Brad Stocker Practice Manager, Consulting May 8 th , 2008 Meeting the Challenges of IT Optimization Using Financial Justification to “Jump Start” a Server, Desktop or Storage Consolidation project © 2008 Avnet Inc. All rights reserved.

Upload: cameroon45

Post on 11-Jun-2015

450 views

Category:

Technology


0 download

TRANSCRIPT

Page 1: ATS Americas IT Consolidation May2008 - Stocker.ppt

Brad StockerPractice Manager, Consulting

May 8th, 2008

Meeting the Challenges of IT Optimization… Using Financial Justification to “Jump

Start” a Server, Desktop or Storage Consolidation project

© 2008 Avnet Inc. All rights reserved.

Page 2: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Discussion Topics

» Perspective» Consolidation Assessment Services» Approach, Methodology & Tools» Server Case Study x86 Study» Desktop Assessments» Storage Assessments» Next Steps

Page 3: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Ripe for Consolidation

0

1,000,000

2,000,000

3,000,000

4,000,000

5,000,000

6,000,000

7,000,000

8,000,000

9,000,000

10,000,000

1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

$0

$5,000

$10,000

$15,000

$20,000

$25,000

$30,000

$35,000

$40,000

Server shipments Server ASP

Page 4: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Importance of a Financial JustificationQ: Using a scale of 1 to 5, with 1 being “not at all important” and 5 being “very important”, how important is financial justification, such as ROI, for securing internal funding for an IT project at your company?

0%

5%

10%

15%

20%

25%

30%

35%

40%

45%

1 - NotImportant

3 5 - VeryImportant

% of Responses

79%

Page 5: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Your part …

Page 6: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Consolidation Impact Assessment Services

» Unix (HP-UX, Solaris, VMS, Tru64, AIX) Server Consolidation Assessment –to- Integrity (HP-UX or Linux)

» Windows and Linux on x86 –to- VMware VI3» Desktop Virtualization Assessment –to- VDI or HP

PC Blade environment

Page 7: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Assessment StrategyAnalyze both the Technical and Financial Impact of Server and

Storage consolidation

» Use a tool called CapacityPlanner from VMware» Non-disruptively captures hardware and software inventory from current

environment» Measure actual utilization of servers and records the peak workloads» Uses peak workloads to create consolidation scenarios

» Model Financial Impact using Brigham-Gapenski Methodology» Collects financial assumptions at start of project via Financial Questionnaire» Total Cost of Ownership (TCO) analysis of selected IT environment» Compares baseline to the costs of a consolidated environment» Provides a detailed Return On Investment analysis

Page 8: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

VMware Capacity Planner

Data Upload

Data Analyzer

HTTPS

InformationWarehouse

Infrastructure Assessments

Capacity Planning

Server Consolidation

Capacity Planner Dashboard

Discovery Inventory

Performance Data Synch

Data ManagerClient IT Environment

DataCollector

Agent-less Data Collection

ClientSite

HostedSecure Site

Web

Industry Data

Page 9: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Hardware

Platform B

CPU

0 – 1

GH

z

CPU

1 – 1

GH

z

Hardware

Platform A

CPU

0 –

80

0M

Hz

CPU

1 –

80

0M

Hz

Virtualization Modeling

Capacity

Planner

Hardware

Platform C

CPU

0 – 2

GH

z

CPU

1 – 2

GH

z

Application C

80% Utilizatio

nApplicati

on B80%

Utilization

App. A80%

Utilization

Target Platform

CPU

0 – 2

.4G

Hz

CPU

1 – 2

.4G

Hz

Inventory gathered using Collector

Utilization gathered using Collector

Page 10: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Virtualization Modeling

Capacity

Planner

Hardware

Platform A

CPU

0 –

80

0M

Hz

CPU

1 –

80

0M

Hz

Hardware

Platform B

CPU

0 – 1

GH

z

CPU

1 – 1

GH

z

Hardware

Platform C

CPU

0 – 2

GH

z

CPU

1 – 2

GH

z

Application C

80% Utilizatio

nApplicat

ion B80%

Utilization

App. A80%

Utilization

Target Platform

CPU

0 – 2

.4G

Hz

CPU

1 – 2

.4G

Hz

App. A20%

Utilization

Virtualization

Page 11: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Virtualization Modeling

Capacity

Planner

Hardware

Platform A

CPU

0 –

80

0M

Hz

CPU

1 –

80

0M

Hz

Hardware

Platform B

CPU

0 – 1

GH

z

CPU

1 – 1

GH

z

Hardware

Platform C

CPU

0 – 2

GH

z

CPU

1 – 2

GH

z

Application C

80% Utilizatio

nApplicati

on B80%

Utilization

Target Platform

CPU

0 – 2

.4G

Hz

CPU

1 – 2

.4G

Hz

App. A20%

Utilization

Virtualization

Application B30%

Utilization

Virtualization

Page 12: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Virtualization Modeling

