AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies ________________________________________________________________________________ 7.1 KKB Envirocare Consultants Pvt. Ltd., Hyderabad Chapter 7 Additional Studies 7 (a) Public Consultation Draft EIA Report was submitted to TSPCB on 17-02-2018 and TSPCB issued Paper Notifications for Public Hearing (PH) to be schedule on 31-03-2018, However District Collector postponed the Public Hearing on 31-03-2018 (Saturday) citing law & order issues because of Hanuman Jayanthi Shoba Yatra to be conducted on same day all over District and TSPCB gave News Paper Notifications in the same Newspapers about the Post postponement on 31-03-2018. TSPCB issued Fresh News Paper Notification for Public Hearing to be schedule on 08-06-2018 with more than 30 days notice in the both English and Telugu Newspaper on 07-05-2018 (Newspaper notifications attached below). As scheduled the PH was conducted on 08-06-2018 at the proposed site of expansion. On obtaining the minutes of the public hearing dated 18-06-2018 from TSPCB, final EIA report is prepared incorporating the industry’s response to the issues raised in public hearing and submitted to the MoEF&CC for its appraisal

Upload: others

Post on 27-May-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.1 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Chapter 7

Additional Studies

7 (a) Public Consultation

• Draft EIA Report was submitted to TSPCB on 17-02-2018 and TSPCB issued Paper

Notifications for Public Hearing (PH) to be schedule on 31-03-2018, However District

Collector postponed the Public Hearing on 31-03-2018 (Saturday) citing law & order

issues because of Hanuman Jayanthi Shoba Yatra to be conducted on same day all

over District and TSPCB gave News Paper Notifications in the same Newspapers

about the Post postponement on 31-03-2018.

• TSPCB issued Fresh News Paper Notification for Public Hearing to be schedule on

08-06-2018 with more than 30 days notice in the both English and Telugu Newspaper

on 07-05-2018 (Newspaper notifications attached below).

• As scheduled the PH was conducted on 08-06-2018 at the proposed site of

expansion.

• On obtaining the minutes of the public hearing dated 18-06-2018 from TSPCB, final

EIA report is prepared incorporating the industry’s response to the issues raised in

public hearing and submitted to the MoEF&CC for its appraisal

Page 2: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.2 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

7.a.1 Public Hearing Notification in English Newspaper Indian Express dated 07-05-2018

Page 3: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.3 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

7.a.2 Public Hearing Notification in Telugu Newspaper “Andhra Jyothi” dated 07-05-2018

Page 4: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.4 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

7.a.3 Public Hearing Minutes dated 18-06-2018 issued by TSPCB RO-1, Sanga Reddy, Telangana State

Page 5: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.5 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 6: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.6 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 7: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.7 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 8: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.8 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 9: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.9 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 10: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.10 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 11: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.11 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 12: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.12 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 13: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.13 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 14: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.14 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 15: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.15 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 16: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.16 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 17: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.17 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 18: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.18 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 19: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.19 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

7.a.4 Public Hearing Attendance sheet on 08-06-2018 issued by TSPCB RO-1, SangaReddy, Telangana State

Page 20: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional Studies

________________________________________________________________________________ 7.20 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 21: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.21 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 22: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.22 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

7.a.5 Representations received for Public Hearing

Page 23: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.23 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 24: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.24 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 25: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.25 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 26: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.26 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 27: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AV

R O

rgan

ics

Pvt

. Ltd

. – E

IA R

epor

t

Cha

pter

7: R

isk

Ass

essm

ent &

DM

P

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

7.

27

KK

B E

nviro

care

Con

sulta

nts

Pvt

. Ltd

., H

yder

abad

Page 28: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.28 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 29: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.29 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 30: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.30 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 31: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.31 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 32: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.32 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 33: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.33 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 34: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.34 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 35: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.35 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 36: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.36 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 37: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AV

R O

rgan

ics

Pvt

. Ltd

. – E

IA R

epor

t

Cha

pter

7: R

isk

Ass

essm

ent &

DM

P

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

7.

37

KK

B E

nviro

care

Con

sulta

nts

Pvt

. Ltd

., H

yder

abad

Page 38: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.38 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 39: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.39 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Page 40: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.40 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

7.a.6: Project Proponent Response to Public Hearing Issues with action plan and time frame with financial budget AVR ORGANICS Pvt. Ltd., Yawapur and Maddikunta (V), Sadasivpet (M), Sangareddy District, Telangana State

Public supported the existing unit going for setting up of API manufacturing unit (expansion project) with suggestions. 13 persons have spoken and 17 representations received and all are supported. Following is the Industry response to the Public Hearing issues. We noted down all their suggestions and observations raised by them.

Time Frame with Financial Budget: Expansion investment is Rs.250 Crores excluding the existing investment of Rs. 35 Crores (Total Rs. 285 Crores); Total capital cost allocated towards environmental pollution control measures is Rs.26.05 Crores including existing cost and 20.5 Crore per annum towards the recurring cost (operation & maintenance). Time frame for EMP is prior to operation i.e., 2 – 3 years. Enterprise Social Commitment (ESC) Budget of Rs. 138 lakhs has been earmarked @ 2.5 % of the proposed capital investment (Rs. 250 Crores) as per approved ToR. Time frame for the allocated ESC Budget mentioned above is 5 years. This will be in addition to the ESC allocation based on Net Profits per annum by Ministry of Corporate Affairs.

