august 2001 meeting action items: status of unknown facilities: –long ez (dobosy) – will not...

11
August 2001 Meeting Action Items: • Status of unknown Facilities: Long EZ (Dobosy) – will not participate XPol (Anagnostou) together with 2D video disdrometer networked with 5 tipping bucket raingauges will participate if funded. Office of Army Research multi-beam, passive remote sensing instrument (Back) – still unknown but rather unlikely. Blue: resolved, Red: still to be done

Upload: oscar-skinner

Post on 14-Jan-2016

214 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: August 2001 Meeting Action Items: Status of unknown Facilities: –Long EZ (Dobosy) – will not participate –XPol (Anagnostou) together with 2D video disdrometer

August 2001 Meeting Action Items:

• Status of unknown Facilities:– Long EZ (Dobosy) – will not participate

– XPol (Anagnostou) together with 2D video disdrometer networked with 5 tipping bucket raingauges will participate if funded.

– Office of Army Research multi-beam, passive remote sensing instrument (Back) – still unknown but rather unlikely.

Blue: resolved, Red: still to be done

Page 2: August 2001 Meeting Action Items: Status of unknown Facilities: –Long EZ (Dobosy) – will not participate –XPol (Anagnostou) together with 2D video disdrometer

• Lidar Information: – Complete lidar and radar information (incl. safety

procedures) to request waiver from FAA– Specs are complete– UCAR Safety Procedures are on paper– Still missing procedures from other groups– Request permission from Trevino– Make sure, radars are included as well.

• Aircraft Information:– Communications capabilities on Learjet: Aircraft does

not have a Satcom system, only standard VHF.

– Aeromet cost estimate: still missing

– Falcon cost estimate: received by Tammy

Page 3: August 2001 Meeting Action Items: Status of unknown Facilities: –Long EZ (Dobosy) – will not participate –XPol (Anagnostou) together with 2D video disdrometer

• Flight Operations– Aircraft tracks

– All aircraft tracks have been modified and were posted for review

– Flight tracks now show horizontal as well as side views

– Produce flight tracks on FAA backgrounds for play book and provide to FAA

– Tentative schedule for all planes available

– Appropriate realism for flight hours

– Meeting with military representatives will take place on 13 November 2001.

– Smaller aircraft meeting took place prior to November planning meeting.

Page 4: August 2001 Meeting Action Items: Status of unknown Facilities: –Long EZ (Dobosy) – will not participate –XPol (Anagnostou) together with 2D video disdrometer

• Flight Operations (cont.)– Details about Naval Aviation Survival Training for

NRL P-3 Scientists has been posted on IHOP web site.

– Project Office visited Longmont FAA and looked at their tactical display system. Define how useful the system will be to IHOP.

– Aircraft utilization:

– Parsons will follow up with NASA on how to increase the number of flight hours (30-35 hours allocated right now) on the DC-8.

– Could the Falcon get more funding?

Page 5: August 2001 Meeting Action Items: Status of unknown Facilities: –Long EZ (Dobosy) – will not participate –XPol (Anagnostou) together with 2D video disdrometer

Dropsonde and Upsondes– Come up with a realistic plan for dropsonde usage (400

total).

– Settle on an aircraft(s) for dropsondes after looking at heights, on station time, length of time at the experiment: Aeromet Learjet. Cost estimate was requested 22 October 2001 – 420K for 120 hours and participation during the entire project.

– 4 versus 8-channel system: 8-Channel system will require twice the space on the aircraft and an additional operator. IHOP will stick with the 4-channel system, which NCAR can provide.

– Define how many sondes (up and down) can be in the air at the same time.

– Real-time data communication: not available on either the Aeromet Learjet or the Falcon.

Page 6: August 2001 Meeting Action Items: Status of unknown Facilities: –Long EZ (Dobosy) – will not participate –XPol (Anagnostou) together with 2D video disdrometer

• Mobile Armada– Check cell-phone coverage in IHOP area and identify

gaps

– Produce map with all paved roads (list of roads with clay?)

– Develop Plan B if Freewave system doesn’t work.

– Decide on secondary Ops Center for mobile facilities

• Surface Stations– Provide recommendations to Van Baelen regarding

location of additional GPS sensors – done, 9 additional sensors will be provided by Meteo France.

– Carry out land-use survey, GIS data base (ABL) – responsibility of LeMone et al.

Page 7: August 2001 Meeting Action Items: Status of unknown Facilities: –Long EZ (Dobosy) – will not participate –XPol (Anagnostou) together with 2D video disdrometer

• Surface Stations (cont’d)– Provide S. Richardson with any additional data

requirements from OK Mesonet (non-qc’ed soil moisture data and FTP access) – discussions were started but need to be finalized with Jeff Batata.

– Priority list was provided to Cress: what ARM data streams are most important and what data are needed in real time (any additional)—(general) disseminate discussion related to ARM involvement in IHOP to Cress, Lilligren and Voyles

Page 8: August 2001 Meeting Action Items: Status of unknown Facilities: –Long EZ (Dobosy) – will not participate –XPol (Anagnostou) together with 2D video disdrometer

• Ops Center– Identify people by name for Project Control responsibilities:

partially done.– Forecasting:

• Determine who does the forecasting and nowcasting (SPC, HPS, NESDIS etc.)

• Determine holes• Recruit outside help (weather channel, Ed Szoke)• Set up forecast team planning meeting

– Produce logistics questionnaire (determine # of people at ops center, analysis center etc.)

– Solve communications issues (with airplanes, with mobile facilities etc.; Phone recording at Ops Center)

– Finalize timing of daily meetings– Identify staff for all systems in the field (logistics

questionnaire)

Page 9: August 2001 Meeting Action Items: Status of unknown Facilities: –Long EZ (Dobosy) – will not participate –XPol (Anagnostou) together with 2D video disdrometer

• Data Streams and Archival– Real-time access of level II for list of sites and archival of

WSR 88D data and provision in real time to Ops Center (Kelvin discussion)

– Archival of two military radars (Vance and Frederick), can we get real time data?

– High resolution ASOS data: Koch to arrange to get data to JOSS Data Archive

– Availability of GOES rapid scan (CERA-NESDIS)– Can we get dropsonde data on GTS: yes but not in real-time.

Is there a difference in getting CLASS and GLASS data on?– Produce data questionnaire: on line

Page 10: August 2001 Meeting Action Items: Status of unknown Facilities: –Long EZ (Dobosy) – will not participate –XPol (Anagnostou) together with 2D video disdrometer

• Modeling:– Get modelers more involved in experimental design– Will any one else step up besides FSL and CAPS with

planning? – Make sure all data on modeler list gets into the models– Make sure NESDIS filters are not on and GTS works

start to finish (check ARM data etc.)– Parallel model evaluation team for nowcast and short

time forecasts (0-9 h)

• Other– Strong need for interagency communication at funding

level - done

Page 11: August 2001 Meeting Action Items: Status of unknown Facilities: –Long EZ (Dobosy) – will not participate –XPol (Anagnostou) together with 2D video disdrometer