atlantic yards b2 foil, ay stv report - 5-30-14 - proposed redactions_redacted
DESCRIPTION
tlantic Yards B2 FOIL, AY STV Report - 5-30-14 - Proposed Redactions_RedactedTRANSCRIPT
![Page 1: Atlantic Yards B2 FOIL, AY STV Report - 5-30-14 - Proposed Redactions_Redacted](https://reader035.vdocument.in/reader035/viewer/2022080106/577cb1cb1a28aba7118bded1/html5/thumbnails/1.jpg)
![Page 2: Atlantic Yards B2 FOIL, AY STV Report - 5-30-14 - Proposed Redactions_Redacted](https://reader035.vdocument.in/reader035/viewer/2022080106/577cb1cb1a28aba7118bded1/html5/thumbnails/2.jpg)
![Page 3: Atlantic Yards B2 FOIL, AY STV Report - 5-30-14 - Proposed Redactions_Redacted](https://reader035.vdocument.in/reader035/viewer/2022080106/577cb1cb1a28aba7118bded1/html5/thumbnails/3.jpg)
STV Construction, Inc.
Project Date 5/27/2014Location Weekday Tuesday
Client Report # 324
Contract # Weather
Project # Temp. L/H 71/85
STV Representative: Bill King Wind Speed
Work hours 8:30-5:30 Precip
117 118 1.0
930 0.126
Tower Crane - Inactive for 31st weekday in a row although some movement - reportedly is being prepared to receive lifting apparatus to attach to sides of tower on Wed.
Module Transportation - 0 mods delivered to site.
Module Installation - 0 new mods installed. Mod completion stands at 12.6%, 117 of 930 installed. Installation Rate = 117 in 118 work days = 1 mod per day so far. FCR informed on 5/13 that restart of mod installation pushed back to June 9 from June 2 and that it is expected installation will halt again after installation of the 6th-8th floors, possibly the 9th floor, waiting for another 3-floor backlog to be manufactured.
Module Fabrication - Ongoing at Navy Yard, presumably, working on 7th floor mods with 142-man workforce. FCR reported on 5/2 that 6th floor mods were all done, per schedule. On 5/13, a number of mods observed sitting outside Bldg 293 at the Navy Yard along with a host of frames (largest quantity seen sitting outside). Schedule received 4/28 states 7th Floor mods commenced production on 4/18 and will be finished by 5/14 but FCR informed on 5/13 that were running late and on 5/14 reported they will be finished the week of 5/21 and that the 8th floor mods had begun production.
MEP - Sprinkler on 2nd/3rd and storm pipe on 1st floor as well as electrical conduit continued in basement levels, primarily upper level.
Additional New Observations: Spray-on fireproofing (SOFP) stopped for the week at approximately noon on Thursday. No spraying operation today. SOFP sub not on site.
DAILY CONSTRUCTION REPORT
Atlantic YardsB2ESD
6717 Sunny, Clouding Up
2114659
Summary of Construction Activities
16 mph gusting to 26 mph
0"
Other - No Con Ed.
New Information received: Still on track to receive mods on June 9. Info on tower crane above.
New Information requested:
Civetta on site placing last of backfill (reportedly) between arena and B2.
At Navy Yard Wed., 10/16, FCR stated that first mods would arrive on site in late December/early January and that there would be a backlog of 30-40 (1-2 floors worth) to 80 (3 floors worth) mods completed at that time which it was felt will be sufficient for production to keep ahead of erection so there will be no downtime during mod erection at the B2 site.
Previous observations: Front façade is 33-35' from the ped walkway. Flatbush façade is 12' from the edge of the sidewalk shed. Height exceeds 2 X the distance between the building and the ped crosswalk at Flatbush across Dean.
Previous Information received: Mod installation now not starting until June 9 per FCR. 7th floor mods due to be finished now the week of 5/21. FCR reiterates that 6th, 7th & 8th floors and Skanska adds poss bly the 9th floor will be installed after which job will shut down again.
Paper documenting DOB's approval (signed 2/2/14) of no sidewalk shed on Dean received on 3/21/14.
Are to 'uninstall' a few of the 5th floor mods in order to correct gasket allignment issues (haven't yet). No leaks noticed in western part of 5th floor where mods are to be uninstalled.
Information to be requested: More information on quality issues noticed with the mods - exterior: torn gaskets, dents and scratches to the façade; interior: lack of completeness of mods.
y.
Information previously requested: 5/1/14 - .
2/27/14 - Copies of sketches or drawings of roof fixes (of John Dolan, Skanska). No response.
4/8: Jury is still out on gaskets which may be under increasing stress under weight of additional floors.
