7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
1/36
Company
LOGO
electrical - electronic
Electronic Report of Basic Subjects
Group 2
Students:
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
2/36
Content
I.The Electric Map and
Circuits on family
III. Motor 3 phase and motor 1 phase
VI.Control circuit
II. Power supply cord connection and
V.O.M
V.Measurement And Control Fan
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
3/36
I.The Electric Map
1.Layout diagram
1.Layout diagram 2.Schematic diagram
2.Schematic diagram 3.Wiring Diagram
3.Wiring Diagram
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
4/36
1.Layout diagram
Funtion:Locate loads
KWh
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
5/36
2.Schematic diagram
Includes circuit:- Three Phase Transformer
6KVA/0.38KV- Single phase electric meters- CB- 2 Fuses- 2 Switch- 2 Light,2 socket (10A,20A)
6KV 0,38KV
10KVA3 4
KWh
KWh
CB 30A
R
R
R
R
R
K1
K2
K3
10A
20A
1~40
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
6/36
3.Wiring Diagram
6KV/ 0,38KV
10A 20A
KWh
1~40
- 4 light
- 2 switch
- 2 socket
- Single phase electric meters
- 5 Fuse
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
7/36
- System have wire mass
- Wire on plastic pipe
- Socket distance land 1.3m
- Pile resistance < or = 4 om
Note
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
8/36
Circuits on family
Includes circuit:
- 1 light
-1 switch
-2 socket
- 1 Fuses
- CB
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
9/36
Includes circuit:
- 1 light
-1 switch
- 1 Fuses
- CB
-Socket
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
10/36
II. Power supply cord connection and V.O.M
1.Power supply cord connection
a. direct connection (communication connection head)- Crossed the wire 2 A and B (already broaching the shell and cleaned)
should join together
- A wire wound on the body B (close to around 10 rounds each)
- B winding wire on the body A (close to each other about 10 rounds)
Use pliers to tighten connections.
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
11/36
b. Branch connections (T-connector):
- Place the wire A wire is perpendicular to the body B (the shell hasbeen grooming and cleaning).
- Wrap the wire A wire around the body behind the head string B of A,
the first wire wrap
- A round wire A to the front lines A and B wire wound on the body
for about 7 to
10 ring-side.
- Use pliers to tighten connections again
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
12/36
c. Lead solder- Plug the burner to reach maximum temperature.
- Clean the surface with sandpaper connection.
- Resin dots on the burner (the burner cleaned by acid in the resin).
- Place the burner at an angle of 45 joints dovoi about 3 to 5 minutes
(depending on the type of burner 40W or 60W) for connection to heat up.
- How to put lead solder burner 1 to 2 mm for lead free flowing around thejoints.
- Connect the burner to reach maximum temperature.
- Rats need to shell the string si.
- Clean the surface of the wire.
- Resin dots on the burner (the burner cleaned by acid in the resin).
- Place the burner at an angle of 45 dovoi the wire about 3 to 5 minutes
(depending on the type of burner 40W or 60W) for the wire to heat up.
- How to put lead solder burner 1 to 2 mm for lead free flowing around the
wire.
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
13/36
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
14/36
2. VOM- Meters VOM meter is called universal because it does much
use.
- VOM meter can measure currents, voltages, resistance. In addition, the
- VOM can be used for Testing Transistor, determine the polarity of the
diode ...
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
15/36
-Elevator (A): Calibration for Ohm (-0 from right to left as the -).- Elevator (B) and (C) dividing the Volt, Ampere DC, AC
(DC.VA & AC.V) left to right, the maximum number of 0.
- Scale (D) read Trasistor amplification factor (HFE = Ic / Ib).- Elevator (E) and uterus (F): read current polarization upon or against
(leakage) of
Diode.- Scale (G): one is to read the leaked ICEO of transistors
** Practices
1.Voltage measurements:
- When you want to measure voltage alternating current (AC) or DC
(DC), we adjust
switch on the meter of the measuring period is denoted AC.V or DC.V
- Select appropriate measurement period (larger) with a voltage to be
measured.
- Install parallel to the clock source to be measured.
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
16/36
-Read the voltage value measured on this scale.
+ 10 volt scale: each bar is 0.2 units.
+ 50 volt scale: each bar unit LA1.
+ 250 volt scale: each bar is 5 units.
For example: choose period, we measured 250 index on the scale read 250
AC.V.
Note: - When measuring AC voltage, attention select appropriatemeasurement range, avoiding- choose smaller voltage range to be measured or choose another
measurement range
voltage measurement.2. DC current measurement:
-- When you want to measure DC DC (DC), we adjust the switch onclock period of measurement is denoted DC.mA
- Select the period to match the measured current to be measured.