Sl. No.

Suggestions / Objections during Public Hearing Response From Project Proponent Action Plan

1. Sri K. Badreesh, Sangareddy:

He informed that he is the Founder chairman of the District Environment Protection committee. He informed that the industry is proposed to be expanded from 8 acres to 102 acres. He informed that he does not know the present status of the industry as he has came from far. He informed that due to establishment of industry that there will be employment to the youth. However, in the disguise of employment there cannot be any damage. If the industry is run in accordance with environmental norms, there will not be any problems. For the last 20 years, due to chemical industries there has been lot of damage caused in the district. There was no drinking water for the people and cattle. Lot

We welcome his observation and suggestion.

Existing industry is operating with all necessary pollution control equipment. We regularly ensure to comply with the consent conditions issued by TSPCB.

An additional amount of Rs. 2605 lakhs are earmarked in our expansion proposal towards Environmental Management Plan with an estimated recurring cost of Rs. 2050 lakhs.

We will ensure to operate all required pollution control equipment and reduce the pollution within the regulatory standards.

We are also proposing 10m width

We have already planted 4000 nos. of trees in existing and expansion area during “Harita Haram” conducted by Telangana Government in 2017. In this rainy season we have started plantation in the greenbelt area all around the expansion boundary with 10 m width and other greenbelt areas in the expansion project. We will install best pollution control equipment for Air, Water on obtaining the CFE from TSPCB. After installation only we will obtain the Consent for Operation from TSPCB for expansion project. We will install online monitoring systems on the exhaust of Boiler flue gas and ETP-ZLD outlet to know the status of treatment within the standards. Also will install the online VOC monitor at ware houses,

Page 41: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.41 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Sl. No.

Suggestions / Objections during Public Hearing Response From Project Proponent Action Plan

of problems were being faced due to the industries. He informed that he is not against the industry. Industries have to be established and employment has to be provided. Number of youth are on the roads by holding the degrees without employment. However, the lands have to be protected. He opined that there is no objection to the industry, if it is run in accordance with the norms and by controlling pollution

greenbelt all around the industry boundary wall for further reducing the pollution if any.

As we are already providing employment to the educated and un-educated local people and it will be continued after expansion of the project also.

production block and at the entrance and these online monitoring systems will be connected to TSPCB and CPCB as per guidelines. We will submit the 6 monthly status of Environmental Clearance conditions to MoEFCC (online) on obtaining the EC from MOEFCC. In first year we will provide the RO drinking water facility and Rain Water harvesting pits and tanks at the surrounding villages in consultation with local villages. On obtaining CFE from TSPCB, we will discuss with the local village people and start the HR process for employment opportunities in our expansion project for various positions with required qualification and experience required for construction, erection and commissioning etc.,. The ESC activities will be strengthened focusing on Drinking water, Rain water harvesting, skill development, Education, Health and Improvement of basic amenities. An amount of Rs.190 lakhs (0.75%) earmarked for the following ESC activities for the surrounding villages as per New MoEFCC OM dated 1-05-2018 and its amendment on 19-06-2018 regarding the Corporate Environment Responsibility (CER).

2. Sri S. Chandrasekhar, Hyderabad:

He informed that he is supporting the industry expansion from the Right Way Global Organization. There is lot of

We welcome his observation and suggestion.

We are proposing to install D.G. sets with acoustic enclosures only to reduce

In addition to the above, D.G sets will be procured with Built-in Acoustic enclosures. Further will regularly monitoring the Noise to ensure within the SPCB limits.

Page 42: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.42 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Sl. No.

Suggestions / Objections during Public Hearing Response From Project Proponent Action Plan

requirement for establishment of industries in the state. Through the same development will take place. Hence he expressed that he is supporting the expansion of the industry. Further he made certain suggestions. He informed that in the pharma industry, there is possibility of sound pollution and environmental pollution. Hence he suggested to develop green belt in the industry. He further suggested to provide an ETP plant in the industry and provide employment to locals only. By providing employment to the locals in the affected areas, their standards will be improved. There are educated unemployed youth in the area and skill development centre shall be provided by the industry to improve the skills of unemployed youth. With these suggestions he informed that from Right Way Global Organization they are supporting the expansion project and requesting the MoEF to grant the permission.

the noise generation from the industry.

We are proposing the ETP – ZLD in the expansion proposal.

We also propose 10m width greenbelt all around the industry boundary wall for further reducing the pollution if any.

As we already providing employment to the educated and un-educated local people and it will be continued after expansion of the project.

We are proposing to construct all Effluent Treatment Plant tanks with minimum 1 m above ground level by providing the RCC flooring with dyke walls to reduce the contamination of soil. Total effluent will be treated in the ETP with Zero Liquid Discharge system and treated effluent will be reused in Cooling towers and Boilers.

3. Sri Khaja Nizamuddin, Sarpanch, Maddikunta village:

He expressed his happiness over the project coming up in their village. He informed that he is a pharmacy student and as the

We welcome his observation.

As we are already providing employment to the educated and un-

On obtaining CFE from TSPCB, we will discuss with the local village people and start the HR process for employment opportunities in our expansion project for various positions with required qualification and experience required for construction, erection and commissioning etc.,.

