

Phas

e 1.

7

Fig.

8.

A d

eep,

ang

led-

leg

subs

oile

r, id

eal f

or

Phas

e 2

deco

mpa

ctio

n of

afte

r the

tops

oil l

ayer

is

gra

ded

on to

p of

the

rippe

d su

bsoi

l.

Pulli

ng-P

ower

of E

quip

men

tU

se t

he f

ollo

win

g ru

le o

f th

umb

for

tract

or h

orse

pow

er (

hp)

whe

neve

r de

ep r

ippi

ng a

nd

deco

mpa

ctin

g a

sign

ifica

ntly

impa

cted

site

: Fo

r bo

th ty

pes

of im

plem

ent,

have

at l

east

40

hp o

f tra

ctor

pul

l ava

ilabl

e fo

r eac

h m

ount

ed sh

ank/

leg.

Usi

ng th

e ex

ampl

es o

f a 3

-sha

nk a

nd a

5-s

hank

impl

emen

t, th

e re

spec

tive

tract

ors s

houl

d ha

ve 1

20

and

200

hp a

vaila

ble

for

frac

turin

g do

wn

to t

he f

inal

dep

th o

f 20

-to-2

4 in

ches

per

pha

se. F

inal

de

pth

for

the

deep

rip

ping

in P

hase

1 is

ach

ieve

d in

crem

enta

lly b

y a

prog

ress

ive

serie

s of

pas

ses

(see

Dep

th a

nd P

atte

rns

of M

ovem

ent,

belo

w);

whi

le f

or P

hase

2, t

he f

ull o

pera

ting

dept

h of

the

deep

subs

oile

r is a

pplie

d fr

om th

e be

ginn

ing.

The

oper

atin

g sp

eed

for

pulli

ng b

oth

type

s of

im

plem

ent

shou

ld n

ot e

xcee

d 2

to 3

mph

. A

t th

is s

low

and

man

aged

rat

e of

ope

ratin

g sp

eed,

m

axim

um f

unct

iona

l pe

rfor

man

ce i

s su

stai

ned

by th

e tra

ctor

and

the

impl

emen

t per

form

ing

the

soil

frac

turin

g.

Ref

errin

g to

Fig

ure

8, t

he

impl

emen

t is

the

6-le

g ve

rsio

n of

the

dee

p an

gled

-leg

subs

oile

r. Its

tw

o ou

tsid

e le

gs a

re

“cha

ined

up”

so

that

onl

y fo

ur l

egs

will

be

enga

ged

(at t

he m

axim

um d

epth

), re

quiri

ng n

o le

ss t

han

160

hp, (

rath

er t

han

240

hp)

of p

ull.

The

4-w

heel

driv

e, a

rticu

late

d-fr

ame

tract

or i

n Fi

gure

8 is

174

hp.

It w

ill b

e de

com

pact

ing

this

un

obst

ruct

ed,

form

er c

onst

ruct

ion

acce

ss a

rea

sim

ulta

neou

sly

thro

ugh

11 i

nche

s of

rep

lace

d to

psoi

l an

d th

e up

per

12

inch

es

of

the

prev

ious

ly d

eep-

rippe

d su

bsoi

l. In

con

stric

ted

area

s of

Pha

se 1

) Dee

p R

ippi

ng, a

med

ium

-siz

e tra

ctor

with

ade

quat

e hp

, su

ch a

s th

e on

e in

Fi

gure

9 p

ullin

g a

3-sh

ank

deep

rip

per,

may

be

mor

e m

aneu

vera

ble.

Som

e in

dust

rial-g

rade

va

riatio

ns

of

rippi

ng

impl

emen

ts a

re a

ttach

ed t

o po

wer

gra

ders

and

bu

lldoz

ers.

Alth

ough

hig

hly

dura

ble,

the

y ar

e ge

nera

lly

not

reco

mm

ende

d.