- Install with the serial clock source to be measured.
- Read the voltage value measured on the scale corresponds to the range
measured.
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
17/36
3. Testers- When you want to measure the electrical resistance R, we adjust the
switch on the measuring range is denoted
.
- Choose a suitable measuring range resistor to be measured.
- Chap 2 measuring stick together and adjust the knob for the needle 0
standards.- Put the rod 2 measured in the first two resistors to be measured.
- Read the index measured on the scale corresponds to the range
measured.
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
18/36
III Motor 3 phase and motor 1 phase
1. Testers heat engine
Step 1: Measure R insulation (check for shells being touched or not)> 1 mg
- If the first measure in turn the AX, BY, CZ with shell insulation resistance> 1 mg
shall meet the requirements => do not touch the shell => machine operating
conditions
Step 2: Measure R (coil resistance) AX, BY, CZ are equal
- Measure the pairs AX and determine the resistance of the coil day.Sau it shall bethe same for the pair BY, CZ
- Case 1:
1. Voltage coil 3 is measured at several volts, the coil (I, II) will have the
following: A_X_B_Y
2.Neu measuring coil 3 is the U = 0V (X_Y) first rolled coil connecting the 2nd
strategy was as follows: A_X_Y_B-Case 2: After measuring the change determined before the 3rd roll to roll 1 or roll
2 rolls to determine the remainder of the 3rd roll
* Experimental:
Scroll I: 1-4
Scroll II :2-5
Scroll III :3-6
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
19/36
U = 0vV
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
20/36
2.3-phase motor conector
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
21/36
Motor 3 phase Xung shun
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
22/36
Picture of motor 3 phase
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
23/36
Y 900
A 1050
E 1200
B 1300
F 1550
H 1800
C >1800
*INS:insclass
*S.F: service factor
*Frame:- structural parameters, such
as structure height of the motor shaft
from the floor, the distance of the axisof the fixed point the base installation.
- example:Engine Frame: 215, then
we get the first two numbers divided 4
so 5 * 1 / 4, this is the height of the
shaft from the floor and 5 are set
distance from a fixed point on the axis
of the base (inch )
* U1U2=W1W2=V1V2
*
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
24/36
3. 1-phase phase motor conector
S. W : stort winding
R. W: run winding
RR. W > RS. W
Experimental: RR. W = 50V, RS. W =20V
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
25/36
Picture of motor 1 phase
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
26/36
VI. Control circuit
1. Components in control circuits
a.CB
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
27/36
b.Contactor
NC(normally closed):0
NO(normally opened):
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
28/36
c.Thermal relay
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
29/36
d. Time relay
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
30/36
2.Control Circuit
a. Jumpstart circuit Direct Engine 3 Phase Asynchronous
Step 1: Close CB
Step 2: Press FOR
Step 3: Test Machine Runs And then OFF Press
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
31/36
b. Boot directly Asynchronous Motor 3 Phase reversal Back
Step 1: Close CB
Step 2: Press FOR
Step 3: Press OFF and note direction of rotation of
the engine REV Then click Back to make
comparison engine => press OFF to stop engine
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
32/36
c. Motor starter circuit / of asynchronous three-phase relay time
Step 1:close CB
Step 2: Adjustment time relay 3 to 5 seconds
Step 3:press FOR after 3 seconds of the transfer
Step 4: press OFF
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
33/36
d. Change Speed circuit 3-phase motor
Step 1:close CB
Step 2: press FOR
Step 3: Mt press, engine performance at low speeds,
the stator windings of the motor's auction
Step 4: Mc Press, engine performance at high
speeds, the stator windings of the motor's auction=> Press OFF to stop engine
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
34/36
Requirements:
- determine the correct position of the Closing Next, Open Your Contactor,
Thermal relay, buttons
- Check Point Next Good Or Not There
- Connect the wires in place
- Electrical Inspection Before Closing
- Connect and notice how
- Control relay time
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
35/36
-
7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748
36/36
V. Measurement And Control Fan
1. Map here of a Phase Electric Fan
Requirements: - Determine the wire- Investment in Title Roll
- Fan runs
Step 1: Wire played by 2 first, determine R4-R5 = Rmax
Step 2: 3 wire connection head left and measurement with R4, R5
will determine R4, R5 (R5> R4)
Step 3:Measure R4 top line top line with 3 remaining, define R1, R2, R3 (R1 >R2 >R3 )
The End