Page 43: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.43 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Sl. No.

Suggestions / Objections during Public Hearing Response From Project Proponent Action Plan

proposed unit is a pharmacy industry wherein pharmaceutical ingredients will be manufactured. Due to the industry employment will be provided for the pharma students like him and other educated youth. He expressed his happiness over establishment of expansion project

educated local people and it will be continued after expansion of the project also

4. Smt. N. Laxmi, Sarpanch, Siddhapur village:

She informed that no roads were laid to their village, but the industry has co-operated with the village for the development. She requested to provide employment in the industry to the youth in their village also.

We welcome her observation.

As we are already providing employment to the educated and un-educated local people and it will be continued after expansion of the project.

On obtaining CFE from TSPCB, we will discuss with the local village people and start the HR process for employment opportunities in our expansion project for various positions with required qualification and experience required for construction, errection and commissioning etc.,.

5. Sri Md. Arifoddin, Maddikunta village:

He welcomed the establishment of the industry in their village. However, he informed that the industry shall follow the conditions of the Pollution Control Board and shall not cause any damage to the village. In such case there is no objection to the industry. With regard to providing employment, he requested to provide employment to the local villagers of Rechintal, Kambalapalli, Maddikunta & Siddhapur on top priority.

We welcome her observation.

An additional amount of Rs. 2605 lakhs are earmarked in our expansion proposal towards Environmental Management Plan for Pollution control with an estimated recurring cost of Rs. 2050 lakhs.

We will ensure to operate all required pollution control equipment and reduce the pollution within the regulatory standards.

As we are already providing employment to the educated and un-educated local people and it will be

In this rainy season we have started plantation in the greenbelt area all around the expansion boundary with 10 m width and other greenbelt areas in the expansion project. We will install best pollution control equipment for Air, Water on obtaining the CFE from TSPCB. After installation only we will obtain the Consent for Operation from TSPCB for expansion project. We will install online monitoring systems on the exhaust of Boiler flue gas and ETP-ZLD outlet to know the status of treatment within the standards. Also will install the online VOC monitor at ware houses, production block and at the entrance and these online

Page 44: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.44 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Sl. No.

Suggestions / Objections during Public Hearing Response From Project Proponent Action Plan

continued after expansion of the project.

monitoring systems will be connected to TSPCB and CPCB as per guidelines. We will submit the 6 monthly status of Environmental Clearance conditions to MoEFCC (online) on obtaining the EC from MOEFCC. On obtaining CFE from TSPCB, we will discuss with the local village people and start the HR process for employment opportunities in our expansion project for various positions with required qualification and experience required for construction, errection and commissioning etc.,.

6. Sri M. Vidyasagar Reddy, Siddhapur village:

He informed that he was sarpanch of the village from 2006 to 2011. There is no problem from the company and they are cooperating with the villagers. He requested to provide employment to the local villagers.

We welcome his observation.

As we are already providing employment to the educated and un-educated local people and it will be continued after expansion of the project.

On obtaining CFE from TSPCB, we will discuss with the local village people and start the HR process for employment opportunities in our expansion project for various positions with required qualification and experience required for construction, errection and commissioning etc.,.

7. L. Chandra Sekhar, NGO, Nalgonda:

He informed that on behalf of their organization, the MoEF shall grant the Environmental Clearance to the industry unconditionally. He requested that the industry shall provide employment to the locals only. He requested that the surrounding 10 villages shall be provided with protected drinking water supply facilities

We welcome her observation.

As we are already providing employment to the educated and un-educated local people and it will be continued after expansion of the project.

We will provide drinking water facility

On obtaining CFE from TSPCB, we will discuss with the local village people and start the HR process for employment opportunities in our expansion project for various positions with required qualification and experience required for construction, errection and commissioning etc.,. The ESC activities will be strengthened focusing on Drinking water, Rain water harvesting, skill development, Education, Health and Improvement of basic amenities. An amount of Rs.190 lakhs (0.75%)

Page 45: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.45 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Sl. No.

Suggestions / Objections during Public Hearing Response From Project Proponent Action Plan

from the CSR funds of the industry. Further medical camps shall be conducted to conduct eye tests and other health tests, which will help the people.

and medical camps to the surrounding villages.

earmarked for the following ESC activities for the surrounding villages as per New MoEFCC OM dated 1-05-2018 and its amendment on 19-06-2018 regarding the Corporate Environment Responsibility (CER).

8. V. Sunanda Reddy, Environmentalist

Environmentalist: He informed that 80% of the chemical industries in the state are polluting. Only 20% are operating as non-polluting. He wished that the industry management to be first in the 20% non-polluting category. He informed that he is working for the past 30 years in the field of environment. If the pharma industries are not encouraged, medicines have to be imported from other countries with huge cost. The country will lose foreign exchange. Healthcare will not available to the common people due to huge cost. Hence, he requested the panel committee to recommend to the Ministry to grant clearance unconditionally. He made certain suggestions on environmental protection. He informed that relation of the human being with air, water & land is defined as environment. He informed that he has belief that the industry will provide ETP and other facilities and control air pollution. As per the rainfall details in the area the industry will

All the points suggested by Mr.Sunanda Reddy have already been covered in the EIA Report.