Typi

cally

, th

e sh

anks

or

“tee

th”

of th

ese

rippe

rs a

re to

o sh

ort

and

stou

t; an

d th

ey a

re m

ount

ed to

o fa

r apa

rt to

ac

hiev

e th

e w

ell-d

istri

bute

d ty

pe o

f la

tera

l an

d ve

rtica

l fr

actu

ring

of

the

soil

mat

eria

ls

nece

ssar

y to

re

stor

e so

il pe

rmea

bilit

y an

d in

filtra

tion.

In

addi

tion,

the

pow

er g

rade

rs a

nd

bulld

ozer

s, as

pul

lers

, are

far l

ess

man

euve

rabl

e fo

r tur

ns a

nd p

atte

rns t

han

the

tract

or.

Fig.

9.

This

med

ium

trac

tor i

s pul

ling

a 3-

shan

k de

ep ri

pper

. The

seve

rely

com

pact

ed

cons

truct

ion

acce

ss c

orrid

or is

nar

row

, and

the

120

hp tr

acto

r is m

ore

man

euve

rabl

e fo

r Pha

se

1 de

ep ri

ppin

g (s

ubso

il fr

actu

ring)

, her

e.

8

Dep

th a

nd P

atte

rns o

f Mov

emen

tA

s pre

viou

sly

note

d bo

th P

hase

1 D

eep

Rip

ping

thro

ugh

sign

ifica

ntly

com

pres

sed,

exp

osed

subs

oil

and

Phas

e 2

Dec

ompa

ctio

n (d

eep

subs

oilin

g) th

roug

h th

e re

plac

ed to

psoi

l and

upp

er s

ubso

il ne

ed

to b

e pe

rfor

med

at m

axim

um c

apab

le d

epth

of e

ach

impl

emen

t. W

ith a

n im

plem

ent’s

gui

de w

heel

s at

tach

ed,

som

e ha

ve a

“no

rmal

” m

axim

um o

pera

ting

dept

h of

18

inch

es,

whi

le o

ther

s m

ay g

o de

eper

. In

man

y si

tuat

ions

, how

ever

, the

trac

tor/i

mpl

emen

t ope

rato

r m

ust f

irst r

emov

e th

e gu

ide

whe

els

and

othe

r no

n es

sent

ial e

lem

ents

fro

m th

e im

plem

ent.

This

ada

pts

the

rippe

r or

the

deep

su

bsoi

ler

for

skill

ful p

ullin

g w

ith it

s fr

ame

only

a f

ew in

ches

abo

ve s

urfa

ce, w

hile

the

shan

ks o

r le

gs, f

ract

ure

the

soil

mat

eria

l 20-

to-2

4 in

ches

dee

p.

Ther

e m

ay b

e co

nstru

ctio

n si

tes w

here

the

dept

h of

the

expo

sed

subs

oil’s

com

pres

sion

is m

oder

ate,

e.

g.:

12 in

ches

, rat

her t

han

deep

. Th

is c

an b

e ve

rifie

d by

usi

ng a

¾ in

ch c

one

pene

trom

eter

and

a

shov

el t

o te

st t

he s

ubso

il fo

r its

lev

el o

f co

mpa

ctio

n, i

ncre

men

tally

, ev

ery

thre

e in

ches

of

incr

easi

ng d

epth

. O

nce

the

full

thic

knes

s of

the

subs

oil’s

com

pact

ed z

one

is fi

nally

“pi

eced

” an

d th

ere

is a

sig

nific

ant d

rop

in th

e ps

i mea

sure

men

ts o

f the

soi

l pen

etro

met

er, t

he d

epth

/thic

knes

s of

co

mpa

ctio

n is

det

erm

ined

. Th

is is

repe

ated

at s

ever

al re

pres

enta

tive

loca

tions

of t

he c

onst

ruct

ion

site

. If

the

thic

knes

s of

the

site

’s s

ubso

il co

mpa

ctio

n is

ver

ified

as,

for e

xam

ple,

ten

inch

es, t

hen

the

Phas

e 1

Dee

p R

ippi

ng c

an b

e co

rres

pond

ingl

y re

duce

d to

the

impl

emen

t’s m

inim

um o

pera

ble

dept

h of

12

inch

es.