Capacity Planner

Hardware

Platform A

CPU

0 –

80

0M

Hz

CPU

1 –

80

0M

Hz

Hardware

Platform B

CPU

0 – 1

GH

z

CPU

1 – 1

GH

z

Hardware

Platform C

CPU

0 – 2

GH

z

CPU

1 – 2

GH

z

Application C

80% Utilizatio

n

Target Platform

CPU

0 – 2

.4G

Hz

CPU

1 – 2

.4G

Hz

App. A20%

Utilization

Virtualization

Application B

30% Utilization

Virtualization

Application C

50% Utilizatio

n

Virtualization

Page 13: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

x86-Windows Consolidation Case Study

Page 14: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Capacity Planner Windows Servers - What we’re seeing

» Rarely find sites with over 10% average prime time utilization … some sites lower than 5%

» About 40 physical servers per System Admin» Main cost drivers are Power, System Admin, Maintenance, and

Growth/Refresh» Seeing 3 year TCO’s of around $1.5 million per

100 servers» Typical consolidation of 7:1 to 10:1, goal is usually

at least 10:1» Typical IT Cost Reduction of 25%, < 18 month payback

Page 15: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

High-Level View: The Dashboard

Page 16: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Peak Load and Peak HourServer CPUs Mhz Business Hours Peak Load Peak Hour

aegis 2 448 6.86 21.34 10

arcadia 2 702 2.82 20.29 18

atlantis 1 199 7.09 22.79 8

boris 1 1,396 2.45 3.49 0

cim7 2 996 2.35 35.39 21

cisdev 2 0 8.6 44.33 15

coil 2 901 19.87 47.33 18

doc1 1 200 7.31 19.19 21

docbeta 1 448 3.8 49.15 21

edmsdb1 4 701 9.99 16.38 15

edmsdb1t 4 701 0.57 1.21 14

edmsdb2 4 701 2.88 5.17 2

edmsdb2t 4 701 1.3 5.08 2

edmsdc1 2 996 7.23 27.87 6

edmsdc1t 2 996 0.79 22.42 4

Page 17: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Created Scenarios – Windows

NameServers

InServers

OutServers Not Consolidated

453 Dovercourt to Target DL385 2.6 GHz (4) 16GB VM 4 1 0

Misc to Target DL385 2.6 GHz (4) 16GB VM 12 2 1

Unknown to Target DL385 2.6 GHz (4) 16GB VM 3 1 0

St. Mary DL580 to Target BL480c 3.2 GHz (4) 16GB VM 19 6 2

St. Mary minus DL580 to Target BL460c 3.2 GHz (4) 16GB VM 75 8 2

St. Mary minus DL580 to Target DL585 2.6 GHz (8) 16GB VM 75 8 2

Taylor DL580 to Target BL480c 3.2 GHz (4) 16GB VM 13 4 1

Taylor minus DL580 to Target BL460c 3.2 GHz (4) 16GB VM 76 12 5

Taylor minus DL580 to Target DL585 2.6 GHz (8) 16GB VM 76 12 5

Waverley DL580 to Target BL480c 3.2 GHz (4) 16GB VM 4 1 0

Waverley minus DL580 to Target BL460c 3.2 GHz (4) 16GB VM 41 4 1

Waverley minus DL580 to Target DL585 2.6 GHz (8) 16GB VM 41 4 1

Page 18: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Scenario Results – St. Mary Group

Page 19: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Financial Assumptions1. 314 Total Windows Servers from Dashboard

2. Net new physical server annual growth rate of 14.3%

3. Assume Five (5) year average useful life

4. Five year lifecycle for hardware with a refresh rate of 50% of 1/5 of the server base per year (10%)

5. Average Server replacement cost = $7,500

6. Six FTE for core Windows Servers Management, 75% utilized for server management at assumed $100,000 fully burdened cost

7. Assume IT budget assessed via five year straight line depreciation

Page 20: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Financial Assumptions - continued1. 228 Windows Servers considered as Consolidation Candidates and

placed in financial model

2. Average server age calculated from Ave server CPU MHz (2047) is 36.0 months

3. Using $1000/server/year as maintenance cost of servers over 36 months, assumes 50.0% of servers are over 36 months

4. Power/Cooling Costs, using calculated power, power infrastructure and AC costs based on 350 watts/server for existing servers and 600 watts/server for new at $0.04 per KWH