An additional amount of Rs. 2605 lakhs are earmarked in our expansion proposal towards Environmental Management Plan for Pollution control with an estimated recurring cost of Rs. 2050 lakhs.

We will ensure to operate all required pollution control equipment to water, air, noise, soil etc., and reduce the pollution within the regulatory standards.

Total Quantity of Rainfall per annum in industry from 42 Ha (104 acres) will be 35.22 Crore liters. Out of which quantity of Runoff will be 14.17 Crore liters which will be collected in proposed 3 nos. of Rainwater harvesting tanks of each 25 lakh liters ie., total capacity of 75 lakh liters. This water will be used back in industry after necessary treatment.

We will install best pollution control equipment for Air, Water on obtaining the CFE from TSPCB. After installation only we will obtain the Consent for Operation from TSPCB for expansion project. We will install online monitoring systems on the exhaust of Boiler flue gas and ETP-ZLD outlet to know the status of treatment within the standards. Also will install the online VOC monitor at ware houses, production block and at the entrance and these online monitoring systems will be connected to TSPCB and CPCB as per guidelines. We will submit the 6 monthly status of Environmental Clearance conditions to MoEFCC (online) on obtaining the EC from MOEFCC. On obtaining CFE from TSPCB, we will discuss with the local village people and start the HR process for employment opportunities in our expansion project for various positions with required qualification and experience required for construction, errection and commissioning etc.,.

The ESC activities will be strengthened focusing on

Page 46: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.46 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Sl. No.

Suggestions / Objections during Public Hearing Response From Project Proponent Action Plan

receive 32 crore litres of rainwater annually in the proposed area of 102 acres. Out of these about 15 crore litres of water will go as ground water. The industry’s requirement is about 300 crores litres of water out of which 105 crores litres will be recycled. There is still requirement of 200 crore litres of water annually. He suggested that the industry shall provide water harvesting structures not only in their land but also in the surrounding village lands, So that there will not be any water scarcity in the area in the future. The local farmers cannot compete with the industry as the industry will continuously require water. Though the Government is proposing to provide water, till the project is completed, the industry shall take up water harvesting not only in their area but also in the surrounding area with the help of the government by spending additional funds under CSR. He will provide free technical assistance in this regard. He informed that it is mandated that for having environmental sustainability we should have 33% forest cover. Unfortunately we are having only 20% forest cover. He suggested that the industry should not restrict to 33% of the area in providing green belt and should go for 50% to 60% of the green cover so as to achieve

We are also proposing Rain water harvesting pits in the expansion area to improve the ground water level. Details are given in the EIA report chapter-10, Table 10.1.

Drinking water, Rain water harvesting, skill development, Education, Health and Improvement of basic amenities. An amount of Rs.190 lakhs (0.75%) earmarked for the following ESC activities for the surrounding villages as per New MoEFCC OM dated 1-05-2018 and its amendment on 19-06-2018 regarding the Corporate Environment Responsibility (CER).

Page 47: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.47 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Sl. No.

Suggestions / Objections during Public Hearing Response From Project Proponent Action Plan

environmental sustainability. By implementing this suggestion the company can become an ideal to other industries. He suggested that a co-ordination committee with local public representatives & government officials shall be created and the budget under CSR shall expended in consultation with co-ordination committee, on emergency local requirements. Thus company can gain the support of the locals. With respect to providing employment he appreciated the industry for proposing to providing employment 1000 people. He informed that the indirect employment will not be 500 as mentioned it will be much more than that, to the tune of 20,000 to 25,000 which we may not know. However, he informed that there are number of youth lacking skill in the area. Hence he requested the industry to provide skill development to the local youth so that they can work not only in the company but also outside. He wished that the company should develop at the same time environment shall be protected and the industry shall become part of development of the state.

9. G. Vijaya Reddy:

He informed that the people are seeking

We welcome his observation and suggestion.

We will install best pollution control equipment for Air, Water on obtaining the CFE from TSPCB. After installation only we will obtain the Consent for Operation

Page 48: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.48 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Sl. No.

Suggestions / Objections during Public Hearing Response From Project Proponent Action Plan

money rather than long life. Earlier, the people were living with long life. Earlier, there used to be good green belt in the area. At that time, the human lifespan was long. It got reduced with reduction in green cover area. He stressed that the people have to think about environmental protection on 100% basis. He informed that the industries should be established for the growth of GDP. However, for the purpose of having environmental sustainability, he proposed three suggestions to MoEF&CC. While permitting the industries, the impact on agriculture has to be studied. The second point is that the impact on animal husbandry in the area has to be studied. The third point is that, the impact on human life has also to be studied as human being is dependent on the surrounding environment. The life span of human being before & after establishment of industries has to be studied and incorporated in the reports. He suggested that these studies have to be insisted by MoEF&CC atleast in coming up industries. The industry is proposed in 104 acres of land which is agricultural land. This land is being converted to non-agricultural. The impact of this conversion has to be studied. In the proposed area of the industry, there is deficit between

All the suggestions given by Mr.Vijaya Reddy are well covered in the EIA Report.

An additional amount of Rs. 2605 lakhs are earmarked in our expansion proposal towards Environmental Management Plan for Pollution control with an estimated recurring cost of Rs. 2050 lakhs.