How

ever

, the

Pha

se 2

sim

ulta

neou

s D

ecom

patio

n (s

ubso

iling

) of

an

11 in

ch

thic

k la

yer

of r

epla

ced

tops

oil a

nd th

e up

per

subs

oil s

houl

d ru

n at

the

subs

oilin

g im

plem

ents

ful

l op

erat

ing

dept

h.

Typi

cally

, th

ree

sepa

rate

ser

ies

(pat

tern

s) a

re u

sed

for

both

the

Pha

se 1

Dee

p R

ippi

ng a

nd t

he

Phas

e 2

Dec

ompa

ctio

n on

sig

nific

antly

com

pact

ed s

ites.

For

Pha

se 1

, eac

h se

ries

begi

ns w

ith a

m

oder

ate

dept

h of

rip

and,

by

repe

at-p

ass,

cont

inue

s unt

il fu

ll de

pth

is re

ache

d. P

hase

2 a

pplie

s the

fu

ll de

pth

of D

ecom

patio

n (s

ubso

iling

), fr

om th

e be

ginn

ing.

Ever

y se

para

te se

ries (

patte

rn) c

onsi

sts o

f par

alle

l, fo

rwar

d-an

d-re

turn

runs

, with

eac

h p

rogr

essi

ve

Fig.

11.

A re

peat

run

of th

e 3-

shan

k rip

per

alon

g th

e sa

me

patte

rned

pas

s are

a as

Fig

. 9;

here

, inc

rem

enta

lly re

achi

ng 1

8 of

the

need

ed

22in

ches

ofsu

bsoi

lfra

ctur

e.

Fig.

10.

An

early

pas

s with

a 3

-sha

nk d

eep

rippe

r pen

etra

ting

only

8 in

ches

into

this

w

orks

ite’s

seve

rely

com

pres

sed

subs

oil.

9

pass

of

the

impl

emen

t’s le

gs o

r sh

anks

eve

nly

stag

gere

d be

twee

n th

ose

from

the

prev

ious

pas

s.

This

com

pens

ates

for

the

sha

nk o

r le

g-sp

acin

g on

the

im

plem

ent,

e.g.

, w

ith 2

4-to

-30

inch

es

betw

een

each

sha

nk o

r le

g.

The

stag

gere

d re

turn

pas

s en

sure

s la

tera

l an

d ve

rtica

l fr

actu

ring

actu

ated

eve

ry 1

2 to

15

inch

es a

cros

s the

den

sely

com

pres

sed

soil

mas

s.

Lar

ge, U

nobs

truc

ted

Are

as

For l

arge

r eas

y ar

eas,

use

the

stan

dard

pat

tern

s of m

ovem

ent:

The

firs

t ser

ies

(pat

tern

) of p

asse

s is

app

lied

leng

thw

ise,

par

alle

l with

the

long

est

spre

ad o

f th

e si

te;

grad

ually

pro

gres

sing

acr

oss

the

site

’s w

idth

, w

ith e

ach

succ

essi

ve p

ass.

The

sec

ond

serie

s ru

ns o

bliq

uely

, cr

ossi

ng t

he f

irst

serie

s at

an

angl

e of

abou

t 45

degr

ees.

The

third

ser

ies

runs

at r

ight

ang

le (o

r 90

degr

ees)

, to

the

first

ser

ies

to c

ompl

ete

th

e fr

actu

ring

and

shat

terin

g on

sev

erel

y co

mpa

cted

site

s, an

d av

oid

leav

ing

larg

e un

brok

en b

lock

s of c

ompr

esse

d so

il m

ater

ial.

(In

certa

in

inst

ance

s, th

e th

ird se

ries

may

be

optio

nal,

depe

ndin

g on

how

tho

roug

hly

the

first

tw

o se

ries

loos

en t

he

mat

eria

l and

elim

inat

e la

rge

chun

ks/b

lock

s of m

ater

ial a

s ver

ified

by

test

s with

a ¾

-in

ch c

one

pene

trom

eter

.)