5. Assume no tax benefits

6. Requires a 36 month payback for project to be considered

Page 21: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Financial Findings

3 Year TCO Breakdown

Sys Admin Costs: $1,120,737 (~70 servers : 1 FTE ratio)

Break/Fix Maintenance: $342,046

Growth (Capital): $513,000 (~33 servers / year)

Refresh/Replace (Capital): $515,250 (~23 servers / year)

Power & Cooling: $471,600

TCO Baseline Summary – 228 Servers(St. Mary, Taylor, Waverley)

Current TCO = $2,433,660

Page 22: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Financial FindingsThree Year Payback Summary – 228 Servers(St. Mary, Taylor, Waverley)

Option

HW/SW Cost1

3 Year TCO2 IT Budget Reduction

Raw Savings

ROI (IRR%)

Payback(months)

BL460c 2W 16GB16 New8 RemainingBL480c 2W 16GB8 New3 Remaining

$1,018,562 $1,864,906 $568,754 $1,966,475 31.1 22.2

DL585 4W 16GB16 New8 Remaining

BL480c 2W 16GB8 New3 Remaining

$1,422,270 $2,147,502 $286,158 $1,831,905 6.5 32.0

2Estimated implementation budget, $217,000

1Estimated storage capacity budget, $250,000

Current TCO = $2,433,660

Page 23: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Financial Findings

Power, $364,861 , 19%

Sysadmin, $300,564 , 15%

Maintenance, $309,046 , 16%

Capital, $992,004 , 50%

Raw Savings Summary – BL460c/BL480c

Page 24: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Desktop Virtualization Case Study

Page 25: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Virtual Desktop (VDI)

Page 26: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

VDI Main Points

» Executive Summary: Virtual Desktop Infrastructure (VDI) » VDI simplifies desktop administrative and management tasks» Users access virtual desktops running in the data center» Technology supports both PCs and thin clients» Desktop security and data protection are centralized» Access can be easily extended to remote users

» Benefits of VDI» Efficient use of CPU and memory resources » Reduced desktop downtime and increased availability » Patches and upgrades performed in data center » New users can be up and running quickly » Data and applications reside in secure data centers» Centralized management reduces operational expenses

Page 27: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

High Level View – A Dashboard

Page 28: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Scenarios - Extrapolated

Scenario NameDesktops

InDesktops

ConsolidatedDesktops Not Consolidated

New Servers

Consolidation Ratios x:1

City Hall to BL465c-16GB  426 426 0 13 32.8City Hall to BL465c-24GB  426 426 0 10 42.6City Hall to BL465c-32GB  426 426 0 8 53.3City Hall to DL585-32GB  426 426 0 8 53.3S&J to BL465c-16GB 332 332 0 10 33.2S&J to BL465c-24GB 332 332 0 8 41.5S&J to BL465c-32GB 332 332 0 6 55.3S&J to DL585-32GB 332 332 0 6 55.3

Page 29: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Current Desktop Environment

Page 30: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

TCO Detail

Page 31: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

TCO Detail (cont)

Page 32: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Financial Findings – VDIThree Year Payback Summary – 426 Desktops

Option HW/SW Cost1

3 Year TCO2,3

IT Budget Reduction

Payback (months)

ROI (IRR%)

BL465c 16GB13 New0 Remaining

$417,836 $2,562,168 $663,555 17.5 54.6

BL465c 24GB10 New0 Remaining

$565,894 $2,705,496 $520,227 22.3 32.2

BL465c 32GB8 New0 Remaining

$549,716 $2,686,164 $539,559 21.7 34.4

DL585 32GB8 New0 Remaining

$510,104 $2,646,552 $579,171 20.4 39.7

2Estimated Implementation costs budget $91,294

1Estimated storage capacity budget $87,880 (4.16TB)

Current TCO = $3,225,723

3Includes thin client phase in over three years, $255,174

Page 33: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Storage AssessmentsSAN Performance Analysis

Page 34: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Vision

RIGHTRIGHT DATADATA RIGHT TIMERIGHT TIMERIGHT PLACERIGHT PLACE

INFORMATION LIFECYCLE MANAGEMENT

Using Business Policy, Architectural Tiers and Financial Justification to move towards or enhance your Information Lifecycle Activity

Page 35: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Assessment Strategy» Analyze both the Technical and Financial Impact of the Storage Environment and

Recapture/Consolidation» Use Storage Essentials to capture a baseline and model options

» Non-disruptively captures file information on presented storage devices» Measure storage capacity, utilization characteristics and recoverable space» Uses business policy to architect effective and cost efficient storage tiers