We will ensure to operate all required pollution control equipments to water, air, noise, soil etc., and reduce the pollution within the regulatory standards.

We are also proposing 10m width greenbelt all around the industry boundary wall for further reducing the pollution if any.

We are proposing about 34.3 acres out of 104 acres exclusively for greenbelt. i.e., 33%.

Hence our proposed industry will not effect on surrounding agriculture, animal husbandry and habitation.

from TSPCB for expansion project. We will install online monitoring systems on the exhaust of Boiler flue gas and ETP-ZLD outlet to know the status of treatment within the standards. Also will install the online VOC monitor at ware houses, production block and at the entrance and these online monitoring systems will be connected to TSPCB and CPCB as per guidelines. We will submit the 6 monthly status of Environmental Clearance conditions to MoEFCC (online) on obtaining the EC from MOEFCC. We have already planted 4000 nos. of trees in existing and expansion area during “Harita Haram” conducted by Telangana Government in 2017. In this rainy season we have started plantation in the greenbelt area all around the expansion boundary with 10 m width and other greenbelt areas in the expansion project. The ESC activities will be strengthened focusing on Drinking water, Rain water harvesting, skill development, Education, Health and Improvement of basic amenities. An amount of Rs.190 lakhs (0.75%) earmarked for the following ESC activities for the surrounding villages as per New MoEFCC OM dated 1-05-2018 and its amendment on 19-06-2018 regarding the Corporate Environment Responsibility (CER).

Page 49: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.49 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Sl. No.

Suggestions / Objections during Public Hearing Response From Project Proponent Action Plan

ground water recharge by rainfall which is only 10% when compared to industry’s water requirement. He questioned the industry on how they are going to full fill the deficit of about 1.7 Lakh KL of water. He requested the industry to clarify on the issue. He further questioned that the industry has not made mention of the CSR budget details as per the 2013 Companies Act Amendment in the report. He further submitted that, he will submit a detailed representation on the EIA report submitted by the industry.

Total rainfall receive per annum in our industry will be around 352271 KL which is equaling to 634 days of our fresh water requirement at 556 KLD. After ground water percolation total rainwater runoff will be 141763 KLD which is equaling to 255 days of our fresh water requirement at 556 KLD. Details of Runoff volume for Rainwater harvesting system is given in EIA Chapter 10, Table 10.1. We have made 2.5% as CER budget as per ToR. However as per New MoEFCC OM we are proposing to allocate Rs. 190 lakhs for CER.

10. Y. Chennakesava Reddy, Social Activist, Hyderabad:

He informed that he is a social activist and informed that he is endorsing to MoEF&CC for grant of clearance to M/s AVR Organics Pvt. Ltd. He informed that due to the establishment of the industry, there will be employment to the locals. However, he suggested that as per the Directions of the Hon’ble Supreme Court of India, the industry shall install effluent treatment plant for treatment of effluents. The industry shall follow all Rules stipulated by CPCB with

We welcome his observation and suggestion.

An additional amount of Rs. 2605 lakhs are earmarked in our expansion proposal towards Environmental Management Plan including the establishment of ETP-ZLD for Pollution control with an estimated recurring cost of Rs. 2050 lakhs.

We will ensure to operate all required pollution control equipment to water, air, noise, soil etc., and reduce the pollution within the regulatory

We will install best pollution control equipment for Air, Water on obtaining the CFE from TSPCB. After installation only we will obtain the Consent for Operation from TSPCB for expansion project. We will install online monitoring systems on the exhaust of Boiler flue gas and ETP-ZLD outlet to know the status of treatment within the standards. Also will install the online VOC monitor at ware houses, production block and at the entrance and these online monitoring systems will be connected to TSPCB and CPCB as per guidelines. We will submit the 6 monthly status of Environmental Clearance conditions to MoEFCC (online) on obtaining

Page 50: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.50 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Sl. No.

Suggestions / Objections during Public Hearing Response From Project Proponent Action Plan

respect to development of 33% green belt, expenditure of CSR funds etc. The employment shall be provided for the locals only. It is observed that in most of the industries employment is not provided to the locals. Employment shall be provided not only to the skilled but also unskilled like SSC passed and Intermediate passed candidates. Generally in pharma industries only pharma qualified candidates will be preferred. It is suggested to provide employment in office jobs also. Preference shall be given to people who have given the lands and the poor. Preference shall be given to SC & ST candidates and the reservation implemented in the Government shall also be implemented here. He concluded that the employment shall be provided only to the locals and recommended the project for clearance to MoEF&CC.

standards.

We are also proposing 10m width greenbelt all around the expansion boundary wall for further reducing the pollution if any.

We are proposing about 34.3 acres out of 104 acres exclusively for greenbelt. i.e., 33%.

As we are already providing employment to the educated and un-educated local people and it will be continued after expansion of the project.

the EC from MOEFCC. In this rainy season we have started plantation in the greenbelt area all around the expansion boundary with 10 m width and other greenbelt areas in the expansion project.

On obtaining CFE from TSPCB, we will discuss with the local village people and start the HR process for employment opportunities in our expansion project for various positions with required qualification and experience required for construction, errection and commissioning etc.,.

Page 51: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.51 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Sl. No.