1 of 2
![Page 4: Atlantic Yards B2 FOIL, AY STV Report - 5-30-14 - Proposed Redactions_Redacted](https://reader035.vdocument.in/reader035/viewer/2022080106/577cb1cb1a28aba7118bded1/html5/thumbnails/4.jpg)
STV Construction, Inc.
Manpower on Site 10-20
Navillus 0
Stearns 0
J SuporTrucking 0
MEP trades 5-10
Other 5-10
William King 5/27/2014 Date
Manpower figure is rough approximation by STV.
Potain Tower Crane (I)
Contract changes, claims, deficiencies, RFI's, RFP's reported to STV by FCR: None
Special instruction(s) given:
Prepared by William King
Materials Delivered other than Mods (Observed)Equip. Arr./ Departure-Observed
Major Equipment on site (I = Inactive)
2 of 2
![Page 5: Atlantic Yards B2 FOIL, AY STV Report - 5-30-14 - Proposed Redactions_Redacted](https://reader035.vdocument.in/reader035/viewer/2022080106/577cb1cb1a28aba7118bded1/html5/thumbnails/5.jpg)
STV Construction, Inc.
Project Date 5/28/2014Location Weekday Wednesday
Client Report # 325
Contract # Weather
Project # Temp. L/H 54/74
STV Representative: Bill King Wind Speed
Work hours 7:30-5:30 Precip
117 119 1.0
930 0.126
Tower Crane - Back in action with full crew of ironworkers to self-install jump attachment to tower after inactivity since last mods installed on 4/14.
Module Transportation - 0 mods delivered to site.
Module Installation - 0 new mods installed. Mod completion stands at 12.6%, 117 of 930 installed. Installation Rate = 117 in 119 work days = 1 mod per day so far. FCR informed on 5/13 that restart of mod installation pushed back to June 9 from June 2 and that it is expected installation will halt again after installation of the 6th-8th floors, possibly the 9th floor, waiting for another 3-floor backlog to be manufactured.
Module Fabrication - Ongoing at Navy Yard, presumably, working on 7th floor mods with 142-man workforce. FCR reported on 5/2 that 6th floor mods were all done, per schedule. On 5/13, a number of mods observed sitting outside Bldg 293 at the Navy Yard along with a host of frames (largest quantity seen sitting outside). Schedule received 4/28 states 7th Floor mods commenced production on 4/18 and will be finished by 5/14 but FCR informed on 5/13 that were running late and on 5/14 reported they will be finished the week of 5/21 and that the 8th floor mods had begun production.
MEP -
Additional New Observations: Again no spray-on fireproofing (SOFP) - stopped since noon on Thursday.
DAILY CONSTRUCTION REPORT
Atlantic YardsB2ESD
6717 Overcast, Cooler
2114659
Summary of Construction Activities
15 mph gusting to 30 mph
0"
Other - No Con Ed.
New Information received: Still on track to receive mods on June 9. Info on tower crane above.
New Information requested:
At Navy Yard Wed., 10/16, FCR stated that first mods would arrive on site in late December/early January and that there would be a backlog of 30-40 (1-2 floors worth) to 80 (3 floors worth) mods completed at that time which it was felt will be sufficient for production to keep ahead of erection so there will be no downtime during mod erection at the B2 site.
Previous observations: Front façade is 33-35' from the ped walkway. Flatbush façade is 12' from the edge of the sidewalk shed. Height exceeds 2 X the distance between the building and the ped crosswalk at Flatbush across Dean.
Previous Information received: Mod installation now not starting until June 9 per FCR. 7th floor mods due to be finished now the week of 5/21. FCR reiterates that 6th, 7th & 8th floors and Skanska adds poss bly the 9th floor will be installed after which job will shut down again.
Paper documenting DOB's approval (signed 2/2/14) of no sidewalk shed on Dean received on 3/21/14.
Are to 'uninstall' a few of the 5th floor mods in order to correct gasket allignment issues (haven't yet). No leaks noticed in western part of 5th floor where mods are to be uninstalled.
Information to be requested: More information on quality issues noticed with the mods - exterior: torn gaskets, dents and scratches to the façade; interior: lack of completeness of mods.
1/20/14 -
Information previously requested: 5/1/14 -
2/27/14 - Copies of sketches or drawings of roof fixes (of John Dolan, Skanska). No response.
4/8: Jury is still out on gaskets which may be under increasing stress under weight of additional floors.
1 of 2
![Page 6: Atlantic Yards B2 FOIL, AY STV Report - 5-30-14 - Proposed Redactions_Redacted](https://reader035.vdocument.in/reader035/viewer/2022080106/577cb1cb1a28aba7118bded1/html5/thumbnails/6.jpg)
STV Construction, Inc.
Manpower on Site 20-30
Navillus 0
Stearns 10
J SuporTrucking 0
MEP trades 5-10
Other 5-10
William King 5/28/2014 Date
Manpower figure is rough approximation by STV.