Cor

rido

rsIn

lon

g co

rrid

ors

of l

imite

d w

idth

and

les

s m

aneu

vera

bilit

y th

an l

arge

r si

tes,

e.g.

: al

ong

com

pact

ed a

reas

use

d as

tem

pora

ry c

onst

ruct

ion

acce

ss, a

mod

ified

ser

ies

of p

atte

rn p

asse

s ar

e us

ed.

Firs

t, ap

ply

the

sam

e in

itial

leng

thw

ise,

par

alle

l ser

ies o

f pas

ses d

escr

ibed

abo

ve.

Fig.

12.

Mod

erat

ely

dry

tops

oil i

s bei

ng

repl

aced

on

the

affe

cted

site

now

that

Pha

se 1

de

ep ri

ppin

g of

the

com

pres

sed

subs

oil i

s co

mpl

ete.

Fig.

13.

The

sam

e de

ep, a

ngle

d-le

g su

bsoi

ler

show

n in

Fig

. 7 is

eng

aged

at m

axim

um

dept

h fo

r Pha

se 2

, dec

ompa

ctio

n (d

eep

soili

ng),

of th

e re

plac

ed to

psoi

l and

the

uppe

r su

bsoi

l mat

eria

ls.

10

Fig.

15.

The

sam

e si

te a

s Fig

. 14

afte

r dee

p rip

ping

of t

he e

xpos

ed su

bsoi

l, to

psoi

l re

plac

emen

t, de

com

pact

ion

thro

ugh

the

tops

oil a

nd u

pper

subs

oil a

nd fi

nal s

urfa

ce

tilla

ge a

nd re

vege

tatio

n to

mai

ntai

n so

il pe

rmea

bilit

y an

d in

filtra

tion.

A s

econ

d se

ries

of p

asse

s m

akes

a b

road

“S”

sha

ped

patte

rn o

f rip

s, co

ntin

ually

and

grad

ually

alte

rnat

ing

the

“S”

curv

es b

etw

een

oppo

site

edg

es i

nsid

e th

e

com

pact

ed c

orrid

or.

The

thi

rd a

nd f

inal

ser

ies

agai

n us

es t

he b

road

, al

tern

atin

g S

patte

rn,

but

it is

“f

lip-f

lopp

ed”

to c

ontin

ually

cro

ss t

he p

revi

ous

S pa

ttern

alo

ng t

he c

orrid

or’s

cent

erlin

e. T

his

fina

l se

ries

of

the

S pa

ttern

cur

ves

bac

k a

long

the

edg

e ar

eas

skip

ped

by th

e se

cond

serie

s.

Mai

nte

nan

ce a

nd

Cos

t

Onc

e th

e tw

o-ph

ase

prac

tice

of D

eep

Rip

ping

and

Dec

ompa

tion

is c

ompl

eted

, tw

o ite

ms

are

esse

ntia

l for

mai

ntai

ning

a s

ite’s

soi

l por

osity

and

per

mea

bilit

y fo

r inf

iltra

tion.

The

y ar

e: p

lant

ing

and

mai

ntai

ning

the

appr

opria

te g

roun

d co

ver

with

dee

p ro

ots

to m

aint

ain

the

soil

stru

ctur

e (s

ee

Figu

re 1

5); a

nd k

eepi

ng th

e si

te fr

ee o

f tra

ffic

or o

ther

wei

ght l

oads

.

Not

e th

at s

ite-s

peci

fic c

hoic

e of

an

appr

opria

te v

eget

ativ

e gr

ound

-cov

er s

eed

mix

, inc

ludi

ng th

e pr

oper

see

ding

rat

io o

f on

e or

mor

e pe

renn

ial s

peci

es w

ith a

dee

p ta

proo

t sys

tem

and

the

prop

er

amou

nt o

f lim

e an

d so

il nu

trien

ts (

ferti

lizer

mix

) ad

apte

d to

the

soil-

need

s, ar

e ba

sic

to th

e fin

al

prac

tice

of l

ands

capi

ng,

i.e:

surf

ace

tilla

ge,

seed

ing/

plan

ting/

ferti

lizin

g an

d cu

lti-p

acki

ng o

r m

ulch

ing

is a

pplie

d. T

he "

mai

nten

ance

" of

an

effe

ctiv

ely

deep

-rip

ped

and

deco

mpa

cted

are

a is

ge

nera

lly l

imite

d to

the

suc

cess

ful

pere

nnia

l (lo

ng-te

rm)

land

scap

e gr

ound

cov

er;

as l

ong

as n

o w

eigh

t-bea

ring

forc

e of

soil

com

pact

ion

is a

pplie

d.