Suggestions / Objections during Public Hearing Response From Project Proponent Action Plan

11. H. Madhubabu, Social Activist:

He informed that, he proposed to furnish certain suggestions in the public hearing of the proposed project. Development has to take place due to establishment of industries. This should not lead to damage to the surroundings. He informed that the Government should act strictly against any industry which is causing damage to the environment. The world countries are entering to competition particularly the developed countries are acting in such a way that the industrial expansion is leading to environmental pollution. He suggested that the industry should operate and give employment but at the same time they should care about the surrounding environment particularly about global warming which has become a world wide phenomena.

We welcome his observation and suggestion.

An additional amount of Rs. 2605 lakhs are earmarked in our expansion proposal towards Environmental Management Plan including the establishment of ETP-ZLD for Pollution control with an estimated recurring cost of Rs. 2050 lakhs.

We will ensure to operate all required pollution control equipments to water, air, noise, soil etc., and reduce the pollution within the regulatory standards.

We also propose 10m width greenbelt all around the expansion boundary wall for further reducing the pollution if any.

We are proposing about 34.3 acres out of 104 acres exclusively for greenbelt. i.e., 33%.

We will install best pollution control equipment for Air, Water on obtaining the CFE from TSPCB. After installation only we will obtain the Consent for Operation from TSPCB for expansion project. We will install online monitoring systems on the exhaust of Boiler flue gas and ETP-ZLD outlet to know the status of treatment within the standards. Also will install the online VOC monitor at ware houses, production block and at the entrance and these online monitoring systems will be connected to TSPCB and CPCB as per guidelines. We will submit the 6 monthly status of Environmental Clearance conditions to MoEFCC (online) on obtaining the EC from MOEFCC. In this rainy season we have started plantation in the greenbelt area all around the expansion boundary with 10 m width and other greenbelt areas in the expansion project.

12. A. Venkateswarlu, BC Organization, State General Secretary:

He informed that on behalf of the organization they have taken up many environmental activities. He further informed that industries are required for development at the same time environment is also

We welcome his observation and suggestion.

Same as point no. 10.

Same as point no. 10

The ESC activities will be strengthened focusing on Drinking water, Rain water harvesting, skill development, Education, Health and Improvement of basic amenities. An amount of Rs.190 lakhs (0.75%) earmarked for the following ESC activities for the

Page 52: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.52 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Sl. No.

Suggestions / Objections during Public Hearing Response From Project Proponent Action Plan

important. The Government is encouraging the industries through TS-iPASS for providing employment. At the same time the Government is also striving towards environment protection with programs like “Haritha Haram”. The industries in rural areas have to provide employment to the local youth. He expressed that the industries in Telangana State are providing employment to outsiders. The industries have to give priority to SCs, STs & BCs in the providing employment. As the industry is using the land in the area, they have to provide employment to the local SCs, STs, & BCs. If the candidate has technical qualification, technical job shall be provided. Study circles shall be established for training the local villagers of 10-20 villages in the 10 Kms radius of the industry, so as to improve the skills for obtaining jobs. The green belt shall be provided with local fruit local bearing trees. The CSR funds of the industry shall be expended in the surrounding 10 villages and shall not be expended elsewhere. He requested the MoEF&CC to grant clearance to the project.

We will consult local surrounding villages for their requirement to spent CER budget on phase wise manner.

surrounding villages as per New MoEFCC OM dated 1-05-2018 and its amendment on 19-06-2018 regarding the Corporate Environment Responsibility (CER).

Page 53: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.53 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

Sl. No.

Suggestions / Objections during Public Hearing Response From Project Proponent Action Plan

13. Mr. Prithvi Raj, Editor,

Sama Samajam Magazine, Rangareddy District:

He informed that the industry has not mentioned the details of CSR budget and its expenditure, details of tree plantation etc. He requested the industry to provide these details so that the people will know about the activities taken up by the industry.

We welcome his observation and suggestion.

We have mentioned the CER budget details in the EIA report chapter no. 8 “Project Benefits”.

Tree plantation details in Executive summary Point no. 6, Page no.10,

EIA Chapter 3, 4, 10 (Environmental Management Plan, section 10.2.5.1)

The ESC activities will be strengthened focusing on Drinking water, Rain water harvesting, skill development, Education, Health and Improvement of basic amenities. An amount of Rs.190 lakhs (0.75%) earmarked for the following ESC activities for the surrounding villages as per New MoEFCC OM dated 1-05-2018 and its amendment on 19-06-2018 regarding the Corporate Environment Responsibility (CER).

We have already planted 4000 nos. of trees in existing and expansion area during “Harita Haram” conducted by Telangana Government in 2017. In this rainy season we have started plantation in the greenbelt area all around the expansion boundary with 10 m width and other greenbelt areas in the expansion project.

Page 54: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.54 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

7.a.7: Project Proponent Response to Public Hearing Representations with Action Plan

Representations received during the Public Hearing Sl. No.

Representation given by with date and Content of the representation Industry Response Action Plan

1 Sri Vivekananda Environment Organization:

Banothu Balu Naik, State Convinor,

Date: 03-03-2018

Support to the expansion project by suggesting to take appropriate measures for controlling Air & Water pollution and also Support for village development.

We welcome his suggestion.

• Existing industry is operating will all necessary pollution control equipment. We regularly ensure to comply with the consent conditions issued by TSPCB.