Potain Tower Crane
Contract changes, claims, deficiencies, RFI's, RFP's reported to STV by FCR: None
Special instruction(s) given:
Prepared by William King
Materials Delivered other than Mods (Observed)Equip. Arr./ Departure-Observed
Major Equipment on site (I = Inactive)
2 of 2
![Page 7: Atlantic Yards B2 FOIL, AY STV Report - 5-30-14 - Proposed Redactions_Redacted](https://reader035.vdocument.in/reader035/viewer/2022080106/577cb1cb1a28aba7118bded1/html5/thumbnails/7.jpg)
STV Construction, Inc.
Project Date 5/29/2014Location Weekday Thursday
Client Report # 326
Contract # Weather
Project # Temp. L/H 51/65
STV Representative: Bill King Wind Speed
Work hours 8:30-4:30 Precip
117 120 1.0
930 0.126
Tower Crane - Active for 2nd day in row - Now 3 5th floor mods removed to ground for gasket inspection/repairs.
Module Transportation - 0 mods delivered to site.
Module Installation - 0 new mods installed. Mod completion stands at 12.6%, 117 of 930 installed. Installation Rate = 117 in 120 work days = 1 mod per day so far. Last mod installed 4/14. FCR informed on 5/13 that restart of mod installation pushed back to June 9 from June 2 and that it is expected installation will halt again after installation of the 6th-8th floors, possibly the 9th floor, waiting for another 3-floor backlog to be manufactured.
Module Fabrication - Ongoing at Navy Yard, presumably, working on 7th floor mods with 142-man workforce. FCR reported on 5/2 that 6th floor mods were all done, per schedule. On 5/13, a number of mods observed sitting outside Bldg 293 at the Navy Yard along with a host of frames (largest quantity seen sitting outside). Schedule received 4/28 states 7th Floor mods commenced production on 4/18 and will be finished by 5/14 but FCR informed on 5/13 that were running late and on 5/14 reported they will be finished the week of 5/21 and that the 8th floor mods had begun production.
MEP -
Additional New Observations: Spray-on fireproofing (SOFP) still stopped; none since approximately noon on Thursday, May 22.
DAILY CONSTRUCTION REPORT
Atlantic YardsB2ESD
6717 Sunny, Cool
2114659
Summary of Construction Activities
Slight (12 mph)
0"
Other - No Con Ed.
New Information received: Environmental consultant is Skanska's. FCR waiting for mold inspection report
New Information requested: Requested mold inspection report from Skanska.
At Navy Yard Wed., 10/16, FCR stated that first mods would arrive on site in late December/early January and that there would be a backlog of 30-40 (1-2 floors worth) to 80 (3 floors worth) mods completed at that time which it was felt will be sufficient for production to keep ahead of erection so there will be no downtime during mod erection at the B2 site.
Previous observations: Front façade is 33-35' from the ped walkway. Flatbush façade is 12' from the edge of the sidewalk shed. Height exceeds 2 X the distance between the building and the ped crosswalk at Flatbush across Dean.
Previous Information received: Mod installation now not starting until June 9 per FCR. 7th floor mods due to be finished now the week of 5/21. FCR reiterates that 6th, 7th & 8th floors and Skanska adds poss bly the 9th floor will be installed after which job will shut down again.
Paper documenting DOB's approval (signed 2/2/14) of no sidewalk shed on Dean received on 3/21/14.
Are to 'uninstall' a few of the 5th floor mods in order to correct gasket allignment issues (haven't yet). No leaks noticed in western part of 5th floor where mods are to be uninstalled.
Information to be requested: More information on quality issues noticed with the mods - exterior: torn gaskets, dents and scratches to the façade; interior: lack of completeness of mods.
1/20/14
Information previously requested: 5/1/14 - Inquired with FCR's
2/27/14 - Copies of sketches or drawings of roof fixes (of John Dolan, Skanska). No response.
4/8: Jury is still out on gaskets which may be under increasing stress under weight of additional floors.
1 of 2
![Page 8: Atlantic Yards B2 FOIL, AY STV Report - 5-30-14 - Proposed Redactions_Redacted](https://reader035.vdocument.in/reader035/viewer/2022080106/577cb1cb1a28aba7118bded1/html5/thumbnails/8.jpg)
STV Construction, Inc.
Manpower on Site 20-30
Navillus 0
Stearns 10
J SuporTrucking 0
MEP trades 5-10
Other 5-10
William King 5/29/2014 Date
Manpower figure is rough approximation by STV.