Fig.

14.

The

seve

rely

com

pact

ed so

il of

a

tem

pora

ry c

onst

ruct

ion

yard

use

d da

ily b

y he

avy

equi

pmen

t for

four

mon

ths;

show

n be

fore

dee

p rip

ping

, top

soil

repl

acem

ent,

and

deco

mpa

ctio

n.

11

The

Dee

p R

ippi

ng a

nd D

ecom

pact

ion

prac

tice

is,

by n

eces

sity

, m

ore

exte

nsiv

e th

an p

erio

dic

subs

oilin

g of

far

mla

nd.T

he c

ost

of d

eep

rippi

ng a

nd d

ecom

pact

ing

(dee

p su

bsoi

ling)

, will

var

y ac

cord

ing

to t

he d

epth

and

sev

erity

of

soi

l-mat

eria

l co

mpr

essi

on

and

the

rel

ativ

e am

ount

of

tract

or

and

impl

emen

t tim

e th

at

is

requ

ired.

In

so

me

inst

ance

s, de

pend

ing

on

open

m

aneu

vera

bilit

y, tw

o-to

-thre

e ac

res

of c

ompa

cted

pro

ject

are

a m

ay b

e de

ep-r

ippe

d in

one

day

. In

othe

r situ

atio

ns o

f mor

e se

vere

com

pact

ion

and

- or l

ess

man

euve

rabi

lity,

as

little

as

one

acre

may

be

ful

ly r

ippe

d in

a d

ay. G

ener

ally

, if

the

Phas

e 1)

Dee

p R

ippi

ng is

ful

ly e

ffec

tive,

the

Phas

e 2)

D

ecom

pact

ion

shou

ld b

e co

mpl

eted

in 2

/3 to

3/4

of t

he ti

me

requ

ired

for P

hase

1.

Usi

ng th

e ex

ampl

e of

two

acre

s of

Pha

se 1

) D

eep

Rip

ping

in o

ne d

ay, a

t $18

00 p

er d

ay, t

he n

et

cost

is $

900

per a

cre.

If th

e Ph

ase

2) D

ecom

pact

ing

or d

eep

subs

oilin

g ta

kes

3/4

the

time

as P

hase

1,

it c

osts

$67

5 pe

r ac

re f

or a

com

bine

d to

tal o

f $1

575

per

acre

to c

ompl

ete

the

prac

tice

(thes

e fig

ures

do

not i

nclu

de th

e co

st o

f the

sep

arat

e pr

actic

e of

tops

oil s

tripp

ing

and

repl

acem

ent).

Due

to

the

man

y va

riabl

es, i

t mus

t be

reco

gniz

ed th

at c

ost w

ill b

e de

term

ined

by

the

spec

ific

cond

ition

s or

con

stra

ints

of t

he si

te a

nd th

e av

aila

bilit

y of

pro

per e

quip

men

t.

12

Res

ourc

es

Publications:

American

Societyof

AgriculturalE

ngineers.1971.CompactionofAgriculturalSoils.ASA

E.

Brad

y,N.C.,an

dR.R.

Weil.2002.TheNatureandPropertiesofSoils.13thed.P

earson

Education,

Inc.

Baver,L.D.1948.SoilPhysics.John

Wiley&Sons.

Carpa

chi,N.1987(1995fifth

printin

g).ExcavationandGradingHandbook,Revised.2nded.C

rafts

man

Book

Com

pany

Ellis,B

.(Ed

itor).1997.

