Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12, 2005

Upload: dylan-mills

Post on 18-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,

Background information of Party(EU)’s R&D on TBM and breeding blankets

Compiled and Presented by

Alice Ying

TBM Costing Kickoff MeetingINL

August 10-12, 2005

Page 2: Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,

EU R&D program on breeding blankets & TBM

(HCPB and HCLL) Fabrication Technologies* Ceramic breeder and Be multiplier pebbles development Pebble beds testing and modeling Tritium control and extraction technologies Tritium cycle modeling PbLi characterization in blanket environment

(compatibility with Eurofer, H solubility/diffusivity, etc.) PbLi Magneto-HydroDynamics Ancillary systems development (He cooling, PbLi loops) Instrumentation development TBM functional tests prior to ITER* Structural Material (EUROFER) development

Page 3: Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,

Basic R&D

Page 4: Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,

TBM functional tests prior to ITER

• Sub-components testing – He manifold, FW heat transfer, BU, box

structure, TRIEX, etc.

• Functional tests on ¼ or 1/3 prototypical mock-ups

• Existing He, PbLi test facilities

• Development of future He, PbLi test facilities

Topics that covered:

Page 5: Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,

He flow distribution in Back Manifold (GRICAMAN) Half size of TBM

Heat transfer/ extraction in First Wall (HETRA)- Verification of transf. coef.- Instrumented full size FW channels

Test of a 1:1 HCPB Breeder Unit (KABUCO)- Fabrication qualif.- Engineering tests

Test of a FW mock-up- Fabrication qualification- Cycling/endurance tests- 1:3 TBM size

Testing of 6-cells box structure (SICEMO)- Fabrication qualification- Flow/temperature distrib.- Thermomechanics

TBM sub-components testing/qualification

Test of a 1:1 HCLL Breeder Cooling Unit (DIADEMO)-Fabrication qualification-Engineering test

Page 6: Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,

TBM functional tests on prototypical mock-ups

6-cells functional mock-ups (breeder units not shown)

• HCLL and HCPB separately• TBM scaling range: [1:4 –1:3]• Functional tests including

thermo-mechanics, hydraulics (He and liquid metals), H isotope permeation & extraction, instrumentation, etc.

1:1 TBM prototypical mock-up• “Highly recommended”• Fabrication qualification • He flow qualification • Thermo-mechanical test of box

structure • Validation of tests procedures in ITER• Test not envisaged before 2009-2010

Page 7: Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,
Page 8: Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,

The HELOKA-HP/TBM high pressure Helium loop

• EU has launched the construction of the He loop facility (HELOKA-HP/TBM) for testing full scale TBM prototypes under full thermal loading

• HELOKA design parameters: Q =1.8 kg/s, P= 10 MPa, Tmax= 550oC

• Construction: 2006-2008

• Operation: 2009

Page 9: Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,

The European Breeder Blanket Test Facility (EBBTF)

LiPb Loop for EBBTF HeFUS3 upgrade for EBBTF

Upgrade of the HeFUS3 He loop up to Q = 1.35 kg/s (presently 0.35 kg/s), 530°C, 10.5 MPa

On-going fabrication of PbLi loop (up to 1:1 TBM scale for PbLi flow rate (Qmax =1.1 m3/h) for EBBTF)

Page 10: Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,

“When costing we should differentiate those of potential US’s contribution from that already being addressed by other parties”

Page 11: Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,

Ferritic Steel Manufacturing R&D (EU)

A. Fabrication of plate components with internal cooling channels (FW, Cooling Plates, Stiffening Grid, Covers)– Definition of reference plates fabrication processes (diffusion

bonding) with suitable dimensional (channel cross section) and mechanical (mechanical properties at the joint) characteristics; heat treatment definition

– Qualification of diffusion welded joints (un-irradiated and irradiated)– NDE definition and capability demonstration– Mock-ups testing under ITER and DEMO relevant conditions

B. Box assembly by welding of plates components (including collector system)– Definition of welding techniques and parameters (TIG, laser, EB)– Modelling of the deformation– Definition of an assembly sequence (minimization of the structure

deformation, feasibility, cost)– Definition of suitable Post Welding Heat Treatment– Qualification of welds (un-irradiated, irradiated)– NDE

Page 12: Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,
Page 13: Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,
Page 14: Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,
Page 15: Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,
Page 16: Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,
Page 17: Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,