Potain Tower Crane
Contract changes, claims, deficiencies, RFI's, RFP's reported to STV by FCR: None
Special instruction(s) given:
Prepared by William King
Materials Delivered other than Mods (Observed)Equip. Arr./ Departure-Observed
Major Equipment on site (I = Inactive)
2 of 2
![Page 9: Atlantic Yards B2 FOIL, AY STV Report - 5-30-14 - Proposed Redactions_Redacted](https://reader035.vdocument.in/reader035/viewer/2022080106/577cb1cb1a28aba7118bded1/html5/thumbnails/9.jpg)
STV Construction, Inc.
Project Date 5/30/2014Location Weekday Friday
Client Report # 327
Contract # Weather
Project # Temp. L/H 55/75
STV Representative: Bill King Wind Speed
Work hours 8:30-4:30 Precip
117 121 1.0
930 0.126
2114659
Summary of Construction Activities
Slight
0"
Other - No Con Ed.
DAILY CONSTRUCTION REPORT
Atlantic YardsB2ESD
6717 Sunny, Perfect Weather
Tower Crane - Used to place 3 mods taken off building Wed-Thurs back onto building.
Module Transportation - 0 mods delivered to site.
Module Installation - 0 new mods installed. Mod completion stands at 12.6%, 117 of 930 installed. Installation Rate = 117 in 121 work days = 1 mod per day so far. Last mod installed 4/14. FCR informed on 5/13 that restart of mod installation pushed back to June 9 from June 2 and that it is expected installation will halt again after installation of the 6th-8th floors, possibly the 9th floor, waiting for another 3-floor backlog to be manufactured.
Module Fabrication - Ongoing at Navy Yard, presumably, working on 7th floor mods with 142-man workforce. FCR reported on 5/2 that 6th floor mods were all done, per schedule. On 5/30 as well as on 5/13, a number of mods observed sitting outside Bldg 293 at the Navy Yard along with a host of frames (largest quantity seen sitting outside). Schedule received 4/28 states 7th Floor mods commenced production on 4/18 and will be finished by 5/14 but FCR informed on 5/13 that were running late and on 5/14 reported they will be finished the week of 5/21 and that the 8th floor mods had begun production.
MEP -
Additional New Observations: Spray-on fireproofing (SOFP) resumed on ground floor, west side, after 1-week hiatus. Tarps hung around area. Insignificant particlulates escaped through half-floor height hole in tarps at tower crane arm.
Paper documenting DOB's approval (signed 2/2/14) of no sidewalk shed on Dean received on 3/21/14.
Per FCR, environmental consultant returning to site on Monday, 6/2/14. Answers to STV's questions after that.
Are to 'uninstall' a few of the 5th floor mods in order to correct gasket allignment issues (haven't yet). No leaks noticed in western part of 5th floor where mods are to be uninstalled.
Information to be requested: More information on quality issues noticed with the mods - exterior: torn gaskets, dents and scratches to the façade; interior: lack of completeness of mods.
1/20/14 -
Information previously requested: 5/1/14 -
2/27/14 - Copies of sketches or drawings of roof fixes (of John Dolan, Skanska). No response.
4/8: Jury is still out on gaskets which may be under increasing stress under weight of additional floors.
New Information received: 1-page very general environmental consultant's report on mold (from FCR).
New Information requested: Follow-up questions to FCR on 1-page mold inspection report.
At Navy Yard Wed., 10/16, FCR stated that first mods would arrive on site in late December/early January and that there would be a backlog of 30-40 (1-2 floors worth) to 80 (3 floors worth) mods completed at that time which it was felt will be sufficient for production to keep ahead of erection so there will be no downtime during mod erection at the B2 site.
Previous observations: Front façade is 33-35' from the ped walkway. Flatbush façade is 12' from the edge of the sidewalk shed. Height exceeds 2 X the distance between the building and the ped crosswalk at Flatbush across Dean.
Previous Information received: Mod installation now not starting until June 9 per FCR. 7th floor mods due to be finished now the week of 5/21. FCR reiterates that 6th, 7th & 8th floors and Skanska adds poss bly the 9th floor will be installed after which job will shut down again.
1 of 2
![Page 10: Atlantic Yards B2 FOIL, AY STV Report - 5-30-14 - Proposed Redactions_Redacted](https://reader035.vdocument.in/reader035/viewer/2022080106/577cb1cb1a28aba7118bded1/html5/thumbnails/10.jpg)
STV Construction, Inc.
Manpower on Site 15-30
Navillus 0
Stearns 5-10
J SuporTrucking 0
MEP trades 5-10
Other 5-10
William King 5/30/2014 Date
Potain Tower Crane
Contract changes, claims, deficiencies, RFI's, RFP's reported to STV by FCR: None
Special instruction(s) given:
Prepared by William King
Materials Delivered other than Mods (Observed)Equip. Arr./ Departure-Observed
Major Equipment on site (I = Inactive)
Manpower figure is rough approximation by STV.
2 of 2