Safe

&Ea

syLa

wnCare:

TheCom

pleteGuide

toOrgan

icLo

wMaintenan

ceLa

wn.

Hou

ghtonMifflin

.

Harpstead

,M.I.,T

.J.Saue

r,an

dW.F.B

ennett.

2001.SoilScienceSimplified.4

thed.Iow

aStateUniversity

Press.

Magdo

ff,F.,

and

H.v

anEs.

2000.BuildingSoils

forBetterCrops.2nded.S

ustainable

Agricultural

Networks

McC

arthy,

D.F.1993.EssentialsofSoilMechanicsandFoundations,BasicGeotechnics4thed.R

egents/Prentice

Hall.

Plaster,E.J.1992.SoilScience&Management.3rded.D

elmar

Publishers.

Union

Gas

Limite

d,Ontario,Can

ada.

1984.RehabilitationofAgriculturalLands,DawnKerwoodLoop

Pipeline;TechnicalReport.

Ecolog

ical

Services

forPlan

ning

,Ltd.;R

obinson,

Merritt&

Devries,

Ltd.

andSm

ith,H

offm

anAssociates,Ltd.

USDepartm

ento

fAgriculture

incoop

erationwith

CornellUniversity

AgriculturalE

xperim

entStation.

Various

years.SoilSurveyof(variousnames)County,NewYork.U

SDA.

InternetAccess:

Exam

ples

ofim

plem

ents:

VRipp

ers.

Accessb

yinternetsearch

ofJohnDeereAgNewEquipmentfor915(la

rger

fram

emod

el)V

Rippe;

and,for913

(smallerfram

emod

el)VRipper.Deep,

angled

legsubsoiler.

Accessby

internet

search

of:BighamBrothersShearBoltParatillSubsoiler.

http

://s

ales

man

ual.d

eere

.com

/sal

es/s

ales

man

ual/e

n_N

A/pr

imar

y_til

lage

/200

8/fe

atur

e/rip

pers

/915

v_pa

tter

n_fr

ame.

htm

l?sb

u=a

g&lin

k=pr

odca

t La

stvisitedMarch

08.

Soils

data

ofUSD

ANatural

Resources

Con

servation

Service.

NRCSWeb

SoilSurvey.

http://websoilsurvey.nrcs.usda.go

v/ap

p/an

dUSDANRCSOfficialSoilSeriesDescriptions;View

byName.http://ortho.ftw

.nrcs.usda

.gov

/cgi

bin/osd/osdn

ame.cgi.LastvisitedJan.08.

Soil

penetrom

eter

inform

ation.

Accessby

internet

searches

of:DiagnosingSoilCompactionusinga

Penetrometer(soilcompactiontester),PSUExtension;

aswellasDickeyjohnSoilCompactionTester.

http

://w

ww

.dic

key-

john

prod

ucts

.com

/pdf

/Soi

lCom

pact

ionT

est.

pdf

and

http

://c

rops

oil.p

su.e

du/E

xten

sion

/Fac

ts/u

c178

pdfLa

stvisitedSept.07

 

Appendix F: Post-Construction Inspections and Maintenance

Stormwater Pollution Prevention Plan Batista Southeast Dunkin’ Appendix F-1

Chazen Job Number: 81625.00 The Chazen Companies

POST CONSTRUCTION INSPECTIONS AND MAINTENANCE

1. SITE COVER

a. Inspections

Site cover and associated structures and embankments should be inspected periodically for the first few months following construction and then on a biannual basis. Site inspections should also be performed following all major (i.e., intense storms, thunder storms, cloud burst, etc.) storm events. Items to check for include (but are not limited to):

i. Differential settlement of embankments, cracking or erosion.

ii. Lack of vigor and density of grass turf.

iii. Accumulation of sediments or litter on lawn areas, paved areas, or within catch basin sumps.

iv. Accumulation of pollutants, including oils or grease, in catch basin sumps.

v. Damage or fatigue of storm sewer structures or associated components.

b. Mowing and Sweeping

Vegetated areas and landscaping should be maintained to promote vigorous and dense growth. Lawn areas should be mowed at least three times a year (more frequent mowing may be desired for aesthetic reasons). Resultant yard waste shall be collected and disposed of off-site.