» Model Financial Impact using Brigham-Gapenski methodology» Collects financial assumptions at start of project via Finance Questionnaire» Total Cost of Ownership (TCO) analysis of selected IT environment» Compares baseline to the costs of a consolidated environment» Provides a detailed Return On Investment analysis

Page 36: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Architectural Framework for Sampling» Integrated Discovery and Data Classification» Comprehensive Classification

» ILM missing link» Enterprise scalability

» Data Differentiation Policy Engine» Storage and Data Classes

» Transparency» OS & Storage Devices» Existing Infrastructure

» Data Migration & Monitoring Services» Place data on the most appropriate storage with no or little

disruption to data accessibility

» Tiered Storage Audits» Determine exactly what amount of data could

be migrated to other tiers of storage and the amount and types of storage required

» Storage Consolidation Audits» Properly plan for storage consolidation by

understanding data types and storage requirements

» Size out new storage infrastructure using actual data

» Back-up Optimization Audits» Identify the unused data causing backup

problems that could be migrated or removed

» Compliance Audits» Quickly identify fixed content data and data

with regulatory requirements that should be placed on a compliance device

Page 37: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Akorri BalancePoint™

» Agent-less Collection Across Databases, Servers, Storage, VMware & Storage Virtualization

» Advanced Analytics & Modeling

» Performance and Utilization

» Troubleshooting & Root Cause

» Optimization and Planning

» Rapidly Delivers ROI:

» Faster Problem Resolution» Avoid Performance Problems» Planning and Optimization

Page 38: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Full IO Layer Visibility & Analysis

Guest Server (VM)

Application (within VM)

O/S Volumes (within VM)

O/S Server LUNs

(within VM)

VMFS Datastore

(ESX Host)Server LUNs(ESX Host)

RAID Set(Array)

Array

Complex Cross Domain Analytics made easy to understand: Green, Yellow, Red

Page 39: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Cross-Domain Performance ViewpointsBalancePoint delivers view from Application to Spindle

Application

Physical & Virtual Server

Volume

LUN

ASG Disk Group

Disk

Page 40: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Storage Consolidation Study - Example

Business Drivers:•Reduce TCO•Manage to Business Policy•Reduce Total Backup Time•Validate file types & Space consumption

•Distributed storage 50 TB•Distributed across multiple States•Validate file types & Space consumption•Overall tier 1 storage 84.8%, industry average < 40%•62% of file server data hasn’t been accessed in over 12 months•8.971 TB of data hasn’t been accessed in over 3 years

EVA

MSA

58 NetApp Filers

New SolutionEVA 8000X MSA 1000’sHP OVSAMStorage Works

Page 41: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Steps 1/2/3: Current State TCO, Alternatives and Comparison  Year 1 Year 2 Year 3 3 Year Totals

Disk Cost (Current Approach) $180,000 $234,000 $304,200 $718,200

Tape Cost (Current Approach) $90,000 $117,000 $152,100 $359,100         

Disk/software Cost (With ILM) $108,000 $140,400 $182,520 $430,920

Tape Cost (With ILM) $0 $45,000 $58,500 $103,500         

Total Savings with ILM $87,000.00 $150,000.00 $195,000.00 $432,000.00

Differences with ILM

$270,000

$351,000

$456,300

$183,000 $201,000$261,300

$0

$100,000

$200,000

$300,000

$400,000

$500,000

Cost year 1 Cost year 2 Cost year 3

3 Year

Dis

k an

d S

oft

war

e C

ost

s

CurrentApproach

With ILM

Page 42: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

What were seeing

» ~70% direct attached with ~20-30% of duplicate data storage» Using tier 1 storage for files not accessed outside of business policy – some

> 5 years» Around 1 admin per 10TB of storage» Main cost drivers are using tier 1 storage for all storage, direct attached vs.

a centralized (SAN/NSA) storage policy, System Admin, Maintenance, and Growth/Refresh

» Seeing 3 year TCO’s of around $750k 25TB of direct attached» Typical consolidation of 42% based on tiered storage» Typical IT Cost Reduction > 30% through a structured ILM strategy

Page 43: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Implementation …

Page 44: ATS Americas IT Consolidation May2008 - Stocker.ppt

© 2008 Avnet Inc. All rights reserved.

Consolidation Steps» Identify project (Work with Insight Team to define scope)

» 100+ Windows Servers, 250+ Desktops» 10+ HP-UX or other Unix servers» >20TB Storage environment

» Gather info for 2 page Project Request Form» Submit to ATS for SOW and pricing » ATS submits to HP for funding approval

(2 week typical turnaround)» Funding approved » Delivery begins (1-2 weeks)» Collect Data (4 weeks)» Analyze and present results (1-2 weeks)