• An additional amount of Rs. 2605 lakhs are earmarked in our expansion proposal towards Environmental Management Plan with an estimated recurring cost of Rs. 2050 lakhs.

• We will ensure to operate all required pollution control equipment and reduce the pollution within the regulatory standards.

• We also proposing 10m width greenbelt all around the expansion boundary wall and other greenbelt areas (33% area) for further reducing the pollution if any.

• As we already providing employment to the educated and un-educated local people and it will be continued after expansion of the project.

• We will consult local surrounding villages for their requirement to spent CER budget on phase wise manner.

We have already planted 4000 nos. of trees in existing and expansion area during “Harita Haram” conducted by Telangana Government in 2017. In this rainy season we have started plantation in the greenbelt area all around the expansion boundary with 10 m width and other greenbelt areas in the expansion project. We will install best pollution control equipment for Air, Water on obtaining the CFE from TSPCB. After installation only we will obtain the Consent for Operation from TSPCB for expansion project. We will install online monitoring systems on the exhaust of Boiler flue gas and ETP-ZLD outlet to know the status of treatment within the standards. Also will install the online VOC monitor at ware houses, production block and at the entrance and these online monitoring systems will be connected to TSPCB and CPCB as per guidelines. We will submit the 6 monthly status of Environmental Clearance conditions to MoEFCC (online) on obtaining the EC from MOEFCC. In first year we will provide the RO drinking water

Page 55: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.55 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

facility and Rain Water harvesting pits and tanks at the surrounding villages in consultation with local villages. On obtaining CFE from TSPCB, we will discuss with the local village people and start the HR process for employment opportunities in our expansion project for various positions with required qualification and experience required for construction, errection and commissioning etc.,. The ESC activities will be strengthened focusing on Drinking water, Rain water harvesting, skill development, Education, Health and Improvement of basic amenities. An amount of Rs.190 lakhs (0.75%) earmarked for the following ESC activities for the surrounding villages as per New MoEFCC OM dated 1-05-2018 and its amendment on 19-06-2018 regarding the Corporate Environment Responsibility (CER).

2 National Environment & Mines, Ground Water Protection Committee (NGO) :

Thota Hussain Naidu (NGO)

Date: 28-02-2018

Support to the project expansion and suggested to take appropriate measures to control air pollution, also conduct Haritha haram programs for environment protection. CSR funds shall be expended for the development of surrounding villages.

We welcome his suggestion.

We are developing the Greenbelt with local native species as per CPCB guidelines.

We are proposing ETP with Zero Liquid Discharge (ZLD) for our expansion project. Treated effluent will be reuse in Cooling towers and Boilers.

We will support the local villages with CER funds.

Same as point no. 1

Same as point no. 1 (above) of industry response to the representation

Page 56: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.56 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

3 Disha Service Heights Voluntary Organization (NGO):

P. V. Sudhakar Rao (Co-ordinator) Date: 13-03-2018 Support to the expansion of project and suggested to develop green belt in the industry and provide special workers for maintainance. Skill development centres should be provided for unemployed youth.

We welcome his suggestion.

Same as point no. 1

Same as point no. 1 of industry response to the representation

4 V. Sunanda Reddy, Environmentalist:

Date: 17-03-2018 Supported to the project expansion and requested the panel committee to recommend to the ministry to grant clearance unconditionally. He also suggested the following 1) May include in the report on the Health

status, Agriculture status and water table status around 10 km radius.

2) Out of 104 acres land for expansion, rain water will be 31 crores liters. In which 6 crores liters will convert into ground water. Industry required to use 20 crore liter per annum. To reduce this effect on ground water, store the rainwater and reuse in industry.

3) Provide water harvesting structures in and around the villages to improve the ground water level

4) Providing 33% green belt is good. However explore the possibilities of

We welcome his suggestion.

Details of Socio economy, Flora, Fauna, Hydrology status in 10 km radius study area is given in EIA report as Baseline Environment.

Rain water harvesting details:

Quantity of Rainfall per annum in industry from 42 Ha (104 acres) will be 35.22 Crores liters. Out of which quantity of Runoff will be 14.17 Crore liters which will be collected in proposed 3 nos. of Rainwater harvesting tanks of each 25 lakh liters ie., total capacity of 75 lakh liters. This water will be used back in industry after necessary treatment.

Other response is same as point no. 1 of Public representations

Same as point no. 1 of industry response to the representation

Page 57: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.57 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

developing the green cover upto 45% to 50% so as to achieve environmental sustainability.

5) Take up plantation in surrounding villages also to promote greenery.

6) Also provide avenue plantation on the road side of surrounding villages.

7) Select the fruit bearing trees and Medicinal value plants on top priority.

8) Preference to local people for employment in the project.

9) Provide skill development training to the unemployed youth in the adjacent villages.

10) Spend the CSR funds in consultation with Villagers and Govt. authorities.

11) Be a role model in protection of environment.

5

PLN Rao, Environment Social Activist

Date: 29-03-2018

Supported to the expansion of the industry. Suggested to provide skill development centers to local villagers so that they can work in the company.

We welcome his observations and suggestion.

• As we are already providing employment to the educated and un-educated local people and it will be continued after expansion of the project.

• We will consult local surrounding villages for their requirement including the Skill development program before spending the CER budget on phase wise manner.