Paved areas should be swept at least twice a year. Additional sweeping may be appropriate in the early spring for removal of deicing materials

c. Debris and Litter Removal

Accumulation of litter and debris should be removed during each mowing or sweep operation.

d. Structural Repair or Replacement

Components of the system which require repair or replacement should be addressed immediately following identification.

e. Catch Basins

The frequency for cleanout of catch basin sumps will depend on the efficiency of mowing, sweeping, and debris and litter removal. Sumps should be cleaned when accumulation of sediments are within six inches of the catch basin outlet pipe.

Disposal of material from catch basins sumps, drainage manholes, and trench drains shall be in accordance with local, state, and federal guidelines.

Stormwater Pollution Prevention Plan Batista Southeast Dunkin’ Appendix F-2

Chazen Job Number: 81625.00 The Chazen Companies

f. Grassed Swales

Swale maintenance will include periodic mowing, occasional spot reseeding and weed control to keep grass cover dense and vigorous. Resultant yard waste shall be collected and disposed of off-site. Application of fertilizers and pesticides should be restricted or limited.

g. Rip-rap Dissipation structures

Rip-rap used to dissipate energy from pipe outfalls shall be cleaned or replaced when it becomes overburdened with silt or sediment.

h. Winter Maintenance

To prevent impacts to storm water management facilities, the following winter maintenance limitations, restrictions, or requirements are recommended:

i. Remove snow and ice from inlet structures, basin inlet and outlet structures and away from culvert end sections.

ii. Snow removed from paved areas should not be piled at inlets/outlets of the storm water management basin.

iii. Use of deicing materials should be limited to sand and “environmentally friendly” chemical products. Use of salt mixtures should be kept to a minimum.

iv. Sand used for deicing should be clean, course material free of fines, silt, and clay.

v. Materials used for deicing should be removed during the early spring by sweeping and/ or vacuuming.

Appendix G: Figures

Service Layer Credits: USGS The NationalMap: National Boundaries Dataset, 3DEP

Date:

Scale:

Project:

Figure:

Drawn:

58

62

65

54

312

22

0 2,000 4,0001,000Feet

1 in = 2,000 ft

RL-B

12/11/2018

81625.00

1

Batista Southeast Dunkin Donuts

USGS Location Map

1617 State Route 22, Town of Southeast - Putnam County, NYENGINEERS

LAND SURVEYORSPLANNERS

ENVIRONMENTAL & SAFETY PROFESSIONALSLANDSCAPE ARCHITECTS

Dutchess County Office:21 Fox Street, Poughkeepsie, NY 12601Phone: (845) 454-3980

North Country Office:20 Elm St, Suite 110Glens Falls, NY 12801Phone: (518) 812-0513

LegendProject Area

Capital District Office:547 River Street, Troy, NY 12180Phone: (518) 273-0055

Service Layer Credits:

Date:

Scale:

Project:

Figure:

Drawn:

312

22

PnB

PnC

RdB

0 60 12030Feet

1 inch = 60 feet

RL-B

12/11/2018

81625.00

4

Batista Southeast Dunkin Donuts

Soils Map

1617 State Route 22, Town of Southeast - Putnam County, NYENGINEERS

LAND SURVEYORSPLANNERS

ENVIRONMENTAL & SAFETY PROFESSIONALSLANDSCAPE ARCHITECTS

Dutchess County Office:21 Fox Street, Poughkeepsie, NY 12601Phone: (845) 454-3980

North Country Office:20 Elm St, Suite 110Glens Falls, NY 12801Phone: (518) 812-0513

LegendProject AreaTax Parcels

Mapunit Symbol, Mapunit NamePnB : Paxton fine sandy loam, 2 to8 percent slopes

PnC : Paxton fine sandy loam, 8 to15 percent slopesRdB : Ridgebury loam, 3 to 8percent slopes

Capital District Office:547 River Street, Troy, NY 12180Phone: (518) 273-0055

2

Service Layer Credits:

Date:

Scale:

Project:

Figure:

Drawn:

0 1,800 3,600900Feet

1 in = 1,800 ft

RL-B

12/11/2018

81625.00

7

Batista Southeast Dunkin Donuts

NYSOPRHP Cultural ResourceInformation System (CRIS) Map

1617 State Route 22, Town of Southeast - Putnam County, NYENGINEERS

LAND SURVEYORSPLANNERS

ENVIRONMENTAL & SAFETY PROFESSIONALSLANDSCAPE ARCHITECTS

Dutchess County Office:21 Fox Street, Poughkeepsie, NY 12601Phone: (845) 454-3980

North Country Office:20 Elm St, Suite 110Glens Falls, NY 12801Phone: (518) 812-0513

LegendProject AreaNational Register Building SitesSurvey ArchaeologyConsultation ProjectsArcheologically Sensitive Areas

Capital District Office:547 River Street, Troy, NY 12180Phone: (518) 273-0055

3

Service Layer Credits:

Date:

Scale:

Project:

Figure:

Drawn:

0 800 1,600400Feet

1 in = 800 ft

RL-B

12/11/2018

81625.00

6

Batista Southeast Dunkin Donuts

NYSDEC Environmental Resource Map

1617 State Route 22, Town of Southeast - Putnam County, NYENGINEERS

LAND SURVEYORSPLANNERS

ENVIRONMENTAL & SAFETY PROFESSIONALSLANDSCAPE ARCHITECTS

Dutchess County Office:21 Fox Street, Poughkeepsie, NY 12601Phone: (845) 454-3980

North Country Office:20 Elm St, Suite 110Glens Falls, NY 12801Phone: (518) 812-0513

LegendProject AreaState Regulated FreshwaterWetlandsState Regulated WetlandCheckzoneNatural Communities Near ThisLocationRare Plants or Animals

Capital District Office:547 River Street, Troy, NY 12180Phone: (518) 273-0055

4

“ ”

Office Locations:

Proud to be Employee Owned

Hudson Valley Office:

North Country Office:

Capital District Office: Tennessee Office:

CHAZEN ENGINEERING, LAND SURVEYING LANDSCAPE ARCHITECTURE, CO., D.P.C.

Westchester NY Office:Civil Engineers

Land Surveyors

Planners

Environmental & Safety Professionals

Landscape Architects

Transportation Planners & Engineers

BATISTA SOUTHEAST DUNKIN'

TOWN OF SOUTHEAST, PUTNAM COUNTY, NEW YORK

EROSION CONTROL LEGEND:

EROSION & SEDIMENT CONTROL PLAN:

PRIOR TO CONSTRUCTION

C150

Call Before You DigWait The Required TimeConfirm Utility ResponseRespect The MarksDig With Care

800-962-7962www.digsafelynewyork.com

Dig Safely.New York

NO PARKING - LOADING AREAP

RO

PO

SE

D 1 S

TO

RY

DU

NK

IN

D

ON

UT

S

8

9

EROSION CONTROL LEGEND:

EROSION & SEDIMENT CONTROL PLAN

DURING CONSTRUCTION

C151

“ ”

Office Locations:

Proud to be Employee Owned

Hudson Valley Office:

North Country Office:

Capital District Office: Tennessee Office:

CHAZEN ENGINEERING, LAND SURVEYING LANDSCAPE ARCHITECTURE, CO., D.P.C.

Westchester NY Office:Civil Engineers

Land Surveyors

Planners

Environmental & Safety Professionals

Landscape Architects

Transportation Planners & Engineers

BATISTA SOUTHEAST DUNKIN'

TOWN OF SOUTHEAST, PUTNAM COUNTY, NEW YORK

Call Before You DigWait The Required TimeConfirm Utility ResponseRespect The MarksDig With Care

800-962-7962www.digsafelynewyork.com

Dig Safely.New York

 

Appendix H: Chazen Certifying  

Professionals Letter