Same as point no. 1 of industry response to the representation

6 Right Way Global Organization: S. Chandrasekhar, President 31-03-2018 Supported to the expansion without causing

We welcome his suggestion.

Same as point no. 1 of industry response to the representation

Same as point no. 1 of industry response to the representation

Page 58: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.58 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

danger to surrounding environment and suggested the following a) Increase the Greenbelt area to control the

Pollution. b) Provide ETP plant to prevent the Ground

water contamination. c) Employment opportunities for the locals

only. d) Provide drinking water and road facilities to

the surrounding villages. e) CSR funds should be used in affected

areas only. f) Skill development centres should be

provided for unemployment youth. He requested the MoEF&CC to grant clearance to the project.

7 Sadguru Ramakrishna paramahamsa Rural Development Society: B.V. Reddy (NGO) Date: 31-03-2018 Supported to the expansion of project.

We welcome his suggestion.

--

8 Integrated Rural Development Society (IRDS):

V. Ramesh Environmental volunteer Date: 05-06-2018 Support to the proposed expansion of the project and advised a) Take proper steps not to release pollution

in to environment from the company as per government norms.

b) CSR funds should go through village committees for the development of

We welcome his suggestion.

Same as point no. 1 of industry response to the representation

Same as point no. 1 of industry response to the representation

Page 59: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.59 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

villages. c) Conduct health camps to the village

people and d) We wish to go greenery surrounding the

company. 9 Rural Environment Education and Health

Awareness Society: H. Madhu babu (Environmental volunteer) Date: 08-06-2018 Support to the project expansion and suggested • Take health status of village people in

10kms radius. • Also requested to take crop production

details from near agricultural lands. • Provide Rain water harvesting system. • Utilize waste water to plantation,

sprinkling on roads to control the dust pollution.

• Requested to increase green belt 50% from the 33%.

• Take up the plantation on village road sides with fruit baring and medicinal value trees.

• Employment preference to local people first and conduct skill development programs for youth so that they can work in other industries too.

• Conduct medical camps • Provide drinking facility and good

education to near villages. • Main all roads of near villages. • Spend CSR funds through village

coordination committee, Govt. officials

We welcome his suggestion.

Same as point no. 1 of industry response to the representation

Same as point no. 1 of industry response to the representation

Page 60: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.60 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

and company people by identifying necessary target oriented works.

He requested the MoEF&CC to grant clearance to the project.

10 Front Line-Environment-Safe Guard Society: P. Ranjith kumar (Chief Secretary) Date: 07-06-2018 Supporting the project expansion and requested the MoEF&CC to grant clearance to the expansion project.

We welcome his suggestion.

--

11 Sri Vamshi Arts Academy Social voluntary organization C. Shekar Date: 08-06-2018 Support to the project expansion and suggested to increase green belt area and to provide employment to local villagers.

We welcome his suggestion.

Same as point no. 1 of industry response to the representation

Same as point no. 1 of industry response to the representation

12 Y. Chenna Kesava Reddy (social activist) Date: 08-06-2018 Support to the project expansion and suggested 1. CSR funds should be expended to local

villagers. 2. Plantation should be increased to 33%. 3. Provide employment to local villagers and 4. Provide the ETF plant

We welcome his suggestion.

Same as point no. 1 of industry response to the representation

Same as point no. 1 of industry response to the representation

13 Rural Environment Education and Health Awareness Society

Date: 08-06-2018

Double time submission (same as point no. 9 in representations received)

--

Page 61: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.61 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

14 Sasya Syamala Integrated Rural Development Society

Date: 08-06-2018

Support to the project expansion and suggested

a) To develop 33% green belt b) Develop water pits to develop ground

water. c) CSR activities should carry to the affected

areas. d) requested the MoEF&CC to grant

clearance to the project

We welcome his suggestion.

Same as point no. 1 of industry response to the representation

Same as point no. 1 of industry response to the representation

15 Sadguru Ramakrishna Paramahamsa Rural Development Society (NGO)

Date:08-06-2018

Double time submission (same as point no. 7 in representations received)

--

16 Right Way Global Organization

Date: 08-06-2018

Double time submission (same as point no. 6 in representations received)

--

17

Mother Organization (NGO) A. Mattaiah Date: 08-06-2018 • Employment preference to local villages. • Adopt the neighboring villages and

provide Education, Medical and Health protection programs and protect the environment.

• Provide safety equipment, Medical facilities for the employees.

• Spend CSR funds to the surrounding villages only

We welcome his suggestion.

Same as point no. 1 of industry response to the representation

Same as point no. 1 of industry response to the representation

Page 62: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.62 KKB Envirocare Consultants Pvt. Ltd., Hyderabad

7.a.8 Public Hearing (08-6-2018) Photographs M/s AVR Organics Pvt. Ltd.,

Yawapur & Maddikunta (V), Sadasivpet (M), Sanga Reddy District, Telangana State

Page 63: AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional ...environmentclearance.nic.in/writereaddata/Public Hearing... · AVR Organics Pvt. Ltd., – EIA Report Chapter 7: Additional

AVR Organics Pvt. Ltd. – EIA Report Chapter 7: Risk Assessment & DMP

________________________________________________________________________________ 7.63 KKB Envirocare Consultants Pvt. Ltd., Hyderabad